compliance status and environmental and social safeguard monitoring report  · 2015-12-31compliance...

72
This environmental safeguard monitoring report is a document of the borrower and made publicly available in accordance with ADB’s Public Communications Policy 2011 and the Safeguard Policy Statement 2009. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff. Compliance Status and Environmental and Social Safeguard Monitoring Report Reporting Period June, 2014 to December, 2014 January, 2015 to July, 2015 Date November, 2015 IND: Himachal Pradesh Clean Energy Transmission Program (Project -1, Loan No. 2794) Prepared by the H.P. Power Transmission Corporation Limited for the Asian Development Bank

Upload: dangque

Post on 04-May-2018

239 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

This environmental safeguard monitoring report is a document of the borrower and made publicly

available in accordance with ADB’s Public Communications Policy 2011 and the Safeguard Policy

Statement 2009. The views expressed herein do not necessarily represent those of ADB’s Board of

Directors, Management, or staff.

Compliance Status and Environmental and Social

Safeguard Monitoring Report

Reporting Period June, 2014 to December, 2014

January, 2015 to July, 2015

Date November, 2015

IND: Himachal Pradesh Clean Energy

Transmission Program (Project -1, Loan No.

2794)

Prepared by the H.P. Power Transmission Corporation Limited for the Asian Development Bank

Page 2: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 2 of 72

List of abbreviations and colloquial terms used

ADB Asian Development Bank

AP’s Affected Persons

C/o Construction of

Distt. District

Deptt. Department

EHV Extra High Voltage

ESSP Environment and Social Safeguards Policy of HPPTCL

FCA Forest Conservation Act

FRA Forest Right Act,2006

GIS Gas Insulated Sub-Station

GOI Govt of India

GRC Grievance Redress Committee

Ha. Hectare(10,000 sq. m. land)

NPV Net Present Value

CA Compensatory Afforestation

HPPTCL H P POWER TRANSMISSION CORPORATION LTD.

IE Rule Indian Electricity Rule

INR Indian Rupee

NPV Net Present Value

MPAF Main Project Affected Family

MoEF Ministry of Forest and Environment

Pvt. Land Private Land

PIU Project Implementing Unit

RRRCP Resettlement, Relief, Rehabilitation and Compensation Policy of HPPTCL

RoW. Right of Way

Page 3: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 3 of 72

INDEX

S.No. CONTENT PAGE

Project Details 4

A Implementation of Safeguard Measures 05-11

1. Forest Clearance

2. Fulfillment of Commitments of Public Hearing

3. ADB Stipulation/Safeguarding Measures

4. Others

B Status of Implementation of Environment Management Plan (EMP)

12-14

1. EMP

2. Additional Measures Undertaken

C Implementation of Social & R&R Measures 15-27

1. R&R Plan

i. Brief description of HPPTCL RR Plan

ii. Brief description of meeting organized at project affected area with MPAF along with photographs

iii. Detail of distribution of ID Card cum Entitlement Card among MPAF

iv. Detail of any infrastructure development work done at project affected area

v. Detail of Compensation (Land/House etc.)

vi. Detail of Resettlement Grant

2. Social and R&R Measures

3 ADB Stipulations

D Record of Complaints (Regarding Environment and Social Safeguard Measures) and their Resolution

31

E Staffing Position 31

F Annexures 35

Page 4: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 4 of 72

PROJECT DETAILS

Name of Project Himachal Pradesh Clean Energy Transmission Investment Program - Tranche 1, Loan No. 2794 – IN

II Name of Monitoring/Reporting Agency and address

HPPTCL, Shimla

III Monitoring Period (Season/month) June-2014-Dec-2014 Jan2015-July2015

IV Report No. 05

V Report for the period June, 2014-December2014 January, 2015– July, 2015

VI Date of reporting 18th November,2015

List of sub-projects PIU

I 220/66/22 kV Pooling Station at Bhoktoo

HPPTCL Bhaba Nagar

II 1. 220kV/400 kV Pooling Station Gumma near Pragatinagar.

2. 400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda

HPPTCL Rohru

III 400/220/66 kV Pooling Station at Wangtoo

HPPTCL Bhaba Nagar

IV 220 kV D/C Transmission Line from 220 kV Switching Station Hatkoti to 220/400 kV Pooling Station Gumma.

HPPTCL Rohru

Page 5: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 5 of 72

A. IMPLEMENTATION OF SAFEGUARD MEASURES A1. ForestClearance

Sr.No. Measures/ stipulation Compliance Status

I 220/66/22 kV Pooling Station at Bhoktoo

1 Right of Way/ land required Land measuring1-43-03 hectare (14303 m²) Govt. Land was acquired by HPSEBL Himachal Pradesh State Electricity Board limited and has been handed over to HPPTCL after obtaining mandatory clearances.

2 Clearance from trees Required clearance from the trees to transmission lines and Extra High Voltage (EHV) sub-station shall be maintained as per Forest Conservation Act (FCA) guidelines, Indian Electricity (IE) Rules and all Technical Standards.

3 Forest area and Nos. of trees. 1-43-03 hectare(14303 m²). of land only. Eight number trees exist around the periphery of land i.e. along the boundary wall of substation but need not to be removed as they are beyond the required electrical equipment (Oct.2008)

4 Damage to forest No damage of any forest area because substation is on barren land.

5 Wild life sanctuaries This land does not fall inside and also not adjoining to any wild life sanctuary area.

II(a) 220kV/400 kV Pooling Station Gumma

1 Right of Way/ land required Pvt. land measuring 2-47-42 hectare (24742 m²). has been acquired on 31.12.2011for construction of substation.

2 Clearance from trees Not required as no tree falls in the vicinity of

substation land.

3 Forest area and Nos. of trees. Pvt land measuring 2-47-42 hectare (24742 m²). has been acquired for the construction of substation and no tree is required to be felled for the construction of substation.

4 Damage to forest No damage to forest being Pvt. land. Methods & Technology shall be adopted so that no damage to forest land / species occurs or is bare minimum. .

5 Wild life sanctuaries No Wild Life Sanctuary is involved in the project.

II(b) 400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda.

1 Right of Way/ land required For the transmission lines specified Width of Right of Way has been considered i.e. max. 46 Mtrs, Spacing between conductors plus required clearance from trees on both sides of Tower Locations.

2 Clearance from trees Required clearance from the trees to Transmission lines shall be maintained as per FCA guidelines, IE Rules and all Technical Standards.

3 Forest area and Nos. of trees. 17-68-41hactare (176841 m²). of govt. land and (b)

Page 6: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 6 of 72

out of 235 no trees total 150No. Forest trees will be cut. Stage-I clearance received on dated 26.6.2015.Net Present Value (NPV) and Compensatory Afforestation( CA) charges deposited on 1.08.2015. NPV Rs 5,61,55,036-00 CA1,1,80,77,228-00

4 Damage to forest Methods & Technology shall be adopted so that no damage to forest land / species occurs or is bare minimum.

5 Wild life sanctuaries No Wild Life Sanctuary is involved in the project.

III 400/220/66 kV Pooling Station at Wangtoo

1 Right of Way/ land required Stage-II Clearance received on dated30.7.2014.The land handed over to contractor on 25.09.2014.

2 Clearance from trees Clearance from trees is not required as no tree falls in the land being acquired for the construction of substation.

3 Forest area and Nos. of trees. Stage-II -clearance obtained in 30 July 2014.

4 Damage to forest Methods & Technology shall be adopted so that no damage to forest land / species occurs or is bare minimum.

5 Wild life sanctuaries No Wild Life Sanctuary is involved in the project.

IV 220 kV D/C Transmission Line from Hatkoti to Gumma

1 Right of Way/ land required For the transmission lines specified Width of Right of Way has been considered i.e. max. 35 Mtrs Spacing between conductors plus required clearance from trees on both sides of Tower Locations.

2 Clearance from trees Required clearance from the trees to Transmission lines shall be maintained as per FCA guidelines ,IE Rules and all Technical Standards

3 Forest area and Nos. of trees. 17-68-41 hectare (176841 m²). of forest land and(b) out of 235 no trees total 150No. forest trees will be cut. Stage-I Clearance received on 30.7.2015

4 Damage to forest Methods & Technology shall be adopted so that no damage to forest land / species occurs or is bare minimum.

5 Wild life sanctuaries No Wild Life Sanctuary is involved in the project.

A2. Fulfilment of commitments made during Public Hearing/Consultation

Sr.No. Query/Apprehension Commitment Compliance Statement

I 220/66/22 kV Pooling Station at Bhoktoo

1 Compensation for crop No crop involved being barren land

Not applicable.

2 Compensation for land damages

The work will be executed in project land and will not be impacting any other

Not applicable.

Page 7: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 7 of 72

Sr.No. Query/Apprehension Commitment Compliance Statement

area.

3 Compensation for Path, Natural resource of water.

There is no path or natural resource of water in this land.

Not applicable.

II 220kV/400 kV Pooling Station Gumma

1 Compensation for crop Rs.10,15,808.00

Rs.10,15,808.00 only Compensation for crop has been paid

2 Compensation for land damages

Compensation for land damages has been paid

3 Compensation for Path, Natural resource of water.

Part of road is constructed by HPPTCL. Around 30 meters of road which is constructed by owner of cold store. It is agreed by HPPTCL that in case the road is damaged the same will be repaired/maintained by HPPTCL.

400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda.

1 Compensation for crop Compensation of crop will be given at the time of acquisition

2 Compensation for land damages

Compensation has been paid on some locations as per land acquisition bill through negotiations &ADB Guidelines. which is under process of estimation.

3 Compensation for Path, Natural resource of water.

Compensation shall be assessed and paid as per R&R policy &ADB Guidelines, which is under process of estimation.

III 400/220/66 kV Pooling Station at Wangtoo

Page 8: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 8 of 72

Sr.No. Query/Apprehension Commitment Compliance Statement

1 Compensation for crop Being barren land no damage to crops is involved. However compensation if any shall be assessed and paid as per R&R policy &ADB Guidelines.

2 Compensation for land damages

It is a Government land the NPV and afforestation charges already deposited with the department.

3 Compensation for Path, Natural resource of water.

No damages to path or natural sources of water is involved, however compensation if any shall be assessed and paid as per R&R policy &ADB Guidelines. Which is Under Process of estimation.

IV 220 kV D/C Transmission Line from Hatkoti to Gumma

1 Compensation for crop Rs One crore and seventy nine lac out of which Rs Thirty two Lac paid

Compensation amounting to Rs 32 Lac paid out of Rs 1 crore 79 lac and remaining mount shall be paid at the time of acquisition of tower foundation area.

2 Compensation for land damages

Compensation has been paid on some locations as per land acquisition bill through negotiations &ADB Guidelines. Under Process of estimation Rs 32 Lac out of 1.79 Crore has been paid as land compensation .

3 Compensation for Path, Natural resource of water.

Compensation shall be assessed and paid as per R&R policy &ADB Guidelines. No path will be damaged. In case the path is damaged,

Page 9: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 9 of 72

Sr.No. Query/Apprehension Commitment Compliance Statement

the same will be repaired/maintained by HPPTCL.

A3. ADB Stipulations/ safeguarding measures (not covered above) on Environment.

Sr.No.

Product Activity/Stage

Parameter to be monitored

Compliance Status

I 220/66/22 kV Pooling Station at Bhoktoo

Construction

1 Archaeological site/ monument safety

Such sites should be avoided and the required distance from EHV Transmission Lines and substation should be maintained.

No Archaeological site, monument is traversed by this Project.

2 Public places, schools, ponds, airport, railway etc.

The required distance from EHV Transmission Lines and substation should be maintained.

