DOCUMENT RESUME ED 246 303 CE 039 366 AUTHOR Lengert, Gerald TITLE Drywall Finishing Apprenticeship. Course Outline (C-6). INSTITUTION British Columbia Dept. of Education, Victoria. PUB DATE 81 NOTE 126p.; For a related manual, see CE 039 365. Developed for the British Columbia Ministry of Labour with the assistance of the Drywall Finishing Trade Advisory Committee. AVAILABLE FROM Publication Services Branch, Ministry of Education, 878 Viewfield Road, Victoria, BC V9A 4V1 ($6.00). PUB TYPE Guides - Classroom Use - Guides (For Teachers) (052) Guides Classroom Use - Materials (For Learner) (051) EDRS PRICE MF01 Plus Postage. PC Not Available from EDRS. DESCRIPTORS *Apprenticeships; Behavioral Objectives; Buildings; Building Trades; Carpentry; Ceilings; Competence; Competency Based Education; *Construction (Process); Construction Costs; Construction Industry; *Construction Materials; Course Content; Course Descriptions; Foreign Countries; *Job Skills; Lesson Plans; Postsecondary Education; Safety; State Curriculum Guides; *Structural Elements . (Construction); Systems Building; Task Analysis; Trade and Industrial Education; Units of Study; Vocational Education IDENTIFIERS British Columbia; *Drywall Construction ABSTRACT This course outline was prepard to help apprentice drywall installers and teachers of drywall finishing courses to learn or teach the skills necessary for the apprenticeship course in British Columbia. The course outline consists of 11 tracks (units) that cover the following topics: estimating, job inspection, safety, applying bead, filling compounds, taping, filling, texturing, making repairs and corrections, maintaining equipment, and job economics. Each unit consists of 3 to 12 skills outlines. The page format for the skills outlines has a statement of the skill at the top, followed by the performance objective, and a list of procedures. The procedures detail the steps and knowledge needed to carry out the objective. Opposite each procedure are criteria that give the acceptable standard for how well the procedure is to be done. The outline can be used by students as a guide to accepted standards and by teachers as a lesson plan. A drywall finishing skill profile chart is included. (KC) *********************************************************************** * Reproductions supplied by EDRS are the best that can be made * * from the original document. * **************-********************************************************

Upload: dokhuong

Post on 01-Feb-2017

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Drywall Finishing Apprenticeship. Course Outline (C-6)

DOCUMENT RESUME

ED 246 303 CE 039 366

AUTHOR Lengert, GeraldTITLE Drywall Finishing Apprenticeship. Course Outline

(C-6).INSTITUTION British Columbia Dept. of Education, Victoria.PUB DATE 81NOTE 126p.; For a related manual, see CE 039 365.

Developed for the British Columbia Ministry of Labourwith the assistance of the Drywall Finishing TradeAdvisory Committee.

AVAILABLE FROM Publication Services Branch, Ministry of Education,878 Viewfield Road, Victoria, BC V9A 4V1 ($6.00).

PUB TYPE Guides - Classroom Use - Guides (For Teachers) (052)Guides Classroom Use - Materials (For Learner)

(051)

EDRS PRICE MF01 Plus Postage. PC Not Available from EDRS.DESCRIPTORS *Apprenticeships; Behavioral Objectives; Buildings;

Building Trades; Carpentry; Ceilings; Competence;Competency Based Education; *Construction (Process);Construction Costs; Construction Industry;*Construction Materials; Course Content; CourseDescriptions; Foreign Countries; *Job Skills; LessonPlans; Postsecondary Education; Safety; StateCurriculum Guides; *Structural Elements

. (Construction); Systems Building; Task Analysis;Trade and Industrial Education; Units of Study;Vocational Education

IDENTIFIERS British Columbia; *Drywall Construction

ABSTRACTThis course outline was prepard to help apprentice

drywall installers and teachers of drywall finishing courses to learnor teach the skills necessary for the apprenticeship course inBritish Columbia. The course outline consists of 11 tracks (units)that cover the following topics: estimating, job inspection, safety,applying bead, filling compounds, taping, filling, texturing, makingrepairs and corrections, maintaining equipment, and job economics.Each unit consists of 3 to 12 skills outlines. The page format forthe skills outlines has a statement of the skill at the top, followedby the performance objective, and a list of procedures. Theprocedures detail the steps and knowledge needed to carry out theobjective. Opposite each procedure are criteria that give theacceptable standard for how well the procedure is to be done. Theoutline can be used by students as a guide to accepted standards andby teachers as a lesson plan. A drywall finishing skill profile chartis included. (KC)

************************************************************************ Reproductions supplied by EDRS are the best that can be made *

* from the original document. ***************-********************************************************

Page 2: Drywall Finishing Apprenticeship. Course Outline (C-6)

V.S. DEPARTMENT 01, EDUCAlIONNATIONAL INSTITUTE OF EDUCATION

IUCATIONAL RESOURCES INFORMATIONCENTER isico

In.,, lhot worm' ntS beta mgocloced aSretrofit bolo No. OtesOn at intonationOinbitaboo itMina/ t Wives have. been mecte to ooftrove

feloodot too ovAr.ty

Pones ot vwv. al opilboaS stated A nos dOcu

inept do not neCeSSaine represent *Moat ME Course Outlinev. v..Lt polity

11IMIMMI5IMMMIMIMW

"PERMISSION TO REPRODUCE THISMATERIAL IN MICROFICHE ONLYHAS BEEN GRANTED BY

a

MAC I") VPTO THE EDUCATIONAL REI,INFORMATION C...+TER (E

ACES

Page 3: Drywall Finishing Apprenticeship. Course Outline (C-6)

DRYWALLFINISHINGApprenticeship

Course Outline (C-6)

Province ofBritish Columbia

Developed by theMinistry of Educationon behalf of theMinistry of Labour1981

Page 4: Drywall Finishing Apprenticeship. Course Outline (C-6)

" `4/1 L- ; t v/hi a 'Lai iliV g ravity

To obtain copies contactPublication Services BranchMinistry of Education878 Viewheld RoadVictoria, B C V9A 4V1Tel 387-5331

For information regarding this program contactCoordinator of Constructon ProgramsPostSecondery DepaernentMinistry of Education7451 Elmbridge WayRichmond, B C VbX 168Tel 278.34 3 3

Ministry of Education. Province of British Columbia. CanadaNo part of this publication mar be reproduced in anyform without permission in writing from the publisher 4

Page 5: Drywall Finishing Apprenticeship. Course Outline (C-6)

I fITRODIICT I ON

The Drywall Finishing Apprenticeship Course Outline is produced usingtho DACUM process, a systematic model for developing career, technical,and vocational training programs.

The first step in the process is to hold a DACUM Workshop. The DrywallFinishing DACUM workshop was held in June, 1976, and was attended bydrywall finishing journeymen, representatives of the Drywall FinishingJoint Board and the Carpentry Apprenticeship Joint Board of B.C., andomfloyers. Participants for a workshop are selected who have a realisticunderstanding of the day-to-day activities carried out on the job andare familiar with new technology in the field. The product of a DACUMWorkshop is a Skill Profile Chart; it lists the essential skills neededby a ocrson to do a job, in this case, the job done by journeymen dry-wall finishers.

Once a skill profile chart is approved, the next step in the DACUMprocess; is to write a Course Outline. For each skill on the chart (ormore remistically, for each skill on the chart possible to teach in atraining program) a Performance Objective is devised, that is, a taskthat the trainee or apprentice must perform, and perform to certainc,tandards, to demonstrate having the skill. When trainees can satis-facterily do all the performance objectives in the course outline, thenthey are considered fo have the skills required to complete the trainingprogram.

The paw format for the Drywall Finishing Course Outline has a statementof the sk"11 at the top, under it the performance objective, and then

f list of Procodures. The procedures detail the steps and knowledgeneeded 10 earn/ oui the objective; they are, in other words, the partswhole the objective is the whole. Opposite each procedure are Criteriawhich give the acceptable standard for how well the procedure is to bederv..

This course outline can be used by both students and instructors. Studentswill find 11 helpful in directing their studies and practice, and as aguide to accepted standards. Instructors can use the outline as a lessonplan. Some modifications to the performance objectives may be necessarybecause of training program restrictions such as money, space and equipment.However, any modifications should retain the interil of the orobjective and have criteria of equal standards.

Page 6: Drywall Finishing Apprenticeship. Course Outline (C-6)

FOR

WA

RD

The Drywall Finishing Apprenticeship Course Outline is

issued by the Ministry of Labour for apprenticeship

training classes.

Apprentices attend these classes in

accordance with the regulations of the Apprenticeship

and Training Development Act.

The outline was prepared

by Gerald Lengert, a drywall finishing instructor at

Pacific Vocational Institute.

Mr. Lengert was advised

and assisted by the Drywall Finishing Trade Advisory

Committee, a body which consists of representatives

from both labour and management, and the outline has

been approved by the commiltee.

Page 7: Drywall Finishing Apprenticeship. Course Outline (C-6)

CONTENTS

TRACK 1: EST I MAT I NG

SKILL I: INTERPRET PLOT PLAN DRAWINGS . . . . . . . . .......... 32: INTERPRET PLAN DRAWINGS . . . 4

3: INTERPRET ELEVATION DRAWINGS 64 INTERPRET DETAIL AND SECTION DRAWINGS 7

5: INTERPRET FINISH SCHEDULE 0 86: INTERPRET ARCHITECT'S SPECIFICATIONS 10

7: CALCULATE MATERIALS . . . II -

TRACK 2: JOB INSPECTION

SKII/ I: DETERMINE FINISH REQUIREMENTS .... ......2: DETERMINE EQUIPMENT REQUIRED3: STORE MATERIAL . . . ........ . . .

4: CHECK TEMPERATURE AND HUMIDITY .

5: CREATE PROPER DRYING CONDITIONS6: RECOGNIZE PROPERLY PREPARED SURFACES 0

7: COVER AREAS TO BE PROTECTED . . . . . . .

8: SEAL FOR STAINS WHEN NECESSARY 0

9: MAKE MINOR CORRECTIONS AND PRE-FILL . . .

10: PERFORM FINAL INSPECTION

TRACK 3 SAFETY

SKILL 1: ICCNTIFY THE ROLE OF THE WORKERS' COMPENSATION BOARD 33

2: MAINTAIN STILTS . . . 34

3: PREPARE SCAFFOLDS 35

4: WORK ON ELEVATED FLOOR LEVELS . . . . . . . . 38

5: CLEAN FLOORS 40

6: TAKE PRECAUTIONS WITH ELECTRICAL EQUIPMENT . . . . . . . . 41

7: IDENTIFY ANO CARE FOR SAFETY EQUIPMENT 43

8: USE LIFTING TECHNIQUES 44

9: PERFORM TASKS USING PRINCIPLES OF BIOMECHANICS 46

10: ADMINISTER SURVIVAL FIRST AID . . . 47

11: CLEAN UP AFTER THE JOB 0 48

12: USE TRADE TERMINOLOGY 49

TRACK : APPLY I NG BEAD

SKILL I: IDENTIFY CORNER BEADS 53

2: IDENTIFY EDGE TRIMS 54

3: SELECT BEADS ;ND TRIMS . . 55

4: MEASURE AND CUT BEADS AND TRIMS ........ . . . . . 57

5: ATTACH BEADS AND TRIMS TO VERTICAL AND HORIZOHTAL CORNERS 58

6: ATTACH BEADS AND TRIMS AROUND OPENINGS AND OUTSIDE MITRES . . . 6C7: PLUMB AND LEVEL READS AND TRIMS . 61

7

Page 8: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 5: FILLING COMPOUNDS

SKILL I: SELECT FILIING COMPOUNDS2: IDENTIFY COMPATIBLE COMPOUNDS3: IDENTIFY FILLER PROBLEMS1: ESTABLISH mIXING AREA'): tlIX FILLER BY HAND OR MACHINE

TRACK 6: TAPING

SKILL I: SELECT APPROPRIATE TAPE2: HAND TAPE (DRY TAPE OR BUTTER METHOD). . 0

3: APPLY TAPE BY HOPPER METHODS4: APPLY TAPE BY MACHINE5: TAPE DEFICIENCIES6: WIPE FLATS AND BUTT JOINTS7: WIPE ANGLES8: WIPE THREE-WAYS AND BOTTOM ANGLES

TRACK 7: FILLING

SKILL I: FELL FASTENERS . .

2: FILL BEAn

3: FILL BUTTS, HEADERS, FLATS4: INSPECT FILLING FOR DRYNESS BETWEEN COATS5: FILL ANGLES6: SAND SURFACES . . . . .

65

6869

70

. 71

75

76

77

. 7880

82

83

0 84

8788

. . 89

. . . . . . . . . . . . 90

91

92

... 9598

100

. . 0 . . . . . 101

102

. . . ......... 103

105

TRACK 8: TEXTURING

SKILL 1: SELECT TEXTURE MATERIALS2: PREPARE SURFACE FOR TEXTURE .

3: LAY OUT A TEXTURED PATTERN4: SEAL SURFACE . .......5: MIX COLOUREC TEXTURES6: APPLY TEXTURE BY MACHINE ...... . . . .

7: APPLY TEXTURES BY HAND

TRACK 9: MAKING REPAIRS AND CORRECTIONS

SKILL I: MAKE ON-THE-SPOT CORRECTIONS TO IMPERFECTIONS 109

2: MAKE DRYWALL PATCHES . . . 110

3: KEY SURFACES III

4: MAKE REPAIRS TO FINISHED DRYWALL SURFACES 112

5: MAKE REPAIRS TO FINISHED PLASTER SURFACES 115

6: REPAIR DAMAGED TEXTURES 116

Page 9: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 10: MAINTAINING EQUIPMENT

SKILL I: MAINTAIN PERSONAL HAND TOOLS 119

2: MAINTAIN TAPING AND FILLING MACHINES 121

3: PERFORM PREVENTIVE MAINTENANCE ON TEXTURE ANDMASKING EOUIPMENT 122

4: PERFORM PREVENTIVE MAI/TENANCE ON AIRLESS PAINT EQUIPMENT 123

TRACK 11: JOB ECONOMICS

SKILL I: ORGANIZE EQUIPMENT 127

?: ORGANIZE SYSTEM FOR WORKING 128

1: IDENTIFY COST-EFFICIENT USE OF MATERIALS 129

Page 10: Drywall Finishing Apprenticeship. Course Outline (C-6)

Track 1Estimating

Page 11: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK I

ESTIMATING

SKILL I: INTERPRET PLOT PLAN DRAWINGS

PirflRMANCE OBJECTIVE: The apprentice will correctly determine theI. :lion of the worksite giver, a plot plan.

