company profile pes 01-04-17mail.pes-egy.com/images/company profile.pdfcapabilities pes have a group...

45
ONLY THE BEST COMPANIES SURVIVE COMPANY PROFILE

Upload: others

Post on 27-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

ONLY THE BEST COMPANIES SURVIVE

COMPANY PROFILE

Page 2: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Table of Contents

Chairman letter Introduction Vision Mission Objective Capabilities Design Electrical Design Automation Design Mechanical DesignErection Electrical ErectionMechanical Erection Commissioning and start up Electrical panels workshopProject management Technical supportPES organization chart Facilities Erection equipment’s Testing equipment’sReference list Projects Photos Contact us

34555 6777899101112131314151515162244

Page 2Company Profile 2017

Page 3: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Chairman Letter.

In today’s global economy, only the best companies survive. Our company is able to do so by adopting approaches that meet and surpass the important challenges caused by Extreme Changes in our country and Middle East .

Our mission statement stands as a reflection of our unbroken commitment to do the best for customer satisfaction

Our company created by a group of professional engineers with Integrated experiences in the Electromechanical Infrastructure, MEP & Industrial work especially cement Industry and other heavy industries

Our commitment to improve efficiency and build reputation in the Field of electromechanical contracting

I invite you to read through this document and to have more information about our esteemed company

SincerelyEng.Tarek El Feshawy

PES Chairman

Page 3Company Profile 2017

Page 4: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Introduction

PES Egypt - is stock company Foundation accordance with the provisions of Egyptian law No.159 of 1981 and established according to the provisions of Egyptian law No.95 of 1992, contained in commercial registration no. 27368, executed before secretary of commercial register, Authorized share capital50,000,000 L.E and the issued and fully paid share Capital of the company at 4 August 2009 amounted to 5,000,000 L.Edistributed over 50,000 shares with par value 100 L.E each, at December 2016 PES Raised the company capital from 5,000,000 to 10,000,000 L.E.

Company Profile 2017

PES staff are aware of the international codes and standards, safety, with high technical and personal skills.PES staff are able to coordinate between various contractors in site, able to manage and control the job with time schedules and periodic reports. PES Policy, in carrying out all its activities, is to pursue a Sound Health, safety and Environmental System and Program in order to protect the safety and health of employees, contractors, customers and the community at large. The main goal is to minimize the impact to environment, in compliance with the Federal and Local Legislation concerning HSE and the applicable international rules and standards. We are looking ahead to the future needs of industry, and we are ready for all the challenges

Page 4

Page 5: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Vision

To be one of the Top Electromechanical contractors in the Market and its related services

Mission

To fill the gap of professional contractors in the market and supply the service in a professional, well organized wayTo give the best of the new electromechanicalservices to everyone, everywhere, at any time

Objectives

Improve workplace health and safetyDevelop our peopleTo fulfill the 3 corners of the project managementtriangle in our projects Time, Cost, Quality

Page 5Company Profile 2017

Page 6: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Capabilities

PES have a group of the best engineers, supervisors, electricians, and fitters with high experience in the Electromechanical work inside and outside Egypt.

PES have all the necessary tools and equipments, and capable of buildingsite facilities for erection.

Design

Page 6Company Profile 2017

Professional Engineering Services

Erection

Commissioning

Project Management

Technical Support

Panels Builder

Page 7: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Design

Electrical Design

MV single line diagramCable calculation and cables routingVoltage drop calculationShort circuit calculationSelectivity studyMotor control center and low voltage distribution boardPower factor improvementHeat dissipation studyAuxiliary control panelMarshalling panelPLC panelNetwork and Junction boxesLighting panel and socket boxesEarthing SystemFire Alarm SystemMaterial lists and bill of quantitySensor, Signal, Cable and Consumer listTrouble shooting drawing.

Automation Design

Expertise, analyseImprovement and optimization…Logic / loop diagrams and Marshalling Panels.Control room layout and arrangement drawings.Programming standardsSystem configurationMimic & visualization systemsPLC programmingDesign and / or implementing communications

Company Profile 2017 Page 7

Page 8: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Company Profile 2017 Page 8

Mechanical Design

HVAC

DX & Package systems Chilled water systemsVentilation (supply & exhaust Fans)Air ducts sizing & calculationsCompressed air systems

Plumbing

Domestic water networksDrainage networksInfrastructure networksIrrigation system

Fire Fighting

Fire fighting pumps & hydraulic calculationsFM200 , CO2 hydraulic calculations.Foam fire suppression systems.Fire cabinets.

