Baldwin Community Schools
May 2018 BondProposal Update
Janua ry 30 , 2018
May 2018 Bond Program Review
Financial Considerations
Preliminary Schedule and Next Steps
May 2018 Bond Program Review
Baldwin Community SchoolsBond Program Cost Breakdown
Site Work ‐ $560K Remodeling/New Construction ‐ $5.96M
Contingency ‐ $1.16M Loose Furniture/Equipment ‐ $595K
Architect/Engineer Costs ‐ $538K Construction Manager Costs ‐ $461K
Owners' Representative ‐ $318K Election/Issuance/Interest Earnings ‐ $302K
Remodel/Construction
Contingency
May 2018 Bond Program Identified $9,910,000 worth of need
District needs to address in the next 5 years
Approximately $3.2M at Baldwin Elementary
Approximately $6.7M at Junior-Senior High
Bond Costs (breakdown by scope)
5
Bond Features: Interiors
6
• Renovate Junior High School science lab for modern learning• Renovate Senior High School science lab for modern learning• Build fitness center addition• Replace worn flooring in multiple locations• Replace worn ceiling tiles• Replace and upgrade doors for enhanced security
7
• Replace and upgrade lighting in parking lots and emergency and exit locations
• Add energy-efficient temperature controls• Replace boilers• Upgrade fire alarm systems• LED Lighting
Bond Features: HVAC, Plumbing, & Electrical
8
• Repave deteriorating parking lots and sidewalks• Replace roofing• Build covered walkway connecting band room to HS• Replace doors and hardware • Install energy-efficient windows (Jr./Sr. High School)
Bond Features: Exteriors
Bond Features: Furniture, Technology, & Equipment
9
• Replace worn, unusable classroom furniture• Replace cafeteria tables• Update computer lab equipment• Update weight room equipment
10
• Upgrade playground site and equipment• Install lighting at football field• Add bleachers and irrigation to football field
Bond Features: Playgrounds & Athletic Fields
Financial Considerations
12
13
Preliminary Schedule and Next Steps
Key Dates (May 2018 Election)
• Friday December 8 • Treasury application provided to Thrun Law for filing with Treasury
• Mid‐December• Treasury meeting with BCS, PMC, and Thrun Law
• Tuesday December 19• Regular school board meeting to approve Treasury Application
• January 2018• Special or rescheduled regular school board meeting to adopt the
resolution calling the election for May 2018
• Early February, 2017• Forward ballot wording and resolution to Election Coordinator
• February through May• Ballot Information Campaign – Ongoing Efforts
• May 8th, 2018 – Election Day
Questions / Answers