canada town of brandon, vt county of ......post-tension tendons to 47 kips for each 0.6"...
TRANSCRIPT
PROJECT LOCATION:
PROJECT DESCRIPTION:
LENGTH OF PROJECT:
LENGTH OF ROADWAY:
LENGTH OF STRUCTURE:
104+0
0
103+0
0
102+00
101+00
100+00
NES
HO
BE
RIV
ER
0 2020
STA.101+35
BEGIN PROJECT STA.103+00
END PROJECT
STA.102+43.86
END BRIDGESTA.102+02.84
BEGIN BRIDGE
COMPACT
URBAN
BRANDON
PARK
STATE
BRADBURY
73
21
53
OF ITS INTERSECTION WITH VT 73, AND EXTENDING NORTHERLY 0.031 MILES.
BEGINNING AT A POINT ON T.H. 22, APPROXIMATELY 0.1 MILES NORTHERLY
T.H. 22 (CHURCHILL ROAD) - BRIDGE NO. 22 OVER NESHOBE RIVER
INDEX OF SHEETS
NESHOB
E
RIV
ER
BRIDGE
BRANDON-CHURCHILL ROAD
165.00 FEET = 0.031 MILES
123.98 FEET = 0.023 MILES
41.02 FEET = 0.008 MILES
DAOR LLI
HCRUHC( 2
2 .H.
T
N
VT STATE PLANE GRID
APPROACH AND CHANNEL WORK.
SUPERSTRUCTURE AND CAST-IN-PLACE CONCRETE ABUTMENTS, WITH RELATED
REPLACEMENT OF BRIDGE NO. 22 WITH PRESTRESSED CONCRETE VOIDED SLAB
NAVD 88
NAD 83 (cors 96)
SERVICE
ROAD #4
0
NATIONAL
FOREST
TO GREEN
MOUNTAIN
JUNE 2016
ENGINEERING, INC.
VERMONT SURVEYING &DAVID J. ATHERTON, TOWN MANAGER
STRUCTURES DETAILS
SD-502.00 CONCRETE DETAILS & NOTES
SD-501.00 CONCRETE DETAILS & NOTES
BRANDON PLH ALPP(1)
ACCESS TRAIL
NORTH SIDE
R.O.W. PLAN
R.O.W. DETAIL SHEET
EPSC DETAIL SHEETS
EPSC FINAL CONDITIONS SITE PLAN
EPSC CONSTRUCTION SITE PLAN
EXISTING CONDITIONS SITE PLAN
EROSION CONTROL NARRATIVE
RESOURCE LAYOUT SHEET
CHANNEL CROSS SECTIONS
ROADWAY CROSS SECTIONS
ABUTMENT DETAILS
NORTH ABUTMENT
SOUTH ABUTMENT
SUPERSTRUCTURE DETAILS (2 OF 2)
SUPERSTRUCTURE DETAILS (1 OF 2)
ROADWAY PLAN AND PROFILE
TIE SHEET
QUANTITY SHEET
PROJECT NOTES
TYPICAL SECTIONS AND DETAILS
TITLE SHEET
23
22
21
18-20
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
PROPOSED IMPROVEMENT
NEW YORK
State of
MASSACHUSETTS
Commonwealth of
NEW HAMPSHIRE
State of
CANADA
ORLEANSESSEX
WASHI
NGTON
LAMOILLE
FRANKLIN
GR
AN
D IS
LE
ADDISON
CHIT
TENDEN
ORANGE
CA
LE
DO
NIA
WIN
DS
OR
RUTLAND
BE
NNIN
GT
ON
WINDHAM
N
VT
ST
AT
E P
LA
NE
GRID
APPROVED DATE
DATUM
VERTICAL
HORIZONTAL
COUNTY LINE
TOWN LINE
LIMITS OF ACCESS
POINT OF ACCESS
FENCE LINE
STONE WALL
TRAVELED WAY
GUARD RAIL
RAILROAD
SURVEY LINE
CULVERT
POWER POLE
TELEPHONE POLE
TREES
CONTROL OF ACCESS
PROPERTY LINE
R.O.W. TAKING LINE
SLOPE RIGHTS
TOP OF CUT
TOE OF SLOPE
SR
.
SR SR
COUNTY LINE
TOWN LINE
CONVENTIONAL SYMBOLS
BRIDGE PROJECT
SURVEYED DATE :
SURVEYED BY :
PROJECT NAME :
PROJECT NUMBER :
M cFarlandJohnsonSHEET 1 OF 23 SHEETS
COUNTY OF RUTLAND
TOWN OF BRANDON, VT
MUNICIPAL PROJECT MANAGER :
PLANS.
SPECIAL PROVISIONS AS ARE INCORPORATED IN THESE
REVISIONS AND SUCH REVISED SPECIFICATIONS AND
FOR CONSTRUCTION DATED 201 1, INCLUDING ALL SUBSEQUENT
WITH THESE PLANS AND VTRANS AOT STANDARD SPECIFICATIONS
CONSTRUCTION IS TO BE CARRIED ON IN ACCORDANCE
B16
X
X
X
NE
SH
OB
E
R.Pond
Spring
PondBurnell
U
U
LOCATION MAPNOT TO SCALE
(BRANDON)
TO VT 73
STANDARDS LIST
T-45
T-1
S-367B
S-367A
G-1D
G-1
*PLH ALPP(1)
BRANDON*
NOTES ON SHEET 3.
APPROACH SIGNING
- SEE CONSTRUCTION
ROAD
CHURCHILL
(1/2/13)
SQUARE TUBE SIGN POST AND ANCHOR
(4/25/16)
TRAFFIC CONTROL GENERAL NOTES
(2/2/17)
GUARDRAIL APPROACH SECTION, GALVANIZED HD STEEL BEAM
(2/2/17)
BRIDGE RAILING, GALVANIZED HDSB/FASCIA MOUNTED/STEEL TUBING
(3/10/17)
STEEL BEAM GUARDRAIL DETAILS (END TERMINAL, ANCHOR, MEDIAN)
(3/10/17)
STEEL BEAM GUARDRAIL DETAILS (POST, DELINEATOR, TYPICALS)
N
VT STATE PLANE GRID
TYPICAL SECTIONS AND DETAILS
z8013typ.dgn
~ ~~ ~
TYPICAL ABUTMENT SECTION
NOT TO SCALE
VARIES
3'-6"
SUPERSTRUCTURE
1
COFFERDAM LIMITS
PAY LIMITS
COFFERDAM EXCAVATION
THE PAY LIMITS OF "COFFERDAM EXCAVATION, EARTH" AND
"COFFERDAM EXCAVATION, ROCK" SHALL BE 2'-0" OUTSIDE THE
PERIMETER OF THE FOOTING, UP TO EXISTING GROUND OR
BOTTOM OF SUBBASE, WHICHEVER IS LOWER.
ONE FOOT UNDERCUT AS DETERMINED NECESSARY BY THE
RESIDENT ENGINEER.
IF A COFFERDAM IS CONSTRUCTED WHICH IS LARGER THAN
THE INDICATED COFFERDAM EXCAVATION PAY LIMITS, PAYMENT
FOR ALL UNCLASSIFIED CHANNEL EXCAVATION, INCLUDING THAT
PORTION WHICH IS INSIDE THE COFFERDAM BUT OUTSIDE
THE COFFERDAM EXCAVATION PAY LIMITS, WILL BE MADE AT
THE CONTRACT UNIT PRICE FOR UNCLASSIFIED CHANNEL
EXCAVATION.
1.
2.
3.
4.
TYPICAL CHANNEL SECTIONNOT TO SCALE
1
*
COFFERDAM NOTES
VARIES
SEE COFFERDAM NOTES
12"
BRIDGE
BEGIN OR END
1'-0"
VARIES
(TYP.)
8'-0"
(TYP.)
4'-0"
2
GRADE
FINISH
COURSE
SURFACE
6" AGGREGATE
CHANNEL EXCAVATION
UNCLASSIFIED
LIMITS OF
TYPE IV
STONE FILL,
STONE FILL
GEOTEXTILE UNDER
SEE NOTES
2'-0" (TYP.)
NOTE 3
SEE COFFERDAM
1'-0" (TYP.)
STRUCTURES
BACKFILL FOR
LIMITS OF GRANULAR
10'-0"
COARSE GRADED
SUBBASE OF CRUSHED GRAVEL,
MATERIAL ITEM TOLERANCE
SUBBASE
AGGREGATE SURFACE COURSE
1"
•"+-+-
GROUND
EXISTING
HIGH WATER
ORDINARY (TYP.)
MATERIAL
GRUBBING
STONE FILL (TYP.)
GEOTEXTILE UNDER
(TYP.)
CHANNEL EXCAVATION
UNCLASSIFIED(TYP.)
TYPE IV
STONE FILL,
** **
COFFERDAM LIMITS TO BE DETERMINED BY THE CONTRACTOR.
15' END
30' BEGIN
*
**
4'-0"(H).
STONE FILL, TYPE II KEY DIMENSIONS ARE 2'-0"(V) AND
BOTTOM OF SUBBASE.
SUBBASE, GRUBBING MATERIAL SHALL BEGIN AT THE
WHENEVER CHANNEL SLOPE INTERSECTS ROADWAY
GROUND
EXISTING
APPROXIMATE
VARIES
LC CONSTRUCTION
2% 2%
(TYP.)
2'-0"
SCALE: ‚" = 1'-0"
TYPICAL ROADWAY SECTION
MATERIAL
EXCAVATED
SUITABLE
(TYP.)
GUARDRAIL
FACE OF
GRADE
FINISH
1
(TYP.)
2" TOPSOIL
SURFACE COURSE
6" AGGREGATE
SEE TYPICAL ABUTMENT SECTION
(VARIES 12" TO 3'-6")
SUBBASE OF CRUSHED GRAVEL, COARSE GRADED
EXISTING GROUND
APPROXIMATE
VARIES* SECTIONS (TYP.)
-SEE CROSS*
STANDARDS G-1 AND G-1D.
POSTS (WOOD POSTS) (TYP.) FOR DETAILS,
STEEL BEAM GUARDRAIL, GALVANIZED W/ 8 FEET
+44.44
7.7
7'
9.3
6'
9.4
3' +46.01
STATIONING
(TYP.)
FACE OF RAIL
7 SPACES @ 6'-3" = 43'-9"
3.6
1'
5.6
0'
6.17'
7.8
7'
102
8.0
0'
'00.
61=R
'00.6
4=R
9.0
9'
12.5
0'
5=
R
7.9
1'
'00.05=R
+51.08
3.4
2'3.7
4'
103
+81.9
2
4.7
0'
APPROACH AND RAIL LAYOUT PLAN
WAY (TYP.)
EDGE OF TRAVEL
+53.37
+60.35
4.7
0'
R=75.00'
R=75.00'
+00.69
+02.26
+96.39
+94.42
+79.80
+85.07
+72.68
+69.66
NOT TO SCALE
8.0
0'
8.0
0'
+66.31
+64.92
+75.12
6.4
2'
"•1-'3
@ SECAPS 4
4 SPACES @ 1'-6ƒ"
6'-3"
4 SPACES @ 1'-6ƒ"
"•1-'3 @
SECAPS 4
ABUTMENT
L BRG. SOUTHC
ABUTMENT
L BRG. NORTHC
4 SPACES
@ 3'-1•"
****
**
@ 3'-1• "
4 SPACES
*
15.3
7'
*
*
**
*
10.7
1'
*
**
*
*
* FACE OF RAIL.
DIMENSIONS GIVEN TO
**
*
8.0
0' *
8.0
0'
@ 6'-3"
3 SPACES
4 SPACES @ 1'-6ƒ" 4 SPACES @ 1'-6ƒ"
6'-3"
SECAPS 3"3-'6 @
9.6
4
14.7
8'*
8.0
5' *
8.15' *
+51.75
+85.78
+81.7
7
5.8
0'
R=10.00'
10.9
0
*
+59.61
+64.70
8.2
8' *
+93.75
GALVANIZED W/8 FEET POSTS
STEEL BEAM GUARDRAIL,
(TYP.)(STD S367A)
HDSB/FASCIA MOUNTED/STEEL TUBING
PAY LIMIT BRIDGE RAILING, GALVANIZED
7 SPACES @ 6'-3" = 43'-9"
(TYP.) (SUBSIDIARY)
END SECTION (STD G-ID)
ROUNDED W BEAM
GALV HD STEEL BEAM W/ 8 FT POSTS
PAY LIMITS-GUARDRAIL APPROACH SECTION,
GALVANIZED W/8 FEET POSTS
STEEL BEAM GUARDRAIL,
+35.00
* *
+62.60
+00.2
6
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OFM cFarlandJohnson
SHEET NAME:
R. Joy
BRANDON PLH ALPP(1)
BRANDON-CHURCHILL ROAD BRIDGE
J. Lund
D. Martel
D. DePaolo
23
PROJECT NOTES
z8013gen_notes.dgn
3
ASHLAR STONE FORM LINER NOTES:
* FIT FILLER MATERIAL AT THE BOTTOM OF THE SHEAR KEY AS SHOWN ON THE PLANS.
