Page 1: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

eTOD integration

into Flight procedure Design Environment

Vadim Tumarkin, LGS, Latvia

PBN Implementation and PANS-OPS provisions Workshop

Minsk, Republic of Belarus 7-10 April 2015

PBN/PANS-OPS Workshop, Minsk 2015 1

Page 2: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Интеграция электронных данных о местности и

проепятствиях (eTOD) в Дизайн летных процедур

Vadim Tumarkin, LGS, Latvia

PBN Implementation and PANS-OPS provisions Workshop

Minsk, Republic of Belarus 7-10 April 2015

PBN/PANS-OPS Workshop, Minsk 2015 2

Page 3: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Presentation purposes

• Outline eTOD scope and benefits;

• Remind eTOD needs for conventional and PBN Flight Procedure

Design;

• Review eTOD ICAO provisions;

• Share Latvian eTOD production and management experience;

• Consider current eTOD implementation difficulties dealing with FPD;

• Discuss CRM implementation issues using eTOD;

• Present eTOD implemented practices commonly elaborated by

eTOD provider, FPD SW developer and ANS provider.

PBN/PANS-OPS Workshop, Minsk 2015 3

Page 4: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Цели презентации

• Очертить сферу применения eTOD и получаемые выгоды;

• Напомнить потребности в eTOD для дизайна традиционных летных процедур и PBN операций;

• Осветить положения ИКАО в области eTOD;

• Поделиться опытом Латвии в производстве и менеджировании eTOD;

• Обсудить текущие трудности применения eTOD при дизайне летных процедур;

• Остановиться на проблемах применения eTOD при использовании CRM;

• Представить практику применения eTOD, совместно разработанную поставщиком eTOD, разработчиком системы Дизайна летных процедур и поставщика аэронавигационных услуг.

PBN/PANS-OPS Workshop, Minsk 2015 4

Page 5: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PBN/PANS-OPS Workshop, Minsk 2015 5

Page 6: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PBN/PANS-OPS Workshop, Minsk 2015 6

Page 7: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Application of CRM for

conventional navigation

PBN/PANS-OPS Workshop, Minsk 2015 7

Page 8: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Применение CRM для

традиционной навигации

PBN/PANS-OPS Workshop, Minsk 2015 8

Page 9: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

What we need to implement CRM

PBN/PANS-OPS Workshop, Minsk 2015 9

Page 10: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Что нам нужно,чтобы применять CRM

PBN/PANS-OPS Workshop, Minsk 2015 10

Page 11: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Application of CRM for PBN

PBN/PANS-OPS Workshop, Minsk 2015 11

Page 12: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Применение CRM для PBN

PBN/PANS-OPS Workshop, Minsk 2015 12

Page 13: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PBN/PANS-OPS Workshop, Minsk 2015 13

Page 14: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PBN/PANS-OPS Workshop, Minsk 2015 14

Page 15: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

This leads us to the following conclusion

• CRM is staying in the game for PBN procedures design;

• CRM has to be improved to have possibility to use eTOD as an input;

• CRM Obstacle data has to be added by CRM Terrain data taking into

account the ICAO eTOD provisions;

• The new solution is required to effectively upload eTOD into CRM

environment.

PBN/PANS-OPS Workshop, Minsk 2015 15

Page 16: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Это приведит нас к следующим выводам

• CRM остается в игре при дизайне PBN процедур;

• CRM должен быть усовершенствован, чтобы иметь возможность принимать на входе данные о препятствиях в виде электронных массивов;

• Для применения CRM электронные данные о препятствиях должны быть дополнены электронными данными о рельефе;

• Должны быть найдены эффективные механизмы «загрузки» в CRM электронных данных о препятствиях и рельефе.

PBN/PANS-OPS Workshop, Minsk 2015 16

Page 17: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

eTOD provision’ implemented practice

Common approach of:

R.I.S.K. Company as FPD Developer;

Latvijas Gaisa Satiksme as AIS/PANS-OPS provider and;

METRUM Company as eTOD provider.

PBN/PANS-OPS Workshop, Minsk 2015 17

Page 18: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Применяемая практика поставки eTOD

Консолидированный подход:

R.I.S.K. Company – разработчик системы дизайна процедур;

Latvijas Gaisa Satiksme - провайдер AIS/PANS-OPS;

METRUM Company - поставщик продуктов eTOD.

