comms international minetec smarts underground above ground planning management simulation

38

Upload: comms-international

Post on 07-Nov-2014

352 views

Category:

Technology


5 download

DESCRIPTION

Planning, Management and Simulation of underground and above-ground mining operations in real-time NOT historical based.

TRANSCRIPT

Page 1: Comms International MINETEC   smarts underground above ground planning management simulation
Page 2: Comms International MINETEC   smarts underground above ground planning management simulation

Mining Transformation: MINETEC´s Underpinning Technologies

Minetec  provides  the  underpinning  technology  and  force  mul6plier  for  mining  transforma6on  

Our  Customers  said: “I  congratulate  Minetec  on  having  the  best  underground  communica6ons  technology  and  the  only  technology  that  actually  works”  

            -­‐  Codelco    Head  of  Underground  Technology  Sep  2013  

“Minetec  outstood  its  compe6tors  not  just  on  a  single  ver6cal  but  on  all  ver6cals  for  the  mechanised  and  opera6onal  requirements.  Minetec  is  our  partner  of  choice  to  make  this  happen”  

            -­‐  Anglo  American New  Mining  Technology  Manager  Oct  2013  

WASP

“Whether  in  my  office,  or  in  the  muster  area,  at  mine  control,  or  my  home  in  Melbourne,  I  can  see  at  a  glance  what  is  going  on  in  the  mine.  It  is  a  new  world”  

            –  Newcrest  Toguraci  Mine  Manager  June  2013  

Page 3: Comms International MINETEC   smarts underground above ground planning management simulation

Mining  Industry  Status  

§   Demand  for  increased  efficiency  and  innova7on  in  mining  technology  through  ‘Smart  Mining’  due  to:  

§       Turbulence  in  Commodity  Prices  

§         Cost  Reduc7on  

§         Skills  Shortages  

§         Asset  U7lisa7on  

§         Consumable  management

§  Increasing demands, driven by the needs of emerging economies, maturing ore bodies and fewer tier-one surface deposits being discovered are forcing migration from surface to underground operations

 §  Australia is considered to be the world’s most innovative mining technology

community  

Page 4: Comms International MINETEC   smarts underground above ground planning management simulation

Opera7ons  Management  

Mining  ac7vi7es  are  projects  •  they  are  ac7vi7es  designed  to  produce  a  result  •  they  are  temporary  in  that  they  have  a  defined  beginning,  end,  scope  and  resources  

To  deliver  the  on-­‐7me,  on-­‐budget  results                                            they  must  be  expertly  managed  

Page 5: Comms International MINETEC   smarts underground above ground planning management simulation

Opera7ons  Management  

     

Inputs  

Simula1on  

Plan  

Con1nuous  Improvement  

Actual  

Reports  and  Reconcilia1on  

Page 6: Comms International MINETEC   smarts underground above ground planning management simulation

Opera7ons  Management  

Inputs  ú  Long  term  mine  design  and  principal  mining  methods  

−  U7lising  specialised  design  and  visualisa7on  tools  −  Ground  support  requirements  

ú  Constraints  such  as  −  Schedule,  including  face  availability,  linked  tasks,  crew  ingress/egress  and  breaks  −  Gear  selec7on  and  availability  −  Heading  priority  −  Grade  control  −  Environmental  −  Manpower  and  skill  level  −  Financial,  including  consumable  costs,  fuel  costs  

ú  Short  term  opera7onal  targets  updated  with  most  recent  actuals  results  

     

Inputs  

Simula1on  

Plan  

Con1nuous  Improvement  

Actual  

Reports  and  Reconcilia1on  

Page 7: Comms International MINETEC   smarts underground above ground planning management simulation

Opera7ons  Management  

Long  term  Simula7on  ú  Sensi7vity  analysis  ú  Visual  analysis  ú  Usually  only  occasionally  done  formally  –  perhaps  annual  business  plan  and  budget  cycle  ú  Op7misa7on  for  such  things  as:  