4. INSTALL OAKUM OR EQUIVALENT JOINT FILLER (BACKER ROD)
* GROUT ANCHOR BOLTS INTO THE SUBSTRUCTURE.
* PLACE ANCHOR BOLTS.
EACH LATERAL TIE.
MAINTAIN PROPER JOINT OPENING WITH A MINIMUM OF ONE WEDGE AT
* AS WORK PROGRESSES, INSTALL HARDWOOD WEDGES BETWEEN ADJACENT BEAMS TO
* PLACE BEAMS TO FIT WITHIN THE WORKING LINES.
DUST AND OTHER DEBRIS.
* PRIOR TO ERECTING THE BEAMS, POWER-WASH THE FASCIA WITH WATER TO REMOVE
* VERIFY THAT THE PRECASTER ROUGHENED THE SHEAR KEY FASCIAS OF THE BEAMS
3. ERECT BEAMS
* INSTALL BEARINGS.
ANCHOR BOLT LOCATION.
* LOCATE AND DRILL ONE 3 INCH DIAMETER HOLE AT EACH
* IF SEATS ARE LOW, ADD SHIMS.
* IF SEATS ARE HIGH, GRIND TO CORRECT ELEVATIONS.
* TAKE ELEVATIONS AT BEAM SEATS.
2. VERIFY BEAM SEAT ELEVATIONS
* BASE THE WORKING LINES ON THE NOMINAL BEAM WIDTHS.
COMMON WORKING POINT.
THE BEAM SEAT. MEASURE ALL WORKING LINES FROM A
* LAY OUT WORKING LINES FOR THE BRIDGE'S ENTIRE WIDTH ON
1. LAYOUT WORKING LINES
SUGGESTED SEQUENCE OF CONSTRUCTION FOR PRESTRESSED VOIDED SLABS:
* IF REQUIRED, PLACE AN OVERLAY.
TRANSVERSE TIES.
* REMOVE WEDGES, AND PATCH DECK AND FASCIA BEAMS AT
9. FINISH WORK
POURED JOINT SEALER.
ENDS. FILL THE ANCHOR BOLT BLOCK OUTS ON THE EXPANSION ENDS WITH COLD
* GROUT OVER THE NUT AND BOLT IN THE ANCHOR BOLT BLOCK OUT ON THE FIXED
ON TOP. HAND-TIGHTEN AND THEN LOOSEN 1/2 TURN.
UNITS AT THE EXPANSION ENDS. PLACE THE WASHER PLATE AND INSTALL THE NUT
* PLACE THE COLD POURED JOINT SEALER IN THE SLEEVES IN THE PRESTRESSED
THE NUT ON TOP AND TIGHTEN.
FIXED ENDS. BEFORE THE GROUT CURES, PLACE THE WASHER PLATE, AND INSTALL
* GROUT ANCHOR BOLTS INTO THE SLEEVES IN THE PRESTRESSED UNITS AT THE
8. END DETAILS
COMPRESSIVE FORCE BETWEEN DECK BEAMS.
TOWARDS THE MIDSPAN FROM EACH END. THIS WILL PROVIDE THE MAXIMUM
* BEGIN WITH THE TENDONS AT EACH END AND THEN WORK SYMMETRICALLY
POST-TENSION TENDONS TO 47 KIPS FOR EACH 0.6" DIAMETER STRAND.
* USING A CALIBRATED JACK OPERATED BY QUALIFIED PERSONNEL,
MANUFACTURER'S RECOMMENDATIONS, PRIOR TO STRESSING.
MINIMUM COMPRESSIVE STRENGTH OF 1,500 PSI, BASED ON THE
* GROUT SHALL ATTAIN A
7. POST-TENSION TRANSVERSE TENDONS
* CAREFULLY ROD JOINTS TO ELIMINATE ANY POSSIBILITY OF VOIDS.
PER MANUFACTURER'S RECOMMENDATIONS, AND SPEC SECTION 510.13.
* ADDITIONAL JOINT PREPARATION AND GROUT PLACEMENT SHALL BE
IN PLACE.
GROUT PLACEMENT. THEN VERIFY THAT THE BACKER ROD IS STILL
* CLEAN JOINT WITH AN OIL FREE AIR-BLAST IMMEDIATELY BEFORE
6. GROUT SHEAR KEYS
5,000 LBS. TO REMOVE SAG IN THE TIE AND TO SEAT THE CHUCK.
* USING CALIBRATED JACK, POST-TENSION TENDON TO APPROXIMATELY
PREVENT SLIPPAGE OF BEAMS.
* VERIFY THAT HARDWOOD WEDGES ARE IN PLACE AS REQUIRED TO
* SLIDE THE TRANSVERSE POST-TENSIONING TENDONS THROUGH DUCTS.
SHEATH AND STRAND).
TENSIONING TENDONS (WITH CORROSION INHIBITOR GREASE BETWEEN
* A SEAMLESS POLYPROPYLENE SHEATH SHALL COMPLETELY ENCASE THE POST-
5. INSTALL TRANSVERSE POST-TENSIONING TENDONS
CONSTRUCTION APPROACH SIGNING NOTES:
PROJECT NOTES:
RESISTANCE THAN USED FOR DESIGN.
IF THE BEDROCK IS COMPETENT TO OBTAIN A HIGHER NOMINAL BEARINGTO DETERMINE
IF BEDROCK IS ENCOUNTERED, THE ENGINEER WILL NOTIFY THE VTRANS STATE GEOLOGIST
THE CONTRACTOR SHALL SUBMIT AN RFI FOR RESOLUTION. PRIOR TO ANY ROCK EXCAVATION.SUIT.
CONTRACTOR, THE ROCK MAY BE EXCAVATED OR THE FOOTING DESIGN MAY BE MODIFIED TO
BASED ON THE ACTUAL ROCK SURFACE ELEVATIONS ENCOUNTERED, AS SURVEYED BY THE
ENGINEER AND EXPOSE ROCK SURFACE WITHIN THE FOOTPRINT OF THE FOOTINGS.
ELEVATIONS PROVIDED IN THE PLANS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY RESIDENT
IF BEDROCK IS ENCOUNTERED PRIOR TO ACHIEVING THE BOTTOM OF FOOTING SUB-BASE23.
IT TO THE ENGINEER FOR APPROVAL PRIOR TO COMMENCING FABRICATION.
THE CONTRACTOR SHALL DEVELOP THE REINFORCING STEEL SCHEDULE AND SUBMIT22.
GRANULAR BACKFILL FOR STRUCTURES: 140 pcf
REINFORCING STEEL: Ft = 24,000 psi Fy = 60,000 psi GRADE 60
f'c = 4000 psi HPC AA
CAST IN PLACE CONCRETE: f'c = 3500 psi HPC B
DESIGN PURPOSES.
THE FOLLOWING ALLOWABLE STRESSES AND WEIGHTS APPLY TO THESE PLANS FOR21.
AT 68 DEGREES F, EXCEPT AS NOTED.
ALL DIMENSIONS ARE EITHER HORIZONTAL OR VERTICAL AND ARE GIVEN20.
PRIOR TO THE PLACEMENT OF THE OVERLAY.
NO WATER REPELLENT SHALL BE APPLIED TO THE PRESTRESSED UNITS
EXCEPT THE UNDERSIDE OF THE PRESTRESSED UNITS BETWEEN THE DRIP NOTCHES.
WATER REPELLENT SHALL BE APPLIED TO ALL EXPOSED CONCRETE SURFACES19.
CLEARANCE +/- 1/4"
SPACING +/- 1"
REINFORCING PLACEMENT TOLERANCES SHALL BE:18.
TIONS OF THE "CONCRETE REINFORCING STEEL INSTITUTE".
PROCEDURES AND TOLERANCES IN ACCORDANCE WITH APPLICABLE PUBLICA-
ALL REINFORCING STEEL SHALL BE DETAILED AND FABRICATED USING 17.
CONTINUOUS FOR THE FULL LENGTH OF THE JOINT.
THE KEY IN CONCRETE CONSTRUCTION JOINTS SHALL BE MONOLITHIC AND16.
INDICATED ON THE PLANS OR AS DIRECTED BY THE ENGINEER.
JOINTS AND SCORE MARKS IN CONCRETE SHALL BE CONSTRUCTED AS 15.
WHERE NOTED.
ALL EXPOSED EDGES OF CONCRETE SHALL BE CHAMFERED 1" BY 1" EXCEPT14.
TROWEL FINISH AND SHALL BE LEVEL FROM FRONT TO BACK.
SHOWN IN THE SUBSTRUCTURE DETAILS. THE SURFACE SHALL BE A SMOOTH
THE ENTIRE BRIDGE SEAT SURFACE SHALL BE LEVEL AS13.
FROM THE SURFACE.
ACCEPTABLE METHOD THAT WILL MINIMIZE TEARING AND ROLLING OF COARSE AGGREGATE
PEAK AMPLITUDE OF 0.005 INCH TO 0.8 INCH. SELECT A TURF DRAG MATERIAL OR OTHER
RANGING FROM 0.02 INCH TO LESS THAN OR EQUAL TO 0.25 INCH AND HAVING A PEAK TO
CAPABLE OF PRODUCING A SURFACE TEXTURE WITH A HORIZONTAL PEAK TO PEAK DISTANCE
PROVIDE AN ACCEPTABLE FINISH. THE SELECTION OF TURF DRAG OR OTHER METHOD SHALL BE
TURF DRAG MADE OF MOLDED POLYETHYLENE OR OTHER MATERIAL OR OTHER METHOD THAT WILL
AFTER FINISHING, THE SURFACE SHALL BE GIVEN A SUITABLE TEXTURE WITH AN ARTIFICIAL12.
ASSEMBLY, STEEL REINFORCED ELASTOMERIC PAD".
AASHTO M251, WILL BE PAID FOR UNDER ITEM 531.17, "BEARING DEVICE
THE STEEL REINFORCED ELASTOMERIC BEARING PADS, CONFORMING TO SECTION 731.03 AND 11.
BE CLEANED UPON REMOVAL FROM THE FORMS. COST SHALL BE INCIDENTAL TO ITEM 510.22.
VOIDS. THE VOID DRAINS SHALL BE 1" DIAMETER AND NON-FERROUS. THE DRAINS SHALL
VOID DRAINS SHALL BE PLACED TO CLEAR STRAND AND INSTALLED AT EACH END OF ALL10.
FOR APPROVAL PRIOR TO FABRICATION.
FABRICATION DRAWINGS SHALL BE SUBMITTED TO THE ENGINEER9.
OF 75 PSF (OVERLAY LOAD) IN ADDITION TO THE PRECAST BEAM WEIGHT.
BE DESIGNED FOR HL-93 LIVE LOAD, PLUS A DEAD LOAD G.
RELAXATION STRANDS PULLED TO 75% OF THEIR YIELD.
USE PRESTRESSING STRANDS WHICH SHALL BE 0.60", LO- F.
USE CONCRETE WITH F'c = 6500 PSI AND F'ci = 4000 PSI. E.
PCI GUIDELINES.
HAVE THE ENDS OF THE STRANDS RECESSED AND GROUTED AS PER D.
BE 18" X 48" SKEWED VOIDED SLAB UNITS. C.
CONFORM TO SECTION 531 "BRIDGE BEARING DEVICES". B.
CONFORM TO SECTION 510 "PRESTRESSED CONCRETE". A.
8. PRESTRESSED, PRECAST MEMBERS AND ELASTOMERIC BEARINGS SHALL:
ENGINEER PRIOR TO FABRICATION.
PROFESSIONAL ENGINEER. THE FABRICATOR SHALL OBTAIN WRITTEN APPROVAL FROM THE
DESIGN CALCULATIONS AND PLANS PREPARED AND REVIEWED BY A REGISTERED VERMONT
THE STEEL REINFORCED ELASTOMERIC BEARINGS. THE FABRICATOR SHALL PROVIDE STAMPED
THE FABRICATOR SHALL DESIGN AND DETAIL THE PRESTRESSED CONCRETE MEMBERS AND 7.
PROVIDED THE CONTRACTOR FINDS IT SUITABLE FOR THEIR USE.
MAY BE USED BY THE CONTRACTOR AS AN ALTERNATIVE TO A TEMPORARY ACCESS BRIDGE
A TRAIL TO ACCESS THE NORTH SIDE IS SHOWN ON THE LOCATION MAP (SHT. 1), AND
ROAD IS CURRENTLY CLOSED AND SHALL REMAIN CLOSED THROUGHOUT CONSTRUCTION.6.
JERSEY BARRIERS SHALL REMAIN THE PROPERTY OF THE TOWN OF BRANDON.
SOUTH SHALL BE RELOCATED BY THE CONTRACTOR AS REQUIRED TO ACCESS THE SITE.
