arnd meyer (rwth aachen) jan 2, 2004page 1 agenda russmechanical fred / drew / abidcft / ps bill...

Post on 26-Mar-2015

212 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Arnd Meyer (RWTH Aachen) Jan 2, 2004 Page 1

Agenda

Russ Mechanical

Fred / Drew / Abid CFT / PS

Bill L. STT

Michael / Sergey SMT

Robert CAL

Dmitri Forward Muon

Al Ito Central Muon Fritz / GeoffControls

Jeff L1Muon BrendanLuminosity

Stefan / Brigitte CTT Mike S. FPD

Miroslav L2

Arnd Meyer (RWTH Aachen) Jan 2, 2004 Page 2

Store 3118 (Dec 31)

Initial Lum. 1.5⋅1031cm-2s-1

STT outBLS PS trip

Special runs (CTT, Muon)

Arnd Meyer (RWTH Aachen) Jan 2, 2004 Page 3

Store 3120 (Dec 31 – Jan 1)

Initial Lum. 2.7⋅1031cm-2s-1

Take STT out, SMT HDI problemMDT problem

Arnd Meyer (RWTH Aachen) Jan 2, 2004 Page 4

Store 3122 (Jan 1 – 2)

Initial Lum. 4.3⋅1031cm-2s-1

Multiple crate x51 downloads SMT tripSTT (in, one out, all out)

Efficiency: Dec 31st 77% (0.70/0.91 pb-1)Jan 1st 87% (1.34/1.55 pb-1)

top related