Public Places, Schools, Ponds, Air Ports, Railways, telephone lines etc. have been avoided.

3 Displacement of schedule tribe/ schedule caste population

Proper R&R policy of HPPTCL covers the interests of Scheduled Tribes or Forest dwellers.

Being barren land, no displacement of any Schedule Tribe / schedule caste family is involved in the project.

4 Safeguard against Flora and fauna.

Areas of Wild Life Sanctuaries should be avoided.

The project is situated in the barren land and does not impact any vegetation i.e. flora &fauna in the area.

5 Rain and Flood prone area.

Such areas should be avoided

No such area is involved.

Other

II 220kV/400 kV Pooling Station Gumma

Construction

1 Archaeological site/ monument safety

Such sites should be avoided and the required distance from EHV Transmission Lines and substation should be maintained.

No Archaeological site, monument is traversed by the Transmission Line Project.

2 Public places, schools, ponds, airport, railway etc.

The required distance from EHV Transmission Lines and substation should be maintained.

Public Places, Schools, Ponds, Air Ports, Railways, telephone Lines etc. have been avoided.

3 Displacement of schedule tribe/ schedule cast

Proper R&R policy of HPPTCL covers the interests of Scheduled

No displacement of any Scheduled Tribe is involved in the project. Interest of forest dwellers

Page 10: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 10 of 72

Sr.No.

Product Activity/Stage

Parameter to be monitored

Compliance Status

population Tribes or Forest dwellers. shall be protected as per R&R Policy &ADB Guidelines.

4 Safeguard against Flora and fauna.

Areas of Wild Life Sanctuaries should be avoided.

No Wild Life Sanctuary is involved.

5 Rain and Flood prone area.

Such areas should be avoided

No such area is involved.

400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda.

Construction

1 Archaeological site/ monument safety

Such sites should be avoided and the required distance from EHV Transmission Lines and substation should be maintained.

No Archaeological site, monument is traversed by the Transmission Line Project.

2 Public places, schools, ponds, airport, railway etc.

The required distance from EHV Transmission Lines and sub -station should be maintained.

Public Places, Schools, Ponds, Air Ports, Railways, telephone Lines etc. have been avoided.

3 Displacement of schedule tribe/ schedule cast population

Proper R&R policy of HPPTCL covers the interests of Scheduled Tribes or Forest dwellers.

No displacement of any Scheduled Tribe is involved in the project. Interest of Forest dwellers shall be protected as per R&R Policy &ADB Guidelines.

4 Safeguard against Flora and fauna.

Areas of Wild Life Sanctuaries should be avoided.

No Wild Life Sanctuary is involved.

5 Rain and Flood prone area.

Such areas should be avoided

No such area is involved.

Other

III 400/220/66 kV Pooling Station at Wangtoo

Construction

1 Archaeological site/ monument safety

Such sites should be avoided and the required distance from EHV Transmission Lines and substation should be maintained.

No Archaeological site, monument is traversed by the Transmission Line Project.

2 Public places, schools, ponds, airport, railway etc.

The required distance from EHV Transmission Lines and substation should be maintained.

Public Places, Schools, Ponds, Air Ports, Railways, telephone Lines etc. have been avoided.

3 Displacement of schedule tribe/ schedule cast

Proper R&R policy of HPPTCL covers the interests of Scheduled

No displacement of any Scheduled Tribe is involved in the project. Interest of Forest

Page 11: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 11 of 72

Sr.No.

Product Activity/Stage

Parameter to be monitored

Compliance Status

population Tribes or Forest dwellers. dwellers shall be protected as per R&R Policy &ADB Guidelines.

4 Safeguard against Flora and fauna.

Areas of Wild Life Sanctuaries should be avoided.

No Wild Life Sanctuary is involved. The land acquired is a barren land and does not impact any vegetation ie flora and fauna.

5 Rain and Flood prone area.

Such areas should be avoided

No such area is involved.

Other

IV 220 kV D/C Transmission Line from Hatkoti to Gumma

Construction

1 Archaeological site/ monument safety

Such sites should be avoided and the required distance from EHV Transmission Lines and substation should be maintained.

No Archaeological site, monument is traversed by the Transmission Line Project.

2 Public places, schools, ponds, airport, railway etc.

The required distance from EHV Transmission Lines and substation should be maintained.

Public Places, Schools, Ponds, Air Ports, Railways, telephone Lines etc. have been avoided.

3 Displacement of schedule tribe/ schedule cast population

Proper R&R policy of HPPTCL covers the interests of Scheduled Tribes or Forest dwellers.

No displacement of any Scheduled Tribe is involved in the project.Interest of Forest dwellers shall be protected as per R&R Policy &ADB Guidelines.

4 Safeguard against Flora and fauna.

Areas of Wild Life Sanctuaries should be avoided.

No Wild Life Sanctuary is involved.

5 Rain and Flood prone area.

Such areas should be avoided

No such area is involved.

A4. Other measures:

I 220/66/22 kV Pooling Station at Bhoktoo

During 2014 the landslide occurred due to flash flood at Bhoktoo. The site needed stabilization. The experts from IIT Roorkee were invited to suggest the measures for stabilization of site. The site was stabilized under the guidance of experts of IIT Roorkee.

II(a) 220kV/400 kV Pooling Station Gumma

To stabilize the land from road side to avoid any land slide the retaining walls have been constructed. The selection of land for the construction of substation is such that short distance transmission lines are being constructed involving minimum area of land for evacuation of power.

(b) 400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda.

None

Page 12: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 12 of 72

III 400/220/66 kV Pooling Station at Wangtoo

None

IV 220 kV D/C Transmission Line from Hatkoti to Gumma

None

Page 13: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 13 of 72

STATUS OF IMPLEMENTATION OF ENVIRONMENT MANAGEMENT PLAN (EMP) B1. EMP

Sr.No. Component of EMP

Cost in EMP (Rs. In Lac)

Implementation status

I 220/66/22 kV Pooling Station at Bhoktoo

1 Muck disposal Nil Site selection and development of layout design is such that the muck generated during construction is minimum and has been utilized in back filling and used to raise the level of approach road. No extra land for the muck disposal is required. The quantity of muck which has been utilized for raising the level of approach road is500 Cum.

2 Compensatory afforestation

Land handed over by HPSEBL after obtaining all clearances.

HPSEBL has taken this land after completing mandatory process of depositing charges towards compensatory afforestation.

3 Local path if damaged during the carriage of tower material and sagging

Nil No local path traverse through this patch hence no damage of local path is involved.

II(a) 220kV/400 kV Pooling Station Gumma

1 Muck disposal As per layout of the substation 22 thousand cubic meter muck shall be used in back filling for remaining quantity of muck i.e 32,000 Cum shall be disposed on the land identified by HPPTCL. The total quantity of muck which has been estimated 50000-Cum. How much is balance after filling land area. The agreement with land owner is in process

2 Compensatory a forestation

Not applicable being Private land and no trees is to be felled.

3 Local path if damaged during the carriage of tower material and sagging

The path 30 Meter has been shared between Cold store owner and HPPTCL with an understanding in case damage to the road occur during construction of Substation the road will be repaired and maintained by HPPTCL

(b) 400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda

1 Muck disposal Site selection and development design of Transmission lines are such that the muck generated during construction is minimum and shall be utilized in back filling.

2 Compensatory a forestation

Shall be implemented by HP Forest Department after the approval of diversion of forest land by MoEF GOI.

Page 14: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 14 of 72

Sr.No. Component of EMP

Cost in EMP (Rs. In Lac)

Implementation status

3 Local path if damaged during the carriage of tower material and sagging

Compensation for the repair of local paths if damaged while carrying Tower material to the sites and during sagging and stringing shall be made accordingly as has been in R&R Policy.

III 400/220/66 kV Pooling Station at Wangtoo

1 Muck disposal The layout of the substation shall be developed so that no muck is disposed outside the substation site and shall be used for back filling.

2 Compensatory afforestation

Shall be implemented by HP Forest Department after the approval of diversion of forest land by MOEF GOI.

3 Local path if damaged during the carriage of tower material and sagging

Compensation for the repair of local paths if damaged while carrying substation material to the sites, during construction shall be made accordingly as has been in R&R Policy.

IV 220 kV D/C Transmission Line from Hatkoti to Gumma

1 Muck disposal Site selection and development design of Transmission lines are such that the muck generated during construction is minimum and shall be utilized in back filling.

2 Compensatoryafforestation

Shall be implemented by HP Forest Department after the approval of diversion of forest land by MoEF GOI.

3 Local path if damaged during the carriage of tower material and sagging

Compensation for the repair of local paths if damaged while carrying Tower material to the sitesand during sagging and stringing shall be made accordingly as has been in R&R Policy.

B2. Additional measures undertaken

Sr.No. Sub-plan/activities Implementation status including Physical and financial

I 220/66/22 kV Pooling Station at Bhoktoo

1 Additional measures if required during implementation of project will be undertaken as per R&R policy and ADB guidelines. Land stabilization in view of IIT consultants report is being done through contractor and project is implemented by Siemens

2.

II(a) 220kV/400 kV Pooling Station Gumma

1 Additional measures if required during implementation of project will be undertaken as per R&R policy and ADB guidelines. Land for Mucking has been arranged on private

Page 15: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 15 of 72

Sr.No. Sub-plan/activities Implementation status including Physical and financial

land with compensation

(b) 400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda.

Additional measures if requiredduring implementation of project will be undertaken as per R&R policy and ADB guidelines.

III 400/220/66 kV Pooling Station at Wangtoo

1 Additional measures if requiredduring implementation of project will be undertaken as per R&R policy and ADB guidelines. Talk of any new commitments made to villagers due to final discussions.The HPPTCL will develop infrastructure for temple.

IV 220 kV D/C Transmission Line from Hatkoti to Gumma

1 At two places route is altered by 20 Mtrs as per the demand of land owners .No the line alignment will not be affected as ROW of 35 Meters has been considered.

Page 16: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 16 of 72

C. IMPLEMENTATION OF SOCIAL AND R&R MEASURES: C1. R&R Plan i. Brief description of HPPTCL R&R Plan.

I 220/66/22 kV Pooling Station at Bhoktoo

No habitation and public is being affected due to this activity. Therefore, no R&R plan has been prepared, however the project will be implemented in line with R&R policy of HPPTCL and ADB.

II(a) 220kV/400 kV Pooling Station Gumma

No habitation and public is being affected due to this activity. Therefore, no R&R plan has been prepared, however the project will be implemented in line with R&R policy of HPPTCL and ADB.

II(b) 400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda.

No habitation and public will be affected due to this activity. However, this will be finalised during detailed design. Therefore no R&R plan has been prepared, however the project will be implemented in line with R&R policy of HPPTCL and ADB.

III 400/220/66 kV Pooling Station at Wangtoo

No habitation and public will be affected due to this activity. However, this will be finalised during detailed design. Therefore no R&R plan has been prepared, however the project will be implemented in line with R&R policy of HPPTCL and ADB.

IV 220 kV D/C Transmission Line from Hatkoti to Gumma

No habitation and public will be affected due to this activity. However, this will be finalised during detailed design. Therefore no R&R plan has been prepared, however the project will be implemented in line with R&R policy of HPPTCL and ADB.

ii. Brief description of meeting organized at project affected area with MPAF along

with photographs

I 220/66/22 kV Pooling Station at Bhoktoo

Meetings were organized at different stage to get the node of local people. Photographs are attached in annexures.Annexure III

II(a) 220kV/400 kV Pooling Station Gumma

II(b) 400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda.