EXISTING JERSEY BARRIERS BLOCKING VEHICULAR ACCESS TO THE BRIDGE FROM THE5.
-EXISTING STEEL PIPE CULVERT
FACE OF WALL.
BRIDGE. REMOVAL LIMITS ARE 1 FT. BELOW GRADE ON LOW SIDE OF WALL AND 4 FT. BEHIND
-EXISTING CONCRETE FACED STONE ABUTMENTS AND WING WALLS AT EACH END OF THE EXISTING
-ORIGINAL STEEL BEAM AND WOOD PLANK BRIDGE UNDER SNOWMOBILE BRIDGE
REMOVAL OF STRUCTURE, ITEM 529.15, SHALL INCLUDE THE FOLLOWING:4.
FOUNDATIONS WILL BE REMOVED BY VAST PRIOR TO START OF CONSTRUCTION.
EXISTING STEEL PONY TRUSS SNOWMOBILE BRIDGE AND CONCRETE WASTE BLOCK3.
ENTERING THE NESHOBE RIVER.
TO PREVENT SILTATION OR POLLUTION, ESPECIALLY RAW CONCRETE, FROM
THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY2.
LRFD BRIDGE DESIGN SPECIFICATIONS AND ITS LATEST INTERIMS.
AND BRIDGE CONSTRUCTION, AND ITS LATEST REVISIONS, AND THE LATEST AASHTO
AGENCY OF TRANSPORTATION, 2011 STANDARD SPECIFICATIONS FOR HIGHWAY
ALL MATERIALS AND CONSTRUCTION SHALL CONFORM TO STATE OF VERMONT, 1.
TEL: 1-800-733-7654
DES PLAINES, IL 60018
200 E. TOUHY AVENUE
SYMONS CORPORATION
SYMONS DURA-TEX
ASHLAR STONE P/C 30664
TEL: 1-800-547-7760
SANTA ANNA, CA 92705
1341 EAST POMONA STREET
FITZGERALD FORM LINERS
ASHLAR STONE #16986
TEL: 1-800-325-9504
ST. LOUIS, MO 63122
3400 TREE COURT INDUSTRIAL BOULEVARD
THE GREENSTREAK GROUP
ASHLAR STONE NO. 330 MULTI-CAST
CONCRETE, HIGH PERFORMANCE CLASS B.
COSTS SHALL BE INCIDENTAL TO ITEM 501.34,
OF THOSE LISTED BELOW, OR APPROVED EQUAL. ALL
ASHLAR STONE FORM LINER FINISH SHALL BE EITHER
7.
6.
5.
4.
3.
2.
1.
COST FOR ITEM 635.11, MOBILIZATION/DEMOBILIZATION.
THE COST OF ALL PROJECT TRAFFIC CONTROL ZONE DEVICES (EXCEPT TEMPORARY TRAFFIC BARRIERS) WILL BE INCLUDED IN THE
THE CONTRACTOR SHALL PROVIDE ACCESS THROUGH THE TRAFFIC PACKAGE FOR EMERGENCY VEHICLES AT ALL TIMES.
THE SIGN INSTALLED ON SAID POSTS.
SIGNS SHALL BE MOUNTED ON TWO 3 LBS/FT FLANGED CHANNEL POSTS. NO SIGN POSTS SHALL EXTEND OVER THE TOP EDGE OF
BE COMPLETELY COVERED OR REMOVED.
DISTANCE FROM DRIVES AND TOWN HIGHWAYS. EXISTING SIGNS WHICH WOULD CONFLICT WITH TEMPORARY TRAFFIC CONTROL SHALL
INTERFERE OR OBSTRUCT THE VIEW OF EXISTING TRAFFIC CONTROL DEVICES, STOPPING SIGHT DISTANCE AND CORNER SIGHT
PROJECT APPROACH SIGNING SHALL BE IN PLACE BEFORE ANY WORK BEGINS. NO CONSTRUCTION SIGNS SHALL BE INSTALLED AS TO
ALL SIGNS SHALL HAVE ASTM D4956-01 TYPE VII, TYPE VIII, OR TYPE IX FLUORESCENT ORANGE RETRO-REFLECTIVE SHEETING.
CONSTRUCTION SIGNS SHALL BE NEW OR IN LIKE NEW CONDITION.
(FOREST DALE ROAD). SIGNS SHALL BE PLACED 250 FEET IN EACH DIRECTION FROM THE CHURCHILL ROAD/VT 73 INTERSECTION.
TWO (2) 48" x 48" DIAMOND SHAPED "TRUCKS ENTERING" CONSTRUCTION APPROACH SIGNS (W42-7) SHALL BE ADDED ALONG VT73
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OFM cFarlandJohnson
SHEET NAME:
R. Joy
BRANDON PLH ALPP(1)
BRANDON-CHURCHILL ROAD BRIDGE
J. Lund
D. Martel
D. DePaolo
23
ITEM
NUMBERITEM DESCRIPTION UNIT
SUPER
STRUCTURE
SOUTH
ABUT.
NORTH
ABUT.
EROSION
CONTROLROADWAY CHANNEL
FULL
E&CTOTAL
ITEM
NUMBERITEM DESCRIPTION UNIT
SUPER
STRUCTURE
SOUTH
ABUT.
NORTH
ABUT.
EROSION
CONTROLROADWAY CHANNEL
FULL
E&CTOTAL
201.10 CLEARING AND GRUBBING, INCLUDING INDIVIDUAL TREES AND STUMPS LS 1 1 651.18 FERTILIZER LB 100 100
203.15 COMMON EXCAVATION CY 230 230 651.20 AGRICULTURAL LIMESTONE TON 1 1
203.27 UNCLASSIFIED CHANNEL EXCAVATION CY 310 310 651.25 HAY MULCH TON 1 1
204.30 GRANULAR BACKFILL FOR STRUCTURES CY 200 235 435 651.35 TOPSOIL CY 10 10
208.30 COFFERDAM EXCAVATION, EARTH CY 315 380 695 651.40 GRUBBING MATERIAL SY 100 100
208.35 COFFERDAM EXCAVATION, ROCK CY 30 40 70 652.10 EPSC PLAN LS 1 1
208.40 COFFERDAM (SOUTH ABUTMENT) LS 1 1 652.20 MONITORING EPSC PLAN HR 50 50
208.40 COFFERDAM (NORTH ABUTMENT) LS 1 1 652.30 MAINTENANCE OF EPSC PLAN (N.A.B.I.) LU 1 1
301.25 SUBBASE OF CRUSHED GRAVEL, COARSE GRADED CY 220 220 653.20 TEMPORARY EROSION MATTING SY 60 60
401.10 AGGREGATE SURFACE COURSE CY 35 35 653.25 TEMPORARY STONE CHECK DAM, TYPE I CY 20 20
501.32 CONCRETE, HIGH PERFORMANCE CLASS AA CY 13 13 653.35 VEHICLE TRACKING PAD CY 30 30
501.34 CONCRETE, HIGH PERFORMANCE CLASS B CY 80 95 175 653.45 FILTER BAG EA 1 1
506.75 STRUCTURAL STEEL LS 1 1 653.50 BARRIER FENCE LF 30 30
507.11 REINFORCING STEEL, LEVEL I LB 8725 11325 20050 653.55 PROJECT DEMARCATION FENCE LF 330 330
507.12 REINFORCING STEEL, LEVEL II LB 1400 1400 675.20 TRAFFIC SIGNS, TYPE A SF 12 12
507.16 DRILLING AND GROUTING DOWELS LF 8 8 16 675.341 SQUARE TUBE SIGN POST AND ANCHOR LF 52 52
510.22 PRESTRESSED CONCRETE VOIDED SLABS (18" X 48") LF 164 164
510.24 GROUTING SHEAR KEYS LF 125 125
514.10 WATER REPELLENT, SILANE GAL 10 5 5 20
525.44 BRIDGE RAILING, GALVANIZED HDSB / FASCIA MOUNTED / STEEL TUBING LF 87.5 87.5
529.15 REMOVAL OF STRUCTURE EA 1 1
531.17 BEARING DEVICE ASSEMBLY, STEEL REINFORCED ELASTOMERIC PAD EA 16 16
613.11 STONE FILL, TYPE II CY 40 40
613.13 STONE FILL, TYPE IV CY 380 380
621.205 STEEL BEAM GUARDRAIL, GALVANIZED W/ 8 FEET POSTS LF 25 25
621.60 ANCHOR FOR STEEL BEAM RAIL EA 4 4
621.738 GUARDRAIL APPROACH SECTION, GALV HD STEEL BEAM W/ 8FT POSTS EA 4 4
621.90 TEMPORARY TRAFFIC BARRIER LF 40 40
631.16 TESTING EQUIPMENT, CONCRETE LS 1 1
635.11 MOBILIZATION / DEMOBILIZATION LS 1 1
649.31 GEOTEXTILE UNDER STONE FILL SY 350 350
649.51 GEOTEXTILE FOR SILT FENCE SY 50 50
649.61 GEOTEXTILE FOR FILTER CURTAIN SY 100 100
651.15 SEED LB 10 10
651.17 SEED, WINTER RYE LB 10 10
PROJECT NAME: BRANDON - CHURCHILL ROAD BRIDGEPROJECT NUMBER: BRANDON PLH ALPP(1)
FILE NAME: z8013qsh FINAL.xls PLOT DATE: 11/8/2017
PROJECT LEADER: J. Lund DRAWN BY: D. DePaolo
DESIGNED BY: D. Martel CHECKED BY:R. Joy
SHEET 4 OF 23
QUANTITY SHEETSUMMARY OF ESTIMATED QUANTITIES
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OFSURVEY TIE SHEET
$FILEABBREV$
DATUM
VERTICAL
HORIZONTAL
TR
AV
ER
SE
TI
ES
ADJUSTMENT LSQ
NAD 83(CORS) sFT
GP
S/
NG
S
CO
NT
RO
L
POI
NT
S
VERMONT
SUR
VEY
AND ENGINEERING,
IN
C.VSE
AND ENGINEERING
VERMONT SURVEY
N
VT
ST
AT
E
PL
AN
E
GRID
HVCTRL #20
NAVD 88(GEOID03) FT
NORTH = 488253.99
EAST = 1497783.88
ELEV. = 774.64
HVCTRL #2 YELLOW VSE CONTROL CAP
5/8"REBAR SET FLUSH
NORTH = 488910.31
EAST = 1497333.89
ELEV. = 768.00
20
HVCTRL
2
HVCTRL
21
HVCTRL
22
HVCTRL
MAGHUB
72"CMP
TINKER4640.3'AG
5/8"REBAR
TINKER4640.1'AG
5/8"REBAR
HVCTRL #21NORTH = 488320.88
EAST = 1497842.29
ELEV. = 768.09
HVCTRL #22NORTH = 488334.52
EAST = 1497750.85
ELEV. = 766.94
48.22'
NESHOBE RI
VER
RO
AD
CH
UR
CHI
LL
26.72'
22.9
5'
88.8
1'
20.8
7'
7.91'
PID DL2744
N = 546895.26
E = 1468689.89
ELLIP HEIGHT = 315.07
THE MIDDLE PLATE IS SECURED WITH 2 THROUGH BOLTS AND 2 ANCHORS. THE BOTTOM PLATE IS SECURED WITH 2 THROUGH BOLTS AND 2 ANCHORS.
AND 3 ANCHORS.AND NUTS OR 1/2 INCH STAINLESS STEEL LAGS WITH LEAD ANCHORS. THE TOP PLATE IS SECURED WITH ONE THROUGH BOLT
OF 1/2 INCH DIA HOLES. ATTACHMENTS ARE EITHER MADE BY THROUGH BOLTING WITH WITH 1/2 INCH STAINLESS STEEL ROD, WASHERS,
MOUNTING PLATES ARE WELDED TO THE END OF EACH OUTRIGGER. EACH MOUNTING PLATE CONTAINS 4 ATTACHMENT POINTS CONSISTING
IS 120 INCHES LONG AND HAS A SMALL CIRLULAR LEVELING DEVICE WELDED TO THE TOP. THE MAST IS WELDED TO 3 OUTRIGGERS AND
3 STORY CONCRETE/BRICK BUILDING WITH A 10 FT CONCRETE FOUNDATION BUILT IN 1996. MAST IS A TWO INCH DIA GALV PIPE THAT
THE ANTENNA IS MOUNTED ON THE ROOF OF MIDDLEBURY UNION MIDDLE SCHOOL, MIDDLEBURY, VT. THE MONUMENT IS ATTACHED TO A
STATION IS A GPS CONTINOUSLY OPERATING REFERENCE STATION. STATION IS THE ANTENNA REFERENCE POINT OF THE GPS ANTENNA.MIDDLEBURY CORS ARP
MAGHUB MAGHUB MAGHUB
SEE HVCTRL #2 SKETCH SEE HVCTRL #2 SKETCH SEE HVCTRL #2 SKETCH
SURVEY COMPLETED: JUNE 23, 2016 BY VSE, R. GAUVIN-PC, T. YEFCHAK
PT 100+73.85 NORTH = 488177.8838
EAST = 1497736.9147
PC 101+56.68 NORTH = 488249.1980
EAST = 1497779.0393
PT 101+99.00 NORTH = 488289.6448
EAST = 1497789.4283
PC 102+47.11 NORTH = 488337.7304
EAST = 1497787.9513
NORTH = 488375.8194
EAST = 1497776.9534
PT 102+87.17NORTH = 488424.7272
EAST = 1497748.1999
PC 103+43.90
ALI
GN
ME
NT
TI
ES
(C
ON
T.)
