annual meetings - lisbon, june 9-10, 2011 business ... · annual meetings - lisbon, june 9-10, ......

20
Experience of COBA with AfDB Projects Experience of COBA with AfDB Projects Vitor Carneiro | COBA, S.A. June 2011 African Development Bank Annual Meetings - Lisbon, June 9-10, 2011 Business Opportunity Seminar

Upload: lamnguyet

Post on 12-Sep-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Experience of COBA with AfDB Projects

Experience of COBA with AfDB Projects

Vitor Carneiro | COBA, S.A.June 2011

African Development BankAnnual Meetings - Lisbon, June 9-10, 2011

Business Opportunity Seminar

Experience of COBA with AfDB Projects

• Founded in 1962, COBA is the largest company of consulting engineers in Portugal

• 400 employees in COBA Group

• Dam design was COBA’s first main field of activity.

• Presently, COBA’s activity covers most of the fields associated with engineering activities and technical assistance during construction of large projects, namely:

• DAMS AND HYDROPOWER PLANTS• WATER SUPPLY SYSTEMS AND WATER AND WASTEWATER TREATMENT PLANTS• IRRIGATION AND DRAINAGE SYSTEMS• ROADS, MOTORWAYS, RAILWAYS AND AIRPORTS• BRIDGES, VIADUCTS AND TUNNELS• ENVIRONMENTAL STUDIES• CARTOGRAPHY AND CADASTRE

Experience of COBA with AfDB Projects

PORTUGAL, BULGARIA,GREECE, HUNGARY,

IRELAND, MACEDONIA,SPAIN, TURKEY

ALGERIA, ANGOLA, CAPE VERT,EQUATORIAL-GUINEA, GHANA,

GUINEA-BISSAU, GUINEA-CONAKRY,MOROCCO, MOZAMBIQUE, NAMIBIA,

REPUBLIC OF CONGO, SENEGAL,SWAZILAND, TUNISIA

ARGENTINA, BRAZIL,COSTA RICA, ECUADOR,

HAITI, DOMINICAN REPUBLIC,VENEZUELA

CHINA (MACAU),UNITED ARAB EMIRATES,

IRAQ, OMAN, JORDAN

Experience of COBA with AfDB Projects

Long list of Projects in Africa

Experience of COBA with AfDB Projects

ALGERIAALGERIACLIENT PROJECT DATE

Agence Nationale des Autoroutes (ANA)

ALGIERS OUTSIDE RING MOTORWAY (4ÈME ROCADE D’ALGER). Section between the NR18 Interchange (Ain Delfa Wilaya) and the NR 1 (Médéa) (80 km) and Section between the NR 1 (Medea Medea) and the NR8 interchange (East of Dirah)(90 km)

2008/11

COSIDER (leader of the G.R.A.K.M.O.F Consortium)

EAST-WEST MOTORWAY. SECTION OUED FODDA - KHEMIS MILIANA (73 km). Final Design and Technical Assistance to Project Management 2005/07

ANA EAST-WEST MOTORWAY. SECTION BETWEEN KHEMIS MILIANA AND HOCEINIA (23 km). Final Design. Financed by the Algerian Government 2004/08

ANA

CONSTANTINE RING HIGHWAY. SECTION BETWEEN AIN SMARA AND AIN EL BEY (11 km, 4,8 km of secondary roads, 1 interchange with 5,8 km, 48 bridges and viaducts and 20 retaining structures). Design Review and Supervision. Financed by the African Development Bank

1997/04

ZAGOPE (Portuguese Contractor) ORAN ES SENIA INTERNATIONAL AIRPORT 2006/09

Agence Nationale de l’Irrigation et du Drainage (AGID)

KRAMIS IRRIGATION PERIMETER (4 300 ha). Basic Design, Final Design and Environmental Impact Assessment 2003/06

AGID DAHMOUNI IRRIGATION PERIMETER (4 000 ha). Basic Design, Final Design and Environmental Impact Assessment 2003/06

Lusogroupe (lead by Mota-Engil) EAST-WEST MOTORWAY. CENTRAL LOT (169 km) and WESTERN LOT (359 km). Design-and-Build Tender. Preliminary Design 2006

