Page 1: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt

BP I,C&E CONFERENCE

ADVANCES IN COMPRESSOR SURGE DETECTION

John Platt & Jim McCraw

E&PTG - Houston

Page 2: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt

Northstar – HP CompressorStg 3-4 Diaph

“Bulb” “Box”

Page 3: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt
Page 4: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt

Northstar Update - Process - CODA

HP-B, 4th Stage - ESD (w/o 1-second delay), Aug 29, 2002

5225 NPT

4950 NPT

1.53

5.335.93

2.07

5.1934.894

1.0

1.2

1.4

1.6

1.8

2.0

2.2

2.4

2.6

2.8

3.0

3.2

3.4

3.6

3.8

4.0

4.2

4.4

0 10 20 30 40 50 60 70 80 90

Flow Function - Sqrt (h/Ps)

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

Pd/Ps CODA Surge Line CODA Overload Line ESD Decel -Seconds ESD Decel -Comp rpm

Page 5: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt
Page 6: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt
Page 7: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt

BackgroundBackground

Goal: To explore the effectiveness of using thrust bearing load changes to measure the onset of surge in centrifugal compressors.

How? By employing static and dynamic thrust load sensing equipment in the thrust bearing and the thrust bearing housing.

Page 8: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt

Engineered SolutionEngineered Solution

• Dynamic sensors between pads/links in RMT thrust bearings (4 load cells per Bearing- 8 Total)

• Static sensors behind Thrust Bearing - recessed in thrust housing (2 top half - 2 bottom half, 4 load cells per side - 8 total)

Page 9: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt

• Four Load Cells Per Thrust Bearing

• Wires Exit Bearings radially and come out Housing at Horizontal Split

RMT Thrust Bearings With Dynamic Load Cells

Page 10: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt

Dynamic Load Cells Wire ExitDynamic Load Cells Wire Exit

Load Cell Wire Bundle

Thrust Bearings

Thrust Housing

Page 11: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt

Static Load Cell CavitiesStatic Load Cell Cavities

Thrust Housing (Bottom Half)

Static load cells mounted in recessed hole in Thrust Housing

Thrust Housing

(Bottom Half- Rotated)

Page 12: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt

Static Load Cells Shown in Orange

Static Load Cells In Thrust HousingStatic Load Cells In Thrust Housing

Static Load Cells Wire Exit

Page 13: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt

Conducted FEA on housing

Results (based on 500 psi thrust load): Maximum stress = 5330 psi Maximum deflection = 0.47 mils

Visual results next 3 slides

Static SensorsStatic Sensors

Page 14: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt

FEA ResultsFEA Results - StressStress

Page 15: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt

FEA ResultsFEA Results - StressStress

Page 16: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt

FEA ResultsFEA Results - DeflectionDeflection

Page 17: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt

The Next Steps

•Static and Dynamic load cells were installed in the thrust bearing and the thrust bearing housing

•Shop factory testing indicated that load cells functioned properly

•Field testing / Operation will be the next step to determine if the these load cells prove to be beneficial to determine the onset of surge.

Page 18: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt
Page 19: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt
Page 20: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt
Page 21: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt
Page 22: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt
Page 23: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt
Page 24: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt
Page 25: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt
Page 26: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt
Page 27: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt
Page 28: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt
Page 29: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt
Page 30: Advances In Compressor Surge Detection - Platt And McCaw - ICE 2003 - Feb 2003 - surge control.ppt

Joint GMRC / PRCI Project

• U$ 50,000 from GMRC

• U$ 50,000 from PRCI

• U$ 125,000 from US DoE / NETL

• Contractor: Southwest Research Institute

• In 2nd year of two year effort

• Discussions with potential commercialization partners