chang liu | lighting + electrical m.a.e./b.a.e. …...2702.2.6 accessible means of egress platform...
TRANSCRIPT
Renzo Museum of American ArtNew York, NY
Chang Liu | Lighting + ElectricalM.A.E./B.A.E. Integrated Degree
Technical Assignment 2 | October 12, 2012Faculty Consultants: Ron Dodson
ChangLiu HoustonMuseumofAmericanArtLighting+Electrical NewYork,NY
Page2of22
Executive Summary This report provides an analysis of the electrical systems of Houston Museum ofAmericanArt.Analysisincludesdevelopingtheelectricalsystemscriteriaandscopeofwork,presenting the currentlydesignedelectrical system,aswell as evaluationandsuggestionsforpotentialchanges.Loadcalculationwasperformed.Informationregarding IBC, NEC code requirement, currently-designed electrical systems wasinvestigated.Overall, the museum of American Art utilizes an integrated building system. Thecontrol system for the building equipment operates using BMS via BACnet. Thecurrentelectricaldesign isappropriate. In theattempt toachieveLEEDgold,well-thoughttechnologyandequipmentchoiceareusedfortheelectricalsystemsuchascogenerationtohelpwithenergyreduction.
ChangLiu HoustonMuseumofAmericanArtLighting+Electrical NewYork,NY
Page3of22
Table of Contents Executive Summary ............................................................................................................................................... 2Part 1 Develop the Electrical Systems Criteria and Scope of work ...................................................... 5Preliminaryelectricalloadcalculation.....................................................................................................................................5Powercompanyandpreliminaryrateschedule.................................................................................................................5Preliminarybuildingutilizationvoltage..................................................................................................................................5Emergencypowerrequirements..................................................................................................................................................5Specialoccupancyrequirements..................................................................................................................................................6Specialequipment..................................................................................................................................................................................7Priorityassessment...............................................................................................................................................................................7Optionalback-uppower.....................................................................................................................................................................7Special/communicationssystems................................................................................................................................................7Otherbuildingservices.......................................................................................................................................................................8Majorequipment.....................................................................................................................................................................................8Part 2 Understand and Describe the Electrical Systems as Currently Designed ............................. 9Actualconnectedbuildingload.....................................................................................................................................................9Powercompanyandrateschedule..............................................................................................................................................9Buildingutilizationvoltage............................................................................................................................................................10Emergencypowersystemloads..................................................................................................................................................11Specialoccupancyrequirements................................................................................................................................................13Specialequipment................................................................................................................................................................................13Generalequipment..............................................................................................................................................................................14Optionalback-uploads.....................................................................................................................................................................15Special/communicationssystems..............................................................................................................................................16OtherBuildingServices....................................................................................................................................................................16Electricalandcommunicationsystemspaces....................................................................................................................17
ChangLiu HoustonMuseumofAmericanArtLighting+Electrical NewYork,NY
Page4of22
Energycostsavingsandenergyreductiontechniques.................................................................................................20Singlelinediagram..............................................................................................................................................................................20Part 3 Evaluation of Criteria vs. Current Design ...................................................................................... 21Buildingloads.........................................................................................................................................................................................21Powercompanyrateschedule.....................................................................................................................................................21Buildingutilizationvoltage............................................................................................................................................................21Emergencypowersystem...............................................................................................................................................................21Generalequipment..............................................................................................................................................................................22Optionalback-uppowerandUPSsystem.............................................................................................................................22Costreductiontechniques..............................................................................................................................................................22Systemsintegration.............................................................................................................................................................................22Energycostsavingsandenergyreductiontechniques.................................................................................................22
ChangLiu HoustonMuseumofAmericanArtLighting+Electrical NewYork,NY
Page5of22
Part 1 Develop the Electrical Systems Criteria and Scope of work PreliminaryelectricalloadcalculationToestimatethepreliminaryelectricalload,followingassumptionsaremade: Lighting:1.1W/SF(ASHREA90.1)Receptacles:1.0W/SFHVAC:4.5W/SFOthers:1.0W/SFDemandfactorsarelistedasfollowing: Lighting:125%Receptacles:first10kVA100%,rest50%HVACandothers:100%Basedontheassumptionsmadeanddemandfactor,thepreliminarytotalbuildingkVAarelistedasfollowing: Lighting:245kVA Receptacles:116kVA HVAC:1,000kVA Others:222kVAPowercompanyandpreliminaryratescheduleThemuseumofAmericanArtshallhaveasecondaryservicefromtheutilitycompany.ConEdisonisthemainpowercompanythatsuppliespowerforNewYork.