ALI
GN
ME
NT
TI
ES
BRANDON PLH ALPP(1)
D. Martel
J. Lund D. DePaolo
R. Joy
5 23
770
772
768
2 Q ELEV 767.17
1 Q ELEV 765.85
STA.102+00
NEW
12"x36"
OM-3R
STA.101+99
NEW
STA.102+48
NEW
STA.102+46
NEW
12"x36"
OM-3R
12"x36"
OM-3L
25
100
12
NE
SH
OB
E
RI
VE
R
CHURCHILL ROAD
STA 101+35
BEGIN PROJECT
STA 103+00
END PROJECT
ROADWAY PROFILE
ROADWAY PLAN
101
+75
740
760
770
780
790
740
760
770
780
790
776.1
775.1
775.35
774.3
774.55
772.9
774.42
774.30
774.7
774.17
774.4
774.05
773.9
773.92
772.3
750 750
761.6
GRADE
FINISHED
TYPE II
STONE FILL,
TYPE IV
STONE FILL,
CURVE #1 CURVE #2
E = 3.09'
L = 42.32'
T = 21.74'
R = 75.00'
D = 76°23'40"
= 32°19'45"
CURVE #1 DATACURVE #2 DATA
E = 2.58'
L = 40.06'
T = 20.46'
R = 80.00'
D = 71°37'11"
= 28°41'33"
APPROXIMATE EXISTING ROW
APPR
OXI
MATE E
XISTI
NG R
OW
C CONSTRUCTIONL
ROADWAY PLAN AND PROFILE
z8013pln.dgn
0 1010
N
VT STATE PLANE GRID
-3.2000% -.5040%
NOTES
EL
EV 775.83
PVI 101
+35.00
EL
EV 774.55
PVI 101
+75.00
EL
EV 773.92
PVI 103
+00.00
101
+00
101
+25
101
+50
102
+00
102
+25
102
+50
102
+75
103
+00
103
+25
103
+50
800800
BASELINE
CHANNEL
STA 102+02.84
BEGIN BRIDGE
STA 102+43.86
END BRIDGE
@ C CONSTRUCTION
EXISTING GROUND
L
W.W.#2
W.W.#4
W.W.#1
W.W.#3L STA. 102+42.86
C BRG.NORTH ABUT.L
ABUTMENT (TYP.)
REMOVE EXISTING
*
14'-8"
*
12'-1"
REMOVE EXISTING PIPE
STA. 102+03.84
C BRG.SOUTH ABUT.
C CONSTRUCTION
* DIMENSIONS AT
L
CHANNEL BASELINE STA. 11+01.47
CHURCHILL ROAD STA. 102+19.98 =
TYPE II
STONE FILL,
TYPE IV
STONE FILL,
(SEE NOTE 4)
TYPE IV (TYP.)
STONE FILL,
NATIVE MATERIAL EXCAVATED FROM EXISTING STREAM BED).
4. STONE FILL, TYPE IV SHALL BE TYPE E4 STONE (TYPE IV MIXED WITH
3. RIGHT-OF-WAY SHOWN IS BASED ON PINS SET BY TINKER SURVEYS AND PICKED UP BY VSE.
2. SURVEY AND MAPPING PERFORMED BY VERMONT SURVEY & ENGINEERING (VSE), INC., APRIL 2008 AND JUNE 2016.
FINISH GRADES ALONG THE PROPOSED CENTERLINE.
THE PROPOSED CENTERLINE. THE GRADES SHOWN TO THE NEAREST HUNDREDTH ARE THE
1. THE GRADES SHOWN TO THE NEAREST TENTH ARE THE ORIGINAL GROUND ELEVATIONS ALONG
12"x36"
OM-3L
0 1010 SIGN POST AND ANCHOR
NEW 1 3/4" SQUARE TUBE
6
101+00
102+00
103+0
0
104+0
0
100+73.85
PT
101
+99.00
PT
101+56.68
PC
11
+00
103+43.90
PC
103
+83.82
PT
102
+47.11
PC
102+87.17
PT
11
+50
764
766
768
770
766
774
772
770
768
774
770
768
764
764772
766
762
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OFM cFarlandJohnson
SHEET NAME:
R. Joy
BRANDON PLH ALPP(1)
BRANDON-CHURCHILL ROAD BRIDGE
J. Lund
D. Martel
D. DePaolo
23
772
774
766
z8013ssdtl_1of2.dgn
SUPERSTRUCTURE DETAILS (1 OF 2)
7
" = 1'-0"21
SCALE:
TYPICAL BRIDGE SECTION
0.020 FT/FT
FINISH GRADE
0.020 FT/FT
L
" DRIP NOTCH43
(TYP)
JOINTS BETWEEN UNITS SHALL BE FILLED
WITH MORTAR TYPE IV IN ACCORDANCE WITH
SECTION 510.13. "THIS WORK WILL BE PAID FOR
18" X 48" VOIDED SLAB
SEE STD. S-367A
UNDER ITEM 510.24, GROUTING SHEAR KEYS
UNIT #1 UNIT #2 UNIT #3 UNIT #4
BLOCKOUT DETAIL
SEE ANCHOR
C CONSTRUCTION
C
L ANCHOR (2-TYPE A)C
(TYP)
1'-
6"
(TYP)
4'-0"
(TYP) TO FASCIA
8'-0"
16'-0"
TO FACE OF RAIL
8'-0"
TO FACE OF RAIL
8'-0"
(TYP)
6"
(T
YP)
9"
(COMPOSITE WITH VOIDED SLABS, BROOM FINISH)
CLASS AA STRUCTURAL OVERLAY
5" MIN. HIGH PERFORMANCE CONCRETE
*
*REINFORCING STEEL
EPOXY COATED
L ANCHOR (TYPE B)
DESIGNED BY FABRICATOR
REINFORCING STEEL
C
RAKED FINISH
TURF DRAG
(TYP)
STEEL TUBING
FASCIA MOUNTED/
BRIDGE RAILING, GALVANIZED HDSB/
102+00
101
+99.0
0
PT
102
+4
7.1
1
PC
" = 1'-0"41
SCALE:
12'-0"
(T
YP)
(TYP)
STATIONING
BEGIN BRIDGE
STA 102+02.84
4'-
0"
FL
OW
1'-0"
(TYP)
END BRIDGE
STA 102+43.86
(TYP)
VT STATE PLANE GRID
85.0
0°
FRAMING PLAN
"85
4'-10 "85
4'-10
FINISH GRADE
ELEV. 774.39
FINISH GRADE
ELEV. 774.19
102+50
C CONSTRUCTIONL
LL
" C BRG. TO C BRG.41
39'-0 L L
UNIT#4
UNIT#3
UNIT#2
UNIT#1
C BRG.C BRG.
TRANSVERSE TENDON
POCKET (TYP)
12'-0"
C TENDONLC TENDONL
12'-0"
C TENDONL C TENDONL
(TYP)
TRANSVERSE TENDONS
EACH END (TYP)
BEARING PAD (2) EACH UNIT
STEEL REINFORCED ELASTOMERIC
2'-0" ABUTMENT
EACH UNIT, EACH END
AND ANCHOR BOLT (1)
VOIDED SLAB BLOCKOUT
"81
2'-6"81
2'-6
2'-
0"
@ 4'-
0"
WID
E=
16'-
0"
4
PR
EC
AS
T
VOID
ED
SL
AB
UNIT
S
TO TENDON SLEEVE
6" MIN. CLEAR FROM VOID
BRIDGE RAILING - 5 SPACES @ 6'-3" = 31'-3" (TYP)
(TYP)
BRIDGE RAILING
"81
41'-0
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OFM cFarlandJohnson
SHEET NAME:
R. Joy
BRANDON PLH ALPP(1)
BRANDON-CHURCHILL ROAD BRIDGE
J. Lund
D. Martel
D. DePaolo
23
z8013ssdtl_2of2.dgn
SUPERSTRUCTURE DETAILS (2 OF 2)
8
C.
B.
A.
BE AASHTO M270 GRADE 50, UNLESS OTHERWISE NOTED.
ALL ANCHOR BOLTS, AND NUTS SHALL BE ANSI A449, AND ALL WASHERS SHALL
ON THE FIXED END, THE CONTRACTOR SHALL TIGHTEN THE NUT.
CONTRACTOR SHALL HAND TIGHTEN THE NUT AND THEN LOOSENED IT BY ½ TURN.
EACH ANCHOR BOLT SHALL HAVE A SINGLE NUT. ON THE EXPANSION END, THE
ANCHOR BOLTS SHALL BE SWEDGED AND GALVANIZED, THREADED FOR 12 INCHES.
FOLLOWING REQUIREMENTS:
ITEM 510.22, PRESTRESSED CONCRETE VOIDED SLABS AND SHALL MEET THE
ANCHOR BOLTS, STEEL PLATES, NUTS, AND WASHERS SHALL BE PAID FOR AS PART OF
ANCHOR BOLT NOTE
**FABRICATION.
ROUGHENED TO A 1/4-INCH AMPLITUDE DURING
THE TOP OF ALL BEAMS SHALL BE INTENTIONALLY
18
"
10
"4
"
" = 1'-0"21
SCALE: 1
TYPICAL INTERIOR VOIDED SLAB UNIT
(TYP)
48" (NOMINAL WIDTH)
"21
9 "21
14 "21
14 "21
9
3/8" RADIUS (TOOLED EDGE)
4"
"
OF EACH VOID (TYP)
9"
TENDON SLEEVE
C
RAKED FINISH (TYP) **
2'-0" ABUTMENT
END OF BRIDGE DETAIL
" = 1'-0"43
SCALE:
BEGIN / END BRIDGE
C BRG.L
2'-
0"
MORTAR TYPE IV
" DIA. SLEEVE21
2
END
MORTAR TYPE IV @ FIXED
SEALER @ EXPANSION END
COLD POURED JOINT
BOLT THREADED 12"
" DIA. GALVANIZED ANCHOR21
1
1'-0"
" DIA. SLEEVE21
2
COURSE
AGGREGATE SURFACE
6"
"43
4
4"
PLATE WASHER
GALVANIZED STEEL
"21
4"x4"x
" DIA. SLEEVE21
2
W/ APPROVED MASTIC.
LEGS AND ATTACH TO MEMBER
PVC WATERSTOP. CLIP TOP
VOIDED SLAB
PRESTRESSED CONCRETE
FABRICATOR
PAD DESIGNED BY
ELASTOMARIC BEARING
3" STEEL REINFORCED
CLOSED CELL FOAM 3"x3"
SECTION ON SHEET 2.
SEE TYPICAL ABUTMENT
GRAVEL, COARSE GRADED.
SUBBASE OF CRUSHED
CONCRETE CLASS AA OVERLAY
5" MIN. HIGH PERFORMANCE
EACH BAR
DRILL & GROUT
ANCHOR BLOCKOUT DETAIL
RECESS
SQUARE
"41
4
HEAVY HEX NUT
BOLT W/GALVANIZED
GALVANIZED ANCHOR
" DIA.21
1
(EPOXY COATED)
BLOCKOUT DETAIL
SEE ANCHOR BOLT
ANCHOR BOLT BLOCKOUT.
(SEE DETAIL THIS SHEET)
OVERLAY CORNER GUARD AT EACH END
" = 1'-0"21
SCALE: 1
(TYP)
"21
9 "21
14RAKED FINISH (TYP)
3/8" RADIUS (TOOLED EDGE)
"
OF EACH VOID (TYP)
TYPICAL EXTERIOR VOIDED SLAB UNIT
9"
TENDON SLEEVE
C
18
"
10
"4
"4
"
L ANCHOR (2-TYPE A)C
CL ANCHOR (TYPE B)*
*
*- SEE S-367A
48" (NOMINAL WIDTH)
24" **
" = 1'-0"21
SCALE: 1
" = 1'-0"21
SCALE: 1
" = 1'-0"21
SCALE: 1
DRIP NOTCH DETAIL
UNIT AND OUTLET AT
5'-0" FROM ENDS OF
(STOP DRIP NOTCHES
" DRIP NOTCH43
UNITS
EXTERIOR PRESTRESSED
6 "
" PLATE21
21
0 "
21
4 "
PROJ21
0 "
410
"
7"
410
"
DOUBLE USE CHUCK
21
7 "
41
0 " 41
0 "
214
"
1"
1"
FACES OF BEAMS
SANDBLAST INTERIOR
TRANSVERSE TENDON
LONGITUDINAL JOINT AT
GROUT MATERIAL
0.6" TRANSVERSE TENDON
IN SEAMLESS
POLYPROPOLENE SHEETH
OR EQUAL
SEAL WITH OAKUM
21
0 "
TENDON
POCKET DETAIL
TRANSVERSE TENDON
TENDON SLEEVE
**
*
*
**
WITH EPOXY BONDING AGENT.