−  Equipment  u7lisa7on  −  km  travelled  −  Fuel  use  reduc7on  −  Hours  worked  −  Tonnes  moved  (and  handled  through  individual  stockpiles)  −  Idle  7mes  −  Traffic  management  

 Short  term  Simula7on  

ú  OYen  informally  done  weekly  and  daily  by  mining  management  and/or  shiY  boss  ú  OYen  also  known  as  “experience”  ú  Depending  on  mechanisms  of  long  term  simula7on,  can  be  very  adhoc    ú  Detailed  task  crea7on  and  review  ú  Update  for  actual  work  done  ú  Considera7on  for  opera7onal  constraints  ú  Develop  a  schedule  consis7ng  of  tasks  ú  Training  and  skills    requirements  

 Approve  and  Communicate  the  Plan    

Inputs  

Simula1on  

Plan  

Con1nuous  Improvement  

Actual  

Reports  and  Reconcilia1on  

Page 8: Comms International MINETEC   smarts underground above ground planning management simulation

Opera7ons  Management  

Keeping  an  eye  on  day-­‐to-­‐day  ac7vi7es  such  as  ú  Tracking  changes  to  the  plan  ú  Communica7ng  changes  to  all  affected  staff  ú  Tracking  equipment  and  loca7on  down7me  and  availability  ú  Tracking  and  loca7ng  staff  ú  Tracking  and  loca7ng  equipment  ú  Tracking  events  as  they  occur  ú  Recording  PLOD  data  ú  Ensuring  skilled  personnel  are  assigned  the  right    tasks  ú  Reducing  delays  

Inputs  

Simula1on  

Plan  

Con1nuous  Improvement  

Actual  

Reports  and  Reconcilia1on  

Page 9: Comms International MINETEC   smarts underground above ground planning management simulation

Opera7ons  Management  

Standard  Repor7ng  ú  EOD,  EOS,  EOM  ú  “Mine  Managers”  preferred  report  ú  Desire  for  high  amounts  of  data    ú  Desire  for  trends  and  graphs  showing  good  depth  to  data  

Reconcilia7on  ú  Rarely  mul7  dimensional  ú  Usually  only  grade  and  produc7on  schedule  against  specific  plan  ú  Does  not  regularly  include  variance  analysis  or  trend  analysis  

Inputs  

Simula1on  

Plan  

Con1nuous  Improvement  

Actual  

Reports  and  Reconcilia1on  

Page 10: Comms International MINETEC   smarts underground above ground planning management simulation

Opera7ons  Management  

Con7nuous  Improvement  •  Usually  done  as  a  specific  project  •  Usually  suffers  from  lack  of  opera7onal  data  •  Not  just  a  decision  on  how  to  get  back  to  target  •  Decisions  on  how  to  achieve  the  same  with  fewer  resources  –  efficiency  and  produc7vity  improvements  

•  Trend  analysis  on  failures  to  remove  root  causes  •  Tradi7onal  systems  require  too  much  work  to  get  to  this  stage  and  insufficient  corporate  resource  available  

Inputs  

Simula1on  

Plan  

Con1nuous  Improvement  

Actual  

Reports  and  Reconcilia1on  

Page 11: Comms International MINETEC   smarts underground above ground planning management simulation

Open  Pit  Opera7ons  Management  

§  Mine  control  and  monitoring  systems  are  now  common  in  open  pit  mining  §  Why  has  it  become  so  pervasive  over  the  past  5-­‐10  years?  §  Some  game  changing  technology:  

ú  WiFi    ú  GPS  device  availability  and  removal  of  Selec7ve  Availability(SA)  

§  Sites  that  have  deployed  this  technology  have  realised  significant  increases  in  opera7onal  performance  through  visibility  on  performance  leading  to  beder  planning  

Page 12: Comms International MINETEC   smarts underground above ground planning management simulation

Financial  Opportunity  

Variability  within  a  ‘typical’  single  heading    development  model  based  on  development  rate:  