PreliminarybuildingutilizationvoltageThe buildingutilization voltage shouldbe480Y/277V,with lighting 277V, receptacle 120V,HVAC208V/480V,andspecialequipmentincludingelevators208V,3phase,audiosignalprocessing120V,informationtechnology120V.
EmergencypowerrequirementsTheemergencypowerforthemuseumofAmericanArt(A-3occupancy)shouldbeprovidedbyadieselgeneratorat480/277V.
ChangLiu HoustonMuseumofAmericanArtLighting+Electrical NewYork,NY
Page6of22
BasedonIBC,emergencypowershallbedesignedandconstructedasindicatedbelow: 2702.2.1GroupAoccupancies.Emergencypowershallbeprovidedforemergencyvoice/alarmcommunicationsystemsinGroupAoccupanciesinaccordancewithSection907.5.2.2.4.2702.2.2Smokecontrolsystems.StandbypowershallbeprovidedforsmokecontrolsystemsinaccordancewithSection909.11.2702.2.3Exitsigns.EmergencypowershallbeprovidedforexitsignsinaccordancewithSection1011.5.3.2702.2.4Meansofegressillumination.EmergencypowershallbeprovidedformeansofegressilluminationinaccordancewithSection1006.3.2702.2.5Accessiblemeansofegresselevators.StandbypowershallbeprovidedforelevatorsthatarepartofanaccessiblemeansofegressinaccordancewithSection1007.4.2702.2.6Accessiblemeansofegressplatformlifts.StandbypowerinaccordancewiththissectionorASMEA18.1shallbeprovidedforplatformliftsthatarepartofanaccessiblemeansofegressinaccordancewithSection1007.5.2702.2.7Horizontalslidingdoors.StandbypowershallbeprovidedforhorizontalslidingdoorsinaccordancewithSection1008.1.4.3. 2702.2.19Elevators.StandbypowerforelevatorsshallbeprovidedassetforthinSections3003.1,3007.7and3008.15.2702.2.20Smokeproofenclosures.StandbypowershallbeprovidedforsmokeproofenclosuresasrequiredbySection909.20.6.2.SpecialoccupancyrequirementsBasedonNEC2011chapter5,specialoccupancyrequirementsmaybeneededfor[520]Theaters
ChangLiu HoustonMuseumofAmericanArtLighting+Electrical NewYork,NY
Page7of22
forthetheaterlocatedonthe3rdfloor.
