epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2...

253
( epey spuB|J8L|i8N ©Ml ^o Luop6uj>| / Ojiqnday 06/IV3A I

Upload: others

Post on 10-Aug-2020

54 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

(epey

spuB|J8L|i8N ©Ml o Luop6uj>| / Ojiqnday

06/IV3A

I

Page 2: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

IIIIII

Republic of YemenMinistry of Agricultureand Water Resources

Kingdom of the NetherlandsMinistry of Foreign A f f a i r sDevelopment Cooperation(Asia) Department

RADA INTEGRATED RURAL DEVELOPMENT PROJECT

SURFACE WATER M0NIT0RIN6IN AL BAYDA PROVINCE

Fi rs t phaseApri l 1987-May 1990

Volume II

Technical note 39

G.J.M. Leereveld

May 1990

ILACOArnhem, The Netherlands

Page 3: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

• • • • • ' • • * " • • * . •

This report is presented in two voiunes:

Volume I - Main reportVolume II - Graphs and Annexes

Page 4: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

Volume I I - Graphs and Annexes

Contents

Introduction 1Wadi Amad

4318-1 34310-1 64351-? 84370-1 9

4424-2 334424-3 394436-1 414433-1 43

4427-1 654433-0 67

4433-3 87

Anad well land4331-0. 97

Amd M»11 wadi

A1 Bayda

Al Hajalah

Mahajab*

III

Page 5: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

Mahajaba 14421-0 1334430-1 ,.*+ •-., 1364429-2. 1474436-2 1514424-4 153

Mahajaba 2 / w1 - pumped well4433-2 1614428-2 1754427-4 178

Mahajaba 3 / w2 - non pumped well

4312-0 185

Mawir

Mawir 14424-0 1924424-1 1964430-0 1984421-2 . 2004421-3 203Mawir 24429-0 2074427-2 209

Mawir well

4328-1 214

Sham1ah

4427-0 216

Yak1ah

4438-0 229

Detailed calculation of wadi Amad21/03/89 - slope area method 23621/03/89 - Alan ft Kennedy 23721/03/89 - Chezy equation 23824/03/89 - slope area method 23924/03/89 ~ A lam ft Kennedy 24024/03/89 - Chezy equation 24128/03/89 - slope area method 24228/03/89 - Alan ft Kennedy 24328/03/89 - Chezy equation 24430/03/89 - slope area method 24530/03/89 - A lam ft Kennedy 24630/03/89 - Chezy equation 247

Page 6: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

Introduction

Every Preslog cycle will be presented in the following pageson a chronological basis.

The first page of a Preslog presentation consists always ofthe administration sheet, which is a standard filled up datasheet.

The pages presented afterwards are the graphs of the workedup Preslog data. The first page is always the pressure plot ofthe whole measuring period.

The two tables on page 2 show again the chronological andnumber sequences of all 43 Preslog cycles.

The last pages of this Volume II are the detailedcalculations of the discharges of wadi Amad in 1989 as annex ofchapter 4.

Page 7: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

cl>rono'3<ucal swuence 9f Prssloas

t place !ESS===^=====3== 1

I23

-j

67891011ia1314151617IB19202122232425262728293031323334353637383?4041424344

ua<i Iaud iamad 1aud 1aud 1aud 1aud laaud laaud lbaud k

aud 1

aud 2

auc 2

aud 2aud 2a

aud 2b

auc 2aud Hiaud mbayda alhajalahiwathavatha«at•adanuhajaba•ahajabauhajabauhajaba•ahajabauhajaba•ahajabauhajabauhajabau*ir 1•awir 1utiir 1UNIT 1

UNir 1

•a«ir 2•a»ir 2aamr HIshafialiyaklah

bar

1111i22£3

sss:

43

i

Ii

!

Ii

I

1

1

1

1

i

i

1

i

1

i

1

I

j

t

Ii

i

sj

»

I

i

i

i

{

i

\

Ii

|

1

i

1

!

f

|

presio

43184310435143704421442444244436443343704438442144274433442844274433433143334429437044364429443044284421443044294436442444334428442743124424442444304421442144294427432844274438

cycles

c-ex

-1-1-?-1-1-2-3-1-1-2-1-0-1-0-1-3-3-1-1-3-3-0-j

-2-0-0-3-2-2-4-2-3

-4-1-0-IV

-2

-0-2-1-tf-0

t.!==!i

i

f

I

!

i

i

!

i

1

Ij

j

1

i

i

I

1

i

1

i

1

1

|

1

I

;

I

1

j

1

!

i

!

i

i

i

i

!

!

1j

i

i

page====;

36893133394143454?5865678385379710311011211812012913013313614715S1531611751781851921961982008C320?ao9214216229

nuafrer sequence of Preslaqs

no= = = • = ;

2341421819341021122653839353667304313411633251532402328203727241493127228894411

alace

aud ;

uhajaba

aud 1

UHir Hiaud *1

aud maud 1aud 1and lchajalahaud 2uhajabaaud 1•Mir iuiiir 1UNIT 1

•Mir 2

a»ai 1aud la

uhajabaSMtlahaud 2u»ir 2

aud 2buhajabaudanaud 2auhajaba•Mir 2

hawt•ahajababayda alUNir 1

•ahajababawtaud 2aud lbuhajabavui Z!»anatuai lal•ahajabayaklahaud 1

3

1

1

2

2

1

1

2

>ar1

43

i

!

1

ii

I

1

!

j

1

!

i

!

!

j

I

j

!

i

i

i

!

I

i

I!i

i

!

i

i

I

I

I1

j

I

1i

!

!

!

I

=!=

Jreslo=====4310431243184328433143334351437043704370442144214421442144214424442444244424442444274427442744274427442B442844234429442944294429443044304430443344334433443344364436443644384438

= = :

cycles

g-e;=~i•i-i-1-I-1-»-1

-e-3-0-«-l-2-3-0-1-2-3-•-t-I-2-3-4-0-1-2~Q~l-2-3-0-1-2

-o-1-2-3-0-1-2-0-i

it.ipage:== | ssss

! 5

! IBS! 3< 214! 97! 103! 8

! 1

! 45! 112! 58i 133> 31! 200! 203! 192

; m! 33! 39! 153< 216! 65! 2091 85i 178! 130< 83! 175! 20?! 120! 147! 110! 198! 136! 129! 67! 43: 161! 87! 118! 41! 151! 229! 47

Page 8: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Amad 1

PRESL0G;4318-l

Service given before ini tiatiomnot known (nk)-interval :OO:I5

Initiation datesnkInitiation timesnk

Try-out resultssnkMarkers given s6

Installation date:06/04/87Installation time:08:45

Installation description :in pipe without drum-installation place;middle of wadi-water level snk

Check up visit date snkCheck up visit resultssnk

Calculated removal/stop date:nkCalculated removal/stop timesnk

Removal date:05/06/87Removal timesnkRemarks :removed by H.Nieuwenhuis

-waterlevel ink-sediment :nk

Stop date :nkStop time snk

Service given snkEprom reading datesnkNumber of eprom s4318-1Number of eprom file :EP4318P_1Number of administration file:AD4318P_lFloppy number of eprom file snkFloppy number of administration filesJosReference where results were listed s8

General remarks:l.The preslog was the first in this wadi.S.A11 data was taken to Holland and answered back 7 April 1990(see telefax).

datei6 May 1990 (Sunday) 17ilO

Page 9: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEHENSTATION i HRDI 'AMADPROJECT i RXRDPBEGIN Oflfre t 108487START TIME I 88188

PLOT or MUTER LEVEL DEPTHHATER LEVEL DEPTH (START)BAROMETER READING (START)END DATEINTERVAL

1 8 on.

t 788 «B.

1 118467

1 80113FILEI EP4I18PJ9 r«b 1887 Ut48t98

-48

-20

e

20

40

60 Ll 1 1 1 • 1 1 1 1 1 1 1

8 8 S S s » * M w < - ' » . 8 S S 8 n > l 8 8 S * ' M W j k t a S > !

i s s i s i s i s s i i i i s i s s s i i s s iCD

88

Page 10: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STATION

PROJECT

t YEHEN

i HRDI 'mm

t RIRDP

BEGIN DRTE t 11B4B7

STfiRT TIHE i 18:00

PLOT OF* HflTER LEVEL DEPTH

HRTER LEVEL DEPTH (STHRT)

«IHOrK.TLR RERDING (STRRT)

END DRTE

INTERVRL

I O OH.

i 790 »B.

1 13040?

1 00115

FILEi EP4318P_1

9 F«b 1997 Iti56tl0

~ 2 S 8 2 8i i i i i s i 8 8 8 8 8 8 8 8 8 S 8 8 8

OD•M

OD

Page 11: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :taadi-

PRE5L06:ttl(H

Service given before initiationsnk-interval iOO:075 (7$ mini

Initiation date.-19/07/87Initiation timesllsOO

Try—out resultssnkMarkers given :8

Installation datesnkInstallation timesnk

Installation description sin container without drum-installation place:middle of wadi-waterlevel :nk

Check up visit date :nkCheck up visit resultssnk

Calculated removal/stop datesnkCalculated removal/stop ti«e:nk

Removal datesSO/11/87Removal timernkRemarks

Stop dateStop time

:nk-Materlevel-sediment

ink:nk

:nk:nk

Service given snkEprom reading dateinkNumber of eprom :EP4310-lNumber of eprom file sEP4310P_lNumber of administration file:AD4310P_lFloppy number of eprom file :JosFloppy number of administration file:JosReference where results Mere listed :8

General remarks:1.strange interval

date16 May 1990 (Sunday)

Page 12: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMEN

STHTION : HMRD

PROJECT j 408046

BEGIN DOTE : 190787

STRRT TIME : 11:00

PLOT OF PRESSURE DRTR

ELEVRTION BflROMETER - DRTRLOGGER : 2 cm.

BRROMETER RERDING (STRRT) : 0 mB.

END DRTE : 010188

INTERVRL : 00:07

PRGE 1

F ILE: EP4310P_I

9 Rpr 1990 13:08:23

790 -

780

770ro•-*eg-sJOD-si

rotoeg-siCD•sJ

roUlegCD-sj

ro• M

eg-sjoo

roto<s-siCD-si

a-si00-si

ISroegCD00-si

cseg0000NT

egCSCOCD•sj

eg00egCD00

escsCDOD• M

roesCOCD• s j

I—*

egCDCD-sj

^ *

egCDCD•M

00eg00CO-sj

roegegCOCO

ro§oo

ro-ft*

egCOCO^ j

roencsCDCD

roODC3COCD^ 1

(itegegCDCD•si

egIDCO^1

eguegCOCD

egUlegu>CO

cs•sj

CSCO00

Page 13: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

II

PLflCT stead 1 I

PRESL0G:<(35H / 4371-? I

Service given before initiation:nk-interval ink

Initiation date:13/18/87Initiation time:ll:O0

Installation description i in drum,filled with water <**0 cm)about SO cm sand above drum

-installation place:in middle wadi-waterlevel :40 cm above sensor =water in drum

Check up visit date snkCheck up visit results snk

Calculated removal/stop datetnkCalculated removal/stop timeink

Removal date:17/O3/88Removal time:*/- 11:30Remarks :

-waterlevel ink-sediment ink

Stop date t19/03/88Stop time :10:58

Service given :nkEprom reading date:nkNumber of eprom inkNumber of eprom file :nkNumber of administration fileinkFloppy number of eprom file :ArnhemFloppy number of administration fileiArnhemReference where results were listed :2

General remarks:l.file nor information is found back. No floods occured accordingto "monitoring with electronic recorders in Al Bayda Province",second phase, February 1988, Ilaco.

dat*t6 Hay 1990 (Sunday) 17:23

ITry-out resultsmk •Harkers given ink m

Installation date:13/12/87Installation timeiKtiOO

8

Page 14: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE lAmad 1

PRESL0G:4370-l

Service given before initiationink-interval :00:15

Initiation date:17/03/88Initiation time:O9:2O

Try-out resultsinkMarkers given :3

Installation date:17/03/88Installation time:12:00

Installation description : in drum, filled with stones andclosed with cloth

-installation place:in middle wadi-waterlevel :0.35 m in drum

Check up visit date :06/04/88,11:45Check up visit results:drum refilled with +/- 10 cm water

Calculated removal/stop date;01/07/88Calculated removal/stop time:nk

Removal date:15/08/88Removal timeinkRemarks :

-waterlevel ink-sediment :nk

Stop date :nkStop time ink

Service given :sent to HollandEprom reading dateinkNumber of eprom ;EP4370-0Number of eprom file :EP4370P_0Number of administration filesAD4370P_0Floppy number of eprom file tl/SFloppy number of administration file:?Reference where results were listed :1,S

General remarks:1.

datet& May 1990 (Sunday) 17iS6

Page 15: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTXON i RMRD

PROJECT t 488046

BEGIN DHTE i 170386

START TIME t 89t15

PLOT OF PRESSURE DHTfl

ELEVRTION BflROMETER - DATALOGGER t 0 om.

BAROMETER READING <START) : 0 mB.

END DOTE : 150888

INTERVAL I 00113

PAGE 1

FILEt E P 4 3 7 0 P 0

10 Apr 1990 1 1 I 4 5 I 9 1

mB890

370

860

850

840

630

820

810

J . l

1 1 1 1 I 1 1 1 1 I 1

r

i j 1TO*

2OP00

U)

8OD00

GJMCO

CO00

(9

0000

TO»•*

C3GOCD

ruODC90000

8UlCOut009

fit(9HI0000

10<9UlCD00

ru0)eauiCD00

isroG>en0000

SCDC90)OBCD

O)

aoo

ru

oo

U)egego>ooOD

Page 16: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMENSTATION t RMFU)PROJECT i 40S04SBEGIN DRTE i 1304B8STBRT TIME t

PLOT OF KRTER LEVEL ELEVHTIONMHTER LEVEL ELEVRTION (STRRT) t 0 m.BAROMETER RERDING (STRRT) I S09 «B.END ORTE i 270486INTERVRL t 00tIS

PflGE 1

FILEi EP4370P_010 Rpr 19S0 12:32:05

Page 17: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STHTION i flMBD

PROJECT t 409046

PLOT OF WRTER LEVEL ELEVHTION PHGE 2

FILEi EP43?0P_B

10 Rpr 1930 12I34I4?

ro

ID

0.20

0.15 r-

0.10

0.05

0.00

-0.05

-0.10

-0.15

-0.20

-0.23

-0.30

00CD

8 2 Si § 3i i i i i

s — fa) u\ro reS -

in A)W

s §

Page 18: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMENSTflTION * RMflDPROJECT : 408046

PLOT OF HRTER LEVEL ELEVflTION PBGE 3

FILEi EP4378P_010 Rpr 1990 1 2 I 3 7 I 2 7

0.20

w

0.15 -

0 .10 I—

0.05

0.00

-0.05

-0. 10

-0.15

-0.20

-0.25

-0.30

tnO<D

8

sss

8 Sg ss ss

8 6) Q 19"•J Qj <f)

g g g g g(9 -

s19

Ul

i s8

§ gms8

CDruru at

a to to s si

Page 19: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTION

PROJECT

i YEMEN

t flMRD

i 488846

PLOT OF HBTER LEVEL ELEVRTION PHGE 4

FILEi EP4370PJJ

10 flpr 1990 12)40109

m0.20

0.15 -

0.10 -

0.05

0.00

-0.05

-0.10

-0.15

-0.20

-0.25

-0.30

0)

g0000

8S8

3•a

8

PO

sA)

8 8 8 8 8 3 8

Page 20: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STRTION : RMRD

PROJECT : 408846

PLOT OF WRTER LEVEL ELEVRTION PRGE S

FILE: EP4370P_0

10 Rpr 1990 12:42:49

m0.20

0.15

0.10

0 .

0 .

- 0 .

- 0 .

- 0 .

- 0 .

05

00

05

10

15

20

-0.25

-0.30

toCDCO

S 69 69 (9

S

s(9

sen1919

O•M

IS)(0

6169

? *•*

i i»-t ** i>— •-» «•* *^ «-• r e r ow - k o i m M O O C D B ) —

ro ruu

S (9 (9 69S IS S 69 O S S 69 S S S

Page 21: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMENSTHTION s HMflD

PROJECT i 4aea48

PLOT OF WRTER LEVEL ELEVRTION PRGE 6

FILEi EP43?0P_0

18 fipr 1990 1 2 I 4 S I 2 9

ffl

8.20

0. 13 -

0 . 1 0 I—0.05

0.00

-8.85

-0.10

-0.15

-0.20

-0.25

-0.30

CD

gOPCD

S IS3 g

3••g

Sa t

SsM

g8 g 8

g gU Ul 01 S - S

S g

Page 22: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMEN

STRTION : RMflD

PROJECT : 408B4S

PLOT OF WflTER LEVEL ELEVHTION PHGE 7

FILE: EP4370PJB

10 Rpr 1390 12:48:10

-0.30

(0sCDCD

S

sBM•a

g8••§ so g

-si

isg

Q

g5i

*(9S

•**

§ ses

>

iin

IS

a

01

IS

ag

to

BB

CD

groBg

PJ*-*i

roro

g

rob>

g

Page 23: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION i RMRD

PROJECT i 408048

PLOT OF WRTER LEVEL ELEVRTION PRGE fl

FILEi EP4370P0

10 Rpr 1930 12i50i31

0,20

0.13 -

0.10

0.05

a. 00

-0.05

-0.10

-0.15

-0.20

-0.25

-0.30ro S KJ

I s iOB00

CD S •- U * U I O ) M ( D ( 0 9 2 RJ 8J?i s

Page 24: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMENSTRTXON i RMRDPROJECT : 40B046

PLOT OF WP.TER LEVEL ELEVRTION PHGE 9

FILE: EP4370PJ3

10 Bpr 1990 12:53:32

m0.20

0.15

0.10

0.05

0.00

-0.05

-0.10

-0.15

-0.20

-0.25

-0.30

CD

ro

s>jwCD

s

§

sru

s(1)

ss

sss

BUl

g38S

6)M

§

o _ - ~CD S * * fO

U (Croro

§ s s i sCO

g g s S BB

BS g B

8

ro

Page 25: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STBTION : RHRD

PROJECT i 488048

PLOT OF WHTER LEVEL ELEVHTION PHGE 10

FILEt EP437BP_010 Hpr 1990 12(56(13

m,20

too

0.15 -

0.10 -

0.05 | -

0.00

-0.05

-0. 10

-0,19

-0.20

-8.25

-0.30rg

CDCD

2 S S 2 82 8

CD , S-si. 9 u s

3 SO) to « ^ U

Page 26: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMEN

STHTION : RMRD

PROJECT j 408046

PLOT OF WHTER LEVEL ELEVRTION PRGE 11

FILE: EP4370PJ3

18 Rpr 1990 12:58:55

-0.30csu

g sC9

ISUl

toS

eg-M

8i §

ss

sg

IS -egeg s

(Ss

wss

s(S

Ul

egts

tnss IB

eg eg

CO

egeg

ruSiseg

ru

cseg

IUruegeg

u

i

Page 27: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTION

PROJECT

» YEMEN

I HMflD

i 408046

PLOT OF HRTER LEVEL ELEVRTION PRGE 12

FILE: EP43?BP_a

IB Rpr 1990 13f0tt36

m

0.20

0.15

0.10

0.05

0.00

-0.es-0. 10

-0.15

-0.20

-0.25

-0.30 I I I I

IU 5

s sCDOD

S — »• M •» ru MM CD tO CB * - ro (rt

i i i i S S 3

Page 28: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STflTION : HHRD

PROJECT i 40B046

PUOT OF NflTER LEVEL ELEVflTlON PflGE 13

FILE: EP4370P_018 Rpr 1S90 13:84:1?

m0.20

B.15 -

e. IB —

0.05 —

0.00

-0.05

-0.10

-0. 15

-0.20

-0.25

-0.30rouiQ

CD00

s sfa) s

0}s s

TO ruu

§ § g s03

S (SS g g g i g

Page 29: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMENSTRTION i HMHDPROJECT i 408046

PLOT OF WHTER LEVEL ELEVRTION PflGE 14

FILEi EP4370PJB10 flpr 1990 13:06i58

0.20

0.15 —

0 .10 -

0.05

0.00

-0.05

-0. 10

-0.15

-0.20

-0.25

-0.30ruCDIS

00CD

aBB

Si

s••s

s s - ft) U 01

§ § i i § § §

ro n>

i iMft)

s s

Page 30: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMENSTHTION : flNRDPROJECT : 409046

PLOT OF WF1TER LEVEL ELEVRTION PRGE 15

FILE: EP437BPJ3

18 flpr 1990 13:89:40

tow

-0.30

Page 31: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION i RMflD

PROJECT i 408046

BEGIN DRTE J 140688

STHRT TIME I 00100

PLOT OF WHTER LEVEL ELEVflTION

WflTER LEVEL ELEVflTION (STRUT) t 0 m.

8RR0METER RERDING (STRRT) t 889 »B.

END DRTE t 180688

INTERVRL t 00113

PRGE 1

FILEi eP437BPja

10 Rpr 1980 13i3StSB

m0.80

-0.05

to

» -0,10

-0.15

-0.20

-0.25

-0.30

CDCD

2 S 8 2 8 g < — • - • - . ru M ro n>

i i i is

Page 32: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTION

PROJECT

: YEMEN

: RMRD

: 408046

PLOT OF WRTER LEVEL ELEVflTION PRGE 2

FILE: EP43?0P_0

10 Rpr 1990 13:37:53

M

-0.05 -

-0.10 -

-0.15 -

-0.20 -

-0.25 -

-0.30

Page 33: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEHEN

STRTION i flMRD

PROJECT t 488046

PLOT Or WRTER LEVEL ELEVRT1ON PflGE 3

FILEt EP437BP_B

10 Hpr 1990 13i40t04

m0.00

roo>

-0.05 -

-0.10 -

-0.15

-0.20

-0.25

-0.30 J I J I

- 2 8 S 2CDSat«CO

soss

pa • •s s so•a • *s s

S -

BS g s 8 S co

Page 34: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMEN

STRTION : RMRD

PROJECT : 40804S

PLOT OF WHTER LEVEL ELEVRTION PRGE 4

FILE: EP4370P_0

IB Bpr 1930 13:42:09

m0.00

-0.05 -

-0.10

-0.15

-0.20

-0.25

-0.30

Nl

tnOD

sts

sft)toIS S

si

•Nl sOD

S(0

ss os ais s i

uss i i

01 00ruIS

SC3

a os

ISIS s

ruruiss

rufat

aa

Page 35: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION i RMflD

PROJECT t 406846

PLOT OF HflTER LEVEL ELEVflTION PHGE S

FXLEi EP437BPJ8

10 Rpr 1398 13t44il3

m

WO

—0. 0 3

-0.10

-0.15

-0.20

-0.25

-n 3n

/

I , ,

\ /

1 1 1 1 1 1 1 1 1 t 1 1 l i f t

eoattooo

? ? 9 °§ i i §

s —

s is -

ru M rtiu

s s s s s

Page 36: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Amad 1

PRESLO6:W1-1

Service given before initiation:batteries changed-interval rOO:l5

Initiation date:19/O9/88Initiation time:07:15

Try-out results:OKMarkers given :£ markers

Installation date:19/09/88Installation time:O9:30

Installation description sclotch sheet-installation placesmiddle wadi-waterlevel sO.<iO m.(drum)

Check up visit date :noneCheck up visit results:none

Calculated removal/stop date;03/0l/89Calculated removal/stop timer-Removal datet02/01/B9Removal time:10:20Remarks :-

-waterlevelt--sed i ment :-

Stop date :03/01/89Stop time rO8:5£

Service given snoneEprom reading date:nkNumber of eprom :44S1~1Number of eprom file :EP*»<»S1P_1ONumber of administration file:AD44SlP_10Floppy number of eprom file :1/SFloppy number of administration file:2/<tReference where results were listed :l+£

General remarks:1.

data16 May 1990 (Sunday) 17*88

31

Page 37: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION > RMHD

PROJECT i 408046

BEGIN DflTE t 190968

STfiRT TIME t 07i15

PLOT OF PRESSURE DHTR

ELEVRTION BfiROMETER - DRTflLOGGER t 0 em.

BRROMETER RERDING (STRRT) t 0 mB.

ENS DflTE i 030189

1NTERVPL i 001 IS

PHGE 1

FILE: EP4421P_I0

10 Rpr 1990 1 5 i S 6 t 3 9

mB860

850

840

830

820

810

800

790

CO

ro

aCS10CO00

ts

1088

51088 88

01

ro1088

I—*

8801

ta•M11

88

.188

ro

1188

ro00

0000

<aUl

8821

ro

8821

Ul1288

roen1

288

CBro3189

Page 38: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

IIIIIIIIIIIIIIIIIIIII

PLACE :Aiad 1

Service given before ini tiat ionmone-interval :00:15

Initiation date:02/01/89Initiation time:08:15

Try-out results:-Markers given :2

Installation date:O2/Ol/89Installation time:10:20

Installation description :in drum with water-installation placesmiddle wadi-waterlevel :40 cm above sensor

Check up visit date :noneCheck up visit results:none

Calculated removal/stop date:18/04/89Calculated removal/stop times-Removal date:02/04/89Removal time:11:20Remarks :top drum= -0.27 m wadi.

-waterlevel:water stood at -0.12 m top drum-sediment s-

Stop date :03/04/89Stop time :08:25

Service given :noneEprom reading dateinkNumber of epromNumber of eprom fileNumber of administration filesAD4424P_20Floppy number of eprom file :l/2Floppy number of administration file:2/<*Reference where results were listed :l+2

General remarks:1.

date16 Hay 1990 (Sunday) 17i29

33

Page 39: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STRTION i RMHD

PROJECT i 408046

BEGIN DflTE j 020189

STflRT TIME • 88i19

PLOT OF PRESSURE DHTR

ELEVATION BRROMETER - DATALOGGER i 0 am.

BAROMETER RERDING (START) : 0 mB.

END DATE : 030489

INTERVAL i 00iIS

PHGE 1

FILE: EP4424P__20

12 topr 1990 16I38I34

mB989

950 -

920 -

690 -

660

630 -

800 1 1 1 1 1 1 1 1 1 1 1

k

1

r i

• • • • HH ^ ^ ^ ^ ^ ^ •* i

Page 40: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMEN

STRTION : BHflD

PROJECT : 408046

BEGIN DRTE : 210383

STRRT TIME : 18:00

PLOT OF KRTER LEVEL ELEVHTION

WHTER LEVEL ELEVRTION (STRRT) : 0 m.

BRROMETER RERDING (STRRT) : 833 mB.

END DRTE s 220389

INTERVRL : 00:15

PRGE 1

FILE: EP4424P_20

10 Rpr 1930 17:02:39

m1.00

0.90

0.60

CO

en

0.

0.

0.

0.

0.

0.

0.

0.

-0.

-0.

-0.