Meetings were organized at different stage to get the node of local people. Photographs are attached in annexure.

III 400/220/66 kV Pooling Station at Wangtoo

Meetings were organized at different stage to get the node of local people. Photographs are attached in annexure. Annexure IV – more consultation details are required.

IV 220 kV D/C Transmission Line from Hatkoti to Gumma

Meetings were organized at different stage to get the node of local people. Photographs and Performa are attached in annexure. Annexure II

iii. Detail of distribution of ID card cum Entitlement Card among MPAF.

I 220/66/22 kV Pooling Station at Bhoktoo

Not applicable because no habitation and public is being affected due to this activity.

II 220kV/400 kV Pooling Station Gumma

Page 17: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 17 of 72

Being done by R&R Consultant and Environment Consultant

400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda.

Not applicable because no habitation and public is being affected due to this activity

III 400/220/66 kV Pooling Station at Wangtoo

Not applicable because no habitation and public is being affected due to this activity

IV 220 kV D/C Transmission Line from Hatkoti to Gumma

Not applicable because no habitation and public is being affected due to this activity

iv. Detail of any infrastructure development work done at project affected area

I 220/66/22 kV Pooling Station at Bhoktoo

There is no requirement for any infrastructure or development work as it is far away from inhabited area. The compensatory afforestation shall be implemented through HP Forest Department.

II(a) 220kV/400 kV Pooling Station Gumma

There is no requirement for any infrastructure or development work as it is far away from inhabited area.

(b) 400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda.

The compensatory a forestation shall be implemented through HP Forest Department

III 400/220/66 kV Pooling Station at Wangtoo

The development of temple area and community hall near temple. It has been agreed by HPPTCL that the temple area and community centre will be constructed by HPPTCL costing about Rs 50 Lac only,

IV 220 kV D/C Transmission Line from Hatkoti to Gumma

The compensatory a forestation shall be implemented through HP Forest Department.

v. Detail of Compensation (Land/House etc.)

Payment Date Cheque No Amount (Rs) Remarks

I 220/66/22 kV Pooling Station at Bhoktoo

Instalment No.

Not applicable

- None The land does not involve any displacement of public property hence no compensation is payable

Installment No.

Not applicable

- -

II(a) 220kV/400 kV Pooling Station Gumma

Instalments No.

Jan.2012.

Payment of land acquired for substation made by transferring amount to A/C No.3383000100157023 ofLAO for land acquisition.

Cost of land Fruit compensation Solitium under section 23 section 2 Solitium under section

2,38,37432 1015808.00 7455972.00 1977364

.

Page 18: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 18 of 72

vi. Detail of Resettlement Grant

Type of Resettlement Grant Rate Amount & release date

I 220/66/22 kV Pooling Station at Bhoktoo

Grant for persons rendered Houseless The land does not involve any displacement of public property hence no compensation/ Resettlement Grant is payable.

Grant on acquisition of Shops NA

Loss of Crops a. Temporary loss during work execution. b. Temporary loss extending to period beyond

execution of work. c. Permanent loss.

NA

(a) Compensation for any existing/ residential structures

NA

(b) Shifting allowance NA

(c) Annuity policy for vulnerable group NA

(d) Loss of income from Forest or Govt. Land Loss of income is negligible as compared to the benefits.

II(a) 220kV/400 kV Pooling Station Gumma

Grant for persons rendered Houseless NA

Grant on acquisition of Shops NA

Loss of Crops a. Temporary loss during work execution. b. Temporary loss extending to period beyond

execution of work. c. Permanent loss.

For substation, value of land has been paid to the owner as per the laid procedure. Please talk about additional value paid on account of right of access/small portion that was purchased later.

(a) Compensation for any existing/ residential NA

23 section1-A

3,42,86,576/-

Installment No.

Not applicable

- -

(b) 400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda.

III 400/220/66 kV Pooling Station at Wangtoo

Installment No.

Not applicable

- - Government land transferred

Installment No.

Not applicable

- -

IV 220 kV D/C Transmission Line from Hatkoti to Gumma

Installment No.

Not applicable

- Rs.32.00 Lac paid for the land acquired for Tower foundations

None – tower bases will be purchased Installment

No. Not applicable

- -

Page 19: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 19 of 72

vi. Detail of Resettlement Grant

Type of Resettlement Grant Rate Amount & release date

structures

(b) Shifting allowance NA

(c) Annuity policy for vulnerable group No vulnerable group is involved.

(d) Loss of income from Forest or Govt. Land Loss of income is negligible as compared to the benefits.

(b) 400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda.

Grant for persons rendered Houseless NA

Grant on acquisition of Shops NA

Loss of Crops a. Temporary loss during work execution. b. Temporary loss extending to period

beyond execution of work. c. Permanent loss

Transmission Lines the acquisition of land will be done by negotiating with the land owners where towers are to be erected. and adequate compensation shall be paid as per R&R policy

(a) Compensation for any existing/ residential structures

NA

(b) Shifting allowance NA

(c) Annuity policy for vulnerable group No vulnerable group involved.

(d) Loss of income from Forest or Govt. Land

Loss of income is negligible as compared to the benefits.

III 400/220/66 kV Pooling Station at Wangtoo

Grant for persons rendered Houseless NA

Grant on acquisition of Shops NA

Loss of Crops a. Temporary loss during work execution. b. Temporary loss extending to period beyond

execution of work. c. Permanent loss.

Not Applicable being barren land.

(a) Compensation for any existing/ residential structures

NA

(b) Shifting allowance NA

(c) Annuity policy for vulnerable group No vulnerable group is involved.

(d) Loss of income from Forest or Govt. Land Loss of income is negligible as compared to the benefits.

IV 220 kV D/C Transmission Line from Hatkoti to Gumma

Grant for persons rendered Houseless NA

Grant on acquisition of Shops NA

Loss of Crops a. Temporary loss during work execution. b. Temporary loss extending to period beyond

execution of work. c. Permanent loss.

TotalRs.32.00 Lac paid out of Rs 1crore and Rs. 79 lac on account of acquisition of land for tower. Transmission Lines the acquisition of land is being done through negotiating with the land owners where towers are to be erected. Adequate compensation paid as per R&R policy.

Page 20: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 20 of 72

vi. Detail of Resettlement Grant

Type of Resettlement Grant Rate Amount & release date

(a) Compensation for any existing/ residential structures

NA

(b) Shifting allowance NA

(c) Annuity policy for vulnerable group No vulnerable group is involved.

(d) Loss of income from Forest or Govt. Land Loss of income is negligible as compared to the benefits.

C-1: Social and R&R measures:

SNo. Component/Item Implementation Status

I Sub-Stations:

I. 220/66/22 kV Pooling Station at Bhoktoo

1 Homeless Grant Not Applicable

2 Shop acquisition Grant Not Applicable

II. 2 220kV/400 kV Pooling Station Gumma

1 Homeless Grant Not Applicable

2 Shop acquisition Grant Not Applicable

(b) 400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda.

1 Homeless Grant Not Applicable

2 Shop acquisition Grant Not Applicable

III. 4 400/220/66 kV Pooling Station at Wangtoo

1 Homeless Grant Not Applicable

2 Shop acquisition Grant Not Applicable

II. Transmission Line:

IV. 220 kV D/C Transmission Line from Hatkoti to Gumma

Core-1 (a) Not Applicable

Core-2 (b) Not Applicable

Core-3 (c) Not Applicable

III. Common Grants (Sub-Station and Transmission Lines):

I. 220/66/22 kV Pooling Station at Bhoktoo

1 Compensation for Structures Not Applicable

2 Shifting allowance Not Applicable

3 Annuity Not Applicable

4 Compensation for loss of Income from Forest

Not Applicable

5 Permission for post-acquisition use of land

Acquired as per Section17-4 of Land Acquisition Act by HPSEBL.

6 Assistance in Accident and Mishap cases.

Have been covered in the Terms &Conditions of the Contract of work.

7 Issuance of Identity Cards NA

II. 220kV/400 kV Pooling Station Gumma

1 Compensation for Structures NA

2 Shifting allowance NA

3 Annuity NA

Page 21: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 21 of 72

SNo. Component/Item Implementation Status

4 Compensation for loss of Income from Forest

NA

5 Permission for post-acquisition use of land

Not Required

6 Assistance in Accident and Mishap cases.

Shall be covered in the Terms and Conditions of the Contract of work.

7 Issuance of Identity Cards NA

(b) 400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda.

1 Compensation for Structures NA

2 Shifting allowance NA

3 Annuity NA

4 Compensation for loss of Income from Forest

NA

5 Permission for post-acquisition use of land

NotRequired

6 Assistance in Accident and Mishap cases.

Shall be covered in the Terms and Conditions of the Contract of work.

III. 400/220/66 kV Pooling Station at Wangtoo

1 Compensation for Structures NA

2 Shifting allowance NA

3 Annuity NA

4 Compensation for loss of Income from Forest

NA.

5 Permission for post-acquisition use of land

Not Required

6 Assistance in Accident and Mishap cases.

Shall be covered in the Terms and Conditions of the Contract of work.

7 Issuance of Identity Cards NA

IV. 220 kV D/C Transmission Line from Hatkoti to Gumma

1 Compensation for Structures NA

2 Shifting allowance NA

3 Annuity NA

4 Compensation for loss of Income from Forest

NA

5 Permission for post-acquisition use of land

Not required

6 Assistance in Accident and Mishap cases.

Have been covered in the Terms &Conditions of the Contracts of work.

7 Issuance of Identity Cards NA

C-2: ADB Stipulations:

Sr.No. R&R Activities Progress Remarks

I 220/66/22 kV Pooling Station at Bhoktoo

Pre-Construction Activities and R&R Activities

1 Assessment of Resettlement impacts due to changes in

NA

Page 22: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 22 of 72

Sr.No. R&R Activities Progress Remarks

project design (If required)

2 Preparation/ updating of Resettlement Plan based on changes in project design

NA

3 Approval of updated Resettlement Plan from ADB

NA

4 Disclosure of updated Resettlement Plan

NA

5 Establishment of Grievance Redressal Committee

The Grievance redressal Committee headed by Project Head has already been put in place as per R&R Policy of HPPTCL clause No 11.

6 Inclusion of safeguards official (designated) to PMU

Consultants of R&R and Environment are engaged.

Consultants of R&R and Environment are engaged w.e.f June 2012&August2012 respectively. But environment consultant resigned and new consultant will be hired shortly.

Resettlement Plan Implementation.

1 Payment of Compensation as per replacement value of land & assets to APs where applicable

Not Applicable The land does not involve any displacement of public property hence no Resettlement Plan Implementation is required.

2 Disbursement of assistance to title holders

Not Applicable

3 Disbursement of assistance to non-title holders

Not Applicable

4 Disbursement of special assistance to Vulnerable groups

Not Applicable

5 Replacement/ shifting of community property resources

Not Applicable

6 Reinstallation of public utilities Not Applicable

7 Records of Grievance Redressal Being Maintained

8 Compensation for temporary loss of crop

Not Applicable being barren land.

Social Measures during Construction as per Contract Provisions

1 Prohibition of employment or use of children as labour

No labour employed below the age of 18years.

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.3(m) of contract of agreement with Contractor.

2 Prohibition of Forced or Compulsory Labour

No Forced or Compulsory Labour working.

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.3(m) of contract of

Page 23: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 23 of 72

Sr.No. R&R Activities Progress Remarks

agreement with Contract

3 Ensure equal pay for equal work to both men and women

Equal pay for equal work to both men and women is being paid.

