dan bin Abdul Aziz B050810281 i Leh Ung B0508 Ching B050 t Amir B05 SCHEDULING (Part II) 1

Upload: blanche-ross

Post on 01-Jan-2016

247 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

1

Mohd Zaidan bin Abdul Aziz B050810281Grace Hii Leh Ung B050810211Low Mei Ching B050810215Sawita bt Amir B050810051

SCHEDULING (Part II)

Page 2: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

2

1. Shortest Processing Time (SPT) Minimizes the mean flow time Minimizes waiting time Minimizes lateness for single-machine sequencing.2. Earliest Due Date Scheduling Minimizes the maximum lateness

4.4 Sequencing Theory for Single Machine

Page 3: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

3

3. Moore’s algorithm Minimizes number of tardy jobsStep 1:Sequence the jobs according to the earliest due date to obtain the initial solution

Step 2:Find the first tardy job in the current sequence, say job [i]. If none exists go to step 4.

4.4 Sequencing Theory for Single Machine

d[1] d[2],…, d[n]

Page 4: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

4

Step 3:Consider jobs [1], [2], …, [i]. Reject the job with the largest processing time. Return to step2.

Step 4:Form an optimal sequence by taking the current sequence and appending to it the rejected jobs. The job appended to the current sequence scheduled in any order.

Reason: Consider number of tardiness jobs rather than tardiness

Reason: Largest effect on the tardiness of the Job[i]

4.4 Sequencing Theory for Single Machine

Page 5: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

5

Job 1 2 3 4 5 6

Due date 15 6 9 23 20 30

Processing time 10 3 4 8 10 6

Job 2 3 1 5 4 6

Due date 6 9 15 20 23 30

Processing time 3 4 10 10 8 6

Completion time 3 7 17 27 35 41

EXAMPLE 1:

Solution:

Longest processing time

4.4 Sequencing Theory for Single Machine

Page 6: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

6

Job 2 3 5 4 6

Due date 6 9 20 23 30

Processing time 3 4 10 8 6

Completion time 3 7 17 25 31

EXAMPLE 1: Solution (cont.) Longest processing time

Job 2 3 4 6

Due date 6 9 23 30

Processing time 3 4 8 6

Completion time 3 7 15 21

Optimal sequence: 2, 3, 4, 6, 5, 1 or 2, 3, 4, 6, 1, 5Number of tardy jobs is two in either case.

No lateness

4.4 Sequencing Theory for Single Machine

Page 7: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

7

Exercise 4.4.1:Seven jobs are to be processed through a single machine. The processing times and due dates are given below.

Job 1 2 3 4 5 6 7

Processing time 3 6 8 4 2 1 7

Due date 4 8 12 15 11 25 21

Determine sequence of the jobs in order to minimize a) Mean flow timeb) Number of tardy jobsc) Maximum lateness

Page 8: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

8

4. Lawler’s Algorithm Minimize maximum lateness Minimize maximum tardinessSubject to precedence constraint ( certain job must be completed before other jobs can begin)

)(maxmin1

iini

Fg

iiiii LdFFg )(

)0,max()( iiii dFFg

4.4 Sequencing Theory for Single Machine

Page 9: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

9

Rule:Schedule job in reverse order. Step 1:At each stage, determine the set of jobs (named V) not require to precedes any other. Among set V, choose job k that satisfies:

n

i i

ivi

k

t

gg

1

))((min)(

Example: Job among V that has smallest tardiness, if arranged on position [n].

Processing time of current sequence.

4.4 Sequencing Theory for Single Machine

Page 10: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

10

Step 2:Now, Job k scheduled last. Consider remaining jobs and again determine set of jobs that not require to precede any other remaining job.Step 3:

After scheduling Job k, τ reduced by tk and job scheduled next to last is now determined.Step 4:Process is continued until all jobs are scheduled.

4.4 Sequencing Theory for Single Machine

Page 11: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

11

1 2 3

4 5

6

Job 1 2 3 4 5 6

Processing time 2 3 4 3 2 1

Due date 3 6 9 7 11 7

EXAMPLE 2:

4.4 Sequencing Theory for Single Machine

Page 12: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

12

Solution:Step 1: Find the job scheduled last(sixth)

Job 1 2 3 4 5 6

Processing time 2 3 4 3 2 1

Due date 3 6 9 7 11 7

τ = Total processing time = 2+3+4+3+2+1 = 15

Job 3 5 6

Tardiness 15-9=6 15-11=4 15-7=8

Min value

Hence, Job 5 scheduled last

4.4 Sequencing Theory for Single Machine

Page 13: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

13

Solution: Cont.Step 2: Find the job scheduled fifth.