70

60

50

40

30

20

10

00

10

-0.20

-0.30ros

g g g g

roro

g

rohi

groIX)ab)00CO

S*-*E9(9

SroQ6)

sa

S S 8 S O* ui en -M at

s gs •-CO (9

19 (9 S CO

»- ro

g g sen

s g

Page 41: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY :

STRTION :

PROJECT :

BEGIN DflTE :

STRRT TIME :

YEMEN

RMRD

4B8046

240389

16:00

PLOT OF WRTER LEVEL ELEVflTIONWRTER LEVEL ELEVRTION (STRRT) : 0 m.BHROHETER REBDING CSTflRT) : 833 mB.END DflTE : 250389INTERVflL : 80:15

PRGE 1

FILE: EP4424P_20

10 flpr 1990 17:08:42

Co

CD• •ss

CO

sroO

g

w•-•• •

§

fitw

S

MW

i tototo

ii Is

S 2si

a BJ 8 88 8

s »*8 8 8 8

Page 42: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION i RMRD

PROJECT : 40B046

BEGIN DRTE : 280389

STRRT TIME : 12:08

PLOT OF HRTER LEVEL ELEVHTION

HRTER LEVEL ELEVRTION (STflRT) i 0 m.

BRROMETER READING (STRRT) t 833 mB.

END DOTE : 290369

INTERVRL : 00:IS

PRGE 1

FILE: EP4424P_20

10 Hpr 1990 17:17:12

m1.000.90

0.80

0.70

0.60

0.50

8.40

0.30

0,20

0.10

0.00

-0.10

-0.20

-0.30

co

(if

ss

s § i §ssca

ro

ss

ruro• •

i

ruh)••

§roU>C9b)CDCO

g? ? ? ?s s s s

gj

s

ISCD

s (9S

CBS s

Page 43: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STRTXON i RMRD

PROJECT t 406046

BEGIN DHTE : 308389

STRRT TINE I 12i00

PLOT OF WRTER LEVEL ELEVRT1ON

HRTER LEVEL ELEVRTION (STRRT) I 0 m.

BRROHETER RERDING (STRRT) i B33 mB.

END DRTE i 310389

INTERVRL i 08tIS

PAGE 1

F X L E J EP4424P_20

10 Rpr 1880 1 ? I 2 3 I 2 4

CO03

ft) Ol toroCO ro

3 S § S 3 S

roroM

8

n>u•a

8usua>to

s••8

S8

$ a a3 8

Page 44: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Amad la

PRESL06;44E4-3

Service given before initiation:none-interval :00:15

Initiation date:03/04/89Initiation time:12:00

Try-out results:0kMarkers given :3

Installation date:03/04/89Installation time:14:30

Installation description :try-out set-up-installation piace:sensor =+50.5 cm wadi level-waterlevel :none, bottom hole is +5.0 cm wl

Check up visit date :noneCheck up visit results:none

Calculated removal/stop date:18/07/87Calculated removal/stop time:-

Rerooval date:17/06/89Removal time:nkRemarks :-

-water level:--sediment :-

Stop date :18/06/89Stop time :08:30

Service given :Holland,rings+batteries.Eprom reading date:nkNumber of eprom :ep4424-3Number of eprom file :EP4424P_3Number of administration file:AD4424P_3Floppy number of eprom file :3Floppy number of administration file:3Reference where results were listed :l+2

General remarks:1.

<Ut»il6 April 1990 (Monday) 13i39

39

Page 45: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION i HMflD 1*

PROJECT : 488046

BEGIN DRTE i 030469

STHRT TIME i 12i00

PLOT OF PRESSURE DRTR

ELEVRTION BRROMETER - DRTRLOGGER t 0 on.

BRROMETER REflDING (STHRT) : 0 mB.

END DflTE i 1806B9

INTERVAL t 00)15

PflGE 1

FILEi EP4424P_3

10 Bpr 1990 17i46i44

818 -

800 -

798

G9C9

CDto

•M

200CD

2OB25inOBto

8eginCOto

Ut(Sen09CO

roroSen00CO

roCOm00to

SI1901CDto

*•*

00to

to(9S)00CO

Page 46: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :A«iad la bar

PRESL0G:W3H

Service given before initiationrnone-interval :00:15

Initiation date:03/04/89Initiation time:lS:0O

Try-out results:OKMarkers given tU

Installation datei03/04/89Installation time:14:30

Installation description :try-out set-up-installation place:in GS-pipe in top-water level :none

Check up visit date :noneCheck up visit results:noneCalculated removal/stop date:18/07/89Calculated removal/stop time:-

Removal date:17/06/89Removal time:nkRemarks :-

-waterlevel:--sediment :-

Stop date :18/06/89Stop time :14:00

Service given :batteries changedEprom reading date:nkNumber of eprom :EP4436~1Number of eprom file :EP4A36P_1Number of administration f i lejAD4'f36P_lFloppy number of eprom file :3Floppy number of administration file:3Reference where results were listed

General remarks:1.

d«t«tl6 April 1990 (Monday) I61O8

41

Page 47: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTION

PROJECT

BEGIN DflTE

STHRT T U «

*

i

t

t

YEMEN

flMflD l a BHR

408046

030469

12)00

PLOT OF PRESSURE DHTR

ELEVflTION BflROMETER - DflTRLOGGER I 0 em.

BfiROMETER REHDING (STHRT) i 0 mB.

END DflTE t 180669

INTERVRL i 00115

PflGE 1

FILEi EP4436P_1

10 Hpr 1990 1 8 I 0 1 I 4 7

830

820 -

810

•-*eg8

CO(0

•«J&

CO(0

rosODU)

(9

5Ul00U>

C9a>SiCOto

entsUlCOto

ro(OOBU l00(0

roto8UlOBto

egtn

OBto

ro3OBto

(O

s

Page 48: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Aftiad lb

PRE5L0G:4433-l

Service given before initiation:none-interval :00:15

Initiation date:03/0<t/89Initiation time:12:00

Try-out resultsaOKMarkers given :3

Installation date:03/04/89Installation time:

Installation description :try-out set-up-installation piace:sensor =-52 cm wadi level-waterlevel :drum full,top drum=-33.5 cm wadi wl

Check up visit date :noneCheck up visit results:none

Calculated removal/stop date:18/07/89Calculated removal/stop time:-

Removal date:17/06/89Removal time:nkRemarks :-

-water level:--sediment ;-

Stop date :18/06/89Stop time :08:30

Service given {batteries changedEprom reading date:nkNumber of eprom :ep4<*33-lNumber of eprom file sEP<t433P_lNumber of administration file:AD4433P_lFloppy number of eprom file :3Floppy number of administration file:3Reference where results were listed :l+2

General remarks:1.

dat»il6 April 1990 <Monday) 16i20

43

Page 49: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STHTION

PROJECT

: YEMEN

i RMRD lb

t 408046

BEGIN DRTE I 030489

STRRT TIME I 12100

PLOT OF PRESSURE DflTfl

ELEVRTION BRROMETER - DflTflLOGGER I 8 on.

BflROMETER REBDING (STHRT) i 0 mB.

END DRTE i 180689

INTERVAL i 00i15

PRGE 1

FILEi EP4433P_1

10 flpr 1930 16t19:4?

mB845

635

825

815

805

?9S

egeg00CO

•MegCOce

ru

CD

Q

egu\CO(0

9 "megUlCD(0

•>«

UlegUlOB(0

ruruegUlOB(0

ruCOegUlCDCfi

Ul

3CD10

ruR03CO

CO

00CD

Page 50: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Amad lc

PRE5L06:4370-E

Service given before initiat ion:changed batteries-interval :00il5

Initiation date:03/04/89Initiation time:12:00

Try-out results:OKMarkers given ;3

Installation date:03/04/89Installation time: I*t:*t5

Installation description ;try-out set-up-installation piace:sensor=-98.5 cm wadi level-water level .-drum full, top drum=-72.5 cm wl

Check up visit date :noneCheck up visit results:none

Calculated removal/stop date:18/07/89Calculated removal/stop timer-Removal date:17/06/89Removal time:nkRemarks :-

-water level:--sediment :-

Stop date :18/06/89Stop time :08:30

Service given :changed batteries and rings.Eprom reading date:nkNumber of eprom :EP4370-£Number of eprom file :EP4370P_SNumber of administration file:AD4370P_SFloppy number of eprom file :3Floppy number of administration file:3Reference where results were listed :l+£

General remarks:1.

dat«il6 April 1990 (Monday) 16i33

45

Page 51: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STHTION t RMRD 1c

PROJECT t 488046

BEGIN DRTE i 038489

STBRT TIME I i2tB0

PLOT OF PRESSURE DOTH

ELEVRTION BBROMETER - DRTHLOGGER I 0 cm.

BfiROMETER REflDING (STRRT) I 0 mB.

END DRTE 1 180699

INTERVHL i 00(15

PflGE I

FILEi EP43?0P_2\Z Hpr 1890 1 S I 4 1 I 2 2

mB840

790 -

740 -

690 -

640

i

\

i i \ N i i i i i I i

*ssJkOD(O

ISOD(0

TO

8

00to

(S**BU)O3to

S

s"UlCOto

Uleg(0to

roroOUlato

ro(o8UlCDto

Q>UlCD0)COto

rocs0)CDCD

(08mCDto

Page 52: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Amad 1

PRESL0G.-W38-1

Service given before initiation:?-interval :00:15

Initiation date:23/0i/90Initiation time:13:00

Try-out results: following data was obtained in field atinstallation 83/01/90, 13:00 h :£3/01/90 13:00 last marker

,, 13:00 air,, 13:15 water of 143 cm on sensor,, 13:30 water of 143 cm on sensor,, 13:45 water of 143 cm on sensor

14:00 airthe results, when reading out, were the same.

Markers given : one at beginning and one at end

Installation date:S3/01/90Installation time:13:00Installation description :in pipe

-installation place:middle wadi-water level :-

Check up visit date :3/90Check up visit results: the pipe was moved; was under strong

slope and there was no sand aroundconcrete fouting anymore, pipe wadreplaced and sand restored.

Calculated removal/stop date:09/05/90

Calculated removal/stop times-

Removal date:02/05/90

Removal time:14:05Remarks : pipe was still vertical whereas there have been a

flood after reconstruction.-waterlevel:--sediment :normal

Stop date :03/05/90Stop time :08:S3

Service given {batteries and ringsEprom reading date:03/05/90Number of eprom :EP4438_1Number of eprom file :EP4438P_1Number of administration filer-Floppy number of eprom file :C: / floppy 7Floppy number of administration filet-Reference where results were listed <2General remarks! date:IB Hay I99O (Saturday) llsgl

Page 53: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTION

PROJECT

I YEMEN

t flMRD 1

t 406048

BEGIN DflTE i 230190

8TRRT TIME 1 13100

PLOT OF PRESSURE DflTfl

ELEVRTXON BftROMETER - DRTRLOGGER i 0 em.

BRROMETER RERDXNG (8THRT) i 0 mB.

END DflTE I 040990

INTERVRL t 00tl5

PHGE

FILEi EP4438P_1

5 Hay 1980 21itSi48

0>

usstoCD

3JS(0o

*-*Sto(9

ruSSru(0G3

ft)

Sto£3

SngC3

usto8

n>C9s(061

ruNstoeg

uegtoeg

004

toCO

N(9Uleg

8(0eg

seg(0<s

egmstoeg

Page 54: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION t RHRD I

PROJECT : 406046

BEGIN DRTE i 230198

STHRT TI^C i 13:00

PLOT OF HflTER LEVEL ELEVHTION

WHTER LEVEL ELEVRTION (STHRT) I 0 ».

BHROMETER REflDING CSTHRT) i 821 «B.

END DRTE : 230190

INTERVflL i 00)15

PRGE 1

FILEi EP4436P_£

3 May 1990 20:07:40

1,1 .1 .I ,1 ,1.

m.50.40.30.20.10,00

0.900.600.700.600.500.400.300.200.100.00

-0.10

Ul

III

§h i

in

t i l

g (tl

s Ul

u

M

in

tg

Ul

Ul

mui

01

s

en*ui

Page 55: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STATION t HKRD 1

PROJECT I 408046

BEGIN DATE i 12029a

STRRT TIME i 00100

PLOT OF HOTTER LEVEL ELEVATION

KRTER LEVEL. ELEVATION (STRRT) I 0 M.

BAROMETER READING (STRRT) I 621 «B.

END DRTE i 140290

INTERVAL i 00113

PAGE 1

FILEi EP443BPJI3 M«y 1990 2Bi23i32

m

0.40

0.300.20 H

0.10

0.00

-0.10

-0.20

-0.30

-0.40

-0.50

ru

CO

ca

s S (9•M

OCD t£i CD t ^ l\^ ^ ) ^^ CJ1 O ^ 0 CD ^ 0 u

Page 56: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEHENSTBTION t HMHD 1PROJECT t 408046

PLOT OF WRTER LEVEL ELEVflTION PflGE 2

FILEt EP443BPjfc3 May 1390 28:26:04

Page 57: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STHTION I flMHD 1

PROJECT i 408346

PLOT OF HRTER LEVEL ELEVHTION PflGE 3

FILEt EP443BP_£

3 M«y 1980 2Bt2Bi36

m0.40

tn

0.30 h

0.20

0.10

0.00

-0.10

-0.20

-0.30

-0.40

-0.50

sroto

2 8 8 2§ g g g g i

•si « § S — wSS S

en

SS § s

10

iraO

fOu

SS

Page 58: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMENSTflTION t HMflD 1PROJECT t 408846BEGIN DRTE : 220290STRRT TZME t 00100

PLOT OF WFITER LEVEL ELEVHTIONHHTER LEVEL ELEVHTION (STflRT) j 0 m.BRROMETER REflDING tSTRRT) : B2I mB.END DRTE i 230290INTERVHL t 001tS

PflGE I

FILE: EP4438PJ|

3 Hay 1990 20:34:10

m0.40

0.30

0.28

0.10

0.00

-8. 10

-0.20

-0.30

-0.40

-8.50

oi

rorotoO

2M

SC9

8g

sOl

s•M

g gsi s ca

IS(9 03 S S

eas i i (9S

ruu

i

Page 59: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMENSTHTION i RMRD 1PROJECT : 408046

PLOT OF WRTER LEVEL ELEVflTXON PRGE 2

FILEi EP4438PJI3 Itty 1S90 20:36:42

0.40

0.30

0.20

0. 10

0.00

-0.10

-0.20

-0.30

-0.40

-0.50rob)ISrou>IS

2 S SMl • • • •

§ s ss

8 5i s

s tD GO

g s— M u O1 O) CD CB • -

roru

row

Page 60: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY iSTRTION :PROJECT :BEGIN DflTE i

STRRT TIME :

YEMENRMRD I408046

260290

00:00

PLOT OF WRTER LEVEL ELEVRTION

WRTER LEVEL ELEVRTION (STRRT) : 0 m.

BRROMETER RERDING (STRRT) : 821 mB.

END DOTE : 270290

INTERVAL : 00:15

PRGE 1

FILE: EP443BPJI

3 Kay 1930 20:41:03

tn

m0.40

0.30

0.20

0.10

0.00

-0.10

-0.20

-0.30

-0.40

-0.50roenGJruto(S

S i2sIS

S S S 3

i i i §CB 1 9 •-•oo to co

i i ien a>

ros

isss § g i <s

C9 g sroISCD

Page 61: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION { flMHD 1

PROJECT t 408046

PLOT OF MflTER LEVEL ELEVflTION PRGE 2

FILE: EP4438Pjl

3 May 1990 20:43:34

m0.40

at

0.30 -

0.20

0.10

0.00

-0.10

-0.20

-0.30

-0.40

-0.50ro S 8 S 3 r\> m CO

ft) n> ru

CO

is

Page 62: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMENSTHTION : HMRD 1PROJECT : 408046BEGIN DRTE t 060490STflRT TIME : 00:00

PLOT OF HflTER LEVEL ELEVRTIONHRTER LEVEL ELEVRTION (STRRT) :8m.BRROMETER RERDING (STflRT) : 821 mB.END DRTE : 870490INTERVAL : 80:15

PRGE 1

FILE: EP4436P_5fc3 May 1990 20:53:It

m0.50

0.40

0.30

0.20

0.10

0.00

-0.10

Ol

C9O)

to

2 S Sg

2 oui

g g g

O »•* •«• *« * »-» •-• *•* •-• »-• H * ^ *u > Q » n i t J A U i m M c o c o

s0 s g en

sg g

ruCO

ru

s

ruru

COea

rou

g

Page 63: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

III

PLACE :Mahajaba 1 / Amad 2

PRESL0G:44Sl-0Service given before initiation:none

-interval :OO:15 •Initiation date:15/01/38Initiation time:19:45 _

Try-out results:OK •Markers given :1

Installation date:18/01/88Installation time:10:00 Mahajaba a

f Installation date:O9/O3/88V Installation time:13:00 Mahajaba b

Installation date:O6/O4/88Installation time:13:45 Amad £

Installation description Mahajaba a:in drum with 3O cm sand above-installation place:in reservoir front old dam-waterlevel :drum full with water

Installation description Mahajaba b:in drum with 80 cm sand above-installation place: in narrow gorge ;future

dam place-waterlevel :drum full with water

Installation description Amad 2 lin drum with 55 cm sand above-installation place:middle of wadi at 850.3 m. of

Amad 1 with netting-waterlevel :drum full with water and

boulders,sen»or=-l.40 mwadi level

s- Check up visit date :2 times:when moving^ Check up visit results:OK

Calculated removal/stop date:30/04/88Calculated removal/stop time:-

Removal date Mahajaba aRemoval timeRemarks

-waterlevel-sediment

Removal date Mahajaba bRemoval timeRemarks

-waterlevel-sediment

Removal date Amad 8

09/03/8810:O0

nk

18/08/88

58

I

Page 64: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

IIIIIIIII

Removal time :13:00Remarks s-

-waterlevel :--sediment :-

Stop date :nkStop time :nk

Service given :changed batteriesEprom reading date:nkNumber of eprom :ep4*»21-0Number of eprom file :EP<f4SlP_0Number of administration f i le:AD4<»£lP_0Floppy number of eprom file :l/£Floppy number of administration files'*Reference where results were listed :l+2

General remarks:

r i-

d«t»il6 April 1990 (Monday) 17il8

59

Page 65: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STRTION i RMHD 2

PROJECT i 406846

BEGIN DRTE i 040488

STRRT TIME t 00100

PLOT OF PRESSURE DRTR

ELEVRTION BRROMETER - DRTHLOGGER t 0 on.

BRROMETER REHDXNG (STRRT) I 0 mB.

END DRTE I 020588

INTERVAL 1 00113

PRGE 1

FILEi EP4421P_011 Rpr 1990 09i33t31

atO

mB920

980 -

880 -

860 -

840| | 1 ; | | | | | | | |Y| | *fV| r \ / l

| 1T i TV I i

g2CO00

oensCDCO

o<n

2OBOB

CS•M

2CDCD

C900

2COCO

G>(0

2CD

S)

20000

2CDCD

rooODOD

fa)

2CDCO

2CDCO

tn

2ODOD

0)S

00CD

•si<SCDto

CDCBCDOD

tocaCDOD

ru

2ODOD

ro

oODCO

roro

200to

rob)

2CDOB

n)4k.

200OD

rutncaCD00

ruO)

203CO

ru•si

2CDOB

ru00

2ODOD

ruto

2CO00

u8200OD

sOB00

egrust0000

25!CDCD

Page 66: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STATION : flMflD 2

PROJECT : 408046

BEGIN DRTE : 1304S8

STRRT TIME : 12:00

PLOT OF WFITER LEVEL ELEVRTION

HRTER LEVEL ELEVRTION (STflRT) : 0 m.

BRROMETER RERDING (STRRT) : 805 mB.

END DHTE : 140468

INTERVRL : 00:15

PRGE 1

FILE! EP4421P_0

11 flpr 1990 06:52:25

m-0.30

-0.35

- -0.40

-0.45

-0.50

-0.55

-0.60 l-1-ro

§ g stg

CO

o

o>

i*\1 CD

i iCO

stg

roIS

§ro

egeg

roro

g

row

S oCOCD

eg

02

g §2 a O) -Nl CD CO es

COtg s s

Page 67: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STBTION i RMRD 2

PROJECT t 408046

BEGIN DflTE t 190488

STRRT TIME ) 12:00

PLOT OF WRTER LEVEL ELEVHTION

VtRTER LEVEL ELEVRTION (STRRT) : 0 m.

SflROMETER RERDING (STRRTJ i 80S mB.

END DRTE t 200488

INTERVRL t 00tl5

PRGE 1

FILE: EP442iP_011 flpr 1990 08:58:14

atto

0 .

0 .

0 .

- 0 .

- 0 .

- 0 .

- 0 .

m20

10

00

10

20

30

40

-0.50

-0.80Ul m (O

tos

IX)u

S 8 8 8 8 8 8S S 2 38 8 8 8

38 8 8

COCD

Page 68: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY j YEMENSTflTION : RMRD 2PROJECT : 408046BEGIN DRTE i 280468STflRT TirC ; 12i00

PLOT OF MflTER LEVEL ELEVHTIONWRTER LEVEL ELEVATION (STRRT) :0m.BRROMETER RERDING (STRRT) : BBS mB.END DRTE t 219488INTERVRL : 00:15

PRGE 1

FILE: EP442IP_8

11 Hpr 1930 09:33:27

O)CO

Page 69: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION i RMRD 2

PROJECT t 408048

BEGIN DHTE t 2S0488

STRRT TIME i

PLOT OF WRTER LEVEL ELEVRTION

WRTER LEVEL ELEVRTION (STRRT) i 0 m.

9RR0METER RERDING (STRRT) t BBS mB.

END DRTE t 270488

INTERVRL i 00s15

PflGE 1

FILEi EP4421PJB

I I flpr 1980 09:47:58

m.20

0.10 -

0.00

-0.10

-0.20

-0.30

-0.40

-0.50

-0.60ru u 0) tO s -

s sM

sft)fal

3roMC9

CO00

2 8• i #•

s s83

S3

8 8 3 8

Page 70: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :A(nad 2

PRESL06:WE7-l

Service given before initiation:changed batteries-interval :00:15

Initiation date:19/09/88Initiation time:07:15

Try-out results:0KMarkers given :2

Installation date:19/09/88Installation time:10:00

Installation description tin drum with 55 cm sand above-installation placesmiddle wadi-waterlevel :drum full with water and boulders

sensor=-l.40 m wadi level

Check up visit date :noneCheck up visit results:-

Calculated removal/stop date:03/0l/89Calculated removal/stop time:-

Removal date:08/01/89Removal time:10:55Remarks :-

-waterlevel:--sediment :-

Stop date :03/01/89Stop time :08:52

Service given :noneEprom reading date:nkNumber of eprom :EP4A27^1Number of eprom fileNumber of administration f i l _Floppy number of eprom file :1/SFloppy number of administration file:2/4Reference where results were listed :l+2

General remarks:1.

dat«il6 April 1990 (Monday) 17iS8

65

Page 71: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STflTION s RMRD 2

PROJECT : 408846

BEGIN DflTE I 19099B

STRRT TIME t 07115

PLOT OF PRESSURE DRTfl

ELEVflTION BflROMETER - DRTRLOGGER : 0 em.

BRROMETER RERDING (STRRT) t 0 mB.

END DRTE t 030189

INTERVRL i B0tlS

PRGE 1

FILE* EP4427P_tB11 Rpr 1990 10106:23

0>

840 -

830ro<ns(OCD00

si03

8

800

QCDCO

ru

CO

10

500CD

8•M* • *

ODCO

0000

ro*-*COOD

roCD> • *

00CO

(Jt

roCD00

ro1—»

COCO

CD

roCDOD

roen»-*roCDCD

s8

' CD(0

Page 72: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

IIIIIIIIIIIIIIIIIIIII

PLACE :Amad E

PRESL06:W33-0

Service given before initiation:none-interval :00:15

Initiation date:02/01/89Initiation time:08:15

Try-out results:OKMarkers given :2

Installation date:02/01/89Installation time:10:55

Installation description sin drum with 55 cm sand above-installation place:middle wadi-waterlevel :drum full with water and boulders

sensor =-1.40 m wadi level

Check up visit date :noneCheck up visit results:-

Calculated removal/stop date:18/04/8?Calculated removal/stop time:-

Removal date:02/04/89Removal time:14:50Remarks :-

-water level:--sediment :-

Stop date :03/04/89Stop time :08:25

Service given :noneEprom reading date:nkNumber of eprom :EP4433-0Number of eprom file :EP4433P_0Number of administration file:AD4433PloFloppy number of eprom file :T/2Floppy number of administration file:S/4Reference where results were listed

General remarks:1.

d«t«H6 April 1990 (Monday) 17i38

67

Page 73: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRYSTRTION

PROJECT

BEGIN DOTE

STRRT TIME

i

t

1

t

t

YEMENRMRO 2

408046

820189

BBilS

PLOT OF PRESSURE DRTR

ELEVRTION BRROMETER - DRTRLOCCER I 0 em.

BRROHETER RERDZN6 (STRRT) i 0 mB.

END DRTE t 03B4B9

INTERVRL t 80tl5

PRGE 1

FILEi EP4433P_B

11 Rpr 1990 10)28(43

mB970 r

940

918

see

859

820 1 I I I I ] I I

sCD(9*^CDCO

(90010

U(95U)

QCO•-*03U3

ms00(O

egroCDto

ro

roCOto

ro•Ms00to

egoi(9uCDto

(1)egb)COto

§b)00to

ro>Jegtoooto

eg01csCDto

Page 74: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMEN

STATION i RMHD 2

PROJECT : 406046

BEGIN DRTE : 050289

STRRT TIME : 12:00

PLOT OF HRTER LEVEL ELEVRTION

HHTER LEVEL ELEVRTION (STRRT) : 0 m.

BRROMETER RERDING (STRRT) i 823 mB.

END DRTE : 060289

INTERVRL : 00:15

PRGE 1

FILE: EP4433P_0

11 Rpr 1990 10:42:35

m-0.30

-0.48

-0.50

-0.60

-0.70

o>

rvtcaca

CO

ea caca ea

en m

s sca to

» • *

M*•cas

CO• •

sto••eaca

ro69

oca

ro***a .

CBca

roroCBCB

rotoa t *

eaca

egenegroCDCO

CB

••CBca

63

roatit 2 S 69

cneaCO

§ 6)CO ca

63s CB

caeas

CD GJ ***

i i i

Page 75: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUKTRY t YEMENSTflTION t RHRD 2PROJECT : 406046BEGIN DRTE i 210389STHHT TIME t 12t00

PLOT OF WRTER LEVEL ELEVRTIONWflTER LEVEL ELEVATION (STRRT) I 0 m.BRROMETER REROXNG (STRRT) t 823 mB.END ORTE i 030489INTERVRL • 001 IS

PRGE 1

FILEi EP4433P_0

I I flpr 1890 10t56t40

Mro••8

fa)• a

sro

sCDCO

2aa

82 a 3 8 — —

a a -•• *• •• •*8 B 9 3

Page 76: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMEN

STRTION : flMRD 2

PROJECT : 408046

PLOT OF WRTER LEVEL ELEVHTION PRGE 2

FILE: EP4433P_0

11 Rpr 1990 10:59:58

0.

0.

0.

0.

0.

0.

0.

0.

-0.

-0.

-0.

-0.

-0.

-0.

