mortensonmortensoncce.umn.edu/documents/cpe-conferences/mipsycon-power... · 2015. 11. 13. · us...

Post on 12-Oct-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

WWW.MORTENSON.COM WWW.MORTENSON.COM

WWW.MORTENSON.COM WWW.MORTENSON.COM

Regional Offices

RENEWABLE ENERGY

HEALTHCARE

HIGHER EDUCATION

FEDERAL GOVERNMENT

CIVIC/MUNICIPAL

TRANSPORTATION/

INFRASTRUCTURE

CORPORATE

HOSPITALITY

LABORATORY &

LIFE SCIENCES

DATA CENTERS

Seattle, WA Portland, OR

Phoenix, AZ

Iowa City, IA Chicago, IL

Milwaukee, WI Madison, WI

Denver, CO

San Antonio, TX

Minneapolis, MN

IT IS ALL ABOUT

OUR RELATIONSHIPS

WWW.MORTENSON.COM WWW.MORTENSON.COM

Target Field, Minneapolis, MN TCF Bank Stadium, Minneapolis, MN

Xcel Energy Center, St. Paul, MN Target Center, Minneapolis, MN

All Local Team AND…

WWW.MORTENSON.COM WWW.MORTENSON.COM

KFC YUM! Center, Louisville, KY Coors Field, Denver, CO

FedExForum, Memphis, TN

… National Sports Builder

Sprint Center, Kansas City, MO

WWW.MORTENSON.COM WWW.MORTENSON.COM

WWW.MORTENSON.COM WWW.MORTENSON.COM

WWW.MORTENSON.COM WWW.MORTENSON.COM

PROJECT OVERVIEW

Start Date: December 3, 2013

Substantial Completion Date: July 29, 2016

Construction Value: $847.6 Million

Architect/Engineer: HKS Architects / Thornton Tomasetti

Customer: Minnesota Sports Facilities Authority

WWW.MORTENSON.COM WWW.MORTENSON.COM

PROJECT OVERVIEW

• Home to the Minnesota Vikings

• 1.7 million square feet

• 65,000 seats; up to 125 suites; 7,500 club seats

• Largest clear ETFE roof in North America – 5.7 ac. (248,000 sf)

• 5 Operable Doors – Each is 55’ wide and ranging from 95’ high to 78’ high

• Venue for a broad range of civic, community, athletic, and

cultural activities

WWW.MORTENSON.COM WWW.MORTENSON.COM

U.S. BANK STADIUM

WWW.MORTENSON.COM WWW.MORTENSON.COM

U.S. BANK STADIUM

WWW.MORTENSON.COM WWW.MORTENSON.COM

U.S. BANK STADIUM

WWW.MORTENSON.COM WWW.MORTENSON.COM

U.S. BANK STADIUM

WWW.MORTENSON.COM WWW.MORTENSON.COM

U.S. BANK STADIUM

WWW.MORTENSON.COM WWW.MORTENSON.COM

Mechanical Mezzanine Upper Concourse

Upper Suite

Upper Club

Main Concourse

Lower Club

Lower Suite

Event

PROJECT OVERVIEW

WWW.MORTENSON.COM WWW.MORTENSON.COM

METRODOME VS. U.S. BANK STADIUM - COMPARISON

WWW.MORTENSON.COM WWW.MORTENSON.COM

PROJECT OVERVIEW

Schedule Milestones

• Groundbreaking Ceremony: Dec 3, 2013

• Excavation: Nov 2013 - April 2014

• Tower Cranes Erected (5): Jan – June 2014

• Demolish Metrodome: Jan - April 2014

• Concrete Foundations & Structure: Jan 2014 - June 2015

• Structural Steel Erection: Aug 2014 – Oct 2015

• Enclosure: Nov 2014 – Dec 2015

• ETFE Installation: May 2015 – Nov 2015

• Substantial Completion: July 29, 2016

WWW.MORTENSON.COM

Project Schedule

WWW.MORTENSON.COM

WWW.MORTENSON.COM WWW.MORTENSON.COM

DEEP UNDERGROUND

BEDROCK CHALLENGES

WWW.MORTENSON.COM WWW.MORTENSON.COM

DEEP UNDERGROUND

WATER TABLE LEVEL

WWW.MORTENSON.COM WWW.MORTENSON.COM

DISTRIBUTION OVERVIEW

3 Xcel Energy Electrical Feeds –

• 2 feeds from Elliott Park and 1 from 5th Street

Substations

WWW.MORTENSON.COM WWW.MORTENSON.COM

DISTRIBUTION OVERVIEW

Seven 13.8kv double-ended substations located

throughout the building

• Substation in each quad (4)

• One on each end zone (2)

• One for the central plant (1)

WWW.MORTENSON.COM WWW.MORTENSON.COM

EMERGENCY SYSTEM

Generators

• Two 2 megawatt emergency system generators

WWW.MORTENSON.COM WWW.MORTENSON.COM

SPORTS LIGHTING

First new stadium with LED sports lighting

DMX controlled

Instant on, dimmable and color tuning

WWW.MORTENSON.COM WWW.MORTENSON.COM

BUILDING LIGHTING

85% LED fixtures for general architectural lighting

WWW.MORTENSON.COM WWW.MORTENSON.COM

BUILDING LIGHTING

WWW.MORTENSON.COM WWW.MORTENSON.COM

DECEMBER 2013

WWW.MORTENSON.COM WWW.MORTENSON.COM

APRIL 2014 – East Buttress Column

WWW.MORTENSON.COM WWW.MORTENSON.COM

JULY 2014 – D-Mag Crane Mobilization

WWW.MORTENSON.COM WWW.MORTENSON.COM

JULY 2014

WWW.MORTENSON.COM WWW.MORTENSON.COM

AUGUST 2014

WWW.MORTENSON.COM WWW.MORTENSON.COM

MARCH 2015

WWW.MORTENSON.COM WWW.MORTENSON.COM

MAY 2015

WWW.MORTENSON.COM WWW.MORTENSON.COM

MAY 2015

WWW.MORTENSON.COM WWW.MORTENSON.COM

APRIL 2015

Snow Catchment Basin

• Designed for 100 year

event

• Deepest section: 40+ feet

• Steepest Slope: 45

degrees

• Combination of concrete

and metal decking wearing

surfaces

• Heated concrete topping

slab

WWW.MORTENSON.COM WWW.MORTENSON.COM

OCTOBER 2015

WWW.MORTENSON.COM WWW.MORTENSON.COM

OCTOBER 2015

WWW.MORTENSON.COM WWW.MORTENSON.COM

OPERABLE DOORS

• Largest pivoting doors in the world

• Five doors spanning from 95’ tall to 75’ tall by 55’ wide

• Operated by (30) hydraulic rams – (6) rams on each door

WWW.MORTENSON.COM WWW.MORTENSON.COM

HYDRAULIC RAMS

WWW.MORTENSON.COM WWW.MORTENSON.COM

US BANK STADIUM CURRENT STATUS

• Project Is Nearly 80% Complete

• Roughly $679M of Work Installed to Date

• Over 2.3 Million Craft Worker Hours

• 1400+/- Men & Women Working On Site Daily

• 4% Veteran Workers

• 37% Minority Workers – Goal 32%

• 9% Female Workers – Goal 6%

• Targeted Businesses

• 17% WBE – Goal 11%

• 12% MBE – Goal 9%

• 33 MBE Firms Awarded Contracts

• 55 WBE Firms Awarded Contracts

• 228 MN Based Firms Awarded Work