PBN/PANS-OPS Workshop, Minsk 2015 18

Page 19: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Electronic Obstacles

PBN/PANS-OPS Workshop, Minsk 2015 19

Production and Management

Page 20: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Электронные Препятствия

PBN/PANS-OPS Workshop, Minsk 2015 20

Производство и Менеджмент

Page 21: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

ICAO eTOD provisions

21 PBN/PANS-OPS Workshop, Minsk 2015

Page 22: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Положения ИКАО в отношении поставки eTOD

22 PBN/PANS-OPS Workshop, Minsk 2015

Page 23: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Approach used for obstacle provision

23 PBN/PANS-OPS Workshop, Minsk 2015

Page 24: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Механизм поставки электронных данных

24 PBN/PANS-OPS Workshop, Minsk 2015

Page 25: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Direct electronic connection Distribution

PBN/PANS-OPS Workshop, Minsk 2015 25

Page 26: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Поставка данных путем прямого электронного соединения

PBN/PANS-OPS Workshop, Minsk 2015 26

Page 27: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Electronic Terrain

Production and Management

PBN/PANS-OPS Workshop, Minsk 2015 27

Page 28: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Электронные данные о Местности

Производство и Менеджмент

PBN/PANS-OPS Workshop, Minsk 2015 28

Page 29: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

ICAO Terrain feature

29 PBN/PANS-OPS Workshop, Minsk 2015

Page 30: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Элементы местности ИКАО

30 PBN/PANS-OPS Workshop, Minsk 2015

Page 31: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Proposed approach for terrain provision

Contour lines associated with vertical accuracy

31 PBN/PANS-OPS Workshop, Minsk 2015

DSM

DTM

Page 32: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Предлагаемых подход поставки данных о местности

Contour lines associated with vertical accuracy

32 PBN/PANS-OPS Workshop, Minsk 2015

DSM

DTM

Page 33: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

DEM supported by AIXM 5.1

• In recent years, the point densities for DTM (DEM) have increased

dramatically due to the use of new sensors and digital processing

capabilities, and often reach 1 point per square metre.

• For this reason, DEM direct implementation for Flight procedure design

purpose becoming more and more problematic and the innovative

solution is needed to make the design process more effective.

• AIXM 5.1 has a possibility to form terrain data set for predefined areas as

specified in Annex 15, Chapter 10.

• AIXM 5.1 VerticalStructure feature may be used to store Terrain data set.

PBN/PANS-OPS Workshop, Minsk 2015 33

Page 34: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

AIXM 5.1 для Цифровой Модели Местности

• В настоящее время наблюдается драматический рост пунктов,

формирующих Цифровую Модель Местности (Цифровую Модель

Превышения) из-за использования новых сенсоров и возможностей

обработки цифровых данных, и часто, это значение может достигать 1

пункт на квадратный метр.

• По этой причине, использование DEM при дизайне летных процедур

становится все более проблематичным и нужны новые подходы для

решения данной задачи.

• В принципе модель AIXM 5.1 располагает возможностью сохранения

terrain data set для соответствующих area в соответствии с

требованиями Annex 15.

• AIXM 5.1 располагает специальным типом feature с названием

VerticalStructure для сохранения как препятствий, так и terrain data set.

PBN/PANS-OPS Workshop, Minsk 2015 34

Page 35: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

AIXM 5.1 VerticalStructure

PBN/PANS-OPS Workshop, Minsk 2015 35

• <feature> Vertical Structure consist of several <object> Vertical Structure part

• Obstacle Vertical Structure may be realized by the following Terrain geometry elements:

• Point

• Line

• Polyline

• This structure is applicable both for the complex obstacles and for Terrain also with an appropriate vertical Extent value associated with specific terrain parts.

Page 36: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

AIXM 5.1 VerticalStructure

PBN/PANS-OPS Workshop, Minsk 2015 36

• Как видно, любое сложное препятствие в представлении <feature> Vertical Structure может состоять из бесконечного количества <object> Vertical Structure part.

• Каждый из частей Vertical Structure может иметь геометрию:

• Точка;

• Линия;

• Полигон.

• Данная структура позволяет сохранить как комплексные препятствия, так и рельеф местности в виде объединения составных частей, где каждая часть должна иметь собственную высоту.