-0.

m?060

50

40

30

20

10

00

10

20

30

40

50

60

70

i i i i i i i iruru• •

g

rouBE>

rouG3CJJ

m

oro

su 2 g g CD ca —s § CO

SS ea CO

(S

Page 77: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRT1ON

PROJECT

YEMEN

HMRD Z

496846

PLOT OF HflTER LEVEL ELEVBTION PRGE 3

FILEi EP4433P_0

11 Hpr 1990 11(03:16

to

Page 78: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMENSTRTION : flMTO 2PROJECT : 408046

PLOT OF MHTER LEVEL ELEVHTION PflGE 4

FILE: EP4433P_0

11 Rpr 1990 11 :06:34

m0.700.60

0.50

0.400.

0.

0.

0.

-0.

-0.

-0.

-0.

-0.

-0.

-0.

30

20

10

00

10

20

30

40

50

60

70u>eaea

U! O) VI CD CDru ru(B • -

eas g g g g 8 iruru••eaea

to

99

roUl(9U)CD10

eaM

eas

S 5 eaut ea

OB

ea —co eaeaea eaea g g

Page 79: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTXON i RMHD 2

PROJECT l 4080-46

PLOT OF WflTER LEVEL ELEVflTION PRGE 5

FILEi EP4433PJB11 Hpr 1990 1 1 I 0 9 I 5 2

m0.780.60

0.50 | -

0.40

0.30

0.20

0.

0.

-0.

-0.

-0.

-0.

-0.

-0.

-0.

10

00

10

20

30

40

50

60

70 t

ru in

ea(9

<n~ •» ruCD ID Q

ruru rv)

eg § § g sw 5

g i00CO

? ? ? ?(9 S S C9

so

s *- •-( O S

i l l

Page 80: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMEN

STRTION : BMRD 2

PROJECT : 408046

PLOT OF HHTER LEVEL ELEVRTION PRGE 6

FILE: EP4433PJ0

11 flpr 199B 1 1 : 1 3 : 1 0

e.e.0.0.0.0.0.0.

-0.-0.-0.-0.-0.-0.-0.

m706050403020100010203040506070

rooa

tti

s

enro tu

C38 § g s

(9

egeg s s

s

roro•a

s

roto ro 5

COto

Sg g

COM

eaess s ea •-

eaea s<s

Page 81: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTIQN

PROJECT

• YEMEN

: HMHD 2

i 406046

PLOT OF WRTER LEVEL ELEVHTION PHG£ ?

FILEt EP4433PJ3

11 Rpr 1990 U i l 6 i 2 8

m0.70

0>

0.60 -

0.50 -

0 .

0 .

0 .

0 .

0 .

e.a.0 .

0 .

40

30

20

18

00

10

20

30

40

• • • •

-0.50

-0.G0

-0.70

* ~ ~ — — - •

9(9

*. tn CD S

i g g i § g g g g gruCOSoo

2 S 2 s(II

g g g g g g g g

Page 82: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEhCN

STHTION t RMFTO 2

PROJECT t 486046

PLOT OF WRTER LEVEL ELEVflTION PflGE 8

FILEJ EP4433P_011 flpr 1990 11:19:46

m0.70

0.60 -

0.50

0.40 {--

0.30

0.

0.

0.

-0.

-0.

-0.

-0.

-0.

-0.

-0.

20

10

00

10

20

30

40

50

60

70n> o> oo

ro ros *-

roru ro

g § s g s S) g gruu>(9(jjooCO

oro

g g2 Si i

ts IS0)

(Sto ts

S S (Soa g g is

IS

Page 83: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STflTION i flMRD 2

PROJECT t 408046

PLOT OF WflTER LEVEL ELEWTION PHGE 9

FILEi EP4433P_0

11 Rpr 1930 Ili23t04

m0.70

00

0.60 —

0.50 —

0.40 h-0.30

0.20

0.10

0.00

-0.10

-0.20

-0.30

-0.40

-0.50

-0.60

-0.70 TUl 01 >- ro

(D CDs s 8 8 8u u

8 §CD

s a s 9 -

8 8

Page 84: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMEN

STBTION i RMRD 2

PROJECT : 408046

PLOT OF WHTER LEVEL ELEVHTION PRGE 10

FILE: EP4433P_0

11 Rpr 1990 1 1 : 2 6 : 2 2

(0

n> en

sen

s s csIS

o s § egCD

Qss ea

G3s s s

ISs IS o (S

Qss

Page 85: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTION

PROJECT

i YEMEN

i RMRD 2

i 408046

PLOT OF WRTER LEVEL ELEVRTION PRGE 11

FILEt EP4433PJ3

11 Rpr 1990 Il:29t41

m0.700.80 -

0.50 —

0.40 —

0.30 -

0.20

0. 10

0.00

-0.10

-0.20

-0.30

-0.40

o

-0.50

-0.60

-0.70ro o> CO iw ru

s —s s sMUa»s s

gCDto

g a s

Page 86: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YENEN

STftTION : HMRD 2

PROJECT : 408846

PLOT OF HflTER LEVEL ELEVHTION PflGE 12

FILE: EP4433P_0

11 Rpr 1990 1 1 ) 3 2 : 5 3

m0.700.60

8.50 -

0 .

0 .

0 .

0 .

0 .

- 0 .

- 0 .

- 0 .

- 0 .

- 0 .

- 0 .

- 0 .

40

30

20

10

00

10

20

30

40

50

60

70

ro

SO03

tn

S(9

m

i itoegea

ssea

egeg

rorueaea

roweaea

<Sro(900u>

eg

sea

19wss § s

eaOIssi

es•s/

9 S £ ~(D CO Q ^i i eaea eaea ss

Page 87: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRYSTRTIONPROJECT

t YEMENs RMflD 2j 408046

PLOT OF NRTER LEVEL ELEVHTION PRGE 13

FILEi EP4433P_011 Rpr 1990 Ui36tl9

rss

m0.700.60 -0.50 -0.40 -0.30 -0.20 -0.0.

10 -00 -

-0.10 --0.

-0.-0.

-0.

-0.

-0.

20

30

40

50

60

70 . T r \ i i i i

ftl tflra M

s -ft)

n)u

S g 3 3Seg00

2 18 8 S3 3 3 S 3

Page 88: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

IIIIIIIIIIIIIIIIIIIII

PLACE :Anad Ea

PRESL0G:W2B-l

Service given before initiation:changed batteries-interval :OO:15

Initiation date:03/04/89Initiation time:lB:OO

Try-out results:OKMarkers given :4

Installation date:03/04/89Installation time:13:55

Installation description :try-out set-up-installation piace:sensor =+SS.5 cm wadi level-waterlevel :none, bottom hole is +7.0 cm wl

Check up visit date :-Check up visit results:-

Calculated removal/stop date:18/07/89Calculated removal/stop time:-

Removal dates 17/06/89Remova1 t i me:-Remarks :-

-waterlevel:--sediment :-

Stop date :18/06/89Stop time :08:30

Service given inoneEprom reading date:nkNumber of epromNumber of eprom fileNumber of administration f i _Floppy number of eprom file :3Floppy number of administration file:3Reference where results were listed :1+S

General remarks:1.

d«t«il6 April 1970 (Monday) 17i36

Page 89: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STflTION t RMRD 2i

PROJECT i 408846

BEGIN DHTE i 030489

STHRT TIME s 12:00

PLOT OF PRESSURE ORTR

ELEVHTION BRROMETER - DRTRLOGGER i 0 on.

BRROMETER RERDING (STRRT) i 0 mB.

END DHTE t 190689

INTERVffl- i 00115

PRGE 1

FILEi EP4429P_1

11 Rpr 1990 Ut57t 11

00

810 -

800 -

790

8800U

200to

ru200(0

8

. amto

ssou>

sCDU>

ruruS0010

rutoSI00to

u>s0)00CO

6O)COto

(9mCO(0

Page 90: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

IIIIIIIIIIIIIIIIIIIII

PLACE :flaad Eb

PRESL0G:W27-3

Service given before initiation:none-interval :00:15

Initiation date:03/04/89Initiation time:12:00

Try-out results:okMarkers given :3

Installation date:03/04/89Installation time:13;55

\ Installation description :try-out set-up-installation place:sensor= -67 cm wadi level-Materlevel :drum full,top drum=-44 cm wl

Check up visit date :-Check up visit results:-

Calculated removal/stop date:18/07/89Calculated removal/stop time:-

Removal date:17/06/89Removal time:-Remarks :-

-water level:-—sediment :-

Stop date :18/06/89Stop time :08:30

Service given sbatteries and rings changedEprom reading date:nkNumber of eprom :EP44S7-3Number of eprom fileNumber of administration f i _Floppy number of eprom file :3Floppy number of administration file:3Reference where results were listed :l+2

General remarks:1.

datei16 April 1970 (Monday) I81I6

85

Page 91: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STATION

PROJECT

i YEMEN

i RMRD 2b

i 488046

BEGIN DflTE : 038489

STRRT TIME t 12i00

PLOT OF PRESSURE DHTR

ELEVATION BRROMETER - DRTRLOGGER t 8 cm.

BflROMETER READING (STRRT) i 8 mB.

END DRTE t 180689

INTERVflL t 88il5

PRGE 1

FILE: EP4427P_3

11 Rpr 1990 12)36)12

mB850

840

830

820

810

800

0»o>

iC9gtoto

*-*•M

g00to

ru83

COto

CD

sCOto

sCOsUlCOto

UlCOUlCOto

rorocaUl00to

rotos00to

SIm00to

MC9O)00to

tos00to

Page 92: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Amad 2

PRESL0G:W33-3

Service given before-interval

initiation:?:00:i5

Initiation date:23/0l/90Initiation time:13:00

Try-out results: following data was obtainedinstallation 83/01/90, 13:00 h23/01/90 13:00 last marker

13:00 air13:15 air13:30 air13:45 air

in field at

14:0014:1514:3014:4515:0015:15

waterwaterwaterwaterwaterair

ofofofofof

143143143143143

cmcmcmcmcm

ononononon

sensorsensorsensorsensorsensor

Markers given

the results, when reading out, weredifferent:-not any increase in pressure can be observedas can be noticed on the listing of the file.

:one at beginning, none at end

Installation date:£3/01/90Installation time:13:00

Installation description :in pipe-installation place:middle wadi-water level :-

Check up visit date :3/90Check up visit results:OK, vertical

Calculated removal/stop date:O9/05/90Calculated removal/stop time:-

Removal date:03/05/90Removal time:? (Mohammed S)Remarks : the pipe was under strong slope, large amount of

sediment in pipe, the logger could not be removedOS/05/90 but only O3/O5/9O when the pipe was takenout and a new one was installed,

-water level:--sediment :as described

87

Page 93: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

II

Service given tnew batteries (plate) and rings IEprom reading date:O5/O3/9O EissaNumber of eprom sEP<^33-3 MNumber of eprom file sEP**»33P_3 INumber of administration files- ~~Floppy number of eprom file scs / floppy 7 _Floppy number of administration file*— IReference Mhere results Mere listed 3S •

General remarks: •1.Longer record than Amad 1 because logger staid one day longer Iin field.

Idate13 Hay 1990 (Saturday) I81OO _

88

Page 94: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMEN

STRTION i RHfiD 2

PROJECT : 408046

BEGIN DRTE i 230190

STRRT TIME t 13)00

PLOT OF PRESSURE DRTfl

ELEVRTION BAROMETER - DRTHLOGGER J 0 cm.

BRROMETER RERDING CSTRRT) i 0 mB.

END DRTE t 040590

INTERVHL i 00:15

PflGE t

FILE} EP4433P_3

5 M»y 1990 13:04:5?

mB

950 —

900 | ~

850

800

750

700

650

600

550

500

00CO

tt

toeg

01egrotoQ

us(0C9

roQsroU)o

-sJegroCOs

<s0)(S0)to

b)QOJtoQ

roC3Q( j j

toQ

ro•si

8to<s

QO>egtoo

•—*egeg-b.toeg

-« j

eg-fc.

toeg

roj i .

eg* .toeg

egI—*

egtittoeg

eg00egUlto

Page 95: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION i RHflD 2

PROJECT i 480046

BEGIN DHTE i 030290

STflRT TIME t 00100

PLOT OF PRESSURE DRTR

ELEVRTION BRROMETER - DHTHLOGGER i 0 en.

BflROMETER REROXNG (STflRT) i 0 tnB.

END DRTE I 030290

INTERVflL t 00t15

PRGE 1

FILEt EP4433P_3

S M»y 1990 13i43t28

mB808

(O

o

750 -

700

650

600

550

500ssrou>Q

s si i

2 a xi i g g

S 5i i

01•-> N l\)to s •» IV)

S g g s g

Page 96: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMEN

STRTION : RMflD 2

PROJECT : 406048

BEGIN DRTE : 240298

STRRT TIME : 00:00

PLOT OF HRTER LEVEL ELEVRTION

WRTER LEVEL ELEVRTION (STRRT) :0m.

SRROMETER REROING (STRRT) : 821 mB.

END DRTE : 2402S0

INTERVRL : 00:15

PflGE 1

FILE: EP4433P_3S May 1990 16:35:45

(D

m1.60

1.40 -

1.20 -

1.00

0.90 -

0.60 -

0.40 -

0.20 -

0.00

-0.30 f 1 1 1 1 1 1 1 1 1 1 I I 1 1 1 1 t 1

- "—'

Tt1

I

L

ru(3rou>C9

ss

sru

s

eg01aea

C301

ea iISto

s

~ toeaea eas ea

eg

tit

eaea

Uleaeg

O)

ea00

eaea

CO

eaea

eaeaea

ruroeas

ruto•hieaea

Page 97: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STRTION t flMHD 2

PROJECT I 406848

BEGIN DRTE i 160398

BTHRT TIME I 12100

PLOT OF WflTER LEVEL ELEVHTION

HflTER LEVEL ELEVflTION <STHRT) i 0 m.

BflRONETER RERDING (STHRT) I 821 mB.

END DRTE i 170390

INTERVRL i M i 13

PflGE 1

FILEi EP4433P_3

S May 19S0 1SI2?I88

Rl

0.50

0.45 -

0.40(0ro 0.

0 .

0 .

35

30

25

0.20

0.15

0. 10n> in 01 M ta

rus ru IV

rv)

g g g g g gMstoto

a *-g s s

Page 98: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY ! YEMEN

STATION I flMRD 2

PROJECT : 486046

BEGIN ORTE : 270390

STflRT TIME : 08:00

PLOT OF KHTER LEVEL ELEVRTION

WflTER LEVEL ELEVRTION CSTflRT) : 0 m.

BRROMETER REHDING (STRRT) : 821 mB.

END DRTE : 270330

INTERVRL : 00:15

PflGE 1

FILE: EP4433P_3

5 May 1990 16:44:42

m0.50

(0

0.45 -

0.40

0.35

0.30

0.25

0.20

0.15

0.10

G>fa)(0CO

s gs § s

sineaCD

ss

s

•M

S

(9to ta ui CD

§ s S Q (g o Q S

to

sCD

ft)(9

ft) ru

§ s §a)sts

Page 99: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STflTION

PROJECT

t YEMEN

t RMRD 2

I 408046

BEGIN DflTE i 300390

3TFMT TIME t 00100

PLOT OF WRTER LEVEL ELEVftTIDN

HRTER LEVEL ELEVHTION (STflRT) t 0 m.

BflROMETER REflDXNG (8TBRT) i 821 »B.

END DflTE i 300390

INTERVAL i 00113

PflGE 1

FILEi EP4433P_3

9 Hmy 1990 19i51iS8

m0.G0

8.50 -

0.40 —

0.30 —

0.20 -<

0.10 -

0.00

-0.10

-0.20

-0.30

-0.40

-0.50

-0.60

-0.?0U)QCStt)toCO

s*-*g

Qnt

gei

2:00 i

g g s •- u Cfl (0

S s 5 8 s § g g §

Page 100: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STRTION : RMRD 2

PROJECT : 406048

BEGIN DRTE : 31039B

STRRT TIME : 80:00

PLOT OF HRTER LEVEL ELEVRTION

WRTER LEVEL ELEVRTION (STRRT) : 0 m.

BflROMETER REH0ING (STRRT) : 621 mB.

END DRTE : 010490

INTERVRL : 00:15

PRGE 1

FILE: EP4433P_3

5 May 1990 16:50:00

Page 101: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY I YEMEN

STRTXON t HMRD 2

PROJECT : 40B04B

PLOT OF WRTER LEVEL ELEVRTION PRGE 2

FILEi EP4433P_3

5 Hmy 1990 IBI53I09

m0.60

to

0.

0.

0.

0.

0.

a.-B.

-8 .

- 8 .

- 0 .

- 0 .

-0.

- 0 .

50 —

40 —

30

20

10

00

10

20

30

40

50

-0.60

70s 2

s iu>C9

sss

au ss

01

g s ss g s s g•M

gs

ss

ru

ss

ruruu

i g

Page 102: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Amad well land

PRESLOG:4331-1

Service given before initiation:none-interval :00:l5

Initiation date:23/01/90Initiation time:13:00

Try-out results:not tried in stand pipeMarkers given : one at start 23/01/90 13:00 h. and one at

end: O3/O5/9O 07s20 h.

Installation dates83/0l/90Installation time:13:00 last marker, in well at +/- 14:30 h.

Installation description : in container-installation place: in non pumped shallow well

north of Amad 1, inagricultural lands, sensor at-14.60 m top flat stone at oldpump place,

-waterlevel : -12.60 m. to reference

Check up visit date :3/9OCheck up visit results:OK

Calculated removal/stop date:09/05/90Calculated removal/stop times-Removal date:02/05/90Removal time:14:10Remarks :-

-water level:--sediment :-

Stop date :03/05/90Stop time iO8:23

Service given :new batteries and ringsEprom reading date:03/0S/90 EissaNumber of eprom :EP4331-10Number of eprom file :EP4331P_lNumber of administration files-Floppy number of eprom file :C: /floppy 7Floppy number of administration files-Reference where results were listed :2

General remarks:-datfttS May 1990 (Saturday) 18t49

97

Page 103: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STATION i HMRD WELL LflND

PROJECT t 406048

BEGIN DflTE t 230190

STHRT TIME t 13i00

PLOT OF PRESSURE DfiTfl

ELEVRTION BHROMETER - DRTRLOGGER i *0 cm.

BRROHETER RERDING (STRRT) i 0 mB.

END DflTE i 0S05S0

INTERVRL i 001 IS

PHGE 1

FILEi EP433lP_l

S May 1990 17i08i2?

to00

mB1270

1220

1170

1120

1070

1020

970

920

870

820

770

Jl « £. J

jJT

1—-tUHfcMBT r = r r j -

1 1 ! 1 1 1 1 1 t 1 1 1 1 1 1Id

gCO

s

s0)srou)S

CJCD(V(0S

roeg8rotos

roMSrou>CO

s0)

210(3

u(9totoca

ro

£00

to19

ro•sisto(9

egu2toeg

**

to(9

*•*•M

2to(9

ro s2toeg

85)

SItoeg

Page 104: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY :

STflTION :

PROJECT :

BEGIN DRTE :

STFIRT TIME t

YEMEN

RMRD HELL LflND

406048

230190

13:00

PLOT OF HHTER LEVEL ELEVHTION

WHTER LEVEL ELEVHTION (STBRT) : 0 m.

BflROMETER REflDING (STRRT5 : 800 rnB.

END DRTC : 240190

INTERVRL J 00:15

PflGE 1

FILE: EP4331P_J

5 May 1930 17:53:45

m12.30

to(0

12.50 -

12.70 -

12.90

13. 10

13.30

13.50

13.70

13.90

14.10

14.30

14.50

14.70tn

O S S

CO

iC3

iro

irorus>eg

ruws(9

ro•&•ta%-+tos>

aru

ou CB ts to eg

-fc UI 01 Nl

i i i i(3 _- — _to 6) •- ru

s § §

Page 105: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMEN

STRTION t RMRD WELL LRND

PROJECT : 406049

BEGIN DRTE i

STRRT TIME i

120290

PLOT OF WfiTER LEVEL ELEVflTION

NRTER LEVEL ELEVflTION (STRRT) i 0 n.

BRROMETER RERDING (STflRT) i 600 «B.

END DRTE i 030590

INTERVRL t 00115

PHGE 1

FILEi EP4331P_1

S May 1990 18I24I03

OO

m-09.B0

-10.10

-10.80

-11.10

-11.IB

-13.10

-18.60

IStSS

(0S

18eg

8 IS(0a

80)

8(0CB

8 ISCDs

IStos

8

m-89.60

•18.10

-10.10

-It.10

•11.60

-12.10

-11.80to13108

89

s

M

s(Ds

88

8 8 8 8Mm

(as

8

.60

-18.10

-10.60

-11.10

-11.60

-12.10

-12.68

mi.60

•10.10

-10.68

-11.10

•11.60

-12.18

ro702

(0s

*• 8tos

8

103

(0o

S 5 28 8 8a e>

-12.68M V* M

8 8 8? 8 58 8 8

(0s

(00)

s au

Page 106: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

BTRTION i RMflD HELL LHND

PROJECT i 408048

PLOT OF HHTER LEVEL ELEVRTION PflGE 2

FILEt EP4331P_IS M»y 1880

-09.60-18.10-10.60

-II.IB

-11.60

-11.1

-12.60

-09.80

-10.10

-10.60

-11.10

-11.60

•It.10

to

wI Sto

(9

ft)

8 8 8 8 8to

s10(9

IBIB

1 Ift*m

8 to

-12.60

COB

toa

8toB

M

i 8tos

(0s

5 5J 5 K 5

. 111 •

-10.10

-10.60

-11.10

-11.60

-IS.10

-12.60

-es.BB

-10.10

run. -10.60

-11.10

-11.60

•12.10

to8 S 8 S 8 8 8 8 8 S 8

CD tO tO tO tO

s o ea s eo

-12.80ISstoB

ft)

i8j( 0o

8SstoB

M

8S5tos

M

885toB

p a

8 5tos

Page 107: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION t flMRD HELL LRND

PROJECT i 406048

PLOT OF WP.TER LEVEL ELEVRTION PRGE 3

FILEi EP433IP_1

5 M«y 1990 18t34iS8

-09.60

-10.10-te.ee

-11. IB-11.60

-18.ie-12.60.

m-09.60

•10. 10

•te.ee• l i . te

-u.ee•12.10

to

a 8 ' I * g <08

-12.6058

52g

Bg

S2g

B8

S2g

g312S

B8

»•*2(08)

8lil2(0s

-09 ,eS-IB.10-te.ee-I t .10-11.60-12.10-12.60

-10.10-ie.ee

-11.10

-11.60-12.10

N

2ru•M (0

8 2 8 2 8 2 8 2 8 2 8 2 8( D M (0 (0 tO (0

s s s s s s

-12.60u

82

(0s

Page 108: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Afliad w e l l wadi

PRE5L0G:4333-l f

Service given before initiationsnone-interval sOO:lS

Initiation date:23/Ol/9OInitiation ti«e:13iOO

Try-out results: not tried out in stand pipeMarkers given : one at start 23/01/90 13:OO h. and one at

end: 03/05/9O 07s20 h.

Installation dates23/01/90Installation time:13iOO last marker, in well at */- 15:00 h.

Installation description : in container-installation place: in well at border of wadi,

about ISO m downstream ofAmad-1, sensor at -11.50 m topstone at wadi side.

-waterlevel : -8.8O m to reference.

Check up visit date :3/90Check up visit results:OK

Calculated removal/stop date:O9/O5/7OCalculated removal/stop times-Removal date:O2/OS/9ORemoval time:14:23Remarks :-

-waterlevel:--sediment :~

Stop date :03/05/9OStop time 108:33

Service given snew batteries and ringsEprom reading dates03/05/90 EissaNumber of eprom JEP4333-IONumber of eprom file :EP4333P_1Number of administration files-Floppy number of eprom file :C: / floppy 7Floppy number of administration files-Reference where results were listed :2

General remarks;1.

dat«t9 Nay 1990 (Saturday) 18i47

103

Page 109: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION i RMRD WELL WRD2

PROJECT i 406048

BEGIN DflTE i 230190

STRUT TIME t 13t08

PLOT OF PRESSURE ORTR

ELEVRTZON BRROMETER - DHTRLOGGER i 0 on.

BAROMETER REflDING (8TRRT) I 0 mB.

END ORTE t 030590

INTERVAL i 00iIS

PRGE 1

FILEi EP4333P_1

S May 1S90 19i06t35

mB

u(SstoCD

s>0)oroCOes

u

COOB

ro

CO

aCO

S§CO09

COsCDs

roS2tos

ro•si

2toa

(9

2COs

004

tos2CO09

ro2COa

s

SICO(9

aCOa

Page 110: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STBTZON : RMRD WELL WflDI

PROJECT t 406048

BEGIN DRTE t 230180

STRRT TIME I 13i00

PLOT OF HHTER LEVEL ELEVflTlON

WHTER LEVEL ELEVRTION (STRRT) i 8 m.

BRROKETER REROING CSTHRT) t 816 tnB.

END DRTE t 240180

XNTERVflL : 08115

PRGE 1

FILEi EP4333P_1

5 M*y 1990 tSi26iS5

m-8.50

-9.00 H

09.50o

10.00

10.50

11.00

11.50

12.00 Llm

ru M to DJ S S S 2 I8 8 5 S 8 5

COts

Page 111: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEHEN

STHT1ON i RMRD HELL WRDI

PROJECT i 406046

BEGIN ORTE t 058298

STflRT TIME i 00100

PLOT OF HRTER LEVEL ELEVflTION

MHTER LEVEL ELEVflTION (8TRRT) i 8 m.

BRROMETER RERDING (STRRT) i 616 tnB.

END ORTE i 848598

2NTERVRL : 08j15

PRGE 1

FILEi EP4333P_1

5 M»y 1990 19i58tB6

O

-3.88

-4.00

-5.80

-6.80

-7.00

-6.00

-8.08

-3.00

-4.00

-3.08

-6.00

-7.00

-8.00

-9.08n> S £ ft)

iM W

-3.00

-4.00

-5.00

-6.00

-7.00

-6.00

-9.80

-3.00

-4.00

-5.00

-7.00

-8.00

-6.00to 7

IS 810

(0 I (O

w ™ *

3 8 Sto to

5 8 58

ro E

(0 sS « 2 «s i s i(0 100) S

18• s

I ?