0.11CMURES

r-Pti.,'. b-tw.en r,lot pionI ri it ,...ir,(1.

Locate a specific building andunit by using directionalsyrtels on plan.

CRITERIA

. Thc pl,)1 plan show location o4building 06 1 lot ant the lona]description of land.

. The plan drawing shows the horizontalcross section of a building, givingthe layout of the floor, joists,rafters, etc,

. Use the indicating arrow to determinethe points of the compass.

. Find a designated building by usingletter, number or name of building.

. Relate a unit to the nearest visiblelandmarks (e.g. entrances, trees,excavations, other buildings).

Page 12: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK

CSTIMATING

e.Fill::: 1NTP°1-T rtAn nmttic-,1

.....,4 r !--ji.sjhr: T'. .. :- r , r i t 7 . . v.. i I I i n f r r r , f ( I ,.)r : 1 tr' !rdwiGgst . 'r , t . :4 i. it.: Tr- ti I. :I 1 :I- ...; II 1 ,r, t r. # 0..! I r .d, ' 1.)!,,.. t - ! f t-t... . ri t,.r. i 1 ! 4 irl, t 1. i. w.

1 qr.,EDUIZES

'-',I..1

I.

4.

'!11,-.t

I.

Z.

3.

,.

5.

CRI TrR I A

, r. , ti 'n f lt.,4 r t I in,...f .bli:;11 in,Idt- oim,.n.ion'..

-f ) room by o.ding 1- ty

:I tlat n.

Identify and name materials,fixiures and equipment fromsymbols on floor plan.

in ii,-.. 0, .:11 I t hr. lid joiltl:

flimn;ioning lines.

Ilnit,. of m.-..r.urment.

"is,,ing dim,,n-,ions as wal. I or

calculated.

interior dimensions for f.ach roomate recorded.

indicate all Ow following:

Stundard achilectural methodf..

are id(ntified and named usinglocal consiruclion names.

Opening,. are located and identifiedas doors, windows, arches or accesspanels.

Doors are Identified as swinging,sliding or folding.

Drops and stub walls 3re leeltedand idenlified.

Major appliances, cabinets andplumbing fixtures are located andidenlified.

.../Cont'd.

4

12

Page 13: Drywall Finishing Apprenticeship. Course Outline (C-6)

N.-(

TRACK I

ESTIMATING

SKILL 2: INTERPRET PLAN DRAWINGS (Cont'd)

PROCEDURES

Identify location of all drywallirims from drawings.

Locate all installationsrelated to other trades(plumbing, heating, electrical,insui1J-Ion).

CRITERIA

Must indicate all the following:

1. 2400 mm exterior corners.

2. Drops.

3. Corners where drywall meet s otherwall surfaces.

4. Shower stalls.

5. Stairs.

6. Windows, doors and other openings.

Must indicate all the following.

. Electrical outlets - 110 & 220 V,switches, fight fixtures (incandes-cent, fluorescent).

2. Heating ducts and cold-air returns.

3. Insulation.

4. Rough plumbing.

5. Telephone.

6, Doorbell.

7. Cable T.V.

5 13

Page 14: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 1

ESTIMATING

SKILL INTERPRET ELEVATION DRAWINGS

rcrt:ww,Ncr OisJECTIVE: The apprentice will read elevation drawings toand exterior features of a building.17timi=10 Ow des-Ign, floor levels,

PROCEDURES CRITERIA

I. Symbols will be identified and namedwith construction material names with70% accuracy.

I. All dimensions to be read, calculatedor scaled with 100% accuracy.

2. Floor levels to be indicated by theirrelative position to the ground levelfloor.

Building must be indicoled a:.> one of eachof the following:

I.. Single family unit, multiple family(swelling or commercial.

2. Slab, crawl space, besemefit, spiiilevel.

3. Wood frame, steel stud, concrete,cement block.

I, Must be identified as one of tnefollowing:. double-hung, horizontalsliding, casement, awning, fixedsash.

2. Size of window aid location in waildetermined with 100% accuracy.

I. Must be identified as one of thefollowing: flush or panel, with orwithout lites.

2. Door schedule must be consultedfor further information regardingdimension, left hand or right hand,and method of opening.

rtoutify 1,-hitocts symbols and(1.11.,.. th. mit,irills they repre-w,nt,

P. iormine floor love's and theirr. Ittions,hip 10 other levels

Ind to Tack,.

l&ntify lyre of construction.

Identify -types of windows andlocation in wail.

Idonlify rype.- of doors.

6 14

1

Page 15: Drywall Finishing Apprenticeship. Course Outline (C-6)

A

i

TRACK I

ESTIMAT1NO

SKIii 4: INTERPRET DCTAIL AND SECTION DRAWINGS

PMRMANCE OBJECTIVE: Using referencing procedures, the apnrentice willin a set of working drawings, and

framing materials, trim materials.

Ioc..i1 detail and section drawingsextrIct specific information regarding

PROCEDURES CRITERIA

I

Iduntify reference procedures.

Describe texture, pattern andtrim of a given wall from detaildrawing.

Describe framing material andtype of wallboard and trimsused, from a section drawing.

1. Cutting lines indicate what sectiondrawing will show.

2. Architect may use symbol withletters and numbers.

3. Abbreviations may be used, to referto specs.

4. All pages of a set of workingdrawings are numbered for easyreference.

Must be indicated as one of following:

I. Machine or hand applied.

2. Free hand or specific pattern.

3. Hard, soft, self-priming material.

Must include the following information:

1. - steel or wood stud- bearing or non-bearing wall- fire-rated or regular wallboard- thickness of wallboard- laminations or single ply- corner bead or edge trim- insulated or non insulated- sound rated or non sound rated.

.

715

Page 16: Drywall Finishing Apprenticeship. Course Outline (C-6)

s3

4

TRACK I

ESTIMATING

SKILL INTERPRET FINISH SCHEDULE

PERFORMANCE OBJECTIVE: The apprentice t, i 1 I locate and correctlyidentity the final decoralion of all waII-7, to be worked on.

PROCEDURES

ovate finish schedule.

Match names of rooms on finishschedule to locations on blue-prints.

CR1TE3IA

. Finish schedule is either a pageof the drawings, or a separatepublication.

2. Finish schedule is found at one ofthe following:

- on site in general contractor'soffice

- drywall contractor's office,foreman or supervisor

- architect's office.

Must locate and identify all of thefollowing:

- vestibule- family room- ensuite- garage- carport- nook- etc.

.../Cont'd.

816

Page 17: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK I

ESTIMATING

SKILL 5: INTERPRET FINISH SCHEDULE (Cont.'d.)

PROCEDURES

Identify paint finishes, wallcoverings and textures fromfiAish schedule,

CRITERIA

Must be identified a8 one of thefollowing:

1. Paint: flat, semi-gloss, high-gloss.

2, Wallcoverings: fabric, foil, paper,vloyl, wail panelling.

3. Texture:

slyed. orange f.Ael

splatterknock downroughself-priming,

- hand applied: trowelbroomstipple.

9

17

Page 18: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK I

ESTIMATING

6: INTERPRET ARCHITECT'S SPECIF1CUIONS

FIRIOWANCE OBJECTIVE: The Jpprontice wiil determire the requIred,end any wIrk restrictions from architect's Lpecifications.

PROCFOURES

1Vo P C4A of specs. statehLa.lif;, pa9e numbers for4rywall information.

discrqpancies betweenwrittc:n 5C0(0. and National6014ing Code.

Idenlily types of infcmationfound in general specs.

Identify other specificationsthah of foci drywall finishing.

CRITERIA

. Must locate all information pertain-ing to drywall installation andfinishing.

. Written specs. must conform toNational Building Code Regulations.

I. Legal liabilities, bonding, su-trades, work responsibilities, etc.

Must indicate all of the following:

I. C.M.H.C.

2. Local municipal standards.

3. Master Painters Associalicn.

4. B.C. Wall and Ceiling Standards.

IO 18

Page 19: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 1

ESTIMATING

SKILL 7: CALCULATE MATERIALS

rrRrORMANCE OBJECTIVE: The apprentice will calculate and itemize wall-br.21-1 types and sizes, trim and finishing materials by rules of thumb.

PROCEDURES CRITERIA

"ak.- up order sheet. 1. All lengths of wallboard are clearlynoted.

rk,aure walls for common board 1. 2400, 3000, 3600 nm lengths used toleneths. minimize number of joints.

2. Thicknesses of 12.7 or 15.5 mmspecified.

Determine placement of joints. 1. No joints above or Mow openings;if joint is necessary, should be30 cm from corner of opening.

2, Butt joints located at ends of wallswhen possible.

3. Walls less than 1200 mm long shouldhave no joints.

Calculate area of walls and Area calculated using following formulas:ceilings using rules of thumb.

I. Level entry: floor area x 3.5.

2. Cathedral entry: floor area x 4.

Calculate area of walls andceilings using board count.

I. Total number of boards of same lengthx length x 4.

2. Add up total areas of 2400, 3000 and3600 mm lengths.

.../Contld

11 19

Page 20: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 1

ESTIMATING

SKILL 7: CALCULATE MATERIALS (Cilei',1)

WoCt-DUR_ S__",a,nre :nd ,:at,)gorize trims

1) n._,Irc,si mawitactured length.

CalcuLtu finishing materialsby rukr, of thumb.

CRITERIA

Trims to b.? listed as follows:

I. Corner bead, metal,paper, screen,veneer:2100, 2400, 3000 mm.

2. L edge trin: 2100, 2400, 3000 mm.

3. J edge trim: 2100, 2400, 3000 mm.

4. Nastic J -i rim: 3000 mm.

1. 2 bags of taping filler per 100 m2.

2.1 bag 3f Topping filler per 100 P-2.

3. 110 m of tape per 100 m2.

4. 1 box of premix taping filler per100 m2.

5. 1 box of premix topping filler per100 m2.

6. 2 bags or I box of premix per 30 mof bead.

7. 5 L of paint per 30 m2.

8. -oft texiures - 1 bag per 25 m2.

9. hard textures - 1 bag per 40 m2.

20

Page 21: Drywall Finishing Apprenticeship. Course Outline (C-6)

Track 2Job Inspection

21

Page 22: Drywall Finishing Apprenticeship. Course Outline (C-6)

4

TRACK 2

JOB INSPECTION

SKILL I: DETERMINE FINISH REQUIREMENTS

PERFORMANCE OBJECTIVE: Frnm -the finish schedule, the apprentice willthe characterist:cs of decorative materials and the amount of

finishing required.

PROCEDURES

Defermin characteristics ofthe final decorative materialsas described in finish schedule.

State "rules of thumb" todetermine finishing workrequired before applicationof final decoration.

CRITERIA

Must identify all of the following:

1. Thickness of material (e.g. paint,wallpaper, etc.).

2. Colour of material (e.g. light ordark).

3. Texture of material (smooth, roughor high reflectance).

Must identify all of the following:

I. The thinner the decoration material,the flatter and more blemish freethe finished wall must be.

2. The lighter the colour, the flatterand more blemish free the finishedwall must be.

3. The finer the texture, the flatterand more blemish free the finishedwall must be.

4. Any time adhesive is applied over thfinish the surface should be dustfree (e.g. wall tile adhesive).

15 22

Page 23: Drywall Finishing Apprenticeship. Course Outline (C-6)

F-

TRACK 2

JOB INSPECTION

`,KILL 2: DETERMINE EQUIPMENT REWIRED

PIRFOrMANCE OPJUCTIVE: The apprentice will determine suitable machinerymi equipment required to complete a given job safely and efficiently.

PROCIOURES

1 method of taping.

Choosc method of elevating worksurface.

Determine method of texturingand undercoating.

CRITERIA

. Drytaping is slow but requires fewtools - and is efficient in dreasthat are hard to get at.

. Hopper method is faster than dry-taping but work must be split intotops and bottoms.

. Machine allows all work to be donefrom the floor thus speeding uptaping process.

Stilts are safe up to 600 mm.

2. Baker-type scaffolds good up to 2 m.

3. Rolling tower can be jointed forheights above 2 m.

. Sa... horses and planks can be used

but lime is spent moving and settingup.

5. Ladders can be used if a small areaat height over 2.4 m to 5o reached.

. Hand-held hopper good for areas under300 m2.

. Hand-held hopper best for orange-peeland splatter type finish.

. Rota - stator pump best for aggregate

type textures over 300 m2.

Paint roller best for 300 m2 andunder.

5. Airless paint machine good for areasover 300 m2.

16 23

Page 24: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 2

JOB INSPECTION

SKILL 2: DETERMINE EQUIPMENT REQUIRED (Cont'd).

PROCEDURCS

i .

2.

CRITERIA

0,..q(?rmine metnod of filling. Machines speed up work by 50% overhandwork.

Hand filling best for scaffold workand small areas.

17

24

1

I.` IN%

Page 25: Drywall Finishing Apprenticeship. Course Outline (C-6)

MACK 2

JOB INSPECTION

l(111 ,t "'TOPE MATERIAL

t:. 0:Cf- nfiNCTIVE: Tho aprroniko will fore fillers, beads andrqc.il t i r,:', in .:n .-Iro -I whoro fh,--y -s r'' r rntoct, d from damage.

PROCEDURES

Id-hfify care to be taken withtmg,, and boxes of filler.

Store mouldings and beads.

Store filler after if is mixed.

CRITERIA

I. Bags of filler and wallboard shouldbe raised from concrete floor.

2. Away from high traffic areas.

3. As near as possible to where they willbe used.

4. Away from damp areas,

5, Pre-mix fillers should not be frozen.

. Beads should be stored horizontal in

dry area away from traffic areas andin original containers when possible.

. Pails of mixed fillers should bewashed down and covered with 2 to 3cm of water to prevent drying outovern i ght.

. Fast sets should never be left In apail overnight.

I';

25

Page 26: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 2

JOB !NSPECTION

SKILL 4: CHECK TEMPERATURE AND HUMIDITY

PERFORMANCE OBJECTIVE: The apprentice will cneck that the temperatureusing instruments and rule of thumband humidity is suitable for working

methods.

PROCEDURES CRITERIA

Determine mom temperature.

Determine relative humidity ofair in room.

Determine moisture content ofwood and gypsum wallboard

Identify the minimum require-ments of temperature andhumidity either by instrumentor rule of thumb.