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.3(h) of contract of agreement with Contract

4 Implementation of all statutory provisions on labour like health, safety, welfare, sanitation, and working conditions

Watch on Implementation of all statutory provisions on labour like health, safety, welfare, sanitation, and working conditions is being kept.

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.7& clause 22.2.3(p) of contract of agreement with Contractorand 22.4.3 clause

5 Maintenance of employment records of workers

The contractor shall make the records.

Contract clause 22.2.3 of contract of agreement with Contractor.

II 220kV/400 kV Pooling StationGumma

Pre-Construction Activities and R&R Activities

1 Assessment of Resettlement impacts due to changes in project design (If required)

NA

2 Preparation/ updating of Resettlement Plan based on changes in project design

NA

3 Approval of updated Resettlement Plan from ADB

Accorded by ADB in10/2012

4 Disclosure of updated Resettlement Plan

Accorded by ADB in 10/2012

5 Establishment of Grievance Redressal Committee

The Grievance redress Committee headed by Project Head has already been put in place as per R&R Policy of HPPTCL clause No 11.

6 Inclusion of safeguards official (designated) to PMU

Consultant for of R&R engaged at Head Office level.

Environment cell already created but appointments will be done by April,2016.

Resettlement Plan Implementation.

1 Payment of Compensation as per replacement value of land & assets to APs where applicable

Payment of Compensation of land has been paid.

2 Disbursement of assistance to title holders

Payment of Compensation of land has been paid

3 Disbursement of assistance to Not Applicable

Page 24: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 24 of 72

Sr.No. R&R Activities Progress Remarks

non-title holders

4 Disbursement of special assistance to Vulnerable groups

Not Applicable

5 Replacement/ shifting of community property resources

Not Applicable

6 Reinstallation of public utilities Not Applicable

7 Records of Grievance Redressal Being Maintained

8 Compensation for temporary loss of crop

Shall be assessed on the occurrence.

Social Measures during Construction as per Contract Provisions

1 Prohibition of employment or use of children as labour

No labour employed below the age of 18years.

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.3(m) of contract of agreement with Contract.

2 Prohibition of Forced or Compulsory Labour

No Forced or Compulsory Labour working

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.3(m) of contract of agreement with Contract.

3 Ensure equal pay for equal work to both men and women

Equal pay for equal work to both men and women is being paid.

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.3(h) of contract of agreement with Contract

4 Implementation of all statutory provisions on labour like health, safety, welfare, sanitation, and working conditions

Watch on Implementation of all statutory provisions on labour like health, safety, welfare, sanitation, and working conditions is being kept.

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.7& clause 22.2.3(p) of contract of agreement with Contractor and 22.4.3 clause

5 Maintenance of employment records of workers

The contractor shall maintain the records

Contract clause 22.2.3 of contract of agreement with Contractor.

(b) 400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda.

1 Prohibition of employment or use of children as labour

No labour employed below the age of 18years.

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.3(m) of contract of

Page 25: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 25 of 72

Sr.No. R&R Activities Progress Remarks

agreement with Contractor

2 Prohibition of Forced or Compulsory Labour

No Forced or Compulsory Labour working.

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.3(h) of contract of agreement with Contract.

3 Ensure equal pay for equal work to both men and women

Equal pay for equal work to both men and women is being paid.

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.3(h) of contract of agreement with Contract

4 Implementation of all statutory provisions on labour like health, safety, welfare, sanitation, and working conditions

Watch on Implementation of all statutory provisions on labour like health, safety, welfare, sanitation, and working conditions is being kept.

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.7& clause 22.2.3(p) of contract of agreement with Contractor and 22.4.3 clause with Contractor….

5 Maintenance of employment records of workers

The contractor shall maintain the records

Contract clause 22.2.3 of contract of agreement with Contractor.

III 400/220/66 kV Pooling Station at Wangtoo

Pre-Construction Activities and R&R Activities

1 Assessment of Resettlement impacts due to changes in project design (If required)

NA

2 Preparation/ updating of Resettlement Plan based on changes in project design

NA

3 Approval of updated Resettlement Plan from ADB

NA

4 Disclosure of updated Resettlement Plan

NA

5 Establishment of Grievance Redressal Committee

The Grievance redressal Committee headed by Project Head has already been put in place as per R&R Policy of HPPTCL clause No 11.

6 Inclusion of safeguards official (designated) to PMU

Consultant for of R&R engaged at Head Office level.

Environment cell already created but appointments will be done by April,2016

Resettlement Plan Implementation.

Page 26: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 26 of 72

Sr.No. R&R Activities Progress Remarks

1 Payment of Compensation as per replacement value of land &assets to APs where applicable

Not Applicable The land does not involve any displacement of public property hence no Resettlement Plan Implementation is required.

2 Disbursement of assistance to title holders

Not Applicable

3 Disbursement of assistance to non-title holders

Not Applicable

4 Disbursement of special assistance to Vulnerable groups

Not Applicable

5 Replacement/ shifting of community property resources

Not Applicable

6 Reinstallation of public utilities Not Applicable

7 Records of Grievance Redressal Being Maintained

8 Compensation for temporary loss of crop

Not Applicable being barren land.

Social Measures during Construction as per Contract Provisions

1 Prohibition of employment or use of children as labour

No labour employed below the age of 18years.

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.3(m) of contract of agreement with Contractor

2 Prohibition of Forced or Compulsory Labour

There is no Forced or Compulsory Labour engaged.

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.3(h) of contract of agreement with Contract

3 Ensure equal pay for equal work to both men and women

Equal pay for equal work to both men and women is being paid.

COMMERCIALCONDITIONS SECTION – 8. clause 22.2.3(h) of contract of agreement with Contract

4 Implementation of all statutory provisions on labour like health, safety, welfare, sanitation, and working conditions

Watch on Implementation of all statutory provisions on labour like health, safety, welfare, sanitation, and working conditions is being kept.

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.7& clause 22.2.3(p) of contract of agreement with Contractor and 22.4.3 clause

5 Maintenance of employment records of workers

The contractor shall maintain the records

Contract clause 22.2.3 of contract of agreement with Contractor.

Page 27: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 27 of 72

Sr.No. R&R Activities Progress Remarks

IV 220 kV D/C Transmission Line from Hatkoti to Gumma

Pre-Construction Activities and R&R Activities

1 Assessment of Resettlement impacts due to changes in project design (If required)

NA

2 Preparation/ updating of Resettlement Plan based on changes in project design

NA

3 Approval of updated Resettlement Plan from ADB

NA

4 Disclosure of updated Resettlement Plan

NA

5 Establishment of Grievance Redressal Committee

The Grievance redressal Committee headed by Project Head has already been put in place as per R&R Policy of HPPTCL clause No 11.

6 Inclusion of safeguards official (designated) to PMU

Consultant for of R&R engaged at Head Office level.

Environment cell already created but appointments will be done by April,2016

Resettlement Plan Implementation.

1 Payment of Compensation as per replacement value of land & assets to APs where applicable

Not Applicable The land does not involve any displacement of public property hence no Resettlement Plan Implementation is required.

2 Disbursement of assistance to title holders

Not Applicable

3 Disbursement of assistance to non-title holders

Not Applicable

4 Disbursement of special assistance to Vulnerable groups

Not Applicable No Vulnerable group is involved in this project

5 Replacement/ shifting of community property resources

Not Applicable

6 Reinstallation of public utilities Not Applicable

7 Records of Grievance Redressal Being Maintained

8 Compensation for temporary loss of crop

Not Applicable being barren land.

Social Measures during Construction as per Contract Provisions

1 Prohibition of employment or use of children as labour

No labour employed below the age

COMMERCIALCONDITIONS SECTION – 8. clause 22.2.3(m) of contract of

Page 28: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 28 of 72

Sr.No. R&R Activities Progress Remarks

of 18years. agreement with Contractor

2 Prohibition of Forced or Compulsory Labour

There is no Forced or Compulsory Labour engaged.

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.3(h) of contract of agreement with Contract

3 Ensure equal pay for equal work to both men and women

Equal pay for equal work to both men and women is being paid.

COMMERCIALCONDITIONS SECTION – 8. clause 22.2.3(h) of contract of agreement with Contract

4 Implementation of all statutory provisions on labour like health, safety, welfare, sanitation, and working conditions

Watch on Implementation of all statutory provisions on labour like health, safety, welfare, sanitation, and working conditions is being kept.

Contract VOLUME – 1 COMMERCIALCONDITIONS SECTION – 8. clause 22.2.7& clause 22.2.3(p) of contract of agreement with Contractor and 22.4.3 clause

5 Maintenance of employment records of workers

The contractor shall maintain the records

Contract clause 22.2.3 of contract of agreement with Contractor.

Page 29: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 29 of 72

D. RECORD OF COMPLAINTS (REGARDING ENVIRONMENT AND SOCIAL SAFEGUARD MEASURES) AND THEIR RESOLUTION

Sr.No Complainant Name and address

Date of receipt

Subject/Issue Date of resolution

Remarks

I 220/66/22 kV Pooling Station at Bhoktoo

No complaint has been recorded till date.

II(a) 220kV/400 kV Pooling Station Gumma

K No complaint has been recorded till date.

(b) 400 kV D/C Transmission Line from 220/400kV Pooling Station Gumma to LILO Point on 400 kV Jhakri-Abdullapur D/C Line of PGCIL near Ghunda.

No complaint has been recorded till date.

III 400/220/66 kV Pooling Station at Wangtoo

Atam Prakash Raj Kumar MaheshwersangharhSmiti Gram Panchayat Chagaon,Katgaon

Regarding development of Devtasthan Temple.

7.05.2015 The demand will be addressed and tentative expenditure .will be about Rs.50Lac

IV 220 kV D/C Transmission Line from Hatkoti to Gumma

No complaint has been recorded till date.

Page 30: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 30 of 72

E. STAFFING POSITION

Sr.No Reporting Aspect Staff posted as on July 2015

1. Environment Management Staff None

2. Social and R & R Management R&R consultant term extended recently after board approval in the month of June 2015

F. ANNEXURES

I 220/66/22 kV Pooling Station at Bhoktoo

Annexure -1

II(a) 220kV/400 kV Pooling Station Gumma

Annexure -II

III 400/220/66 kV Pooling Station at Wangtoo

Annexure-III

IV Constructionactivities of Bhoktoo substation

Annexure -IV

V Constructionactivities of Gumma substation

Annexure -V

VI EHS GUMMA

Annexure –VI

VII FINAL APPROVAL OF FCA

Annexure -VII

VIII Air and Noise Pollution Reports

Annexure- VIII

Page 31: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 31 of 72

Annexure- I

InitialBhoktoo Sub StationPhotographs

Page 32: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 32 of 72

Annexure II Detail of R&R Consultation with Land owners of HatkotiPragatinagar 220 KV Transmission line Name of owners of land for tower foundations

Tower location No

Date on which consultation took place

Name of owner Khasra No.