Page 9: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Erection

Electrical Erection

Installation of transformers, panels…etcCables laying and termination (MV, LV, LC)Cable ways (trays, ladder, conduits ,….etc) Lighting (indoor ,outdoor & street lighting)Wiring devices & safety switchesEarthing & lightning protectionCathodic protection Industrial instrumentationsPatch panels & fiber optics cables Fire Alarm systemTelephone and data systemCCTV & surveillance systemAccess control systemSound & public address systemFalse floor and False ceilingInfrastructure & underground gridsManpower supply with complete Tool’s and Equipment’s, and safety tools.

Company Profile 2017 Page 9

Schneider Electric - Sudan

South Valley Cement – Egypt

Arabian Cement Company- Egypt

Tourah Cement - Egypt

Page 10: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Mechanical Erection

Diesel generators & air CompressorsDX & package unitsChilled water systems (water / air cooled)Expansion tanks & air separators Water treatment systemAir handling units, fan coil units & hookup Fresh air & exhaust fans.Air ducts (galvanized & black steel)Filters (pre-filter, HEPA ,…….etc)Air outlets (SCD, RCD, EXCD,….etc)Thermal insulation for ducts & pipesBuilding management system BMSDomestic water & drainage systemIrrigation networkDrainage & water supply Infrastructure Sanitary fixtures & ancillariesPump room (diesel ,electrical, jokey ,booster & sump pumps)Sprinkler system including zone control valve Fire standpipe system (Fire hydrant , Siamese connection & hose cabinets.FM200 ,CO2 & foam fire suppression systems

Company Profile 2017 Page 10

Linking Plaza- Egypt

Cairo Festival City - Egypt

Twin Towers - Egypt

Twin Towers - Egypt

Page 11: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Commissioning and Start-up.

Distribution transformers up to 2500 KVAMP, MCC, ACC and Lighting panelsUPS and battery charger systemsTesting all types of cables (low voltage, medium voltage, and control)Variable speed drivesMV switch gear Relay TestingStart up all the equipment on the field like belts,screw conveyors, air blowers, compressors, fans, water and oil pumps , generators , chillers , pumps …… etcCheck and adjust all types of instrumentation like limit switches, water and oil Levels, speed monitor, pressure and temperatureCold run test , sequence test & load testLight Current Systems loop tests, commissioning and Start-upHVAC testing, balancing and startupFire and Water Pumps commissioning and start up.Fire and domestic water hydraulic test.

Company Profile 2017 Page 11

Sinai Grey -Egypt

Amreyah -Egypt

South Valley -Egypt

Page 12: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Electrical panels workshop

Located in the industrial Zone – 15th May City – Cairo , certified from Schneider Electric as panel builder in cement Industry , example ofproduced panels :

Motor Control CentersMarshalling panels & PLCsDistribution boardsLighting & sockets panels

Company Profile 2017 Page 12

Page 13: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Project Management

Projects cost estimateProject time schedulesResources needs and allocationwork follow up including coordination meeting

Technical Support

After sales servicesTender preparationTender evaluation for work which done by othersPreventive maintenance

Company Profile 2017 Page 13

Page 14: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

PES Organization Chart

Company Profile 2017 Page 14

Page 15: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Facilities

Erection Equipments:

Clark.

Diesel engine generators 40 KVA.Diesel engine generators 125 KVA.1-phase welding Machines3-phase welding MachinesGrinding machines 9"Grinding machines 4"3-phase cutting desk 14"Big drilling deskHydraulic press for cablesHiltiDrilling machines 16mmHydraulic bending machinesScaffoldingsManual press up to 185mm2

Cable cuttersPuncher setRopes, spring, cable rollers

Testing Equipments:

Insulation testers

Meg OhmmetersEarth resistance testerDigital multi-metersDigital clamp metersDigital phase indicatorMultifunction calibratorsInfrared thermometerFog machines for ducts testHydraulic test pump setsPressure , temperature & flow meters

Company Profile 2017 Page 15

Page 16: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Company Profile 2017 Page 16

Reference List (1/5)2007-2015 (Main Project List)