Agence Nationale des Barrages et Transferts (ANBT) BENI SLIMANE DAM In the Medea wilaya. Detailed Design and Tender Documents 2007/11

ANBT DERMOUN DAM. Detailed Design and Tender Documents 2005/09

ZAGOPE (Portuguese Contractor) BOUSSIABA DAM. Expertise Mission 2006

ANBT SEKLAFA DAM AT OUED M’ZI AND CONVEYANCE FROM THE CHARGUI (Wilaya de Laghouat). Detailed Design and Tender Documents 2004/11

ANBT Studies for MONITORING AND REINFORCEMENT OF THE BAKKADDA, OUED FODDA, BOUGHZOUL AND GRIB DAMS currently under operation 2003/11

ANBT KERRADA DAM AND CHELIFF-KERRADDA WATER CONVEYANCE SYSTEM. Detailed Design and Tende Documents 1998/01

Experience of COBA with AfDB Projects

ALGERIAALGERIACLIENT PROJECT DATE

ANBTMONITORING AND EXPERT ASSESSMENT OF ALGERIAN DAMS (ABOUT 50)

1992/97

ANBT KOUDIAT-ACERDOUNE DAM. Detailed Design and Tender Documents 1991/93

Agence Nationale de l’Eau Potable et Industrielle et de l’Assainissement (AGEP)

REINFORCEMENT OF THE DRINKING WATER SUPPLY SYSTEM TO THE TIZI OUZOU – ALGIERS CORRIDOR from the Taksebt and Souk Tleta Dams. Study of Alternatives, Preliminary Design, Tender Design and Specifications. Financed by the World Bank

1994/98

Agence Nationale des Barrages et Transferts,URBAN LAKE OF THE NEW BOUGHZOUL TOWN – Characterisation of the

Boughzoul reservoir in view of its integration in the urban area to be assigned to the New Town of Boughzoul (300 000 inhabitants).

ANBT TAKSEBT-FREHA-AZZAZGA CONVEYANCE PIPELINE (Wilaya de Tizi Ouzou) serving a population of 240.000 inhabitants 2006/08

Office National de l’irrigation et du Drainage (ONID) OUED DJER WATER TRANSFER, 21 M m3/year from the Oued Djer to the El Mostakbel dam, for increasing the irrigation capacity of the West Mitidja Perimeter.

2006/10

Teixeira Duarte (Owner: ONA – Office National de d’Assainissement)

SOUF VALLEY SANITATION SYSTEM. Lagoon Aerated Waste Water Treatment Stations (Guemmar, Magrane and Reguiba) 2006/09

Teixeira Duarte (Contractors)WATER TRANSFER FROM THE CHELIFF INTAKE TO THE SIDI-HADJEL RESERVOIR AND WATER SUPPLY PIPELINE TO THE MOSTAGNEM-ARZEW- ORAN CORRIDOR. Detailed Design and Specifications. Financed by the World Bank

1990/96

Algérienne des Eaux (AdE)DIAGNOSIS AND REHABILITATION STUDIES FOR THE DRINKING WATER SYSTEMS of the following towns: Lot B – BÉJAÏA (235.200 inhabitants), TIZI-OUZOU (122.000 inhabitants), and CHLEF (307.000 inhabitants).

2006/10

AdE Studies for CONNECTION OF THE SKIKDA SEAWATER DESALINATION PLANT TO THE SKIKDA DRINKING WATER SUPPLY NETWORK 2005/07

AdEStudies for the CONNECTION OF THE HAMMA SEAWATER DESALINATION PLANT (200.000 M3) TO THE GREATER ALGIERS DRINKING WATER SUPPLY NETWORK

2004/05

Experience of COBA with AfDB Projects

ANGOLAANGOLACLIENT PROJECT DATE

ODEBRECHT HUAMBO-BENGUELA ROAD. CAÁLA/GANDA SECTION (Provinces of Huambo and Benguela) (130 km). Preliminary Study and Final Design 2007/..