1 2 3

4 5

6

Job 1 2 3 4 6

Processing time 2 3 4 3 1

Due date 3 6 9 7 7

τ = New total processing time = 15 – 2 = 13

Job 3 6

Tardiness 13-9=4 13-7=6

Min valueHence, Job 6 scheduled fifth.

4.4 Sequencing Theory for Single Machine

Page 14: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

14

Solution: Cont.Step 3: Find the job scheduled fourth.

1 2 3

4 5

6

Job 1 2 4 6

Processing time 2 3 3 1

Due date 3 6 7 7

τ = New total processing time = 13 – 4 = 9

Hence, Job 6 scheduled fourth.

Job 2 6

Tardiness 9-6=3 9-7=2

Min value

4.4 Sequencing Theory for Single Machine

Page 15: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

15

Solution: Cont.Step 4: Find the job scheduled third.

1 2 3

4 5

6

Job 1 2 4

Processing time 2 3 3

Due date 3 6 7

2 4

Tardiness 8-6=2 8-7=1

τ = New total processing time = 9 – 1 = 8

Hence, Job 4 scheduled third.Min value

4.4 Sequencing Theory for Single Machine

Page 16: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

16

Solution: Cont.Step 5: Find the job scheduled second.

1 2 3

4 5

6

Job 1 2

Processing time 2 3

Due date 3 6

Job Processing time

Flow time Due date Tardiness

124635

233142

2589

1315

36779

11

001244

The optimal sequence: 1-2-4-6-3-5

Maximum tardiness

4.4 Sequencing Theory for Single Machine

Page 17: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

17

Exercise 4.4.2:Eight jobs are to be processed through a single machine. The processing times and due dates are given below.

Furthermore, assume the following precedence relationships must be satisfied:

Job 1 2 3 4 5 6 7 8

Processing Time 2 3 2 1 4 3 2 2

Due date 5 4 13 6 12 10 15 19

2 6 3

1 4 7 8

Determine the sequence in which jobs should be done in order to minimize maximum lateness subject to precedence restriction.

Page 18: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

18

• Analysis of the previous section which several jobs must be proceed on more than one machine.

•The optimal solution for scheduling n jobs on two machines is always a permutation schedule (that is, jobs are done in the same order on both machines).

•Permutation schedules provide better performances in term of both total and average flow time

• Minimization of the mean idle time in the system

4.5 Sequencing Theory for Multiple Machines

Page 19: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

19

• How to implement this rule:1. List value of A and B in to columns2. Find the smallest element in the 2 columns. If it appears in

column A, then schedule that at front of the sequence. If appears in column B, schedule that at the back of sequence

3. Find the remaining element in the two columns. If it appears on column A, then schedule that next job. If appears in column B, then schedule that job last.

4. Cross off the jobs as they are scheduled.

1. Johnson’s algorithm : Scheduling n jobs on two machines

4.5 Sequencing Theory for Multiple Machines

Page 20: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

20

EXAMPLE:• Five jobs are to be scheduled on two machines. The processing

time are:

Job Machine A Machine B1 5 22 1 63 9 74 3 85 10 4

Machine A A2 A4 A3 A5 A1

Machine B B2 B4 B3 B5 B1

0 1 4 7 13 15 22 23 27 28 30

2-4-3-5-1

4.5 Sequencing Theory for Multiple Machines

Page 21: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

21

Exercise 4.5.1: Six job are to be schedule on two machine. The processing time are

Job Machine A Machine B1 20 272 16 303 43 514 60 125 35 286 42 24

Page 22: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

22

2. Extension to three machine

• The 3 machine problem can be reduced to a 2 machine problem if the satisfied the following condition:min A ≥ max B or min C ≥ max B

• only either one of these conditions be satisfied. • Then reduced to 2 machine problem in the

following way:A’ = A + B and B’ = B + C

4.5 Sequencing Theory for Multiple Machines

Page 23: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

23

EXAMPLE:  Machine

Job A' B'