Area. Patwar circle/Mohal

39 22.8.13 BishanSingh,shyamsingh&others

1986 225 Patsari/Sari

40 22.8.13 Rajiv, Mukesh, Atul Ajay Sons,jagdish Chand Govind Singh & others

1007 225 Patsari

41 23.8.13 Kanwarsingh, Mohan singh S/O karamchand, smtshamudevi, Daoghter and jogindersingh& others

897&898 72 Patsari

42 22.8.13 Mohan Lal& Gain Singh S/O Sh. BijaNand

812 225 Patsari

43 24.8.13 Diwan Chand S/O sh. Bhag Chand

799 225 Sari

44 24.8.13 Sohan Singh S/O Sh. Bhagat Ram

702 225 Astandli

45 25.8.13 DevenderSingh,KalyanSingh,Lokender Singh

632 225 Astandli

46 25.8.13 Ramgopal Son &Kamlesh D/O Beli Ram

520 225 Astandli

47 25.8.13 Widow LachmiNand,Jeet Singh, Sandeep Sons,Lohorisinghsons,Draupti, Balbir Singh, Bhawan Singh & others

1711 225 Mandhol

48 25.8.13 Beli Ram son &smtMurty, SmtNamu,Sati Ram, Shishi Ram & other

1674 & 1675

225 Mandhol

49 27.8.13 Gopal Singh S/O Sati Ram 1661 225 Mandhol

50 27.8.13 ShyamLal, Gain Chand, Raghu Devi, &Padam Chand, Roshan LalRoop Singh & others

26 225 Maghara

51 27.8.13 Jogindersingh,sanjay,rajiv, sanjiv,davindersingh& others

34 225 Maghara

52 28.8.13 Beli Ram, Sita ram, parayLal

393 225 Gahir

53 28.8.13 Chet Ram S/O Sh. Gopi 561 225 Kaina

54 28.8.13 JoginderSingh,krishandass, ravindersingh,Balbirsingh& others

587 225 Kaina

Page 33: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 33 of 72

55 28.8.13 DurgaNand S/O Kantu 341/1 225 Rampuri

56 1.9.13 Chanderparkash,lajja ram, Bimla,Lchhi& others

288 225 Rampuri

57 1.9.13 Jai parkash,Vinod Kumar, Rajender Singh,& others

123 225 Rampuri

58 1.9.13 Narayan singh son, mainadevi,

33 225 Naktara

59 1.9.13 Narayan singyh S/o S hinder dass

271 225 Naktara

60 1.9.13 Kirpa ram 344 225 Deem

61 1.9.13 Nakhu Devi, Roshni Devi 367 225 Deem

62 1.9.13 Kirparam,chet ram, sita ram, bhadersingh

436 225 Deem

63 1.9.13 Raghubirsingh son, &smtchandidevi D/o Saligram equal share

284 225 Deem

64 1.9.13 Khanjansingh,satyadevi,debbudevi,jaichand& others

175 225 Kharapther

65 1.9.13 Kishore kuma,sanjaikumar s/o jeewan ram

311 225 Kharapther

66 1.9.13 Bhagwansingh,amarsingh s/o shobha ram

345 225 Kharapther

67 1.9.13 Alamdeen,Firozdeen s/o Noora

331 225 Chendal

68 1.9.13 Mathu ram s/o gulabchand 149 225 Chendal

69 1.9.13 Belu&mehru 43 225 Chendal

70 3.9.13 Digvijaysinghson, &smtrama, neelam,gitanjli, banita daughters,&smtkamla,&others

255 225 Darkoti

71 3.9.13 Digvijaysingh son, neelam,gitanjli, banita daughters, smtkamla, ram chand& others

55 225 Darkoti

72 3.9.13 Jialal,mohanlal, shyamlal, kundanlal,

567 225 Jharoli

73 3.9.13 Shyamlal, mohendersingh& others

580 225 Jharoli

74 3.9.13 Mohan lal, parkashchand,& others

473 225 Jharoli

75 3.9.13 Bharat bhushan on &smt Krishna devi

337 225 Jharoli

76 3.9.13 Ravinderkumar,vinaykumar sons, &smtvarinda, salochana, shashikiran& others

307 225 Jharoli

Page 34: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 34 of 72

77 3.9.13 Jhenka ram, matha s/o maia 27/28share chara s/o thanku 1/28 share

5&6 225 Marathu

78 4.9.13 Mahendersingh s/o phulma&shyamanandShanta,s/o nika ram

369 225 Pujarli

Consultation with people/owners of HatkotiPragati Nagar 220 kV D/c Transmission line.

Sh.Rajesh S/O IshwerNand Sharma villDalsar

Sh.Rohit Sharma S/O Rajinder Sharma

Page 35: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 35 of 72

Sh.Mohinder Sharma S/o Sh. Phulma Ram Sharma Pujarli

Raja Hamender Singh S/o ShRanaNarander.Kotkhai

Page 36: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 36 of 72

220 kV Transmission line from Hatkoti to Pragati Nagar Gumma.

Issues Discussed People’s Views and perception

General Perception about Project The project will improve power position in the area and will get relief from erratic supply. The project will provide indirect employment which will add to the economy growth of the area.

Support of local people for proposed project

Yes local people supported the project. No resentment No agitation.

Critical issue and concern by the local people for the project

The line should not cross over the temple area. The matter stands resolved.

Criteria liked to see during project design, operation stage and construction

The local peoples view if any will be considered .till date only shifting of tower issue arose which has been sorted out with the design unit.

Loss of residential / commercial structures, if any due to the project

No loss since no commercial structure is involved in the project.

Loss of community life like any Market Places or community activities to be affected

No loss ofcommunity life like market place or community activities as line is crossing far from villages.

Shortage of water for human consumption, irrigation, and other downstream uses

No shortage of water for human consumption being linear project. Small quantity of water is required that too at the time of tower foundation.

Negative impact on food grain, availability /land use

No Negative impact on food grain, availability /land use

Will project cause landslides or soil erosion

No, the projectwill not cause landslides or soil erosion because protection work is always designed to protect tower foundation at design stage.

Will project cause widespread imbalance

No project will not cause widespread imbalance being linear project.

Will project cause health and safety issues

No the project will not cause any health and safety issues

Will project setting change migration pattern of animals

No the project will not change migration pattern of animals

Will project site adversely impact the water and soil

No, the project site will not adversely impact the water and soil.

Perceived benefits from project Improve the power position of state as well as nation. The economy growth of area due to indirect employment and power availability. Industries can come up in the area with improved power situation.

Perceived loss Only fruit loss and timber loss due to cutting of trees in the ROW. Adequate Crop compensation will be provided and people are satisfied with the measures of HPPTCL. The compulsory afforestation will meet the temporary loss of vegetation.

Other organizations active in the area

Himachal Pradesh Power Corporation

Village Committee Jubbal, Deem,Darkoti,Sairy,

Page 37: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 37 of 72

Issues Discussed People’s Views and perception

Other issues

Only some issues like shifting of towers at two locations. The matter resolved by shifting of tower by 5 meters

Usefulness of consultation

Any kind of unrest by local public avoided by discussing pros and cons of the project.

Involvement of people in implementation

Since this is a turnkey project and involvement of the people is only for few works i.e labour etc.

Page 38: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 38 of 72

ANNEXURE III

Wangtoo Substation Consultation

SmtAngchooWANGTOO(Katgaon)

A7.13 Summary of Consultations

Issues Discussed People’s Views and perception

General Perception about Project Good project

Support of local people for proposed project

Full support

Critical issue and concern by the local people for the project

least pollution.contractor should sublet the petty works to local public

Criteria liked to see during project design, operation stage and construction

Least pollution.

No of shops/commercial establishments

No shop or commercial establishment since construction is on barren land

Number of industrial units Nil

Socio economic standing: land use, cropping pattern

Orchard ,one crop a year. Potato one crop a year s

Page 39: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 39 of 72

Issues Discussed People’s Views and perception

Sources of irrigation Natural i.e rain fall

Access to Forest Land and Use

Sources of power supply HPSEBL power supply

Sources of electricity HPSEBL power supply

Average total monthly expenditure per household on grid electricity

Rs.250.00

Other non-grid electricity to use in your village and expenditure

Source of drinking water I&PH Schemes

Loss of residential / commercial structures, if any due to the project

No loss

Loss of community life like any Market Places or community activities to be affected

Nil

Shortage of water for human consumption, irrigation, and other downstream uses

Nil

Negative impact on food grain, availability /land use

No negative impact barren land is being used.

Will project cause landslides or soil erosion

yes in case of Kinnaur .soil strata is fragile landslide may occur but will be protected by providing adequate protection work.

Will project cause widespread imbalance

no

Will project cause health and safety issues

no

Resettlement and land acquisition

Protected areas wild life and reserved forest

Health status good

Will project setting change migration pattern of animals

no

Will project site adversely impact the water and soil

No

Educational status

Employment status Indirect employment will be generated through this project.

Migration pattern NA

Type of compensation expected Fruit crop compensation

Perceived benefits from project will boost the local economy.

Perceived loss

Other organizations active in the area

NGOs

Village Committee Village Panchayat, Katgaon

Other issues No issue except development of temple area and community center. Resolved through negotiation.

Usefulness of consultation Local public which has resorted to agitation was resolved and construction activities started.

Involvement of people in implementation

complete involvement of people near the project site.

Page 40: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 40 of 72

ANNEURE IV

66KV OUTGOING GANTRY TOWERS

66KV outgoing gantry tower B completed & Tower-erection work is under progress

Page 41: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 41 of 72

66KV OUTGOING SF6 BUS DUCTS FOUNDATIONS

66KV outgoing Sf6 bus ducts, supporting structures completed. 220/66 KV 31.5MVA TRANSFORMER FOUNDATION

220/66KV 31.5MVA Transformer foundation RCC work is under progress.

Page 42: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 42 of 72

ACDB & DCDB ROOM

ACDB, DCDB panels are erected on their positions. 22KV GIS BUILDING

22KV GIS Bays areplaced inside the 22KV GIS room and ready for erection.

Page 43: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 43 of 72

220KV GANTRY TOWER

220KV Gantry towers foundation rafts completed & columns upto bolt Lv is under progress MAIN EARTH MAT

Page 44: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 44 of 72

40mm Main earth Mat, laying of 40mm MS Rod work is under progress PAINTING WORK

Page 45: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 45 of 72

220/CRB/22KVBuilding outside painting work is under progress ILLUMINATION WORK

Illumination work started at site

Page 46: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 46 of 72

MISCELLANEOUS PICS

Page 47: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 47 of 72

Page 48: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 48 of 72

Work for stabilization of slope above crown of existing land slide

Protection crate wall work in the sliding zone nallah is under progress

Page 49: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 49 of 72

ANNEURE V 220/400 kV Gumma

Page 50: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 50 of 72

ANNEURE VI

PICTURES of EHSGUMMA SUBSTATION

Page 51: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 51 of 72

ANNEURE VII

Page 52: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 52 of 72

Page 53: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 53 of 72

ANNEURE -VIII Report No ETTC/08/12/334 Dated 27-08-2012 AMBIENT AIR SAMPLES ANALYSIS REPORT 1. Laboratory Sample No. : 334 2. Name of Industry : Construction of 220/66/22 KV GIS Sub-Station At Bhoktoo along with Lillo of one circuit of 220KV D/C Bhaba-Kasang Line at Bhoktoo, NearKalpa, Distt. Kinnaur, H.P. 3. Name of Sample Collecting Officer : Mr. Krishan Kumar Soni 4. Designation of Officer Authorizing : Lab Assistance 5. Type of Sample : Ambient Air 6. Date & Time of Sample Collection : 23-07-201206:00 AM 7. Date & Time of Sample Receipt in Lab : 29-07-2012 05:00 PM 8. Description of stack by Lab : a) Point of Sample Collection :120o at 220/66/22 KV GIS Sub-Station atBhoktoo b) Remark : ENVIRONMENTAL DATA 1. Ambient Air Temperature ( 0C ) 18oC 2. Flue / Vent Air Temperature ( 0C ) N/A 3. Velocity of Flue/ Venture (m/sec) N/A 4. Flow Rate of Sampling (m3/m) 1.2 5. Time Period of Sampling (hrs) 8 6. Volume of Flue /Vent Air Sampled at NT (m3) 576

