PRESENTATION OUTLINE
1. Survey & defect2. Building defect: example3. Building condition
survey: inspection4. Building condition
survey: reporting5. Next: analysis6. Next: performance
measurement7. Next: how “defect”
benefit us8. Summary
Page 3
Survey & Defect
UKM:Che-Ani 2012
http://myprservices.com
“Defects will occur in buildings. It is one of the great certainties in construction, the equivalent of death and taxes in life more generally”. (Professor Anthony Lavers)
Survey (Hollis & Gibson – Surveying Buildings, 2005):Inspection & investigation of construction &
services of property in sufficient details to enable surveyor to advise what impact the condition & circumstances of that property will have upon client.
http://www.buildingdefects.com.au/
http://www.blaketurner.com
Defects:areas of non-compliance to the bye-law, regulation,
standard (mostly not subjective)Out of acceptable condition (subjective)
Page 4
Survey & Defect
UKM:Che-Ani 2012
Page 5
BUILDING DEFECTS – An Example
Growth of mould and algae due to water ponding and continuous
dampness Water ponding due to blockage of outlet to rainwater downpipe (due to small outlet) – it’s very
hot during the course of inspection
Page 6
BUILDING DEFECTS – An Example
Water mark on the ceiling surface due to water penetration
from leaking roof (the brown color suggest it dripped via timber trusses, perhaps the
trusses need structural inspection)
Stalactite effect due to water proofing failure at
upstairs toilet
Page 7 UKM:Che-Ani 2012
BUILDING DEFECT: CRACKS
http://www.youtube.com/watch?v=wvTlB1EVKbQ&feature=player_embedded
Page 8 UKM:Che-Ani 2012
BUILDING DEFECT: FOUNDATIONS DEFECT
http://www.youtube.com/watch?v=7rAhPhB46oc&feature=player_embedded
Page 9 UKM:Che-Ani 2012
BUILDING DEFECT
http://www.youtube.com/watch?v=OeAB9XLjA8k&feature=player_embedded
Page 10 UKM:Che-Ani 2012
BUILDING CONDITION SURVEY : INSPECTION
http://www.nienergyrating.com
An apparent defect has been perceived when
It looks wrong Something
smells strange
Someone heard
something
It just felt wrong
Something felt
Page 11
BUILDING DEFECT ACTION FLOW (WOOD, 2009 – BUILDING MAINTENANCE)
Inspect All seem OK?
Allocate priority in accord with agreed
criteria
Is a matter of health and safety
Record and keep in mind
for future
Defect confirmed
No further action at this
time
UKM:Che-Ani 2012
Page 12
Initiate urgent action
Check and record work in progress early on and periodically
Commission rectification work
Discuss and agree with client and users
Select appropriate specialists for
further inspection
Prepare or select appropriate rectification specification
Review periodically(annually)UKM:Che-Ani 2012
Page 13
Various standard available
BUILDING CONDITION SURVEY : REPORTING
UKM:Che-Ani 2012
http://www.home-building-inspectors-ny.com/
No Piawaian/ Dokumen
Tahun dibang-unkan
Kerja Pra-Pemeriksaan
