Columbia County Road Department Department Presentation June, 2013 By David Hill

Upload: matthew-weiss

Post on 01-Jan-2016

33 views

Category:

Documents


0 download

DESCRIPTION

Columbia County Road Department. Department Presentation June, 2013 By David Hill. Columbia County Road Department Presentation: Work Performed Revenues / Expenses Projects Completed / Planned Issues and Needs. Work Performed By County Road Crews. Ditching. Road Grading. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Columbia County Road Department

Columbia County Road Department

Department PresentationJune, 2013

By David Hill

Page 2: Columbia County Road Department

Columbia County Road Department Presentation:

Work Performed

Revenues / Expenses

Projects Completed / Planned

Issues and Needs

Page 3: Columbia County Road Department

Work Performed By County Road Crews

Page 4: Columbia County Road Department

Ditching

Road Grading

Page 5: Columbia County Road Department

Bridge Repair

Culvert Replacement

Page 6: Columbia County Road Department

Herbicide Application

Page 7: Columbia County Road Department

Chip Seal

39 Miles in 2012

Page 8: Columbia County Road Department

Excavation

Page 9: Columbia County Road Department

Clear Debris From Landslides and

Floods

Page 10: Columbia County Road Department

We Move Snow

and Apply to Icy Roads:

Sand

Anti-Ice Chemical

Page 11: Columbia County Road Department

Storm Damage Removal

Page 12: Columbia County Road Department

Earthquake Preparation and

Recovery

Page 13: Columbia County Road Department

Other Tasks Performed By The Road Department

• Signs and Striping

• Roadside Vegetation

• Pothole Repair

• Paving

• Equipment Repair

• Building Repair

• Regulation and Permitting

Page 14: Columbia County Road Department

Budget and Personnel Numbers

Page 15: Columbia County Road Department

Columbia County Road Department Personnel & Mileage

• EMPLOYEES: Road Maintenance 13 (includes supervisors) Mechanics 2

Signs 1 Office 5

Total 21 (25.5 in 2011)

– COUNTY ROAD MILES: Paved Gravel Total Employees Miles

/Emp– Clatskanie District 79 55 135 3

45– Rainier District 111 43 153 4

38– St. Helens District 147 32 179 4

45*– Vernonia District 52 34 85 2

42

– Total 389 164 553If all the Columbia County Roads were placed end to end they would reach from St. Helens to Reno NV.

* St. Helens crew performs all centerline striping and herbicide application for all districts