1 9 13

2 15 16

3 10 8

4 9 10

5 9 15

  Machine

Job A B C

1 4 5 8

2 9 6 10

3 8 2 6

4 6 3 7

5 5 4 11

Min A = 4 Max B = 6 Min C = 6 1-4-5-2-3

Machine A A1 A4 A5 A2 A3

Machine B B1 B4 B5 B2 B3

180 9 63 7122 27 32 42 47 52

4.5 Sequencing Theory for Multiple Machines

Page 24: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

24

Exercise 4.5.2:The following four job must be processed through a three-machine flow shop

MachineJob A B C1 4 2 62 2 3 73 6 5 64 3 4 8

Page 25: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

25

3. Two job flow shop problem• Two jobs are processed through m machines.• Present graphical procedure for solving this problem. The step are:1. Draw a cartesian coordinate system with the processing times

corresponding the first job on the horizontal axis and the processing time corresponding to the second job on the vertical axis.

2. Block out areas corresponding to each machine at the intersection of the intervals marked for the machine on the two axes.

3. Determine the part from the origin to the end of the final block that does not intersect any of the blocks and that minimize the vertical movement.

4.5 Sequencing Theory for Multiple Machines

Page 26: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

26

EXAMPLE:

• A regional manufacturing firm produces a variety of household products. One is a wooden desk lamp. Prior to packing, the lamp must be sanded, lacquered and polished. Each operation requires a different machine. There are currently shipments of two models awaiting processing. The times required for the three operations for each of the two shipments are:

Job 1   Job 2

Operation Time   Operation Time

Sanding (A) 3 A 2

Lacquering (B) 4 B 5

Polishing ( C) 5   C 3

4.5 Sequencing Theory for Multiple Machines

Page 27: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

27

A1 A2

B1 B2

C1 C2

3

531 42 1196 7 8 10 12

1

2

4

5

7

9

6

8

10

B

A

C

2 4 6 8 10 12 14

C

BGantt Chart

Solution

A

Total time = 12 + 3 = 15

Total time = 12 + (2 + 2) = 16

4.5 Sequencing Theory for Multiple Machines

Page 28: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

28

3

531 42 1196 7 8 10 12

1

2

4

5

7

9

6

8

10

B

A

C Total time = 10 + 6 = 16

Total time = 10 + (3 + 2) = 15

2 4 6 8 10 12 14

C

BGantt Chart

Solution

A A1 A2

B1 B2

C1 C2

4.5 Sequencing Theory for Multiple Machines

Page 29: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

29

Exercise 4.5.3:Two jobs must be proceeds through four machines in same order. The processing time in the required sequence are

Job 1 Job 2Machine Time Machine Time

A 5 A 2B 4 B 4C 6 C 3D 3 D 5

Determine how the two job should be schedule in order to minimize the total makespan and draw the gantt chart indicating the optimal schedule.

Page 30: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

30

Line balancing: the process of assigning tasks to workstations in such a way that the workstations have approximately equal time requirements.

Line Balancing

Cycle Time

Cycle time: maximum time allowed at each workstation tocomplete its set of tasks on a unit. amount of time allotted to each workstation determined in advance, based on the desired rate of production of assembly line.

Maximum cycle time = summation of the task times.Minimum cycle time = the longest task times.

4.6 ASSEMBLY LINE BALANCING

Page 31: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

31

Introduction (cont.)Factors that contribute to the

difficulty of the problem:- There are precedence

constraints- Some tasks cannot be

performed at the same workstation

D

OT = timecycle = CT

CT

OT = D rate,Output

rateoutput desired = D

dayper timeoperating OT

4.6 ASSEMBLY LINE BALANCING

Page 32: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

32

• Assign tasks in order of most following tasks.

– Count the number of tasks that follow

• Assign tasks in order of greatest positional weight.

– Positional weight is the sum of each task’s time and the times of all following tasks.

Some Heuristic (intuitive) Rules:Line Balancing Rules

4.6 ASSEMBLY LINE BALANCING

Page 33: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

33

Precedence diagram: Tool used in line balancing to display elemental tasks and sequence requirements

A Simple Precedence Diagrama b

c d e

0.1 min.

0.7 min.

1.0 min.

0.5 min. 0.2 min.