Kerja ukur kondisi
Keperluan nilai pasaran
Keperluan anggaran kos
Kaedah pengkadaran/ numerik
Penggunaan kod warna
Input data Cadangan pembaikan
Kandungan utama pelaporan
1 RICS Building Survey Report
2005 Kajian Meja Protokol 1 (visual)
Tidak perlu
Tidak perlu
Tiada Tiada Keadaan, sebab, tahap kerosakan
Ada Pemeriksaan, Laporan, Penilaian
2 BRE Design Quality Manual
2007 Tiada Protokol 1 (visual)
Perlu Perlu Ada Tiada Keadaan Ada Pemeriksaan, Laporan, Penilaian
3 ASTM E-2018 2008 Penelitian dokumen & temubual
Protokol 1 (visual)
Perlu Tiada Tiada Keadaan Ada Laporan Keadaan Hartanah
4 The RICS Home Buyer Report 2009
2009 Tidak perlu Protokol 1 (visual)
Perlu Perlu 3 kadaran Ada Keadaan Ada Pemeriksaan, Laporan, Penilaian
5 Matriks CSP1 2010 Kajian meja Protokol 1 (visual)
Tidak perlu
Tidak perlu
Keadaan (5 kadaran) & Keutamaan (4 kadaran)
Ada Keadaan, Kepentingan
Tiada Jadual keadaan bangunan, Kotak gambarfoto, pelan tandaan kecacatan
6 RICS Condition Report
2010 Tidak perlu Protokol 1 (visual)
Tidak perlu
Tidak perlu
3 kadaran Ada Keadaan Tiada Pemeriksaan, Laporan
7 CP BS101 2011 Kajian meja Protokol 1 (visual)
Tidak perlu
Perlu Ada (Building Assessment & Rating System – BARIS)
Ada Keadaan, Kepentingan
Ada Jadual keadaan bangunan, Kotak gambarfoto, pelan tandaan kecacatan
And many more…
Page 14 UKM:Che-Ani 2012
BUILDING CONDITION SURVEY : REPORTINGProblem: No standard is adopted….
Then you need to be certified….but who certified
Page 15
NEXT: ANALYSIS
UKM:Che-Ani 2012
http://www.home-building-inspectors-ny.com/
Common building defectsOverall building ratingDistribution of defectsPredictive model
http://www.researchrockstar.com/market-research-challenge-analysis-bias/
Page 16
NEXT: ANALYSIS
UKM:Che-Ani 2012
Komponen Bilangan Kecacatan PeratusPintu 222 23.5Lantai 63 6.7Dinding 177 18.7
Tingkap 32 3.4Siling 138 14.6Sanitari 230 24.3Kelengkapan 48 5.1Paip Buangan 26 2.7Paip Agihan 7 0.7Pintu Utiliti 1 0.1Meja Konkrit 1 0.1Paip Bekalan 1 0.1Jumlah 946 100.0
Common defects: toilet (design input for future projects)
Page 17
Table 6: BUILDING CONDITION ASSESSMENT for ECSTRACT, LANGKAWI, KEDAH Schedule of Building Condition (CSP1 Matrix)
Condition Survey Protocol (CSP) 1
NO. AREA DEFECTS Condition Assessment
[a]
Priority Assessment
[b] Matrix A’lysis [c]
(a x b) Photo No. /
(Sketch No.) Defect Plan Tag
A EXTERNAL Rainwater outlet 1 Front outlet: Blockage with dried leaf 2 2 4 1 1
Rainwater collector 2 Back collector: Had little gap 2 2 4 2 2 3 Back collector: Sealant fail 1 2 2 3 3 Gutter at bothsides 4 Back gutter: Blockage with dried leaf 2 2 4 4 4 Water tank 5 Water tank (front): Distortion 3 4 12 5 5 6 Water tank (back): Sagging and leaking 3 4 12 6 6 Water tank support 7 Supporting bar: Corrosion 2 2 4 7 7 Distribution board (DB) 8 Cover: Can not open and close properly 1 1 1 8 8
B MALE
