application for planning permit - devonport builder to verify all dimensions and levels on site ......

8
Devonport City Council PUBLIC NOTICE APPLICATION FOR PLANNING PERMIT Section 57(3) Land Use Planning Approvals Act 1993 An application for a planning permit has been made which may affect you. Application Details Application Number: PA2017.0109 Proposed Use or Development: Residential (2 x additional multiple dwellings) - assessment against performance criteria for setbacks and building envelope Address of the Land: 29a Middle Road, Devonport Date of Notice: 30/08/2017 You are invited to view the application and any documents and plans accompanying it at the Devonport City Council Offices or on Council’s website www.devonport.tas.gov.au Any person may make a representation relating to the application in accordance with section 57(5) of the Land Use Planning Approvals Act 1993, during a period of 14 days commencing on the date of this notice. Your representation must: be received by close of business on 12/09/2017; be in writing; and addressed to the General Manager, Devonport City Council: o P.O. Box 604, Devonport, Tasmania, 7310; or o [email protected] If you make a representation then Council must consider your submission before making its decision on the application.

Upload: duongquynh

Post on 12-Jun-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Devonport City Council

PUBLIC NOTICE

APPLICATION FOR PLANNING PERMIT

Section 57(3) Land Use Planning Approvals Act 1993

An application for a planning permit has been made which may affect you.

Application Details

Application Number: PA2017.0109

Proposed Use or Development: Residential (2 x additional multiple dwellings) -

assessment against performance criteria for setbacks

and building envelope

Address of the Land: 29a Middle Road, Devonport

Date of Notice: 30/08/2017

You are invited to view the application and any documents and plans accompanying it

at the Devonport City Council Offices or on Council’s website www.devonport.tas.gov.au

Any person may make a representation relating to the application in accordance with

section 57(5) of the Land Use Planning Approvals Act 1993, during a period of 14 days

commencing on the date of this notice.

Your representation must:

• be received by close of business on 12/09/2017;

• be in writing; and

• addressed to the General Manager, Devonport City Council:

o P.O. Box 604, Devonport, Tasmania, 7310; or

o [email protected]

If you make a representation then Council must consider your submission before making its

decision on the application.

Copyright © Devonport City Council 28/08/2017

Approx Scale: 1: 1,105.00

PA2017.0109 - 29a Middle Road, Devonport

DevonportCity Council

This map is made available for the purpose of providing access to Devonport City Council information and not as professional advice. The information contained on the map is diagrammatic only. All information should be verified on site, or with the appropriate State Government Department or Council Office, prior to being used for any purpose.

Date Printed:

GSPublisherVersion 0.0.100.100

PROJECT: 29A MIDDLE ROADCLIENT: BIG BLUE CO

PROJECT NO: 170502ADDRESS: 29 a MIDDLE ROAD, DEVONPORT, TASMANIADATE OF ISSUE: 31/07/2017

CLIMATE ZONE: 7BAL RATING: N/ACORROSION ENVIRONMENT:

CYKE

L: 17

0502

29

A MI

DDLE

ROA

D 3

1/07/2

017

10:55

AM

29A MIDDLE ROAD, ,TASMANIA

PROJECT:

BIG BLUECLIENT:

REV DESCRIPTION DATE APPLIED

31/07/2017DACYKEL ARCHITECTURE

level 2 /51 Murray49 - 51 Murray St, Hobart, Tasm: 0410054749e: [email protected]

DRAWING SCHEDULE

01.0101.0201.0301.0401.05

SITE PLAN 400SITE PLAN / BOUNDARYFLOOR PLANELEVATIONELEVATIONS

DEVELOPMENT APPLICATION

GSPublisherVersion 0.0.100.100

CYK

EL:

1705

02

29A

MID

DLE

RO

AD

31

/07/

2017

10

:55

AM

170502

01.01

31/07/2017 1:200

dateproject no scale

drawing norevisionDA

checkedsg

SITE PLAN 400

29A MIDDLE ROAD, DEVONPORTTASMANIA

PROJECT:

CLIENT:

DRAWING:

BIG BLUE

CYKEL ARCHITECTURE

level 2 /51 Murray49 - 51 Murray St, Hobart, Tasm: 0410054749e: [email protected]