No Client Project Scope Year Man‐hours

1 Pertech  South valley cement plant (4200T/D) Line 1  Erection and commissioning  2008 484 K

2 Riga Royal El‐Minya white cement plant (900T/D) Technical support, erection and commissioning. 

2008 306 K

3 RHI  Pyramids panel’s factory Materials supply, design, erection and commissioning 

2008 112 K

4 Interpharm  Interpharm medical devices factory   Panels assembly, erection, commissioning  2008 21 K

5 ESCC  P&G warehouse  ‐ Nigeria Design for lighting and socket and BOQ For material  

2008 210

6 ESCC  El Masry EL yom newspaper  Design of cable routing, earthing, lighting   2009 330

7 ACC  Arabian cement company workshop  Supply and erection  2009 6.4 K

8 RHI Sinai Grey Line 1 new clinker vibration system 

Design, supply, erection and commissioning   2009 10.6 K

9 Argonaut  Cairo festival city (Al‐Futtaim Group)  Erection, commissioning for CDC Buildings  2009 36 K

10 Schneider  Schneider electric ‐ SudanTermination, commissioning for 33KV MV Cables 

2009 520

11 Zelog Tourah cement company air lift ofLine 8&9 filters 

PLC programming and graphic S.W modification  

2009 210

12 Royal Royal Elminya white cement main substation 

Supply, erection and commissioning 2009 10.2 K

13 ITCGR Tourah cement upgrading cement silos bag filter 

Supply Panels, erection and commissioning  2009 6 K

14 Riga  Sinai white line 2 new palletizer plant  Supply, erection and commissioning   2009 5.4 K

15 ABB  Tourah cement Mill 11 upgrading Supply, erection and commissioning   2009 11.2 K

16 Aresco  Sinai white line 2 kiln shell cooling FansEngineering, supply, erection and commissioning  

2009 3.6 K

17 SCC Sinai grey line 1 new by pass hopper Supply, erection and commissioning   2009 6 K

18 SWCC Sinai white line 2 new WF and bulk loading Supply, erection and commissioning   2009 3.8 K

19 ITCGR  Helwan cement Mill MVSG and Cables Supply, erection and commissioning   2009 4 K

20 ITCGR  Helwan cement mill rehabilitation Supply, erection and commissioning   2009 1.2 K

Page 17: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Reference List (2/5)

Company Profile 2017 Page 17

No Client Project Scope Year Man‐hours

21 SGGESaint‐Gobain MVSG, transformers and cables

Supply, erection and commissioning   2009 19.8 K

22 ACC Arabian cement company (6000T/D) line II Erection and commissioning   2009 468 K

23 SchneiderSchneider electric Dubai Borogue 2 project ‐ UEA

Technical support and Commissioning 2009 1.3 K

24 FlexFlex P. films Egypt lighting, Earthingand fire alarm

Supply, erection and commissioning   2009 32 K

25 CPC Royal cement plant Las Vegas – USA Technical support and Tender Preparation 2009 260

26 PEPSIPepsi Cola Nasr city factory electrical capacity upgrade

Supply, erection and commissioning   2009 14.5 K

27 RHI Amreyah cement company 5 packing machines upgrading

Supply, erection and commissioning   2010 11.6 K

28 WNCCWadi El‐Nile cement company central control room CCR

Design, supply, erection and commissioning   2010 18.8 K

29 NHDAl‐Nahda cement company service buildings

Engineering and BOQ 2010 580

30 ACCArabian cement company line I new cement & packing

Erection and commissioning   2010 186 K

31 WNCCWadi El‐Nile cement company administration building

Design, supply, erection and commissioning   2010 22.6 K

32 ACCArabian cement company Line II Road Lighting

Supply, erection and commissioning   2010 9.7 K

33 Aresco  Aresco sukari gold mine Erection and commissioning  2010 136 K

34 Cemex  Cemex supply and Install for Rice Straw  Supply, erection and commissioning.  2010 10.6 K

35 ITCGR Helwan CM8 and CCR civil Civil Works 2011 3.4 K

36 ABB ABB abu zenima capacitors Supply, erection and commissioning.  2011 220

37 Schneider Schneider al‐shabab and damietta stations Design, supply, erection and commissioning   2011 86 K

38 WNCCWadi el‐nile cement company fence and road lighting

Supply, erection and commissioning.  2011 7.6 K

39 ITCGR Tourah ‐ kiln camera installation kiln 8&9 Supply, erection and commissioning.  2011 1.3 K

40 Flex Flex P. films egypt turn Key Project Supply, erection and commissioning 2011 134 K

Page 18: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Reference List (3/5)