First cubicle (Disable) Water closet (WC) 9 Flush does not function 2 2 4 9 9
Door
10 Misaligment 2 2 4 10 10
11 Can not close and lock properly 2 2 4 11 11
Second cubicle Water closet (WC)
12 Flush does not function 2 2 4 12 12
Tap
13 Function with low water pressure 2 2 4 13 13
Circulation Hand dryer
14 Not function and not fix at wall 2 2 4 14 14
Dustbin
15 Not properly fix at floor and sagging 1 2 2 15 15
Sink
Overall Building RatingNEXT: ANALYSIS
Page 18
16 Sink tap 1: Function with low water pressure 2 2 4 16 16
17 Sink tap 2: Not function 2 2 4 17 17
18 Outlet: Blockage 3 2 6 18 18
Lamp
19 Not function 2 2 4 19 19
Vegetation area
20 Vegetation: Not available anymore 2 2 4 20 20
C FEMALE First cubicle (Disable) Tap 21 Function with low water pressure 2 2 4 21 21 Second cubicle Tap
22 Pipe disconnected and function with low water pressure 2 3 6 22 22
Door 23 Can not close properly 2 2 4 23 23 Circulation Hand dryer 24 Not properly fix at wall 2 2 4 24 24 Dustbin 25 Not properly fix at floor 1 2 2 25 25 Sink
26 Sink tap 1: Function with low water pressure 2 2 4 26 26
27 Sink tap 2: Function with low water pressure 2 2 4 27 27
Lamp 28 Not function 2 2 4 28 28 Vegetation area 29 Vegetation: Not available anymore 2 2 4 29 29
Total marks [d] (∑ of c) 127 Number of defects [e] 29
Total score (d/e) 4.38
Overall building rating Good Limitation(s):
1. Roof top is not inspected as there is no safe access during the time of inspection.
Overall Building Rating
NEXT: ANALYSIS
Page 19
NEXT: ANALYSIS
UKM:Che-Ani 2012
5.31
5.07
5.49
4.81
4.4
4.6
4.8
5
5.2
5.4
5.6
Pelajar/K.Tangan
K.Tangan Pelajar K.Tangan/Pelawat
Kategori pengguna
Nila
i sko
r
Matriks CSP1Distribution of defects: toilet (perhaps frequency of toilet cleaning can be reasonably distributed)
Page 20
NEXT: ANALYSIS
UKM:Che-Ani 2012
Kebarangkalian (bangunan tidak selamat) = zezf
1
1)(
di mana z = -0.606 – 0.891(Dinding) + 1.372(Kasau Bumbung) + 1.961(Kekuda) + 1.968(Papak) - 1.628(Pendawaian) – 1.479(Tiang)
Predictive model: multiple logistic regression – school (possibly to predict the building condition with focusing to critical defect )
Page 21
NEXT: ANALYSIS
UKM:Che-Ani 2012
Komponen Sampel1 2 3 4 5 6 7 8 9 10
Anak Tangga 0 0 0 0 0 0 0 0 0 0Apron 1 1 1 0 0 0 0 1 0 0Atap 0 0 0 0 0 0 0 0 0 0Atap bumbung 0 0 0 0 0 0 0 0 0 0Balkoni 0 0 0 0 0 0 0 0 0 0Beam 0 0 0 0 0 0 0 0 0 0Bilik 0 0 0 0 0 0 0 0 0 0Bumbung 0 1 0 0 0 0 0 0 0 1Dinding 1 1 1 1 0 0 1 1 0 1Footing 0 0 0 0 0 0 0 0 0 1Halaman Luar 0 0 0 0 0 0 0 0 0 0Kasau Bumbung 0 0 0 0 0 0 0 0 0 0Kekuda 0 0 0 0 1 0 0 0 0 0Kelengkapan 1 1 0 1 0 0 0 1 0 1Lantai 1 1 1 0 0 1 1 1 0 1Lantai Apron 0 0 0 0 0 0 0 0 0 0Longkang 0 0 0 0 0 0 0 0 0 1
Lubang Pengudaraan 1 0 0 0 0 0 0 0 0 0Manhole 0 0 0 0 0 0 0 0 0 0Pagar 0 0 0 0 0 0 0 0 0 0Paip 1 0 0 0 0 0 1 0 0 0Paip Agihan 0 0 0 0 0 0 0 0 0 0Paip Air Hujan 0 0 0 0 0 0 0 0 0 0Paip Bekalan 0 0 0 0 0 0 0 0 0 1Paip Buangan 0 0 0 0 0 0 0 0 0 0
