brendan upton - bimmepaus.com.au...ibim file based collaboration paper file based collaboration...
TRANSCRIPT
Fabrication Containment
New Electrical Generic Content
New Manufacturers Content
Colour Filters
Fabrication Ductwork
Fabrication Containment
New BMA Sample Model
August 2019
https://www.bimmepaus.com.au/shared/parameters/
Parameter Manager
Parameter Update
tool for Revit
▪ Multi-disciplined engineering consultancy with expertise in structural,
civil, traffic, waste, building services engineering and environmentally
sustainable design solutions
▪ Over 60 years in Melbourne
▪ Recently acquired by WSP
▪ Long successful track record delivering state of the art facilities over
multiple sectors including specialist fields of Pharmaceutical and
Laboratory
A BIT ABOUT ME..
▪ 2.5 years in manufacturing drafting
▪ 11 years in the Building Services
▪ 3 years as BIM Coordinator at Irwinconsult (Current)
▪ 23 Modelers in Building Services Drafting
IDENTIFIED CHALLENGES
▪ Originally developed in house
▪ Was not industry standard
▪ Contractors needed to start from scratch
▪ Drawings didn’t appear as well as older AutoCAD documentation
Screen Shots from In-house Template Drawings
▪ Change to BMA Template was the result of:
1. Specific project requirement
2. Internal requirements for change
3. Wanting to produce great documentation in 2D & 3D model
SPECIFIC PROJECT REQUIREMENTS
• Lessons learned from previous similar
project for same client
• Minimise contractor modelling and shop
drawing development time and cost
• High level of spatial accuracy
• High degree of consultant co-ordination
REQUIREMENT FOR CHANGE
• Improvement required to the dated in-house template
• More consistent looking drawings across all projects
• Reduce time and cost associated with template development
GREAT DOCUMENTATION
• Significant improvement in documentation quality
In-House Template
BIM-MEPAUS Template
• Highly accurate spatial allocation using downloaded equipment from BMA
website
• Improved level of 3D co-ordination through accurately modelled layouts
• Highly accurate spatial allocation using downloaded equipment from BMA
website
• Improved level of 3D co-ordination through accurately modelled layouts
• Seamless transfer to contractors for shop drawing development
• No remodeling required; only final contractor co-ordination
• BIM's immediate benefits has best
suited needs of the Mechanical or
Lead Coordinating trade.
• RFI Process
• Duct manufacture/Prefab
• The Cloud / BIM360
• Digital Coordination
• BIM's immediate benefits has best
suited needs of the Mechanical or
Lead Coordinating trade.
• RFI Process
• Duct manufacture/Prefab
• The Cloud / BIM360
• Digital Coordination
• The 'BAD NEWS GUY'
• Embrace the coordination process
• Have meaningful and efficient
coordination meetings
• The work up front DOES pay off
• Essential that all trades are aware
of what is expected, the technology
to be used and are working to meet
deadlines together.
• A dive in approach at the start
• Can be a long lead time before
seeing the real benefits
• Fear of the unknown
• Technical staff turnover
• Training
• General lack of understanding
about the modelling process
• The benefits are being experienced
by a larger portion of the industry
• Technology is no longer the limiting
factor
• Ease of access to information – The
Cloud
• Many companies doing a level of BIM
by default
• The Industry is developing a realistic
understanding what BIM can be used
for
• No control or standards for the
Revit/modelling environments
• Large amount of time for
developing templates
• Early users could see the benefit of
an Industry Master Template
• Similar control issues with Family
creation
• Company's becoming 'Silos' with
regard to Revit development and
BIM development
• The BIMMEPaus subscription
solves all this
• Give delegated technical people
time to develop and learn new
technology
• Don't fear technology, by nature it's
always new!
• Get the mechanical or coordinating
trade on your project as early as
possible
• Adopt BIM within your Company -
Get on the BIM Train!
• GET A BIMMEPaus SUBSCRIPTION!
TOOLS
LEVEL 0 LEVEL 1 LEVEL 2 LEVEL 3
CAD
BIM
iBIM
File based
collaboration
Paper File Based
collaboration &
Library
Management
Integrated Web Services
BIM Hub
Drawings, lines, arcs, text etc.
2D 3D
Models, objects, collaboration Integrated, Interoperable Data
Life
cycle
ma
na
gem
ent
MATURITY
1990’s 2000’s 2010’s 2020’s
100 YEARS OF CONSTRUCTION INNOVATION EMBRACING A DIGITAL AGE
FOUNDED ANNIVERSARY
1918 2009 2018
DIGITAL
INNOVATION
$1.2 BILLION
Annual turnover
for five
consecutive years
100 YEARS
of knowledge and
expertise
5 STATES
600+ Staff
5,000+
Projects delivered
nationally
Architectural
Model
Structural
Design Model
Mechanical
Services Design
Model
Electrical
Services Design
Model
Hydraulic
Services Design
Model
Fire Services
Design Model
Specialist
Services Design
Model
Federated
Construction
Model/As Built
Handover
Model
Mechanical
Services
Contractor Model
Electrical
Services
Contractor Model
Hydraulic
Services
Contractor Model
Fire Services
Contractor Model
Specialist
Services
Contractor Model
Structural Steel
Contractor Model
12 Common data environment (CDE) solution and workflow
12.1 Principles
A CDE solution and workflow should be used for managing
information during asset management and project delivery
TOOLS
LEVEL 0 LEVEL 1 LEVEL 2 LEVEL 3
CAD
BIM
iBIM
File based
collaboration
Paper File Based
collaboration &
Library
Management
Integrated Web Services
BIM Hub
Drawings, lines, arcs, text etc.
2D 3D
Models, objects, collaboration Integrated, Interoperable Data
Life
cycle
ma
na
gem
ent
MATURITY
1990’s 2000’s 2010’s 2020’s
11 Managing the collaborative production of information
11.3 Information quality
Classification of objects should be in accordance with the
principles in ISO 12006-2.
Automated checking of information in the CDE should be
considered.
Introduction
0.2 National annex with relevant national standards
There are several standards required for the successful
implementation of this document, relating to specific regions or
countries, that are currently not suitable for inclusion within an
international standard. As such, national standards bodies are
encouraged to compile and document the standards, relevant to
the region or country they represent, within a national annex.
BIM-MEPAUS Specification
Standard Generic Sizing
Standard colouring
Standard Naming
Can be scheduled
Can be costed
Stream B (Clarendon Room E):
Brendan Upton – A2KSenior MEP Technical Consultant
Shannon Thomas –Executive Manager
BIM-MEPAUS AMCA
Demonstration of the Latest
Development with BIM-MEPAUS for
Electrical Consultants and Contractors.
Electrical Fabrication Parts in Revit
AVAIL – Content Solution
RevTag – Tagging Solution
Stream A (Clarendon Room D):
Craig Farish –PO / QA & analyst
Autodesk
Dave Mangham – A2KSenior MEP Solutions Consultant
Martin SchmidProduct Line Manager
Building and Infrastructure Design
Autodesk
Fabrication Management
A forward look with Autodesk
Please join us for the streamed Sessions tomorrow morning
8:00am: -