SpecialequipmentBasedonNEC2011chapter6,alistofpotentialspecialequipmentislistedbelow:[620]Elevators[640]Audiosignalprocessing[645]Informationtechnologyequipment[695]FirepumpsPriorityassessmentReliability-MediumPowerQuality-LowRedundancy-MediumInitialCost(lowinitialcost)-LowLongTermOwnershipCost-MediumFlexibility-HighOptionalback-uppowerLoadsmay desire optional back-up power for the project can be the lighting for themechanicalrooms.Special/communicationssystemsPotentialspecial/communicationssystemsforthebuildingarelistedbelow:Telephone/dataFireAlarmCATVOverheadPaging/intercomAccesscontrolSecurity–IntrusionDetection,VideoSurveillance
FireAlarmIBCrequirement:Amanual fire alarmsystem that activates theoccupantnotification system in accordancewithSection907.5shallbeinstalledinGroupAoccupancieshavinganoccupantloadof300
ChangLiu HoustonMuseumofAmericanArtLighting+Electrical NewYork,NY
Page8of22
ormore.PortionsofGroupEoccupanciesoccupiedforassemblypurposesshallbeprovidedwithafirealarmsystemasrequiredfortheGroupEoccupancy.ManualfirealarmboxesarenotrequiredwherethebuildingisequippedthroughoutwithanautomaticsprinklersysteminstalledinaccordancewithSection903.3.1.1andtheoccupantnotificationapplianceswillactivatethroughoutthenotificationzonesuponsprinklerwaterflow.ActivationofthefirealarminGroupAoccupancieswithanoccupantloadof1,000ormoreshall initiate a signal using an emergency voice/alarm communications system inaccordance with Section 907.5.2.2. Where approved, the prerecorded announcement isallowedtobemanuallydeactivatedforaperiodoftime,nottoexceed3minutes,forthesolepurpose of allowing a live voice announcement from an approved, constantly attendedlocation.OtherbuildingservicesOtherbuildingservicesmayberequiredarelistedbelow:TelephoneDataCATVMajorequipmentPotentialmajor equipment that should be used includes switchgear,main transformer and step-downtransformers,generator(ifindoor),ATS,distributionpanelboards.
ChangLiu HoustonMuseumofAmericanArtLighting+Electrical NewYork,NY
Page9of22
Part 2 Understand and Describe the Electrical Systems as Currently Designed ActualconnectedbuildingloadTheactualconnectedbuildingloadswerecalculatedandsummarizedinthefollowingtables: Table1Connectedbuildingloads
Connected Building Loads (KVA)
Lighting 179Receptacle 310
HVAC 1,234Special Equipment 276
Total loads 1,999 Table2ConnectedloadsforspecialequipmentConnected Loads Special Equipment (KVA)
BMS 8Dock Leveler 25
Pavement & Gutter snow melting 70Kitchen appliance 127Shade controller 4
UV sterilizer 4Mechanical Tools 38
PowercompanyandratescheduleTheutilitycompanyfortheprojectistheConsolidatedEdisonCompanyofNewYork.Theserviceisfeed to the switchgears located on the cellar level. The secondary service voltage is 208Y/120V.Informationabouttheratescheduleandprimaryservicevoltagewererequestedfromthebuildingowner.Figure1and2showstheserviceentrancedetail.
ChangLiuLighting+
Figure1C
Figure2S
BuildingTheelecta.bc.
+ElectricalCellarelectri
Serviceentra
utilizationvtricalservice. Lighti. Recep. Mecha
icalroomenl
ancedetail
voltageng–120Vptacle–120Vanical• Airconditi• Hotwater• Fancoilun• Exhaustan• Pumps–2• Expansion
largedplan
Vioningunit–boiler–208nit–115V,1ndventilation08V,3phasetanks/make
208V,3phaV,3phasephasenfan–208Vee-uppump–
H
aseV,3phase&1–208V,3pha
HoustonMuseu
120V,1phasase
umofAmericaNewYo
Page10of2se
anArtrk,NY
22
ChangLiuLighting+
de.EmergenA750KWswitchboemergencpoweredemergencdistributiFigure3powerde1em E2em E4em E1optE
+Electrical. Elevat. HydrancypowersyWNo.2fueloard ESS, andcy, automatby the genecylighting,fiion system iand4showsevicesarelistmergencyservSSmergencydistDS-2-EM-A,mergencydistDP-C-A,EDPtionalemergEODP-C
tor–208V,3aulicLevelersystemloadsilgeneratord then branic transfererator poweiresuppressiis used to festheloaddetedbelow:viceswitchbtributionswiEDS-2-EM-BtributionpanP-C-B,EDP-C-encydistribu
Fig
3phases–208V,3p
locatedonthches off to tswitch willer. The poweionsystem,eeed loads suetailsfortheoards:208/1itchboards:2nelboards:20-K,EDP-9utionpanelbure3Emerg
phase
hesecondflothe emergenl allow emeer from theetc.Becauseuch as IDF raemergency120V-3phas208/120V-308/120V-3poard:208/1gencypower
H
oorisusedtncy distributergency swigenerator isofthetimedack j-box, copowersystese-4wires–3phase-4wphase-4wir20V-3phaseloaddetails
HoustonMuseu
tofeedtheetion switchbitchboardss used to fedelayofthegontrol roomem.Asumm–65,000AICires–100,00res–65,000-4wires–2
umofAmericaNewYo
Page11of2
mergencyseboards. In caand panelboeed loads sugenerator,theworkstationaryofemerg00AICAIC22,000AIC
anArtrk,NY
22
ervicease ofoardsch aseUPSn, etc.gency
ChangLiuLighting+
+Electrical Figuree4EmergenccypowerloaH
addetailsconHoustonMuseunt.