INEA - Instituto Nacional de Estradas de Angola / Financiamento: Banco Mundial

REHABILITATION OF FOUR SECTIONS OF THE ROAD NETWORK in the area of Luanda, financing from de World Bank: Luanda - Barra do Kwanza, Luanda - Viana, Viana - Catete and Catete - Kifangondo (117 km). Final Design and Construction Supervision. Financed by the World Bank

1996/97

1998/00

INEA - Instituto de Estradas de Angola Rehabilitation of the BITCHEQUETE / MASSABI Road Section, in the Cabinda Province. Studies and Design. 2003/05

ENE - Empresa Nacional de Electricidade, EP CACOMBO HYDROPOWER PROJECT. Feasibility Study and Detailed Design and Tender Documents

2008/ underway

GABHIC – Gabinete de Administração da Bacia do Rio Cunene

REHABILITATION OF THE GOVE DAM AND HYDROPOWER II (60 MW). Detailed Design and Tender Documents

Technical Assistance for Tenders Evaluation, Final Design, Project Management and Construction Supervision

2003/05

2006

2007/..

ENE – Empresa Nacional de Energia LUACHIMO HYDROELECTRIC UNDERTAKING. Economic Feasibility Study. Detailed Design and Tender Documents

2006/07

2008/10

ENE – Empresa Nacional de ElectricidadeCHIUMBE–DALA HYDROELECTRIC DEVELOPMENT. Located on the Chiumbe river, it aims essentially at hydropower supply to the city of Luena, in the Moxico province . Final Design

2002/04

DNA - Direcção Nacional de Águas WATER SUPPLY AND SANITATION MASTER PLANS FOR THE CITIES OF HUAMBO, N’DALATANDO, KUITO, ONDJIVA, MALANJE 2001/05

DNA - Direcção Nacional de Águas WATER SUPPLY AND SANITATION MASTER PLANS FOR THE CITIES OF DUNDO, SAURIMO AND MENONGUE, 2003/08

Ministério da Agricultura e Desenvolvimento Rural

BOM JESUS AND CALENGA HYDRO-AGRICULTURAL PROJECT. Detailed Design and Tender Documents 2007/09

Projecto Aldeia NovaALDEIA NOVA PROJECT DEVELOPMENT. Expansion of project to other development poles, including the provinces of Bié, Kwanza Norte, Malanje, Uige e Zaire.

2006/..

Ministério da Agricultura e Desenvolvimento Rural ANGOLA IRRIGATION PLAN 2007/10

Experience of COBA with AfDB Projects

REPUBLIC OF CONGOREPUBLIC OF CONGOCLIENT PROJECT DATE

ESCOM (Grupo Espírito Santo) / Ministère de l’Equipement et des Travaux Publics

Rehabilitation and Upgrading and Concreting of Road Section OKOYO-LEKETY- Gabon Border (90 km and 2 bridges) and Bridges of the LEKANA-AMPAKA-LEKETY road axis (2 with 80 m each and 5 with 20 m each). Feasibility Study and Final Design

2001/03

PROGEST/ESCOM Brige over the Djiri River (60 m) 2006

EQUATORIAL GUINEAEQUATORIAL GUINEACLIENT PROJECT DATE

Ministério das Obras Públicas, Habitação e Urbanismo

WATER SUPPLY MASTER PLANS. Drinking Water Supply to the City of Bata. Detailed Design and Tender Documents

2002/06

2007/08

GHANAGHANACLIENT PROJECT DATE

Mota & Cª, S.A. ASANKRAGUA – ENCHI ROAD. Final Design 2000/02

GUINEAGUINEA--BISSAUBISSAUCLIENT PROJECT DATE

Banque Africaine de Développement (BAD) SALTINHO DAM. Environmental Impact Study. Financed by the African Development Bank

1984

1985PNUD – Prog. das Nações Unidas para o Desenvolv.

SALTINHO HYDROELECTRIC UNDERTAKING (18 MW). Design. Financed by UNDP (United Nations) 1985

PNUD – Prog. das Nações Unidas para o Desenvolv.