Page 37: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Grid Terrain vs DEM contour lines

PBN/PANS-OPS Workshop, Minsk 2015 37

Latvian State area 1 terrain

representation through Grid

requests approximatelly 13 millions

points using AIXM 5.1 <feature>

Vertical Structure.

To reduce the storage volume

needed for Terrain presentation by

means of AIXM 5.1 it was decided to

implement the following mechanism:

Terrain data set represented as

DEM was divided for slices with a

vertical step that is an equivalent of

the half of the vertical accuracy for

area of the interest.

At the this step DEM is transformed

into contour lines associated with

vertical accuracy.

Page 38: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Terrain Representation through Grid

PBN/PANS-OPS Workshop, Minsk 2015 38

• Terrain Data set в виде grid для

Латвии по критериям зоны 1

потребует приблизительно 13

миллионов частей <feature>

Vertical Structure.

• Для уменьшения объема памяти

было решено применить

следующий механизм:

• Исходный Terrain Data set,

представленный в DEM формате

разрезается горизонтальными

плоскостями с вертикальным

шагом, равным половине

значения vertical accuracy of data

set.

• В результате, DEM

трансформируется в контурные

линии.

Page 39: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

DEM presentation using AIXM 5.1 contour lines

39 PBN/PANS-OPS Workshop, Minsk 2015

Latvian METRUM Company has

prepared terrain digital model in form

of the AIXM 5.1 contour lines using

“VerticalStructure” feature.

Then, that AIXM 5.1 terrain snapshot

was successfully imported in LGS

integrated AIM DB by the Data

Manager tool provided by the R.I.S.K.

Company.

AIXM 5.1 terrain data stored in LGS

AIM DB were successfully retrieved

and processes during Flight

procedure design by the PANDA

system.

Page 40: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Отображение DEM с помощью контурных линий AIXM 5.1

40 PBN/PANS-OPS Workshop, Minsk 2015

Латвийская Компания METRUM

сформировала цифровую модель

местности в форме AIXM snapshot

следуюя требованиям

“VerticalStructure” feature.

Этот AIXM 5.1 terrain snapshot был

успешно введен в

Интегрированную LGS AIM DB,

разработанную Компанией R.I.S.K..

Система дизайна летных процедур

PANDA способна забирать

необходимые для расчетов данные

о местногсти из Интегрированной

базы данных и использовать их для

определения безопасных высот

пролета препятствий.

Page 41: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

eTOD processing in FPD environment by PANDA system

PBN/PANS-OPS Workshop, Minsk 2015 41

Page 42: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Обработка eTOD системой дизайна летных процедур PANDA

PBN/PANS-OPS Workshop, Minsk 2015 42

Page 43: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

AIXM 5.1 DEM contour lines benefits

• DEM presentation using AIXM 5.1 contour lines provides the following benefits for automation of the Flight procedure design process keeping calculation accuracy:

– Generalize terrain data and significant reduce data volume and storage resources needed;

– Directly implement AIXM 5.1 DEM contour lines for Instrument approach procedures altitude and Minimum altitudes calculations within the obstacle assessment areas associated with the procedure constructed;

– Reduce terrain data processing to expedite Flight Procedure design process.

PBN/PANS-OPS Workshop, Minsk 2015 43

Page 44: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Выгоды использования AIXM 5.1 DEM contour lines

• Представления DEM в виде контурных линий AIXM 5.1 дает следующие

выгоды для автоматизации процесса дизайна процедур без потери

точности расчетов:

– Генерализацию и отсеиванию малоинформативных данных, что

уменьшает объем сохраняемой информацию на два порядка;

– Расчетные программы дизайна процедур и все остальные

приложения считывают из AIXM 5.1 базы данных “контурное”

представление рельефа местности средствами AIXM 5.1 и

обрабатывают их для расчета минимальной безопасной высоты

пролета в пределах защитной зоны маневра;

– За счет реализованного подхода существенно сокращается время

обработки и получения приемлемых результатов.