CLEAN AND ROUGHEN TENDON POCKET PRIOR TO PAINTING
AND VERTICAL REPAIR MATERIAL.
THAT MEETS THE REQUIREMENT OF 780.02, OVERHEAD
MORTAR OF THE SAME TEXTURE AND COLOR AS BEAM
POCKET RECESSES TO BE FILLED WITH NON-SHRINK
PRIOR TO PLACEMENT OF GROUT
AGENT MEETING REQUIREMENT OF ASTM C881 (TYPE II, GRADE 2)
PAINT TENDON POCKET SURFACE WITH EPOXY BONDING
" PLATE (MIN.)21
"x421
"x421
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OFM cFarlandJohnson
SHEET NAME:
R. Joy
BRANDON PLH ALPP(1)
BRANDON-CHURCHILL ROAD BRIDGE
J. Lund
D. Martel
D. DePaolo
23
SHEAR KEY DETAIL FOR VOIDED SLAB
" = 1'-0"SCALE: 3
10"
4"
18"
4"
43"
43"
41"
TO NOMINAL WIDTH
83"
83"
85"
3/4" CHAMFER
135
GUARD DETAIL
OVERLAY CORNER
" = 1'-0"SCALE: 3
(TYP.)
"21
1
"41
3
GUARD PLATE
WELDED TO CORNER
#3 ANCHOR BAR
CORNER GUARD PLATE
OVERLAY
LIMITS OF CONCRETE
"41
3
"41
"21
R=1
OVERLAY CORNER GUARD NOTES:
ITEM 506.75, STRUCTURAL STEEL.
SECTION 506 (STRUCTURAL STEEL), WITH THE COST INCLUDED IN
THE CORNER GUARD ASSEMBLIES SHALL MEET THE REQUIREMENTS OF3.
CORNER GUARD ASSEMBLIES SHALL BE HOT DIP GALVANIZED.2.
AND SPACED AT 18 INCHES ON CENTER.
SHALL BE SET 6 INCHES FROM THE EXTENTS OF THE DECK OVERLAY
WIDTH OF THE CONCRETE OVERLAY (16 FEET). THE #3 BAR ANCHORS
LIMITS OF EACH CORNER GUARD ASSEMBLY SHALL EXTEND FULL1.
R=1 "83
4'-6"5'-0"
2'-
0"
4'-
0"
0"
9
SOUTH ABUTMENT
z8013abut south.dgn
2'-
0"
1'-0"
85.0
0°
WPWP WP
" = 1'-0"41
SCALE:
8'-1"
" = 1'-0"41
SCALE:
EL 756.00
EL 758.00
EL 774.19 EL 774.20
4'-
6"
L
13
A
15
B
15
B
15
D
VT
ST
AT
E
PL
AN
E
GRID
EL 764.00
1'-0"
HORIZONTAL
CONSTRUCTION JOINT
1'-
6"
7'-
0"
10'-
9"
5'-0"
2'-
3"
"81
3'-11
1'-
6"
"81
11'-
112
'-3"
10'-
9"
7'-
0"
"85
7'-10
15'-
2"
1'-0" 1'-0"
6'-10
"
"81
2'-6
8'-1"
45°
25°
5'-
0"
11'-
0"
1'-0"
1'-
0"
1'-
0"
10'-0" MAX (TYP)
STA 102+02.84
BEGIN BRIDGE
C CONSTRUCTION
WW #1
1'-
0"
C
WW #2
102
+00
"81
11'-
0
"83
4'-8
"83
8'-2 "83
8'-0
"83
8'-2"83
8'-0
"81
4'-2
"85
1'-0
"43
1'-6
2'-
4"
"41
17'-
5
"83
10'-2 "81
11'-2
EL 770.25
(LEVEL)
EL 772.04
CL CONSTRUCTION
FINISH (TYP.)
ASHLAR STONE
EL 768.00
PROPOSED GROUND
CONSTRUCTION JOINT
6"
(T
YP.)
(TYP.)
*
EL 764.00
*
(TYP.)
1'-0"
(TYP.)
SEE ASHLAR STONE FORM LINER NOTES ON SHEET 16.
(TYP.)
JOINT FILLER
1" PREFORMED
SOUTH ABUTMENT PLAN
SOUTH ABUTMENT ELEVATION
EL 762.00
(TYP)
STA. 102+03.84
L BRG. SOUTH ABUTMENT
ABUTMENT
L BRG. SOUTHC
(SHEET 9)
CONSTRUCTION JOINT DETAIL
SEE HORIZONTAL WINGWALL
2'-0"
" = 1'-0"21
SCALE:
TYPICAL ABUTMENT STEM SECTION A-A
FINISH GRADE
1'-0" 1'-0"
C BRGL
FOR STRUCTURES
GRANULAR BACKFILL
#8 @ 12"
#5 @ 12"
#5 @ 12"
WEEP HOLE (TYP)
#5 @ 12"
2'-
0"
#8 @ 6"
#6 @ 6"
3"
CLE
AR
11'-6"
#5 @ 12" #5 @ 12"
2"
CL
R
2"
CLR
0"
2'-0"
FOR STRUCTURES
GRANULAR BACKFILL
2'-0"
1'-
0"
COFFERDAM EXCAVATION PAY LIMITS
STONE FILL, TYPE IV
VA
RIE
S
2"
CLR
GRAVEL, COURSE GRADED
SUB-BASE OF CRUSHED
EL. 756.00
SURFACE COURSE
6" AGGREGATE
SEE ROADWAY PLAN
AND ELEV. VARIES.
STONE FILL SLOPE
(TYP.)
COFFERDAM
#6 @ 6"
FILL
UNDER STONE
GEOTEXTILE
SEE DETAIL SHEET 7
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OFM cFarlandJohnson
SHEET NAME:
R. Joy
BRANDON PLH ALPP(1)
BRANDON-CHURCHILL ROAD BRIDGE
J. Lund
D. Martel
D. DePaolo
23
NORTH ABUTMENT
10
z8013abut_north.dgn
WP WP
" = 1'-0"41
SCALE:
1'-
0"
"81
1'-0
2'-
0"
8'-1"
8'-1"
" = 1'-0"41
SCALE:
NORTH ABUTMENT ELEVATION VIEW
C
EL 756.00
EL 758.00
EL 774.01 EL 774.00
EL 763.00
EL 761.00
5'-
0"
4'-
6"
13
A
15
B
15
B
15
C
VT
ST
AT
E
PL
AN
E
GRID
" = 1'-0"41
SCALE:
EL 756.00
EL 758.00
EL 763.00
EL 761.00
EL 774.00
4'-0"
1'-0"
FINISH
ASHLAR STONE
TYPICAL STEPPED FOOTING DETAIL
CONT. WALL REINF.
SAME AS BOT.
CONT. WALL
FOOTING
BOT. CONT.
WALL REINF.
" = 1'-0"41
SCALE:
2'-
6"
2'-
6"
5'-0"
2'-0" MINIMUM
LAP LENGTH (TYP)
PROPOSED GROUND
PROPOSED GROUND
2
1
HORIZONTAL
CONSTRUCTION JOINT
CONSTRUCTION JOINT
6"
90°
" = 1'-0"21
SCALE:
75°
WP
"41
4'-3 4'-2"
10'-9"
5'-0"
2'-0"
1'-6"
12'-
6"
12'-
2"
"83
7'-
2
"81
8'-
11
7'-
6"
1'-
6"
85°
45°
1'-0"
"85
12'-3"85
7'-10
10'-0" MAX (TYP)
10'-0" MAX (TYP)
2'-3"
10'-
9"
5'-
0"
"83
8'-1"83
8'-1
CONSTRUCTION JOINT
6'-0"
LC CONSTRUCTION
STA. 102+42.86
L NORTH ABUTMENTC
STA 102+43.86
END BRIDGE
WW #3
WW #4102
+50
"41
8'-0"83
8'-2
"83
10'-2
"87
3'-1
2'-
4"
"41
14'-
5
"43
28'-
8
"83
8'-
0
EL 764.00
EL 760.50
2'-
3"
7'-
0"
"21
1'-11
"83
11'-5
L CONSTRUCTION
EL 764.00
EL 770.25
SEE HORIZONTAL WINGWALL
(LEVEL)
EL. 771.86
1'-0"
(TYP.)1'-0"
(TYP.)
WINGWALL
TOP OF
EL 764.00
6"
(T
YP.)
FINISH (TYP.)
ASHLAR STONE
HORIZONTAL
(TYP.)
JOINT FILLER
1" PREFORMED
NORTH ABUTMENT PLAN
WINGWALL NO. 4 ELEVATION
EL 762.00
EL 762.00
1'-
0"
CONSTRUCTION JOINT DETAIL
THIS SHEET
HORIZONTAL WINGWALL CONSTRUCTION JOINT DETAIL " = 1'-0"21
SCALE: 1
SCORE MARK DETAIL
43
0 "
" = 1'-0"21
SCALE: 1
JOINT BETWEEN FASCIA AND ABUTMENT
OF CONCRETE, CLASS B.
TO BE INCLUDED WITH COST
POLYURETHANE JOINT SEALER
" RADIUS43
1" PREFORMED JOINT FILLER (707.08)FASCIA
CIP ABUTMENT
PRECAST CONCRETE
" CENTER ON JOINT21
1"1
"21
0 "83
0
OVERLAY
CONCRETE CLASS AA
5" MIN. HIGH PERFORMANCE
" = 1'-0"21
SCALE:
ABUTMENT
WINGWALL
LONGEST LEG REQUIRED
MAKE ALL LEGS EQUAL TO
IDENTICAL #5 BARS @ 12"
2'-0" MINIMUM
LAP LENGTH (TYP)
#5 BAR @ 12"
#5 BARS @ 12"
#5 BARS @ 12"
" = 1'-0"21
SCALE:
ABUTMENT
WIN
GW
ALL
2'-0" MINIMUM
LAP LENGTH (TYP)
#5 BAR @ 12"
#5 BARS @ 12"
ELEVATION
BRIDGE SEAT
ABUTMENT FILLET TO
WINGWALL AND
2'-0" TYPICAL FOR
#5 BARS @ 12"
" = 1'-0"21
SCALE: 1
SCORE MARK
W = WALL THICKNESS "
"W31
"W31
"W31
21
0 " 21
0 "
W (6" MAX.)31
"
TYPICAL VERTICAL CONCRETE CONSTRUCTION JOINT
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OFM cFarlandJohnson
SHEET NAME:
R. Joy
BRANDON PLH ALPP(1)
BRANDON-CHURCHILL ROAD BRIDGE
J. Lund
D. Martel
D. DePaolo
23
ABUTMENT DETAILS
z8013wingwall_dtls.dgn
11
6"
1'-6"
" = 1'-0"21
SCALE:
WINGWALL SECTION B-B
FILL SLOPE
FOR STRUCTURES
GRANULAR BACKFILL#6 @ 6"
#5 @ 12"
ROADWAY PLAN SHEET
ELEV. VARIES. SEE
STONE FILL SLOPE AND
#5 @ 12"
#5 @ 12"
4'-0"
5'-0"
4'-0"
2'-
0"
4'-
0"
2'-
0"
#8 @ 6"
#8 @ 9"
3"
CLE
AR
10'-6"
#5 @ 12"
6"
1'-6"
" = 1'-0"21
SCALE:
WINGWALL SECTION C-C
FILL SLOPE
FOR STRUCTURES
GRANULAR BACKFILL
#6 @ 12"
#5 @ 12"
#5 @ 12"
2'-3"
5'-0"
2'-0"
2'-
0"
3'-
0"
2'-
0"
#6 @ 6"
#6 @ 9"
3"
CLE
AR (T
YP)
8'-9"
#5 @ 12"
6"
1'-6"
" = 1'-0"21
SCALE:
WINGWALL SECTION D-D
FILL SLOPE
FOR STRUCTURES
GRANULAR BACKFILL
#5 @ 12"
#6 @ 12"
4'-0"
WEEP HOLE (TYP)
WEEP HOLE (TYP)
2" CLR
0"
0"
STONE FILL
GEOTEXTILE UNDER
2'-0"
FOR STRUCTURES
GRANULAR BACKFILL
2"
CL
R
1'-
0"
5" CLR
ELEV. VIEW
SEE ABUTMENT
STONE FINISH
ASHLAR
ASHLAR STONE)
PERIMETER OF
(TYP AROUND
" REVEAL83
" x 243
#5 @ 12"
1'-
0"
5" CLR
ELEV. VIEW
SEE ABUTMENT
STONE FINISH
ASHLAR
ASHLAR STONE)
PERIMETER OF
(TYP AROUND
" REVEAL83
" x 243
STONE FILL
GEOTEXTILE UNDER
2'-0"
FOR STRUCTURES
GRANULAR BACKFILL
3"
CL
R
2" CLR
2" CLR
#5 @ 12"
1'-
0"
5" CLR
ELEV. VIEW
SEE ABUTMENT
STONE FINISH
ASHLAR
ASHLAR STONE)
PERIMETER OF
(TYP AROUND
" REVEAL83
" x 243
ELE
VA
TIO
N
VIE
W
SE
E
SO
UT
H
AB
UT
ME
NT
ELE
VA
TIO
N
VA
RIE
S
STONE FILL
GEOTEXTILE UNDER
0"
0"
ROADWAY PLAN SHEET
ELEV. VARIES. SEE
STONE FILL SLOPE AND
ROADWAY PLAN SHEET
ELEV. VARIES. SEE
STONE FILL SLOPE AND
COFFERDAM EXCAVATION LIMITS COFFERDAM EXCAVATION LIMITS
4'-3"
COFFERDAM EXCAVATION LIMITS
#6 @ 6"
EL. 756.00
#6 @ 6"
TYPE IV
STONE FILL,
TYPE IV
STONE FILL,
TYPE IV
STONE FILL,
WITH FOOTING
EXTEND 36" INTO WALL
EL. 761.00
" = 1'-0"41
SCALE:
SO
UT
H
AB
UT.