Sr. No. Name of the parameter Standard limit Results

1. SPM(µg/m3) 80 25.2

2. PM10(µg/m3) 100 18.1

3. PM2.5(µg/m3) 60 10.3

4. SO2(µg/m3) 80 2.07

5. NO2(µg/m3) 80 5.16

6. NH3(µg/m3) 400 11.5

7. CO(mg/m3) 4 1.11

8. O3(µg/m3) 180 N.D

9. C6H6(µg/m3) 5 N.D

10. Benzo(a)Pyrene(ng/m3) 1 N.D

11. Pb(µg/m3) 1 N.D

12. As(ng/m3) 6 N.D

13. Ni(ng/m3) 20 N.D

* N.D. (Not Detected)

Page 54: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 54 of 72

Report No ETTC/08/12/335 Dated 27-08-2012 AMBIENT AIR SAMPLES ANALYSIS REPORT AMBIENT AIR SAMPLES ANALYSIS REPORT 1. Laboratory Sample No. : 335 2. Name of Industry : Construction of 220/66/22 KV GIS Sub-StationAt Bhoktoo along with Lillo of one circuit of 220KV D/C Bhaba-Kasang Line at Bhoktoo, NearKalpa, Distt. Kinnaur, H.P. 3. Name of Sample Collecting Officer : Mr. Krishan Kumar Soni 4. Designation of Officer Authorizing : Lab Assistance 5. Type of Sample : Ambient Air 6. Date & Time of Sample Collection : 23-07-201202:00 PM 7. Date & Time of Sample Receipt in Lab : 29-07-2012 05:00 PM 8. Description of stack by Lab : a) Point of Sample Collection :240o at 220/66/22 KV GIS Sub-Station at Bhoktoo b) Remark : ENVIRONMENTAL DATA Ambient Air Temperature ( 0C ) 25oC 1. Flue / Vent Air Temperature ( 0C ) N/A 2. Velocity of Flue/ Venture (m/sec) N/A 3. Flow Rate of Sampling (m3/m) 1.3 4. Time Period of Sampling (hrs) 8 5. Volume of Flue /Vent Air Sampled at NT (m3) 624

Sr. No. Name of the parameter Standard limit Results

1. SPM(µg/m3) 80 27.3

2. PM10(µg/m3) 100 19.5

3. PM2.5(µg/m3) 60 11.8

4. SO2(µg/m3) 80 2.19

5. NO2(µg/m3) 80 5.23

6. NH3(µg/m3) 400 11.2

7. CO(mg/m3) 4 1.11

8. O3(µg/m3) 180 N.D

9. C6H6(µg/m3) 5 N.D

10. Benzo(a)Pyrene(ng/m3) 1 N.D

11. Pb(µg/m3) 1 N.D

12. As(ng/m3) 6 N.D

13. Ni(ng/m3) 20 N.D

* N.D. (Not Detected)

Page 55: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 55 of 72

Report No ETTC/08/12/336 Dated 27-08-2012 AMBIENT AIR SAMPLES ANALYSIS REPORT 1. Laboratory Sample No. : 336 2. Name of Industry : Construction of 220/66/22 KV GIS Sub-Station at Bhoktoo along with Lillo of one circuit of 220KV D/C Bhaba-Kasang Line at Bhoktoo, NearKalpa, Distt. Kinnaur, H.P. 3. Name of Sample Collecting Officer : Mr. Krishan Kumar Soni 4. Designation of Officer Authorizing : Lab Assistance 5. Type of Sample : Ambient Air 6. Date & Time of Sample Collection : 23-07-201210:00 PM 7. Date & Time of Sample Receipt in Lab : 29-07-2012 05:00 PM 8. Description of stack by Lab : a)Point of Sample Collection :360o at 220/66/22 KV GIS Sub-Station at Bhoktoo b)Remark : ENVIRONMENTAL DATA 1. Ambient Air Temperature ( 0C ) 20oC 2. Flue / Vent Air Temperature ( 0C ) N/A 3. Velocity of Flue/ Venture (m/sec) N/A 4. Flow Rate of Sampling (m3/m) 1.25 5. Time Period of Sampling (hrs) 8 6. Volume of Flue /Vent Air Sampled at NT (m3) 600

Sr. No. Name of the parameter Standard limit Results

1. SPM(µg/m3) 80 28.4

2. PM10(µg/m3) 100 19.8

3. PM2.5(µg/m3) 60 12.1

4. SO2(µg/m3) 80 2.29

5. NO2(µg/m3) 80 5.18

6. NH3(µg/m3) 400 11.3

7. CO(mg/m3) 4 1.11

8. O3(µg/m3) 180 N.D

9. C6H6(µg/m3) 5 N.D

10. Benzo(a)Pyrene(ng/m3) 1 N.D

11. Pb(µg/m3) 1 N.D

12. As(ng/m3) 6 N.D

13. Ni(ng/m3) 20 N.D

* N.D. (Not Detected)

Page 56: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 56 of 72

Report No ETTC/08/12/337 Dated 27-08-2012 AMBIENT AIR SAMPLES ANALYSIS REPORT 1. Laboratory Sample No. : 337 2. Name of Industry : C/O 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315MVA GIS

Pooling station at Wangtoo,Distt. Kinnaur, H.P 3. Name of Sample Collecting Officer : Mr. Krishan Kumar Soni 4. Designation of Officer Authorizing : Lab Assistant 5. Type of Sample : Ambient Air 6. Date & Time of Sample Collection : 24-07-201206:00 AM 7. Date & Time of Sample Receipt in Lab : 29-07-2012 05:00 PM 8. Description of stack by Lab : a) Point of Sample Collection :120o at 66/220 KV 2 x 80 MVA & 220/400 KV2 x 315 MVA GIS Pooling station at Wangtoo b) Remark : ENVIRONMENTAL DATA 1. Ambient Air Temperature ( 0C ) 19oC 2. Flue / Vent Air Temperature ( 0C ) N/A 3. Velocity of Flue/ Venture (m/sec) N/A 4. Flow Rate of Sampling (m3/m) 1.16 5. Time Period of Sampling (hrs) 8 6. Volume of Flue /Vent Air Sampled at NT (m3) 557

Sr. No. Name of the parameter Standard limit Results

1. SPM(µg/m3) 80 20.1

2. PM10(µg/m3) 100 15.9

3. PM2.5(µg/m3) 60 12.8

4. SO2(µg/m3) 80 1.12

5. NO2(µg/m3) 80 5.10

6. NH3(µg/m3) 400 11.7

7. CO(mg/m3) 4 1.11

8. O3(µg/m3) 180 N.D

9. C6H6(µg/m3) 5 N.D

10. Benzo(a)Pyrene(ng/m3) 1 N.D

11. Pb(µg/m3) 1 N.D

12. As(ng/m3) 6 N.D

13. Ni(ng/m3) 20 N.D

* N.D. (Not Detected)

Page 57: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 57 of 72

Report No ETTC/08/12/338 Dated 27-08-2012 AMBIENT AIR SAMPLES ANALYSIS REPORT

1. Laboratory Sample No. : 338 2. Name of Industry : C/O 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315MVA GIS Pooling station at Wangtoo,Distt. Kinnaur, H.P. 3. Name of Sample Collecting Officer : Mr. Krishan Kumar Soni 4. Designation of Officer Authorizing : Lab Assistant 5. Type of Sample : Ambient Air 6. Date & Time of Sample Collection : 24-07-201202:00 PM 7. Date & Time of Sample Receipt in Lab : 29-07-2012 05:00 PM 8. Description of stack by Lab : a) Point of Sample Collection :240o at 66/220 KV 2 x 80 MVA, & 220/400 KV2 x 315 MVA GIS Pooling station at Wangtoo b) Remark : ENVIRONMENTAL DATA 1. Ambient Air Temperature ( 0C ) 24oC 2. Flue / Vent Air Temperature ( 0C ) N/A 3. Velocity of Flue/ Venture (m/sec) N/A 4. Flow Rate of Sampling (m3/m) 1.3 5. Time Period of Sampling (hrs) 8 6. Volume of Flue /Vent Air Sampled at NT (m3) 624

Sr. No. Name of the parameter Standard limit Results

1. SPM(µg/m3) 80 22.8

2. PM10(µg/m3) 100 16.9

3. PM2.5(µg/m3) 60 13.1

4. SO2(µg/m3) 80 3.25

5. NO2(µg/m3) 80 5.21

6. NH3(µg/m3) 400 12.2

7. CO(mg/m3) 4 1.11

8. O3(µg/m3) 180 N.D

9. C6H6(µg/m3) 5 N.D

10. Benzo(a)Pyrene(ng/m3) 1 N.D

11. Pb(µg/m3) 1 N.D

12. As(ng/m3) 6 N.D

13. Ni(ng/m3) 20 N.D

* N.D. (Not Detected)

Page 58: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 58 of 72

Report No ETTC/08/12/339 Dated 27-08-2012 AMBIENT AIR SAMPLES ANALYSIS REPORT 1. Laboratory Sample No. : 339 2. Name of Industry : C/O 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315MVA GIS Pooling station at WangtooDistt. Kinnaur, H.P. 3. Name of Sample Collecting Officer : Mr. Krishan Kumar Soni 4. Designation of Officer Authorizing : Lab Assistant 5. Type of Sample : Ambient Air 6. Date & Time of Sample Collection : 24-07-201210:00 PM 7. Date & Time of Sample Receipt in Lab : 29-07-2012 05:00 PM 8. Description of stack by Lab : a) Point of Sample Collection :360o at 66/220 KV 2 x 80 MVA, & 220/400 KV 2 x 315 MVA GIS Pooling station at Wangtoo b) Remark : ENVIRONMENTAL DATA 1. Ambient Air Temperature ( 0C ) 20oC 2. Flue / Vent Air Temperature ( 0C ) N/A 3. Velocity of Flue/ Venture (m/sec) N/A 4. Flow Rate of Sampling (m3/m) 1.2 5. Time Period of Sampling (hrs) 8 6. Volume of Flue /Vent Air Sampled at NT (m3) 576

Sr. No. Name of the parameter Standard limit Results

1. SPM(µg/m3) 80 22.9

2. PM10(µg/m3) 100 16.6

3. PM2.5(µg/m3) 60 13.3

4. SO2(µg/m3) 80 1.41

5. NO2(µg/m3) 80 5.11

6. NH3(µg/m3) 400 12.2

7. CO(mg/m3) 4 1.11

8. O3(µg/m3) 180 N.D

9. C6H6(µg/m3) 5 N.D

10. Benzo(a)Pyrene(ng/m3) 1 N.D

11. Pb(µg/m3) 1 N.D

12. As(ng/m3) 6 N.D

13. Ni(ng/m3) 20 N.D

* N.D. (Not Detected)

Page 59: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 59 of 72

Report No ETTC/08/12/334 Dated 27-08-2012 AMBIENT AIR SAMPLES ANALYSIS REPORT AMBIENT AIR SAMPLES ANALYSIS REPORT 9. Laboratory Sample No. : 334 10. Name of Industry : Construction of 220/66/22 KV GIS Sub-Station At Bhoktoo along with Lillo of one circuit of 220KV D/C Bhaba-Kasang Line at Bhoktoo, NearKalpa, Distt. Kinnaur, H.P. 11. Name of Sample Collecting Officer : Mr. Krishan Kumar Soni 12. Designation of Officer Authorizing : Lab Assistance 13. Type of Sample : Ambient Air 14. Date & Time of Sample Collection : 23-07-201206:00 AM 15. Date & Time of Sample Receipt in Lab : 29-07-2012 05:00 PM 16. Description of stack by Lab : a) Point of Sample Collection :120o at 220/66/22 KV GIS Sub-Station at Bhoktoo b) Remark : ENVIRONMENTAL DATA 7. Ambient Air Temperature ( 0C ) 18oC 8. Flue / Vent Air Temperature ( 0C ) N/A 9. Velocity of Flue/ Venture (m/sec) N/A 10. Flow Rate of Sampling (m3/m) 1.2 11. Time Period of Sampling (hrs) 8 12. Volume of Flue /Vent Air Sampled at NT (m3) 576