Page 112: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YENEN

STJITXON t flMftD WELL HBDI

PROJECT i 406048

PLOT OF WflTER LEVEL ELEVRTION PRCE 2

FILE: EP4333PJI

5 M*y 1390 80103144

-3.00

-4.00

-a. 00

-€.00

-7.00

-t.ee-9.00

-3.00

-4.00

-5.00

-6.00

-7.00

N M M

8 8 8 8 8 8<B o 9

COB

w ~ ru

8 8 8tos

-8.00IU

gu8COs

i 8COB

8tA

8 8a

to

s

-3.00

-4.00

-S.00

~s.ee-7.ee-8.00

-8.00

-3.00

-5.00

-s.ee-7.ee-8.00

M ro 10u 7

IU foen

-s.ee

<a COB

8 8 S 8 8 S 8 S 8 8 8{ A Cft tO AD COS S S B S

ro E N g ivi s ro09 _ *M ™ B ~ CO

8 8 8 8 8 8 8to co co ata s s a

u

toI 8 « i «

Page 113: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STHTION r RMHD WELL WRDI

PROJECT i 406848

PLOT OF WHTER LEVEL ELEVATION PflGE 3

FtLEi EP4333P_1

5 May 1890 20i08t23

-3.00

-4.00

-3.00

-6.00

-7.00

O -8.00

-3.00

-4.00

-S.00

-6.00

-7.00

-I

5 8 58 ! •

s

5 |

• IS

sCO

s

M

182$

M-8.00

• I B I B 1 I-3.00

-s.ee

-7.1

-3.00

-s.ee-e.ee-7.ee

-e.i -8.00

-8.00i.ee

8 2 8CD

3CO

s

ts

8CO

2S

M

iNS

ss

M

i 2ws

M

8M

2S

M

3 8 2 8 2rom

2to

•M 2* ! • II

Page 114: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTION

PROJECT

t YEMEN

l RMfiD WELL HHDI

I 406048

PLOT OF HHTER LEVEL ELEVRTION PflGE 4

FILEi EP4333P_1S Mty 1990 <0i l4t iS

m

-3.00

-4.00

-5.00

-6.00

-7.00

Ou>

-8.00

S 8 S 8 S 8 3 8 S 8 SCO

stoa

too 10

atos

Page 115: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

II

PUCE zAJBayda •

PRESL06:W?-3 •Service given before initiation:none

-interval :00s15

Initiation date:18/01/90Initiation time:15:15

Try-out results: last marker at 18/O1/9O IS:ISair pressure at 18/01/90 IS: 151<*3 c« of Mater 18/01/90 15:3014-3 cm of water 18/01/90 15:45air pressure at 18/01/90 16:00At processing these evalues were found aswell

Markers given : one at start 18/01/90 15:15 and one at end at03/05/90 07:20 h.

Installation date:18/01/90Installation time:last marker at 15:15, inpipe at 16:00

Installation description :in 6S pipe in Middle of wadi +/-5OO m us of Al Bayda dam

-installation place:top-bottom at bottom pipe-waterlevel :none

Check up visit date :3/90Check up visit results:OK

Calculated removal/stop date:O4/O5/9OCalculated removal/stop time:-

Removal daterOa/05/90Removal time:O9:3SRemarks :no traces of floods

-waterlevel:--sediment :-

Stop date 103/05/90Stop time :O8:£3

Service given :batteries and ringsEprom reading date:O3/O5/9O EissaNumber of eprom :EP<»4£9_3Number of eprom file " :EP^B9P H_3Number of administration filer-Floppy number of eprom file :C: /floppy 7Floppy number of administration files-Reference where results were listed :S

General remarks-

date: 18 May 1990 {Friday) 19:09

110

Page 116: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRYSTATION

PROJECT

BEGIN DflTE

STRRT TIME

i

t

t

i

i

YEMENRL BflYDfl

486048

190190

ISilS

PLOT OF PRESSURE DHTflELEVRTION BflROMETER - DRTRLOGGER i 0 on.BflROMETER RERDING (STRRT) t 0 mB.END DflTE i 040590INTERVAL i 001 IS

PflGE 1

FILEt EP4429PJI

5 rUy 1990 81i0li23

BO5 -

680WUleg10eg

egegtoeg

§

to

>->Ulegrotoes

roroegTOtoeg

egegtoeg

eg00egU)toS

en03totoeg

roro<stotoeg

rotoegU)toeg

egenCO

to

ro£3j i .

toeg

toegtoea

wC5

toeg

esuegUltoes

Page 117: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE iHajalah

PRESL0G:4370-3

Service given before initiation:?-interval :OO:15

Initiation date:23/Ol/9OInitiation time:lO:3O

Try-out results: last Murker at 23/01/90 10:30Air pressure at 23/01/9O 10:3O143 cm of water 23/01/90 10*45143 cm of water 23/OI/9O 11:00143 cm of water H3/O1/9O 11:15air pressure at 23/O1/9O 11:30when reading out, the values were found.

Markers given : one at start 23/OI/9O 1O:3O and one at end at03/03/90 07:20 h.

Installation date:23/01/90Installation time:I0;30

Installation description :in pipe, at bottom-installation place:in middle of reservoir-Mater level :0

Check up visit date :3/90Check up visit results:OK

Calculated removal/stop date:09/05/90Calculated removal/stop time:-

Removal date:02/05/90Removal time:lOs3ORemarks :-

-waterlevel :0, under reservoir floor-sediment ;about 5 cm in pipe, not around

Stop date :O3/O5/9OStop time :08:23

Service given snew batteries and ringsEprom reading date:O3/05/9O EissaNumber of eprom :EP4370-3Number of eprom file :EP4370P_3Number of administration filer-Floppy number of eprom file :c: /floppy 7Floppy number of administration filee-Reference where results were listed :2

Remarks:-

date: 18 flay 199O (Friday) 19:11

112

Page 118: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION i HHJRLflH

PROJECT t 400046

BEGIN DRTE t 230190

STRRT TIME i 10:30

PLOT OT PRESSURE DflTR

ELEVRTION BflROMETER - ORTRLOGGER t 0 cm.

BRROMETER RERDING (STHRT) t 0 mB.

END DRTE t 030590

INTERVHL : 00:15

PflGE 1

FILE: EP4370P_3

6 May 1890 B8t42i55

W

uCOst-(06)

8csroCOCO

u(3WUJs

roOStoeg

ro(9rou>eg

(S

csU)(0CO

•—*(t)sCD(9

roISsu>eg

ro

2(0(9

S01

gIDeg

eggIDeg

•M

2(Deg

ro

geg

G> 6300

Page 119: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMENSTRTION i HRJflLRHPROJECT i 408846BEGIN DOTE i 230180STRRT TIME t 10i30

PLOT OF NRTER LEVEL ELEVRTIONHRTER LEVEL ELEVflTION <STflRT) i 0 m.BRROMETER RERDING (8TRRT) l 801 mB.END DRTE i 230180INTERVRL I 001 IS

PflGE 1

FILEi EP4370P_3

8 May 1980 08i53t40

1.5011

1

1

1000000

000

a- 0

. 4 0

. 3 0

. 2 0

. 1 0

. 0 0

. 9 0

. 8 0

. 7 0

. 6 0

. 5 0

. 4 0

. 3 0

. 2 0

. 10

.00

. 1 0ft) ni

U) u(9

s us

OI 01 uCO

w

gu

enu

Page 120: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STflTION i HRJflLflH

PROJECT i 408046

BEGIN DflTE t 200290

STRRT TIME t 00100

PLOT OF WflTER LEVEL ELEVRTION

HRTER LEVEL ELEVRTION CSTflRT) t 0 m.

BAROMETER REflDING (STRRT) t B01 mB.

END DflTE i 040S90

INTERVRL • 00il5

PfiGE I

FILEi EP4S7M»_36 M»y 1990 09t06i21

10.9.B.7.6.5.4.3.2.1.e.

- t .-2 .

000000000000

10.009.008.00

6.005.004.003.002.00I ,

- 1 .-2.000 0

- 5 8 5COto

5 2 5 S 5 28 S 8 8 8 S

CO U> COto aa s

S 5 S 5 8S 8 S 8 SID IS COS 8 8

sCOto

838CDS

828tos

M

i88CD(0

ft)

888COto

8 8 8CD CDto to

M l00000100

10.9.I7.6.5.4.3.2.1.0.80

m10.008.001.007.008.00S.00

0000

4.13.002.001.

- 1 . 00

S . N ? co ™ a ™8 8 8 8 8 8 8

0.00-i.<-2.00

(p CO U)to a to

• I 8 | 8to to

s i sCO CD

cn 7

I »to

8coto

8 8 8 § 8

Page 121: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STflTION i HHJRLHH

PROJECT t 40B046

PLOT OF HfiTER LEVEL ELEVHTION PRGE 2

FILE* £P43?0P_3

6 M»y 1990 09i13t36

10.9.e .7.s.s .4 .3.i.1.0.

- 1 .-2.

0000

00

10.009.009.007.006.009.004.003.002.001.00

0000

0.00-1.00

~fit • * ffct * * fki • ** M

B ? 2 » IS • 8_ 8 8 8 8 8 2co to co cos t9 (D a

-2.00M4k

atos

fkfc ™ M? 01 ?8 8 8

COs

ro

8CO

a8

w•st

8CO

sCO

ruCO

(0

m

ISs

S 5 58 8 2 8 2co to ces a s

2 8 2 8 2co to cos a s

i8 2COCO

s2COs

8 2tos

8 2tos

1tos

N

8

1104

toa

N•.

8aCOs

8u 7 4k. ~ w ~ m2 8 2 8 2 8 2to co co coS S Q S

Page 122: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTIONPROJECT

i YEMEN

I HflJflLRH

t 488CM6

PLOT OF HHTER LEVEL ELEVHTION PBGE 3

FILE: EP437BPJI6 May 1390 09:20:57

M ™ mS 8 Ss g

to

2COs

ru

toea

8 Sitts

M

8 2toB

M

ito2COCB

8 2 8 2 8 2 8 2 8 2 8 2g g 3 S S 3

M10.009.008.00

6.5.4.3 .2 .I .0.

- I .-2 .

0080ee808080

08

s8 8 8 82

COS

3us

8 Stoa

8 8toIS

Page 123: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Hawat

PRESL06:W36-0

Service given before initiationsnone-interval :00:15

Initiation date:09/U/88Initiation time:10:00

Try-out results:OKMarkers given :S

Installation date:14/11/88Installation time: 13:00 (measurement +/- 498)

^ Installation description sin drum-installation placesmiddle wadi-Materlevel sdru« full of water=wl

sensor at -40 cm wl

Check up visit date :-Check up visit results:-

Calculated removal/stop datesS3/02/89Calculated removal/stop times-Removal date:81/OS/89Removal times 10:45Remarks s-

-Materlevels--sediment :-

Stop date :21/02/39/ Stop time :18:30

Service given snoneEprom reading date:nkNumber of eprom :EP4436-0Number of eprom file sEP4436P_0Number of administration filesAD4436P_0Floppy number of eprom file :l/8Floppy number of administration file:2/4Reference where results were listed :l+8

General remarks:1.

datetl6 April 1990 (Monday> 18tS9

118

II

I

Page 124: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION i HHHRT

PROJECT t 408046

BEGIN DflTE t 091188

STflRT TIME i 10(80

PLOT OF PRESSURE DRTR

ELEVRTION BRROMETER - DRTRLOGGER : 0 cm.

BRROMETER REflDING tSTflRT) : 0 mB.

END DRTE • 010389

INTERVAL t 0BiIS

PRGE I

FILE: EP443BPJ89 Rpr 1990 09)37i39

mB840

to 828

800 -

780

k .

I f 1 1 1 I I 1 1 1 1 t I I 1

cn

Q00

ruW~CDCD

W63

CDCD

QJ*\|1—

ru00CD

ruCDCD

ru»*-*ruCDCO

ruCDruCDCD

DO

oCO

*^^«8

00CO

008

00CO

ruut8

00CO

88ru00CO

ts00

CDID CO

Page 125: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Ha*at

PRESL06:W9-l

Service given before init iatiomnone-interval :OO:15

Initiation date:< 21/02/891 at 21/08/89Initiation time:nk I 08:15 marker at record

Try-out results:OKMarkers given :3

Installation date:2l/02/89Installation time:10:55

v Installation description :in drum-installation place:middle wadi-waterlevel :drum full of water= wl

sensor at -W cm wl

Check up visit date :-Check up visit results:—

Calculated removal/stop date:07/06/89Calculated removal/stop time:-

Removal date:07/06/89Removal time:+/- 09:00Remarks :-

-wa terleve1:->diment :-

Stop date =07/06/89Stop ti«e ink

Service given sbatteries and rings changedEprom reading dateinkNumber of epromNumber of eprom fileNumber of administration f i 1 e _Floppy number of eprom file :3Floppy number of administration file:3Reference where results Mere listed :l+2

General remarksx1.

datei16 April 199O (Monday) 18s*0

120

Page 126: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STflTION

PROJECT

t YEMEN

: HflHHT

i 408046

BEGIN DflTE t 81O2B9

8TRRT TIME i 08(15

PLOT OF PRESSURE DHTR

ELEVRTION BRROMETER - DRTRLOGGER t 0 cm.

BAROMETER RERDING (STRRT) I a mB.

END DRTE i 070688

INTERVAL t 00t13

PRGE 1

FILEi EP4428P_>I

8 flpr 1890 10I03IB8

mB650

840 -

S30 -

820

810

HI ., ,

00

8CO(0

3suCOto

eguao(0

ro*sCOto

roCDCS03to

egeg00to

COCOto

COsCOto

roUIeg09to

egi\)egUICO(0

egtoegUIto(0

**»tnegUI00to

ro10§toto

w8OD(0

9

8CBto

*

Page 127: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION i HRWflT

PROJECT i 408048

BEGZN DRTE t 240489

STRRT TIME i 00100

PLOT OF WflTER LEVEL ELEVHTION

WflTER LEVEL ELEVRTION (STflRT) i 8 m.

BflROMETER RERDXNG (STRRT) i 793 mB.

END DRTE • 230489

JNTERVRL t 00113

PAGE I

FILEI EP4429P_l

9 Rpr 1990

m0.20

to

0.13 -

0. 10

0.09

-0.05

-0.10ru

caCOID

S!•*• t

s sss g • J CD

i l ls -(0 S

• - TO U -k tfl m uro mCO -

niiw U

i S S

Page 128: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTXON i HRWP.T

PROJECT t 408046

BEGIN DOTE I 180589

STRRT TIME I 12i00

PLOT OF HRTER LEVEL ELEVRTION

WflTER LEVEL ELEVRTION CSTHRT) i 0 m.

BflROMETER RERDING (STRRT) i 793 mB.

END DRTE I 240589

INTERVRL i 00115

PRGE 1

FILEi EP4429P_1

8 flpr 1890 11109147

m0.25

0.20

0.15

0.10

0.85

0.00

-e.es

MCO

I

-•«

I 1

(0 « 5 S; I

3 3 3 3 3 g 8 , I**' S *CO(0

Page 129: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION t HflHflT

PROJECT i 40S048

PLOT OF HflTER LEVEL ELEVflTlON PflGE 2

FILEi EP4429P_1

9 flpr 1990 l i t 12)00

m0.25

to

0.20 -

0.15 I-

8.10

0.05

0.00

-0.0S

-0.10hi o»

8 S 810

8S <-

8 8 8w

8ru

«D(0

« H • * H

S 8 8 8f f r8 8 8

Page 130: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STRTION : HRWflT

PROJECT i 409046

PLOT OF WRTER LEVEL ELEVfiTION PRGE 3

FILEi EP4429P_l

9 Rpr 1990 11I14I13

en

m0.25

0.20 -

0.15 -

0.10 -

0.05 l-

0.00

-0.05

-0.10 t 1 1 1 1 1

^ ^ 'AT-

I , ,W Ul 0>

g 8 SOB

i*+(B

iruCB

iru

irv*rui

roui

ru5UlCD(0

s i s s sfi

Page 131: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY s YEMEN

STRTION i HflWflT

PROJECT i 408046

PLOT OF WHTER LEVEL ELEVflTION PHGE 4

FILEi EP4429P_1

9 Rpr 1990 11t16i2S

m0.25

ro

0.20 -

0.15

0. 10

0.05

0.00

-0.05

-0.10 J I I I I I I I

ni w m C0 ro ros —

g §(9 B

roro••s

ro

s

roroSmOSto

s«ss

a s ?so S 8

Page 132: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMENSTHTION i HRHflTPROJECT i 406046

PLOT Or WATER LEVEL ELEVATION PMC S

FILEi EP4429P_>19 flpr 1990 H I 1 8 I 3 7

m0.25

0.20

0.15

0.10

0.05

0.00

-0.05

-0.10

ro

UI - » t~ • - M> ft)O l 01 -St CD IB S

g sroS

egB

IU

"•

g

ft)ft)

iroto••

groCOsOlCDCO

s

g sg gg g s g s

Page 133: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMENSTRTION I HRWflTPROJECT t 409046

PLOT OF HRTER LEVEL ELEVflTION PRGE B

FILEt EP44H9P_19 Rpr 1990 1 1 I 2 0 I 5 0

m0.25

to09

0.20 -

0.15

0.10

0.05

0.00

-0.05

-0.10 J I t I I 1 J I I 1

n) IV)fat m S

8 8 g 88 8 28 8 8

8 s

CDCO

Page 134: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

IIIIIIIIIIIIIIIIIIIII

PLACE :Hanat

PRESL0G:W3O-e

Service given before ini tiatiombatteries changed-interval :00:15

Initiation date:O7/O6/89Initiation time:07:00

Try-out results:OKMarkers given s?

Installation datesO7/O6/B9Installation timeink

Installation description sin drum-installation placesmiddle wadi-waterlevel sdrum full of water=n#l

sensor at -40 cm wl

. Check up visit date s-Check up visit results:-

Caleulated removal/stop daterEl/09/89Calculated removal/stop time«-

Removal date:81/09/89Removal timei-Remarks :stolen

-waterlevels--sediment s-

Stop date :-Stop time :-

Service given :-Eprom reading date:-Number of eprom :-Number of eprom file :-Number of administration files-Floppy number of eprom file :-Floppy number of administration files-Reference where results Mere listed s-

General remarkss1.

data•16 April 199O <Monday) 18i43

129

Page 135: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

II

PLACE ;Hadan I

PRESLOG:W2B-0 ; I

II

Service given before initiationrnone-interval sOOslS

Initiation date:15/01/88Initiation time:19:^5

Try-out results:OK IMarkers given :1

Installation date:57/01/88Installation timesllsOO

Installation description :in drum _-installation place:in narrow gorge / wadi I-waterlevel sdrum full with water and sand, •

85 c« sand above drum, sensor at-40 en top drum* -65 cm wadi level •

Check up visit date :-Check up visit results:- •

Calculated removal/stop date:12/O5/88Calculated removal/stop time:-

Removal date:15/08/88Removal time:11:00Remarks :-

-water level :->d iment :-

Stop date :-Stop time :-

Service given ibatteries changedEprom reading dateinkNumber of epromNumber of eprom fileNumber of administration file:AD44S8P_0Floppy number of eprom file :l/2Floppy number of administrationReference where results were listed

General remarks:1.

I

Id*teil6 April 1990 (Monday) 18t99

I130

Page 136: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMENSTATION i MftDRNPROJECT t 406046BEGIN DRTE t 150186STRRT TIME t 19t45

PLOT Or PRESSURE DflTP.ELEVRTION BHROMETER - DflTRLOGGER i 0 cm.BflROMETCR RERDING (STflRT) i 0 nB.END DATE i 150888INTERVAL i 00115

PflGC 1

FILEi EP4486P_B

6 Rpr 1930 {0148106

mB660

950 -

630 -

S20 -

610 1

IM1IMIIH1II111111111II1IH I.I, l . ._ U ILJ......AI..—... j I l L . i... • ...I—JXM J.U.hnTl—,nr nT|iifrif w iincni I I vmwwrmjMtt/mfm^^wffWti^nnw'niffl^iif

TMrosCOOD

ft)( 0es0000

sG3ro00OD

ro8ro0000

•-•u>(9ro0000

ru01(9ro03CD

s>egu00CO

^^H ^

ISu0303

00soo03

WenOU)OD00

ots03OD

(S00oA0000

»-*Ul6)M.0000

roroO00OD

Mu>(9OD00

Page 137: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STRTION i MRDRN

PROJECT t 400046

BEGIN DRTE t 220488

STHRT TIME i

PLOT OF HRTER LEVEL ELEVRTION

NflTER LEVEL ELEVflTION (STRRT) i 8 m.

BAROMETER REflDING (STBRT) t 882 mB.

ENS DflTE i 230488

INTERVAL i 00iIS

PRSE 1

FILEi EP4428PJS

8 Hpr 1890 12i0?t29

W

0 .

e.

a.

0 .

10

15

20

25

-0.30

Page 138: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

IIIIIIIIIIIIIIIIIIIII

PLACE :Hahajaba 1 / ftiad 2

PRESLffi:¥£l-0

Service given before initiation:none-interval :OO:1S

Initiation date:15/01/88Initiation time:19:45

Try-out results:OKMarkers given :1

Installation date:18/01/88Installation time:10:00 Mahajaba aInstallation date:O9/O3/88Installation time:13:00 Mahajaba bInstallation datvt06/O4/88Installation time:13:45 Amad 2

Installation description Mahajaba a:in drum with 3O cm sand above-installation place:in reservoir front old dam-waterlevel :drum full with water

Installation description Mahajaba b:in drum with 80 cm sand above-installation place: in narrow gorge ;future

dan place-waterlevel :drum full with water

Installation description Amad 2 :in dru* with 55 cm sand above-installation placesmiddle of wadi at 25O.3 m. of

Amad 1 with netting-waterlevel sdrum full with water and

boulders,sensor=-l.40 mwad i 1 eve 1

Check up visit date :2 timesjwhen movingCheck up visit results!OK

Calculated removal/stop date:30/04/88Calculated removal/stop time:-

RemovalRemovalRemarks

RemovalRemovalRemarks

Removal

date Mahajaba atime

-waterlevel-sediment

date Mahajaba btime

-water level-sediment

date Amad 2

:09/03/88:1O:OO* **

• ^«

.-03/O4/88:nk•• ^•

: -

:18/06/88

133

Page 139: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

III

Removal time »13sOO _Remarks :- I

-waterlevel :- •-sediment i-

Stop date :nkStop time :nk

Service given xchanged batteries IEprom reading date:nkNumber of eprom tep<t4£l-0 _Number of eprom file :EP4421P_0 INumber of administration f i le:AD4421Pl<> •Floppy number of eprom file :1/SFloppy number of administration file:** •Reference where results were listed sl-t-2 I

General remarksi

datet16 April 1990 (Monday) 17il8

134

IIIIIIIIIIIII

Page 140: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STRTXON i MRHRJRBR 1

PROJECT t 408846

BEGIN DflTE : 150166

STRRT TIME : 19:45

PLOT OF PRESSURE DflTfl

ELEVRTION BRROMETER - DRTRLOGGER t 0 om.

BBROMETER RERDZNG (STRRT) I 0 MB.

END ORTE : 860466

ZNTERVRL i 80:15

PRGE 1

TILE: EP4421PJB

11 Rpr 1990 06(21:34

U01

mBB40

830 -

B20 -

810

800n1 |

, . . L . . . AmA

1 1 1 I 1 1 1 1 1 ! 1 i f ! 1 I 1 1 ! 1 1 1 1 1 1 1 1 1 t 1 1 1 t 1 1 1 1 1 1 1 1

W I M N r U W n J N W I M W N N N I M U U U I U U U I i l U U I i l U a i U U U l i ! * * * *00 OD CD CO 00 03 CD 00 CD p QD QD 00 00 00 00 00 00 00 00 OB 00 00 CO 00 00 OB 00 00 00 CO 00 OD 00 00 00 00 flO 00 (B 00 (OD00 OP 00 OP CD 00 00 00 CO 00 00 CD 00 CD CD 00 00 QD 00 00 OD CD 00 00 CD CD 00 00 00 00 OD CD OD 09 00 00 00 CD 00 00 OB' (0

Page 141: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

I

' .. ._ IPLACE :Hahajaba 1

PRESLOfcWSM

Service given before initiationjnone-interval :OO:1S •

Initiation date:18/03/89Initiation time:08:30 _

Try-out results:OK 'Markers given :4

Installation date:18/02/89 |Installation time:10:45

v Installation description :in PVC-pipe us of new dam •-installation place:sensor= -9.70 m crest dam-waterlevel :none

Check up visit date :two times •Check up visit results:water levels measured by hand

see reference S for details. •

Calculated removal/stop date:O4/06/89Calculated removal/stop time:- m

Removal date:25/05/89 *Removal time:17:00Remarks :pipe had collapsed,logger was removed after a few •

days of digging H-waterlevel:above the sensor-sediment :little or none •

/ Stop date .-26/06/89^ Stop time :- M

Service given :batteries changedEprom reading date:nkNumber of eprom tEP4430-l INumber of eprom file sEP4430P_l •Number of administration f i lerAD*»*t30P_lFloppy number of eprom file :3 •Floppy number of administration file:3 |Reference where results were listed :1+S

General remarks:1.

date:16 April 1990 (Monday> 19tle

136

Page 142: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRT2ON

PROJECT

I YEMEN

l MRHHJHBH 1

t 408846

BEGIN DRTE t 190289

STflRT TIME i 08i30

PLOT OF PRESSURE DHTH

ELEVflTION BHROMETER - DRTRLOGGER t 0 em.

BRROMETER REflDING (STHRT) i 8 mB.

END DRTE i 278509

INTERVHL t 001 IS

PRGE 1

FILEi EP4438P_1

11 Rpr 1998 13)31:57

CO

mB

1250

1200

1150

1100

1050

1000

950 -

900 -

850

800

- ^ Z ^ * - - T —

11

i

j""""" "1" 1 4 l^»> J I ! 1 1 1 1 1 1 I |

tn

CDto

2Sto

2CD(0

sa>CO

rotncatoCD(0

8(9CDU)

2CDto

tn200to

roro2CDto

roto2CDto

3CDto

u§1CD

ro

CDCO

CD(O

Page 143: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRT1ON t MRHHJflBR I

PROJECT i 408046

BEGIN DHTE I 240389

STHRT TIME i 12iO0

PLOT OF WRTER LEVEL ELEVRTION

WHTER LEVEL ELEVRTION (STRRT) i 0 m.

BflROMETER REROZNG (STRRTJ t 815 mB.