STE
M
BENCH MARK
6"
BRIDGE PLAQUE
" = 1'-0"41
SCALE:
SOUTH ABUT.
OF CONCRETE
FLUSH WITH TOP
BENCH MARK
BRIDGE PLAQUE
WIN
GW
ALL #2
BENCHMARK AND BRIDGE PLAQUE NOTE
VIEW A-A
A
A
BENCHMARK LOCATION PLAN
#2
WINGWALL
FOR BRIDGE PLAQUE LOCATION.
AS SHOWN OR AS DIRECTED BY THE ENGINEER. SEE SD-502
THE CONTRACTOR ON WW #2 OF THE SOUTH ABUTMENT
THE AGENCY OF TRANSPORTATION AND SHALL BE INSTALLED BY
THE BENCH MARK AND BRIDGE PLAQUE WILL BE SUPPLIED BY
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OFM cFarlandJohnson
SHEET NAME:
R. Joy
BRANDON PLH ALPP(1)
BRANDON-CHURCHILL ROAD BRIDGE
J. Lund
D. Martel
D. DePaolo
23
O.G. = 775.8
F.G. = 775.83
F.G. = 774.42
O.G. = 772.9
7.1 1'6.58'
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
760
770
780
790
800
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
101+50
760
770
780
790
800
760
770
780
790
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
101+75
760
770
780
790
750
760
770
780
790
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
102+50
750
760
770
780
790
750
760
770
780
790
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
102+75
750
760
770
780
790
750
760
770
780
790
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
750
760
770
780
790
2'-
0"
4'-0"
TYPE II
STONE FILL,
z8013xs.dgn
ROADWAY CROSS SECTIONS
F.G. = 775.35
F.G. = 774.55
F.G. = 774.17
F.G. = 774.05
F.G. = 773.92
O.G. = 775.1
O.G. = 774.3
O.G. = 774.7
O.G. = 774.4
O.G. = 773.9
101+35 BEGIN PROJECT
1
2
COFFERDAM EXCAVATION, ROCK
COFFERDAM EXCAVATION, EARTH AND
UNCLASSIFIED CHANNEL EXCAVATION
COARSE GRADED (TYP.)
SUBBASE OF CRUSHED GRAVEL,
COURSE (TYP.)
6" AGGREGATE SURFACE
APRON
DRIVEWAY
103+00 END PROJECT
8'-0"
4'-0"
1
2
STONE FILL (TYP.)
GEOTEXTILE UNDER
790 790
750
760
770
780
790
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
102+00
760
770
780
790
750
COURSE (TYP.)
6" AGGREGATE SURFACE
COARSE GRADED (TYP.)
SUBBASE OF CRUSHED GRAVEL,
W.W.#1 W.W.#2
1
_ sto
ne wall
1:-21:-1.5
RO
W
5.88'
4.50'
RO
WR
OW
RO
W
3.61'
5.60'
RO
W
RO
W
(TYP.)
SURFACE COURSE
6" AGGREGATE
(TYP.)
SURFACE COURSE
6" AGGREGATE
3.42'
3.74'
RO
W
RO
W
1:-2
1:-21:-
2
1:-2
RO
W
RO
W
RO
W
RO
W
TYPE IV
STONE FILL,
RO
W
RO
W
12
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OFM cFarlandJohnson
SHEET NAME:
R. Joy
BRANDON PLH ALPP(1)
BRANDON-CHURCHILL ROAD BRIDGE
J. Lund
D. Martel
D. DePaolo
23
TYPE II
STONE FILL,
TYPE IV
STONE FILL,
2
TYPE IV
STONE FILL,
2
STONE FILL (TYP.)
GEOTEXTILE UNDER
MATERIAL
GRUBBING
2
LEGEND
FINISH GRADE
ORIGINAL GROUND
F.G.
O.G.
11+00
CHANNEL CROSS SECTIONS
z8013cxs.dgn
1
2
COFFERDAM EXCAVATION, ROCK
COFFERDAM EXCAVATION, EARTH AND
UNCLASSIFIED CHANNEL EXCAVATION
750
760
770
780
790
800
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
750
760
770
780
790
800
TYPE IV
STONE FILL,
TYPE IV
STONE FILL,
O.G. = 763.4
STONE FILL (TYP.)
GEOTEXTILE UNDER
(SKEWED PARALLEL TO THE MAINLINE)
10+80
OHW
(TYP.)
MATERIAL
GRUBBING
750
760
770
780
790
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
11+20
750
760
770
780
790
TYPE II
STONE FILL,
TYPE II
STONE FILL,
TYPE IV
STONE FILL,
TYPE IV
STONE FILL,
O.G. = 761.0
OHW
750
760
770
780
790
0 10 20 30 40 50 60 70-10-20-30-40-50-60-70
750
760
770
780
790
TYPE IV
STONE FILL,TYPE IV
STONE FILL,
O.G. = 761.7
1 2 2 1
OHW
EXISTING PIPEGRADE
FINISH
1 2
13
$$$$DATE$$$
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OFM cFarlandJohnson
SHEET NAME:
R. Joy
BRANDON PLH ALPP(1)
BRANDON-CHURCHILL ROAD BRIDGE
J. Lund
D. Martel
D. DePaolo
23
FOREST
AND DECIDUOUS
MIXED EVERGREEN
WETLANDS (TYP.)
VT CLASS III
NOTES
NE
SH
OB
E
RI
VE
R
RESOURCE PLAN
STA 101+35
BEGIN PROJECT
STA 103+00
END PROJECT
N
VT STATE PLANE GRID
RESOURCE LAYOUT SHEET
z8013res.dgn
CHURCHILL ROAD
MILL SITE
WITH 19TH CENTURY
STONE WALL ASSOCIATED
(NORTH OF SITE)
NATIONAL FOREST
GREEN MOUNTAIN
RI
PA
RI
AN
BU
FF
ER
RI
PA
RI
AN
BU
FF
ER
DI
RT
RO
AD
DIRT ROAD
APPR
OXI
MATE R.
O.
W.
APPROXIMATE R.O.W.
APPROXIMATE R.O.W.
APPR
OXI
MATE R.
O.
W.
2-8% SLOPES.
4. SOILS IN VICINITY OF BRIDGE ARE WELL-DRAINED, COARSE-LOAMY, DUXBURY-COLTON COMPLEX,
3. SITE LIES WITHIN THE "CHURCHILL MILL ARCHAEOLOGICAL DISTRICT" (SITE VT-RU-585).
2. RIGHT-OF-WAY SHOWN IS BASED ON PINS SET BY TINKER SURVEYS AND PICKED UP BY VSE.
1. SURVEY AND MAPPING PERFORMED BY VERMONT SURVEY & ENGINEERING (VSE), INC., APRIL 2008 AND JUNE 2016.
0 1010
14
101+00
102+00
103+0
0
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OFM cFarlandJohnson
SHEET NAME:
R. Joy
BRANDON PLH ALPP(1)
BRANDON-CHURCHILL ROAD BRIDGE
J. Lund
D. Martel
D. DePaolo
23
LEGEND
ORDINARY HIGH WATER
DELINEATED WETLAND
OHW
760
770
770
770
770
770
770
770
780
780
780
780
780
790
790
790
800
z8013ero nar.dgn
EROSION CONTROL NARRATIVE
4/20/2018PLOT DATE:
SHEET OF
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OFM cFarlandJohnson
SHEET NAME:
R. Joy
BRANDON PLH ALPP(1)
BRANDON-CHURCHILL ROAD BRIDGE
J. Lund
D. Martel
D. DePaolo
2315
NOTES
NE
SH
OB
E
RI
VE
R
z8013exc.dgn
EXISTING CONDITIONS SITE PLANEXISTING CONDITIONS SITE PLAN
N
VT STATE PLANE GRID
CHURCHILL ROAD
STA 101+35
BEGIN PROJECT
STA 103+00
END PROJECT
LOCATION
72" PIPE
DIRT ROAD
DI
RT
RO
AD
FOUNDATION WALL
OLD MILL HOUSE
LEGEND
DELINEATED WETLAND
ORDINARY HIGH WATEROHW
APPROXIMATE R.O.W.
APPROXIMATE R.O.W.
APPR
OXI
MATE R.
O.
W.
APPR
OXI
MATE R.
O.
W.
2. RIGHT-OF-WAY SHOWN IS BASED ON PINS SET BY TINKER SURVEYS AND PICKED UP BY VSE.
1. SURVEY AND MAPPING PERFORMED BY VERMONT SURVEY & ENGINEERING (VSE), INC., APRIL 2008 AND JUNE 2016.
0 1010
16
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OFM cFarlandJohnson
SHEET NAME:
R. Joy
BRANDON PLH ALPP(1)
BRANDON-CHURCHILL ROAD BRIDGE
J. Lund
D. Martel
D. DePaolo
23
101+00
102+00
103+0
0
760
770
770
770
770
770
770
770
770
780
780
780
780
780
790
790
790
800
NE
SH
OB
E
RI
VE
R
z8013er1.dgn
N
VT STATE PLANE GRID
EROSION CONTROL LAYOUT
STA 101+35
BEGIN PROJECT
STA 103+00
END PROJECT
TYPE II
STONE FILL,
EPSC CONSTRUCTION SITE PLAN
CHURCHILL ROAD
DI
RT
RO
AD
DIRT ROAD
20cM Farland Johnson
SHEET NAME:
R. Joy
BRANDON PLH ALPP(I)
BRANDON-CHURCHILL ROAD BRIDGE
OHW
J. Lund
D. Martel
D. DePaolo
ACCESS
CONSTRUCTION
STABLIZED
TYPE IV
STONE FILL,ACCESS
CONSTRUCTION
STABLIZED
TYPE II
STONE FILL,
FOUNDATION WALL
HISTORIC OLD MILL HOUSE
WALL PRIOR TO CONSTRUCTION
AROUND HISTORIC FOUNDATION
FENCING (BARRIER FENCE)
PLACE EXCLUSIONARY
0 1010
(ITEM 653.20)(TYP.)
EROSION MATTING
TEMPORARY
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF17
101+00
102+00
103+0
0
11
+00
11
+50
LEGEND
TYPE IV
STONE FILL,
ORDINARY HIGH WATER
DELINEATED WETLAND
SILT FENCE (649.51)
ROCK CHECK DAM (653.25)
PROJECT DEMARCATION FENCE (653.55)
BARRIER FENCE (653.50)
FILTER CURTAIN (649.61)
(ITEM 653.45)
FILTER BAG
760
770
770
770
770
770
770
770
770
780
780
780
780
780
790
790
790
800
770
772
768
NE
SH
OB
E
RI
VE
R
0 1010
N
VT STATE PLANE GRID
STA 101+35
BEGIN PROJECT
STA 103+00
END PROJECT
FINAL CONDITIONS LAYOUTEPSC FINAL CONDITIONS SITE PLAN
NOTE
CHURCHILL ROAD
FOUNDATION WALL
OLD MILL HOUSE
DI
RT
RO
AD
DIRT ROAD
REFER TO CROSS SECTIONS FOR FINAL GRADING.