1. To nearest degree Celsius usingthermometer.

I. To nearest percent using slingpsychrometer.

1. To nearest percent using woodmoisture meter or one calibratedfor gypsum wallboard.

I. Minimum temperature: I2oC.

Maximum moisture content of board:14%.

2. Rule of thumb for unacceptabletemperature and moisture conditions:

- board feels damp and cold- surface paper is soft- you can see your breath- water standing on floors of

building.

19 26

Page 27: Drywall Finishing Apprenticeship. Course Outline (C-6)

I

TRACK 2

JOB INSPECTION

SKILL 5: CREATE PROPER DRYING CONDITIONS

PERFORMANCE OBJECTIVE: The apprentice will create and maintain properfrying conditions according to the manufacturer's recoi-lendalions so thatfiller will dry in 24 h.

PROCEDURES

Create and maintain propertemperature, using thermo-statically controlled heatingsystem.

Create and maintain properhumidity.

Create 'nd maintain properventilation.

Create proper moisture contentof wallboard.

CRITERIA

I. Minimum temperature for slow settingwterials 13°C.

L. Minimum temperature for fast settingmaterials rt.

1. Minimum relative humidity 30%. (Set

Drying Chart).

2. Water spread on floor to increaserelative humidity if below 30%.

3. Heat and ventilation decreaserelative humidity when greater than30%.

. 2 openings required to ventilate

building.

. Size of opening relative to size ofarea to be ventilated.

. Cold air returns for forced airheating must be open for circulation.

Recommended maximum moisture contentof wallboard is 14%.

Heat and ventilation will decreasemoisture content of wallboard.

. High humidity and low temperatureand poor ventilation increasemoisture content of wallboard.

20

27

Page 28: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 2

JOB INSPECTION

SK! !. 6: RECOGNIZE PROPERLY PREPARED SURFACES

PCRFORmANCE OBJECTIVE: The apprentice will visually check ihdi sur.acesand beads and mouldings for proper preparation for 1-.111.0g an0 identifyall deficiencies.

PROCEDURES

Identify deficiencies incondition of board.

Identify deficiencies ininstallation of board.

CRITERIA

I. Crumbly edges.

2. Air pockets in core.

3. Face paper should be clean andsmooth.

4. Little or no tapered edge.

5. Edge of taper not 900.

6. High shoulder on tapered edge.

I. Board should be on tight so that whenstruck it does not rattle.

2. Fasteners must not be above surfaceof board.

3. Screws should .be 300 mm o.c.Single nails 180 mm o.c. on ceiling,200 mm on wall; double nails, nails50 mm apart - 300 mm o.c.

4. Face of board should be showing.

5. Broken pieces of board larger than150 mm i diameter should be cut toframing member and larger piecesinstalled.

6. All boards called for in plans shouldbe installed.

. Maximum lap between boards - 5 mm.

.../Conted

21

29

Page 29: Drywall Finishing Apprenticeship. Course Outline (C-6)

IRACK 2

JOU INSPECTION

SKILL (,: RECOGNIZE PROPERLY PRCPARE0 SURFACES (Coni'd)

w)CEDURES

I.

CRITERIA

Identif. !..ficioncies ih 011:-,4: Walls should be free o waves ininO -:t ,i,ranc J. of w4:11. ,Airfacc due to framing members.

2. Walls should be plumb within 6 mmin 2400 mm.

3. No plumbing or electrical pipes inplane of surface of studs.

Identify deficiencies in to Maximum depth of fill should be 6 mmapplication of beads andmouldings.

2.

for siowsetting fillers.

Beads should be on tight with nowaves in flange.

3. Joints in bead should be tight.

4. Joined beads should be in same plane.

5. Finishing edge should be straight.

6. Finishing edge should not be damaged.

Ensure that other trades have I. House must have the followingfinished their work. inspection slips posted:

- electrical- framing- plumbing- insulation- drywall installation (if required

by municipality).

2. On commercial and large residentialsites check the following:

rooms have light switches at1200 mm mark

- residential sites have convenienceoutlets every 2000 mm

- aii boxes have wireb running tothem

- sink,, have 2 copper pipes and 1

plastic drain

- cement floors should be finished

.../Cont'd.

29

Page 30: Drywall Finishing Apprenticeship. Course Outline (C-6)

1RACK 2

JOB INSPICTtON

SKILL 6: RECOGNIZE PROPERLY PREPARED SURFACES (Cont'd)

PROCEDURES CRITERIA

Ensure that other trades havefinished their work. (Cont'd)

- steps should be in place and sturdy

- dryer vents should be installed inlaundry area

- window and door openings are closedor Covered.

2330

Page 31: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 2

JOB INSPECTION

ISKILL 7: COVER AREAS TO BE PROTECTED

PERFORMANCE OBJECTIVE: The apprentice will choose an economical anduniciont way lo mask an area. The apprentice will apply the maskingmIN.ftrill, ensuring that no damage to walls results from the method ofIpplic-ilion, frclm insufficient fastening which allows drywall finishingmatri31 1'0 !elk throuoll, or from the removal of the material.

PROCEDURES CRITERIA

%I.-rAc with masking tape. i. Masking tape should not be used onwet or dusty surfaces.

2. Masking tape should not be appliedto paint that is soft or recentlyapplied.

3. Masking tape is used where detailmasking is necessary.

4. Masking tape must be removed as soonas work is completed.

. Masking tape does not have to bepressed tightly in place for the fullwidth of tape.

. Masking tape should be pulled off sothat it does no damage to surface.

7. Masking tape should not be put onpaper surface of wallboard.

8. On photo finish panelling maskingtape must be applied very lightly.

Mask with maskina machine. I. At least half the width of tapeshould be available for stickingto surface.

2. Paper should be taped down incorners if airless paint machineis used.

3. Paper should be placed as close toangle as possible.

4. Paper cannot be reused.

5. If paper is used without plastic,windows ehould be protected.

. ./Con d

24 3.1

Page 32: Drywall Finishing Apprenticeship. Course Outline (C-6)

I

1

TRACK 2

JOB INSPECTION

SKILL 7: COVER AREAS TO BE PROTECTED (Cont'd)

PROCEDURES CRITERIA

Mask with plastic.

Protect floors.

I. 0,05 an plastic is sufficient,

2. If stapled on, staples should beplaced I m apart and plastic shouldbe folded.

3. If taped, piece of tape should beat least 15 cm long to provide asolid bond.

4. Plastic should be hung so doorwayscan be passed through.

5. Plastic can be reused.

1. 0.05 mm plastic is sufficient if itIs short time protection.

2. if the area has a lot of traffic,heavy plastic or a tarp should beused.

3. When texturing or spraying paint,

plastic on floors should be sealedto walls to prevent overspray.

.

25 32

Page 33: Drywall Finishing Apprenticeship. Course Outline (C-6)

II

rAt ior wHin NECARY

rOfC11VV: Th.r pr-ntie_- will con;? ani apply an117) Iv-7), The eniir,! yhin mu51 bc

' tt.0 )!..r t)b. 111rvt.! to 4ry comp1001,/ beforc. arplyirp.fili.r, 114 r ieture.

PROCEDURES

1,:o0ify rusting and potentialrijt aribas.

Identify stains which willblec4 throuoh.

Choose seal for prewent!ngbleeding through.

Apply seal.

CRITERIA

Rust creates red brown spots on metal.

. Caused by moisture on uncoatedfastener.

Screws and concrete nails used tofasten hoard. May rust with highhumidity areas in basements.

Metal rebar exposed in concreteceilings.

Must identify all of the following:

- coffee- tea- blood- red pencil

- chalk- ink- felt pen- food.

. Concrete seal should be used onconcrete.

. Lacquer or varathane for stains onwallboard.

Eniire stain is covered.

. Sealer is applied in thin layersfor faster drying.

Sufficient time is allowed for sealto dry before filler paint or textureis applied.

Equipment must be cleanedur,ing appropriaie solvent.

Page 34: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 2

JOB INSPECTION

SKILL 9: MAKE MINOR CORRECTIONS AND PRE-FILL

PERFORMANCE OBJECTIVE: The apprentice will fasten loose boards, removea surface for taping.loose materials and pre-fill to prepare

PROCEDURES CRITERIA

Fasten loose boards.

Remove loose material.

Pre-fill joints.

I. Criteria for the task "Recognizeproperly prepared surface" must bemet.

2. Nails should be used on wood studs.

3. No fasteners within 6 mm of edge ofboard.

4. Screws and screw gun should be usedon steel studs.

S. Drive in any nails above surface ofboard with wallboard hammer.

6. Drive in any screws above surfaceof board with phillips screwdriver.

I. All loose paper, insulation, plasticin joints should be removed.

2. Broken board should be cut out.

I. if taping is to be done within 24hours,fast set should be used topre-fill.

2. If a slow setting filler is to beused it must be hard before tapesare applied.

3. Any joints wider than 5 mm should bepre-filled.

4. Uneven joinis should be pre-filledto level them.

27 34

Page 35: Drywall Finishing Apprenticeship. Course Outline (C-6)

J''.. l'rl'il,11,.)11

A.Ilt l ^: PFRFORM rink, INSPECTION

iI:,t '-',:!,I 0!.II-CTIVE: The apprent' will examint; finished work fora 200 watt bulb, by the feel of handof inspection will be determined by

, ,--,I.', --, J.! imp,lrfections with, vi iti in,p,ovn, The methodtinii N,... rlti,)n.

MOO-DORN CRITERIA

If1.4-04:; surface preparation for

suitability of reflective paintfinish (egg-shell, semi-gloss,high-gloss).

Inspect for flat paint finishes.

I . Bulb should be held so that lightwill shine at right angles tosurface of filled area.

2. No scratches or ridges should show0.5 mm tolerance.

3. 150-200 watt bulb used.

. Wide fills, fills around joinedbeads or any areas that arequestionable should be checked,

5. Beads should be full and blond intowall surface.

6. See criteria for flat finishes.

I. Joints, butts can be out 3mm in 1200.

2. Beads must be full up to 30 cm fromfinishing edge.

3. Paper should not be torn or oversanded.

4. Jclnts should look straighi andparallel.

5. No metal or tape should show throughfiller. ---

6. No scratches, ridges (1 mm) or waves.

7. All edges should be feathered andsanded.

.../Coni'd..

35

Page 36: Drywall Finishing Apprenticeship. Course Outline (C-6)

q

TRACK 2

JOG INSPECTION

SKILL 10.. PERFORM FINAL INSPECTION (Conttd)

In'..ptct

PROCEDURES CRITERIA

for completion of work. I . Masking materials should be removed.

2. Any surfaces covered with drywallmaterial should be cleaned.

, Floors should be scraped and swept.

4. Finishing edge of edge mouldings andbeads should be clean.

5. All tapes have been coated.

7')36

Page 37: Drywall Finishing Apprenticeship. Course Outline (C-6)

Track 3Safety.

37

Page 38: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

SKILL 1: IDENTIFY THE ROLE OF THE WORKERS' COMPENSATION BOARD

PERFORMANCE OBJECTIVE: The apprentice will identify the role of theinjury claim procedures and all thefinishers.

Workers' Compensation Board, theregulations that apply to drywall

PROCEDURES CRITERIA

Explain role of Workers' I. Provides benefits for injured workersCompensation Board.

2. Inspects for safety.

Identify procedures for making I. Claims can be made for on-jobclaims for injuries. injuries.

2. Claims can be made for some off-jobinjuries through criminal injury.

3. Accidents should be reported within24 hours.

4. Claims must be made within one year.

Identify specific Workers'Compensation Board regulationsthat apply to drywall finishers.

1. Sections: 2, 4, 6, 12, 13, 14, 19,

20, 30, 32, 35 and 78.

Appendices: A, C, K, L.

Tables: 2, 4 and 7.

3338

Page 39: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

SKILL 2: MAINTAIN STILTS

PERFORMANCE OBJECTIVE: The apprentice will assemble a pair of stiltsbefore using them.and perform a safety check on them

PROCEDURES CRITERIA

Assemble stilts.

Perform safety check.

Adjust stilts.

I. Follow instructions supplied bymanufacturer.

2. Lock all nuts.

I. Check straps, nuts and bolts beforeeach use.

2. Check that rubber foot pads aresecure.

3. Grease moving parts on stilts.

I. Springs adjusted until It feels likenatural foot action.

2. foot adaptors set to match foot size.

3. Leg supports adjusted so strap passesjust below the knee.

4. Ankle should line up'with leg supportfor centering foot on stilts.

3439

Page 40: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

SKILL 3: PREPARE SCAFFOLDS

PERFORMANCE OBJECTIVE: The apprentice will construct a safe scaffoldingloads to a lifting device and move suchadhering to W.C.B. regulations, tie

a system safely.

PROCEDURES CRITERIA

Identify types of scaffolding.

Identify safe height of workfloor for scaffolds.

.

Identify safe construction offramework.

Must identify all of the following:

I. Rolling tower.

2. Baker type.

3. Temporary stairwell ncaffolding.

1. 3 x min. base dimension for safeheight. Workers should not remainon scaffold while it is moved.

2. 2 x min. base dimension worker mayremain on scaffold while it ismoved.

3. If x min. base dimension worker maymove scaffold himself and remain onscaffold.

I. No weakened supports due to rust,bends or broken welds.

2. Safety braces are secured in place.

3. Framework is not twisted due touneven floor.

4. Brakes on all wheels lock.

5. Guardrails must be used on allscaffolds 3 m or more above grade.

6. Top rail of guardrail shall beapproximately 1.07 cm above floorlevel.

..,/Cont'd.

35 40

Page 41: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

SKILL 3: PREPARE SCAFFOLDS (Cont'd)

PROCEDURES

Identify safe working floor.

Use safe methods of construction.

CRITERIA

. Minimum of 2 planks for a floor.

. 38 x 255 mm is minimum plankdimension.

. No less than 15 cm and no more than30 cm overhang on planks.

. Planks should be free of knots orcracks.

Toe boards should be 10 cm in heightabove the work platform and shall nothave more than 13 mm gap betweentheir tower edges and the work plat-form.

. Wooden scaffolds must have minimum38 x 89 mm supports that are crossbraced and securely nailed.

. Hard hat should be worn when there isa danger of falling objects.

. Consideration of safety of partnershown throughout construction ofscaffold.

. Scaffold must be built on solid levelfloor.

. Scaffold must be built so as not tocontact energized electrical wires.

. Scaffold must be built so that peopleconstructing it are protected fromfalling.

.../Contld.