umofAmericaNewYo
Page12of2
anArtrk,NY
22
ChangLiuLighting+
SpecialoThereisnSpecialeSpecialeq[620]Ele[640]Aud[645]Info[695]FirThere arsection inserverro
+Electrical
occupancyrenospecialocequipmentquipmentfouevatorsdiosignalprormationtecepumpse 5 elevatorncludes videomandlocal
Figur
equirementsccupancyint
undinthedeocessingchnologyequrs in the buieo surveillanlfloorcloset
e5UPSdistr
sthedesigndo
esigndocumeuipmentilding, locatince and recosareusedfo
ributionboar
ocument.
entsareliste
ons shownording systemorequipment
Hrdloadsdeta
edbelow:
by figure 5.m and intertsuchasUPS
HoustonMuseuail
The audiorcom. InformS.
umofAmericaNewYo
Page13of2
signal procemation techn
anArtrk,NY
22
essingology
ChangLiuLighting+
Figure6E
GeneraleFourindopower toindividuaAs the utransformThepaneCoppercthatofpu i
iiivForconduflexiblem
+ElectricalElevators
equipmentoorfree-stano the rest ofallymountedutility compamer(includinelboardsareMonductorswurecopper,ui. Allcopii. Field-inunlessballast,ii. Allcon“XHHWv. Allconuits,rigidstemetalconduit
nding,dead-frf the buildindcircuitproteany will prongstep-downMCB,bolt-inwithsoft-drawsinganampaperconductonstalledcondusedasabra,shallbetypductorsinstaW”.ductorsinstaeelandintermt(FMC),and
rontsingleeg. They areectivedeviceovide the sentransformewithNEMAwnannealedacityasdescorinsulationductorswithanchcircuitceSFF-2alledverticalalledincondmediatemetliquid-tightf
nded4000Aall 208Y/12es,includingsecondary seers)specified1forindoorcopper,havcribedfora7nshallbetypinlightingfixconductor,usllyforadistaduitthatisinalconduit(Rflexiblemeta
H
Aserviceswit20V, 3 phasesurgeprotecervice voltagdinthedesigenclosure,Nvingaconduc75°Careusede“THHN”orxtures,fixtursedasracewanceinexcescontactwithRMC),electrialconduit(LF
HoustonMuseu
tchboardsare, 4 wires, 2ctiondevicesge of 208Y/gndocumentNEMA3Rforctivityofnotd.r“THHN/THWrebodies,secways,orwithissof35ft.shhearthshallcalmetallictFMC)areuse
umofAmericaNewYo
Page14of2
reusedtofee200,000 AIC,s(SPD’s)./120V, there.wetlocationtlessthan98WN”ctionsoffixtuin3inchesoallbeTypebetype“THWtubing(EMTed.