LEGEND
ORDINARY HIGH WATER
DELINEATED WETLAND
GRUBBING MATERIAL
z8013fnc.dgn
OHW
TYPE II
STONE FILL,
TYPE IV
STONE FILL,
18
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OFM cFarlandJohnson
SHEET NAME:
R. Joy
BRANDON PLH ALPP(1)
BRANDON-CHURCHILL ROAD BRIDGE
J. Lund
D. Martel
D. DePaolo
23
101+00
102+00
103+0
0
104+0
0
11
+00
11
+50
764
766
768
770
766
774
772
770
768
774
770
768
764
764772
766
762
772
TYPE II
STONE FILL,
TYPE IV
STONE FILL,
774
766
CLOTH
FILTER
GROUND
EXISTING
50'MIN
3'
GROUND
EXISTING
12'MIN
10' MIN
10' MIN
cM Farland Johnson19
SHEET NAME: EPSC DETAILS (1 OF 3)
D. Martel
J. Lund
z8013ero det.dgn
D. DePaolo
R. Joy
23
BRANDON-CHURCHILL ROAD BRIDGE
BRANDON PLH ALPP(1)
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
SYMBOL
CONSTRUCTION SPECIFICATIONS
NOT TO SCALE
ANCHOR
GRADING LIMIT
CONSTRUCTION
ANCHORS
LENGTH B/T
100' MAX
10' MINBARRIER
FLOATING SILT
EXISTING HIGHWAY
FL
OW
BOTTOM
WATERWAY
SYSTEM
ANCHOR
WEIGHTED
ABUTMENT
BRIDGEBARRIER
FLOATING SILT
REVISIONS
AA
SECTION A-A
JANUARY 13, 2009 WHF
APRIL 1, 2008 WHF
ITEM 649.61).
SECTION 649 FOR GEOTEXTILE FOR FILTER CURTAIN (PAY
THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH
FILTER CURTAIN
A WATERWAY WITH STREAM VELOCITIES GREATER THAN 1.5 FEET/SECOND.
FILTER CURTAIN SHALL NOT BE PLACED ACROSS A FLOWING WATERWAY, OR IN
TO CONFORM TO THE BOTTOM OF THE WATERWAY.
THE WEIGHTED ANCHOR SYSTEM SHALL BE A TYPE WHICH ALLOWS THE CURTAIN
MINIMIZING THE ESCAPE OF SEDIMENTS INTO WATERWAY.
THE CURTAIN SHALL BE REMOVED BY SLOWLY PULLING TOWARD THE SHORE
MAXIMUM 100' LENGTH BETWEEN ANCHORS.
DISTURBANCE.
LAST SECTION SHALL TERMINATE A MINIMUM OF 10' BEYOND LIMIT OF
5.
4.
3.
2.
1.
SEPTEMBER 4, 2009 WHF
RIPRAP TYPICAL
TYPE OR USE OF COFFERDAM IF USED.
CURTAIN. IT IN NO WAY DEFINES THE
OF A TYPICAL INSTALLATION OF FILTER
NOTE: THIS DRAWING IS A DEPICTION
SYMBOL
CONSTRUCTION SPECIFICATIONS
GUIDANCE.
THE VT AGENCY OF NATURAL RESOURCES FOR ADDITIONAL
EROSION PREVENTION & SEDIMENT CONTROL -2006- " FROM
REFER TO "THE VERMONT STANDARDS & SPECIFICATIONS FOR
NOTES:
VERMONT DEPARTMENT OF ENVIRONMENTAL CONSERVATION
ORIGINALLY DEVELOPED BY USDA-NRCS
ADAPTED FROM DETAILS PROVIDED BY: NEW YORK STATE DEC
5:1
PAVEMENT
EXISTING
PAVEMENT
EXISTING
PLAN VIEW
12'MIN
ENTRANCE
CONSTRUCTION
STABILIZED
REVISIONS
MARCH 24, 2008 WHF
9.
8.
7.
6.
5.
4.
3.
2.
1.
JANUARY 13, 2009 WHF
OR AS SPECIFIED IN THE CONTRACT.
SECTION 653 FOR VEHICLE TRACKING PAD (PAY ITEM 653.35)
THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH
EQUIVALENT.
STONE SIZE- USE 1-4" STONE, RECLAIMED OR RECYCLED CONCRETE
30' MINIMUM LENGTH APPLIES).
LENGTH- NOT LESS THAN 50' (EXCEPT ON A SINGLE RESIDENCE LOT WHERE A
THICKNESS- NOT LESS THAN 8".
WHERE INGRESS OR EGRESS OCCURS. 24' IF SINGLE ENTRANCE TO SITE.
WIDTH- 12' MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS
STONE.
GEOTEXTILE MUST BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING
PERMITTED.
PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE
CONSTRUCTION ENTRANCES SHALL BE PIPED BENEATH THE ENTRANCE. IF
SURFACE WATER- ALL SURFACE WATER FLOWING OR DIVERTED TOWARD
PUBLIC RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY.
RIGHTS-OF-WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO
WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC
MAINTENANCE- THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH
DEVICE.
WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING
WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED
ACCORDING TO PERMIT REQUIREMENTS.
PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED
EPSC MEASURES
ENVIRONMENTAL RESOURCES
CONSTRUCTION FEATURES
UTILITY SYMBOLOGY
PROJECT BOUNDARY FENCE
EPSC LAYOUT PLAN SYMBOLOGY LEGEND
ARCHEOLOGICAL & HISTORIC
(OPTIONAL)
BERM
MOUNTABLE
8"MIN
PROFILE
SPECIES
THREATENED & ENDANGERED
FILTER CURTAIN
SILT FENCE
SILT FENCE WOVEN WIRE
PROJECT DEMARCATION FENCE
BARRIER FENCE
REQUIRING RE-VEGETATION
DISTURBED AREAS
EROSION MATTING
WETLAND BOUNDARY
RIPARIAN BUFFER ZONE
SOIL TYPE BOUNDARY
HISTORIC STRUCTURE
HISTORIC DISTRICT BOUNDARY
HISTORIC AREA
AGRICULTURAL LAND
HAZARDOUS WASTE AREA
FISH & WILDLIFE HABITAT
FLOOD PLAIN
STORM WATER
USDA FOREST SERVICE LANDS
WILDLIFE HABITAT SUIT/CONN
AREAL ELECTRIC & TELEPHONE
AREAL ELECTRIC
UNDERGROUND ELECTRIC
UNDERGROUND TELEPHONE
UNDER GROUND TV
GAS LINE
WATER LINE
CHECK DAM
TOE OF SLOPE CUT OR FILL
ARCHEOLOGICAL BOUNDARY
STONE FILL, TYPE III
STONE FILL, TYPE II
STONE FILL, TYPE I
NOT TO SCALE
THIS ITEM SHALL BE PAID FOR UNDER ITEM
SPECIAL PROVISION 900.675 (GEOTEXTILE FOR SILT FENCE, WOVEN WIRE REINFORCED)
STANDARD SPECIFICIATION 649.51 GEOTEXTILE FOR SILT FENCE OR
NOTES:
REFER TO "THE VERMONT STANDARDS & SPECIFICATIONS FOR EROSION
PREVENTION & SEDIMENT CONTROL -2006- " FROM THE VT AGENCY OF
NATURAL RESOURCES FOR ADDITIONAL GUIDANCE.
ADAPTED FROM DETAILS PROVIDED BY: NEW YORK STATE DEC
VERMONT DEPARTMENT OF ENVIRONMENTAL CONSERVATION
ORIGINALLY DEVELOPED BY USDA-NRCS
FLO
W
FLO
W
4"
EMBED FILTER
A MIN. OF 6" IN GROUND.
COMPACTED SOIL
FLOWUNDISTURBED GROUND
FABRIC UPSLOPE OF WIRE
HEIGHT OF FILTER
= 16" MIN.
SPACING)
W/ MAX. 6" MESH
(MIN. 14 GAUGE
WOVEN WIRE FENCE
WOVEN WIRE FENCE
HALF OF FABRIC HEIGHT.
7. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN SEDIMENT REACHES
6. PREFABRICATED UNITS SHALL BE GEOFAB, ENVIROFENCE, OR APPROVED EQUIVALENT.
INCHES AND FOLDED.
5. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVER-LAPPED BY SIX
TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES SPACED EVERY 24" AT TOP AND MID SECTION.
4. WOVEN WIRE FENCE IS TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES. FILTER CLOTH IS
ELONGATION IS <50%, POST SPACING SHALL NOT EXCEED 6'.
ELONGATION IS >50%, POST SPACING SHALL NOT EXCEED 4'. FOR FILTER-CLOTH FENCE, WHEN
3. POST SPACING FOR WIRE-BACKED FENCE SHALL BE 10' MAXIMUM. FOR FILTER-CLOTH FENCE, WHEN
FILTER CLOTH SHALL BE EITHER FILTER X, MIRAFI 100X, STABILINKA T140N OR APPROVED EQUIVALENT.
2. WHERE REQUIRED FENCE SHALL BE WOVEN WIRE, MIN. 14 GAUGE WITH A 6" MAXIMUM MESH OPENING.
1. WOVEN WIRE FENCE REINFORCEMENT IS ONLY REQUIRED WITHIN 100 FT UPSLOPE OF RECEIVING WATERS.
INTO GROUND.
POSTS DRIVEN MIN. 16"
36" MIN. LENGTH FENCE
6"MIN.
16" MIN.
SEE NOTE #3
POST SPACING
20" MIN.
PERSPECTIVE VIEW
SECTION VIEW
CONSTRUCTION SPECIFICATIONS
SYMBOL
SILT FENCE
cM Farland Johnson20
EPSC DETAILS (2 OF 3)SHEET NAME:
BRANDON-CHURCHILL ROAD BRIDGE
BRANDON PLH ALPP(1)
z8013ero det.dgn
J. Lund
D. Martel R. Joy
D. DePaolo
23
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
SYMBOL
CONSTRUCTION SPECIFICATIONS
VERMONT DEPARTMENT OF ENVIRONMENTAL CONSERVATION
ORIGINALLY DEVELOPED BY USDA-NRCS
ADAPTED FROM DETAILS PROVIDED BY: NEW YORK STATE DEC
NOT TO SCALESTAPLESTAPLE
JUTE MESH
EROSION CONTROL MATTING
EXCELSIOR BLANKET
FIRMLY
TAMP SOIL
4"MIN
DETAIL 1 TERMINAL FOLD
3"MIN
1"MIN
STAPLE DETAIL
SHALL BE PLACED LOOSELY OVER GROUND SURFACE. DO NOT STRETCH.
DISTURBED AREAS SHALL BE SMOOTHLY GRADED. EROSION CONTROL MATERIAL
APPROXIMATELY 12" INTERVALS.
ALL TERMINAL ENDS AND TRANSVERSE LAPS SHALL BE STAPLED AT
REQUIRED PER 4'X150' ROLL OF MATERIAL.
ARE REQUIRED PER 4'X225' ROLL OF MATERIAL AND 125 STAPLES ARE
APART AND IN ROWS APPROXIMATELY 3' APART. APPROXIMATELY 175 STAPLES
STAPLES ARE TO BE PLACED ALTERNATELY, IN COLUMNS APPROXIMATELY 2'
APPLY FERTILIZER, LIME SEED PRIOR TO PLACING MATTING.
5.
4.
3.
2.
1.
REVISIONS
APRIL 16, 2007 JMF
DETAIL 2 JUNCTION SLOT
6"12" 12"
EXCELSIOR BLANKET
EROSION CONROL MATTING
JUTE MESH
STAPLESSTAPLES
DETAIL 3 ANCHOR SLOT
EROSION CONTROL MATTING
EXCELSIOR BLANKET
JUTE MESH STAPLE
STAPLES
12"
FIRMLY
TAMP SOIL
4" MIN6"-12"
6"-12"6"-12"
DETAIL 4 LAP JOINT
3
2
1
H
V
4
TOGETHER
EXCELSIOR BLANKET SHALL BE BUTTED
JUTE MESH, EROSION CONTROL MATTING
(RECP) SIDE SLOPE
CONTROL PRODUCT
ROLLED EROSION
ESTABLISHING VEGETATION.
APPLY TO SLOPES GREATER THAN 3H:1V OR WHERE NECESSARY TO AID IN
JANUARY 13, 2009 WHF
SYMBOL
CONSTRUCTION SPECIFICATIONS
GUIDANCE.
THE VT AGENCY OF NATURAL RESOURCES FOR ADDITIONAL
EROSION PREVENTION & SEDIMENT CONTROL -2006- " FROM
REFER TO "THE VERMONT STANDARDS & SPECIFICATIONS FOR
NOTES:
VERMONT DEPARTMENT OF ENVIRONMENTAL CONSERVATION
ORIGINALLY DEVELOPED BY USDA-NRCS
ADAPTED FROM DETAILS PROVIDED BY: NEW YORK STATE DEC
TRENCH
CUTOFF
PROFILE
A
A
NOT TO SCALE
@ CENTERLINE
CREST HEIGHT (H)
1.5'MINB
B
FABRIC
FILTER
STONE
2"-9"
TRENCH
CUTOFF
1
11
1 6"
24" MAX
FABRIC
FILTER
18"
TOE
2 2
1
SECTION A-A
MIN
9"
SECTION B-B
1
SLOPE(ft/ft)X=
H(ft)
VARIES WITH SLOPE
SPACING (X)
CHECK DAM
BOTTOM
DITCH
SLOPE
AS NECESSARY
3/4" STONE
REVISIONS
MARCH 21, 2008 WHF
JANUARY 8, 2009 WHF
ITEM 653.25)
SECTION 653 FOR TEMPORARY STONE CHECK DAM, TYPE I (PAY
THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH
STONE WILL BE PLACED ON A FILTER FABRIC FOUNDATION.