36

Page 42: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

SKILL 3: PREPARE SCAFFOLDS (Cont'd)

PROCEDURES

Move scaffolding.

CRITERIA

I. Ensure that the scaffolding is safeheight for moving.

2. Ensure that all the scaffold wheelsare unlocked.

3. Check the floor for any obstructionsor holes.

4. Inform the people on the scaffold thatit is going to be moved.

5. Be aware of any overhead obstructions.

6. Make sure materials and equipment onwork floor are secure.

37 42

Page 43: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

SKILL 4: WORK ON ELEVATED FLOOR LEVELS

M./

PERFORMANCE OBJECTIVE: Given an elevated floor level to work on, theapprentice will identify and practice safe working habits.

PROCEDURES

Work on stilts.

Work on scaffold.'

CRITERIA

Must check for the following:

1. See Criteria for Maintaining Stilts.

2. Floors:

- electrical conduit- wet filler- paper- wire- holes- rooks- water- unstable surface- stairs.

3. Ceilings:

- height less than 2400 mm- drops and archways- unusual projections- electrical wires.

4. Safety railings at suitable height.

5. Heavy weights are not lifted while onstilts.

I. Maintain communication with otherpeople on work floor.

2. Be in a stable position when scaffoldis moved.

3. Keep work floor free of wet filler.

4. Avoid exerting excess!ve horizontalforces.

.../Conttd.

38 43

G.

Page 44: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

SKILL 4: WORK ON ELEVATED FLOOR LEVELS (Conttd).....

PROCEDURES

Work .on scaffold (cont'd).

Work on ladder.

Tie knots for lifting material.

CRITERIA

S. Do not use stilts, sawhorses orladders, etc. to elevate work floor.

6. Make sure safety railings and toeboards are in place.

7. Use rope and pulley to lift material.

8. Keep floor uncluttered.

I. Base of ladder 30 mm away from wallfor every 1200 mm vertical.

2. Do not stand on top rung.

3. Work with base of ladder secured.

4. Do what can be easily reached fromladder.

5. Extension ladders should have a 910 mmoverlap.

6. Wooden ladders should not be painted.

7. Top and bottom of ladder must beInsulated.

. Must use standard knots.

See that knots are secure beforelifting.

. Method of tying will support loadsafely.

39 44

Page 45: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

SKILL 5: CLEAN FLOORS

PERFORMANCE OBJECTIVE: The apprentice will clean floors using adispose of the waste safely.floor scraper and a broom and will

-PROCEDURES CRITERIA.

Scrape filler off floor. 1. Stiff blade floor scraper should beused.

2. All lumps should be scraped to leaveflat smooth surface.

3. On finished floors water should beused to soften material beforeremoving it.

4. Wet filler should be removed at thetime it is dropped.

Sweep floor. 1. Approved mask should be worn.

2. Vacuum cleaner is not acceptable.

3. All loose materials should beremoved.

Dispose of waste material. I. In bins on Job site.

2. In garbage chute.

3. Waste containing asbestos must besealed in plastic bags.

4. In back-fill area (with priorapproval).

J.4.

40

45

Page 46: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

SKILL 6: TAKE PRECAUTIONS WITH ELECTRICAL EQUIPMENT

PERFORMANCE OBJECTIVE: The apprentice will take appropriate precautionsand prevent an electrical shock:to ground electrical equipment

PROCEDURES CRITERIA

Identify grounded tools. Must have the following:

1. Plastic bodies or three-prong plugs.

2. Airless paint hoses must have groundwire.

Repair grounded tools. 1. Replace plugs with green wire toground.

2. Use ground adapter (when no groundedoutlet is available).

3. All connections must be tight.

Identify working procedures to I. Work area should be dry.prevent electrical shock.

2. Proper footwear with no holes shouldbe worn.

3. Drill should never be left standingin a pail of water.

4. Insulate or de-energize bare livewires.

5. Metal ladders must have non-conductinmaterials at either end.

6. Hard hats should be W.C.B. approvedfor protection against electricalshock.

'7. Electrical cords should not be incontact with water.

. Wet filler should not contactenergized wires when filling.

.../Cont'd

4146

Page 47: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

SKILL 6: TAKE PRECAUTIONS WITH ELECTRICAL EQUIPMENT (Cont'd)

PROCEDURES CRITERIA

Identify faulty equipment. Must inspect for all of the following:

I. Broken cases.

2. Sticky switches.

3. Missing guards.

4. Frayed electrical cords.

5. Broken ground wires.

42

47

Page 48: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

SKILL 7: IDENTIFY AND CARE FOR SAFETY EQUIPMENT

PERFORMANCE OBJECTIVE: The apprentice will wear appropriate clothing andbe kept clean and white. Safety equipment

necessary.

safety equipment. Clothing mustmust be maintained or replaced when

PROCEDURES CRITERIA

Wear protective clothing.

Wear safety equipment when

appropriate to specific tasks.

1. Work clothes should be worn on joband a change of clothes should behad for wearing home.

2. Clothes should be washed regularlyto remain white.

3. Dusty clothes should be taken homein container.

4. Hat should be worn white sanding.

t. Approved mask should be worn wheneverdust or paint mists are present.

2. Hard hat should be worn on or offjobsite or when people working above.

3. Goggles or glasses worn when sandingoverhead.

4. Mask filters should be cleaned whenbreathing becomes difficult.

5. Mask should be N.1.O.S.H. or M.E.S.A.approved for pneumoconiosis producingdusts.

6. Mask must be sealed to face.

4348

Page 49: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

SKILL 8: USE LIFTING TECHNIQUES

PERFORMANCE OBJECTIVE: The apprentice will lift drywall materialsprocedures.safely according to W.C.B. recommended

PROCEDURES CRITERIA

Identify safety procedures forlifting.

Identify safe conditions forlifting.

Identify correct methods ofmoving filler pails (individu-ally and in pairs).

Carry filler.

Must do all the following:

I. Use Palmer Grip.

2. Keep object close to body.

3. Keep back straight.

4. Tuck chin into chest.

5. Lift with legs.

1. Good footing.

2. Never lift pails of filler whenwearing stilts.

3. Use machine to lift whenever possible

4. Use rope and pulley for lifting toscaffold.

1. Keep back straight.

2. Carry two pails at a time.

3. Do not completely fill pails.

4. Use a cart when possible.

5. Carry pail of filler with partner.

I. Bags are best carried on shoulderto reduce strain on back.

2. Carry one box of premix at a timeas close to body as possible.

... /Cont'd

44 49

Page 50: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

SKILL 8: USE LIFTING TECHNIQUES (Cont'd).

PROCEDURES

1.

2.

CRITERIA

Carry wallboard. Sheets longer than 3000 mm should becarried by two people.

Should be carried as follows:

- both people on same side of sheetwith same hand on board

- approximately 30 cm from ends iftwo people carry

- board held in center if one personcarries

- board cradled in hand at bottom ofsheet

- board leaned against shoulder.

"5o

,1Mt

Page 51: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

ii

SKILL 9t PERFORM TASKS USING PRINCIPLES OF BIOMECHANICS

PERFORMANCE OBJECTIVE: The apprentice will perform tasks in such away as to prevent damage to joints and muscles.

PROCEDURES CRITERIA

Identify precautions to protectmuscles.

t. Light form of exercise is necessaryas wt -m up.

2. Start working relaxed then after5-10 min. exert more effort.

3. Avoid sudden unguarded motions.

4. Avoid stretching with muscles understress.

Identify precautions to protect I. Vary movements.L

I

shoulder, elbow, wrist and hipjoints.

2. Avoid awkward movements.

3. Avoid over-extension of limbs.

4. Use leverage of tools not body.

46 51

Page 52: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

SKILL 10: ADMINSTER SURVIVAL FIRST AID

PERFORMANCE OBJECTIVE: When injuries occur, the apprentice willfirst aid techniques until properidentify and use correct survival

medical attention arrives.

PROCEDURES CRITERIA

Check for breathing and performresuscitation if necessary.

Stop arterial, venous andcapillary bleeding.

Check for consciousness.

Place person in drainageposition.

Get help.

Criteria found in W.C.B. "SurvivalFirst Aid" course.

47 52

Page 53: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

SKILL II: CLEAN UP AFTER THE JOB

PERFORMANCE OBJECTIVE: The apprentice will clean up personal andcompany tools and the work area each time a job is finished.

PROCEDURES

Clean personal tools at end of

shift.

Clean company tools at end ofshift.

Clean work area in preparationfor painting at end of job.

Remove left-over materials.

CRITERIA

Hand tools should be washed andstored in dry place each day.

Tools should be checked for anydamage and filed each day.

Filler should not be left on metaltools as oxidation may occur.

Exterior of company tools should becleaned so as to maintain a like newappearance each day.

Filler must be removed from allmoving parts.

All hoses should be flushed untilclean each day.

. Floors should be scraped and swept.

. Any filler on window's, brickwork,

doorframes, etc. should be removed.

. Material moved to next job site orback to company warehouse.

48 53

Page 54: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 3

SAFETY

SKILL 12: USE TRADE TERMINOLOGY

PERFORMANCE OBJECTIVE: The apprentice will use the appropriate tradeterminology when discussing equipment or job practices to ensure clearcommunications especially in hazardous situations.

PROCEDURES

Name standard equipment.

Describe standar' drywallfinishing techniques by name.

Give clear directions whenoperaving equipment and movingscaffolding.

CRITERIA

. Must be able to use each term indrywall finishing glossary correctly(see Appendix).

I. Common terms applied to taping,filling and texturing procedures.

Must do the following:

I. Speak in clear,loud voice.

2. Use standard phrases or hand signals.

49 54

Page 55: Drywall Finishing Apprenticeship. Course Outline (C-6)
Page 56: Drywall Finishing Apprenticeship. Course Outline (C-6)

SKILL I: IDENTIFY CORNER BEADS

PERFORMANCE OBJECTIVE: Given a type of corner bead, the apprenticeof application.will name the bead and its methods

PROCEDURES CRITERIA

Identify and name corner beads. Must identify all of the following:

1. Metal corner bead.

2. Paper corner bead.

3. Screen corner bead.

4. Flexible corner bead.

5. Veneer bead..

Identify and name methods of Must identify all of the following:applying corner beads.

I. Mechanical means of fastening formetal beads:

- nails

- screws

- clinching

4

- contact glues,

2. Mechanical fastener for veneer bead

- staple.

3. Adhesives for paper, screen andflexible beads:

- joint f Iler

- taping filler

- or all purpose filler.

..........

Page 57: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 4

APPLYING BEAD

SKILL 2: IDENTIFY EDGE TRIMS

PERFORMANCE OBJECTIVE: Given an edge trim, the apprentice will namethe trim and Its method of attachment.

PROCEDURES

Identify and name edge trims.

Identify and name methods ofapplying trims.

CRITERIA

Must Identify all of the following:

I. Metal J-bead.

2. Plastic J-bead.

3. Metal square nose bead.

4. Expansion Joint bead.

5. Metal L-bead.

I. Must identify the following ascompression fit:

- metal J-bead- plastic J-bead- metal square nose.

2. Must identify the following asmechanical fasteners for metalL-bead and expansion joint bead:

- nails- staples- screws.

p.

54

57

Page 58: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 4

APPLYING BEAD

SKILL 3: SELECT BEADS AND TRIMS

PERFORMANCE OBJECTIVE: Given a job situation, the apprentice willbe used.select the correct bead or trim to

PROCEDURES CRITERIA

Identify when metal bead is to 1. On corners when high speed appli-be used. cation Is required.

2. When you wish to fill immediatelyafter applying bead.

Identify when the use of veneerbead is preferable.

1.

2.

When a corner has to be straightened.

When the corner is subject to heavywear. .

3. When you wish to fill immediatelyafter applying bead.

Identify when the use of screenor paper bead is preferable.

I. When, a corner is subject to heavywear, bumps and knocks.

2. When there is no backing.

3. When tolerances are important.

Identify when the use of flexible 1. On internal or external cornerspaper bead is preferable. greater or less than 90 °.

Identify when finishing trims 1. They are used to finish the roughare used. edge of a wallboard.

2. J-beads are used when there is nobacking for nails or screws. Notethat J-beads are difficult to usewhere there is more than one sheetof board requiring trim.

3. J-metal square nose is used whenfilling is not desired.

4. Plastic J-bead requires no fillingand is used around windows as avapour barrier where wallboardis used as a liner.

.../Cont'd

55 58

Page 59: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 4

APPLYING BEAD

SKILL 3: SELECT BEADS AND TRIMS (Cont'd)

..--PROCEDURES

5.

6.

CRITERIA

Identify when finishing trimsare used. (Cont'd)

Expansion bead is used where smoothfinish of an expansion joint isrequired.

L-bead is used when there is a backingto the boards and where drywall abutsanother finish, e.g., T-bar ceilingor plastic or concrete block wall. It'

is also used when a straight line mustbe maintained.

56 59

t.

Page 60: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 4

APPLYING BEAD

SKILL 4: MEASURE AND CUT BEADS AND TRIMS

PERFORMANCE OBJECTIVE: Given a vertical or horizontal corner, or a roundor rectangular opening, the apprentice will measure bead to the requiredtolerance and cut the bead cleanly.

PROCEDURES

Measure bead and trims.

Cut bead and trims.

CRITERIA

. Tape measure used to measure verticalbeady to 10 mm of height of corner.

. Tape measure used to measure hori-zontal beads to 2 mm of length ofcorner.

Bead for round openings must be exactcircumference of opening.

. Bead may be held up to opening andcut so that bead slides into snugfit In opening.

Horizontal beads in rectangularopenings cut to 2 mm, vertical beads1 mm.

Aircraft snips are the acceptedcutting tool.

. End of cut must be clean and notcurled up or down for flange andfinishing edge.

. Flange of beads for lineal or rightangle interior joints cut at 85° -90°.

. Flange and finishing edge of beadfor outside mitres cut at 45° - 500angle.

. Bead for in-ide curved opening iscut on flange at right angles.

Bead for outside curved opening cuton flange only with allowance forcontraction of flange as it isapplied.

5760

Page 61: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 4

APPLYING BEAD

SKILL 5: ATTACH BEADS AND TRIMS TO VERTICAL AND HORIZONTAL CORNERS

PERFORMANCE OBJECTIVE: The apprentice will apply bead to vertical andtightly with the required fasteners.horizontal corners, securing them

PROCEDURES CRITERIA

Apply beads and trims tovertical or horizontal corners.

.;',tc:r. -,:,t7,1 tynds and trims

with mc.:)anicaf fasteners.