anArtrk,NY
22
edthe withe’s nons.8%ofuresfaWN”.),
ChangLiu HoustonMuseumofAmericanArtLighting+Electrical NewYork,NY
Page15of22
Receptacles used are standard duplex convenience receptacles that shall be specification gradeNEMA5-15R,5-20R,2pole,3wire,grounded,15or20ampereratedfordevicesshownona15or20amperecircuitrespectively.For switch and receptacle wall plates, plastics are used for all back-of-house devices andarchitecturalmetalfinishareusedforallothers.Additionally,switchesare“Decora”style“Paddle”type.MotorsareTEFCpremium-efficiencytypeandbeprovidewithvariablespeeddrive.UPSare75KVA/64KWat0.9power factor.TheUPSsystemhasa20minutes lifeandanon-linedoubleconversionsystemwithwraparoundmaintenancebypasscircuit.Optionalback-uploadsAsmentioned in theEmergency system loadsection, there is anoptional emergencydistributionpanelboard EODP-C (208Y/120V, 3 phase, 4 wires) feeding power to sump pumps and ejectorpumpswhich are all 208V, 3 phase. The optional emergency distribution panelboard is directedfeedbytheemergencyswitchboard.Loaddetailsareindicatedinfigurebelow.
ChangLiuLighting+
Special/cThe propaging/insystemfoBACnetpOtherBuOther buCATV.
+ElectricalFigure
communicatject has tentercom,accorsecurity.Tprotocol.uildingServiuilding servic
7Optionale
tionssystemelephone/datesscontrol,aThebuildingicesces that can
emergencyd
msta system,aswellasintautomation
be found in
istributionp
fire alarmtrusiondetecsysteminp
n the design
Hpanelboardlo
system (IBctionandvidplaceusesind
n document
HoustonMuseuoaddescripti
BC 2007),deosurveillandustrystand
include Tele
umofAmericaNewYo
Page16of2
ion
CATV, OvernceandrecodardAHSRAE
ephone, data
anArtrk,NY
22
rheadordingE135
a, and
ChangLiuLighting+
ElectricaThebuildlevel.ThebelowindCellarlevLowerlev1stlevel:E2nd level:1,875SF3rdlevel:4thlevel:5thlevel:6thlevel:7thlevel:8thlevel:9thlevel:Totaldedarea(222
+Electricalalandcommdinghaselecerearethreedicatethelocvel:Mainservvel:ElectricaElectricalclo Electrical cElectricalcloElectricalcloElectricalcloElectricalcloElectricalcloElectricalcloEMRroom=dicatedelectr2,952SF)
municationsyctricalroomseelectricalclcationofindiviceroom+Ealcloset+Teloset=85SFloset + Teleoset+Telecooset+Telecooset+Telecooset+Telecooset+Telecooset+Teleco250SFricalandcom
ystemspaceson thecellosetsA,BanividualmajorElectricalclolecomclosetcom closet +mcloset=1mcloset+ITmcloset=15mcloset=15mcloset=14mcloset=14mmunication
esar,secondanndC,detailsrelectricalrooset=2,045S=170SF+ Generator55SFTserverroom55SF50SF48SF48SFnssystemssp
Hndninth levareindicateooms.SFroom + Emm=733SF
paceis5,914
HoustonMuseuvelandITrodbyfigureb
mergency swi
4SF,2.7%of
umofAmericaNewYo
Page17of2
oomonthe fbelow.Thefi
itchboard ro
thetotalbui
anArtrk,NY
22
fourthgures
om =
ilding
ChangLiuLighting+
+Electrical
HHoustonMuseuumofAmericaNewYo
Page18of2
anArtrk,NY
22
ChangLiuLighting+
+Electrical
HHoustonMuseuumofAmericaNewYo
Page19of2
anArtrk,NY
22
ChangLiuLighting+
EnergycTheprojecompleteforproduLEEDme
SinglelinPleasese
+Electricalostsavingsaectaimstoae,fullyoperatuctionofheaasurementa
nediagrameattachmen
andenergyachieveaLEEtional,naturatandpowerandverificati
ntonthelast
reductionteEDgoldinneralgas-drivenrthroughoutonswithdet
page.
echniquesewconstructn,combinedttheprojecttailshowedb
Htion.Itutilizheatandpot.Italsousesbythefigure
HoustonMuseuzescogeneratowergeneratsaLEEDmebelow.
