15ft rolling scaffold stair tower
TRANSCRIPT
15Ft Rolling Scaffold Stair Tower
PSV-502 - 5’ Tube Guard Rail PSV-502 - 5’ Tube Guard Rail
PSV-503 - 7’ Tube Guard Rail
PSV-530 - 42” Female Corner Guard Rail Post
PSV-540 - 42” S-Style Male Guard Rail Posts
PSV-917B - 7’ Top Rail for Internal Stair Unit
PSV-610B - 5’ x 6’4” Walk Thru Frame
PSV-303 - 7’x4’ Tube Cross Brace
PSV-920 - Internal Stair Unit w/
Handrails
PSV-919 - Internal Stair Unit Starter Bar &PSV-925B - Rolling Stair Tower Starter Step
PSV-130 - Socket Screw Jacks
PSV-SP-07 - 7’ x 9’’ Steel Decks
DIAGRAM
Need Help? Call 800-592-1718 www.ScaffoldExpress.com
Disclaimer: ScaffoldExpress.com recommends with all scaffold erection projects, that an OSHA certified Competent Person be on site to supervise any and all scaffold building, including that of Scaffold Stair Towers.
Toggle Pin PSV-112 locks the Upper Frame into the Coupling Pin
PSV-104
Insert Spring ClipPSV-113
into Coupling Pin
PSV-150 - 8” Locking Caster w/ 1 3/8” Stems
PSV-111 - Span Pins
PSV-520N - 5’ Guard Rail End Panel (Yellow)
PSV-RST-15