1. Flange must be below plane offinishing edge.

2. No warps in flange.

3. Vertical bead or trim applied tightto ceiling.

4. 6 mm maximum at bottom of bead ortrim.

5. I mm maximum gap at either end ofhorizontal bead.

6. Finishing edge not damaged.

7. Depth of fill should be maximum 6 mmexcept for veneer bead.

. Veneer bead may have maximum fill of10 mm for straightening or plumbingreasons.

9. Joints in beads or trims must havesmooth level finishing edge.

I . flails ,r screws placed 300 - 450 mmo.c. and opposite each other.

. Fasiener heads must be below planeof finishing edge.

3. If clinched, bead clinched every150 - 200 mm.

4. Clincher teeth must cut and flangeburied minimum of 3 mm intowallboard.

... /Cont'd.

58 61

Page 62: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 4

APPLYING BEAD

SKILL 5: ATTACH BEADS AND TRIMS TO VERTICAL AND HORIZONTAL CORNERS

(Canted)

PROCEDURES CRITERIA

Fasten metal beads and trimswith mechanical fasteners.(Cont9d.)

Fasten paper, screen andflexible beads with filler.

Apply compression fit trims.

5. Staples are used to applied veneerbead at 150 - 200 mm intervals.

6. If glue is used in addition to fast-ners, bead must be applied before theglue forms a film on the surface.

1. Paper or screen must be bondedsecurely to metal part of bead.

2. Paper or screen bonded securely towallboard for entire length.

3. Flexible bead used on corners greaterthan 90°.

4. Line formed by flexible bead must bestraight and plumb or level.

I. Metal J-bead applied around closetopenings, valences, and inspectionholes.

2. Plastic and J-bead applied wherewallboard is butted against metal asvapour barrier.

3. Metal square nose used where nofilling is required around an opening.

4. Finished edges of bead must besmooth, flat and free of dents.

5. Trim must fit solidly on board.

6. Back edge of bead must not beobstructed by paper, broken wallboardor tear srrips.

7. Flange must be below finishing edgeof bead.

5962

Page 63: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 4

APPLYING BEAD

SKILL 6: ATTACH BEADS AND TRIMS AROUND OPENINGS AND OUTSIDE MITRES

PERFORMANCE OBJECTIVE: The apprentice will apply bead to fit an openingbead requires a maximum fill of 6 mm andand an outside mitre so that the

the joints are tight.

PROCEDURES CRITERIA

Apply bead or trim to squareopenings.

Apply bead or trims to roundopenings.

ApPfy tq-ld to drop.

I. Vertical beads or trims should meetto form a continuous finishing edge.

2. Corners should be level.

3. Beads must meet at 900.

4. See criteria for "Apply vertical andhorizontal bead".

). Edge should form smooth unbrokenline.

2. Diameter at any point on circleshould be within 6 mm of round.

3. No blocked or squared sections oncircumference.

4. See criteria for "Apply verticaland horizontal bead".

I. Drop must have continuous smoothedge in all three planes.

2. Beads must meet solidly at apexof corner.

3. Corners must form 900 angle.

60 63

Page 64: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 4

APPLYING BEAD

SKILL 7: PLUMB AND LEVEL BEADS AND TRIMS

PERFORMANCE OBJECTIVE: The apprentice will plumb and level beads,to 6 mm in 2400 mmchecking them with a level and straightedge

PROCEDURES CRITERIA

Identify methods of leveling I. Spirit level attached to a 2400 mmor plumbing. metal straightedge.

2. Plumb bob.

3. Chalk line.

Plumb vertical cornerbead. 1. Vertical bead should be out of plumbno more than 6 mm in 2400 mm.

Level horizontal cornerbead. 1. Bead must be level to 3 mm in 2400mm if building is level.

2. Horizontal bead must be parallel tonearest horizontal edge wherebuilding is not dead level.

3. Bead is checked for straightnesswith a straightedge at apex offinishing edge and on one side.

64GI

Page 65: Drywall Finishing Apprenticeship. Course Outline (C-6)

Track 5Filling Compounds

65

Page 66: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 5

FILLING COMPOUNDS

SKILL I: SELECT FILLING COMPOUNDS

PERFORMANCE OBJECTIVE: Given a specific job and the conditions under,will choose an appropriatewhich it will be performed the apprentice

filler.

PROCEDURES CRITERIA

Identify characteristics ofvinyl filler.

Identify characferistics offastset filler.

Vinyl fillers:

I. Are made from calcium carbonate.

2. Use P.V.A. as a bonding agent andmust dry within 72 h. or binderwill decompose.

3. Are easily affected by moisture whendry.

4. Work best in high temp. low humidityconditions.

5. Mix easily.

. Come in topping, taping and all-purpose compounds.

Fastset fillers:

1. Are made from calcined.

2. Set to harden.

3. Expand rather than shrink.

4. Set in 15 - 90 min.

5. Are excellent for deepfills.

. Have both mechanical and adhesivebonding.

.../Cont'd.

65 66

Page 67: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 5

FILLING COMPOUNDS

SKILL 1: SELECT FILLING COMPOUNDS (Cont0d)

PROCEDURES

Identify characteristics ofCasein filler.

Identify characteristics ofpremix fillers.

Identify type of fillercompound as taping, joint,or all purpose.

Select appropriate type offiller compound for environ-mental conditions.

CRITERIA

Casein fillers:

1. Have an organic binder.

2. Rot in pail after 48 h.

3. Are not affected by water when dry.

4. Are taping or topping fillers.

S. Have shrinkage problems.

Premix fillers:

I. Are packaged in 25 kg boxes.

2. Cannot be used until remixed.

3. Have a binder that is affected byfreezing temperatures.

4. Have little if any shrinkage.

5. Require little water on the job.

1. From label information.

Z. Using manufacturer's color code.

. Casein will withstand coolertemperatures.

. Hot, dry conditions best for vinyl.

. Fastset requires same generalconditions as vinyl fillers (seeFiller Criteria).

. Fast drying conditions will causefastset to shrink.

. Slow drying conditions will causefastset to become brittle.

.../Contld.

6667

Page 68: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 5

FILLING COMPOUNDS

SKILL 1: SELECT FILLING COMPOUNDS (Cont'd)

PROCEDURES CRITERIA

Select appropriate materialfor taping method.

Select appropriate materialfor filling.

I. Must be slow set for machine method.

2. Fast or slow set for hopper methods.

3. Fast or slow for hand taping method.

1, Fastsets may be used for first coating.

, Taping filler compounds may be usedfor first coating.

3. All purpose may be used for all coats.

4. Topping compounds may be used forsecond and third coats.

67 69

Page 69: Drywall Finishing Apprenticeship. Course Outline (C-6)

49

TRACK 5

FILLING COMPOUNDS

SKILL 2: IDENTIFY COMPATIBLE COMPOUNDS

PERFORMANCE OBJECTIVE: Given several compounds, the apprentice willby comparing their formulation and will

from incompatible compounds.

match those which are compatiblevisually identify any chemical reactions

PROCEDURES, CRITERIA

Compare composition of fillingcompounds.

Identify the observablereactions when incompatiblefilling compounds are mixed.

Identify compounds which aresafe to mix.

I. According to:

- binders used- binder modifiers- proportions of ingredients- filler material.

1. Filler will be rubbery.

2. Filler will become gritty.

3. Filler will become watery.

I. Fastsets and slowsets may not bemixed together.

2. Materials from different manufact-urers may not be mixed together.

3. Taping and topping compounds fromthe same manufacturer may be mixedif there is no observable reaction.

4. Pre mix materials may not be mixedwith powder materials.

68 69

Page 70: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 5

FILLING COMPOUNDS

SKILL 3: IDENTIFY FILLER PROBLEMS

PERFORMANCE OBJECTIVE: Given the type of filler used and the conditionunder which It was used the apprentice will classify defects as filler-related or job-condition-related and recommend a solution.

PROCEDURES

Identify filler relatedproblems.

identify job condition relatedproblems.

CRITERIA

Must identify the problem as one of thefollowing:

1. Edge cracking.

2. Shrinkage.

3. Fish eyes.

4. Scratches.

5. Air bubbles.

6. Tearing.

7. Poor finish surface.

8. Sandabillty.

9. Poor feathering.

10. Open time.

Must identify the problein as one of thefollowing:

1. Delayed shrinkage.

2. Joint cracking.

3. Air bubbles.

4. Scratches.

5. Reaction between filler andwallboard.

6. Alligatoring.

7069

Page 71: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 5

FILLING COMPOUNDS

SKILL 4: ESTABLISH MIXING AREA

PERFORMANCE OBJECTIVE: The apprentice will establish and maintain aclean, safe mixing area that is centrally located.

PROCEDURES

Establish clean mixing area andmaintain.

Establish safe mixing area andmaintain.

Mix in central safe area.

CRITERIA

Floor covered with scrap wallboardor other material to keep spilledmaterial away from floor.

. Empty material containers disposedof

- neatly stac*ed during shift- removed to garbage container at

end of shift.

I. Floor dry and free from wet filler.

2. When not in use, drill leaned againstwall.

3. Electrical cords placed close towail and away from traffic areas.

Mixing area should be:

I. Not near the lunch area.

2. Well ventilated.

3. Located near water, power and centerof building if possible.

4. Out of high traffic areas.

P.70 71

Page 72: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 5

FILLING COMPOUNDS

SKILL 5: MIX FILLER BY HAND OR MACHINE

PERFORMANCE OBJECTIVE: Given any type of filler and a situation in whichwill mix a pail of filler by hand orit is to be used, the apprentice

machine.

PROCEDURES CRITERIA

Identify the correct consistency When a finger is run through the fillerfor the following fillers: the ollowing t il happen:

1. Taping by hand or machine:

- valley will flow back immediately.

- should be slightly thinner forangles.

2. Finishing boxes:

- valley will fill but still beevident.

- slight resistance when pumped.

3. First coat hand:

- valley will fill only slightly.

4. Second coat hand:

- valley will fill half full.

5. Polish coat:

- filler consistency slightly thickerthan taping filler.

Choose mixing apparatus. I. Drills should not exceed 450 r/min.

2. A "potato ma:zher" can be used forhand mixing.

3. Premixed filler may be re-mixedby hand mixer.

... /Cont'd.

71 72

Page 73: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 5

FILLING COMPOUNDS

SKILL 5: MIX FILLER BY HAND OR MACHINE (Conttd)

PROCEDURES

Identify the important points othe mixing technique.

Use suitable container.

CRITERIA

Water must be clean, free of chemicalimpurities.

Order of addition of materials:

- powdered fillers must be added towater

- water must be added to premixedfiller.

. Powdered filler must be left to stand10 - 15 min. and must be remixed.

When remixing filler, do not add wateruntil filler is remixed.

Fastset should be mixed and usedwithout waiting.

Drill should be moved around in pailso all filler is mixed.

. Pail of filler should have same con-sistency from top to bottom.

. Prolonged mixing of fastset fillerswill destroy crystal growth.

. Pail should be free of chemicals,rust, dry paint or filler.

Drill must be used with care so that:

- pail does not spin

- clothes or hair will not be caught

- pail is on a level, sturdy surface

- drill is not pulled too far out ofpail

- trigger does not stick

- pail does not spin with mixer.

72

Page 74: Drywall Finishing Apprenticeship. Course Outline (C-6)

74

Track 6Taping

Page 75: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 6

TAPING

SKILL 1: SELECT APPROPRIATE TAPE

PERFORMANCE OBJECTIVE: Given a job situation, the apprentice will selectpaper tape or gauze self-adhesive tape for taping.

PROCEDURES

Identify characteristics anduses of paper tape.

Identify characteristics anduses of gauze self-adhesivetape.

CRITERIA

1. Made from cross-fibered Kraft paper.

2. Creased in the middle for angletaping.

3. Spark perforated for keyed surface.

4. Back side of tape is buffed on edges.

5. Bonded to wall with taping compound.

6. Used on all types of joints andwalls.

7. Tape must be dry before coating.

1. Fiberglass mesh.

. Self-adhesive backing requires notaping compound.

. Recommended for use on non-bearingsteel stud walls only.

. Not suitable for angles.

. Can be coated immediately afterapplication.

75

Page 76: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 6

TAPING

SKILL 2: HAND TAPE (DRY TAPE OR BUTTER METHOD)

PERFORMANCE OBJECTIVE: The apprentice will hand tape flats, butts,and knife. Tapes must be centered

of the total length of the joint.

small tapes and angles using a panand straight and be within 10 mm

PROCEDURES CRITERIA

Identify necessary tools forhand taping.

1. Pan, knife (120 - 150 mm wide), tapereel or wire loop.

Spread mud on flats and butts. I. 5 mm muc minimum thickness.

2. 60 mm minimum width.

3. Use correct sequence: butts, flats,small tapes and angles.

Spread mud on angles. 1. Both sides as well as corner ofangle must have 5 mm mud.

2. Minimum of 30 mm wide on either sideof angle.

Lay in tape. 1. Tape should be pressed into mud byhand before being wiped.

2. Angle tapes should be creased beforebeing laid into place.

3. Tape should be laid in before filmforms on surface of mud.

4. See Track 9, "Make Drywall Patches."

I

76 76

Page 77: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 6

TAPING

SKILL 3: APPLY TAPE BY HOPPER METHODS

1

PERFORMANCE OBJECTIVE: The apprentice will set up a mud hopper or aTapes must be centered and straightof the joint.

banjo and apply tapes to all joints.and within 10 mm of the total length

4

PROCEDURES CRITERIA

Identify necessary equipment. 1. Hopper can be of any capacity, withor without adjustable gate.

2. Rubber gloves should be worn toprotect hands.

3. 10 L pail used to carry tape.

4. Harness for holding pall with tape.

Set up hopper or banjo. I. Hopper is secured one of 3 ways:bench mount, wall mount, arch mount.

2. I or more rolls loader onto tapereel.

3. Gate on front should be set so that5 mm maximum mud on tape.

4. Back gate should be set so thatfiller does not escape but tapepasses through easily.

5. Hopper should be mounted high enoughso that tape can be pulled out whilewearing stilts.

6. Protect floor in front of hopperf 'spilled mud.

Apply tape to butts, flats andangles.

I. Tape should have mud along entirelength.

2. Tape should be centered over joint.

3. Tapes should be applied in correctsequence: butts, flats, small tapesand angles.

4. Angles should be sharply creased.

-4]L

77

Page 78: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 6

TAPING

SKILL 4: APPLY TAPE BY MACHINE

PERFORMANCE OBJECTIVE: The apprentice will choose and set up a machineand angles. Tapes must be centered,

total length of the joint.