Figure 4.6.1

Precedence Diagram

4.6 ASSEMBLY LINE BALANCING

Page 34: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

34

task timeof sum = tCT

t)( = N

Determine the Minimum Number of Workstations Required

What is the minimum number of workstations for the previous precedence diagram? (assume minimum cycle time)

mins 2.5 = t

35.2min 1

mins 2.5 = N

4.6 ASSEMBLY LINE BALANCING

Page 35: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

35

WorkstationTimeRemaining Eligible

AssignTask

RevisedTime Remaining

StationIdle Time

1 1.00.90.2

a, ccnone

ac–

0.90.2

0.2

2 1.0 b b 0.0 0.0

3 1.00.50.3

de–

de–

0.50.3 0.3

0.5

EXAMPLE:Arrange tasks shown in Figure 4.6.1 into 3 workstations.

Use a cycle time of 1.0 minute Assign tasks in order of the most number of followers

Solution

Idle time per cycle

4.6 ASSEMBLY LINE BALANCING

Page 36: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

36

%100*(N)(CT)

cycleper timeIdle = timeidle %

Efficiency = 100% – Percent idle time

Calculate Percent Idle Time

What’s the % idle time and efficiency for the above example?

%7.16%100*(3)(1.0)

0.5 = timeidlePercent

Efficiency = 100% - 16.7% = 83.3%

4.6 ASSEMBLY LINE BALANCING

Page 37: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

37

A manager wants to assign workstations in such a manner that hourly output is 4 units. Working time is 56 minutes per hour. What is the cycle time?

Cycle time = operating time/output rate= 14 min

EXAMPLE:

4.6 ASSEMBLY LINE BALANCING

Page 38: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

38

Assign the tasks above to workstations in the order of greatest positional weight.

Steps:1) Arrange the task in the decreasing order of positional weights.2) Find out the number of workstations

Number of workstations = = = 3.2 =4

timecycle

s task timeof sum

14

45

Task Task time

F 5

D 7

G 6

A 3

B 2

C 4

E 4

H 9

I 5

Arrange tasks in decreasing order of positional weight

Page 39: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

39

%64.19

%100*(4)(14)

11 = timeidlepercent

D=7

Cycle Time=14 min

F=5

G=6 A=3 B=2C=4 E=4

I=5H=9

14

Stati

on

I

II

III

IV

Page 40: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

40

A shop wants an hourly output of 33.5 units per hour. The working time is 60 minutes per hour. Assign the tasks using the rules:

a) In the order of most following task.b) In the order of greatest positional weight.

EXERCISE 4.6.1

4.6 ASSEMBLY LINE BALANCING

Page 41: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

41

EXAMPLE:

4.6 ASSEMBLY LINE BALANCING

Page 42: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

42

The job times & precedence relationship for this problem:

Task ImmediatePredecessor

Time

1 - 12

2 1 6

3 2 6

4 2 2

5 2 2

6 2 12

7 3,4 7

8 7 5

9 5 1

10 9,6 4

11 8,10 6

12 11 7

Page 43: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

43

Suppose that the company is willing to hire enough workers to produce one assembled machine every 15 minutes.

Sum of task time = 70 minutesMinimum no. Workstation = 70/15 = 4.67 5

Positional weight of task i: the time required to perform task i plus the times required to perform all task having task i ask a predecessor.

TASK POSITIONAL WEIGHT

1 70

2 58

3 31

4 27

5 20

6 29

7 25

8 18

9 18

10 17

11 13

12 7

TASK POSITIONAL WEIGHT

1 70

2 58

3 31

6 29

4 27

7 25

5 20

8 18

9 18

10 17

11 13

12 7

Arrange tasks in decreasing order of positional weight

Page 44: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

44

Rank the step in the order of decreasing positional weight:Assume C = 15 min

But, minimum possible No. of workstation = 5!!!This method is heuristic possible that there is a solution with 5 stationsUse C = 16 min

No. of stations decreases 16 %, cycle time increases 7%Assume production day = 7 hrsC = 15 daily production level = 28 units/assembly operation

Station 1 2 3 4 5 6 Total idle time

Tasks 1 2,3,4 5,6,9 7,8 10,11 12

Idle time 3 1 0 3 5 8 20

Station 1 2 3 4 5 Total idle time

Tasks 1 2,3,4,5 6,9 7,8,10 11,12

Idle time 4 0 3 0 3 10

Page 45: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

45

C = 16 daily production level = 26.25 units/assembly operationManagement have to determine whether the decline in the production rate of 1.75

units/day/operation is justified by the savings realised with 5 rather than 6 stations.

Alternative choice:Stay with 6 stations, but use C = 13 min

13 min: minimum cycle time with 6 stations. Why not 12 min???!!Production rate = 32.3 units/day/operationIncreasing No. of stations from 5 to 6 substantial improvement in the throughput rate.