SALTINHO HYDROELECTRIC UNDERTAKING (18 MW). Environmental Studies. Financed by the African Development Bank 1992/94

Experience of COBA with AfDB Projects

MOROCCOMOROCCOCLIENT PROJECT DATE

Société Nationale des Autoroutes du Maroc (ADM) RABAT–TANGER MOTORWAY. ASILAH–TANGER SECTION (30 km). Final Design. Co-financed by the Portuguese Cooperation 2000/02

Société Nationale des Autoroutes du Maroc (ADM) RABAT–TANGER MOTORWAY. SIDI EL YAMANI – ASILAH SECTION (15 km). Final Design. Co-financed by the Portuguese Cooperation 1999/02

Office Régional de Mise en Valeur de la Région du Gharb (ORMVAG)

GHARB HYDRO-AGRICULTURAL DEVELOPMENT. Study for Reconversion of the Sprinkler Irrigation System into Localized Irrigation (19.356 ha). Rehabilitation and Modernization of the Existing Infrastructures

2009/ underway

Office Régional de Mise en Valeur de la Région du Gharb (ORMVAG)

GHARB HYDRO-AGRICULTURAL DEVELOPMENT (15 000 ha). Preliminary Design and Final Design. Financed by the African Development Bank 1995/98

Office Régional de Mise en Valeur de Doukkala (ORMVAD)

DOUKKALA IRRIGATION PERIMETER (16000 ha). Rehabilitation of the Hydro- mechanical Equipment. Financed by the World Bank 1995/97

ONE - Office National de l’Electricité

EL BORJ HYDROELECTRIC PROJECT (18 MW). Preliminary Design and Feasibility Study, Detailed Design and Specifications. Co-financed by the Portuguese Cooperation 1998/01

ONEP – Office National de l’Eau PotableBASIC SANITATION OF THE TAROUDANT, IMINTANOUT And EL KELAA DES SRAGHNA CENTRES. Tender Designs and Specifications. Financed by the African Development Bank

1997/00

Office National de l’Eau Potable (ONEP) WATER SUPPLY TO THE CITY OF MEKNÈS FROM THE SAISS AQUIFER. Final Design and Specifications. 1993/94

SWAZILANDSWAZILANDCLIENT PROJECT DATE

Ministry of Works and ConstructionMR4 – LUYENGO-SICUNUSA ROAD (50 km, 11,3 m paved width, 3 bridge, 10 retaining walls). Design Review and Contract Documents. Supervision of the Construction Works. Financed by the African Development Bank.

2000/03

1997/98

Experience of COBA with AfDB Projects

MOZAMBIQUEMOZAMBIQUECLIENT PROJECT DATE

ANE – Administração Nacional de Estradas Rehabilitation of National Road NR 256 BETWEEN NR 205 AND LAGOA NOVA, in the GAZA Province. Design Review and Supervision of the Construction Works. 2005/07

ANE – Administração Nacional de Estradas Rehabilitation of Rural Road ER 405 between the MAPUTO BORDER AND CHÓKWÉ. Tender Design. Financed by the World Bank. 2004/06

ZAGOPE MOAMBA MAJOR DAM and Water Transfer for the water supply to Maputo. Preliminary Design and Environmental Impact Assessment 2010/..

ARA-Sul – Administração Regional de Águas do Sul

REHABILITATION OF XAI-XAI IRRIGATION SCHEME. Financed by the African Development Bank. Tender Design and Supervision of the Construction Works

2003/05

2005/08

Direcção Nacional de Hidráulica Agrícola Feasibility and Design Study for the REHABILITATION OF THE THEWÉ 2 IRRIGATION SCHEME and Supervision of Engineering Works. 2004/06

DNA – Direcção Nacional de Águas FIRST NATIONAL WATER DEVELOPMENT PROJECT. BUILDING BLOCK 4. Water Resources Development 2003/05

Vale MozambiqueMOATIZE EXPANSION PROJECT – NACALA CORRIDOR, I Environmental Impact Assessment, Heritage and Ecology of all Studies and Coordination of Rehabilitation of existing Line between Malawi and Nacala Port.

2010/..