END DflTE i 260589

INTERVRL i 00119

PAGE 1

FILEt EP4430P_1

11 Rpr 1990 18i03i36

CO

oo

w «D ru

8 SCO(O

ruS 3 8 g 8

COID

IM•M(Sb)CO10

8 t~ M

roCDCOtdCDCO

si

TO

sCD

8CO

oaCDto

ft) Ul

ca(Sa)COCO

83

ro

S5•*3 g

CO

Page 144: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMENSTRTXON : MHHflJRBR 1PROJECT i 406046

PLOT OF HHTER LEVEL ELEVflTION PflGE 2

EP4430P_1

11 flpr 1990 16t06i33

m-5.20

-5.70

-B.20

-6.70

-7.20

-7.70

-a. 20

-8.70

09.20

09.70

to

S 3(9(9

COCO

01

iro09S

CD

3<3INIrU

COto

«

irvj

3•3

s2COCO

iCD

3o2COto

IU CD 19UI

3 3 2to10

to

3 s 3(9

COto

3 8?8

UD

Page 145: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN8TRTION • MRHflJRBR 1PROJECT t 408046

PLOT OF MflTER LEVEL ELEVHTION PRGE 3

PILEi EP4430P_1

It Hpr IS80 I6i08t4t

m-5.20

-3.70|—

-6.20

-S.70

-7.80

-7.78

-B.20

-8.70

09.20

09.70rti ro CD

s i 200(S

03 «CO »

2 •00to

10 CD•• .*s s s

00(0

g*•i

ro a>** mm

s s (900(O

s s s ro(9COto

ruUIS

CDCO

M

O <B S

CD • -

to

Page 146: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STflTION i MflHflJRBfl 1

PROJECT t 4BB046

PLOT OF HflTER LEVEL ELEVflTION PAGE 4

FXLEt EP443BP_1

11 ftpr 1890 16tl8i4B

m-5.20

-5.70 -

-6.20 h

£ -6.70

-7.20

-7.70

-6.20

-8.70

09.20

09.70

H * * m

8 I 3

W OB >- 91 N OB * -

8 8 S 8 8 8 Sft) a >-

CDCO

asto

00to

S mCD 9•*• ™OD(O

II

8it

810

gOD(0

ro

03S g 8

CO(0

Page 147: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION t MRHflJRBH 1

PROJECT i 409046

PLOT OF HRTER LEVEL ELEVflTION PRGE 9

FILEi EP4438P_l

II Apr 1990 16itSi44

- 5

-5

-B

- 6

- 7

m.20

.70

.20

. 7 0

. 2 0

-8.20

-8.70

09.20

09.70 I

roB>soto

to

g s sroui8OB

to

IV)

Ss g s g s s s00

8 » .-ro CD ro

g g i i gCD 03CO (0

g 5 o ro•M

N rooo

g g g s g g00ID CO

Page 148: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STHTION i HRHHJRBH 1

PROJECT i 488846

PLOT OF WHTER LEVEL ELEVflTION PRGE S

FILEi EP4430P_1

11 Rpr 1998 1 6 I 1 8 I 4 6

m

-5.20

-5.70

-6.70

-7.28

-7.7B

-6.20

-8.70

09.20

09.70

CO

ft) ruCO(9

0910

rui00CO

ru

s••*mi

cacaCA00CO

iru

isi

eg 8

a iOBCO

I S** 9o C3 n

s § s00CO

ru

i i(S

00CO

s —en ro

s i58

SUl

SICOto

si

Page 149: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMENSTRTXON • MRHflJRBfl 1PROJECT i 486846

PLOT OF HflTER LEVEL ELEVATION PflGE 7

FILEt EP4430P_1 i

11 Hpr 1990 16:21(49

m-5.20

-5.70

-6.20

-8.70

-7.20

-9.20

-8.70

03.20

09.70 I Iro

3 8 § 3 3 S03to

s m® £CJI »03to

hi m

19 (9

SssUlODto

N <0

8ui00to

M CO « -

3 3 g

# - • » • * n M f

w o) ^* 9) ro CD

3 3 8oto

oUl03to

8 3 3IU - i

S 303to

Page 150: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION i MRHRJRBR 1

PROJECT t 406046

PLOT OF HflTER LEVEL ELEVflTION PBGE 8

FILEI EP443BP_1

It Rpr 1990 16I24I92

- 5

- 5

-e-6

- 7

m. 2 0

. 7 0

.20

.70

. 2 0

-8.20

-8.70

09.20

09.70 I I I I

§ s gCDW

OB • -

00

r\> <D •— en w <D —

s S S g00W

§ § §Hi

gCDCO

a — _ m i- . -

h) 00 • - m N CD •—

~ .. -g .. _ « m( 9 S O ( j | S S S c n

00 (BCO CO

r\>

03(0

Page 151: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMENSTPTION I MflHflJRBR iPROJECT i 408046

PLOT OF WfiTER LEVEL ELEVHT1ON PftGE 9

FILEI EP4430P__1

11 Rpr 1990 16I27IS5

- 5 .

- 3 .

- 6 .

- 6 .

- 7 .

- 7 .

- 6 .

- 8 .

09.

09 .

m20

70

20

70

20

70

20

70

20

,70

i

8 ro S>

to

5UiCDto

ro rorogmto

8 5s s

o roto

COto

s s sro

C9cn09to

n> ro 8 nj a ru

s s s i ga> Dto to

Page 152: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Mahajaba 1

PRESL0G:W9-E

Service given before initiation:batteries and rings changed-interval :00:15 J

•&*Initiation date:S4/06/B9Initiation time:ll:OO marker at record 8

Try-out results:OKMarkers given s?

Installation date:£5/06/89Installation time:11:00

Installation description ;in GS-pipe us of new dam-installation placetsensor = -8.95 m crest dam-waterlevel :little

Check up visit date : 10/07/89Check up visit results:removed 09:07, reinstalled 10:00,

water level measured - -8.15 m crest

Calculated removal/stop date:08/10/89Calculated removal/stop time:-

Removal date:28/10/89Removal time:11:00Remarks :-

-water level:1ittle—sediment :-

Stop date :-Stop time :-

Service given :noneEprom reading date:00/03/90Number of eprom »EP4^S9-2Number of eprom file :EP4<f29P_aNumber of administration ft lei-Floppy number of eprom file iHP c-driveFloppy number of administration file:-Reference where results were listed :5

General remarks:1.

d«t»i!6 April 1990 (Monday) 19i30

147

Page 153: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

i_i*ting of file: EP4429P_2 START *t rmgx strati on 1

161116212631364146SI5661667176818691961O11O6111

4429812911808809809aio910309911311811811811809809809811826822823820819

2712l~22273237424732576267727782879297102107112

812810BO98O9810810aio8O98118118118118118O98C98O9811824822823819819

38131823283338434853586368737883889398103108113

88888128098098098103108108O9811811311311311809809809311819822825819819

4914t924293439444954596469747934999499104109114

BOB8128108O78O98108108O98118118118118118O98098O981181O323823324819

-9999

... S101520253O-354O455O556065707580859O95

1OO1O5110

8068128088O78098108108O98118118Z1Bll8118O98O98O9811827822824822819

148

Page 154: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMENSTRTION i MRHflJflBfl 1PROTECT i 488046BEGIN DRTE i 2406B9STRRT Tire r Ut0B

PLOT OF PRESSURE DflTRELEVflTION BHROHETER - DRTRLOGGER t 0 on,BRROMETER REHDING (8TRRT) t 0 mB.END ORTE t 288609INTERVflL i 00iIS

PflGE I

FILEi EP4429P_2 '11 Rpr 1990 16t43i39

mB830

825

820

815

810

80S

800 I*

(D

ft) ft) ft) A) ^B ^9 G) CD 03 C9 19 03 CO •-* * *** ••* * ** *™* *i— * *** ft) ft) f^ ft) ^9 ^9 ^9 IS fl3 ^3 ^3 03 ^3 *•*fi^roul\)MfuuA(Jta)NiDU)fQHn)(jAui(n\iiiiu)nh*iutiir\]HM£iIufii\iSSnUl 0) ? ? ?

S g g g S g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g g S g g g g g g g g g gato

CD(O

Page 155: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION i MRHflJRBfl 1PROJECT i 438048BEGIN DHTE t 240689STRRT TIME I 11100

PLOT OF MRTER LEVEL ELEVRTIONWRTER LEVEL ELEVRTION CSTRRT) a 0 m.BRROMETER RERDING CBTRRT) I 808 mB.END DflTE i 260689INTERVAL t 00113

PRGE 1

FILEt EP4429P_211 Rpr 1980 t6tS8i27

m-8.70

tnO

-8.75 -

-8.80

-8.85

-8.90

-8.95

-9.00 I l I t i l l I 1 r i i i j _ t i t i j i i

i i i i i i i i i i i i i i i i i i i i i i i i i i i i i i s i i i i i i g i i i i i i s s i s00 CD

CO

Page 156: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

IIIIIIIIIIIIIIIIIIIII

PLACE :Hahajaba 1

PR£SL06;H36-2

Service given before initiatiomnew batteries-interval sOOslS

Initiation datesS8/10/89Initiation time;08x00 ?

Try-out results:OKMarkers given :2

Installation date:38/IO/89Installation time:l£:30

Installation description rin GS-pipe us of new dam-installation piace:sensor = -8-95 m crest dam-••ater level : —

Check up visit date : —Check up visit resultss-

Calculated removal/stop date:11/02/90Calculated removal/stop tines-Removal date:18/01/90Removal time:12:£5Remarks :-

-waterlevel:--sediment :-

Stop date :18/01/90Stop time :-

Service given rnew batteriesEprom reading date:00/03/90Number of eprom :EP4436-SNumber of eprom file :EPV»36P_SNumber of administration files-Floppy number of eprom file :HP c-driv©Floppy number of administration files-Reference where results Mere listed :8

General remarks:1.

datei16 April 1990 (Monday) 19i47

151

Page 157: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

Listing of -file: EP443<£»P_2 START at rwqi strat i or 1

12 •

345678

443688888888817SIS8O7811811

9 -9999

152

Page 158: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

IIIIIIIIIIIIIIIIIIIII

PLACE :Nahajaba 1

Service given before initiation:?-interval :00:15

Initiation date:18/01/90Initiation time:11:15

Try-out results:OKMarkers given : one at beginning 18/01/9O 11; 15 h and one at

end 03/0S/90 O7s2O h.

Installation date:18/01/90Installation time:11:IS last Marker, in pipe 12:3O

Installation description :in GS-pipe us of new dam-installation place:sensor = -8.95 in crest dam-waterlevel :little

Check up visit date :3/9OCheck up visit results:OK

Calculated removal/stop date:O4/05/9OCalculated removal/stop time:-

Removal date:O2/O5/9ORemoval time:11:46Remarks :little Mater

-waterlevel:--sediment :-

Stop date :03/OS/9OStop time :08:23

Service given snew batteries and ringsEprom reading date:O3/O5/9O EissaNumber of epromNumber of eprom fileNumber of administration file:-Floppy number of eprom file :c: / floppy 7Floppy number of administration filei-Reference where results mere listed s2

General remarks:1.

datet6 May 1990 <Sunday> 10*21

153

Page 159: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMENSTHTXON t MRHRJRBfl 1PROJECT t 408046BEGIN DHTE i 168198START TIME t lit 19

PLOT OF PRESSURE ORTRELEVRTZON BRROMETER - DRTRLOGGER t 0 cm.BRROMETER RERDING CSTRRT) i 0 mB.END DRTE i 030598INTERVRL i MilS

PRGE 1

FILEt EP4424P_4

6 Hay 199B 00146:47

tfl

mB

1030 -

1010 -

990

970

950

930

910

090

870

850

030

810

790 t I I i 1 1 t I 1 1

V

::::z:z™:::::::

t i i :

• i

rainstoC9

8

s(0IS

SItos(0C9

COs

roro8toeg

8

8toCO

s00s(fi

ss(0ca

roros(0s

rotoCDutos

sUl2toeg

rosto

CO

2COs

rom

2COca

su

3tos

Page 160: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMENSTATION i MfiHRJRBR 1PROJECT t 486046BEGIN DflTE t 180188STRRT TIME I lit 15

PLOT OF MRTER LEVEL ELEVRTIONWRTER LEVEL ELEVRTION (STRRT) : 8 m.BRROMETER RERDING (STRRT) i 808 mB.END DflTE i 198190INTERVAL : 00iIS

PRGE 1

FILEt EP4424P_46 May 1998 10:01100

m-7,90

-8.00

-8.10 J--* -8.20 hen

w -8.30 f-

-8.40 -

-8.50 -

-B.G0 -

-8.70 -

-8.80 -

-B.90 |-

-9.00

\y ~~- ^

y - ~ ^i i i i i i i i i i i i 1 i i i i i i i i i |

u en» - . - • • IV)M OD (0 S

ft) ft) to

s s s s s g s (0

sto(S

s s 2 as s s s

as aS I

Page 161: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION t MBHRJflBfl t

PROJECT i 486046

BEGIN DflTE i 170280

STRRT TIKE t Kit00

PLOT OF HHTER LEVEL ELEVRTION

WflTER LEVEL ELEVRTION (STRRT) t 0 <n.

BRROMETER RERDING (STRRT) i 800 mB.

END DflTE t 170280

INTERVRL t 00115

PRGE 1

FILEi EP4424P_4

S Hay 1932 I6t2Bi2S

O>

Page 162: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTION

F»ROJECT

BEGIN DHTE

STWtT TIME

i

I

i

i

I

YEMEN

MflHflJRBn i

408046

060490

eat 00

PLOT OF WRTER LEVEL ELEVHTION

WRTER LEVEL ELEVRTION (STHRT)

BRROMETER REHDING (STRUT)

END DOTE

INTERVRL

t

t

i

i

0 n.

800 mB

030590

001 IS

PRGC I

FILEi EP4424Pj4

6 M»y 1880 IBI41I22

-8.

-6. 80-7.00

-7.

-7.

-7.

-7.

20

40

60

60

-J

g

8S 8 8 g S

g

Xg

88

-6.60

-6.60

-7.00

-7.20

-7.40

-7.60

-7.80

-8.001

sg

I 8 SH M *t

8 8 85 98 8

a

S 8

-6.

-6.

-7.

-7.

-7.

-7.

60

80

00

20

40

60

80

-6.60

-6.80

-7.00

-7.20

-7.40

-7.60

-7.60

-8.00

to

-f 1 i 1-8 I 8 8 i s

to

s

88 8

^ I * s8 8 8

k i 8SIS

s

5(O

8 8

Page 163: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STHTION i MRHBJflBfl 1

PROTECT i 408846

PLOT OF MflTER LEVEL ELEVBTION PfiGE 2

FXLEt EP4424P_4

6 M«y 1990 10I48I03

<D

-6.B0

-6.80-7.ee-7.20

-7.40

-7.60

-7. SB

-8.00

! is

8 5 5 Si

i I iIM

s s g« « K

1 1 1

-6.60

-6.ee

-7.20

-7.4B

-7.60

-7.80

-6.00*

l i i i i i i i i i i is

-6.ee-6.60

-7.00

-7.20

-7.40

-7.60

-7.60

-e.ee

m

-6.60

-6.80

-7.20

-7.40

-7.6B

-7.60

-8.00*rrr8 8 8 8 8

=—r-r8 8

CO

a

N

8 8(0S

S8

88 I 8 5

to(9

88 t~r

Page 164: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STHTION i MflHHJflBH 1

PROJECT t 409046

PLOT OF WHTER LEVEL ELEVHTION PflCE 3

FILEi EP4424P_4

6 M«y 1990 10tS0:4S

10

- a . SB

-7.00-7.80-7.40-7.M-7.00-a.ee

(0s

! « ?l l t

• V 18 ! I ? • il l f l l S I I

-6. BO-6.80-7.00

-7.20-7.40-7.lt-7.8B

.00 "tCO

s

t B S | S i i % 8 fi i a i s i i i i i

CO

fiCO

Q

8

Page 165: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STATION t MflHRJflBfl I

PROJECT : 409046

PLOT OF WBTER LEVEL ELEVfiTION PflGE 4

FILEi EP4424P_4

6 Hmy 1990 10t5Si27 j

O>

o

-6.60;

-6.ee-7.ee-7.20

-7.48

-7.60

-7. SB

-B.00

-6.60

-e.ee-7.00

-7.2B

-7.4B-7.60

ti i i SI

(0si

-7.60

-e.ee

i i gS s 8

S 8i i

3a(0s

Si

88

Kt

8

Page 166: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Mahajaba2

PRESL0G:W33-2

Service given before initiatiomnew batteries-interval :OO:15

Initiation date:10/07/89Initiation time:07:l5

Try-out resultssOKMarkers given :£

Installation date:10/07/89Installation time:09:37

Installation description sin pumped shallow well us of dam-installation pi ace: sensor = -SO.00 m top wood beam-waterlevel s-10.40 m top beam

Check up visit date :~Check up visit results:-

Calculated removal/stop dates24/10/89Calculated removal/stop times-

Removal date:8^/10/89Removal time:11:00Remarks :~

-water 1evel:--sediment :-

Stop date :S4/10/89Stop time :-

Service given inoneEprom reading dater£8/10/B9Number of eprom :EP<t<t3a-SNumber of eprom file sEP<»«»33P_2Number of administration filei-Floppy number of eprom file :5 and HP c-driviFloppy number of administration filer-Reference where results were listed iS

General remarks:1.

datei16 April 1990 (Monday) aOtOO

161

Page 167: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY I YEMEN

8TRTI0N I MRHRJR8R 2

PROJECT t 408046

BEGIN DRTE t 100789

STRRT TIME I 07s15

PLOT OF PRESSURE DRTR

ELEVRTION BRROMETER - ORTRLOGGER i 0 on.

BRROMETER READING (STRRT) I 0 mB.

END ORTE i 291089

1NTERVRL i 00tl5

PRGE 1

FILEt EP4433P_2

12 fipr 1990 0B:96tl9

ro

NB

1800170016001S001400130012001100

to toCDto s s CO

tO<D(0

CD(0

<DU

(D(0

9to to

180017001600150014001300120011001B00

EE^asf:J—i—i—i—t—i—i—i—i i i__i i • i • 1 1 • i

§ | 8 S a §t o t o S te ts

18BB170016001S001400130012001100

^ ^ 0kl ^*^ Dk4 ^ ^ Bk% ^ ^ DkA ^ ^ Kb ^ ^ b l ^ ^ AA ^^ tkk ^ ^ JU ^ ^ fc^t T V

a H t t ± i f l E a f i i

1«001700160019001400130012001100

t o m t o t o t D t o t o t o t o t o t D t O t t t O I D t O t O t O t O to to

Page 168: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMENSTRTION i MRHflJBBfl 2PROJECT i 408946

PLOT OF PRESSURE DHTR PRGE 2

FILE: EP4433P_2

12 flpr 1990 09i07:07

O)U

8 S i 8 8 8 8 8 8 I 8 I 8S8^C 0 C 0 ( O ( 0 < 0 C 0 C 0 t f >

8 | lto to

1 8 8 3 8_ ID CD __Iff tO to 10

8 S a § 8 8 8 8 8 8 8 § 8 3 l 8 8 g 8 8 8 § 8 g i g B gt o w f o t D u c o i o c b i o CO 10 CO

Page 169: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STHTION : MRHRJRBH 2

PROJECT i 108046

BEGIN DRTE • 108789

START TIME i 0?ilS

PLOT OF WflTER LEVEL ELEVflTION

WATER LEVEL ELEVRTION (START) I 0 m.

BAROMETER READING (START) t 806 mB.

END DATE t 231089

INTERVAL i 08iIS

PRGE 1

FILEi EP4433P_2

12 Apr 1990 09I47I38

m

11.00

12.00

14.00

15.00

16.00

17.00

18.00

19,00

20.00

CD

i I i i t L I i i i I i i t I i i i I i i i I t i i I i i i i i j _ j_ i • i i

00to

00 CO

to00to

00to

09to

toto

(0 09to s

Page 170: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEHEN

STRTION i MBHHJRBfl 2

PROJECT i 408846

PLOT Of WflTER LEVEL ELEVflTION PRGE 2

FILE: EP4433P_2

12 Rpr 1990

OS

m

10.00

11.00

12.00

13.00

14.00

IS. 00

16.00

17.00

19.00

19.00

20.00 j I I i_ j i j I _i I

N ea ro

CDCD

iu

CO

r u c D r u n r u e o r u c n r u o o r u m r u i s

CD OD ODCO

ft)

CO

N O M

COtD

f o m r o S r u S r o S w S c j H

Q S r a S C 3 Q s B 8 9 C 0 5S B M B S D O S B O M S

OOCO

CO

to 10

Page 171: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STflTION i NflHflJflBfl 2

PROJECT t 406046

PLOT OF MHTER LEVEL ELEVflTION PRGE 3

FILEi EP4433P_2

12 Rpp 1990 09:54i3?

166

ie

11

12

13

14

15

16

17

18

19

20

m.ee.ee

. 0 0

.ee

.ee

.ee

.ee

.ee

.ee

.00

1.00 I ,TO a

8 Q -j 5COto

CDto

s ?8 8CDto

n>

s • sS g

00CO

CD(0

00to

00(O

C3 m ntM » •

CO

IS SS ro a

CDCD

CD10

Page 172: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMENSTRTXON i MRHflJBBfl 2PROJECT i 406046

PLOT OF WBTER LEVEL ELEVRTZON PBGE 4

FILEi £P4433P_2

iz Rpp 1930

a

i I i ito

g g g g g g g g gG)ODODto

00(0

g g g g gooto

03to

ru OD •—

i § g00to

i i I i00to

•• * \ l •• a* "• QD •*

g g g g g g g0303to

ODODID

4O

g g g g0040

Page 173: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION t MHHRJflBfl 2

PROJECT i 406046

PLOT OF HflTER LEVEL ELEVftTION PflGE 5

FILEi EP4433P_2

12 Rpr 1998 1 B I 0 1 I 3 9

CO

17.80 -

18.00 -

19.00 -

20.00N O W

ill0010

*mt mm A »* fr* B ** *•• B *° ** B • * *• B »•• ** B *•• * • ( Q ^ * » *n i o r u n i t t a ) r u m n i c o r t ) n i u c o r o m n > a r o n n ) c Q n ) m n t a B r o c R r o a >w " " "s s g s s s g s s s g s s s g s s s

CO COCO

CD a>to

g s s i g i s i g sCD CD 00CD CO 10

a>s g u r

CO(0

si<DCD

Page 174: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY I YEMENSTRTION i MRHflJflBfl 2PROJECT i 408046

PLOT OF WRTER LEVEL ELEVHTION PflGE 6

FILEt EP4433PJ812 Hpp 1990 1BI05I11

m10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

16.00

19.00

20.00

to

00U>

g g gODto

OS ro a Q 9i- «• « en ~

TO a S ™

ODto

aoto

OBta

CDg g g g g g g g s s g s s s g

CDin

toto

CDCO

(Dto

Page 175: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION i MRHHJRBH 2

PROJECT I 4880-46

PLOT OF MflTER LEVEL ELEVBT1ON PRGE 7

FILEi EP4433PJ8

12 Rpr 1890 10t0Bi42

19

ae.ee »~ m *- ^CD C3 0) M O M

8 1 8 8 8 I00U)

gCDto

8•a

8 8 C9CO00to

8 8 8(_v **9 SCO •*00(D

8 8 SCOto

8

100 «8

Ul

i(O

• - m re o • - a• • 0 ] • « • « • • *V| M

8 S 8 8 8 S 8CO COto to

m *- ft» * Q ) ^ * *

8 3|ito ]

Page 176: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMEN

STHTION i MflHRJRBR Z

PROTECT t 408046

PLOT OF HRTER LEVEL ELEVRTION PRGE 8

FILEi EP4433P_2

12 Rpr 1990 10tl2il3

Page 177: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STRTION : MRHRJRBR S

PROJECT : 488046

PLOT OF WHTER LEVEL ELEVRT1ON PR6E 9

FILE: EP4433P_2

12 ftpr 1880 10I19I44

10.00

ro

11.08 -

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00 I ItotogCOto

88

fO CDM * •

S 8ss00to

8 ** t* m N* •-

N O IS SI M 01

10i

ro a G)

u>

<B ( 9 n »•» ^* CQ ^*

S c n r o c D S c n r u

S S S S Ba> to

S (9 Si ro S CD« * ^ | -* W H » S8 i » • » 8

CO CD

Page 178: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTXON t MRHRJTflBfl 2

PROJECT i

PLOT OF WflTER LEVEL ELEVHT10N PAGE 10

FILEt EP4433P_2

12 Rpr 1990 18tl9ll3

10m00

u

11.00 h

12.00

13.00

14.00

15.80

16.00

17.00

IB.00

19.00

20.00M CD

S S = g00to

CDto

COto

00to

m iv a *-'

to to to to

Page 179: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STflTION t MfiHRJHBfl 2

PROJECT i 408046

PLOT OF MHTER LEVEL ELEVRTION PRGE 11

FILEi EP4433P_2

12 Rpr 1990 10I22I42

m

10.00

11.0012.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00 1N ID w— — tn

8 8 500to

W CB ft)

§to

sen«•s

•-*ro• •

8*CP

a *

ss

ro S•pa* • #

- sto

ro

g

••* 9«o ro »•• ro ••s - s8 B B

COto

ro•>8

CP

8rou108

to to to

Q

Page 180: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

IIIIIIIIIIIIIIIIIIIII

PLACE :Hahajaba2

PRESL06:WEB-E

Service given before initiation:none-interval :00:15

Initiation date:£8/10/89Initiation timet08:00 ?

Try-out results:OKMarkers given :2

Installation date:28/10/89Installation time:12:30

Installation description :in pumped shallow-installation placetsensor - -8O.0O m-waterlevel :

Check up visit date :-Check up visit results:-

Calculated removal/stop date:11/02/90Calculated removal/stop time:-

Removal date:18/01/90Removal time:11s15Remarks :-

-water level:--sediment :-

Stop date :18/01/90Stop time :18:36

Service given s totaly damaged,see fax from 23/01/90,24/01/90,10/02/90

Eprom reading date: 00/03/90Number of eprom : EP4429-2Number of eprom file :EPVt29P_2Number of administration filet-Floppy number of eprom file :HP c:Floppy number of administration filet-Reference where results were listed :2

General remarks:I.

date117 April 1990 (Tundiy) 19iO3

175

Page 181: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

lit ing cf f i l e : EP4428P_2 _SJART at registration

18

1522293643505764717885929910611.312012713414114815516216917618319O1972O4

44288128191245105411531249127712871294129713OO13O313O713O71O97122412771293129913O313O713O91311131213133999399939993999

29

1623303744515865727986931001O71141211281351421491S6163170177184191198205

888881281612111043117412561278128812941298130O13O4130813051079123712811294129913O4130713091311131213133999399939993999

31O172431384552596673SO87941O11O8115122129136143ISO1571641711781851921992O6

8888807816117110301193126112811289129512981301130413081258110412481284129513001304130813101311131213133999397939993999

4.11182532394653606774818895102109116123130137144151158165172179186193200207

505311

11881141i;-201209lib*12831290129512981302130513061211113912571286129613011305130813101311131313143999399939993999

5121926334047546168758289961O31101171241311381451521591661731801871942O12O8

8O281912O611141O581222126?128412911296129913O213O513O71172116512641288129713O113O513O8131O13111312770

399939993999—9999

613202734414855626976839097

1O411111812513213914615316016717 A181188195202

802817

1223109110**3123312721Z35129112961299130213O7130811441190126812891297130213051309131O131113133999399939993999

714212835424956637077849198105112119126133140147154161168175182189196203

813316123410721125124212741286129312961300130313071307111812081273129112981302130713091310131113133999399939993999

176

IIIIIIIIIIIIIIIIIIIII

Page 182: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STHTION i MflHRJRBR 2

PROJECT t 408846

BEGIN DflTE t 261089

STRUT TIHE i 1B:3B

PLOT OF PRESSURE ORTR

ELEVRTION BAROMETER - DRTRLOGGER i 0 cm.

BAROMETER RERDING (STRRT) t 0 mB.

END DRTE i 011189

INTERVRL i 00i15

PAGE 1

FILEi EP442BP_2

11 Rpr 1990 18it4i30

mB1370

1270

1170

1070 -

970 -

870 -

770 1 1 1

(\.r \rfu i_r v

f i i i \ 111 11 i i i i i i i t i i i t i t i i i i i i i i i i i i i i i i i i t i i f i i i i i i i t i i i i 1 i i i i i f i \ \ t

MM MN B>

. . . . . . 6)**^B fil B ^«* SSSS

69 S 8 09 s s00to

CO GO

Page 183: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE i

Service given before initiation:?-interval :00:15

Initiation date:I8/O1/9OInitiation time:11:15

Try-out results: last marker at 18/OI/9O 11:15air pressure at 18/O1/9O 11:15143 cm of water 18/OL/9O 11:30143 cm of water 18/01/9O 11:45143 cm of water 18/01/90 12:00in well at 18/O1/9O 12:15when reading out, they were found

Markers given : one at start 18/O1/9O 11:IS and one at end at03/05/90 07:20 h.

