Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Upload: dinah-moody

Post on 26-Dec-2015

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Fleet Management Consolidation

UpdateLloyd Waguespack, Deputy Chief of Staff, Mayor’s Office

Andy Icken, Chief Development Officer, Mayor’s Office

1

Page 2: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Estimated Fleet Savings Grand Total Savings/Revenues

− FY2011 $ 9,963,000− FY2012 $11,866,000

− Grand Total $21,829,000

2

Page 3: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Table of Contents

Risk/Challenges to Fleet Consolidation

Components of Fleet Management Consolidation

Departments and how they are affected

Details of current status of the fleet

Plans and projected savings

3

Page 4: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Risks/Challenges to Fleet Consolidation Moving too quickly – The consolidation plan yields

the elimination of both maintenance facilities and fuel sites. The plan must be well thought out and must be flexible enough in both timelines and in scope to not adversely affect the citizens of the city.

Avoiding an inconsistent approach We must establish and document clear and well defined policies and procedures early in the planning. The new management will then have to enforce these policies and procedures consistently throughout the implementation phases.

Absence of proper metrics - The effective use of Asset Works M5 and the use of dashboards will have to be setup at the onset so that we can report back to the Mayor and City Council.

Departmental push-back – We will need a consistent and high degree of top down governance as we move through the departments.

4

Page 5: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Risks/Challenges to Fleet Consolidation Maintaining the ability to provide the core services

- We cannot compromise the services of our existing departments.

Well defined boundary lines - Communication and clear lines of responsibility will be key factors in the success of the project.

Developing strong leadership - The new Director must be able to work very closely with and communicate with all Directors. The new Director will have to have a clear understanding of each department’s core functions and the need to not have those functions compromised.

Impact on the labor force - There must be a clear understanding (buy-in) prior to implementation of the plan and the eventual results/impact on the labor force and how that labor force will be aligned in the new organization.

5

Page 6: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Risks/Challenges to Fleet Consolidation

Challenges (continued)− Funding and budget parameters must be properly

aligned at the outset to ensure a proper charge back system to the departments.

− Customer focused attitude - The performance metrics must be aligned along departmental lines to insure effective monitoring of the department.

6

Page 7: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Components of Consolidation Maintenance

Fuel

Strategic Vehicle Parts Partnership

Take Home Vehicles

Capital Asset Renewal and Replacement Requirements

7

Page 8: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Details of the current Fleet The study of Fleet Management started back in

January 2010. After considerable analysis the city hired CST Fleet Services to further look at the data and make recommendations for moving forward with a plan to consolidate the city’s fleet management operations. CST presented a Consolidation plan to the City at the end of July.

CST Fleet Services is a consultant that specializes in the area of fleet consolidation− Experience

City of Chicago City of Detroit Fedex State of Indiana

8

Page 9: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Details of Fleet

Solid Waste 402 119 168 689

Public Works and Engineering 1,738 2,005 769 4,512

Police Department 106 3,823 139 4,068

Fire Department 385 546 218 1,149

Parks 390 330 530 1,250

Aviation 274 425 275 974

BARC 0 34 0 34

Other 83 824 76 983

Totals 3,378 8,106 2,175 13,659

Average collective life of these vehicles is 7.4 years

9

Heavy Duty Light Duty Other Total

Page 10: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Details of the current Fleet 29 Maintenance Facilities

− 250 mechanics− 152 support personnel− 277 work bays – 15,400 bay hours− Only 6 sites have a second shift

Budget – Maintenance Facilities− Operations $106 M− Capital $ 48 M

10

Page 11: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Details of the current Fleet 99 fuel facilities of which 3 are currently closed

(80% of the current fuel consumption by city vehicles is serviced by 24 of these sites)

Budget - Fuel Consumption− Consumption -11 Million Gallons− Cost - $28 M

11

Page 12: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Details of the current Fleet 19 parts rooms in these 29 maintenance facilities

(40 Personnel)

All PWE and Parks locations contract with NAPA for parts inventory (NAPA owns and operates the parts room and personnel and the city only pays for the parts it uses)

The City has a current RFP to extend the Strategic Vehicle Parts Partnership (SVPP) currently being used by PWE and Parks to all city maintenance facilities

12

Page 13: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Details of the current Fleet

Take Home Vehicles− 736 Municipal Employees – We have

performed a preliminary justification analysis by the departments to get us to this number, initially at 900 vehicles

− 900 Police Personnel ( Police Personnel currently pay $75 per pay period for the personal use of a vehicle)

13

Page 14: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Current Technology

Asset Works M5 – Implemented in all facilities – tracts all maintenance on every vehicle in the city

Fuel Force – Partially implemented – Controls the distribution of fuel to city only vehicles.