100  $6,000  $2,400  $3,400  $2,200  

$1,400,000    

$14,000    

2.30    

150  $3,960  $1,900  $2,800  $1,500  

$1,524,000    

$10,160    

3.40    

200  $3,000  $1,600  $2,500  $1,100  

$1,640,000    

$8,200    

4.50    

Development  -­‐  meters/month  -­‐  Labour  ($/meter/month)  -­‐  Maintenance  ($/meter/month)  -­‐  Consumables  ($/meter/month)  -­‐  Capital  ($/meter/month)  Total  Cost  ($/month)      Total  Cost  per  Meter  ($/meter)      Meters  per  Man  per  Month    

Benefits 150m/m -> 200m/m: •  For 8% increase in overall costs, 30% increase in development rate •  Economy of scale reduces cost per meter by 20% •  Manpower efficiency rate of 132%

Page 13: Comms International MINETEC   smarts underground above ground planning management simulation

Open  Pit  to  Underground  

How  do  we  leverage  the  open  pit  model  into  the  underground  environment?    Do  the  ‘game  changers’  exist?  

Page 14: Comms International MINETEC   smarts underground above ground planning management simulation

WiFi  for  Underground  

ELF  is  the  Minetec    Ethernet-­‐over-­‐Leaky  Feeder  solu6on  that  delivers  high  bandwidth  voice  and  data  (Ethernet)  communica6ons  for  underground  applica6ons  where  RF-­‐based  systems  are  not  able  to  be  deployed      

• Fully  Ruggedized:  designed  for  harsh  underground  condi7ons  • High  Speed  Data,  Voice  &  Ethernet    up  to  60Mbs  • Deliver  high  bandwidth  from  the  backbone  broadband  network  to  the  development  and  opera7onal  areas  of  the  mine  

• Centralized  Management  • Rapid  Installa7on  and  Maintenance  • Cost  Effec7ve  &  Scalable  

Page 15: Comms International MINETEC   smarts underground above ground planning management simulation

Proximity  Awareness  

SafeDetect  ™  is  the  Minetec  real-­‐6me  proximity  awareness  and  detec6on  system  for  personnel,  equipment  and  assets  in  underground  and  open  pit  (above-­‐ground)  mining  opera6ons    • Simple  to  use  • Sub  metre  accuracy  down  to  10cm  (proven)  • Designed  for  a  wide  variety  of  installa7ons  

•  Stand  Alone  or  Integrated    •  Two  levels  of  operator  console  •  Fully  integrate-­‐able  with  machine  control  systems  (RS485,  RS  422  &  I/O)  •  Data  logging  for  review  and  analysis  

• Highly  Configurable  •  Mul7ple  zones  with  unlimited  number  of  contacts  per  zone  •  Configurable  alarm  sequence  and  incremental  warning  •  360  degree  contact  monitoring  •  Configurable  contact  classifica7on  and  display  •  Dynamic  zone  adjustment  

• Op7ons  include:  •  Camera  interface  •  Dynamic  zone  adjustment  on  machine  status  

Page 16: Comms International MINETEC   smarts underground above ground planning management simulation

GPS  for  Underground  

Trax+Tags™  is  the  Minetec  wireless  tracking  system  that  enables  operators  to  track  the  loca6on  of  personnel,  equipment  and  assets  by  u6lising  WASP  technology.  

• WASP  (Wireless  Ad-­‐hoc  System  for  Posi7oning)  developed  in  partnership  with  CSIRO  • Centrally  managed,  low  cost,  robust  technology  • Designed  for  severe  mul7path  radio  environments  • High  accuracy  

•  0.1  m  outdoors  line  of  sight  (low  mul7path)  •  0.2  m  indoors  line  of  sight  (high  mul7path,  including  underground)  •  Down  to  1  m  non  line  of  sight  •  1D,  2D  and  3D  

• Features  include:  •  Anchor  Nodes  –  at  fixed  and  known  loca7ons  •  Mobile  Nodes  –  adached  to  person  or  object  to  track  •  5.8  GHz  (ISM)  band,  125  MHz  bandwidth,  typical  50  mW  transmit  power  •  All  nodes  can  provide  up  to    8Mbps    data  network  capability  •  Supports  mesh    installa7on  with  limited  infrastructure  requirements  •  Full  historical  repor7ng  and  playback  