umofAmericaNewYo
Page20of2
tiontechnolotion(CHP)syeteringsyste
anArtrk,NY
22
ogy,aystemmfor
ChangLiu HoustonMuseumofAmericanArtLighting+Electrical NewYork,NY
Page21of22
Part 3 Evaluation of Criteria vs. Current Design
BuildingloadsThetotalactualbuildingloadisgreaterthantheestimatedload.Theactuallightingloadsarelessthantheestimated lighting loads.However,receptacles,HVACaswellasotherequipmentrequireadditional power than estimated. Larger HVAC loads may result from the rather large portionglazingofthefacades.Todifferentiatefromatraditionalmuseum,thetamuseumtakesupamodernsystemdesign.Extraloadsareresultedfromtheadditionalequipmentimplemented. estimated
kVA actual kVA
Lighting 245 179Receptacles 116 310HVAC 1,000 1,234Others 222 276Total 1,583 1,999
PowercompanyratescheduleNot sufficient information is obtained at the time of this report was written, thus no adequateevaluationcanbemade.BuildingutilizationvoltageTheactualbuildingutilizationvoltageis208Y/120Vinsteadoftheproposed480Y/208Vinpart1.480y/208V is themore reasonable choicewith a building this size to reduce thewire sizes andpower consumption. Exact reasoning behind the choice of 208Y/120V over 480Y/208V wasrequiredfromthecontractor.EmergencypowersystemTheactualfuelandpowersourcefortheemergencypowersystemisdiesel,sameasexpected.Thesizeof thegenerator is sufficient for theconnectedbuilding loads.The loadsconnectedmeet theIBCemergencyrequirements.Theoptionalback-uploadsforsumppumpsandejectorpumpswerenotexpected,butmakesensefortheactualdesign.
ChangLiu HoustonMuseumofAmericanArtLighting+Electrical NewYork,NY
Page22of22
GeneralequipmentAs mentioned in the building utilization voltage section, information is requested regarding thechoiceof208Y/120Vinsteadof480Y/120V. Theutilizationvoltagelimitedtheequipmentchoiceforlighting,HVAC,andotherequipment.Asidefromthepotentialproblemresultedfromtheutilizationvoltage,theoverallequipmentchoiceto serve the building is appropriate and compatible. The choice for conductors, conduit, andreceptacles is industrial standard for this type of building. Because of the busy urban site of theproject, the choice of indoor electrical equipment is very reasonable. Spare spaces on thepanelboard and switchboard allow for flexibility and future expansion. The cogeneration systemimplementedisenergyefficientandcostsaving.Optionalback-uppowerandUPSsystemAsmentioned in theemergencypowersystemsection, thecurrentdesign foroptionalback-up israther reasonable. The loads, feed by UPS system in case of power outage, are rather industrialstandard.Thus,theoptionalback-uppowerandUPSsystemdesignispractical.CostreductiontechniquesUsing higher quality equipmentmay increase the initial cost and reduce the long term cost. Asdiscussed in part 1, cost overall has a rather low propriety. However,with higher efficiency andlong-lastingequipment,thebuildingwillencounterlessproblemsinthefutureandalsosavecostlongterm.
SystemsintegrationTheentirebuildingsystemdesigned israther integrated,operateswithBMSviaBACnet.Buildingsystemequipmentsuchasventilation, lighting,powersystems, firesystems,andsecuritysystemscanbecontrolledandoverrideatacentrallocation.
EnergycostsavingsandenergyreductiontechniquesThebuildingusescogenerationforheatandpowergenerationandmeetsLEEDpowerconsumptionrequirementinattempttoachieveLEEDgold.As the building is located at a busy downtown area,with tall buildings around, itmay not seemworth tousePVarrayorwindgeneration.Asapublicmuseum, thecomfort-abilityof thegalleryspaceshouldstayratherconstant.Demandreductionandshiftingmaybereasonableinspacessuchasopenofficeareasinthebuilding.