1/10 cjk imt 25, beijing, china tta pg707 status report cjk imt 25 beijing, china may 19, 2010...

10
1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) ([email protected]) CJK-IMT25-xxx

Upload: clement-barrett

Post on 14-Dec-2015

218 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: 1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) (hkchung@etri.re.kr) CJK-IMT25-xxx

1/10CJK IMT 25, Beijing, China

TTA PG707 Status Report TTA PG707 Status Report

CJK IMT 25

Beijing, China

May 19, 2010

CHUNG, Hyun Kyu (HK) ([email protected])

CJK-IMT25-xxx

Page 2: 1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) (hkchung@etri.re.kr) CJK-IMT25-xxx

2/10CJK IMT 25, Beijing, China

Introduction

PG707 Work Scope

Updates of Current Activities

Future Plans : PG707

Page 3: 1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) (hkchung@etri.re.kr) CJK-IMT25-xxx

3/10CJK IMT 25, Beijing, China

1. Introduction : PG707 Positioning

Mobile Communication Technical Committee(TC7)

Mobile Communication Technical Committee(TC7)

IMT-IMT-AdvanceAdvanceddPGPG

(PG701)(PG701)

IMT IMT WiBroWiBroPGPG

(PG702)(PG702)

Mobile Platform & Service PG(PG703)

WLANPG

(PG704)

Cognitive RadioPG

(PG705)

VHOPG

(PG706)

IMT IMT EvaluatioEvaluationnPGPG

(PG707)(PG707)

ToR (Terms of Reference) of PG707 – Evaluate for proposed RIT/SRIT of IMT-Advanced

Develop evaluation report / Submit evaluation report to ITU-R – Cooperate and coordinate with international/domestic standardization bodies related to evaluation

ITU-R WP5D, 3GPPs, IEEE 802, SDOs

ToR (Terms of Reference) of PG707 – Evaluate for proposed RIT/SRIT of IMT-Advanced

Develop evaluation report / Submit evaluation report to ITU-R – Cooperate and coordinate with international/domestic standardization bodies related to evaluation

ITU-R WP5D, 3GPPs, IEEE 802, SDOs

Page 4: 1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) (hkchung@etri.re.kr) CJK-IMT25-xxx

4/10CJK IMT 25, Beijing, China

2. PG707 Work Scope

Evaluation Targets3GPP LTE-Advanced

• Contributions from Individual Members(IM) for 3GPP self-evaluation.• PG707 internal evaluation to be harmonized with IM’s contributions.

IEEE 802.16m• Contributions from Individual Members(IM) for IEEE self-evaluation.• PG707 internal evaluation to be harmonized with IM’s contributions. (WG7028 under PG702 are preparing Self Evaluation as a proponent)

Evaluation ScopeFull scale evaluation for FDD /TDD of 802.16mFull scale evaluation for FDD of LTE-AdvancedConfirm performance reported by the proponent

Page 5: 1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) (hkchung@etri.re.kr) CJK-IMT25-xxx

5/10CJK IMT 25, Beijing, China

3. Activities on Evaluation

Submission of the preliminary evaluation reportsAs an IEG of WP5D, TTA PG707 submitted two preliminary evaluation reports on the candidate IMT-Advanced (s)RITs in the 7th meeting of WP5D.

• (5D/652) 3GPP LTE Release 10 & beyond (LTE-Advanced)• (5D/653) Based on IEEE 802.16

We focused on the simulation works• Cell spectral efficiency• Cell edge-user spectral efficiency• VoIP capacity

Our simulation results have similar values from proponent's self evaluation results which meet the minimum requirement of IMT-Advanced technology

Page 6: 1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) (hkchung@etri.re.kr) CJK-IMT25-xxx

6/10CJK IMT 25, Beijing, China

3. Activities on Evaluation

Drafting Group (DG) ActivitiesWe have organized two sub-DGs for developing the evaluation reports

• IEEE Sub-DG• LTE Sub-DG

The evaluation report will be made based on the contributions from IMsWe have conducted simulation works based on the simulation configuration presented in the proponent's self-evaluationAssessments by analysis and inspection are considered

• Verify the results based on the proponent’s self-evaluation and discussion results of the Correspondence Group of WP5D

Page 7: 1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) (hkchung@etri.re.kr) CJK-IMT25-xxx

7/10CJK IMT 25, Beijing, China

3. Activities on Evaluation

Schedule for developing the evaluation reports05 December 2009: 1st call for the evaluation results31 December 2009: Develop the initial preliminary evaluation reports29 January 2010: Finalize the preliminary evaluation reportsFebruary 10 2010: Submit the preliminary evaluation reports to ITU-R

30 April 2010: 2nd call to the participants for the final evaluation.28 May 2010: Finalize the final evaluation report02 June 2010: Submit the final evaluation report to ITU-R

Page 8: 1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) (hkchung@etri.re.kr) CJK-IMT25-xxx

8/10CJK IMT 25, Beijing, China

3. Activities on Evaluation

Participation in the 2nd workshop and meetingAs an IEG of WP5D, TTA PG707 participated in the following workshop and meeting

• IEEE 802.16 IMT-Advanced Evaluation Group Coordination Meeting (May 17, 2010, Beijing, China)

• 3GPP LTE-Advanced Evaluation Workshop (May 18, 2010, Beijing, China)

TTA PG707 presented on a status and final result of evaluation for two candidate IMT-Advanced (s)RITs.

Page 9: 1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) (hkchung@etri.re.kr) CJK-IMT25-xxx

9/10CJK IMT 25, Beijing, China

4. Future Plans : PG707

Finalization and submission of the final evaluation reports

As an IEG of WP5D, TTA PG707 will submit final evaluation reports on two candidate IMT-Advanced (S)RITs to the 8th meeting of WP5DFull scale evaluation (Analysis, Inspection, Simulation) including,

• Compliance template for services• Compliance template for spectrum• Compliance template for technical performance

Update the Simulation Results• Full buffer performance• Mobility performance

Page 10: 1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) (hkchung@etri.re.kr) CJK-IMT25-xxx

10/10CJK IMT 25, Beijing, China

www.tta.or.krwww.tta.or.kr