87 m2

63 m2

61 m2

87 m2

21-48

21-48

N

5,900

5,900

10,800

900

3,600

10,549

1,050

9,908

900

27.18

24.77

27.06

26.46

26.8527.2427.64

Top of Kerb 26.53

26.5027.980

27.5827.40

27.033

27.187

27.310

27.240

27.390

27.22428.092

27.699

30.773

30.77730.686

27.53

27.14

27.09

27.274

27.33

26.93

26.92

26.70 26.62

26.657

26.591

26.35

27.533

25.704

24.63

24.660

24.926

25.731

25.7526.04

26.45

26.35

26.08

26.39

26.27

25.91

25.55

25.18

24.808

24.97

25.32

25.24

25.40

25.86

25.64

26.21

26.24

27.29

26.421

24.034

23.54

23.4024.09

24.52 24.18

22.89

22.12

23.64

22.779

21.814

27.102

25.765

25.323

25.106

22.312

23.301

25.25

27.18

24.77

25.25

27.18

26.37

26.455

25.866

24.52

24.91

25.34

25.55

25.49

25.3525.44

25.393

25.32

25.482

25.96

25.92

26.49

26.18

25.69

25.40

25.20

25.07

25.198

24.77

23

23

24

SW MH

Lid RL 23.30W Inlet RL 22.77 Ø225mm

W Inlet RL 22.37 Ø225mmE Outlet RL 21.54 Ø300mm

Sewer MHLid RL 22.31

NW Inlet RL 21.66 Ø150mmNW Inlet RL 21.17 Ø150mm

S Inlet RL 21.17 Ø150mmNE Outlet RL 21.09 Ø150mm

25

FL 26.54

FL 26.33

FL 25.87

26

FL 25.17

1

3

2

4

5

6

7

C o n c r e t e A p r o n

Row ofLetterboxes

27

27

27

28

TBMSH in KB

RL 27.18

Top of Kerb 26.93

Top of Kerb 27.35

Top of Kerb 27.72

Concrete P a t h

162°52'

77.44

162°49'56.53

Co r r . I r o n F e n c e

Paling Fence

No FenceL i n e o f P o s t s

C o r r . I r o n F e n c e

C o r r . I r o nF e n c e

CT 47684/2

CT 240427/1

CT 24749/1DEPT OF EDUCATION

REECE HIGHSCHOOL

CT 47684/3

73°21'

36.61

162°50'

45.62 73°21'

6.09

342°50'

45.62

9 9 ° 2 3 '

4 7 .6 7

AREA of LOT 13120m²

3136m² (Calc)

wm

p1

p2

p3

p4

p5

p6

p7p8

p9

p10 p11 p12 p13

p14

p15

wm

p16

bins

bins

clothes dry

bins

bins

clothes dry

1800

high

palin

g fen

ce18

00 hi

gh pa

ling f

ence

1800 high paling fence

HARD PAVEDDRIVE

setback to wall

setback to wall

pos

pos

1 SITE PLANSCALE 1:400

GSPublisherVersion 0.0.100.100

CYK

EL:

1705

02

29A

MID

DLE

RO

AD

31

/07/

2017

10

:55

AM

170502

01.02

31/07/2017 1:200

dateproject no scale

drawing norevisionDA

checkedsg

SITE PLAN / BOUNDARY

29A MIDDLE ROAD, DEVONPORTTASMANIA

PROJECT:

CLIENT:

DRAWING:

BIG BLUE

CYKEL ARCHITECTURE

level 2 /51 Murray49 - 51 Murray St, Hobart, Tasm: 0410054749e: [email protected]

87 m2

63 m2

61 m2

87 m2

21-48

21-48

N

5,900

5,900

10,800

900

3,600

10,549

1,050

9,908

900

3,000

24.77

27.533

25.704

24.63

24.660

24.926

25.731

25.7526.04

26.45

26.35

26.08

26.39

26.27

25.91

25.55

25.18

24.808

24.97

25.32

25.24

25.40

25.86

25.64

26.21

26.24

26.421

24.034

23.54

23.4024.09

24.52 24.18

22.89

22.12

23.64

22.779

21.814

27.102

25.765

25.323

25.106

22.312

23.301

25.25

24.77

25.25

26.455

25.866

24.52

24.91

25.34

25.55

25.49

25.3525.44

25.393

25.32

25.482

25.96

25.92

26.18

25.69

25.40

25.20

25.07

25.198

24.77

23

23

24

SW MH

Lid RL 23.30W Inlet RL 22.77 Ø225mm

W Inlet RL 22.37 Ø225mmE Outlet RL 21.54 Ø300mm

25

F L 2 6 .5 4

F L 2 6 .3 3

F L 2 5 .8 7

26

FL 25.17

1

3

2

4

5

6

7

Conc r e t e Ap r on

Conc r e t e Pa t h

162°52'

77.44

162°49'56.53

Cor r . I r o n Fence

Paling Fence

No FenceLine o f Pos t s

Co r r . I r o n Fence

C o r r . I ronF e n c e

REECE HIGHSCHOOL

73°21'

9 9 °2 3 '

4 7 .6 7

wm

p1

p2

p3

p4

p5

p6

p7p8

p9

p10 p11 p12 p13

p14

p15

wm

p16

bins

bins

clothes dry

bins

bins

clothes dry

1800

high

palin

g fen

ce18

00 hi

gh pa

ling f

ence

1800 high paling fence

HARD PAVEDDRIVE

setback to wall

setback to wall

pos

pos

setba

ck to

wall

1 SITE PLANSCALE 1:200

GSPublisherVersion 0.0.100.100

CYKE

L: 17

0502

29

A MI

DDLE

ROA

D 3

1/07/2

017

10:55

AM

170502

01.03

31/07/2017 1:100

dateproject no scale

drawing no

FLOOR PLAN

revision

DA

checkedsg

29A MIDDLE ROAD, DEVONPORTTASMANIA

PROJECT:

CLIENT:

DRAWING:

REV DESCRIPTION DATE APPLIED

31/07/2017

BIG BLUE

CYKEL ARCHITECTURE

level 2 /51 Murray49 - 51 Murray St, Hobart, Tasm: 0410054749e: [email protected]

DA

87 m2

21-48

903,4

0090

2,550

905,3

1090

580

90 3,350 9060090 3,290 90

903,4

0090

1,000

902,5

503,1

1090

1,200

11,62

0

7,600

3,000

6,000

90 6,230 9090 7,420 90

6,390 1,190

floor area

KITCHEN

LIVING

BATHROOM

BED 1 BED 2

ROBE

ROBE

WC

CAR

1 TYPICAL FLOOR PLAN 1:100

NOTE:Builder to verify all dimensions and levels on siteprior to commencement of work.

Do not scale off drawing - dimensions to takeprecedence over scale. Discreapncey to be reportedto architect immediately.

Contractors to ensure structural adequacy integrityand stability whilst ensuring thedesign intent is maintained

Contractor must allow for all safety measuresrequired to maintain site staff and visitors safety.

All construction work shall be carried out inaccordance with the Planning and Building permits.Materials and workmanship to conform with statebuilding regulations, local council by laws andrelevant BCA codes, Australian standards andmanufactureres specifications.

All insulation to comply with ASnzs 4859.1 - 2002

GSPublisherVersion 0.0.100.100

CYKE

L: 17

0502

29

A MI

DDLE

ROA

D 3

1/07/2

017

10:55

AM

170502

01.04

31/07/2017 1:100

dateproject no scale

drawing no

ELEVATION

revision

DA

checkedsg

29A MIDDLE ROAD, DEVONPORTTASMANIA

PROJECT:

CLIENT:

DRAWING:

REV DESCRIPTION DATE APPLIED

31/07/2017

BIG BLUE

CYKEL ARCHITECTURE

level 2 /51 Murray49 - 51 Murray St, Hobart, Tasm: 0410054749e: [email protected]

DA

2,400

select lightweight wallcladding

colorbond flashing50mm turn down

colorbond custom orbroof pitch @ 5 deg

aluminium framed doorspowdercoat finish

boun

dary

2,400 3,5

64

2,4003,5

61

select lightweight wallcladding

colorbond flashing50mm turn down

colorbond custom orbroof pitch @ 5 deg

abov

e ngl abov

e ngl

1 NORTH ELEVATION 1:100

2 EAST ELEVATION 1:100

NOTE:Builder to verify all dimensions and levels on siteprior to commencement of work.

Do not scale off drawing - dimensions to takeprecedence over scale. Discreapncey to be reportedto architect immediately.

Contractors to ensure structural adequacy integrityand stability whilst ensuring thedesign intent is maintained

Contractor must allow for all safety measuresrequired to maintain site staff and visitors safety.

All construction work shall be carried out inaccordance with the Planning and Building permits.Materials and workmanship to conform with statebuilding regulations, local council by laws andrelevant BCA codes, Australian standards andmanufactureres specifications.

All insulation to comply with ASnzs 4859.1 - 2002

GSPublisherVersion 0.0.100.100

CYKE

L: 17

0502

29

A MI

DDLE

ROA

D 3

1/07/2

017

10:55

AM

170502

01.05

31/07/2017 1:200

dateproject no scale

drawing no

ELEVATIONS

revision

DA

checkedsg

29A MIDDLE ROAD, DEVONPORTTASMANIA

PROJECT:

CLIENT:

DRAWING:

REV DESCRIPTION DATE APPLIED

31/07/2017

BIG BLUE

CYKEL ARCHITECTURE

level 2 /51 Murray49 - 51 Murray St, Hobart, Tasm: 0410054749e: [email protected]

DA

2,400

select lightweight wallcladding

colorbond flashing50mm turn downcolorbond custom orb

roof pitch @ 5 deg

aluminium framed doorspowdercoat finish

boun

dary

1 SOUTH ELEVATIONSCALE 1:100

2 WEST ELEVATIONSCALE 1:100

NOTE:Builder to verify all dimensions and levels on siteprior to commencement of work.

Do not scale off drawing - dimensions to takeprecedence over scale. Discreapncey to be reportedto architect immediately.

Contractors to ensure structural adequacy integrityand stability whilst ensuring thedesign intent is maintained

Contractor must allow for all safety measuresrequired to maintain site staff and visitors safety.

All construction work shall be carried out inaccordance with the Planning and Building permits.Materials and workmanship to conform with statebuilding regulations, local council by laws andrelevant BCA codes, Australian standards andmanufactureres specifications.

All insulation to comply with ASnzs 4859.1 - 2002