-taping system to tape butts, flatsstraight, and within 10 mm of the

1

PROCEDURES CRITERIA

Given a particular manu-facturer's machine tapingsystem, select all the necessarycomponents needed for taping bymachine.

Prepare taping machine.

I. Ames, Tapeworm, Tornado:

- automatic taper: pump- gooseneck.

2. Versa tool:

- tube- taping head- material pump- air pump.

3. Corban:

- tape gun- back pack- compressor unit.

1. Tape must be loaded in machine.

2. Drive wheels must move freely.

3. Cutter blade must cut tape cleanly.

4. Creaser wheel must extend fully.

5. Check tape advancing system fortape feed.

6. Check mud-feeding mechanism.

.../Cont'd..

.

78 78

Page 79: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 6

TAPING

SKILL 4: APPLY TAPE BY MACHINE (Cont'd.)

PROCEDURES CRITERIA

Tape,butts and flats insequence.

Tape angles.

1. Tape should be cut to within 10 mmof length of joint.

2. Centre of tape must be within 10 mmof centre of joint.

3. All tapes must remain in place afterapplication and before being wiped.

4. Sequence; butts, flats, small tapes,then angles.

5. Mud must be present under entireleng-th and width of tape.

. First 150 300 mm of tape run withboth wheels on wall, then one only.

1. Angle tapes are centered on the joint.

2. Tape should be within 10 mm of floor,but tight at ceiling.

3. Tape must be creased with creasingwheel.

4. Mud must be present under entirelength and width of tape.

5. Automatic taper is run so thatmachinery doesn't impede tapingprocess.

7979

Page 80: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 6

TAPING

SKILL 5: TAPE DEFICIENCIES "

PERFORMANCE OBJECTIVE: The apprentice will identify deficiencies inand pipes that require taping, andbacking.

wallboard around light boxes, plugswill apply tape to provide a solid

PROCEDURES CRITERIA

Identify deficiencies.

Apply tape.

I. Cut or cracked surface paper ofboard.

2. Broken board where core is notbonded to face paper.

3. Board more than 20 mm from floor.

4. Openings cut for electrical boxesthat are more than 3 mm away frommetal box.

5. Razor openings that are not tightto box.

6. Openings around pipes that are nottight to pipe.

7. Corners of bead that meet at 90°angles.

8. Loose-fitting valence beads.

9. Inside corners of archways.

1. Broken board around fasteners.

II. Under window silt's that are in placebefore taping.

I. Tapes should be ripped in center toconform to pipe circumference.

2. Tapes should have mud applied tothem before they are applied to tnewallboard.

3. Tapes should be put as tight topipe or box as possible but notoverlapping.

.../Contld.

80so

Page 81: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 6

TAPING

SKILL 5: TAPE DEFICIENCIES (Cont'd.)

PROCEDURES

Apply tape. (Cont'd.)

CRITERIA

. Light switch and outlet screw holesshould not be covered.

Tapes should be set in place so theywill not have to be cut to installcover.

. Tape should not extend beyond edgeof wallboard at openings or edgesof bead.

81 81

Page 82: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 6

TAPING

SKILL 6: WIPE FLATS AND BUTT JOINTS

PERFORrANCE OBJECTIVE: Using an appropriate knife, the apprentice willwipe and adjust tapes on butt joints and flats leaving a smooth flat tapethat is bonded over its entire length. The bevel on flats should be full,the filler,edges feathered and the walls clean. The tape should be within10 mm of the length of the joint (le., it should not extend beyond joint).

PROCEDURES

Choose appropriate knife.

Fill bevel on flat joints.

Wipe tape flat.

Feather edges.

".11e: : ;rrn4-1 ions 1'Q +aoqs.

Clean erea after wiping.

CRITERIA

I. Wiping hehind machines requires along handleu knife 180 - 200 mm wide.

2. When wiping behind hopper a shorthandled 150 mm knife can be used.

3. Knife edge should be filed square.

4. Stiff bladed knife works best.

I. Bevel should be full.

. Apply mud to fill bevel whennecessary.

. No ripples.

. Tape is wiped leaving 5 mm of mudunder edge.

. Filler should he tapered off so thatthere is no edge by feel.

2. Feathered edges should be parallelto t3re and within 80 mm of centerof faro.

All tr4pes are appropriate length.

';spo rlou ld be centered on joints.

lums under tare.

. 1 Wes or folds in tape are removed.

. No filler leftover on walls or floor.

2. Discarded tapes disposed of.

87

82

Page 83: Drywall Finishing Apprenticeship. Course Outline (C-6)

C.

01-.--.-.

WSK11! 7: WIPE ANGLES

-...--w...-- -...,

TRACK 6

TAPING

PERFORMANCE OBJECTIVE: The apprentice will wipe angles to make 900corners using a pan and knife or a roller and-frUsher. The tape must beoz..nded over its entire length. The edges must be feathered and thewalls clean.

PROCEDURES

Identify tools.

Wipe by hand.

Wipe by rollers and flashers.

CRITERIA

Pan used to hold mud.

'20 mm knife with slightly bluntedcorners.

. Roller.

. 80 mm flusher for wiping.

I. Tape should be square and centeredwith no rips in angle.

2. Edges shou'd be feathered.

3. No ripples in tape.

4. No excess mud in angle.

I. Tape not dragged along angle.

2. Tape centered on angle.

3. Smooth skim coat on tape.

4. Feathered edges.

5. Angle should have no gouges.

83

Page 84: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 6

TAPING

SKILL 8: WIPE THREE-WAYS AND BOTTOM ANGLES

PERFORMANCE OBJECTIVE: The apprentice will wipe three-ways and bottomsleaving ahem smooth, square and tight. Edges must be feathered and thetape must be within 10 mm of the bottom of the angle and tight to theceiling.

PROCEDURES

Wipe three4ay.

Wipe bottom angles.

CRITERIA

I. Skim coat of filler left on tapes.

2. Edges should be feathered.

3. Tape in Junction of angles must beflat.

4. No gouges.

5. No excess filler.

6. No gaps in junction of angle.

I. Edges should be feathered.

2. Tape should be flat.

3. No gouges or holes in corner.

4. No excess filler visible.

. Bottoms of angles should be wipeddown to the floor.

. Tape should have smooth finish.

84 84

.

Page 85: Drywall Finishing Apprenticeship. Course Outline (C-6)
Page 86: Drywall Finishing Apprenticeship. Course Outline (C-6)

e ',mall. aromas.. +-

TRACK 7

FILLING

SKILL is FILL FASTENERS

PERFORMANCE OBJECTIVE: The apprentice will fill fasteners using theappropriate filler for each coat and leaving the fastener area flushwith the surface of the board.

PROCEDURES CRITERIA

Choose filter.

Fill fasteners by hand or witha nail spotter.

Use same filler as for bead.

. Filler for nail spotter slightly-hinner.

I. Depression is filled level withsurrounding surface.

2. Edges are feathered.

3. Surface Is smooth.

J. Fastener Is completely covered.

5. Maximum finished width of fillednails or screws is ISO rim.

87 88

Page 87: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 7

FILLING

-=?WrM.Ia

SKI LL 2: F ILL BEAD

PERFORMANCE OBJECTIVE: The apprentice will fill bead to blend in withthe wall surface using a hawk and trowel or pan and knife. The edge mustbe straight and the bead full.

PROCEDURES

Fill beads.

Check for fullness of fillon bead.

Correct hollow bead.

CRITERIA

1. Depth of more than 6 mm should befilled with fastset, 2nd and 3rdcoats should be toping or all-purpose.

Three coats of filler should beused.

. Feathered edge should be parallelto edge of bead.

. Final coat should be 30 cm wide.

. No metal should be showing throughfill.

. lo waves or scratches should be Insurface of fill.

. No lift offs.

. After one-half hour,'I15 mm offiller from feathered edge shouldbe dry.

. Surface of fill must be full overwidth and length of fill.

. After filler is completely dry.

. Slowset must ,be used to refill hollowareas.

. Must conform to criteria for"fullness".

88 87

Page 88: Drywall Finishing Apprenticeship. Course Outline (C-6)

f...a . - -w .TRACK 7

FILLING

SKILL 3: FILL BUTTS, HEADERS, FLATS

PERFORMANCE OBJECTIVE: Given a work area, the apprentice will fill butts,to a tolerance of 2 mm rise inheaders and flats by hand or machine

1200 mm.

PROCEDURES CRITERIA

Fill butts, headers and flatsby hand or machine.

Set up flat finisher.

Inspect hand filling toois.

I. Finished joint must be no more than2 mm out of level in 1200 mm.

2. 600 - 750 mm wide for butt joints.

3. Edges parallel to each other and tojoint.

4. Feathered edges.

5. 300 mm wide fill for flats.

6. 300 - 400 mm wide fill for headers.

7. Finished surface smooth and blemish-free.

1. Pump should have screen.

2. Box blade should stick up one finger-nail thickness above steel skid.

3. Box should be soakedin water tosoften any hard material.

4. Brake should be adjusted to personalpreference.

5. Condition of blade should bechecked for nicks and squareness.

I. Blades should be filed square.

2. Blade has suitable curve forfilling.

3. Hand tools are clean and free ofany materials that may causechemical reactions.

8988

Page 89: Drywall Finishing Apprenticeship. Course Outline (C-6)

- -TRACK 7

FILLING

SKILL 4: INSPECT FILLING FOR DRYNESS BETWEEN COATS

PERFORMANCE OBJECTIVE: The apprentice will check filler for drynessbefore coating using a moisturemeter, or by visual inspection and a touchtest, and theo state whether another coat can be applied.

PROCEDURES

Use moisturemeter to measuredryness.

Identify the visual character-istic of dry filler.

ldeLtify the procedures used totouch test filler for dryness.

CRITERIA

I. A wood moisturemeter can be used.Dry filler and wallboard willregister between 6% and 12%.

I. Filler must be solid in colour.Colour will be determined bypigment used by manufacturer.

I. Filler must be dry enough so thatwhen a fingernail is tapped againstthe filler no impression is left.

. Should be done in conjunction withvisual inspection.

90 89

Page 90: Drywall Finishing Apprenticeship. Course Outline (C-6)

.110.

TRACK 7

FILLING

SKILL 5: FILL 1NGLES

PERFORMANCE OBJECTIVE: The apprentice will fill angles by hand orfeathered edges. The threeways andand have feathered edges. All

angles must be straight and either

machine leaving smooth surfaces andbottoms will be square, smooth, cleanlines formed by the center of thelevel or plumb.

PROCEDURES CRITERIA

Select angle tools and material.

Fill by hand.

Fill by cornerbox.

Wipe bottoms and threeways.'

I. 100 120 mm knife and pan.

2. Cornerbox, flusher and pump.

3. Topping or all purpose filler.

1. No build up of mud in angles.

2. No scratches or air bubbles in mud.

3. Smooth feathered finish.

4. Finished surface must be smooth.

5. Lines made by angles must bestraight.

. Corner must not be gouged on eitherside of angle.

1. Mud must be thinner than that usedfor filling by hand.

2. Angle filled in one complete pass.

3. Edges feathered.

4. No scratches or air bubbles.

I. Square and clean.

2. Feathered edges.

3. Smooth.

4. No build up of filler in threewayor at bottom.

9091

Page 91: Drywall Finishing Apprenticeship. Course Outline (C-6)

=111.

,i,i11.. f.: SAM PEACE'

PERFOW.IANCE OBJECTIVE: The apprentice will sand between coats whendry or wet sanding methods.necessary and will finish sand ubing

PROCEDURES, CRITERIA

Rough sand.

Finish sand.

Wei sand surfaces.

1. 80 grit sandpaper is used.

2. Pole sander is used.

3, Filler is brushed off not ground off.

4. Ridges removed.

5. Rough sand 100 m2

in 5 min.

6. Only filler is sanded.

1. 100 grit for latex flat.

2. 120 grit for semi-gloss.

3. Whole surface and wall must becovered.

4. No ridges, lumps or edges left onwall.

5. No gouges from sandpaper in filler.

I. Thin mix of filler must be used.

2. Entire wall surface must be covered.

3. No ridges, bumps or edges are left.

4. Fife grain sponge mounted on a flatsurface used for sanding.

91

Page 92: Drywall Finishing Apprenticeship. Course Outline (C-6)

Track 8Texturing

92

Page 93: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 8

TEXTURING

SKILL 1 : SELECT TEXTURE MATERIALS

PERFORMANCE OBJECTIVE:Given a description of a desired finish as well

the apprentice will select theachieve the finish.

as the humidity and wear conditions,appropriate texture material to

PROCEDURES CRITERIA

Identify characteristics oftextures.

I. Hard textures:- requires undercoating of surface

before application- fine aggregate- will not rub off- does not cover entire surface

unless applied by hand- of sprayed on surface, coverage is

50 - 80%- used on walls- limestone based.

2. Soft textures:- requires undercoating of surface

before application- medium perlite aggregate- can be rubbed off- covers 80 - 100% of surface- used on ceilings only.

3. Self-priming textures:- little if any acoustic value- large expanded polystyreneaggregate

- contains powdered latex paint- can be used in high standard

humidity areas- can be easily rubbed off- requires no undercoat beforeapplication

4. Acoustic textures:- large aggregate mixed with fibres- true acoustic value- applied to a thickness 5 mm or

more

.../Contid.

93

Page 94: Drywall Finishing Apprenticeship. Course Outline (C-6)

[ 53.11W I: SELECT TEXTURE 1.1ATERIALS (onttd.)

PROCEDURES CRITERIA

Identify the best use for each I. Hard texture (Spantex):texture.

- orange peel

- knock down finish- walls and ceilings- spattercoat.

2. Hard texture Waltex):

- used for hard spattercoat- knock down.

3. Soft texture (Roughtex):

- low humidity areas- ceilings only.

4. Self-priming texture:

- kitchens/bath room- ceilings only- high humidity areas.

4. Acoustic textures:

- high humidity areas- ceiling texture only.

Identify characteristics of agood texture sealer.

1.

2.

White in colour.

Seals surface and hides joints foreven suction.

3. Flat tone.

4. Reasonably fast drying.

Ildcntify the cervociflon and 1. Various coloured plastic or metallicproradures for se of glitter. particles.

2. Applied after ceiling is sprayed andwhite texfirre is still wet.

.../Conttd.,

.0

Page 95: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 8

TEXTURING

SKILL I: SELECT TEXTURE MATERIALS (Conttd.)