Page 16: Columbia County Road Department

Road Department RevenuesYear Motor Vehicle

FeesAggregate Mining Fee

O&C Timber/Levy

Permits Federal STP Fund Exchange

Total Total Adj to 1996 Dollars

95-96 $2,181,988 $312,790 0 $16,971 $193,558 $2,705,307 $2,705,307

96-97 $2,174,958 $447,560 $455,422 $18,157 $178,653 $3,274,750 $3,201,298

97-98 $2,160,605 $445,143 $426,870 $13,206 $198,407 $3,244,231 $3,122,821

98-99 $2,270,155 $341,064 $416,808 $13,683 $188,142 $3,229,852 $3,041,799

99-00 $2,358,619 $421,047 $420,000 $18,597 $222,105 $3,440,368 $3,134,690

00-01 $2,380,647 $329,436 $420,000 $32,504 $229,646 $3,392,233 $3,005,315

01-02 $2,494,885 $324,978 $420,000 $23,166 $233,268 $3,511,187 $3,062,285

02-03 $2,266,730 $306,819 $420,000 $21,428 $246,832 $3,277,565 $2,794,836

03-04 $2,570,434 $270,129 $420,000 $30,258 $239,568 $3,545,682 $2,945,037

04-05 $2,564,061 $385,506 $420,000 $26,605 $265,584 $3,678,709 $2,955,399

05-06 $2,664,546 $396,848 $420,000 $28,740 $250,382 $3,776,498 $2,939,149

06-07 $2,639,899 $334,751 $420,000 $32,457 $276,840 $3,721,678 $2,816,271

07-08 $2,509,933 $339,531 $420,000 $36,174 $340,806 $3,668,198 $2,673,164

08-09 $2,260,613 $264,980 $420,000 $40,171 $310,085 $3,315,662 $2,424,884

09-10 $2,510,874 $298,670 $340,200 $38,303 $323,718 $3,532,428 $2,541,723

10-11 $2,946,734 $336,694 $306,400 $32,499 $372,872 $4,019,000 $2,803,342

11-12 $3,278,527 $314,381 $37,352 $27,843 $493,248 $4,161,651 $2,858,466

12-13 (Est) $3,339,713 $370,613 0 $32,654 $382,982 $4,125,962 $2,800,482

13-14 (Bud) $3,450,000 $360,000 0 $28,000 $385,400 $4,223,000

Page 17: Columbia County Road Department

2012 Revenues

78%

12%

1%

1%

8% Motor Vehicle Fees

Depletion Fees

O&C Timber

Permits

Federal STP$3,278,527

$314,381

$493,248

Total Revenue: $4,125,962

$27,843

$37,352

Page 18: Columbia County Road Department

2

2.5

3

3.5

4

4.5

95-96

96-97

97-98

98-99

99-00

00-01

01-02

02-03

03-04

04-05

05-06

06-07

07-08

08-09

09-10

10-11

11-12

12-13

Mil

lio

ns

Adj Rev Revenues

Road Revenues and Revenues Adjusted for Inflation

Page 19: Columbia County Road Department

County Road Revenues per Mile, FY July 2010 to June 2011

Washington

Columbia

Clatsop

Tillamook

Page 20: Columbia County Road Department

2010-2011 Revenue Per Mile

Higher Revenue Per Mile than Columbia County

Lower Revenue Per Mile than Columbia County

Page 21: Columbia County Road Department

Expense Cost

Personnel Salary (59%) $1,233,845 $2,097,412

Med Insurance (18%) $384,861

PERS (15%) $312,155

SS, W/C, Unemployment (8%) $166,551

Rock $150,000

Asphalt $300,000

Paint (for striping) $130,000

Culvert, Herbicide, Anti-Ice, Signs, Supplies $105,000

Fuel $220,000

Equipment, Parts, Supplies & Repairs $225,000

Utilities, Insurance, Admin, Other $388,000

Bridges (Fishhawk, JP West & Pebble Cr Rds) $383,000*Total $3,998,412

FY 2014 Road Department Budget

* STP Fund Exchange through ODOT

Page 22: Columbia County Road Department

Average Diesel Prices

$1.82

$2.24

$2.94 $2.89

$4.12

$2.46

$3.10

$3.99$4.16

$0.00

$1.00

$2.00

$3.00

$4.00

$5.00

2004 2005 2006 2007 2008 2009 2010 2011 2012

Page 23: Columbia County Road Department

Average Local Rock Prices / Ton

$5.82

$7.25

$8.13 $8.13 $8.25

$9.17 $8.97 $9.06 $8.94

$0.00$1.00$2.00$3.00$4.00$5.00$6.00$7.00$8.00$9.00

$10.00

2004

2005

2006

2007

2008

2009

2010

2011

2012

Page 24: Columbia County Road Department

Average Local Asphalt Prices / Ton

$29.75 $30.31

$34.81

$43.60

$48.00

$54.00

$50.00 $50.00

$54.00

$0.00

$10.00

$20.00

$30.00

$40.00

$50.00

$60.00

2004 2005 2006 2007 2008 2009 2010 2011 2012

Page 25: Columbia County Road Department

Recent Road Projects

Page 26: Columbia County Road Department

Elk Creek Road Reconstruction

Grinding Old Asphalt

Grading

Oil Matte

Page 27: Columbia County Road Department

Canaan Rd Guard Rail

Before

After

Total Cost: $494,000

Grant: $345,000

Page 28: Columbia County Road Department

Nicolai Rd Overlay 2011

Total Cost: $500,000

4.6 Miles

Page 29: Columbia County Road Department

Brinn Rd, Cox Cr

Four Watershed Council Culvert Replacements

Cater Rd, Alder Cr

Cedar Cr Rd, Cedar Cr

Scappoose Vernonia Rd, Elk Cr

Cost: $73,000

Page 30: Columbia County Road Department

Scappoose Vernonia Road

At Milepost 8

.

Repaired in 2011

Total Cost: $465,000

Grant: $390,000

Page 31: Columbia County Road Department

Holbrook Road Washout

Jan 2013

May 2013

Page 32: Columbia County Road Department

Nick Thomas Road

Landslide

Repair and Construction To Start: June 2013

Page 33: Columbia County Road Department

Marshland – Midland Road

Recycled Asphalt Resurfacing

Construction To Start:

July 2013

5000 CY of Asphalt Grindings to be used on Midland District Rd

Page 34: Columbia County Road Department

Marshland District Road Resurfacing Using Asphalt Grindings.