Hidroeléctrica Mphanda Nkuwa, SAMPHANDA NKUWA HYDROPOWER PROJECT in the Zambeze river. Preliminary Impact and Environmental Impact Studies and Environmental Impact and Social Studies

2009/10

2011/

MULTINATIONALMULTINATIONALCLIENT PROJECT DATE

African Development BankTRANSPORT SECTOR REVIEW (TSR) STUDIES IN FOUR LUSOPHONE REGIONAL MEMBER COUNTRIES (ANGOLA, CAPE VERDE, GUINEE-BISSAU, SAO TOME E PRINCIPE)

2006/08

Experience of COBA with AfDB Projects

A Selection of AfDB Funded Projects

Experience of COBA with AfDB Projects

CLIENT: Agence Nationale des Autoroutes (ANA)CLIENT: Agence Nationale des Autoroutes (ANA)

FINANCING: AfDB - AFRICAN DEVELOPMENT BANKFINANCING: AfDB - AFRICAN DEVELOPMENT BANK

DATE: Revision of Final Design of Engineering Structures: 1997/98Monitoring and Supervision: 1997/2003

DATE: Revision of Final Design of Engineering Structures: 1997/98Monitoring and Supervision: 1997/2003

EAST-WEST HIGHWAY IN SMARA – AIN EL BEY SECTION ALGERIA

Supervision of the construction works of the motorway 11 km long, 4,8 km of secondary routes, one cloverleaf + trumpet junction 5,8 km long, 11 current over and underpasses and 20 retaining walls.

Experience of COBA with AfDB Projects

CLIENT: Agence Nationale des Barrages (ANB)CLIENT: Agence Nationale des Barrages (ANB)

FINANCING: AfDB - AFRICAN DEVELOPMENT BANKFINANCING: AfDB - AFRICAN DEVELOPMENT BANK

DATE: Tender Design 1989/93DATE: Tender Design 1989/93

KOUDIAT-ACERDOUNE DAM ALGERIA

TYPE: ERTYPE: ER

HEIGHT: 111 mHEIGHT: 111 m

CREST LENGTH: 385 mCREST LENGTH: 385 m

VOLUME OF DAM: 4 820 X 103 m3VOLUME OF DAM: 4 820 X 103 m3

MAXIMUM FLOOD FLOW: 8 600 m3/sMAXIMUM FLOOD FLOW: 8 600 m3/s

SPILLWAY: 7 340 m3 - LABYRINTH WEIRSPILLWAY: 7 340 m3 - LABYRINTH WEIR

BOTTOM OUTLET: 180 m3/s - CULVERTBOTTOM OUTLET: 180 m3/s - CULVERT

Experience of COBA with AfDB Projects

CLIENT: Office Régional de Mise en Valeur Agricole duGharb (Ministry of Agriculture)CLIENT: Office Régional de Mise en Valeur Agricole duGharb (Ministry of Agriculture)

FINANCING: AfDB - AFRICAN DEVELOPMENT BANKFINANCING: AfDB - AFRICAN DEVELOPMENT BANK

DATE: Preliminary Report: 1995Detailed Design / Final Design, Tender Documentsand Procurement Processes: 1996/98

DATE: Preliminary Report: 1995Detailed Design / Final Design, Tender Documentsand Procurement Processes: 1996/98

GHARB HYDRO-AGRICULTURAL DEVELOPMENT MOROCCO

Experience of COBA with AfDB Projects

CLIENT: Ministério da Agricultura e Desenvolvimento Rural(Ministry of Agriculture)CLIENT: Ministério da Agricultura e Desenvolvimento Rural(Ministry of Agriculture)

FINANCING: AfDB - AFRICAN DEVELOPMENT BANKFINANCING: AfDB - AFRICAN DEVELOPMENT BANK

DATE: Detailed Engineering Designs 2007/09 DATE: Detailed Engineering Designs 2007/09

BOM JESUS AND CALENGA HYDROAGRICULTURAL DEVELOPMENTS ANGOLA

The Bom Jesus Hydroagricultural Development is located on the right bank of the Kwanza River, approximately 50 km from Luanda and to the northeast of the existing Bom Jesus Perimeter (coincident with the ancient sugar cane plantation).The infrastructures which are to be built will cover an area of about 1 150 ha.

