Page 1: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

Page 2: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

Regional Offices

RENEWABLE ENERGY

HEALTHCARE

HIGHER EDUCATION

FEDERAL GOVERNMENT

CIVIC/MUNICIPAL

TRANSPORTATION/

INFRASTRUCTURE

CORPORATE

HOSPITALITY

LABORATORY &

LIFE SCIENCES

DATA CENTERS

Seattle, WA Portland, OR

Phoenix, AZ

Iowa City, IA Chicago, IL

Milwaukee, WI Madison, WI

Denver, CO

San Antonio, TX

Minneapolis, MN

IT IS ALL ABOUT

OUR RELATIONSHIPS

Page 3: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

Target Field, Minneapolis, MN TCF Bank Stadium, Minneapolis, MN

Xcel Energy Center, St. Paul, MN Target Center, Minneapolis, MN

All Local Team AND…

Page 4: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

KFC YUM! Center, Louisville, KY Coors Field, Denver, CO

FedExForum, Memphis, TN

… National Sports Builder

Sprint Center, Kansas City, MO

Page 5: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

Page 6: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

Page 7: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

PROJECT OVERVIEW

Start Date: December 3, 2013

Substantial Completion Date: July 29, 2016

Construction Value: $847.6 Million

Architect/Engineer: HKS Architects / Thornton Tomasetti

Customer: Minnesota Sports Facilities Authority

Page 8: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

PROJECT OVERVIEW

• Home to the Minnesota Vikings

• 1.7 million square feet

• 65,000 seats; up to 125 suites; 7,500 club seats

• Largest clear ETFE roof in North America – 5.7 ac. (248,000 sf)

• 5 Operable Doors – Each is 55’ wide and ranging from 95’ high to 78’ high

• Venue for a broad range of civic, community, athletic, and

cultural activities

Page 9: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

U.S. BANK STADIUM

Page 10: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

U.S. BANK STADIUM

Page 11: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

U.S. BANK STADIUM

Page 12: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

U.S. BANK STADIUM

Page 13: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

U.S. BANK STADIUM

Page 14: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

Mechanical Mezzanine Upper Concourse

Upper Suite

Upper Club

Main Concourse

Lower Club

Lower Suite

Event

PROJECT OVERVIEW

Page 15: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

METRODOME VS. U.S. BANK STADIUM - COMPARISON

Page 16: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

PROJECT OVERVIEW

Schedule Milestones

• Groundbreaking Ceremony: Dec 3, 2013

• Excavation: Nov 2013 - April 2014

• Tower Cranes Erected (5): Jan – June 2014

• Demolish Metrodome: Jan - April 2014

• Concrete Foundations & Structure: Jan 2014 - June 2015

• Structural Steel Erection: Aug 2014 – Oct 2015

• Enclosure: Nov 2014 – Dec 2015

• ETFE Installation: May 2015 – Nov 2015

• Substantial Completion: July 29, 2016

Page 17: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM

Project Schedule

Page 18: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM

Page 19: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

DEEP UNDERGROUND

BEDROCK CHALLENGES

Page 20: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

DEEP UNDERGROUND

WATER TABLE LEVEL

Page 21: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

DISTRIBUTION OVERVIEW

3 Xcel Energy Electrical Feeds –

• 2 feeds from Elliott Park and 1 from 5th Street

Substations

Page 22: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

DISTRIBUTION OVERVIEW

Seven 13.8kv double-ended substations located

throughout the building

• Substation in each quad (4)

• One on each end zone (2)

• One for the central plant (1)

Page 23: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

EMERGENCY SYSTEM

Generators

• Two 2 megawatt emergency system generators

Page 24: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

SPORTS LIGHTING

First new stadium with LED sports lighting

DMX controlled

Instant on, dimmable and color tuning

Page 25: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

BUILDING LIGHTING

85% LED fixtures for general architectural lighting

Page 26: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

BUILDING LIGHTING

Page 27: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

DECEMBER 2013

Page 28: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

APRIL 2014 – East Buttress Column

Page 29: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

JULY 2014 – D-Mag Crane Mobilization

Page 30: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

JULY 2014

Page 31: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

AUGUST 2014

Page 32: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

MARCH 2015

Page 33: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

MAY 2015

Page 34: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

MAY 2015

Page 35: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

APRIL 2015

Snow Catchment Basin

• Designed for 100 year

event

• Deepest section: 40+ feet

• Steepest Slope: 45

degrees

• Combination of concrete

and metal decking wearing

surfaces

• Heated concrete topping

slab

Page 36: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

OCTOBER 2015

Page 37: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

OCTOBER 2015

Page 38: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

OPERABLE DOORS

• Largest pivoting doors in the world

• Five doors spanning from 95’ tall to 75’ tall by 55’ wide

• Operated by (30) hydraulic rams – (6) rams on each door

Page 39: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

HYDRAULIC RAMS

Page 40: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM

US BANK STADIUM CURRENT STATUS

• Project Is Nearly 80% Complete

• Roughly $679M of Work Installed to Date

• Over 2.3 Million Craft Worker Hours

• 1400+/- Men & Women Working On Site Daily

• 4% Veteran Workers

• 37% Minority Workers – Goal 32%

• 9% Female Workers – Goal 6%

• Targeted Businesses

• 17% WBE – Goal 11%

• 12% MBE – Goal 9%

• 33 MBE Firms Awarded Contracts

• 55 WBE Firms Awarded Contracts

• 228 MN Based Firms Awarded Work

Page 41: MORTENSONMORTENSONcce.umn.edu/documents/CPE-Conferences/MIPSYCON-Power... · 2015. 11. 13. · US BANK STADIUM CURRENT STATUS • Project Is Nearly 80% Complete • Roughly $679M

WWW.MORTENSON.COM WWW.MORTENSON.COM