Sr. No. Name of the parameter Standard limit Results

1. SPM(µg/m3) 80 25.2

2. PM10(µg/m3) 100 18.1

3. PM2.5(µg/m3) 60 10.3

4. SO2(µg/m3) 80 2.07

5. NO2(µg/m3) 80 5.16

6. NH3(µg/m3) 400 11.5

7. CO(mg/m3) 4 1.11

8. O3(µg/m3) 180 N.D

9. C6H6(µg/m3) 5 N.D

10. Benzo(a)Pyrene(ng/m3) 1 N.D

11. Pb(µg/m3) 1 N.D

12. As(ng/m3) 6 N.D

13. Ni(ng/m3) 20 N.D

* N.D. (Not Detected)

Page 60: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 60 of 72

Report No ETTC/08/12/335 Dated 27-08-2012 AMBIENT AIR SAMPLES ANALYSIS REPORT 9. Laboratory Sample No. : 335 10. Name of Industry : Construction of 220/66/22 KV GIS Sub-Station At Bhoktoo along with Lillo of one circuit of 220KV D/C Bhaba-Kasang Line at Bhoktoo, NearKalpa, Distt. Kinnaur, H.P. 11. Name of Sample Collecting Officer : Mr. Krishan Kumar Soni 12. Designation of Officer Authorizing : Lab Assistance 13. Type of Sample : Ambient Air 14. Date & Time of Sample Collection : 23-07-201202:00 PM 15. Date & Time of Sample Receipt in Lab : 29-07-2012 05:00 PM 16. Description of stack by Lab : a) Point of Sample Collection :240o at 220/66/22 KV GIS Sub-Station atBhoktoo b) Remark : ENVIRONMENTAL DATA 6. Ambient Air Temperature ( 0C ) 25oC 7. Flue / Vent Air Temperature ( 0C ) N/A 8. Velocity of Flue/ Venture (m/sec) N/A 9. Flow Rate of Sampling (m3/m) 1.3 10. Time Period of Sampling (hrs) 8 11. Volume of Flue /Vent Air Sampled at NT (m3) 624

Sr. No. Name of the parameter Standard limit Results

1. SPM(µg/m3) 80 27.3

2. PM10(µg/m3) 100 19.5

3. PM2.5(µg/m3) 60 11.8

4. SO2(µg/m3) 80 2.19

5. NO2(µg/m3) 80 5.23

6. NH3(µg/m3) 400 11.2

7. CO(mg/m3) 4 1.11

8. O3(µg/m3) 180 N.D

9. C6H6(µg/m3) 5 N.D

10. Benzo(a)Pyrene(ng/m3) 1 N.D

11. Pb(µg/m3) 1 N.D

12. As(ng/m3) 6 N.D

13. Ni(ng/m3) 20 N.D

* N.D. (Not Detected)

Page 61: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 61 of 72

Report No ETTC/08/12/336 Dated 27-08-2012 AMBIENT AIR SAMPLES ANALYSIS REPORT 9. Laboratory Sample No. : 336 10. Name of Industry : Construction of 220/66/22 KV GIS Sub-Station At Bhoktoo along with Lillo of one circuit of 220KV D/C Bhaba-Kasang Line at Bhoktoo, NearKalpa, Distt. Kinnaur, H.P. 11. Name of Sample Collecting Officer : Mr. Krishan Kumar Soni 12. Designation of Officer Authorizing : Lab Assistance 13. Type of Sample : Ambient Air 14. Date & Time of Sample Collection : 23-07-201210:00 PM 15. Date & Time of Sample Receipt in Lab : 29-07-2012 05:00 PM 16. Description of stack by Lab : a) Point of Sample Collection :360o at 220/66/22 KV GIS Sub-Station at Bhoktoo b) Remark : ENVIRONMENTAL DATA 7. Ambient Air Temperature ( 0C ) 20oC 8. Flue / Vent Air Temperature ( 0C ) N/A 9. Velocity of Flue/ Venture (m/sec) N/A 10. Flow Rate of Sampling (m3/m) 1.25 11. Time Period of Sampling (hrs) 8 12. Volume of Flue /Vent Air Sampled at NT (m3) 600

Sr. No. Name of the parameter Standard limit Results

1. SPM(µg/m3) 80 28.4

2. PM10(µg/m3) 100 19.8

3. PM2.5(µg/m3) 60 12.1

4. SO2(µg/m3) 80 2.29

5. NO2(µg/m3) 80 5.18

6. NH3(µg/m3) 400 11.3

7. CO(mg/m3) 4 1.11

8. O3(µg/m3) 180 N.D

9. C6H6(µg/m3) 5 N.D

10. Benzo(a)Pyrene(ng/m3) 1 N.D

11. Pb(µg/m3) 1 N.D

12. As(ng/m3) 6 N.D

13. Ni(ng/m3) 20 N.D

* N.D. (Not Detected)

Page 62: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 62 of 72

Report No ETTC/08/12/337 Dated 27-08-2012 AMBIENT AIR SAMPLES ANALYSIS REPORT 17. Laboratory Sample No. : 337 18. Name of Industry : C/O 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315MVA GIS Pooling station at Wangtoo,Distt. Kinnaur, H.P. 19. Name of Sample Collecting Officer : Mr. Krishan Kumar Soni 20. Designation of Officer Authorizing : Lab Assistant 21. Type of Sample : Ambient Air 22. Date & Time of Sample Collection : 24-07-201206:00 AM 23. Date & Time of Sample Receipt in Lab : 29-07-2012 05:00 PM 24. Description of stack by Lab : a) Point of Sample Collection :120o at 66/220 KV 2 x 80 MVA & 220/400 KV2 x 315 MVA GIS Pooling station at Wangtoo b) Remark : ENVIRONMENTAL DATA 13. Ambient Air Temperature ( 0C ) 19oC 14. Flue / Vent Air Temperature ( 0C ) N/A 15. Velocity of Flue/ Venture (m/sec) N/A 16. Flow Rate of Sampling (m3/m) 1.16 17. Time Period of Sampling (hrs) 8 18. Volume of Flue /Vent Air Sampled at NT (m3) 557

Sr. No. Name of the parameter Standard limit Results

1. SPM(µg/m3) 80 20.1

2. PM10(µg/m3) 100 15.9

3. PM2.5(µg/m3) 60 12.8

4. SO2(µg/m3) 80 1.12

5. NO2(µg/m3) 80 5.10

6. NH3(µg/m3) 400 11.7

7. CO(mg/m3) 4 1.11

8. O3(µg/m3) 180 N.D

9. C6H6(µg/m3) 5 N.D

10. Benzo(a)Pyrene(ng/m3) 1 N.D

11. Pb(µg/m3) 1 N.D

12. As(ng/m3) 6 N.D

13. Ni(ng/m3) 20 N.D

* N.D. (Not Detected)

Page 63: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 63 of 72

Report No ETTC/08/12/338 Dated 27-08-2012 AMBIENT AIR SAMPLES ANALYSIS REPORT 9. Laboratory Sample No. : 338 10. Name of Industry : C/O 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315MVA GISPooling station at Wangtoo,Distt. Kinnaur, H.P. 11. Name of Sample Collecting Officer : Mr. Krishan Kumar Soni 12. Designation of Officer Authorizing : Lab Assistant 13. Type of Sample : Ambient Air 14. Date & Time of Sample Collection : 24-07-201202:00 PM 15. Date & Time of Sample Receipt in Lab : 29-07-2012 05:00 PM 16. Description of stack by Lab : a) Point of Sample Collection :240o at 66/220 KV 2 x 80 MVA, & 220/400 KV2 x 315 MVA GIS Pooling station at Wangtoo b) Remark : ENVIRONMENTAL DATA 7. Ambient Air Temperature ( 0C ) 24oC 8. Flue / Vent Air Temperature ( 0C ) N/A 9. Velocity of Flue/ Venture (m/sec) N/A 10. Flow Rate of Sampling (m3/m) 1.3 11. Time Period of Sampling (hrs) 8 12. Volume of Flue /Vent Air Sampled at NT (m3) 624

Sr. No. Name of the parameter Standard limit Results

1. SPM(µg/m3) 80 22.8

2. PM10(µg/m3) 100 16.9

3. PM2.5(µg/m3) 60 13.1

4. SO2(µg/m3) 80 3.25

5. NO2(µg/m3) 80 5.21

6. NH3(µg/m3) 400 12.2

7. CO(mg/m3) 4 1.11

8. O3(µg/m3) 180 N.D

9. C6H6(µg/m3) 5 N.D

10. Benzo(a)Pyrene(ng/m3) 1 N.D

11. Pb(µg/m3) 1 N.D

12. As(ng/m3) 6 N.D

13. Ni(ng/m3) 20 N.D

* N.D. (Not Detected)

Page 64: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 64 of 72

Report No ETTC/08/12/339 Dated 27-08-2012 AMBIENT AIR SAMPLES ANALYSIS REPORT 9. Laboratory Sample No. : 339 10. Name of Industry : C/O 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315MVA GIS Pooling station at Wangtoo,Distt. Kinnaur, H.P. 11. Name of Sample Collecting Officer : Mr. Krishan Kumar Soni 12. Designation of Officer Authorizing : Lab Assistant 13. Type of Sample : Ambient Air 14. Date & Time of Sample Collection : 24-07-201210:00 PM 15. Date & Time of Sample Receipt in Lab : 29-07-2012 05:00 PM 16. Description of stack by Lab : a) Point of Sample Collection :360o at 66/220 KV 2 x 80 MVA, & 220/400 KV2 x 315 MVA GIS Pooling station at Wangtoo b) Remark : ENVIRONMENTAL DATA 7. Ambient Air Temperature ( 0C ) 20oC 8. Flue / Vent Air Temperature ( 0C ) N/A 9. Velocity of Flue/ Venture (m/sec) N/A 10. Flow Rate of Sampling (m3/m) 1.2 11. Time Period of Sampling (hrs) 8 12. Volume of Flue /Vent Air Sampled at NT (m3) 576

No. Name of the parameter Standard limit Results

1. SPM(µg/m3) 80 22.9

2. PM10(µg/m3) 100 16.6

3. PM2.5(µg/m3) 60 13.3

4. SO2(µg/m3) 80 1.41

5. NO2(µg/m3) 80 5.11

6. NH3(µg/m3) 400 12.2

7. CO(mg/m3) 4 1.11

8. O3(µg/m3) 180 N.D

9. C6H6(µg/m3) 5 N.D

10. Benzo(a)Pyrene(ng/m3) 1 N.D

11. Pb(µg/m3) 1 N.D

12. As(ng/m3) 6 N.D

13. Ni(ng/m3) 20 N.D

* N.D. (Not Detected)

Page 65: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 65 of 72

Report No ETTC/08/12/337-1 Dated 27-08-2012 ISSUED TO: C/O 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315 MVA GIS Pooling station at Wangtoo, Distt.Kinnaur, H.P DESCRIPTION: Sound Level Monitoring done on24-07-2012 (Day Time) at 1200 at 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315 MVA GIS Pooling station at Wangtoo, Distt. Kinnaur, H.P Daytime reckoned from 9 AM to 12.00 noon. CERTIFICATE OF ANALYSIS Location of Sound Average Slow Average Fast

