Date Filming Location Actors needed Equipment and props needed Scenes filmed? Any problems? How we solved the problems? 6 th December 2012 Erica’s house Cherry Whipp Nai’lah Firdaws Camera Tripod Memory card Book Newspaper DVD n/a -Problems setting up camera and tripod -Problems with natural lighting (by the time we set up it was dark outside) Unable to resolve the problem as we could not use artificial lighting therefore, we cancelled the filming session 21 st December 2012 Erica’s house Cherry Whipp Nai’lah Firdaws Camera Tripod Memory card Book Newspaper Opening scene -No problems encounter ed

Upload: anikachy

Post on 09-Jun-2015

56 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Filming Schedule

Date Filming Location

Actors needed Equipment and props needed

Scenes filmed? Any problems?

How we solved the problems?

6th December 2012

Erica’s house Cherry WhippNai’lah Firdaws

CameraTripodMemory cardBookNewspaperDVD

n/a -Problems setting up camera and tripod-Problems with natural lighting (by the time we set up it was dark outside)

Unable to resolve the problem as we could not use artificial lighting therefore, we cancelled the filming session

21st December 2012

Erica’s house Cherry WhippNai’lah Firdaws

CameraTripodMemory cardBookNewspaperDVD

Opening scene -No problems encountered

Saturday 8th February 2013

Cemetery and Mile end

Cherry Whipp CameraTripodMemory card

Walking to the Cemetery scene and some scenes at the cemetery

-No problems encountered

Saturday 19th

Cemetery Cherry WhippAbdullah Al-

CameraTripod

Scenes outside and at the

-Problem with the

-Waited for it to stop raining

Page 2: Filming Schedule

February 2013

MarufAfsana Ahmed

Memory cardTorchesGloves with wiring

Cemetery with all actors

weather- was a cold and rainy day

and carried on with the filming

Friday 12th February 2013

Cemetery (FINAL DAY)

Cherry Whipp CameraTripodMemory cardBlack bin bagTorchFake blood

Final scenes at the cemetery

No problems encountered