Page 17: Comms International MINETEC   smarts underground above ground planning management simulation

GPS  for  Underground  

Page 18: Comms International MINETEC   smarts underground above ground planning management simulation

UG Mine Management Solution

 •  Planning  &  development  simula7on    •  Scenario  evalua7on  based  on  knowledge  of  mine  design,  asset  configura7on  and  

many  other  criteria  •  Create  daily  ac7on  lists  based  on  real-­‐7me  and  recent  history  performance  •  Monitor  assets,  people,  task  status  &  comple7on  to  modify  the  plan  in  real  7me  •  Real  7me  repor7ng  of  performance  and  progress  according  to  plan  •  Team  management  approach,  not  individuals  working  in  isola7on  •  Configured  for  centralized  control  room  or  mobile  management  •  Opera7onal  data  capture  of  down7me  and  u7liza7on  tracking  for  maintenance    

planning  •  Leverages  Game  Changer  Technology  

     

SMARTS is a suite of advanced software applications and leading edge hardware devices for integrated real-time mine operation, simulation, management, tasking and reporting.

Page 19: Comms International MINETEC   smarts underground above ground planning management simulation

NOT  a  Rear  View  Mirror  Approach  

§  Combines  long-­‐term  produc7vity  modelling  with  short  term  real-­‐7me  op7misa7on  

§  Exis7ng  Mine  Management  &  Control  (MMC)  products  cannot  do  this  and  typically  model  produc7vity  based  on  past  performance  -­‐  Rear  View  Mirror  Approach    

§  Ongoing  simula7on  using  latest  opera7onal  data  

Page 20: Comms International MINETEC   smarts underground above ground planning management simulation

Industry  Standards  

• A  Windows  ‘Smart  Client’  database  applica7on  with  web  access  portal  and  repor7ng  interface  

• Users  are  able  to  enter  data  and  report  informa7on  from  anywhere  on  your  network  or  the  Internet.  

• Wriden  in  C#.net  and  ASP.net    • SQL  Server  database  that  is  open  and  available  for  external  interface  • Reports  delivered  in  Excel  or  Acrobat  (.pdf)  • Modular  • Scalable    • Robust  •  Integrated  

Page 21: Comms International MINETEC   smarts underground above ground planning management simulation

Indica7ve  Costs  

For  the  same  development  model  used  earlier:  

100  $3,000  $12,000  

$17  $33  

$20,000    

$200    

150  $3,000  $12,000  

$17  $33  

$22,500    

$150      

200  $3,000  $12,000  

$17  $33  

$25,000    

$125        

Development  -­‐  meters/month  -­‐  ‘Head-­‐end’  Voice  Only  ($/month)  -­‐  ‘Head-­‐end’  SMARTS  add-­‐on  ($/month)  -­‐  Consumables  Voice  Only($/meter)  -­‐  Consumables  SMARTS($/meter)  Total  Cost  ($/month)      Total  Cost  per  Meter  ($/m)      

~1.5% increase in costs …

Page 22: Comms International MINETEC   smarts underground above ground planning management simulation

Budget 0+12 5+7 8+4

Rolling 13 Week

Month

Week

Day

Shift

Shiftboss: Input Accountable

Superintendent: Input Accountable

Foreman: Input Accountable

Long  Term    

Short  Term  

Daily  

SMARTS  Control  Centre  

(SMARTcontrol)  

SMARTS  Mobile  Client  

(SMARTmobile)  

SMARTS  Long  Term  Planning  

(SMARTsim)  

SMARTS  Short  Term  Planning  

(SMARTsched)  

Mul7  Level  Planning  

Page 23: Comms International MINETEC   smarts underground above ground planning management simulation

Comprehensive  Input  Capture  

• Mine  design,  including  import  from  exis7ng  planning  and  scheduling  tools  • Define  targets  such  as  financial,  schedule,  movement,  grade  control  • Apply  constraints  such  as  gear  type  and  availability,  traffic  bodlenecks,  face  availability  