PROCEDURES

I.

CRITERIA

Identify samples of sprayedand hand-applied texturefinishes.

Identify the following with 100%accuracy:

sprayed - orange peel

self-primingknock-downsplattersoft.

hand applied - trowelledbroomstipple.

97 95

Page 96: Drywall Finishing Apprenticeship. Course Outline (C-6)

I

TRACK 8

TEXTURING

SKILL 2: PREPARE SURFACE FOR TEXTURE

.1--PERFORMANCE OBJECTIVE: Given a specific texture finish, the

or concrete surface for textureapprentice will prepare a drywallapplication.

PROCEDURES CRITERIA

Check surface of renovations.

Prepare drywall surface fororange peel,splatter coat,knock -down, and soft textures.

Prepare drywall surface forself-priming textures.

I. All loose materials removed.

2. Wallpaper removed even if fastenedsecurely.

3. Discoloured areas sealed preferablywith PVA sealer.

4. Lumps, large holes or gouges areremoved.

5. Painted surface is keyed.

6. Dirty or greasy surfaces washed.

7. Background colour matched to texturecolour if desired.

i. Tape all joints and angles.

2. 2 coats of filler on flats, buttsand nails.

3. No holes or scratches in finishJoints, field of wallboard orangles.

4. Coated with texture undercoat whichleaves the surface uniform incolour.

t. Tape all joints and angles.

2. 1 coat of filler on flats, 2 onbutts.

3. No liftoffs or gouges.

4. No sealer required.

.../Conftd.

98 96

Page 97: Drywall Finishing Apprenticeship. Course Outline (C-6)

/

TRACK 8

TEXTURING

SKILL 2: PREPARE SURFACE FOR TEXTURE (Cont'd.)

PROCEDURES CRITERIA

Prepare concrete surface fortextures.

I. Concrete seal, trowelled on with}

single coat depth of 3 mm.

2. Concrete must be free of dust, greaseor loose concrete.

3. Joints and honey-combed areastrowelled in first.

4. Entire surface must be covered.

99 97

Page 98: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 8

TEXTURING

SKILL 3: LAY OUT A TEXTURED PATTERN

PERFORMANCE OBJECTIVE: Given a wall or ceiling, the apprentice will layout a pre-determined pattern using principles of geometry.

PROCEDURES

Establish reference lines.

Lay out pattern on wall orceiling.

CRITERIA

. Main line taken from one wall at 90°.

. Crossing line is centered and bisectsat 90°.

. Measurements taken from referencelines.

. Circles must be round.

. Squares have equal sides, equalangles.

. Diamonds - opposing angles are equal.

. Pattern must be centered withinreference tines.

. Pattern should match drawings.

100

98

Page 99: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 8

TEXTURING

SKILL 4: SEAL SURFACE

PERFORMANCE OBJECTIVE: In preparation for a texture, the apprenticewill paint a surface with a paint roller and brush or with an airless paintmachine. The surface must have uniform colour, and have no runs orstreaks. The appropriate safety precautions must be observed.

PROCEDURESSeal surfaces with roller andbrush.

Use airless paint machineefficiently.

CRITERIAI. Surface sealed completely.

2. No drips, runs or roller marks.

3. Task is performed without injury toself or others.

4. Ventilation must be provided whentoxic fume-producing paints are used.

. Machine must be set up and checkedaccording to manufacturer's direction.

. Pressure is set at 22 MPa. for latexpaints.

.4572 mm or .5334 mm tip used forlatex paint.

. Surface must be uniformly coloured.

There should be a uniform thicknessof paint over entire surface.

. Proper safety precautions should behollowed:

- never point gun at any part ofanyone's body

- lock trigger when gun is unattended

- release pressure from pump and gunwhen not in use

- ensure that safety features ofmachine are serviceable

- appropriate mask must be worn

- adequate ventilation must heprovided.

. Areas not to be sprayed must betightly masked.

101 99

Page 100: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 8

TEXTURING

SKILL 5: MIX COLOURED TEXTURES

PERFOMANCE OBJECTIVE: Given a colour sample, the apprentice will mixtexture to match. The coloured texture must be within one shade of thesample when dry.

PROCEDURES

Identify warm and cold colours.

Explain the effect of colours.

Mix colours to match a givensample.

CRITERIA

Blues, greens and violets aregenerally cooler.

. Reds, yellows and oranges aregenerally warmer.

I. Dark colours close in a space.

2. Light colours expand a space.

I. Amount of coloured texture requiredto do an entire job or partitionedsection mixed as one batch.

2. Prope- base colours used to mixdesired colour. See the DrywallFinishing Manual.

3. Colour mixed to within one shadeof desired colour.

'2 100

Page 101: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 8

TEXTURING

SKILL 6: APPLY TEXTURE BY MACHINE

PERFORMANCE OBJECTIVE: Given a pattern and a Type of texture, themachine, matching the pattern. The

the appropriate safety precautions

apprentice will apply texture Dytexture must be evenly applied andtaken.

PROCEDURES CRITERIA

Apply textures by machine.

Apply texture patterns.

I. Texture nozzle moved parallel tothe surface.

2. The same nozzle to surface angle ismaintained.

3. Same nozzle to surface distancemaintained.

4. Even coverage is achieved.

5. No buildup in angles, overlaps orcorners.

. Gas-powered equipment properlyvented.

7. Electrical equipment connected tosufficiently grounded power supply.

8. Eye, ear and head protection aswell as mask worn during applicationof textures.

1. Splatter coat:

- no crossing of pattern wherestraight-pattern Isjoined

- pattern flows in one direction.

2. Knock-down:

- no crumbly appearance

- no trowel lines

- no discoloration of textures

- no smeared or large flat sections.

.../Cont'd.

103 101

Page 102: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 8

TEXTURING

SKILL 6: APPLY TEXTURE BY MACHINE (Cont'd)

PROCEDURES

3.

Q.

5.

CRITERIA

Apply texture patterns. (Cont'd). Orange peel:

- entire surface covered with texturematerial

- must resemble surface of an orangepeel

- no smooth, oversprayed areas.

Roughtex:

- see general criteria for machineapplication

- 80 - 100% of surface is covered.

Self-priming:

- wallboard does not show throughtexture, ie., 100% coverage

aggregate Is evenly distributedover entire surface

- no smooth or built up areas.

104

.102

Page 103: Drywall Finishing Apprenticeship. Course Outline (C-6)

SKILL 7: APPLY TEXTURE BY HAND

PERFORMANCE OBJECTIVE: The will apply texture by hand topattern. The textured surface must

and be completed within the boundries.

apprenticeproduce a stippled, broom, or trowelbe even, be no thicker than 6 mm

PROCEDURES CRITERIA

Identify texture tools.

Identify texture patterns.

Apply texture.

i. Sponge, trowel, knives, broom.

1. Stippled, broom, or trowelled.

I. Hard textures only used for handapplications.

2. Pattern is matched, even, and Iscompleted within boundry.

3. Thickness of applied texture no morethan 6 mm.

4. No trowel lines or discolouration oftexture.

, No cracks in finished product as aresult of the drying process.

Page 104: Drywall Finishing Apprenticeship. Course Outline (C-6)

Track 9Making Repairs and Corrections

1

104

Page 105: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 9

MAKING REPAIRS AND CORRECTIONS

SKILL 1: MAKE ON-THE-SPOT CORRECTIONS TO IMPERFECTIONS

PERFORMANCE OBJECTIVE: While working, the apprentice will recognize andrepair imperfections in fasteners, filled joints and beads.

PROCEDURES

Make corrections to tapes.

Make corrections to fasteners.

Make corrections to filledjoints.

Make corrections to beads.

CRITERIA

Ripples and air bubbles cut out andreglued.

Edge cracked tapes removed and jointre-taped.

. Loose paper cut out and taped.

Paper from removing fastener glued

into place.

. Fasteners that are sticking out setin place or removed.

. Edges, ridges, scratches and airbubbles filled before filler dries.

. Tapes covered.

Joins widened where necessary toflatten joint.

. Loose flanges tightened withmechanical fasteners or glue.

Corners less than 3 mm off levelare floated.

Corners more than 3 mm level arereplaced.

. All metal covered with filler.

109 105

Page 106: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 9

MAKING REPAIRS AND CORRECTIONS

SKILL 2: MAKE DRYWALL PATCHES

PERFORMANCE OBJECTIVE: The apprentice will patch a hole in a drywallsurfaCe using wallboard mechanical fasteners, tape and filler so thatthe patched area blends into the surrounding surface.

PROCEDURES

Patch holes more than 150 mm indiameter using wallboard andmechanical fasteners.

Glue in a wallboard patch lessthan 150 mm in diameter.

Patch hole up to 80 mm indiameter using tape.

CRITERIA

I. Wood or metal backing used.

2. Set screws or nails below surfacelevel.

3. Board type and thickness shouldmatch existing wall.

4. Fill to 2 mm tolerance in 1200 mm.

I. Overhanging paper bonded securelyto surface.

2. Paper wiped tightly into place.

3. Fill to 2 mm tolerance in 1200 mm.

. Tape must overiap 'vie by at least40 mm on all sides.

. Tape must provide solid surface overhole.

. Edges of tape over hole laminatedtogether.

. Fill to 2 mm tolerance in 1200 mm.

110 106

Page 107: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 9

MAKING REPAIRS AND CORRECTIONS

L

SKILL 3: KEY SURFACES

PERFORMANCE OBJECTIVE: Where necessary, the apprentice will prepare bysurface for filler to adhere to.

free of dust, grease or oil. Tapes must

mechanical or chemical means a bondingThe surface must be deglazed andbond securely when dry.

PROCEDURES CRITERIA

Mechanically key surface.

Chemically key surface.

All surfaces must be properlykeyed before repairs are done.

I. Surface is free of dust

2. Surface must be deglazed by sandingor cutting.

3. Face of wallboard must not bedamaged.

I. Surface is deglazed using TSP.

2. Surface is freed of grease, dust andoil using household cleaner.

3. Gasoline or varsol should not beused.

4. Surfaces chemically treated must beflushed with clean water to removeany cleaner residue.

I. Tapes over keyed surfaces must notbubble or edge crack when coated withfiller.

2. Filler over keyed surfaces must notlift from surface when sanded or.painted.

Ili 107

Page 108: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 9

MAKING REPAIRS AND CORRECTIONS

SKILL 4: MAKE REPAIRS TO FINISHED DRYWALL SURFACES

PERFORMANCE OBJECTIVE: The apprentice will make repairs to joints,keying the surface and removing loose

and not be visible after the final

fasteners or painted walls aftermaterials. The repair must be smoothfinish has been applied:

PROCEDURES CRITERIA

Fill hollow nails, joints andbeads.

I.

2.

Surface has been keyed.

Tape and fill to a tolerance of2 mm in 1200 mm.

3. Smooth surface must be produced.

Repair nail pops. I. Nail is set below surface of board.

2. Another fastener driven in to secureboard.

3. Any loose paint or filler Is removed.

4. Depression is filled to a smoothfinished surface.

Repair ridged joints. I. Determine cause of ridging as oneof following:

Moisture:

- tape not bonded to wallboard- nail pops in conjunction with ridge.

Settlement of building:

- tape firmly bonded- evidence of stress cracks- wallboards tightly joined.

Defective wallboard:

- tape bonded securely to wallboard- wallboard not joined excessively

tight

- no evidence. of stress cracks- core of wallboard powdery at edgeof board.

... /Cont'd.

Page 109: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 9

MAKING REPAIRS AND CORFIECTIONS

SKILL 4: MAKE REPAIRS TO FINISHED DRYWALL SURFACES (Cont'd.)

PROCEDURES, CRITERIA

Repair ridged Joints (contld.)

Repair cracked joints,

.

2. Repairs must be carried out as follows:

Moisture related ridging:

- tape Is removed- loose filler is removed- moisture content checked foraccepted level

- joint is retaped and filled

Settlement of building and defectivewallboard and related ridging:

- ridge is cut out to form a V-sIrpedgroove

- Joint pre-filled with fast settingmaterial

- joint is retaped and refilled

- in extreme settlement conditionsinstall expansion-joint

1. Determine cause of crack as one offollowing:

- bonding: fine line crack- building settlemeni, jagged crack- general abuse: evidence of Joint

being struck or otherhise damaged- untaped Joint: fine line crack

2. Repairs must be carried out as follows:

- bonding crack: remove tape, retapeand fill

- building settlement crack: thebuilding must be at least a year oldbefore effective repairs can bedone - tape and prefill the joint

- untaped Joint: remove any soft orloose material, refasten or replacedamaged material - tape and refill

- general abuse: tape and refill

.../Conticl.

" 109

4.

Page 110: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 9

MAKING REPAIRS AND CORRECTIONS

SKILL 4: MAKE REPAIRS TO FINISHED DRYWALL SURFACES (Cont'd)

PROCEDURES CRITERIA

Repair overfilled or humpedjoints.

Repair cracked beads.

I. Fill on either side of center ofjoint.

2. Center of joint must not be coveredwith filler.

1. Determine cause of crack as one offollowing:

- settlement of building: jagged crack- poorly fastened bead: fine line- general abuse: evidence of bead

being struck.

2. Repairs must be carried out as follows:

- building settlement cracked bead:remove loose material to form V-shaped groove, prefill with fast-setting material, and tape andrefill

- poorly fastened bead: refasten beadabove and below crack, refasten inmiddle of crack, and refill

- general abuse: replace damaged beador a portion of it, remove filler toform sloping stop (not a sudden one)and refill.

114110

Page 111: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 9

MAKING REPAIRS AND CORRECTIONS

SKILL 5: MAKE REPAIRS TO FINISHED PLASTER SURFACES

I

PERFORMANCE OBJECTIVE: The apprentice will first choose a method formaterial for patching a plaster wall,the patches blend into the rest of the

keying surfaces and an appropriateand then make the repairs so thatsurface.

7

PROCEDURES CRITERIA

Choose material. i. East set if plaster Is exposed,

2. Slow set, if plaster is not exposed.

3. Drywall tape for cracks.

Patch plaster. 1. Surfaces are properly keyed.

2. Loose materials are removed.

3. Cracks are taped completely.

4. Holes filled with fast set, skimmedwith slow set before painting.

5. All filling to meet criteria inTrack 7.

Page 112: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 9

MAKING REPAIRS AND CORRECTIONS

SKILL 6: REPAIR DAMAGED TEXTURES

PERFORMANCE OBJECTIVE: Given a damaged texture, the apprentice willarea.repair the texture to match the surrounding

PROCEDURES CRITERIA

Identify texture patching tools.