PBN/PANS-OPS Workshop, Minsk 2015 44

Page 45: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Electronic Terrain and Obstacles data portrayal

PBN/PANS-OPS Workshop, Minsk 2015 45

Page 46: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Изображение электронных данных местности и препятствий

PBN/PANS-OPS Workshop, Minsk 2015 46

Page 47: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

47 PBN/PANS-OPS Workshop, Minsk 2015

AD Liepaja Terrain and Obstacle

– LUCIAD AIXM 5 Viewer

Page 48: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

48 PBN/PANS-OPS Workshop, Minsk 2015

Местность и Препятствия АД Лиепая

– LUCIAD AIXM 5 Viewer

Page 49: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

49 PBN/PANS-OPS Workshop, Minsk 2015

AD Liepaja Terrain and Obstacle

– Snowflake ATM Viewer

Page 50: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

50 PBN/PANS-OPS Workshop, Minsk 2015

Местность и Препятствия АД Лиепая

– Snowflake ATM Viewer

Page 51: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PBN/PANS-OPS Workshop, Minsk 2015 51

AD Liepaja eTOD Portrayal – ArcScene 10.2

Page 52: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PBN/PANS-OPS Workshop, Minsk 2015 52

Изображение Местности и Препятствий АД Лиепая

– ArcScene 10.2

Page 53: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PBN/PANS-OPS Workshop, Minsk 2015 53

AD Liepaja Terrain and Obstacle

– ArcGIS online

Page 54: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PBN/PANS-OPS Workshop, Minsk 2015 54

Изображение Местности и Препятствий АД Лиепая

– ArcGIS online

Page 55: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PBN/PANS-OPS Workshop, Minsk 2015 55

Изображение eTOD АД Рига средствами 3D PDF

Page 56: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PBN/PANS-OPS Workshop, Minsk 2015 56

AD Riga eTOD Portrayal – 3D PDF

Page 57: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PBN/PANS-OPS Workshop, Minsk 2015 57

AD Obstacle Chart production automation – Type A example

Page 58: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PBN/PANS-OPS Workshop, Minsk 2015 58

Автоматизация производства АД карт – «Type А» пример

Page 59: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PBN/PANS-OPS Workshop, Minsk 2015 59

Terrain and Obstacle (Combined) eChart example

Page 60: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PBN/PANS-OPS Workshop, Minsk 2015 60

Комбинированные карты местности и препятствий

Page 61: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

eTOD provision for CRM calculations

Common approach of:

R.I.S.K. Company as FPD Developer;

Latvijas Gaisa Satiksme as AIS/PANS-OPS provider ;

METRUM Company as eTOD provider.

PBN/PANS-OPS Workshop, Minsk 2015 61

Page 62: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Поставка eTOD для CRM расчетов

PBN/PANS-OPS Workshop, Minsk 2015 62

Консолидированный подход:

R.I.S.K. Company – разработчик системы дизайна процедур;

Latvijas Gaisa Satiksme - провайдер AIS/PANS-OPS;

METRUM Company - поставщик продуктов eTOD.

Page 63: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PANS-OPS provider/FPD SW

developer consolidated solution

PBN/PANS-OPS Workshop, Minsk 2015 63

Polyline obstacle conversion into walls

Page 64: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Консолидированное решение

PANS-OPS провайдера и

Разработчика FPD SW

PBN/PANS-OPS Workshop, Minsk 2015 64

Конверсия полилайновых препятствий в стены

Page 65: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PBN/PANS-OPS Workshop, Minsk 2015 65

Polygon obstacle

conversion into walls

Page 66: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

PBN/PANS-OPS Workshop, Minsk 2015 66

Конверсия полигональных

препятствий в стены

Page 67: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

eTOD Implementation for CRM calculations

DEMO movie

PBN/PANS-OPS Workshop, Minsk 2015 67

Page 68: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Конверсия eTOD для CRM расчетов

DEMO movie

PBN/PANS-OPS Workshop, Minsk 2015 68

Page 69: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Thank you for your attention

Vadim Tumarkin, LGS, Latvia

Questions, please

PBN/PANS-OPS Workshop, Minsk 2015 69

Page 70: eTOD integration into Flight procedure Design Environment › EURNAT › Other Meetings Seminars and... · 2015-05-13 · • CRM has to be improved to have possibility to use eTOD

Спасибо за внимание

Vadim Tumarkin, LGS, Latvia

Пожалуйста, вопросы

PBN/PANS-OPS Workshop, Minsk 2015 70