Installation date:18/OI/9OInstallation time:11:15 marker, in well 12:15

Installation description :in pumped shallow well-installation pi ace: sensor at -20. OO m top beam-waterlevel :-14.52 « at 13:27 h

Check up visit date :3/90Check up visit results:0K

Calculated removal/stop date:O4/OS/9OCalculated removal/stop time:-

Removal date:O2/O5/9ORenova1 t ime:12:04Remarks s-

-waterlevel:--sediment :-

Stop date :03/O5/90Stop time :08:23

Service given :new batteries and ringsEprom reading date:03/O5/9O EissaNumber of eprom :EP4427-4Number of eprom file :EP4427P_4Number of administration filex-Floppy number of eprom file sCs /floppy 7Floppy number of administration file:-Reference where results were listed :HGeneral remarks:-

date: 18 Hay 1990 (Friday) 19s 17

178

Page 184: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION • MflHBJRBfl 2

PROJECT i 408046

BEGIN DOTE i 188190

8TRRT TIME i 11:15

PLOT OF PRESSURE DHTB

ELEVflTION BflROMETER - DRTflLOGGER i 0 on.

BflROMETER READING (STRRT) i 0 mB.

END DHTE i 030590

INTERVRL : 00t 15

PflGE 1

FILEi EP4427P__4

S M»y 1998 I l i 2 3 : 4 0

(0

TOUl(S••*too

IS

s>TOtoeg

§SIroto6)

UlSIrutoS

roro19TO(0O

S)

5uto(S

SIu(O

s

UlSItl)toca

ruroSIutoCO

roCDs>bl(O6)

QUleg(Oeg

ro2to6)

tocatocs

wO)2toea

(0C9

Page 185: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMENSTRTION : MBHRJRBfl 2PROJECT i 40S046BEGIN DRTE i 1B0190STflRT TIME i lit IS

PLOT OF NRTER LEVEL ELEVRTXONWflTER LEVEL ELEWTION (STRRT) i 0 m.BAROMETER REHDING (STflRT) i 601 »B.END DflTE i 19B190INTERVRL t 00115

PHGE 1

FILEi EP4427P_4

6 Miy 1990 U t4Z tS9

00O

h> u * ut m N tp

8 8 8s8

- at

8• •

8

fub>

s to2toeg

s a v 9 S •

8 S

r .

Page 186: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTXON

PROJECT

t YEMEN

t MflHRJHBR 2

i 488846

BEGIN DHTE i

STRRT TIME i

060490

00)00

PLOT OF HRTER LEVEL ELEVRTION

WRTER LEVEL ELEVBTION (STRRT) : 0 «.

9RR0METER RERDING (STflRT) : S01 *»B.

END DRTE : 038590

INTERVRL i 00(15

PRGE 1

FILEJ EP4427P_4

6 May 1990 12(82)05

CD

-15.-IS.-16.-16.-17.-17.-18.-10.-19.-19.-20.-20.

003000500050005000se0050 *

£s8

IV)

8 8 852COs

t8

M

i09

8

m-13.00-13.30-16.00-16.50-17.00-17.50-16.00-18.50-18.00-19.50-20.00-20.50*

2IDs

8 8in

8n

828 2

s

S8

88 8

SI

838

T8 8 8

S

iZ * 8 |2to

8 8t 9 B i *•M X B M n2tos

8 8 8 8to)2CDIS

TT8 8

8

i

Page 187: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMENSTflTION i MRHRJBBR 2PROJECT t 408846

PLOT Or WRTER LEVEL ELEVRT1ON PHGE 2

FILEi EP442?P_4

B H«y 1990 12t08i80

0»M

-19.00-15.50-IS.80-16.50-17.00-17.58-18.08-18.58-18.00-19.50-28.08-28.50; * 8 5

S 8 8 IS r. I

8 8 8

-15.00-13.30•IB.•16.50-17.08•17.58-18.00-18.58-19.00•18.50-20.00-20.30*~ k 8

2 8 8(O

I-? *ft*

8s r8 8

I ?S 8

88

••*ID

S(0(9

28

88

N

8S 88 8

(O

S8

S8

M

8 8*0490

s8 88 8 8

S8

Page 188: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTXON t MflHRJRBfl 2

PROJECT i 408B46

PLOT OF HflTER LEVEL ELEVflTION PflGE 3

FILEi EP4427P_4

6 M»y 19SB 1 13i5G

09CO « 8

I •a

8 8s

8ruu

s(0s

28

8-20.se

8 8 S(0

88 8 8 8

rumJ

58

88

ruMsCOs

T—r

-is.ea-is.se-iB.ee-16.50-17.ee-i7.se-i8.ee-ie.se-19.00-t9.se-2e.ee-2e.se

n

8 sto(9

sM

r S n

8t—r

2s

8r

Page 189: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMEN

STRTION t MRHflJRBR 2

PROJECT t 488046

PLOT OF WHTER LEVEL ELEVRTION PRGE 4

TILEi EP4427P_4

6 May 1890 12I19I52

O>

-15.20-15.50-16.00-ie.se-i7.ee-17.50-18.00-18.50-is.ee-18.50-20.00-20.50

IDs

iii

5 * 881too

ftf

8 8T

n•13.00•15.50•16.00-16.50•17.00•17.50•16.00-18.50•18.00•19.50-20.00-20.50

toCB

I8

r(O

s

8Ti

Page 190: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

IIIIIIIIIIIIIIIIIIIII

PLACE :ttahajaba 3 /non pumped well

PRESL06:«EM

Service given before initiation:none-i nterva1 :OO:15

Initiation date:18/01/90Initiation time:ll:15

Try-out results: - in the field the following action were done:last marker at I8/O1/9O 11:15air pressure at 18/O1/9O 11:15air pressure at 18/01/90 11:30air/well 18/01/90 11:45air pressure at 18/O1/9O 12:00143 cm of water J8/O1/9O 18:15143 cm of Mater jS/Ol/90 I£:30143 cm of Mater 18/O1/9O 12:45air/well 18/O1/9O 13:00in well 18/O1/90 13:15

- when reading out these were foundMarkers given : one at start 18/01/90 11:15 and one at end at

O3/O5/9O O7s2O h.

Installation date:18/OI/9OInstallation time:11:15 marker, 13;15 in well

Installation description :in non pumped shallow well-installation place:sensor at -16.45 m top white stone-waterlevel s-12.85 m to reference at 13:15

Check up visit date :3/9OCheck up visit results:OK

Calculated removal/stop date:O4/05/9CCalculated removal/stop time:-

Removal date:OS/05/90Removal time:12:14Remarks :-

-i*a ter leve 1: --sediment :-

Stop date :03/05/90Stop time :08:53

Service given snew batteries and ringsEprom reading date:O3/O5/9O EissaNumber of eprom sEP4312-lNumber of eprom file :EP43l2P_lNumber of administration file:*Floppy nunber of eprom file :C: /floppy 7Floppy number of administration file:-Reference where results were listed :2

185

Page 191: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

SeneraI remarks:1.

date: 18 May 199O (Friday) 19sEO

136

II

Page 192: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STHTION i MRHRJBBfi 3

PROJECT i 408046

BE6XN DflTE t 180190

STRRT TIME t l i t IS

PLOT OF PRESSURE DHTflELEVRTION BflROMETER - DRTRLOGGER i a cm.BRROMETER RERDXNG (STRRT) i 0 mB.END DflTE i 040590INTERVAL : 08:15

PRGE 1

FILEi EP4312P_1

6 May 1990 1 5 t l 2 t 2 9

CB-si

mB1120

1100

1088

1062

1040

1020

1000

960

960

J J I I L ^ .

_—.—

1 I

_||LJL

..„„! jzujiniir —r--l—f-nt-r-ft--

1 ! t 1

"" lt-™f|

i i i

i ftT i, r •

roOlC B*>*CO

o

eg(9ro(Oea

sstoo

UTcsroCO

<s

roro

CO8)

eg

sCOca

ssIDea

uisCO(S

roroCD1010

ea

CO

2CO(2

9

to9

rosCO

ca

**CO69

CO

ea

ft)o)

2(0

ea

s3COs

Page 193: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STRTXON i MflHflJHBfl 3

PROJECT I 488046

BEGIN DRTE t 06049B

STRRT TIME i 80100

PLOT OF WFITER LEVEL ELEVRTJON

HflTER LEVEL ELEVflTION (STHRT) i 0 m.

BflROMETER REHDING (STflRT) t 7S4 »B.

END DflTE t 030590

INTERVAL i 00115

PRGE 1

FILEi EP4312P_1

6 Mmy 1990 15t4St27

0000

-14.10

-14.20

-14.30

-14.40

-14.50

-14.80

-14.70

-14.00

I iI

1 8 1 i I iI l

-14.10

•14.20

-14.30

-14.40

-14.50

-14.60-14.70

-14.90

(0s

? • 5 • ? I ? ? S • T8 8 8 8 8 S 8 8 8 8 8

-14.10

-M.li

-14.80

-14.40

-14.50

-14.60

-14.70

-14.80

-14 .10

14.11•14.30

-14.40

•14.30-14.60

-14.70

-14.60S t 88

28

~ f 88 8 8

Jostoo

S8 8 8 8 8 S

10s

T3

88

Page 194: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTXON

PROJECT

i YEMEN

t MRHRJRBR 3

i 408046

PLOT OF WRTER LEVEL ELEVRTION PRGE 2

FILEt EP4312P_l

S May 1990 15l33i57

00

-14.10-14.20-14.30-14.40-14.SB-14.68-14.78-14.B0

3:

S 8M

8s k i •8 2

CO

s

8M 09

i

-14 .10•14.20

•14.30•14.40-i4.se-14.60-14.70-14.60

ms 8 8

n8 8

•si

2 8 8 i

m-14.10-14.20

-14.30

-14.40

-14.58

-14.60

-14.70

-14.60

-14.10

-14.20•14.30•14.40

•14.50-14.60

k t 82IP

8 8 8 888

CD

sCOto

X8

88

M

8 8

-14.70

-14.68ni

tos

s8 8 S

(0

s

8 • S 88 8 8

Page 195: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTION

PROJECT

i YEMEN

: MRHflJRBR 3

t 488046

PLOT OF MHTER LEVEL ELEVflTION PRGE 3

FILE: EP4312P__i

6 May 1980 15t58i2S

(0

o

-14.10

-14.20-t4.ie-14.40-14.90-14.8B-14.70

r-ri

si

SM

16I

-14.10•14.20•14.10

•14.40•14.80-14.80-14.70-14.00 1 I S I i a I I I i t

8 8 8 8 8 | 8 8 8 8 8(9

-14.10-14.20-14.30-14.40-14.50-14.80-14.70-14.80

-14.10•14.20

-14. IB-14.40•14.30-14.80

-14.70-14.80

At0)

ss 8

8N 8 5 8

CO

s

88

r—r r T8

Page 196: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION i MRHRJRBR 3

WWWCT i 408048

PLOT Or WRTER LEVEL ELEVATION PRGC 4

FILEt EP4312P_1

I M»y IBM lliBliflf

to

-14.18

-14.10

-14.98

-14.40-14.90-14.60-14.70-i4.ee

o8 8 8

m 2 ? I 5Ss

8 8 8

-14.10-14.10-14.30

-14.40

-14.80

-14.60

-14.70-14.80

(O

r8

M

8 8 8ss(0s

hi

8

Page 197: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

II

...._ •

PLACE :Mawir 1 ""

PRESL0G:W4-0 "

Service given before initiatiomnone-interval :00:15

Initiation dates 15/01/88 IInitiation time:19:45

Try-out results*- |Markers given i-

Installation date:16/01/88 I* Installation times1^:OO *

Installation description sdrum in wadi»30 cm sand above drum-installation pi ace: sand and boulders in drum-Materlevel sdrum full= 40 cm water

Check up visit date :-Check up visit results:-

Calculated removal/stop date:30/0A/88Calculated removal/stop times-Removal date:05/06/88Removal times09:00Remarks s-

-waterlevels--sediment s4S cm of sediment above drum

Stop date :-Stop time :-

Service given :new batteriesEprom reading date:nkNumber of eprom sEP4**&**-0Number of epro* file iEP4**S**P_0Number of administration fi 1 e:AD4*»24P_0Floppy number of eprom file ;l/£Floppy number of administration file:4Reference where results were listed :l+£

General remarks!1.

datai17 ^iril 1990 (Tuesday) I61O6

192

Page 198: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMENSTRTION i NRWIR 1PROJECT t 408046BEGIN ORTE t 190196STHRT TIME i 19i43

PLOT OT PRESSURE DHTHELEVATION BflROMETER - DflTHLOGGER i 0 o*.BRROMETER RERDING (STHRT) t 0 nfi.END DRTE t 040S98INTERVRL : 00:15

PAGE 1

FILEt EP4484P_0

17 Rpr 1998 15 )49 :43

(OW

BIB

B00Mru<3•"•

CO00

rutoegCOCO

eginCOruoCO

*-»ro(9roCD00

toegto00CD

roCOegCDCO

CO<aU)0000

egU)00CO

» • *

00egojCDCO

roCJ)eg0)COOD

(9

5CDCO

egCOegjk.

CDCO

egCDCD

roruegCDCD

ruCDeg4wCOCD

Page 199: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY s YEMEN

STATION i MRWIR I

PROJECT i 408046

BEGIN DATE t 160188

START TIME i 00:00

PLOT OF HHTER LEVEL ELEVHTION

WATER LEVEL ELEVATION (BTRRT) t 0 m.

BAROMETER READING (START) t 80S mB.

END DATE i 220188

INTERVAL : 00:IS

PAGE 1

FILEi EP4421P_0

25 Rpr 1990 I 6 i 4 4 i 0 9

<O

m0.00

-0,10

-0.*0

-t .M

-0.40

—0. 90

s01

888

m0.00

-9,19

.S0

-0,10

-0.40

-0.S0•sis

s8

r8

N

8 8

m0.00

-0.10

-0.20

-0.30

-0.40

-0.50^

0.00

-0.10

-0.20

CD

5an

8 8 80»

8

-0.30

-0.40

-0.50U

SOBS

M

8 a

Page 200: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STHTION ; MRHIR 1

PROJECT t 408046

PLOT OF WBTER LEVEL ELEVRTXON PRGE 2

FILEi EP4421P_8

25 Rpr 1990 !Bt47il4

a. 80

-e.ie

-e.se

-a.se

-0.40

-8.38"

ID

0.80

-B. 10

-8.20

-0.38

-8.40

88

-8.SBUre

i 8 8ros0CD

si 8

n

8r8

0.08

-8.10

-0.20

-8.38

-0.40

-8.50M

ro09

8

Page 201: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Ma*if1

PRESLQG:WH

Service given before initiatiombatteries changed-interval :0OJ15

Initiation date:140688Initiation time:10:47

Try-out results:0KMarkers given :5,last marker at record 100 is 14/06/88 10:47

Installation date:14/06/88Installation time:ia:OO

Installation description :drum in Madi,30 cm sand above drum-installation piace:sand and boulders in drum-Materlevel sdrum -full- 40 cm water

Check up visit date t-Check up visit resultst-

Calculated removal/stop date:28/09/88Calculated removal/stop timer-Removal date:O9/10/88Removal time:09:00Remarks :-

-water level:--sediment s-

Stop date :-Stop time :-

Service given :noneEprom reading dateinkNumber of eprom :EP44S4-1Number of eprom file :EP4454P_1Number of administration fileiEP44e4P~lFloppy number of eprom file fl/SFloppy number of administration file:4Reference where results were listed :1+2

General remarks:l.only lie records: 1- 99 were before 14/06/88 10:47

100 was at 14/06/88 10:47Itl was at 14/06/88 13:15 when the Preslog

was already installed in the wadi; did not give any increase inpressure due to water of drum. Why did he stop at lie ?

date: 18 Hay 199O (Friday)

196

Page 202: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

IIIIIIIII

listing of f i le : EP4424P_1 START at registration 1

13IE222936435057647178859299

4424SOI802804802802802802804804804804802B01801

291623TO37445158657279869310O

4O518028028O48028O2S028028048048048048028014O51

310172431384552596673808794101

79840518028O48028028028028O48O58O48048O1801801

4•t -t

ia2532394653606774818895102

4C5180G8028O26028028028028O4804805804801801793

5121926T3*O475461iS75328996103

8008028023O28028O28028O48O4805805802301801784

613202734414325626976639097104

4051eo2eo4£02602602802804804804805802801801784

714212835424956637077849198106

8008028048O28O28028028O48O4804304802801801783

106 783 107 783 108 783 109 782 110 8O6 111 4095 112 -9999

197

Page 203: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Mawir 1

PRESLQG:W30-0

Service given before initiation:none-interval J00:15

Initiation date:09/10/88Initiation time:07:lS

Try-out results:OKMarkers given :1

cInstallation dates09/10/88Installation time:09:15

Installation description sdrum in wadi,30 cm sand above drum-installation place:boulders in drum covered with cloth

sheet-waterlevel :drum full= 40 cm water

Check up visit date :-Check up visit results:-

Calculated removal/stop date:S3/01/89Calculated removal/stop time:—

Removal dates21/01/89Removal time:09:45Remarks s-

-waterlevel:--sediment :-

Stop date :El/01/89Stop time sll;00

Service given snoneEprom reading datesnkNumber of eprom ZEP4430-0Number of eprom file :EP4430P_0Number of administration f i le = AD*i*»3OP_OFloppy number of eprom file :l/2Floppy number of administration file:£/4Reference where results were listed :l+2

General remarks:1.

datei17 April 1990 (Tuesday) 17t07

198

III

Page 204: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STflTION

PROJECT

: YEMEN

• MR+tIR 1

t 408046

BEGIN DOTE t 891088

STRRT TIHE t 07:15

PLOT OF PRESSURE DflTR

ELEVHTION 8RR0METER - DHTBLOGGER i 0 cm.

BflROMETER REHDING (STRRT) i 0 mB.

END DHTE i 220189

INTERVRL : 80:15

PflGE 1

FILEi EP443BP_B

17 flpr 1990 16t14i08

(O

800

0)

00

rob)

ea00CD

eg

egCO00

63ff)*-**0000

*-*COt—

0000

roa0000

ro•M*-*p*

0000

eg

ro0009

••*

•_•

ro0000

CO•—ru0000

roenroCD00

egeg*-•COCD

eg00egCOto

eg00(0

roroea» • *00CO

Page 205: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

II

PLACE :Mawir 1

PRESL0G:Wl-2I

Service given before initiation:none-interval :00:15

Initiation date:51/01/89Initiation time:08:45

Try-out results:OKMarkers given :1

Installation date:2i/01/89Installation time:09:45

Installation description :drum in wadi,30 cm sand above drum-installation pi ace: boulders in drum covered with cloth-waterlevel :drum full* 40 cm water

Check up visit date :-Check up visit results:-

Calculated removal/stop date:07/05/89Calculated removal/stop timei-

Removal date:03/04/89Removal time:-Remarks :-

-waterlevel:--sediment j-

Stop date :05/04/89Stop time :08:08

Service given :batteries changedEprom reading date:nkNumber of eprom :EP4421-aNumber of eprom file :EP44S1P_2ONumber of administration fi1e:AD4480P~S0Floppy number of eprom file :l/2Floppy number of administration file:S/4Reference where results were listed

General remarks:1.

date117 April 1990 (Tuesday) 17«08

200

Page 206: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STBTION t MRHIR 1

PROJECT i 406046

BEGIN DHTE I 210189

STflRT TIME i 00t45

PLOT OF PRESSURE DRTfl

ELEVRTION BRROMETER - DRTRLOGGER : 0 on.

BRROMETER RERDING (STflRT) t 0 mB.

END DflTE i 060489

XNTERVRL i 00115

PRGE 1

FILEi EP4421P_2017 Rpr 1990 17:13(29

mB850 r

too

840

830

820

G10

600I i

8CO8•-*COCO

8roCOID

8roCOID

CO8roCO(0

en8roCOCO

8

gCOCO

gCOCO

COISb)COU>

roU1

gCO(0

8*--

2CO

Page 207: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STHTION t MRMIR I

PROJECT i 488846

BEGIN DRTE i 310389

STRRT TIHE : 12t00

PLOT OF WHTER LEVEL ELEVHTION

HRTER LEVEL ELEVRTION (STRRT) i 0 m.

BRROMETER RERD1NG (STRRT) t 810 nB.

END DRTE i 010469

INTERVRL : 00:15

PRGE 1

FILEi EP4421P_2017 Hpr 1990 17)01)36

roOto

-0.10 -

-0.20 -

-0.30

-0.40ro

SO

Page 208: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE

PRESLQ6.-WE1-3

Service given before initiation:-interval :OO:15

Initiation dates17/OI/90Initiation timesO9:OO

Try-out results: •following data Mas obtained in field atinstallation 17/01/90, 09:00 h :17/01/90 09:OO last aarker

,, O9sOO air,, 09:15 Mater of 143 cm on sensor,, O9:3O Mater of 143 cm on sensor,, 09:45 Mater of 143 cm on sensor

10:00 airthe results, when reading out, were the same.The Preslog was started at the s a w date andtime as the Preslog at Mawir 1.

Markers given :1 at start and 1 just before end

Installation date:17/O1/9OInstallation time:O9:OO

Installation description :in pipe with the holes just to high-installation place:middle wadi-water level :

Check up visit date :3/90Check up visit results:OK

Calculated removal/stop date:03/05/90Calculated removal/stop timer-Removal date:Oe/O5/9ORemoval time:16:85Remarks :

-water levelt-sediment inone, no traces of floods.

Stop date :O3/O5/9OStop time :O8:23

203

Page 209: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

I.In the middle, no flood has occured

II

Service given :oatteries +• rings |Eprom reading date:03/05/90 EissaNumber of epromNumber of eprom file |Number of administration files-Floppy number of eprom file :floppy 7Floppy number of administration file;- •Reference where results were listed :& HReneral remarks:-

Ioccureu «date:18 nay 199O (Friday) 19:86 I

204

Page 210: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STHTION i MRWIR 1

PROJECT t 408046

BEGIN DRTE i 170190

STRRT TIME i 09i00

PLOT OF PRESSURE DRTH

ELEVRTION BRROMETER - DRTRLOGGER t 0 on,

BRROMETER RERDING (STRRT) I 0 mB.

END DflTE i 030590

ZNTERVRL t 001 IS

PRGE 1

EP4421PJ0319S0 18fSli42

mB810

o01 800 -

790

780rotstots

utsCOts

tsroCOs

tsroCOts

rotsrotots

roCDtsrotots

IS•MtsCi)toCS

tsutots

ro

5<o

ro<Dtsu>COts

(S

19

tots

stots

00S)

tots

roentsCOIS

roISUlCOS

Page 211: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTION

PROJECT

i YEMEN

• MflWIR 1

I 408046

SE6IN DOTE i 170130STflRT TIME i 09100

PLOT OF WRTER LEVEL ELEVHTIONWflTER LEVEL ELEVRTION CSTflRT) i 0 m.

BRROHETER REROING (STflRT) I 789 nB.END DOTE i 170190

INTERVRL i 00tI5

PflGE 1

FILEi EP4421PJP3

3 M»y 1990 19t l6 i2S

roO0>

m1.401.30 [--1.20 —1.101.000.900.600.700.600.500.400.300.200.100.00

-0.10

til

8oi

M

tfl Olus u Ul

10

til

ni

Page 212: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

IIIIIIIIIIIIIIIIIIIII

PLACE :NaNir 2

PRESLOGiWM)

Service given before initiation:none-interval :OOsIS

Initiation date:09/10/88Initiation time:07:15

Try-out results:OKMarkers given :1

Installation date:09/10/88Installation time:13:40

Installation description sin drum, middle wadi-installation places top drum= wadi level-tuaterlevel sdrum full* 40 cm.

Check up visit date s-Check up visit resultss-

Calculated removal/stop date:23/01/89Calculated removal/stop time:-

Removal date:Sl/01/89Removal time:10:15Remarks :-

-«a terlevel:--sed intent :-

Stop date :21/01/89Stop time :11:00

Service given ;noneEprom reading date:nkNumber of epromNumber of eprom fileNumber of administration f i lesAD<*429P_0Floppy number of eprom file :1/SFloppy number of administration file:S/4Reference where results Mere listed :1+S

General remarks:1.

date!17 April 1990 (Tuesday) 17183

207

Page 213: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STRTION i MRWIR 2

PROJECT i 408046

BEGIN DflTE i 0S10S8

STflRT TIME j 07:15

PLOT OF PRESSURE DHTR

ELEVRTION BRROMETER - DATALOGGER i 0 em.

BAROMETER READING (STRRT) i 0 mB.

END DRTE : 220188

INTERVflL t 00!15

PRGE 1

FILEi EP4429P_0

17 Rpr 1990 1 7 I 3 4 I 1 0

roO00

810

800

0)I-*

(SCO03

ro0)* • *

(SS

eg*-*C90003

Sm»*-*0900

***-*00CO

roS

*-*0000

ro•\jb ^t*+

00CD

sru0000

• • *

ro0000

00

ro0000

roUl*roCD09

caeg*00to

sS<si—•00CO

CO00u>

roroC9CDCO

Page 214: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

IIIIIIIIIIIIIIIIIIIII

PLACE :HaHir E

PRESL06:W27-E

Service given before initiation:none-interval :00:15

Initiation datesSl/Ol/89Initiation time:08:45

Try-out results:OKMarkers given :<t

Installation date:21/01/89Installation time:1O:15

Installation description lin drum,middle Madi-installation places top drum= wadi level-Mater level sdrum full= <M> cm

Check up visit date :-Check up visit results:-

Calculated removal/stop date:07/05/89Calculated removal/stop time:-

Removal date:02/04/89Removal time:-Remarks :-

-waterlevel:--sediment :-

Stop date :03/04/89Stop time :09:09 (marker)

Service given :noneEprom reading date:nkNumber of eprom :EP<i f27-2Number of eprom file :EP<^27P_S0Number of administration file:ADV*27P_S0Floppy number of eprom file :l/2Floppy number of administration file:2/4Reference where results were listed sl+S

General remarks:1.

date117 April 1990 (TuMday) 17t30

209

Page 215: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION : MFIWIR 2

PROJECT ) 40B046

BEGIN DflTE i 210189

STRRT TIME t B8i43

PLOT OF PRESSURE DflTfl

ELEVflTION BflROMETER - DflTflLOGGER : 0 cm.

BRROMETER RERDING (STflBT) i 0 iB,

ENS DRTE t 040499

INTERVRL i 001 IS

PRGE t

FILEi EP442?P_20

17 flpr 1990 19IB3I47

RtB865

645 -

835 -

625 -

SIS

BBS

795

7B5

Z ™ ^ ^

1 1 1 1 1 1 1 f 1 1*ro

5COID

IS00(0

00CO

CO

roCO(0

ro

1800U3

300to

sCDto

00toCOto

roUI030)00to

63

5GOto

Page 216: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMENSTRTION l WHIR 2PROJECT t 40804SBEGIN DflTE I 300369STRRT TIME I 30t00

PLOT OF HRTER LEVEL ELEVRTIONWRTER LEVEL ELEVRTION <STRRT) i 0 m.

