carbon audit seminar - carbon footprint management … lao_fro web.pdf · carbon audit seminar -...
TRANSCRIPT
10/31/2016 Page 1 MTR Corporation
Janice Lao Senior Manager – Sustainability 27 October 2016
Carbon Audit Seminar - Carbon Footprint Management and Reporting in MTR Corporation
10/31/2016 Page 2 MTR Corporation
Carbon Emission Calculation
Define boundary
Identify source
Select emission
factor/GWP Calculation
MTR Corporation Business in Hong Kong
10/31/2016 Page 3 MTR Corporation
Property and other businesses Property developments Investment properties -
shopping malls and offices
Property management
Network expansion 4 new rail lines under
construction 2 new lines are
opening
Station commercial businesses Station retail space Advertising Telecommunications
Transport operations Heavy rail: 220.9 km, 87
stations Light rail station: 68 stops Feeder bus routes Intercity services
Define boundary
Identify source
Select emission
factor/GWP Calculation
MTR Corporation Carbon Footprint in Hong Kong
10/31/2016 Page 4 MTR Corporation
Property and other businesses Fuel and refrigerant
usage Electricity consumption
at common areas Water consumption
Network expansion Fuel consumption at
MTR site office Electricity at MTR site
office Waste disposal
Station commercial businesses Electricity consumption at
advertising panels, kiosk Water consumption
Transport operations Fuel and refrigerant usage Electricity consumption Water consumption
MTR Headquarter Office Buildings Fuel, refrigerant usage Electricity consumption Paper consumption Staff business travel Water consumption
Define boundary
Identify source
Select emission
factor/GWP Calculation
10/31/2016 Page 5 MTR Corporation
Carbon Emission Calculation
• Standards EPD/EMSD- Guidelines to Account for and Report on Greenhouse Gas Emissions and Removals for Buildings (Commercial, Residential or Institutional Purposes) in Hong Kong • Carbon Data Management System
Define boundary
Identify source
Select emission
factor/GWP Calculation
10/31/2016 Page 6 MTR Corporation
Over 90% of our GHG emissions are Scope 2
…. of which close to 80% are from our transport operations
10/31/2016 Page 7 MTR Corporation
Carbon Independent Assurance
• Boundary • Scope • Emission factors
• Materiality • Completeness • Accuracy • Consistency
• Data revision • Management
improvement • Embed
awareness/mind-set
• Reliability • Confidence • Leverage for future
plan
Define Check
Liaison Report
Minimising Our Carbon Footprint and Environmental Impact
10/31/2016 Page 9 MTR Corporation
Energy Savings from our Transport operations LED Lighting Photo sensor control Temperature Gradient Platform Screen Doors Winter Free Exhaust Mode Escalator Energy Saving
Mode Regenerative Braking Trackside Energy Storage Train Coasting Trackside Ventilation Fan
Property and other businesses BEAM Plus requirement in new
property developments Green features Energy saving measures Water saving measures Waste reduction and encourage
recycling
Network expansion Environmental Impact
Assessment Green design Impact during construction:
noise, dust, wastes Biodiversity and tree
conservation