1/10 cjk imt 25, beijing, china tta pg707 status report cjk imt 25 beijing, china may 19, 2010...
TRANSCRIPT
1/10CJK IMT 25, Beijing, China
TTA PG707 Status Report TTA PG707 Status Report
CJK IMT 25
Beijing, China
May 19, 2010
CHUNG, Hyun Kyu (HK) ([email protected])
CJK-IMT25-xxx
2/10CJK IMT 25, Beijing, China
Introduction
PG707 Work Scope
Updates of Current Activities
Future Plans : PG707
3/10CJK IMT 25, Beijing, China
1. Introduction : PG707 Positioning
Mobile Communication Technical Committee(TC7)
Mobile Communication Technical Committee(TC7)
IMT-IMT-AdvanceAdvanceddPGPG
(PG701)(PG701)
IMT IMT WiBroWiBroPGPG
(PG702)(PG702)
Mobile Platform & Service PG(PG703)
WLANPG
(PG704)
Cognitive RadioPG
(PG705)
VHOPG
(PG706)
IMT IMT EvaluatioEvaluationnPGPG
(PG707)(PG707)
ToR (Terms of Reference) of PG707 – Evaluate for proposed RIT/SRIT of IMT-Advanced
Develop evaluation report / Submit evaluation report to ITU-R – Cooperate and coordinate with international/domestic standardization bodies related to evaluation
ITU-R WP5D, 3GPPs, IEEE 802, SDOs
ToR (Terms of Reference) of PG707 – Evaluate for proposed RIT/SRIT of IMT-Advanced
Develop evaluation report / Submit evaluation report to ITU-R – Cooperate and coordinate with international/domestic standardization bodies related to evaluation
ITU-R WP5D, 3GPPs, IEEE 802, SDOs
4/10CJK IMT 25, Beijing, China
2. PG707 Work Scope
Evaluation Targets3GPP LTE-Advanced
• Contributions from Individual Members(IM) for 3GPP self-evaluation.• PG707 internal evaluation to be harmonized with IM’s contributions.
IEEE 802.16m• Contributions from Individual Members(IM) for IEEE self-evaluation.• PG707 internal evaluation to be harmonized with IM’s contributions. (WG7028 under PG702 are preparing Self Evaluation as a proponent)
Evaluation ScopeFull scale evaluation for FDD /TDD of 802.16mFull scale evaluation for FDD of LTE-AdvancedConfirm performance reported by the proponent
5/10CJK IMT 25, Beijing, China
3. Activities on Evaluation
Submission of the preliminary evaluation reportsAs an IEG of WP5D, TTA PG707 submitted two preliminary evaluation reports on the candidate IMT-Advanced (s)RITs in the 7th meeting of WP5D.
• (5D/652) 3GPP LTE Release 10 & beyond (LTE-Advanced)• (5D/653) Based on IEEE 802.16
We focused on the simulation works• Cell spectral efficiency• Cell edge-user spectral efficiency• VoIP capacity
Our simulation results have similar values from proponent's self evaluation results which meet the minimum requirement of IMT-Advanced technology
6/10CJK IMT 25, Beijing, China
3. Activities on Evaluation
Drafting Group (DG) ActivitiesWe have organized two sub-DGs for developing the evaluation reports
• IEEE Sub-DG• LTE Sub-DG
The evaluation report will be made based on the contributions from IMsWe have conducted simulation works based on the simulation configuration presented in the proponent's self-evaluationAssessments by analysis and inspection are considered
• Verify the results based on the proponent’s self-evaluation and discussion results of the Correspondence Group of WP5D
7/10CJK IMT 25, Beijing, China
3. Activities on Evaluation
Schedule for developing the evaluation reports05 December 2009: 1st call for the evaluation results31 December 2009: Develop the initial preliminary evaluation reports29 January 2010: Finalize the preliminary evaluation reportsFebruary 10 2010: Submit the preliminary evaluation reports to ITU-R
30 April 2010: 2nd call to the participants for the final evaluation.28 May 2010: Finalize the final evaluation report02 June 2010: Submit the final evaluation report to ITU-R
8/10CJK IMT 25, Beijing, China
3. Activities on Evaluation
Participation in the 2nd workshop and meetingAs an IEG of WP5D, TTA PG707 participated in the following workshop and meeting
• IEEE 802.16 IMT-Advanced Evaluation Group Coordination Meeting (May 17, 2010, Beijing, China)
• 3GPP LTE-Advanced Evaluation Workshop (May 18, 2010, Beijing, China)
TTA PG707 presented on a status and final result of evaluation for two candidate IMT-Advanced (s)RITs.
9/10CJK IMT 25, Beijing, China
4. Future Plans : PG707
Finalization and submission of the final evaluation reports
As an IEG of WP5D, TTA PG707 will submit final evaluation reports on two candidate IMT-Advanced (S)RITs to the 8th meeting of WP5DFull scale evaluation (Analysis, Inspection, Simulation) including,
• Compliance template for services• Compliance template for spectrum• Compliance template for technical performance
Update the Simulation Results• Full buffer performance• Mobility performance
10/10CJK IMT 25, Beijing, China
www.tta.or.krwww.tta.or.kr