Company Profile 2017 Page 18

No Client Project Scope Year Man‐hours

41 Schneider Gamasa stations  Erection and commissioning 2011 32 K

42 Schneider CFC bus‐way installation  Erection and commissioning 2011 14.5 K

43 Galaxy  Galaxy chemicals E&I Supply, erection and commissioning 2011 178 K

44 MSGC Main substation MV switch gear and transformer 

Supply, erection and commissioning 2012 116 K

45 FLS  New phosphate terminal ‐ Jordan Erection and commissioning 2012 337 K

46 MCG Manaseer cement factory electrical supervision ‐ Jordan

Supervision and technical assistance  2012 108 K

47 GIP  Tourah complete line upgrading  Supply, erection and commissioning 2012 83 K

48 Energya  EIPIT CHIPS – Chemicals E&I Supply, erection and commissioning 2012 289 K

49 Cemex  Cemex ‐MSW materials handling  Design, supply, erection and commissioning 2012 7.5 K

50 United  United calcium carbon   Design, supply, erection and commissioning 2012 38.7 K

51 Schneider  Installation of MCC helwan CM9  Erection and commissioning   2012 129 K

52 El Qsrawee  Twin tower sheikh zayedElectro‐Mechanical design, supply, erection and commissioning

2012 208 K

53 Lafarge  Lafarge PLC upgrade ‐ ZimbabwyAutomation, supply, erection and commissioning 

2013 19.6 K

54 RHI  AMCC alternative fuel continuous       Automation, Supply, Erection and commissioning 

2013 14.7 K

55 TI Film  TI ‐ Films   Supply, erection and commissioning 2013 131 K

56 Knauf   Knauf engineering suez gypsum factory   Erection and commissioning   2013 94.5 K

57 ACC  Alternative fuel feeding line 2  Supply, erection and commissioning 2013 21 K

58 Mariout  ACC new coal mill  Supply, erection and commissioning 2013 88 K

59 Lafarge  IBITEC CM 8 to petcoke mill  Supply, erection and commissioning  2013 16.5 K

60 NLS NLS ‐ NCC long belt conveyors upgrading  Supply, erection and commissioning  2014 18 K

Page 19: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Reference List (4/5)

Company Profile 2017 Page 19

No Client Project Scope Year Man‐hours

61 INPECINPEC ‐Mopco zero liquid discharge phase I&II

Supply, erection and commissioning 2014 21 K

62 Boldrocch Boldrocch ‐ Elminya filter conversion Supply, erection and commissioning 2014 18 K

63 ACC ACC ‐ hot disc line 1 Supply, erection and commissioning 2014 21 K

64 ITCGR Change the OHTL to underground cables  Supply, erection and commissioning 2014 11 K

65 SWDY  El Sewedy cement factory new coal mill   Design, supply, erection and commissioning   2014 88 K

66 WNCC Wadi El‐Nile cement factory new coal mill   Design, supply, erection and commissioning   2014 88 K

67 SWDY El Sewedy cement factory new cement mill and packing 

Design, supply, erection and commissioning   2014 102 K

68 FLS  Qena cement new coal mill   Supply, erection and commissioning 2015 88 K

69 FLS  Qena cement new cement mill Supply, erection and commissioning 2015 102 K

70 HAL Schlumberger Integration project  Design, supply, erection and commissioning   2015 192 K

71 Royal  Royal cement new coal mill   Supply, erection and commissioning 2015 62 K

72 Royal Royal cement new cement mill Supply, erection and commissioning 2015 88 K

73 ITCGR Helwan alternative fuels line 1 Supply, erection and commissioning 2016 92 K

74 FIC FIC ‐ SGGE furnace booster project Supply, erection and commissioning 2016 75 K

75 TITAN Titan cement mill upgrade Supply, erection and commissioning 2016 89 K

76 ECOBAT ECOBAT‐ Gypsum powder MCC Supply LV Panels 2016 65 K

77 BoldrochiBoldrocchi ‐ Suez electrical work for filters conversion

Supply, erection and commissioning 2016 98 K

78 Al FahdAl Fahd ‐MOD Building cable routing , cables and Termination

Supply and Erection  2016 105 K

79 IMSAT IMSAT ‐ BMC new coal mill   Supply, erection and commissioning 2016 96 K

80 NLS NLS ‐WNCC upgrade Supply, erection and commissioning 2016 75 K

Page 20: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Reference List (5/5) NEW

