O Department of Transportation and Public Works (DTPW) www.miamismartplan.com #MiamiSMARTPlan SOUTH CORRIDOR STATION #2: PROJECT STATUS - RECAP October 23-25, 2017

Upload: others

Post on 02-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Department of Transportation and Public Works (DTPW) · BRT Master Presentation Author: Hansen, Sarah Created Date: 11/14/2017 2:56:59 PM

O

Department of Transportation and Public Works(DTPW)

www.miamismartplan.com #MiamiSMARTPlanSOUTH CORRIDOR

STATION #2: PROJECT STATUS - RECAP

October 23-25, 2017

Page 2: Department of Transportation and Public Works (DTPW) · BRT Master Presentation Author: Hansen, Sarah Created Date: 11/14/2017 2:56:59 PM

● Miami-Dade County SMART Plan

● South Corridor Description● Project History and Timeline● Study Elements● Project Scope and Purpose● Study Objectives: Evaluate Transit Alternatives● Public Engagement ● Selecting the Locally Preferred Alternative (LPA)● Project Schedule

Meeting Overview

2www.miamismartplan.com #MiamiSMARTPlanSOUTH CORRIDOR

Page 3: Department of Transportation and Public Works (DTPW) · BRT Master Presentation Author: Hansen, Sarah Created Date: 11/14/2017 2:56:59 PM

Miami-Dade County SMART Plan

Six Corridors:

• Beach Corridor

• East-West Corridor

• Kendall Corridor

• North Corridor

• Northeast Corridor

• South Corridor

3SOUTH CORRIDOR www.miamismartplan.com #MiamiSMARTPlan

Page 4: Department of Transportation and Public Works (DTPW) · BRT Master Presentation Author: Hansen, Sarah Created Date: 11/14/2017 2:56:59 PM

South Corridor - Description

4

• Existing South Dade Transitway: Connects Dadeland South Metrorail Station with SW 344th

Street in Florida City (approximately 20 miles)

• Corridor Cities• Village of Pinecrest• Village of Palmetto Bay• Town of Cutler Bay• City of Homestead• City of Florida City

www.miamismartplan.com #MiamiSMARTPlanSOUTH CORRIDOR

Page 5: Department of Transportation and Public Works (DTPW) · BRT Master Presentation Author: Hansen, Sarah Created Date: 11/14/2017 2:56:59 PM

Project History and Timeline2

00

0

20

05

20

10

20

15

2003TOD Master

Plans for Exclusive T-Way Corridors Study

2006South Link Study / AA

Report

2007South Dade Managed

Lanes

2013US 1 Express Lanes PD&E

Study

2017South Corridor Rapid Transit

Project commences

2016South Link

Study Update

5www.miamismartplan.com #MiamiSMARTPlanSOUTH CORRIDOR

Page 6: Department of Transportation and Public Works (DTPW) · BRT Master Presentation Author: Hansen, Sarah Created Date: 11/14/2017 2:56:59 PM

Study Elements

6www.miamismartplan.com #MiamiSMARTPlanSOUTH CORRIDOR

Public

Engagement

Page 7: Department of Transportation and Public Works (DTPW) · BRT Master Presentation Author: Hansen, Sarah Created Date: 11/14/2017 2:56:59 PM

• Document Existing Conditions• Develop Transit Mode Alternatives using Existing

Transitway Alignment• Station Locations and Transit Terminals• Multimodal Connections

– Improve 1st & last mile service– Integrate feeder service into the trunk line

Project Scope

• Improve Mobility & Safety• Promote Connectivity• Enhance Accessibility• Stimulate Economic Development

Project Scope and Purpose

Project Purpose

7www.miamismartplan.com #MiamiSMARTPlanSOUTH CORRIDOR

Page 8: Department of Transportation and Public Works (DTPW) · BRT Master Presentation Author: Hansen, Sarah Created Date: 11/14/2017 2:56:59 PM

Study Objectives: Evaluate Transit Alternatives

• At-Grade Metrorail Extension

• At-Grade Rapid Transit Service (RTS)

• At-Grade Light Rail Transit• Connected and

Autonomous Vehicle (CAV) alternative

All alternatives will consider grade separations at major intersections

8www.miamismartplan.com #MiamiSMARTPlanSOUTH CORRIDOR

Page 9: Department of Transportation and Public Works (DTPW) · BRT Master Presentation Author: Hansen, Sarah Created Date: 11/14/2017 2:56:59 PM

Public Engagement

• Elected Officials and Agency Kick-Off Meeting held on May 5th, 2017

• Public Kick-Off Meeting held on May 31st, 2017• Outreach

• Property Owner Notices• Advertisements (Miami Herald and El Nuevo Herald)• Meeting Notice Distribution

• Metrorail Station• Park-and-Rides• Public Facilities (18 locations)• DTPW Social Media and Municipal Networks

• Meetings with stakeholders • Project Advisory Group (PAG)• Project website and social media listed below.

9www.miamismartplan.com #MiamiSMARTPlanSOUTH CORRIDOR

Page 10: Department of Transportation and Public Works (DTPW) · BRT Master Presentation Author: Hansen, Sarah Created Date: 11/14/2017 2:56:59 PM

Selecting the Locally Preferred Alternative (LPA)

Purpose and Need• Identify the need for transit investment• Determine project goals and objectives• Define evaluation criteria

Tier 1 Definition and Evaluation: Qualitative• Identify the universe of alternatives• Qualitative evaluation to determine feasibility

Tier 2 Definition and Evaluation: Quantitative• Define the remaining alternatives in detail:o Develop operating plano Generate ridership forecasto Estimate capital and O&M costs• Evaluate the alternatives in detail

Selection of Locally Preferred Alternative(LPA)

10www.miamismartplan.com #MiamiSMARTPlanSOUTH CORRIDOR

Page 11: Department of Transportation and Public Works (DTPW) · BRT Master Presentation Author: Hansen, Sarah Created Date: 11/14/2017 2:56:59 PM

Notice to Proceed/Project Initiation/Class of Action Determination

Agency/Public Kick-Off Meeting

FTA Issues Class of Action - Environmental Assessment (EA) for Rail Options

Corridor Workshops/Initiate EA Corridor Workshops/Initiate EA

Identify Viable Alternatives

Alternatives Public Workshops

Identify Recommended Alternative

Draft Engineering/Environmental Reports

Public Hearing

Select Locally Preferred Alternative

Environmental Finding

Winter

20182017

Summer Fall Winter Spring Summer Fall Spring Summer

2019

PAG

PAG

PAG

Project Schedule

11www.miamismartplan.com #MiamiSMARTPlan

We are here!

SOUTH CORRIDOR