Construction Completed August 2013

Page 35: Columbia County Road Department

Eddings Road Culvert Construction To Start:

August 2013

Page 36: Columbia County Road Department

Eddings Road Culvert Construction Finished September 2013

Page 37: Columbia County Road Department

Scappoose – Vernonia Road Landslide / Heaving

Walker Road Landslide

Construction To Start: August 2013

Page 38: Columbia County Road Department

Hudson Park Bridge and

Fishhawk Creek Bridge

Construction To Start: Summer 2013

Other Bridge Replacement Projects:

• JP West - 2014 - $1,425,000

• Coon Creek - 2014 - $2,915,000

• Pebble Creek - 2016 - $2,693,000

County Bridge Inventory: 93

Total Cost: $921,000

Grant: $820,000

Total Cost: $1,624,000

Grant: $1,477,000

Page 39: Columbia County Road Department

Very Poor

Poor

Fair

Good

Very Good

Preventive Maintenance

Corrective Maintenance

Heavy Resurfacing

Reconstruction

$50 K

$120 K

$200 K

$360 K

10 Yrs 20 Yrs

Pavement Life Cycle

Page 40: Columbia County Road Department

Very Good

Typical Time

Maintenance Strategies

Heavy Resurfacing

Good

Fair

Poor

Very Poor

$200,000 / RM

$200,000 / RM

Heavy Resurfacing

Total Spent on Preventative Maintenance: $150,000 /RM

Total Spent on Heavy Resurfacing: $400,000 / RM

30 Yrs

15 Yrs

Page 41: Columbia County Road Department

Mayger Road

May 25, 2012

Very Poor

Poor

Fair

Good

Very Good

Preventive Maintenance

Corrective Maintenance

Heavy Resurfacing

Reconstruction

$50 K

$120 K

$200 K

$360 K

10 Yrs 20 Yrs

Pavement Life Cycle

Page 42: Columbia County Road Department

Ilmari Road

May 25, 2012

Very Poor

Poor

Fair

Good

Very Good

Preventive Maintenance

Corrective Maintenance

Heavy Resurfacing

Reconstruction

$50 K

$120 K

$200 K

$360 K

10 Yrs 20 Yrs

Pavement Life Cycle

Page 43: Columbia County Road Department

Haven Acres Road

Very Poor

Poor

Fair

Good

Very Good

Preventive Maintenance

Corrective Maintenance

Heavy Resurfacing

Reconstruction

$50 K

$120 K

$200 K

$360 K

10 Yrs 20 Yrs

Pavement Life Cycle

Page 44: Columbia County Road Department

Conyers Creek Road

Very Poor

Poor

Fair

Good

Very Good

Preventive Maintenance

Corrective Maintenance

Heavy Resurfacing

Reconstruction

$50 K

$120 K

$200 K

$360 K

10 Yrs 20 Yrs

Pavement Life Cycle

Page 45: Columbia County Road Department

Tide Creek Road

Very Poor

Poor

Fair

Good

Very Good

Preventive Maintenance

Corrective Maintenance

Heavy Resurfacing

Reconstruction

$50 K

$120 K

$200 K

$360 K

10 Yrs 20 Yrs

Pavement Life Cycle

Page 46: Columbia County Road Department

Lentz Road

Very Poor

Poor

Fair

Good

Very Good

Preventive Maintenance

Corrective Maintenance

Heavy Resurfacing

Reconstruction

$50 K

$120 K

$200 K

$360 K

10 Yrs 20 Yrs

Pavement Life Cycle

Page 47: Columbia County Road Department

Columbia County Roads Department Needs:

• Pavement Preservation – Scappoose Vernonia Rd, Apiary Rd, Mayger Rd, and most other County Roads.

• Port Westward / Hermo Road access / construction / reconstruction

• Gable Road – Bike / Ped / Enhancement, Overlay / Drainage

• Guardrail Construction

• Safety Improvements

State Highway Concerns:

• Hwy 30 Preservation

• Swedetown Overpass

• Bennett Road and Tide Creek Road Intersections

Page 48: Columbia County Road Department

Apiary Culvert Replacement

Page 49: Columbia County Road Department

Apiary Culvert Replacement

Today

Poor Roads, Poor Funding,

But we will work safe, hard, and effective to perform good work …

Page 50: Columbia County Road Department

… and with a smile!