appendix 2 egress diagram for the mui ho fine arts library

1
1 Appendix 2 Egress diagram for the Mui Ho Fine Arts Library in Rand Hall Prepared by Jonathan Ochshorn Nov. 25, 2020 Both means of egress systems in the Mui Ho Fine Arts Library contain exit access stairways and interior exit stairways. The means of egress containing Exit Stair A (shown in blue) is compliant. The means of egress containing Exit Stair B (shown in green) is noncompliant because its path of egress travel passes through more than one adjacent story, in violation of Section 1006.3 of the 2015 NYS Building Code. Appendix Figure 2.1 Schematic diagram showing means of egress systems in the Mui Ho Fine Arts Library in Rand Hall, Cornell University. Drawing by Jonathan Ochshorn based on life safety plans submitted by STV Architects.

Upload: others

Post on 18-Apr-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Appendix 2 Egress diagram for the Mui Ho Fine Arts Library

1

Appendix 2 Egress diagram for the Mui Ho Fine Arts Library in Rand Hall

Prepared by Jonathan Ochshorn Nov. 25, 2020 Both means of egress systems in the Mui Ho Fine Arts Library contain exit access stairways and interior exit stairways. The means of egress containing Exit Stair A (shown in blue) is compliant. The means of egress containing Exit Stair B (shown in green) is noncompliant because its path of egress travel passes through more than one adjacent story, in violation of Section 1006.3 of the 2015 NYS Building Code.

Appendix Figure 2.1 Schematic diagram showing means of egress systems in the Mui Ho Fine Arts Library in Rand Hall, Cornell University. Drawing by Jonathan Ochshorn based on life safety plans submitted by STV Architects.