Experience of COBA with AfDB Projects

CLIENT: ARA-SUL/DNACLIENT: ARA-SUL/DNA

FINANCING: AfDB - AFRICAN DEVELOPMENT BANKFINANCING: AfDB - AFRICAN DEVELOPMENT BANK

DATE: 2003/2009 DATE: 2003/2009

The Xai-Xai Irrigation and Drainage scheme is located in thelower basin of the Limpopo river, in the vicinities of theXai-Xai city (170 000 inhabitants), capital of the province ofGaza and located some 200 km to the north of Maputo.The National Highway passes through the scheme(south-east), linking Maputo in the south toInhambane/Maxixe in the north.

The Xai-Xai Irrigation and Drainage scheme is located in thelower basin of the Limpopo river, in the vicinities of theXai-Xai city (170 000 inhabitants), capital of the province ofGaza and located some 200 km to the north of Maputo.The National Highway passes through the scheme(south-east), linking Maputo in the south toInhambane/Maxixe in the north.

The irrigation scheme disposed of a great deal of infrastructures, although by 1993 it was not yet entirely utilized, and is subdivided in three irrigation units – Magula, Chimbonhanine and Ponela (550 ha, 400 ha and 200 ha in 1993), being each one of these units served by a large pump station

MASSINGIR DAM AND SMALLHOLDER AGRICULTURAL REHABILITATION PROJECT (MDSAR) MOZAMBIQUE

Experience of COBA with AfDB Projects

MR 4 UPGRADING. SECTION BETWEEN LUYENGO AND SICUNUSA SWAZILAND

The MR4 Luyengo-Sicunusa road is located in the west of the country and lies entirely in the highveld ecological zone of Swaziland. The project included the upgrading of the existing MR4 road for about 39 km and the construction of a new 8 km section connecting the MR18 to the MR4, three bridges over the Usuthu, Mhlatane and Rowela rivers and 10 retaining walls, with heights from 3 to 15 m. The cross section is 2 x 3,65 m and paved shoulders with 2 m.

CLIENT: MINISTRY OF PUBLIC WORKS AND TRANSPORTCLIENT: MINISTRY OF PUBLIC WORKS AND TRANSPORT

DESIGN REVIEW: 1997/1998DESIGN REVIEW: 1997/1998

MONITORING AND SUPERVISION: 1999/2002MONITORING AND SUPERVISION: 1999/2002

FINANCING: AfDB - AFRICAN DEVELOPMENT BANKFINANCING: AfDB - AFRICAN DEVELOPMENT BANK

STUDIES UNDERTAKEN IN ASSOCIATIONSTUDIES UNDERTAKEN IN ASSOCIATION

Experience of COBA with AfDB Projects

TRANSPORT SECTOR REVIEW (TSR) STUDY IN FOUR LUSOPHONE REGIONALMEMBER COUNTRIES (Angola, Cape Verde, Guinea-Bissau and São Tomé e Principe)

The objective of the Transport Sector Review (TSR) studies is to enable the Bank to assess and understand transport sector related development conditions in four lusophone countries, namely Angola, Cape Verde, Guinea-Bissau and São Tomé e Príncipe, in order to build a sound basis for:

- Formulating Bank transport sector intervention strategies in these countries; - Improving policy dialogue with and giving policy advice to member countries on transport sector development issues;- Mobilizing resources and coordinating development activities for pre-identified transport projects and programs with other donors.

A three-tiered phase approach was carried out:Phase 1 – Characterization and analysis of present transport systems in these countries;Phase 2 – Analysis of transport policies, programs and projects; Phase 3 – Guidance on action

CLIENT: AfDB - AFRICAN DEVELOPMENT BANKCLIENT: AfDB - AFRICAN DEVELOPMENT BANK

DATE: 2006/08DATE: 2006/08

ANGOLAANGOLA

CAPE CAPE VERDEVERDE

GUINEAGUINEA--BISSAUBISSAU

SÃO TOMSÃO TOMÉÉ E PRE PRÍÍNCIPENCIPE

Experience of COBA with AfDB Projects

Conclusions

•The AfDB is a friendly multilateral financing organization

•COBA always experienced a cooperative way of conducting projects from the Bank

•The AfDB is open to look for solutions to meet national needs

•For COBA a special attention to the dialogue with the national clients is a key for the success of AfDB projects.

Experience of COBA with AfDB Projects

Thank you