Response dB (A) Response dB (A) (120o AT THE BOUNDARY) 54.6 59.7

Report No ETTC/08/12/338-1 Dated 27-08-2012 ISSUED TO : C/O 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315 MVA GIS Pooling station at Wangtoo, Distt. Kinnaur, H.P DESCRIPTION: Sound Level Monitoring done on24-07-2012 (Day Time) at 2400 at 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315 MVA GIS Pooling station at Wangtoo, Distt. Kinnaur, H.P Daytime reckoned from 02.30 PM to 05.00 PM. CERTIFICATE OF ANALYSIS Location of Sound Average Slow Average Fast

Response dB (A) Response dB (A) (240o AT THE BOUNDARY) 52.6 59.1

Page 66: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 66 of 72

Report No ETTC/08/12/339-1 Dated 27-08-2012 ISSUED TO : C/O 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315 MVA GIS Pooling station at Wangtoo, Distt. Kinnaur, H.P DESCRIPTION: Sound Level Monitoring done on24-07-2012 at 3600 at 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315 MVA GIS Pooling station at Wangtoo, Distt. Kinnaur, H.P Time reckoned from 10.30 PM to 12.00 midnight. CERTIFICATE OF ANALYSIS Location of Sound Average Slow Average Fast

Response dB (A) Response dB (A) (360o AT THE BOUNDARY) 58.6 63.7

Report No ETTC/08/12/337-1 Dated 27-08-2012 ISSUED TO: C/O 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315 MVA GIS Pooling station at Wangtoo, Distt.Kinnaur, H.P DESCRIPTION: Sound Level Monitoring done on24-07-2012 (Day Time) at 1200 at 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315 MVA GIS Pooling station at Wangtoo, Distt. Kinnaur, H.P Daytime reckoned from 9 AM to 12.00 noon. CERTIFICATE OF ANALYSIS Location of Sound Average Slow Average Fast

Response dB (A) Response dB (A) (120o AT THE BOUNDARY) 54.6 59.7

Page 67: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 67 of 72

Report No ETTC/08/12/338-1 Dated 27-08-2012 ISSUED TO : C/O 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315 MVA GIS Pooling station at Wangtoo, Distt. Kinnaur, H.P DESCRIPTION:Sound Level Monitoring done on24-07-2012 (Day Time) at 2400 at 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315 MVA GIS Pooling station at Wangtoo, Distt. Kinnaur, H.P Daytime reckoned from 02.30 PM to 05.00 PM. CERTIFICATE OF ANALYSIS Location of Sound Average Slow Average Fast

Response dB (A) Response dB (A) (240o AT THE BOUNDARY) 52.6 59.1

Report No ETTC/08/12/339-1 Dated 27-08-2012 ISSUED TO : C/O 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315 MVA GIS Pooling station at Wangtoo, Distt. Kinnaur, H.P DESCRIPTION: Sound Level Monitoring done on24-07-2012 at 3600 at 66/220 KV 2 x 80 MVA & 220/400 KV 2 x 315 MVA GIS Pooling station at Wangtoo, Distt. Kinnaur, H.P Time reckoned from 10.30 PM to 12.00 midnight. CERTIFICATE OF ANALYSIS Location of Sound Average Slow Average Fast

Response dB (A) Response dB (A) (360o AT THE BOUNDARY) 58.6 63.7

Page 68: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 68 of 72

Report No ETTC/08/12/328 Dated 22-07-2012 AMBIENT AIR SAMPLES ANALYSIS REPORT 25. Laboratory Sample No. : 328 Name of Industry : 220/400 KV GIS Sub-Station PragtiNagar(Gumma), Distt. Shimla, HP 26. Name of Sample Collecting Officer : Mr. Krishan Kumar Soni 27. Designation of Officer Authorizing : Lab Assistance 28. Type of Sample : Ambient Air 29. Date & Time of Sample Collection : 12-07-201206:00 AM 30. Date & Time of Sample Receipt in Lab : 16-07-2012 5:00 PM 31. Description of stack by Lab : a) Point of Sample Collection :120o at 220/400 KV GIS Sub-Station Gumma b) Remark : Clear Environment ENVIRONMENTAL DATA 19. Ambient Air Temperature ( 0C ) 24oC 20. Flue / Vent Air Temperature ( 0C ) N/A 21. Velocity of Flue/ Venture (m/sec) N/A 22. Flow Rate of Sampling (m3/m) 1.2 23. Time Period of Sampling (hrs) 8 24. Volume of Flue /Vent Air Sampled at NT (m3) 576

Sr. No. Name of the parameter Standard limit Results

1. SPM(µg/m3) 80 23.1

2. PM10(µg/m3) 100 13.6

3. PM2.5(µg/m3) 60 12.6

4. SO2(µg/m3) 80 3.14

5. NO2(µg/m3) 80 6.21

6. NH3(µg/m3) 400 13.6

7. CO(mg/m3) 4 1.15

8. O3(µg/m3) 180 N.D

9. C6H6(µg/m3) 5 N.D

10. Benzo(a)Pyrene(ng/m3) 1 N.D

11. Pb(µg/m3) 1 N.D

12. As(ng/m3) 6 N.D

13. Ni(ng/m3) 20 N.D

* N.D. (Not Detected)

Page 69: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 69 of 72

Report No ETTC/08/12/329 Dated 22-07-2012 AMBIENT AIR SAMPLES ANALYSIS REPORT 1. Laboratory Sample No. : 329 2. Name of Industry : 220/400 KV GIS Sub-Station Pragti Nagar : (Gumma), Distt. Shimla, HP 3. Name of Sample Collecting Officer : Mr. Krishan Kumar Soni 4. Designation of Officer Authorizing : Lab Assistance 5. Type of Sample : Ambient Air 6. Date & Time of Sample Collection : 12-07-201202:00 PM 7. Date & Time of Sample Receipt in Lab : 16-07-2012 5:00 PM 8. Description of stack by Lab : a) Point of Sample Collection : 240o at 220/400 KV GIS Sub-Station Gumma b) Remark : Clear Environment ENVIRONMENTAL DATA 1. Ambient Air Temperature ( 0C ) 27oC 2. Flue / Vent Air Temperature ( 0C ) N/A 3. Velocity of Flue/ Venture (m/sec) N/A 4. Flow Rate of Sampling (m3/m) 1.3 5. Time Period of Sampling (hrs) 8 6. Volume of Flue /Vent Air Sampled at NT (m3) 624 Results

Sr. No. Name of the parameter Standard limit Results

1. SPM(µg/m3) 80 25.26

2. PM10(µg/m3) 100 14.63

3. PM2.5(µg/m3) 60 13.68

4. SO2(µg/m3) 80 4.41

5. NO2(µg/m3) 80 6.19

6. NH3(µg/m3) 400 14.16

7. CO(mg/m3) 4 1.15

8. O3(µg/m3) 180 N.D

9. C6H6(µg/m3) 5 N.D

10. Benzo(a)Pyrene(ng/m3) 1 N.D

11. Pb(µg/m3) 1 N.D

12. As(ng/m3) 6 N.D

13. Ni(ng/m3) 20 N.D

* N.D. (Not Detected)

Page 70: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 70 of 72

Report No ETTC/08/12/330 Dated 22-07-2012 AMBIENT AIR SAMPLES ANALYSIS REPORT 1. Laboratory Sample No. : 330 2. Name of Industry : 220/400 KV GIS Sub-

StationPragtiNagar(Gumma), Distt. Shimla, HP

3. Name of Sample Collecting Officer : Mr. Krishan Kumar Soni 4. Designation of Officer Authorizing : Lab Assistance 5. Type of Sample : Ambient Air 6. Date & Time of Sample Collection : 12-07-201210:00 PM 7. Date & Time of Sample Receipt in Lab : 16-07-2012 5:00 PM 8. Description of stack by Lab : a) Point of Sample Collection :360o at 220/400 KV GIS Sub-Station Gumma b) Remark : ENVIRONMENTAL DATA 1. Ambient Air Temperature ( 0C ) 25oC 2. Flue / Vent Air Temperature ( 0C ) N/A 3. Velocity of Flue/ Venture (m/sec) N/A 4. Flow Rate of Sampling (m3/m) 1.2 5. Time Period of Sampling (hrs) 8 6. Volume of Flue /Vent Air Sampled at NT (m3) 576

Sr. No. Name of the parameter Standard limit Results

1. SPM(µg/m3) 80 22.71

2. PM10(µg/m3) 100 12.16

3. PM2.5(µg/m3) 60 11.36

4. SO2(µg/m3) 80 3.04

5. NO2(µg/m3) 80 6.11

6. NH3(µg/m3) 400 13.1

7. CO(mg/m3) 4 1.15

8. O3(µg/m3) 180 N.D

9. C6H6(µg/m3) 5 N.D

10. Benzo(a)Pyrene(ng/m3) 1 N.D

11. Pb(µg/m3) 1 N.D

12. As(ng/m3) 6 N.D

13. Ni(ng/m3) 20 N.D

* N.D. (Not Detected)

Page 71: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 71 of 72

Report No: ETTC/08/12/328-1 Dated 22-07-2012 ISSUED TO :220/400 KV GIS Sub-Station, Pragti Nagar (Gumma)Distt. Shimla (Himachal Pradesh) DESCRIPTION:Sound Level Monitoring done on12-07-2012 (Day Time) at 1200 at 220/400 KV GIS Sub-Station Pragti Nagar (Gumma) Distt. Shimla (HP) Daytime reckoned from 9 AM to 12.00 PM. CERTIFICATE OF ANALYSIS Location of Sound Average Slow Average Fast

Response dB (A) Response dB (A) 220/400 KV GIS Sub-Station 48.6 50.9 (120o AT THE BOUNDARY)

Report No: ETTC/08/12/329-1 Dated 22-07-2012

ISSUED TO :220/400 KV GIS Sub-Station, Pragti Nagar (Gumma)Distt. Shimla (Himachal Pradesh) DESCRIPTION:Sound Level Monitoring done on12-07-2012 (Day Time) at 2400 at 220/400 KV GIS Sub-Station Pragti Nagar (Gumma) Distt. Shimla (HP) Daytime reckoned from 02.30 PM to 05.00 PM. CERTIFICATE OF ANALYSIS Location of Sound Average Slow Average Fast

Response dB (A) Response dB (A) 220/400 KV GIS Sub Station 43.3 45.2 (240o AT THE BOUNDARY)

Page 72: Compliance Status and Environmental and Social Safeguard Monitoring Report  · 2015-12-31Compliance Status and Environmental and Social Safeguard Monitoring Report ... GIS Gas Insulated

HPPOWER TRANSMISSION CORPORATION COMPLIANCE AND MONITORING REPORT Page 72 of 72

Report No: ETTC/08/12/330-1 Dated 22-07-2012 ISSUED TO :220/400 KV GIS Sub-Station, Pragti Nagar (Gumma)Distt. Shimla (Himachal Pradesh) DESCRIPTION: Sound Level Monitoring done on12-07-2012 at 3600 at 220/400 KV GIS Sub-StationPragti Nagar (Gumma) Distt. Shimla (HP) Nighttime reckoned from 10.30 PM to 12.00 midnight CERTIFICATE OF ANALYSIS Location of Sound Average Slow Average Fast

Response dB (A) Response dB (A) 220/400 KV GIS Sub-Station 44.0 46.9 (360o AT THE BOUNDARY)