• Update    opera7onal  targets  based  on  most  recent  actuals  ac7vi7es  

     

Inputs   Simula1on   Plan   Con1nuous  Improvement  Actual   Reports  and  

Reconcilia1on  

Page 24: Comms International MINETEC   smarts underground above ground planning management simulation

Long  Term  Simula7on  

Complete  calcula7ons,  view  simula7ons    and  adjust  variables  to  achieve  required  outcome/criteria    Configure  for  varied  mining  processes  and  methods    Op7mise  for  individual  plant  &  equipment  usage  including  

ú     U7lisa7ons  ú     km  travelled  ú     Hours  worked  ú     Tonnes  moved  (and  handled  through  individual  stockpiles)  ú     Idle  7mes  

     

Inputs   Simula1on   Plan   Con1nuous  Improvement  Actual   Reports  and  

Reconcilia1on  

Page 25: Comms International MINETEC   smarts underground above ground planning management simulation

Long  Term  Simula7on  

   

Inputs   Simula1on   Plan   Con1nuous  Improvement  Actual   Reports  and  

Reconcilia1on  

Page 26: Comms International MINETEC   smarts underground above ground planning management simulation

Short  Term  Planning  

Specify  shiY  constraints  Develop  day  plan.  Approve  and  communicate  to  opera7ons    Iden7fy  training  and  skills  requirements    Long  term  plans  and  short  term  schedules  §  A  Schedule  consists  of  Tasks.  §  Each  Task  contains  a  Duty,  Loca1on,  Start  Time,  End  Time  and  Asset.  §  Task  are  assigned  to  Assets  –  any  vehicle  or  group  capable  of  doing  a  task    

Inputs   Simula1on   Plan   Con1nuous  Improvement  Actual   Reports  and  

Reconcilia1on  

Page 27: Comms International MINETEC   smarts underground above ground planning management simulation

Short  Term  Planning  

Inputs   Simula1on   Plan   Con1nuous  Improvement  Actual   Reports  and  

Reconcilia1on  

Page 28: Comms International MINETEC   smarts underground above ground planning management simulation

Opera7ons  Tracking  

Mobile  client  –  Operator  View  •  Ensure  training  completed  and  current  for  equipment  •  Respond  to  allocated  tasks  •  Add  enter  delay  and  abort  tasks  •  Turn  by  turn  naviga7on  •  See  all  equipment  and  personnel  in  vicinity  

Inputs   Simula1on   Plan   Con1nuous  Improvement  Actual   Reports  and  

Reconcilia1on  

Page 29: Comms International MINETEC   smarts underground above ground planning management simulation

Opera7ons  Tracking  

Mobile  client  –  Supervisor  View  •  View  en7re  opera7on  •  Respond  to  alerts  on  services  such  as  dewatering,  power,  ven7la7on  •  View  real  7me  loca7on  and  status  of  all  equipment  and  personnel  

•  Re-­‐alloca7on  of  people  and  equipment  to  new  tasks  and  re-­‐priori7sa7on  

Inputs   Simula1on   Plan   Con1nuous  Improvement  Actual   Reports  and  

Reconcilia1on  

Page 30: Comms International MINETEC   smarts underground above ground planning management simulation

Opera7ons  Tracking  

Control  Room  • Monitor  and  react  to  events  and  delays  

 

Inputs   Simula1on   Plan   Con1nuous  Improvement  Actual   Reports  and  

Reconcilia1on  

Page 31: Comms International MINETEC   smarts underground above ground planning management simulation

Real  Time  Dashboards  

• Monitor  and  report  on  actual  performance  • Dashboard  performance  views  • Compare  to  budgets  and  plans  

Inputs   Simula1on   Plan   Con1nuous  Improvement  Actual   Reports  and  

Reconcilia1on  

Current Status

Event History

Jobs Started

Page 32: Comms International MINETEC   smarts underground above ground planning management simulation

Regular  Repor7ng  

• Fully  customised  reports  through  SQL  Repor7ng  Services  • Produc7on  reports  • Daily  shiY  reports  