BRROHETER REflDING (8TRRT) i 810 »8.END DflTE t 010469INTERVAL i 001 IS

PME 1

FILEi EP442?P_8017 Rpr 1890 1 B I 2 2 I 1 8

- 0 . 20

Page 217: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STATION i HflWIH 2

PROJECT i 406046

PLOT OF HflTER LEVEL ELEVfiTION PflGE 2

FXLEi EP442?P_20

1? Apr 1890 1BI24I33

m0.50

0.40 -

2 0-30

0.20 h

0.10 -

0.00 =.

-0. 10 -

-0.20

I

1 1 1 I t 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 t i 1

19U00(0

U Ss s ! ! 5 I -

I 8 8 g gN U

§ sU!

SC9

0) N

s s S

s

S

ruCOCB

it)

Page 218: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STATION t MNHXR 2

PROJECT t 408046

PLOT OF WRTER LEVEL ELEVRTION PRGE 3

FILEi EP4427P_2B

17 Hpr 1880 18i28i47

m0.30

2.40

0.32

0.20

0.10

0.00

-0.10

-0.20

w

_t i i i t i i i _ _ i i I i J 1 ± I

5toto

s»•»

s i2i

2 g g 5 3ss

S *- ft)

ssen en

g s s s s s §to s *-

s i ift>

Page 219: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Mawir well

PRESLO6:«E8-1

Service given before initiationrnone (first time uesed)-interval :OO:15

Initiation date:17/O1/9OInitiation time:09:OO

Try-out results:OKMarkers given : 1 at beginning and 1 at end

Installation date:17/01/90Installation time:?

Installation description sin non pumped well near Mawir-installation piacesunder water-waterlevel j?

Check up visit date :3/9OCheck up visit results:OK

Calculated removal/stop date:O3/OS/90Calculated removal/stop time:-

Removal date:02/05/90Removal time;16:50Remarks : —

-water level:--sediment :-

Stop date :03/05/90Stop time :O8:23

Service given :batteries and ringsEprom reading date:03/05/9O EissaNumber of eprom sEP43S8-lONumber of eprom file ;EP43S8P_1Number of administration file:-Tloppy number of eprom file :Cs / floppy 7Floppy number of administration file:-Reference where results were listed :£

General remarks:l.Not the same amount of records between Hawir 1 (44S1-3) andthis one.a.It was not possible to give a marker at 03/05/90 at 07:20.

d*tatS nay 1990 (Saturday> 16il9

III

214

Page 220: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTION t MRHIR WELL

PROJECT i 408046

BEGIN DflTE I 170180

STRRT TIME * 09iB0

PLOT OF PRESSURE DHTR

ELEVRTZON BAROMETER - DflTHLOGGER 1 0 em.

BRROHETER RERDING (STRRT) t 0 MB.

END DRTE i 890590

INTERVAL i 00115

PROE I

FILEi EP4328PJ3

3 M»y 1990 19t39>03

mB3000

ro

2750 -

2500 I—

2250

2000

1750

1500

1250

1000

750

ros

CD

s(O(S

toegtoeg

ro

5rotoeg

roonegrotoeg

8•M

8toeg

ro

8toeg

cab)(OQ

ro00egb)toeg

egeg*.

stseg

toC9

rotntstoeg

sro

eg

Page 221: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

I

PLACE :Shaalah

PRESL06:W7-0

Service given before initiation:none-interval :00:15 _

•Initiation date:15/01/88Initiation time:19:45

Try-out results:OKMarkers given :1

Installation date:17/01/88Installation time:10:00

Installation description :in drum-installation place:just outside reservoir-waterlevel :drum full= 40 cm

Check up visit date :-Check up visit results:-

Caleulated removal/stop date:30/04/88Calculated removal/stop timer-Removal date:09/06/88Removal time:lO:00Remarks :—

—«a ter1eve1:--sediment ;-

Stop date :-Stop time :-

Service given tchanged batteriesEprom reading dateinkNumber of eprom SEP4427-0Number of eprom file :EP4427P_0Number of administration file:AD4487P_0Floppy number of eprom file il/£Floppy number of administration file:4Reference where results were 1 istedl-t£+Draft Project document for

the Sham1ah dam.

General remarks:1.

datei17 April 1990 (Tuesday) 17i40

216

I

Page 222: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTION

PROTECT

BEGIN DRTE

STHRT TIME

i

i

t

t

YEMEN

SHRMLRH

408046

13018B

1814.9

PLOT OF PRESSURE DflTR

ELEVHTION BRROMETER - DRTRLOGGER i 0 am.

BBRONETER RERDING <STHRT) t 0 mB.

END DRTE i 090688

INTERVRL t 00115

PRGE 1

FILEt EP442?P_0

B flpr 1890 12i20t48

mB690

870

6 5 0

830

810

?90

to

ruro(9I—»

OD00

rotoaCO03

sQroCO

a

rooroooao

us

roODCD

romtsrua>oo

sCDUCDOD

CO00CD

CDCD

CDOS

rouitstoCDoo

CD

cs

COS3

toCD

00ao

<s

aoCD

rorueg

ODao

rv>

(9

0003

Page 223: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY ( YEMEN

STRTION t SHRMLBH

PROJECT i 408046

BEGIN ORTE t 190488

STRRT TIHE j 12tB0

PLOT OF WHTER LEVEL ELEVftTION

HRTER LEVEL ELEVRTION (STRRT) i 0 m.

BAROMETER REHDING tSTRRT) i 809 mB.

END DflTE i 2904B8

INTERVHL i 00115

PRGE 1

FILEt EP4427PJS8 flpr 1990 12i45i21

toCD

Page 224: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTION

PROJECT

i YEMEN

i SHflHLflH

i 400046

BEGIN DflTE t 190488

STflRT TIME t 12100

PLOT OF WHTER LEVEL ELEVRTION

WHTER LEVEL ELEVHTION (STflRT) i 0 m.

BflROMETER REflDING (STHRT) i 809 mB.

END DflTE t 290488

INTERVAL • 001 IS

PflGE 1

FXLEi EP4427P_0

8 Rpr 1990 12i54t00

—4

to

-0.10 -

S S 5 ^2 8 8CO

m

Page 225: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STRTZON i SHHMLRH

PROJECT : 408046

PLOT OF HftTER LEVEL ELEVflTION PHGE 2

FILE: EP4427PJJ

8 Rpr 1990 12i56i50

m0.68

0.50 |—

0.40

0.32

8.20

0. 10

-0. 10

-0.20

-0.30

-0.40

-0.5001 0)

i S g g g gto

iIVsss

nJi —

OS

ntni

gro

gru

5000D

o

iS 2 SI 3S S S (9

U S

g g

Page 226: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMENSTHTION i SHRMLRH

PROJECT t 488046

PLOT OF WHTER LEVEL ELEVflTXON PAGE 3

FILEi EP442?P_BB Rpr 1990 1 2 J 5 9 I 4 0

m0.60

0.50 -

0.40 —

0.30 —

0.20 H

0. 10

0.00

-0.10

-0.20

-0.30

-0.40

-0.50U m to

ro N

s s s s i S S 8roroS>

o00

a* • *••

8188

8••8

S8

3 8 -M 8 S si i i i 8 i

Page 227: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMEN

STATION : SHflMLRH

PROJECT i 408046

PLOT OF WRTER LEVEL ELEVflTION PRGE

EP4427P_0

8 Rpr 1890 13 i02 i30

to

14

0

0.40 -

0.20 -

S i S(J1

IBS

mSC9

toSS

ru ruru

iruu

s egCDGO

S

s ss s sseg

oto

M S to S <-

§ i ss

Page 228: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMENSTRTION i SHRMLflHPROJECT : 40804G

PLOT OF WHTER LEVEL ELEVHTION PflGE 5

FILEi EP4427PJB8 Rpp 1990 13(95:21

0.60

3.30

a.40

0.30

.0.2a

0.10

0.0a

-0.10

-0.20

-0.30

-0.40

-0.50

ro10CO

u m CD

s ssi

rg

sPiros

ruu§

ro19

ODCD

s s8 Ss s

S q 8s s s

s

s

Page 229: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STRTION t SHRHLflH

PROJECT • 486846

PLOT OF WRTER LEVEL ELEVHTION PBGE 6

FILE! EP4427P_0

8 Rpr 1990 13:09!12

Mro

0 .

B.

0.

0.

0 .

0 .

- 0 .

- B .

- 0 .

- 0 .

—0

m60

50

40

20

10

0 0

10

2 0

30

40

50ro u ui tn

. - ro

§ s s s s sru»

rofa)••

§roui

•sCDCO

w tii A tn

i s s §S CO —

u> s

s i s

Page 230: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMENSTflTION i SHHMLRHPROJECT i 408046

PLOT OF HRTER LEVEL Et-EVRTION PflGE 7

FILEi EP4427PJB

B flpr ISSB 13i tl iB2

0.60

0.50 -

0.48 h

0.30

0.20

0.10

0.00

-0. 10

-B.20

-0.30

-0.40

-0.50Ul m CO

§ s

IV)IV)—

ft)u*•§

ruen8

0000

s s 8 s .•N)

Page 231: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMENSTRTXON i SHRMLflHPROJECT i 408046

PLOT OF WRTER LEVEL ELEVRTION PflGE 8

FXLEi EP4427PJ86 Rpr 1998 13tl4:14

0.G0

0.50 -

0.40

0.30

0.20

0.10

0.00

-0.10

-0.20

-0.30

-0.40

-0.50

s s»-»•M••as

*-*m—ss

10

g

titS

st\>»•»••

§

ruru••s

ruw•«s

rv>•MS00CD

§ g g § S § S 3 sea g

Page 232: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STRTXON

PROJECT

i YEMEN

i SHRMLRH

i 408046

PLOT OF WRTER LEVEL ELEVRTION PflGE 9

FILEi EP4427P_0

8 Rpr 1930 13il?i04

m0.60

ro

0.50

0.40 H-

0.3B

0.20

0.10

0.00

-0.10

-0.20

-0.30

-0.40

-0.50ru u

03S

ui

Ss

01 -M

CD

s g ss

to

(S

o

ros

s

(VIV•#

iu

groat<SCOo

2s

s••s

sg

2S

Ss g g

(0 S

i g

Page 233: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY ! YEMEN

STATION i SHRMLflH

PROJECT i 409046

PLOT OF MRTER LEVEL ELEVRTION PRGE 10

FILE: EP4427P_0

8 Rpr 1930 13tl9)SS

m0.60

M

0.50 —

0.40

0.30

0.20

0.10

0.00

-0.20

-0.30

-0.40

-0.50

so S iOI

ss

CDto ro

u>

eg Cg Q s §ru 5

£ iCO00

B 8 2 a 8(9 S (9 CD B

CS 9 CS "•55 » S C3

S S 3 S

Page 234: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACE :Yaklah

PRESL0G:W3B-0

Service given before initiation:none-interval :00:IS

Initiation date:31/lO/88Initiation time:O8:15

Try-out results:OKMarkers given il ?

Installation date:31/10/88Installation time:12:00

Installation description : without drum-installation place: middle wadi, water level -40

cm wadi level-waterlevel s - 65 cm wadi level

Check up visit date :-Check up visit results:-

Calculated removal/stop date: 1<»/OS/89Calculated removal/stop time:-

Removal date:01/l1/89Removal time:11:00Remarks :-

—waterlevel:--sediment :-

Stop date :-Stop time :-

Service given :batteries changedEprom reading date:nkNumber of eprom iEP<*<f38-0Number of eprom file :EP^38P_0Number of administration file:-Floppy number of eprom file ;HP c: / floppy 7Floppy number of administration files-Reference where results were listed :S

General remarks:l.due to internal disputes the Preslog could not be removedear 1 i er .

date:18 Hay 1990 (Friday) 19:88229

Page 235: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY

STflTION

PROJECT

s YEMEN

: YRKLRH

: 408046

BEGIN ORTE : 31108B

STflRT TIHE i 08113

PLOT OF PRESSURE DP.TR

ELEVRTION BRROMETER - DRTRLOGGER : 8 en.

BAROMETER REflDING (STflRT) : 0 mB.

END QRTE : 010489

INTERVRL i 00tlS

PHGE 1

FILE: EP53SPJ3

9 Rpr 1990 88140113

mB

858

638

810

798

M

COCO

*-*I—*

COCO

ro•••*

* • *

COCO

roCO

COCO

sUlroCDCO

roIX)COCO

»-»10roCO00

roCO*-•roCOCO

Sros>CO(D

caCOsCO

*-•0)63CD(O

roU)SM*00U)

u(96900to

s

COto

uCOID

Page 236: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STRTION i YRKLRHPROJECT i 408046

BEGIN ORTE i 311088

START TIME i 081 13

PLOT OF WflTER LEVEL ELEVBTION

WflTER LEVEL ELEVflTION (STRUT) t B *.BRROMETER RERDING (9TRRT) I 787 mB.

END DRTE I 010489

INTERVRL I 001 IS

PflGE 1

FILEi EP535PJB

9 Rpr 1980 09102128

-0.10 —

-0.30

2 g

-0.10

-0.30

-0.50

-0.704:

CDCD

S 5= 8toCD

a0000

ru

8 *>»OBID

IN)

88OBIB

8S == sCBOB

ea

a

i0000

8 CDCD

ni

8(ikl•-*

5CD

-0.10

-0.30

-0.50

-0.70

-0.10

-0.30

9.50

or ™

6

*" 91 "* * Cw i ^«B CDCO CD

8S ID

CB= 8 = 8 = 8 =CD OD CD 0CD CD CD CD

288

-0.784; J,22

u ?OBOB

*

0000

iMU

a>CD

8in0)

m»0000

8 =CD00

ifuCD

CDCD

Page 237: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY t YEMEN

STHTION i YRKLRH

PROJECT i 408848

PLOT OF WHTER LEVEL ELEVflTION PflGE 2

FILEi EP333P_0

9 fipp 1990 0910?t9B

-0.10

-0.30

-0.50

ro -0.704:

-0.10

-0.30

-0.50

ruto

5CO

M

8wCO

118

CO

10

8o128

CD

ruCOCD

sn>CO

M

82ru(DCO

M

8a01rus

-0.701-^-

a<D

8 M ttCOCO

8S

8 8ru

-0.10

-8.30

-o.se

-0.7B

-0.10

-2.30

-0.50

8uruatCD

8 n»COCD

8CM

ro<D<D

8COPiCOCO

8 ru<D<D

8CO

roCOCO

8(0

ruIDID

-0.704:

8ruS»«MCOID

8ru

ruCOCD

8rururuCOCD

8rocu•ruCDCD

8A)*M(D<D

8NUruCDCD

8N«lruCDCD

Page 238: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMENSTRTION t YRKLHHPROJECT t 406046

PLOT OF WHTER LEVEL ELEVATION PHGE S

FILEi EP53SP_0

9 Rpr 1990 B9iUtS0

-e.ie

-0.38

. 5 0

toto

-0.10

-0.30

-0.S0

i hiCDCD

hiCO

sCD

Cll

sro

8CJ*•*hiCD

8sau

ro

8SsCDCD

g09

CDCO

ro

8oeg

sto

ro

88ts

Su>

M

8Seg

sto

ro

8 09

sCD

ro

8S =2 8SCO

SCB

sto

-0.10

-0.30

-0.90

-0.70

-0.10

-0.80

-0.50

-0 .70

8s - *- ™ w ™ u2 8 2 8 2 8 2CD fD OD 09CO tO CO 10

*sCDCD

gen -s S••* CDCDCD

cr>S

5to8

•MSCDCD

8CD ™B S

5 8

to

IUsCO

2 8 2 8 2 8 2<D CD CD CBto to to a

8U

sCDCD

Page 239: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY : YEMEN

STflTION I YflKLflH

PROJECT i 406846

PLOT OF WHTER LEVEL ELEVflTION PHGE 4

FXLEi EP333P_0

9 flpr 1990 09i16t26

roCO

-0.10

-0.30

-0.S0

-0.70"-^

-0.10

-0.30

-0.50

M4kS

s

M

8roU

SCDCD

IwM

roO)

2CD(0

nj roI? "M

8 2CDCO

M ™BB

8 2CDCO

u

8co ;

SCD

j U

' S! 2CD

CO

-0.?0l-£

8 2 8 S 8 S0 CD ODID ID U>

CDCO

? S 5 8 58 S I S 8

CDCO at

(0

CDCD

,10

-0.38

-0.58

-0.10

-8.30

-0.50

8 IS 8 18 8 58 8CO CD

sSCDCO

r<*

8 ISCDCO

8ro

ISCDCO

N

iuISCDCO

M

8CDCO

ro

i CDCO

I S 8 I S 8 I S 8B (D CO CD(O CO CO IB

ro-

8

Page 240: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

COUNTRY i YEMEN

STATION t YRKLRH

PROJECT i 408046

BEGIN DflTE I 120269

BTRRT TIME I 18i00

PLOT OF WflTER LEVEL ELEVflTION

HRTER LEVEL ELEVflTION (STRRT) I 0 m.

BAROMETER RERDING (STflRT) i 797 »B.

END DRTE t 140269

INTERVAL i 00115

PflQE 1

FILEi EP533P_0

12 Rpr 18S0 10i32i56

M(001

-0.15 -

-0.28 -

-0.25 -

-0.30*•*COM

sCO

i

IX)s

ito•-*••s

ra••s

rui>>••s fa)

CDCO

- 2 g g g S S CO • -S 9

s s s

• - M u Ol

§ s o19

O>

SO

eas

Page 241: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

w

PLflKPRESL06SATE

i . slope

input

*•«

:

1 arei

width heightat

iitnin

40.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.00

i t

laassaa

0.000.070.960.940.810.730.730.660.550.410,370.310.B60.230.160.150.130.080.050.010.00

AftAD 14284-2021/03/89

•ithod

slope roughnisi• I / i f

lasaacaaai

0.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.004

taseaaaaaaj

0.030.030.030.030.030.030.030.030.030.030.030.030.030.030.030.030.030.030.030.030.03

(calculations. i „__

! A! 12

is *siia« tan

0.002.80

38.4037.6032.4029.8029.2026.4022.0016.4014.B012.4010.409.207.206.005.203.202.000.400.00

R1

•saaaai

0.000.070.9B0.900.780.700.700.640.S40.400.360.310.260.230.180.150.130.080.050.010.00

file :aiadi241

(results !input [results

a/s

X9XXE

0.000.361.991.941.781.671.671.561.391.151.070.96O.BS0.790.670.590.540.390.290.100.00

si3/s

(1)aaaaaax

0.001.00

76.3673.7757.8046.7348.7341.2930.5616.8215.8911.85B.897.23d.Bl3.552.801.250.570.040.00

B•3 /s(2)

aaasxaa

0.001.00

80.0277.2460.1450.5150.5142.6531.4219.2116.1B12.046.977.314.B53.382.621.250.5?0.040.00

{starting! t iw! hh:aaaaaaassaa

21:3021:4522:0022:1522:3022:4523:0023:1523:3023:4524:0000:1500(3000:4501:0001:1501:3001:4502:0002:1502:30

endingHaeItluaa

»aBaaass

21:4522:002211522:3022:4523:0023:1523:3023:4324:0000:1500:3000(4501(0001:1501:3001:4502:0002:1502:3002:45

durationainutas

duration lama !

1

nua voluiea3

i v i n g e voluw•3

saas caaa a a assaasa as a sssca s s a Ba xaauaa sssss s E 3 sss a

IS1515151515151515151515ISIS1515IS15151515

900900?00900900900900900900900900900900900900900900900900900900

0903

72,02069,51454,12943,45845,45838,38426,27317,29014,56110,8328,0736,9784,3683,2222,5371,129

515350

0432

36,46170,76761,62249,79345,45641,92133,33022,78315,92612,6979,4387,3235,4733,7952,8601,833

82227518

Total 423,282

Page 242: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

2. ALAJt

input

Speed(t/S

rrsrsss

0.000.632.352.452.302.202.802.101.95

1,70i.se1.461.311.221.070.9B0.900.700.500.200.00

t, KENNEDY

itidth height•1

40.0040.0040.00

40.0040.0040.0040.0040.0040.00

40.0040.0040.0040,0040.0040.0040,0040.0040,0040.0040.0040.00

•1

0.000.070.960.940.810.730.730,640.550.410,370.31

0,840.230.180.150,130.080.050.010.00

diaieter••

=,«=====

:

.00.00.00.00.00.00.00,00.00

1.00,00.00.00.00.00

t.oo.00

1.001,001.00(.00

slope•I/Hi

'3=S=£ =

0.004

0.0040.004

0.0040.0040.0040,0040.0040.004

0,0040.0040.O04

0.0040.O040.0040.004

0.004

0.0040.0040.004

0.004

(calculations

! rb Froude

0.000

0.0700.916

0.8980.77B0.704

0.7040.6390.3350.40E0,3630.3050,8370.2270.17B0.1490.129

o.oeo0.030

0.010

0.000

=====

07

2625S322

8821201716IS131211fO97520

rb/d50

=======

070

9168987787047044395334083633058372271781491298050100

Reynolds

r a~aa

0460B4

237423822357401819889

1574890

157469013437371060937

mats38340745301t341751281965

194017148302118153

3669325347

2032

0

! input

! ff!

3_

0,0000.0400.0400.0400.0400.0400,0400,0400.0400.0400.0*00.0400.0400.0400.0400.0400.0400.0400.0400.0400.040

(calculations

fb !1

=«»=:0.0000.0120.003

0,0040.0030.004

0,0040.0040.003

0.0030,0030.0050.0070.0070.0070.0080.0090.0100.0200.0300.100

rb•i

0.0000.0700.B920.8420.7390.679

un0.619

0.5210.3960.35B0.3060.6370.2230.17E0.1470.1270.0780.0480.O090.000

i3/s/*l

a .

0.0000.0452.3368.2O01.7901.549

1.3491.3421.0440,6930,3740.4460.3360.2770.1910.1460.1160.0360.0250.0O20.000

0•3/s

=„„„0.0001.814

93.435

87.9B371.61961.978

41.97633,66941.75287,38088,93917.82B13.44911.0967.6335.8364.6502.2310.9980.0800.000

! input

[starting! tiae! hh:M

21 [30Sl:4522:00

82(1322t3022:43

83)0083il3£3:30£3(4514)0000115

00)3000:45OltOO01:15

01:30

01:4502:00

02:1502:30

endingt i nhh:w

21t4S

22:00

22:15

E2:3002i4523:00

83t 1523(3023:45E4i0000H300:3000(4301:000hl501:3001:4502:0002:1502:3002:45

duration•imites

- • • - • • S M S

131515151515

15IS15151315191515151515151515

duration

s

nimiii

900900900900900900

900900900900900900900900900900900900900900900

Intuits

! total YOIUM! i3

::::«i::3::::::

01,632

B4t09279,186

64,45755,780

99,76048,30837,57784,58880,64316,04518,1049,9876,8725,SS3

4,1852,008

898720

average voluie

•3

. . . . . . . . . . . . . . .

0B16

42,86281,639

71,82260,119

59,78032,04142,93931,08818,61418,354

14,07511,045B,4E96,0624,7193,096i,453

48336

Total 439,100

Page 243: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

00

3. Chezy

input

equation

width height slopeat •1 •!/•!

40.00 0.00 0.004

40.0040.00

40.0040.00

40.00

40.0040.00

40.0040.00

40.00

40.00

40.00

40.0040.00

40.0040.0040.00

40.00

40.00

40.00

0.07 0.0040.96 0.004

0.94 0.0040.81 0.004

0.73 0.004

0.73 0.004

0.66 0.004

O.SS 0.004

0.41 0.004

0.37 0.0040.31 0.004

0.86 0.004

0.23 0.0040.18 0.0040.13 0.0040.13 0.0040.08 0.004

0.05 0.0040.01 0.004

0.00 0.004

f

( fret Alai & Kennedy)

0.000

0.0580.043

0.044

0.04S

0.044

0.044

0.044

0.0430.043

0.0450.045

0.0470.0470.0470.0480.0490.050

0.060

0.070

0.140

! results

! V! »/%i

0.000

0.6498.586a.531

8.330

8.2488.S42

8.135

1.9771.713

1.592

1.459

1.3091.8381.098

0.9870.910

0.70?

0.51!

0.818

0.000

D•3/f

0.000

1.817

99.303

95.168

75.504

65.45563.455

56.365

43.49088.067

83.561

18.09513.617

11.3387.859

3.9814.730

2.263

1.088

0.093

0.000

! input

litirtinj! tlM! hh:n

indingUi thh:w

dun t ion•inutii

durationl

Iresultsi

1 total VOIUM

! n31

ivtngt VOIUM•3

81:30 81:45 15 900 0 081:45

28:0082:13

88:30

22:45E3:00

23:15

23:3023:45

24:00

00:15

00:30

00:4501:00

01:1501:30

01:45

02:00

08:15OfiiSO

82:00

82:15

22:30

28:45

23:0023:15

23:30

23:4524:00

00:15

00:30

00:4501:00

01:13

01:3001:45

08:00

02:15

02:3006r43

1515151515151515IS151515IS15151515151513

900900900900900900900900900900900900900900900900900900900900

1,635B9,373

85,645

67,954

59,96958,909

50,72339,14185,878

21,804

16,886

12,85510,8047,073

5,3894,257

8,037

919760

81845,504

87,309

76,799

63,43850,909

54,819

44,93538,810

83,841

18,745

14,270

11,230

8,6396,801

4.793

3,147

1,478

49636

To t i l 557,815

Page 244: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACEPRESL06

DATE

1 . slop*

input

:-

i

irii

width htight•1 •1

AHAD 1

4824-80

84/03/B9

aithod

i lop* roughrms

• i / t l •

asa asa a BSBB BBaa asaasscasa asa asaa

40.0040.0040.0040.0040.0040.0040.00

M 40.00W 40.00* 40.00

40.0040.0040.0040,0040,0040,00

40.0040.00

40.00

40,00

40.00

40.0040.0040.0040.0040.0040.00

0.000.000.870.390.330.880.850,810.800.170.150,140.140,130.180.100.100.080.070.060.060.040.030.030.080.010.00

0.0040.0040.0040.0040.0040.0040.0040.0040.004

0.0040.0040.0040.004

o.rn0.0040.004

0.004

0.0040.004

0.004

0.004

0.0040.0040.0040.0040.0040.004

0.030,030.O30.030.030.030.030.030,030.030.030.030.030.030.030.030.030.030.030.030.030.030.030.030.030.030.03

Ictlculitionf

! A! i8I

R

icaa aaa aaaa=a ass: a=s

0.000.00

10. B015.6013.80

11.80

10.008.40B.006.806.003.605.603,804.804.004.003,20£.80E.408.401.601.80

1.20

0.800.400.00

0,000.000.870.380.38

o.ae0.250,810.800.170.150.140.140,13o.te0.100.100.080.070.060.060.040.030.030.08o.ot0.00

file i Mid 1848

! result!• !