Repair abrasion damage.

Repair fire damage.

Repair stained surfaces orphotographed joints.

I. Method of patching must be same orsimilar to original applicationmethod.

2. Air powered texture guns.

3. Hand operated texture guns:

- ceiling hopper- wall touch .up stick.

I. Edges of abrasion must be feathered.

2. Color must match existing colour.

3. Same texture as original must beused.

I. Seal surface with P.V.A. sealer.

2. Texture undercoat applied over P.V.A.Sealer before texturing.

I. Seat with lacquer prior to paintingor spray varethane prior torepainting.

2. Entire surface re-painted.

I I 6 112

A

Page 113: Drywall Finishing Apprenticeship. Course Outline (C-6)

Track 10Maintaining Equipment

113

Page 114: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 10

MAINTAINING EQUIPMENT

SKILL 1: MAINTAIN PERSONAL HAND TOOLS

PERFORMANCE OBJECTIVE: The apprentice will maintain a personal set ofthe apprentice at all times while ontools that is complete and is with

the job.

PROCEDURES CRITERIA

Identify personal hand tools,necessary for each year ofapprenticeship.

1

First Year:

1 . Pole sander,

2. Hand sander.

3. Stilts.

4. Phillips and flat screw driver.

5. 150 mm short handle knives.

6. 180 mm long handle knife.

7. 250 mm and 300 mm knives or trowels.

8. Hawk.

9. Pan.

10. Mask.

II. Clothes (white).

12. Utility knife.

13. Scrub brush.

14. Aircraft snips.

Second Year:

All of the above plus:

1. Nailing pouch.

2. Hatchet.

3. Tape measure 5 M.

4. Key hole saw.

Third Year:

All of the above.

.../Conftd.rg

119 114

Page 115: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 10

MAINTAINING EQUIPMENT

SKILL 1: MAINTAIN PERSONAL HAND TOOLS (Cont'd.)

PROCEDURES CRITERIA

Store hand tools. I. All tools must be stored either in atool box or in a job site lock up.

Maintain hand tools. I. Blades of trowels should be square.

2. Blades of trowels should have either a

slight curve away from wall at centeror be straight.

3. Blades of trowels or knives should befiled to a square cutting edge.

4. Utility knife should be sharp.

5. Sandpaper clamps on sanders shouldhold one piece of paper tietly.

6. Trowel handles should be tight.

7. Aircraft snips should be sharp.

8. Aircraft snips should intersect the. full length of blade.

9. Blades should move freely and returnto open position when released.

10. Blades should contact snugly.

120

115

Page 116: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 10

MAINTAINING EQUIPMENT

SKILL 2: MAINTAIN TAPING AND FILLING MACHINES

PERFORMANCE OBJECTIVE: The apprentice will clean, oil and replace anyor filling machine on the job.worn or broken parts of a taping

PROCEDURES CRITERIA

Identify taping machine partsthat can be replaced on thejob.

1.

2.

Cutter blade and chain.

Cable.

3. Drive chain.

4. Filler valve.

Identify parts to be maintained. 1. Wheels can be cleaned and oiled.

2. Blades must be adjusted before eachuse.

Replace parts on taping and 1. According to manufacturer'sfilling machines. specifications.

2. Replaced part functions properly.

3. Down time is kept to a minimum.

121

1.1i

Page 117: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK 10

MAINTAINING EQUIPMENT

SKILL 3: PERFORM PREVENTIVE MAINTL1ANCE ON TEXTURE AND MASKINGEQUIPMENT.

PERFORMANCE OBJECTIVE: In preparationlib

for the dgxt shift, the apprenticeof the texture machine, and will

gear cases.

I

will wash the lines and the exteriorcheck oil levels for the motor and

PROCEDURES CRITERIA

Maintain motors.

Check transmission.

Grease machine.

Connect and disconnect materialhose.

Wash equipment.

Maintain masking machine.

Maintain and repair stapler.

I. Spark plug gap set to manufacturer'sspecifications.

2. Oil level is correct.

3. Mix oil and gas for 2-cycle enginesto proportions recommended bymanufacturer.

4. Belt tension is correct.

I. Oil level is correct.

I. Grease points were located andlubricated.

I. Pipewrench, pliers, hammers wereused to remove.

2. Hose does not leak when replaced.

1. Lines flushed out with water.

2. Outside of machine cleaned.

3. Wand cleaned with brush.

1. All nuts and bolts are tight.

2. Tape reel aligned with paper.

i. Dismantle and clean parts by wiping.

2. Lubricate hammer assembly.

3. Tighten bolts.

. Replace staples.

122 111

Page 118: Drywall Finishing Apprenticeship. Course Outline (C-6)

-1;TRACK 10

MAINTAINING EQUIPMENT

SKILL 4: PERFORM PREVENTIVE MAINTENANCE ON AIRLESS PAINT EQUIPMENT

PERFORMANCE OiUECTIVE: Given an airless paint machine, the apprenticeexterior of the machine, and will removewill wash lines, filters, and the

and replace worn parts.

PROCEDURES CRITERIA

Wash up airless paint equipment.

Identify parts replaceable onthe job.

Replace parts. .

Identify regular maintenancecheck points.

I. Lines must be flushed thoroughlywith solvent if oil base, water iflatex paint used.

2. Solvent should be left in pump.

3. Filters should be clean.

4. Exterior of machine should be washeddown.

I. Drive belts.

2. Spray tips.

3. Pump diaphragm and check valves.

4. Filters.

I. According to manufacturer'sspecifications.

2. Replaced parts function properly.

3. Down lime is kept to a minimum.

I. Drive belt tension.

2. Oil levels.

3. Filters.

4. Hoses and connections.

123

113

Page 119: Drywall Finishing Apprenticeship. Course Outline (C-6)

Track 11Job Economics

119

Page 120: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK II

JOB ECONOMICS

SKILL I: ORGANIZE EQUIPMENT

PERFORMANCE OBJECTIVE: The apprentice will organize all the equipmentin a central area, ready for use. 4.needed for a job and will put it

PROCEDURES CRITERIA

Organize equipment. I. All equipment required for joblocated in central area.

2. Equipment is located away from hightraffic areas.

3. Equipment is in good repair andready to use.

. All equipment required Is availableat the start of job.

127 120

Page 121: Drywall Finishing Apprenticeship. Course Outline (C-6)

1RACK II

JOB ECONOMICS

SKILL 2: ORGANIZE A SYSTEM FOR WORKING

PERFORMANCE OBJECTIVE: Given a work crew, the apprentice will organizea system in which all of the crew are working.

PROCEDURES

Organize a work crew.

Work within a crew.

Compare actual working timefor specific tasks withaverage times for journeyman.

Give clear directions.

CRITERIA

I. Ensure everyone in group is busy.

2. Each person is assigned task.

3. Task clearly explained.

4. Assigned work is done.

5. Group leader helps individuals orbrings problems to instructor.

6. Instructions are given clearly.

7. Organizes and leads clean up.

I. Identify foreman or "charge hand" onsite.

2. Identify office phone number andname of ccntact person.

I. First year within 150f of journeyman.

2. Second year within 125% of journey-man.

3. Third year within 110% of journey-man.

I. Speak in clear, loud voice.

2. Use standard terms.

3. Use performance based instructionsin giving directions:

- state desired performance- state desired standard of

performance- state conditions under which

task is to be performed.

128

121

Page 122: Drywall Finishing Apprenticeship. Course Outline (C-6)

TRACK II

JOB ECONOMICS

SKILL 3: IDENTIFY COST - EFFICIENT USE OF MATERIALS

PERFORMANCE OBJECTIVE: The apprentice

[

will use units, lengths and types

cost.of materials that will minimize

PROCEDURES CRITERIA

Identify ways of minimizing I. Short pieces of bead were used where

waste. possible.

2. Only the amount of filler requiredwas mixed.

3. Broken bags or boxes of filler usedfirst. 1

4. Pails of filler properly cleaned andcovered for next day's use.

Identify company material I. Where to purchase.

order policy.2. P.O. numbers.

3. Quantities.

4. Return of goods.

5. Shipping arrangements.

6. Bills of lading.

129 122

Page 123: Drywall Finishing Apprenticeship. Course Outline (C-6)

Province ofBritish Columbia

DR ALL -F1

SKILL PROFIL

INTERMITPLOT PLANON AWINGS

INTERNETPLAN

DRAWINGS

INTERMITELEVATIONDRAWINGS

DETERMINEAMEN

REOUMIMENTS

STONEMATERIAL

INTERNETMAIL ANTI

SECTIONONAWINOS

INTERPRET

ANIONSC1411OULE

CHECK

TEMPERATUREANO

NUMWITY

CREATE

PROPER

CRYINGCOINNTIONS

THE ROTSOP TM

WORKERS'COMPENSATION

WINO

MAINTAINSTILTS

PREPARE

SCAFFOLDS

WORK ONELEVATED

FLOOR LEVELS

CLEAN FLOORS

IlliPP"EL

TARE I

EUE12

APPLYINGBEAD

101/4;%"CO:11...Er.-IS

IDENTIFY

EWE TRIMSSELECT

MASS ANC TRIMSMEASURE ANO CUTNAOS AND TRIMS

ATTACNWADS ANO TRIMS

TO VERTICALAND HORIZONTAL

CORNERS

FILLINGCOMPOUNDS

SELECTPILUNG COMPOUNDS

SELECTAPPROPRIATE

TAPE

*INTIMCOMPATISLECOMPOUNDS

IDENTIFYPILLER

MOSLEMS

MUSLIM.MIXINGAREA

MIX FILLERSY HAND

ON MACHINE

SIMIAWOL*

ANC

NANO TAPEMY TAPE

OR

SUTTER METHOD)

APPLY TAPENY

HOPPER

MEDICOS

APPLY TAMav wow,

TAPEoanotNewa

W

m

FILL

FA SINNERSFILL MAO

PILL

WITS. HEADERS,FLATS

INSPECT

PILLING MTNDRYNESS 1111WEEN

COATS

FILL ANGLES SANI

SELECTTEXTURE

MATERIALS

PREPARE

SURFACEFON TEXTURE

LAY OUTA TEXTURED

PATTERN

SEALSURFACE

MIXCOLOREDTEXTURES EV

MAKING REPAIRSAND CORRECTIONS

MAKE

014WIEPOTCONNECTIONS

TOIMPERFECTIONS

MAKEDRYWALL PATCHES

KEY

SURFACES

MAKI NEPAINSTO

PI MMI)DRYWALL

SURFACES

MAKE REPAIRSTO

MIMEOPLASTER

SURFACES

0T

MAINTAININGEQUIPMENT

MINOAN'PERSONAL

HAND TOOLS

MAINTAIN

TAPING ANDPILLING

MACHINES

PERFORM

PREVENTIVEMAINTENANCE

ON TEXTURE ANOMASKING

EQUIPMENT

PERFORMPREVENTIVE

MAINTENANCE

014 AMUSEPAINT

EQUIPMENT

OMAN=gouIPMENT

ORGANIZE

A SYSTEMFOR WORKING

Page 124: Drywall Finishing Apprenticeship. Course Outline (C-6)

FALL FINISAINGPROFILE CHART

iDeveloped by:

Program Research and DevelopmentPOST SECONDARY DIVISIONMinistry of EducationFirst Edition, 1551

MUMMYARCHITECTS

SPEOPICANONS

I

P"

MICOOMZEMOPERLTPOMPANOsuRFAMS

CALCULATEMATERIALS

TAM PRECAUTIONSWITH

ILECTRICALEQUIPMENT

1

leafIL.

ITAL

ATTACHMEADS AND TRIMS

AROUND OPINIONSAND OUTSIDE

MIMS

C OVEN

ARIASTO OE

PROTECTED

SEAL FOESTAINS

WHEN raceway

MANEMINOR CORRECTIONS

AND MANI

MINIIPTAND CAME F011

SAFETYEMEMMENT

USELIFTING

TECHNIOUIS

'MOM TAMSUMW

IMINCIPLIS OFSlomsompscs

CLEAN UPAMR THE JOE

USETRAM

TERMINOLOOT

PLUMS AND LEVELSCADS AND TENS

N

GE

vaPIE FLATSAND

NTT JOINTS

winTHRUM% 11

ANDSOTTOM ANGLES

'S SAND SURFACES

1

APOLT

TEETWIEST HAND

INSWAN

DAMAGEDTEXTURES

I

Page 125: Drywall Finishing Apprenticeship. Course Outline (C-6)

Ilk

Itr

THE DACUM APPROACH

DACUM is a systematic model of program development used in designingcareer. technical and vocational training programs. The first step in theprocess is to establish the skills expected of a graduate entering em-ployment. These skills are generally specified by a representative employergroup in a workshop conducted by program development specialists. Theproduct of this activity is a skill profile chart. This chart is then circulatedboth to the participants and to a number of other employers for review prior tofurther development.

The next step is to specify learner-centred performance objectives. These in-dude not onty the skills a learner must demonstrate but also the conditionsunder which the Skill is to be performed and the criteria used to determine theacceptable standard of performance.

Once the performance objectives have been set. there are three importantsteps to complete the development process. These are generally undertakenby an instructor or group of instructors. in the following order:

1) Appropriate evaluation instruments are chosen 'or created to assessso student capability in relation to the specific objectives of the program.

2) A variety of suitable instructional techniques and teaming experiencesare chosen to facilitate learning of the skills and knowledge required tomeet the objectives.

F

3) Instructional resources (texts. films. models. and other learning aids)are selected or created.

4

READING THE SKILL PROFILE CHART

A skill profile chart (often referred to as a DACUM Chart). is a graphicrepresentation of the essential skills expected of a student graduating from aspecific career. vocational or technical program.

Broad areas of employee responsibility are Shown in the boxes on the ieft ofthe chart. These are called "general areas of competence". The tasks orskills related to each are sequenced along the horizontal track to the right ofthe general area of competence.

125

Page 126: Drywall Finishing Apprenticeship. Course Outline (C-6)

FOR FURTHER INFORMATION

Please contact: Research and Curriculum Development BranchPost-Secondary DepartmentMinistry of Education7451 Elmbridge WayRichmond. S.C.V6X 1138Telephone: (604) 278-3433

ADDITIONAL COPIES

Additional copies of this chart and performance objectivesmay be ordered from:

Publication Services878 Viewfieid RoadEsquimalt. British ColumbiaV9A 4V1Telephone: (604) 387-5331

126