03 public transport

23
Urban Urban Transport Transport Public Transport Riza Atiq bin O.K. Rahmat

Upload: universiti-kebangsaan-malaysia

Post on 20-Jun-2015

427 views

Category:

Business


1 download

DESCRIPTION

slide for urban transport course: http://www.eng.ukm.my/riza/UrbanTransport/UrbanTransport.htm

TRANSCRIPT

Page 1: 03 public transport

Urban TransportUrban TransportPublic Transport

Riza Atiq bin O.K. Rahmat

Page 2: 03 public transport

Rail based

• Mass Rapid Transit (MRT)• Light Rail Transit (LRT)• People Rapid Mover (PRT)

Page 3: 03 public transport

MRT• Speed – up to 100 km/hr• 4 – 12 couches per train• Couches 22m x 3.1 m • Capacity – up to 80,000 passengers / hr /

direction• Acceleration / deceleration ≈ 1.2 m/s2

• Rail – 1435mm gauge• Headway ≥ 120 s• Suitable for radial movement• For high density and high plot ratio area.• Feeder bus service is required• Power supply: 750 V dc• Sub-station: 3 – 5 km spacing

Page 4: 03 public transport

LRT• Speed – up to 40 km/hr• 2 – 6 couches per train• Capacity – up to 40,000 passengers / hr / direction• Acceleration / deceleration ≈ 1.2 m/s2

• Rail – 1000 or 1435mm gauge• Headway ≥ 120 s• Suitable for radial movement• For high density and high plot ratio area.• Feeder bus service is required• Power supply: 750 V dc• Sub-station: 3 – 5 km spacing

Page 5: 03 public transport

PRT• Speed – up to 30 km/hr• 2 – 4 couches per train• Capacity – up to 10,000 passengers / hr / direction• Rail – 1000 gauge or monorail• Headway ≥ 90 s• Suitable for intra-city travel

Page 6: 03 public transport

Transit Capacity

h

nSC p

3600

Cp = Theoretical passenger line capacity

n = vehicle per train  

S = Maximum passenger per vehicle 

h = headway in second

Page 7: 03 public transport

Operational design

h

nSC p

3600

α = guideway utilisation factor (0.6) = load factor (0.9)

Page 8: 03 public transport

ExampleExample

•City Hall of KL intends to provide a transit line to meet peak hour demand of 12,000 passengers/hr. Required speed = 35 - 40 km/hr. Minimum headway = 120s maximum headway = 240s. Guideway utilisation factor = 0.6 and load factor = 0.9s. Station platform limit = 10 vehicles. Vehicle capacity = 130 passengers.

Page 9: 03 public transport

h

nSC p

3600

12,000 = 3600 x 0.6 x 0.9 x n x 130 / h n = 0.04748 h

n (veh/train) h (headway (s)  1 21.06 2 42.12 3 63.18 4 84.24 5 105.30 6 126.36

Possible range  120 ≤ h ≤ 240 

7 147.428 168.489 189.54

10 210.60

Page 10: 03 public transport

Bus Service• Capacity = 12 - 240 passengers.• Flexible - Expansions and extensions

can be introduced easily• Transit systems using buses are

capable of carrying 2,400 to 15,000 passengers per hr per direction.

• Volume of up to 30,000 passengers per hr per direction can be achieved with special bus lane, off-line stations and multiple boarding platform.

Page 11: 03 public transport

Bus travel pattern• Radial service - sub-urban to CBD (Shuttle buses)• Ring road service to link up various sub-centres (Stage

buses)• Local travel service (Mini bus)• Special travel in the CBD (eg. tourism)• Travel service between activity centres (Shuttle of mini

bus).

Page 12: 03 public transport

Example of Bus Service Guidelines

Service pattern•Service major activity centres such as office buildings, school and hospital.•Provide 300 meters coverage where population density > 30. Serve at least 90% of the residents.•Space routes at about 0.75 km in urban area and 1.5 in sub-urban area.

Page 13: 03 public transport

Example of Bus Service Guidelines

Service Level

 •Service period : 6 am-12 pm•Headway: Peak: 5 minutes off-peak: 15 minutes

Page 14: 03 public transport

Example of Bus Service Guidelines

Bus Stop

•City centre: 5 -7 stops / km, •sub-urban: 1 - 3 stops /km

Page 15: 03 public transport

Example of Bus Service Guidelines

Passenger comfort

 •Passenger shelter•Route and destination sign•Driver courtesy

Page 16: 03 public transport

Bus Station

Passengers’ area (embark / disembark)

Bus holding area

Underground LRT station

Ca

r p

ark

Page 17: 03 public transport

Bus station above underground transit stationBus station above underground transit station

Page 18: 03 public transport

Bus Priority lane

The first stop line for regular traffic

The second stop line for buses

Special treatment for buses at intersection of Jalan Raja Laut and Jalan Sultan Ismail

Page 19: 03 public transport

Bus laneBus lane

Page 20: 03 public transport

Bus Operation DesignFrequency, f = n / N

 •n = Demand for service (passengers / hr)•N = Maximum number of passengers per bus

•Usually minimum headway is set in multiples of 7.5 or 10 minutes for the shake of coordination (or service frequency of 8, 6, 4 …. per hr)

Page 21: 03 public transport

ExampleA bus service is planned between Bangi and Putrjaya, a distance of 20 km. The operating time is 45 minutes. Estimated demand is 500 passengers/hr. 45-seater buses will be used, which can accommodate 20 standees. Design basic system and determine the fleet size. Maximum headway is 30 minutes and the minimum terminal time is 5 minutes.

Page 22: 03 public transport

Solution:• Operating speed v = 60L/t

= 60 x 20 / 45 = 26.67km/hr  • headway, h = 60(45 + 20)/500 = 7.8 min (adopt 7.5 min.)• Cycle time, T = 2 (45 + 5) = 100 • Fleet size, N = T / h = 100 / 7.5 = 14 vehicles• Revised cycle time, T'= N x h = 14 x 7.5 = 105 min• Revised terminal time = (T' - 2 travel time)/2

= (105 - 2 x 45)/2 = 7.5 minutes• Commercial speed = 20 / (105 / 60 / 2) • = 22.86 km/hr

Page 23: 03 public transport

TerimakasihhTerimakasihhThank youThank you