DAM.
DOWNSTREAM DAM IS AT THE SAME ELEVATION AS THE TOE OF THE UPSTREAM
CHECK DAMS SHALL BE SPACED SO THAT THE ELEVATION OF THE CREST OFTHE
NECESSARY.
3/4" FILTERING STONE MAY BE ADDED TO THE FACE OF THE CHECK DAM AS
EROSION WITH STONE OR LINER AS APPROPRIATE.
PROTECT CHANNEL DOWNSTREAM OF THE LOWEST CHECK DAM FROM SCOUR AND
STONE.
CHECK DAMS ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED
ENSURE THAT CHANNEL APPURTENANCES SUCH AS CULVERT ENTRANCES BELOW
MAXIMUM DRAINAGE AREA 2 ACRES.7.
6.
5.
4.
3.
2.
1.
CUTTING AROUND THE DAM.
EXTEND THE STONE A MINIMUM OF 1.5' BEYOND THE DITCH BANKS TO PREVENT
GUIDANCE.
THE VT AGENCY OF NATURAL RESOURCES FOR ADDITIONAL
EROSION PREVENTION & SEDIMENT CONTROL -2006- " FROM
REFER TO "THE VERMONT STANDARDS & SPECIFICATIONS FOR
NOTES:
(PAY ITEM 653.21).
MATTING (PAY ITEM 653.20) OR PERMANENT EROSION MATTING
653 AND AS SHOWN IN THE PLANS FOR TEMPORARY EROSION
THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH SECTION
SYMBOL
CONSTRUCTION SPECIFICATIONS
GUIDANCE.
THE VT AGENCY OF NATURAL RESOURCES FOR ADDITIONAL
EROSION PREVENTION & SEDIMENT CONTROL -2006- " FROM
REFER TO "THE VERMONT STANDARDS & SPECIFICATIONS FOR
NOTES:
50' MIN LENGTH
HOSE
DISCHARGE
PUMP
WI
DT
H
REVISIONS
MARCH 24, 2008 WHF
JANUARY 13, 2009 WHF
SPECIFIED IN THE CONTRACT.
SECTION 653 FOR FILTER BAG (PAY ITEM 653.45) AND AS
THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH
DURING DEWATERING OPERATIONS.
THE PRIMARY PURPOSE OF FILTER BAG IS TO RETAIN SILT, SAND, AND FINES
INCOMING WATER TO FLOW THROUGH THE BAG.
FILTER BAGS SHALL BE INSTALLED ON A VEGETATED SLOPE GRADED TO ALLOW
HAYBALES TO INCREASE FILTRATION EFFICIENCY.
FILTER BAGS MAY ALSO BE PLACED ON COARSE AGGREGATE, STONE, OR
STATE UNLESS OTHERWISE APPROVED BY THE ENGINEER.
FILTER BAGS SHALL BE LOCATED A MINIMUM OF 50' FROM WATERS OF THE
DISCHARGE HOSE.
THE NECK OF THE FILTER BAG SHALL BE STRAPPED TIGHTLY TO THE
SEDIMENT OR ALLOW WATER TO PASS AT A REASONABLE RATE.
A FILTER BAG IS FULL WHEN IT NO LONGER CAN EFFICIENTLY FILTER
DIRECTED BY THE ENGINEER.
FILTER BAG SHALL BE DISPOSED OF AS APPROVED IN THE EPSC PLAN OR AS 7.
6.
5.
4.
3.
2.
1.
WA
TE
RS
OF
TH
E
ST
AT
E
FLOW
PROFILE
PLAN VIEW
SLOPE TO ALLOW DRAINAGE THROUGH BAG
FILTER BAG
FLOW
NOT TO SCALE
ROADWAYS AND TRANSPORTATION FACILITIES
ADAPTED FROM VTRANS TECHNICAL LANDSCAPE MANUAL FOR
SECTION 651 FOR SEED (PAY ITEM 651.15)
THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH
ROADWAYS AND TRANSPORTATION FACILITIES
ADAPTED FROM VTRANS TECHNICAL LANDSCAPE MANUAL FOR
SECTION 651 FOR SEED (PAY ITEM 651.15)
THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH
cM Farland Johnson21
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
EPSC DETAILS (3 OF 3)SHEET NAME:
BRANDON-CHURCHILL ROAD BRIDGE
BRANDON PLH ALPP(1)
z8013ero det.dgn
J. Lund
D. Martel R. Joy
D. DePaolo
23
CONSTRUCTION GUIDANCE
REVISIONS
TURF ESTABLISHMENT
WHFJANUARY 12, 2015
7.
6.
5.
4.
3.
2.
1.
GROWTH OF GRASS.
TO SEPTEMBER 15 AND AFTER APRIL 15 CAN BETTER ENSURE A VIGOROUS
TURF ESTABLISHMENT: PLACING SEED, FERTILIZER, LIME AND MULCH PRIOR
THE AMOUNTS AND TYPES OF SOIL AMENDMENTS TO BE APPLIED.
AND THE TYPE OF HYDROSEED PROPOSED FOR USE WILL ULTIMATELY DICTATE
HYDROSEEDING: ALTHOUGH GUIDANCE IS GIVEN ABOVE THE SITE CONDITIONS
ACHIEVE 90% GROUND COVER OR AS DIRECTED BY THE ENGINEER.
HAY MULCH: TO BE PLACED ON EARTH SLOPES AT THE RATE OF 2 TONS/ACRE,
DIRECTED BY THE ENGINEER.
FERTILIZER AND LIMESTONE: SHALL FOLLOW RATES SHOWN ON PLAN OR AS
WEIGHT AND SHALL BE FREE OF ALL NOXIOUS SEED.
ALL SEED MIXTURES: SHALL NOT HAVE A WEED CONTENT EXCEEDING 0.40% BY
UPLAND (NON WETLAND) AREAS DISTURBED BY THE CONTRACTOR.
SEED MIX: USE AS INDICATED IN THE PLANS AND/OR FOR ALL ESTABLISHED
ON WHICH SEED MIX TO USE.
SEED MIX: THE CONTRACTOR SHALL COORDINATE WITH THE RESIDENT ENGINEER
CONSTRUCTION GUIDANCE
REVISIONS
TURF ESTABLISHMENT
7.
6.
5.
4.
3.
2.
1.
GROWTH OF GRASS.
TO SEPTEMBER 15 AND AFTER APRIL 15 CAN BETTER ENSURE A VIGOROUS
TURF ESTABLISHMENT: PLACING SEED, FERTILIZER, LIME AND MULCH PRIOR
TYPES OF SOIL AMENDMENTS TO BE APPLIED
AND THE TYPE OF HYDROSEED WILL ULTIMATELY DICTATE THE AMOUNTS AND
HYDROSEEDING: ALTHOUGH GUIDANCE IS GIVEN ABOVE THE SITE CONDITIONS
ACHIEVE 90% GROUND COVER OR AS DIRECTED BY THE ENGINEER.
HAY MULCH: TO BE PLACED ON EARTH SLOPES AT THE RATE OF 2 TONS/ACRE,
DIRECTED BY THE ENGINEER
FERTILIZER AND LIMESTONE: SHALL FOLLOW RATES SHOWN ON PLAN OR AS
WEIGHT AND SHALL BE FREE OF ALL NOXIOUS SEED.
SEED MIX: SHALL NOT HAVE A WEED CONTENT EXCEEDING 0.40% BY
SEED MIX: USE ONLY AS INDICATED IN THE PLANS.
WATERS OF THE STATE OF VERMONT.
SEED MIX: THE URBAN AREA MIX SHALL NOT BE USED IN WETLANDS OR ANY
WHFJANUARY 22, 2015
PARCEL NO. PROPERTY OWNER BEGINNING STATION ENDING STATION TAKE REMAINDER RIGHT RECORDING DATA REMARKS REVISION
NO. DESCRIPTION DATE
AREA± AREA± TYPE T / P AREA ± TITLE DATE TOWN / CITY BOOK PAGE1 TIMOTHY G. AND MELISSA H.W. GIBBUD 1 101+35.00 LT 102+11.59 LT CONSTRUCTION T 613 sf BRANDON PDF & EROSION CONTROL
1 TIMOTHY G. AND MELISSA H.W. GIBBUD 1 101+79.00 LT 102+09.81 LT CHANNEL T 227 sf BRANDON INCLUDING STONE FILL
2 TIMOTHY G. AND MELISSA H.W. GIBBUD 1 102+11.59 LT 103+03.89 LT CONSTRUCTION T 1106 sf BRANDON PDF & EROSION CONTROL
3 TIMOTHY G. AND MELISSA H.W. GIBBUD 1 101+71.58 RT 102+34.78 RT CONSTRUCTION T 931 sf BRANDON PDF & EROSION CONTROL
4 DONALD & CRESCENT REMANIAK 1 102+34.78 RT 102+82.05 RT CONSTRUCTION T 622 sf BRANDON PDF & EROSION CONTROL
RIGHT - OF - WAY DETAIL SHEETTABLE OF PROPERTY ACQUISITION TABLE OF REVISIONS
ROW LAYOUT
NO.
ROW SET SHEET #
3 4
MELISSA H.W. GIBBUDTIMOTHY G. &
2
MELISSA H.W. GIBBUDTIMOTHY G. &
1
MELISSA H.W. GIBBUDTIMOTHY G. &
PL
PL
PL
NE
SH
OB
E
RI
VE
R
CHURCHILL ROAD
0 1010
N
VT STATE PLANE GRID
STA 103+00
END PROJECT
STA. 102+03.84
C BRG.SOUTH ABUT.L
STA 101+35
BEGIN PROJECT
STA. 102+42.86
C BRG.NORTH ABUT.L
ROW LAYOUT PLAN
C CONSTRUCTIONL
6.00' LT
101+35.00
16.00' LT
101+35.00
16.10' LT
101+58.30
27.43' LT
101+64.55
23.58' LT
101+69.37
38.75' LT
102+00.72
38.88' LT
102+07.25
23.96' LT
102+1 1.59
39.66' LT
102+47.09
31.40' LT
102+82.06
27.24' LT
102+77.68
9.09' LT
103+03.89
28.84' RT
101+71.58
39.88' RT
101+93.07
40.71' RT
102+03.38
25.09' RT
102+34.78
39.97' RT
102+40.94
27.35' RT
102+82.05
R.O.W. PLAN
z8013row.dgn
USE ONLY
FOR R.O.W.AND RIGHTS FOR THIS PROJECT.
STATE OF VERMONT'S ACQUISITION OF LAND
UPON FOR PURPOSES UNRELATED TO THE
ACCURATE BUT SHOULD NOT BE RELIED
PROPERTY LINES P/L ARE BELIEVED TO BE
LINES SHOWN ON THIS PLAN AS EXISTING
ROW LAYOUT SHEET 1 OF 1
CONST (T)
CONST (T)CO
NST (T)
CONST (T)
CONST (T)
CONST (T)
LEGEND
N30 16' 22" E 128.25'
5.89' LT
101+62.92
27.79' LT
102+02.92
24.64' LT
102+45.90
N 02 53' 20" E 42.99'
39.28'
N8 25' 54" E
N37
36' 25
" W 63.76'
15.50' LT
103+52.70
42.26'N2
4 11'
01" W
7.35' LT
102+90.1 1
S24
1 1' 0
1" E 3
5.17'
S37
36' 25
" E
73.90'
17.67' RT
103+54.58
S1 1 1 1' 19'
E 46.2
7'
38.41' RT
102+59.38
39.84' RT
102+47.88
24.85' RT
102+46.88
25.70' RT
102+03.90
S03 18' 45" W 42.19'
42.99'
S02 53' 20" E
S30 16' 21" W 138.40'
37.28'
N17 23' 59
" W
16.28' LT
101+79.00
23.92' LT
102+09.81
25.00' LT
101+79.00
36.44' LT
102+02.58
CHANNEL (T)
REMANIAKDONALD & CRESCENT
23
101+00
102+00
103+0
0
4/20/2018
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OFM cFarlandJohnson
SHEET NAME:
R. Joy
BRANDON PLH ALPP(1)
BRANDON-CHURCHILL ROAD BRIDGE
J. Lund
D. Martel
D. DePaolo
23
PROJECT DEMARCATION FENCE (653.55)
BARRIER FENCE (653.50)
72"C
MP