Station 1 2 3 4 5 6 Total idle time

Tasks 1 2,3 6 4,5,7,9 8,10 11,12

Idle time 1 1 1 1 4 0 8

Page 46: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

46

EXERCISE 4.6.2

Consider the assembly line balancing problem represented by the figure above. Determine a balance for a. C = 20

4.6 ASSEMBLY LINE BALANCING

Page 47: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

47

1. Single machine Uncertainty of processing times Exact completion time of one or more jobs may not be

predictableObjective: Minimize expected average weighted flow

time. Job i precedes job i+1 if

4.7 Stochastic Scheduling 4.7.1 Static Analysis

where job times are t1, t2, …, tn and weights are u1, u2, …, ui.

Page 48: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

48

Jobi 1 2 3 4 5 6 7 8 9 10

Processing Time, ti 1 10 5 2 8 7 8 4 3 6

Importance weight, ui 3 2 1 1 4 2 3 3 2 4

Due date, di 10 20 15 10 10 25 15 25 10 20

4.7.1 Stochastic Scheduling: Static Analysis

EXAMPLE:

Find the optimal sequence that minimize expected average weighted flow time.

Page 49: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

49

Jobi ti ui ti/ui di Ci Ti

1 1 3 0.3 10 1 08 4 3 1.3 25 5 09 3 2 1.5 10 8 0

10 6 4 1.5 20 14 04 2 1 2 10 16 65 8 4 2 10 24 147 8 3 2.7 15 32 176 7 2 3.5 25 39 143 5 1 5 15 44 292 10 2 5 20 54 34

∑Ci = 237

∑Ti= 114

4.7.1 Stochastic Scheduling: Static Analysis

Solution:

Expected average weighted flow time = 237/10= 23.7

Page 50: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

50

2. Multiple Machine• n jobs are to processed through two identical parallel

machines. Each jobs needs to be processed only once on either machine.

• The objective is to minimize the expected makespan.• Parallel is different from flow shop problem.• In flow shop, jobs are processed first one machine 1

then on machine 2.• Then the optimal sequence is to schedule the jobs

according to LEPT (longest expected processing time first) opposite with the SPT rule

4.7.1 Stochastic Scheduling: Static Analysis

Page 51: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

51

Dynamic: Jobs arrive randomly over time, and decisions must be made on an ongoing basis as how to schedule those jobs.When jobs arrive shop dynamically over time, queuing theory provides a means of analyzing the results. Standard M/M/1 queue applies to case of purely random arrivals to single machine with random processing times.

4.7.2 Stochastic Scheduling: Dynamic Analysis

Page 52: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

52

Selection independent of job processing times Same mean flow times, but differ variance

flow timesSelection dependent of job processing times Job times realized when job joins the queue

rather than when job enters service SPT results lowest expected flow time.

4.7.2 Stochastic Scheduling: Dynamic Analysis

Page 53: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

53

4.8.1 FINITE CAPACITY PLANNING (FCS)FCS - jobs are being scheduled through a number of work centers, each with one or more machines.• jobs can pass each other or change their order as they are processed, depending on their priority.• a job can be split into two or more parts if this will facilitate scheduling

Advantage:-The addition of capacity improves completion dates of jobs & reduces waiting times.

Bottleneck: a work centre whose capacity is less than the demand placed on it & less than the capacities of all other resources.

4.8 ADVANCED TOPIC FOR OPERATIONS SCHEDULING

Page 54: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

54

Page 55: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

55

Batch operation:Job shop “shop”, “job”, “work center”Job “customer”, “patient”, “client”, “paperwork”Work centre “room”, “office”, “facility”, “skill specialty”

In a job shop, batch corresponds to what customer orders – can include one or several parts or items.

Each part or job is scheduled through the various machines & work centres according to the equipment & labour needed to process the job.

4.8.2 BATCH SCHEDULING

Page 56: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

56

Batch scheduling:• each batch flowing through a batch process typically moves along with many starts & stops, not smoothly – due to layout of batch process jobs or customers wait in line as each batch is transferred from one work centre to the next.

• batch scheduling problem: network or queues.

•Jobs or customers spend most of their time waiting in line – amount of time waiting varies with the load of the process

Page 57: 1. 1.Shortest Processing Time (SPT)  Minimizes the mean flow time  Minimizes waiting time  Minimizes lateness for single-machine sequencing. 2.Earliest

57

Thank You ^^