Inputs   Simula1on   Plan   Con1nuous  Improvement  Actual   Reports  and  

Reconcilia1on  

Page 33: Comms International MINETEC   smarts underground above ground planning management simulation

Inputs   Simula1on   Plan   Con1nuous  Improvement  Actual   Reports  and  

Reconcilia1on  

Reconcilia7on  

Budget 0+12 5+7 8+4

Rolling 13 Week

Month

Week

Day

Shift

Shiftboss: Input Accountable

Superintendent: Input Accountable

Foreman: Input Accountable

Page 34: Comms International MINETEC   smarts underground above ground planning management simulation

Con7nuous  Improvement  

•  Vast  amounts  of  data  available  to  make  well  reasoned  high  level  decisions  through  trend  analysis,  etc  

•  Includes  decisions  on  how  to  get  back  to  target  or  change  target  • Decisions  on  how  to  achieve  the  same  with  fewer  resources  –  efficiency  and  produc7vity  improvements  

•  Trend  analysis  on  failures  to  remove  root  causes  •  Business  is  freed  from  transac7onal  ac7vi7es  to  allow  greater  focus  on  opera7onal  improvements  • Maintenance  planning  is  beder  focused  on  targe7ng  equipment  in  need  based  on  run  hours,  etc,  but  also  iden7fy  troublesome  equipment,  condi7ons  and  operators  

•  Staff  skills  and  training  development  

Inputs   Simula1on   Plan   Con1nuous  Improvement  Actual   Reports  and  

Reconcilia1on  

Page 35: Comms International MINETEC   smarts underground above ground planning management simulation

The  Next  Level  

ú  A  large  por7on  of  a  typical  underground  mine’s  energy  costs  are  associated  with  ven7la7on.      ú  By  intelligently  managing  secondary  ven7la7on  fans,  the  case  study  indicated  up  to  30%  energy  reduc7on  ú  Automa7c  vent  fan  control  based  upon  factors  such  as:  

−  Personnel  loca7on  using  Tagging  and  Tracking  −  Time  of  Day  (Scheduling),  −  Air  Quality  -­‐  Temperature,  gas  levels,  or  minimum  air  veloci7es  reaching  undesirable  thresholds.  

Advanced Environmental and Condition Management Case Study - Ventilation on Demand

Page 36: Comms International MINETEC   smarts underground above ground planning management simulation

Summary  

§  Minetec  have  the  experience  and  track  record  in  engineering  and  maintaining  miner-­‐proof  solu7ons  

§  Minetec  products  provide  high  accuracy,  in  mo7on  posi7oning,  tracking  and  collision  avoidance  throughout  the  opera7on  

§  SMARTS  is  a  cost  effec7ve,  scalable  and  extensible  management  system  

§  SMARTS  adds    a  level  of  mine  management  and  planning  to  your  opera7on  through  simula7on,  data  acquisi7on  and  transparency  that  will  deliver  significant  improvement  in  safety,  efficiency  and  costs  

Page 37: Comms International MINETEC   smarts underground above ground planning management simulation

Toguraci  Update  

§  Elf  commissioned  ..  ~50  wireless  nodes,  ~15km  leaky  feeder  §  Elf  over  fibre    §  Trax&Tags  v1    

ú  U7lising  mul7  zone  electronic  tag  board  

§  SMARTS  ú  Tradi7onal  voice  mode  dispatch  ú  Working  on  simulator  integra7on,  semi-­‐automa7c  planning  ú  Comprehensive  repor7ng  

−  Delay  accoun7ng  −  Task  compliance  −  Material  movement  −  Run  hours/equipment  hours  −  Environment  temperature  monitoring  and  repor7ng  

Page 38: Comms International MINETEC   smarts underground above ground planning management simulation

Toguraci  Update  

�13

TecWise Sistemas de Automaçao / Comms International !Phone: +55 31 3019-0129 [email protected]

Rua Rio Grande do Norte, 1164/501 (Savassi), 30.130-131, Belo Horizonte. Brasil

!Phone: +44 207 193 4247 Fax: +44 207 117 4460

[email protected]