! V! i/s

I input1

Q S 'starting ending•3/5 «3/s ! ttie tin(1) (8) I hhni hhiM

! result!1

duration duration fiaxiaui voluae average voluie•mutes s ! «3 a3

s sa s=a asxa assssrsaa ssasssr sasaasassasaasssa assa a a a asraaasa a asa sa asassaasa asa aaasaaa a assaaasaa ass

0.000.000.871.111.000.B90.B30.740.780.640.590.370.570,340.510.450.430,390.36

0*380.850.80

o.eo0.160.100.00

0,000.009.43

17.3313.1410.018.306.815.734,373.553.173.178.102.43

1.81

1.B1

1.85

1.00

0.77

0.77

0.39

0.84

0.24

0.18

0.04

0.00

0.000.009.55

17.6713.3610.138.406.885.794.413.533.193.1?8.982.47

1.68

1.88

1.85

1.00

0.78

0.76

0.39

0.84

0.84

0.12

0.04

0.00

80:00

80)15

80:30

80)45

81)00

81:13

81)30

81 (43

88:00

88:15

88:30

83t00

83(13

83130

23:45

84:00

00:15

00:30

00:45

01:00

01:15

01:30

01;45

02:00

02:15

08:30

80:15

80:30

20:45

81:0081:1381:308114388:00

8E:13

82:30

88:45

83:00

£3:1563:3083)4584:0000:1500:3000:4501:0001:13

01)30

01:45

02:00

03:1502:3008:45

15151515151313131315151515IS131515IS15151313131515IS15

900900900900900900900900900900900900900900900900900900900900900900900900900900900

00

8,59913,90818,0869,1377,5613,6315,8063,9713,8228,871

eti7i8,3372,880

1,636

1,6381,189

9036996W335220220118350

00

4,89918,25013,96410,5818,3496,6065,4294,5893,5963,047

8,8718,7048,379

1,989

1,6361,383

1,016B0169938788628016674ie

aaa aa acxc »=rs R

Total

Page 245: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

fv)

o

2. ALAN

input

Speed•/s

S5SSS91

0.000.00.31t.47.451.34.231.15.101.000.96

0.930.930.90

0.870.790.790.700.650.58

0.560.430.300.300.300.200.00

I KENNEDY

width height•1 •1

dtaieter

H

'calculations

slope !il/il !

rb•1

Froude rb/d50 Reynolds

40.0040.00

40.00

40.0040.0040.0040.0040.0040.0040.0040.00

40,0040.0040.0040.0040.00

40.0040.0040.0040.00

40.0040.0040.0040.0040.0040.0040.00

0.00

0.000.27

0.390.330.280.850.210.E00.170.15

0.140.140.130.120.10

0.100.080.07

0.06

0.060.040.030.030.080.010.00

M-is •* * m 4* *• wm •

1.001.00

1.00

1.001.00l.OO1.001.00l.OOl.OO1.00

t.oo1.001.001.001.001.001.00

t.oo1.001.001.001.001.001.001.001.00

0.0040.0040.004

0.0040.004

0.004

0.0040.0040.004

0,0040.004

0.0040.004

0.0040.004

0.004

0.0040.0040.0040.004

0.0040.0040.0040.0040.0040.0040.004

0.0000.0000.266

0.3830.3250.2760.24?0.8060.1980.1690.149

0.1390.1390.1290.1190.100

0.1000.0800.0700.060

0.0600.0400.0300.0300.0800.0100.000

0013151514IE181110109999fi87766533380

00

866383385876247208196169i49139139129119too1008070606040303020100

00

35*720

571369476463376096308691842915221399171335145275

13141813141811813310548279898

7989636693

46086

35866352661885991349134609820380

! input

! ff

!i

0.0400.0400.033

0.0400.0400.0400.0400.0400.0400.0400.040

0.0400.040

0.0400.0400.040

0.0400.0400.040

0.0400.0400.0400.0400.0400.0400.0400.040

{calculations

fb !

!

CffSSSBV

0.0000.0000.010

0.0150.0070.0070.0090.0090.0090.0090.009

0.0090.009

0.0090.0090.010

0.0100.0100.010

0.0150.0150.0200.0800.0200.0200.0300.030

rbil

T.I0RS9"

0.0000.0000.S350.3790.3150.8690.8360.2070.1890.1360.1440.1330.1330.1270.1180.100

0.1000.0780.067

0.059

0.0590.0390.0170.0170.0170.0090.000

g•3/s/il

3SB8BSE

0.0000.0000.3490.3620.4710.3700.3040.839

0.2180.1690.1430.1890.1890.1160.1040.079

0.0790.0560.043

0.033

0.0330.0180.0090.0090.0060.0020.000

B•3/s

!input

'starting! tin

endingtiie

duration•inutes

! hh;ti hhtM

O.OOO0.00013.960

22.49318.82914.60112.1489.5608.7136.7435.7173.1785.1724.6304.1513.144

3.1442.8311.514

1.3881.3880.7190.3590.3590.2400.0800.000

20:0020:1580:3080:4521:0081:1581:302h4588:002Eil528:3028(4383:00

23il523:30

83:45

24i0000:1500:30

00:45

01 tOO01:1501:3001:4508:0002:1302:30

20:1520:3020:4521:0021:1381:3081:4522:0028it322i3028:4583)0023:1523(3023:4524:0000:1500:3000:4501:0001:1501:3001:4302i0002:1502:3002:45

15151515151515IS1313151515151515131515IS13IS1515151515

durations

V V BW M • • fl 1• m • • • W •!

900900900900900900900900900900900900900900900900900900900900900900900900900900900

!results

'total voluie! i3j

91V H B W M «i • • W w|l JV-I

00

12,56420,24416,94613,38110,9338,6047,6486,0685,1454,6534,635

4,1833,7362,8302,8302,008

1,6321,8491,849647384324216720

average volute•3

00

6,28216,40418,39513,13418,1879,7688,2?36,9593,6074,9004,6334,4203,960

3,8632,8302,419

1,820

1,4411,24994848332427014436

Total 63,898

Page 246: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

3. Chezy equation

input [results ! input Iresults

widthil

height slope

(froi fllai I Kennedy)S333S3S33S33S83SSSrBB3S3383S3 B33SS3S 33S3 3SS3SSS

40.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040,0040.0040.0040.0040.0040.0040.0040.0040.00

0.000.000.270.390.330.S8O.ES0.210.200.170.190.140.140.130.120.100.10O.OB0.070.060.060.040.030.030.020.010.00

0.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.004

0.0400.0400.043O.OSS0.0470.0470.0490.0490.0490.0490.0490.0490.0490.0490.0490.0500.0SO0.050O.OSO0.0550.0550.0600.0600.0600.0600.0700.070

V•7s

0•3/5

E3S333S333SS3S3S33333S

0.0000.000

.395.478.473.358.858.154.186

1,0390.9770.9440.9440.91O0.B740.7900.7900.7070.6620.5840.584DM70.3960.3960.3830.2120.000

0.0000.000

15.06823.05119.43715.21012.577

9.6929.0117.0675.860S.2B55.2854.7304.1963.1623.1622.2631.B531.4021.4020.7310.4750.4750.2590.0850.000

(starting! t in! hh:u

BS3333SX

80:0080:1520:3020:4521:0021:1581:3021:4528i0022:1522:3082:4583:0023:1523:3083:4524:0000:1500:3000:4501:0001:1501:3001:4502:0008:1502:30

endingti.ehh.H

sssssssss

80:1580:3020)4581:0021:1521:3021:4582:0022:1528:3028:4523:0023:1523:3083:4584:0000:1500:3000:4501:0001:1501:3001:4508:0002:1508:3002:45

duration duration•inutes

SEE33333S3E3

151515151515151515151515151515151515151515151515151515

s

BSEESEE

900900900900900900900900900900900900900900900WO900900900900900900900900900900900

average•3

00

13,55580,74617,49413,68911,3198,723B,1106,3605,2744,7574,7574,2573,7768,8452,8452,0371,6681,2621,862

658488428633

740

Total

00

4,77817,15119,18015,59112,50410,0818,4)67,2355,8175,0154,7574,5074,0173,3112,B452,4411,8581,4651,262

96054348B33015531

S3 ESXSESSSSSBM

77,919

Page 247: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACEPRESL06

DATE

1 . slope

input

•1

area

width height•1 •1

AMD 14884-8028/03/89

•ethod

slope roughness•l/il I

{calculations

! A! *2i

i x » • • • • • • • • • • (• • • • • i > • * > i » • i * • • • • M I i m • • •

40.00kO.M40.0040,0040.0040.0040.00

40.0040.0040.0040,0040.0040.0040.0040.0040.0040.00

0.000.130.100.090.090.090.100.090.08

o.oe0.060.050.030.030.030.010.00

0.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.004

0.030.030.030,030.030.03O.O3

0.030.030.030.030.O30.030.030.030.030.03

0.005.2*)4.003.603.603.604,003.603.203.808.402.008.001.801.200.400.00

R•

lit!

0.0.0.0,0.0.0.0.0.0,0.0,0.0,0.0,0.

'Ill

001310090909to0908,0806,05OS,0303.0100

fill i Mid 1243

!results [input Irtsulti

ro

Ve/s

• • • S I0.000.S40.4S0.480.420.480.430.480.390.390.380.290.890.200.200.100.00

013/sID

• • • • • • •0.00

s.eo.SI.se.58

1.52.81

1.38.23

l . S S0.770.570.570.240.840.04).00

0•3/s(8)

Illllll

0.00

e.ee.se.33.53

1.53

.se1.53.83

1.230.790.570.570.840.240.04).00

(starting! tiie! MUM•t B M M • MmM A

• • « • • • • • •

1BI43

19(0019)1!19)3019:4380:00SOUS

20l3080:4521:00ElllS21:3081:4388(00E£:1522:3022:45

endingtiMhh:u

E • • & • • • I I19i0019flS19)3019(4320:0020:15£0i3020:4321:0021:1321:3021:4588:0088:1582:3082:4583:00

duration duration•inutes

M BM-HBI BIBB M M B M M • «

• • • • • • • • • • Ml

IS131513151313IS15ISIS151515151515

s

• • • • IB900900900900900900900900900900900900900900900900900

i3

•••>••!•••

08,337 11,638 E1,374

1,374 j

1,374

1,638 11,3741,1291,189

699515515220880350

0,869,089,306,374,374

,306

,506,251

1,129

9146075153688801E818

rssss

Total 15,771

Page 248: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

2 . ALAM

input

Spud• / f

t KENNEDY

l id t t i height•1 •1

dililtirM

M99MM••*••••••*•« * * « • • • * * • • * • •0.00 40.00 0.00 1.000.900.7?0.740.740.7*0.790.7*0.700,70

0.360.910.510.300.300.800.00

40.0040.0040.0040.00

40.0040.00

40.0040.0040.0040.0040.0040.0040.0040.0040.0040.00

0.130.100.090.090.090.100.09O.OS

o.oe0.06O.OS

0.050.030.030.010.00

1.001.001.001.001,001.00

.00.00.00.00.00.00.00.00

1.00L.OO

flop!• l / f t l

0.0040.0040.0040,0040.004

0.00*0.00*

0.00*0.0040.0040.00*0.0040.00*0,0040.0040.00*0.004

Icilculittoni

1 rb! Hii

• •SIM I d0.0000.1890.1000.0900.0900.0?00.1000.0900.0800,0800.0600.0500,0500.0300.030O.O100.000

Froudl

•• iOI!09877767776353320

rb/dSO

• M I in0

1891009090W

10090BO806050SO3030100

fifynoldi

01181337969867390673906739079B986739056693366933526685834

856549134913*2038

0

! input

! ffIi

IIIIMI0.0000.0400.0*00.0*00.0400,0400.0*00.0*00.0400.0*00.0*00.0400.0*00.0*00.0400.0400.040

Icjlcutitioni

fb Ili

•••VMB0.0000.0090.0100.0100.0100.0100.0100.0100.0100,0100.0190.0170,0170.0800.0200.0300.000

rb• i

Fffiiffii

0.0000.1270.1000.0670.0870,4870.1000.0670.0780.0760.0390.0470,0470.01?0.0170.0090.000

1•3/i/nl

• • > • • • •0.0000.1160.0790.0660.0660,4660.07?0.0660.0560.0360.0390.025$.0230.0090.009

o.ooe0.000

. 3 / 1

• • • • • • j

0.0004.6503.1442.6588.6522.6923.1442.6322.8312.2311.3861.017

1.0170.3590.3590.0800.000

1 input

Ittirtlng1 llM1 hh:ia-H M mwut M MM mm mto ml

•liiiiiii

18t4S19:0019)1519)3019:45

eoioo20; 15

20(3080:4521(00Bhl!£1:30

211*388 tOO82:1522:3022145

indlnjt i n

durationiinutti

mm H mm « . « « M m± mm mm H

dilutioni

mm mt mm mm ^ ^ maz mm ^

!r#iultj

Itotil voluit ivvngi

19iO0 IS 900 0

19:1519(3019i4520:00EOil!20:3020(4921:00

em!8li3021:45SElOO88tl522:3028:45£3:00

151913IS1315131313151513IS15IS15

900900900900900900900900?00900900900900900900900

4,1658,0308,3872,3672,3672,6302,3872,0082,0081,349

916916324384780

voluit

02,0923,5072,6082,36?2,38?2,40fl2,6068,197

2,0081,6891,088

91662032419B36

Total 87,807

Page 249: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

3. Cheiy equation

input !results (input ! result!

width•1

haight iloptit • ! / • !

40.0040.0040.0040.0040.0040.0040.0040.0040,0040.0040.0940.0040.0040.0040.0040.0040.00

( f r o i flUa t> Kennedy!leases asa aasa a asBaaasaa Baa a easEaas a as aaas ea x as a E as s a a a as a a ssa a S E S aa saaa B as;

0.000.130.100.090.090.090.100.090.0B0.080.040.050.050.030.030.010.00

0.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.004

0.0000.0490.0500.030

o.oso0.0500.0500.0500.050O.OSO0.0350.0370.0570.0600.0600.0700.040

! Vj a/si

0.0000.9100.7900.7500.7500.7500.7900.7500.7070.7070.3840.5840.5840.3960.3960.8180.000

a•3/1

0,0004.7303.1622.7008.7008.7003. ltSE.7002.2638.8631,40!1.0481.0480.4730.4750.0850.000

(starting! tiae! hhiii

18:4319:0019*1519:3019:4320:0080:1580:3020:4581(0061:1381:3021:4588:0028:1588:3028:45

•nttingtiaeMUM

E JFE l i t 3 S S

19:0019:1519:3019:4520:0020:1520:3080:4521:00

81:15Eh 30Eh4528:0028:1382:3088:45E3:00

durationei nutes

13151515131515131513131513IS151515

duration Itotals !

i

900900900900900900900900900900900900900900900900900

voluai.3

04,8578,B45E,4302,4308,430E,8452,4302,037£,0371,862

943943428488760

average volute•3

08,1893,5518,6388,4302,4308,6388,6388,2348,0371,6301,103

94368342885238

Total 87,822

Page 250: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

PLACEPRESL06

DATE

1. slope

input

1j

area

width heightat •1

WAD 14884-2030/03/89

aethod

slope roughness• l/il

sss ssstssss assz ssass ess

40.0040,0040,0040.0040.0040.0040.0040,0040.0040.0040.0040.0040.0040.0040.0040.0040,0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.00

0.000.300.400.470.460.640.46

0,430.390,360,350.310.87

0.85O.EE0.210.190. IB0.160.170.160.160.140.130.120.120.10

0.0040,0040.0040.0040,0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040,0040.0040.004

tut:::::

0.030,030.030.030,030.030.030,030.030.030,030.030.030.030.030.030.030.030.030.030.030.030.030.030.030.030.03

(calculations

! A

1

Ra

\:S=83S::SSSSSSS::SSJ

0.0018.0016.0018.6019.8085.6019,2016,0015.6015.8014,0012.4010.8010.00B.808.407.607.807.206.806.406.405.605.304.804.804.00

0.000.300.390.460.470.620.470.440.360.370.340.310.870.850.220.210.190.180.180.170.160.160.140.130.120.120.10

file :saadl244

[results )input 'results

tfl

: ssssr asrsr a s as xss=s

1 V! e/s

0.000.94.13t.es.871.53.87!,££.111.091.030.960.B7

0.830.760.740.69$.670.670.640.680.680.570.540.510.510.45

9a3/s11)

0.0011.2318.0783.39S4.4339.2584.4381.9617.3316.6014.4911.859.436.306.716.819.864.B14.814.373.963.963.172.802.458.451.81

Sa3/sii)

0.0011.3916.43£4.1385.0140.5083,0188.4917.6716.9214.7412.049.558.406.796.885.314.834.854.413.993.993.198.888.478.471.82

Istarting! tiae! hfciHE33SS2ES&

19(1915(3015:4516(0016(1916:3016(4917)0017:1517(3017(4518:00

16:1518:3018:4519(0019il319:3019(45SO tOO80:1580:3020:4581:0081:1581:3031:45

endingtiae

duration durationainutes

15:30 1513(4516:0016(1516(3016:4517(0017(1517J30

17:4516(0018:15

18:3018t4519:0019il519(3019(43£0:0080tl520:3020:4521:0081:1521:3081:4522:00

1313191915191915131315151315131313151315151515151515

s

900900900900900900900900900900900900900900900900900900900900900900900900900900900

liaximua voluse average voluie1 a3 a3

010,8!*16,59061,731££,5103A.453££,510S0,80315,90213,88613,86910,8328,5997,5616,1075,e!l4,7114.3M4,36!3,9713,5883,5862,8712,5378,2802,8201,636

05,18713,42819,14088,18029,488

£9,*SS21,33713,05315,56414,£4712,030».7|58,0806»B34

3,m3,8164,3744,3664,1693,779JatJDif

3,2302,7042,3792,2801.929

Page 251: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

40.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.00

0.100.090.090.07O.OSO.Oi0.040.040.O3O.OS0.00

0.0040.0040.0040.0040.0040.0040.0040.0040,0040.0040.004

0.030.030.030.030.030.030.030.030.030.030.03

4.003.603.602.303.202.401.601.601.20O.BO0.00

0.100.090.090.070,080.060.0*0.040.030.020.00

0.45O.*20.420.3b0.390.320.250.250,200.160.00

1.811.521.5E1.001.250.770.390.390.840.120.00

1.S21.531.531.001.250.780.390.390.E40.120.00

29:0022:1522:3022:4523:0023s 1523:3023:4524:0000:1500:30

22:1522:3022:4523:0023:1523:3023:4524:0000:1500:3000:45

1515151515151515151515

900900900900900900900900900900900

1,6381,37*1,37*

9031,129

699355355220112

0

11111

,636,504,37*,139,01691*527355

m14456

Total 54,527

2. ALAH

input

Speeda/s

BIEBBBB

0.001.441.651.761.792.101.791.741.631.611.551.461.351.30l.EO1.151.13

I KENNEDY

lidthal

asaaaai

40.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040,0040.0040,00

heightal

I3ECBBBI

0.000.300.400.470.480.640.480.450.390.380.350.310.270.250.2E0.210.19

diaaeteraa

•3BBSBBSB:

1.001.00.00.00.00.00.00.00.00.00.00

1.00.00

1.00,00

1.00LOO

{calculations

slope !al/al !

i

:axsESas

0.0040,0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040,0040.004

rbal

XS3EEII

0.0000.2960.39E0.4590.4690.6200.4690.4400.3630.3730.3440.3050.2660.2470.2160.2080.188

Froude

'sssaasi

015171818811818161616151413IE1211

rb/dSO

• BBC3BBS

0296392459449620449440383373344305266247SIS208168

Reynolds

taaaasaaaa

0432605657685821480652842

132371385864277834663378161085254192545301136555132625926541624291521617E

!input

I ffi

1saaaaai

0.0400.0400.0400.0400.0400.0406.0100.0400.0400.0400.0400.0400.0400.0400,0400.0400.040

! calculationsi

fb ii!

IIEaBEBB

0.0000.0050.0050.0040,0040.0030,0040,0040.0050.0050.0050.0050.0060.0060.0070.0070.007

rbal

aaeaaai

0.0000.E980.3910.4350.45O0.6050.4500.4250.3810.3720.3450.3060.2670.2480.2160.1980.591

qa3/s/al

IBBMEEa

0.0000.4860.6470.6080.8391.3020.8390.7660.6240.6000.5330.4460.3600.3210.2610.E390.213

a•3/5

BCSBBBS

0.00017.02325.68232.32833.56338.09333.56330.63124.94284.01621.38717.88014.38612.84010.4459.5606.307

! input

(starting! tiae\ hh:at

ts BSB a a aaa

IStlS15:3015:4516:0016:1516)3016:4517:0017:1517:3017:4518:0018:1518:3018:4319 {0019:15

endingtiae

SBEsaaaa)

13:3015:4316:0016:1514:3014:4517:0017:1517:3017:4518:0018:1518:3018:4519:0019:1519:30

durationai mites

BBSaSBBEBl

13151515IS15IS15151515151515131515

durations

laaaaaaBSt

900900900900900900900900900900900900900900900900500

•results•

!total volute! a3I

average voluae•3

saaBaaasaaaasaEESssssEsaaasaaas

015,32223,£9*29,09530,20646,68430,80627,54822,44721,61419,19416,0*512,9*711,5569,4018,6047.456.

07,661

19,30826,19529,65136,54538,54526,88725,00828,03120,40417,42014,49612,25110,4769,002

_ 8-J30

Page 252: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

1.071.07

t.oo1.001.000.940.900.870.870.790.790.740.740.650.700.58

„ 0.45* O.«"*• 0.30

0.300.00

40.0040.0040.0040.0040.0040.0040.0040,0040.0040.0040.0040.0040.0040.0040.0040,0040.0040,0040.0040.0040.00

0.180.180.170.160.160.140.130.1E0.120.100.100.090.0?0.070.080.060.040.040.030.080.00

3. Chety equation

input

1.001.001.001.001.001.001.00

t.oot.oo1.00i.001.001.001.001.001.00t.oo1.001.00

t.oot.oo

0.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.004O.OC0.0040.004

0.1780.1780.1690.15?0.1390.1390.1290.11?0.1190.1000.1000.0900.0900.0700.0800.0600.0400.0400.0300.0800.000

11111010109999B17777635330

17B178169J5915913912911?11?10010090?0708060404030800

1940171940171713351613371613371388311181331054K1054B879B987969867390673?04608656493332661883?18259913460920

0.0400.0400.0*00.0400.0400.0400.0400.0400.0400.0400.0400.0400.0400.0400.0400.0400.0400.9400.0400.0400.040

0.0.0.0.0.0.

008008009009009009

0.0090.00,00.00

00?009010010010010010

0.010000000

013.020.080.080.020.000

0.1750.1730.1560.1560.1360.1380.1870.119o.tte0.1000.1000.0870.0870.0670.0780.0590.0390.03?0.0170.0170.000

!results

0.1910.1910.1690.1S90.13?0.1310.116O.tO40.1040.07?0.0790.0660.0660.0450.0560.0350.0180.01B0.0090.0060,000

7.6357.6356.7436,3496.349.5.2274.6304.1314.1513,1443.1442.6582.6521.8142.2311.3680.7190,71?0.3590.E400.000

19:3019:4520:0020:1520:3020:4521:00El r 1521:3021t4522:0028:1528:3022:4323:0023:1323:3023(4584 tOO00! 1500(30

(input

19:4580:0080:1520:3020:4521:0081:1581:3081:4582:0022:1522:3028:45£3:0023:1523:3023:4524:000011300:3000(43

151515151515151515151515151515151515151513

900900TOO900900900900900900900900900900900900900900900900900WO

6,8786,8786,0685,7145,7144,7054,1853,7363,7368,8302,8302,3878,3871,6322,0081,84?647647324216t

il

7,2646,87E6,4705,8915,7143,20?4,4453,9603,7363,8832,8302,6088,3872,0101,8201,629948647483270108

••••••••••••••a

90,290

! result!

width height slope fil •1 • ) / • !

V•/s

0•3/s

!starting! tiie

(froi kin t Kennedy) i

ending duration duration (total volutetiie tinutes s ! i3hhiee !

average volute

S3 ESSSE srss ssr3 sss ssss sss ss=s=ssas sss s r=s ssss » 3 ssss szs s E ES ss s s ss a ssss sss srssssasss ss ssssssasss: C S XBSSSSSSSSSSSSr S 3 ES S 3 3SSS33E5S S 3 E C 3 E2S52

40.0040.0040.0040.0040.0040.0040.0040.00

0.000.300.400.470.480.640.480.45

0.0040.0040.OO40.0040.0040.0040.0040.004

0.0400.0450.045O.OU0.0440.0430.0440.044

0.0001.4361.6541 .BIO1.8292.1881.8291.778

0.00017.23126.46434.08935.11854.47135.11831.196

15sl515:3015:4516:0016:1516:3016:4517(00

15:3015:4516:0016:1516:3016:4517:00t7(15

15151515IS151513

900900?00900900900900900

015,50883,B1730,62631,60149,08431,60126,706

7,75419,66387,82231,11340,31240,31230.1Y)

Page 253: epey · 2014-03-09 · amad 1 aud 1 aud 1 aud 1 aud la aud la aud lb aud k aud 1 aud 2 auc 2 aud 2 aud 2a aud 2b auc 2 aud Hi aud m bayda al hajalah iwat havat ha«at •adan uhajaba

40.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.00

^ 40.00do 40.00

40.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.00

0.390.380.350.310.270.850.220.810.1?0.180.180.170.160.160.14

0.130,120.180.100.100.090.090.070.080.060,040.040,030.020.00

0.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.0040.004

0.0450.0450.0450.0450.0460.0460.0470.0470.0470.0480.0480.0490.0490.0490.0490.0490.0490.0490.0500.0300.0500.0500.0300,0500.0550,0600.0600.0600.0600.040

1.6341.6131.5491.4591.3481.8981.8061.1781.1811.0801.0801.039l .OOB1.0080.9440.9100.8740.9740.7900.7900.7500.7500.6660.7070,5840.4570.4570.3960.3E30.000

25.48484.51621.6B718.09514.56818.98110.6099.8968.5817.7777.7777.0676.4ft6.4545.E354.7304.1964.1963.162

* 3.1688.7002.7001.8338.8631,4080.7310.731

0.W50.2390.000

17:1517:3017:4518:0018:1518:3018:4519iO019:i519:3019:4580:00

aotis£0:3080:45SliOO81:1521:3021(4588 tOOeat 13ggi308Et4383 tOO83ttS63l3083:4324(0000:1900:30

17:3017:4518:0018:1518:3018:4519:0019:1519:3019:4520:0080:1520:3080:4581:00Sit IS81:3021.-4528 tOO22:1522:3082!«83:0083i 1383;3063(4584:0000:1500:3000:45

151515151515151515151515151515IS1515151315151313IS1313IS1315

900900900900900900900900900900900900900900900900900KM)900900900900900900900900900WO900900

88,93688,06419,51816,86613,10611,6839,5488,9077,6696,9996,9996,3605,3095,8084,7574,3573,7763,7768,8452,845£,4308,4301,6688,037

Iffl6386se

2330

85,88122,50080,79117,90214,69615,39410,6159,2288,8887,3346,9996,6806,0645,8085,2834,5074,0173,7743,3112,8452,6382,4308,049],85d1,690

960656343330116

EE==S S3 S E9113CE

Total 91,698