Paip Penghawa Dingin 0 0 0 0 0 0 0 0 0 0Papak 0 0 0 0 0 0 0 0 0 0Pendawaian 0 1 0 1 0 0 0 0 0 1Pentas 0 0 0 0 0 0 0 0 0 0
Perabot Kelengkapan 0 0 0 0 0 0 0 1 0 0Pintu 1 0 1 1 0 0 0 1 1 0Rasuk 0 0 0 0 0 0 0 0 0 0Saliran 0 0 0 0 0 0 0 0 0 0Sanitari 0 0 0 1 0 0 0 1 1 1Servis 0 0 0 0 0 0 0 0 0 1Siling 1 1 1 0 0 0 0 1 0 1Sinki 0 0 0 0 0 0 0 0 0 0Talang hujan 0 0 0 0 0 0 0 0 0 0Tangga 1 0 0 0 0 1 1 1 0 0Tiang 0 0 0 0 0 1 0 0 0 0Tingkap 1 1 1 1 0 0 0 1 0 1Matriks 0 0 0 0 1 0 0 1 0 0
Kebarangkalian 0.1829 0.0421 0.1829 0.0421 0.7948 0.1105 0.1829 0.1829 0.3529 0.0421
Status keselamatan 0 0 0 0 1 0 0 0 0 0
Predictive model: multiple logistic regression – school (possibly to predict the building condition with focusing to critical defect)
help to select the critical school to be repair urgently: budget is very limited
Page 22 UKM:Che-Ani 2012
QlassicBuilding condition
NEXT: PERFORMANCE MEASUREMENT
http://mrtplus.wordpress.com/2011/07/14/meauring-up/
http://www.cartoonstock.com/directory/m/measures.asp
Page 23
NEXT: PERFORMANCE MEASUREMENT
UKM:Che-Ani 2012
Defects Group For Assessment Of Architectural Works (Internal Finishes)
Weightage for architectural elements
Sampling guideline for architectural works
Qlassic (construction quality, especially contractor)
Page 24
NEXT: PERFORMANCE MEASUREMENT
UKM:Che-Ani 2012
R01 R03 R05 R07 R09 R11 R13 R15 R17 R19 R21 R23 R25 R27 R29 R31 R33 R35 R37 R39 R41 R43 R45 R47 R49 R51 R53 R55 R57 R59 R61 R63 R65 R67 R69 R710
5
10
15
20
25
E 4 U 3 R 2 N 15 20 15 10 54 16 12 8 43 12 9 6 32 8 6 4 21 4 3 2 1
Scale Priority Assessment
Con
ditio
n
Ass
essm
ent
Construction quality of 72 newly completed terrace houses (by the same consultant + contractor)
Page 25
NEXT: How “defect” benefit us…
UKM:Che-Ani 2012
It wasn’t hit by the massive earthquake. In true fashion of the Ripley Legacy, it was built to reflect the odd 1812 earthquake that measured 8.0 on the rick. The building has now become one of the most photographed in the world.
Page 26
NEXT: How “defect” benefit us…
UKM:Che-Ani 2012
Page 27
NEXT: How “defect” benefit us…
UKM:Che-Ani 2012
Page 28
NEXT: How “defect” benefit us…
UKM:Che-Ani 2012
Page 29
CONCEPT BUILDING
HOK & VANDERWEIL
U.S General Service
Administration (GSA), LA
Page 30
NEXT: How “defect” benefit us…
UKM:Che-Ani 2012
Page 31
SUMMARY
UKM:Che-Ani 2012
Start up: building defects identification – more than an “album” Reporting: standard and certified – qualify to stand in court Next level: building defect analysis – defects are here & there:
so what? Next level: performance measurement – information for future
design Next level: building defect “advantage”? – new theory around
the corner
“We do not want a structural survey. If you can just have a quick look at the house to make sure that it is structurally sound, that