Company Profile 2017 Page 19Page 20

No Client Project Scope Year Man‐hours

81 RIS RIS ‐ LV Panels Supply and commissioning 2016 90 K

82 RIS RIS ‐main substation MV, TR, RMU Supply, erection and commissioning 2016 98 K

83 WNCC WNCC ‐ Coal storage electrical works Supply, erection and commissioning 2016 112 K

84 FLS  FLS ‐WNCC Rejects bin for atox 45 raw mill Supply, erection and commissioning 2016 77 K

85 RIS RIS ‐ LV Panels Supply and commissioning 2017 65 K

86 Veolia Veolia ‐ Helwan power generation Erection 2017 86 K

87 MODMOD ‐ Hikestep building cable routing , cables and Termination

Supply and Erection  2017 98 K

Page 21: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Company Profile 2017 Page 21

Page 22: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Arabian cement company (6000T/D) line II

Page 22Company Profile 2017

Page 23: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Pyramids Badr Factory

Page 23Company Profile 2017

Page 24: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

U Felx Film Plastic Factory

Page 24Company Profile 2017

Page 25: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Sukari Golden Mines

Page 25Company Profile 2017

Page 26: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Saint Gobain Glass Factory

Page 26Company Profile 2017

Page 27: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Cairo Festival City (Admin Building)

& Infrastructure Project

Page 27Company Profile 2017

Page 28: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Cairo Festival City (Linking PLAZA )-MEP Project

Page 28Company Profile 2017

Page 29: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Cairo Festival City (Linking PLAZA )-MEP Project

Page 29Company Profile 2017

Page 30: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

ACC Road Lighting and High Mast

Page 30Company Profile 2017

Page 31: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Royal el minya white cement plant (900T/D)

Page 31Company Profile 2017

Page 32: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

South valley cement plant (4200T/D) Line 1

Page 32Company Profile 2017

Page 33: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Galaxy – Chemicals

Page 33Company Profile 2017

Page 34: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

FLS – New Phosphate Terminal – Jordan

Page 34Company Profile 2017

Page 35: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Cemex – Alternative Fuel Project

Page 35Company Profile 2017

Page 36: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Amreyah– Alternative Fuel Project

Page 36Company Profile 2017

Page 37: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

ACC New Coal Mill line II

Page 37Company Profile 2017

Page 38: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Inter farm Factory

Page 38Company Profile 2017

Page 39: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Twin Tower Sheikh ZayedMEP Project

Page 39Company Profile 2017

Page 40: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Twin Tower Sheikh ZayedMEP Project

Page 40Company Profile 2017

Page 41: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Manresa (Zimbabwe) Plant DCS Upgrade

Page 41Company Profile 2017

Page 42: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

COAL MILLS

Page 42Company Profile 2017

Page 43: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

PES –Panel Building Workshop (Several Projects in Cement Industry)

Page 43Company Profile 2017

Page 44: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Contact us

Chairman

Eng. Tarek El feshawy

E-mail: [email protected]

Tel: +20100-6617137

Commercial Manager

Eng. Mohamed Hamdy

E-mail: [email protected]

Tel : + 20128-4071010

Head office

Tel: (+202) 29820534– (+202) 27538235Fax: (+202) 25175226E-mail: [email protected]

(Days of business: Sunday - Thursday )

Company Profile 2017 Page 44

Page 45: Company Profile PES 01-04-17mail.pes-egy.com/images/Company Profile.pdfCapabilities PES have a group of the best engin eers, supervisors, electricians, and fitters with high experience

Address: 4Z/3 Sayed Dawoud – Teba Building Ellaselky Division -New Maadi - Cairo – Egypt

Tel: (+202) 29820534 – (+202) 27538235Fax: (+202) 25175226

E-mail: [email protected]

Web Site: www.pes-egy.com

Company Profile 2017 Page 45