Note: These two pieces of software are integrated so that at any point in time we can notify a vehicle operator that planned maintenance is required on a vehicle based on predefined parameters

14

Page 15: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

New Fleet Management Plan Maintenance Facilities – Cut back to 11 – 15

sites− Mechanics 251− Support Staff 64− All facilities will run a second shift − 2 or 3 facilities are targeted for a third shift− 209 work bays – 19,680 bay hours− Will perform most major maintenance of

vehicles in the second shift , leaving the working hours available for emergency service type work

Fuel Sites will be reduced down to a number between 30 and 40

SVPP – Once implemented in all facilities will reduce the 40 personnel (Bidding Vendors will be given credit for a plan to hire city personnel)15

Page 16: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

New Fleet Management Plan Take Home Vehicles

− HPD – Changes in the use policies for police officers is being discussed as part of the Meet and Confer process that is currently underway. It is anticipated that the rate officers pay to take home their vehicle will increase to $105 per pay period.

− Other Personnel – The city continues to analyze options including charging the same $105 per pay period that is paid by police officers. Other options include lease programs or vehicle allowances both tiered and flat rates.

16

Page 17: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Timelines Creation of the Fleet Management Department (FMD)

– Plan for an ordinance to be brought before City Council on October 13th

Approve a two year contract at the October 13th Council Meeting with CST Fleet Services to help the city with the fleet consolidation implementation plan

Announce a candidate for Director of Fleet Management within the next three weeks

Finalize the SVPP bid process and award a contract to be effective about November 1st

The project completion is targeted for the last quarter of FY 2012 (24 months)

17

Page 18: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Timelines Phase 1 (FY2011 2nd Quarter)

− Close 44 fuel sites that are minimally used.− Purchase additional computer software from Asset Works

to facilitate the ordering of parts from the SVPP vendor− Begin working with departments to evaluate the size and

age of the city’s fleet and develop a five year capital plan for fleet turnover and determine replacement policies

Phase 2 (FY2011 3rd Quarter)− Close 1 Solid Waste Shop, reassign mechanics and support

staff as needed − Close additional fuel sites as they are identified− Buyout by the SVPP vendor of the Solid Waste inventory – − Evaluate the SWD fleet to determine where cuts can be

made to reduce the size of the fleet – both heavy equipment and light duty vehicles

− Complete the installation of Fuel Force in all Fuel Sites to better control the consumption of fuel by city personnel

18

Page 19: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Timelines Phase 3 (FY2011 4th Quarter)

− Close 4 or 5 PWE and 2 Parks Maintenance Shops– reassign mechanics and support staff as needed. (This will result in some reduction in support staff)

− Close additional fuel sites as they are identified− Purchase additional computer software from Asset Works

to facilitate the ordering of parts from the SVPP vendor− Buy out of both HFD and HPD Parts rooms by the SVPP

vendor (Parts room personnel will be encouraged to apply for positions with eth SVPP vendor)

− Evaluate fleet size for both PWE and Parks to determine the level of downsizing

Phase 4 (FY2012 1st Quarter)− Close 1 Fire Shop - reassign mechanics and support staff as

needed (This will result in some reduction in support staff)− Close additional fuel sites as they are identified

19

Page 20: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Timelines Phase 5 (FY2012 2nd Quarter)

− Close 5 or 6 HPD Maintenance Shops– reassign mechanics and support staff as needed. (This will result in some reduction in support staff)

− Close additional fuel sites as they are identified− Evaluate fleet size for HPD to determine any level of

downsizing

Phase 6(FY2012 3rd & 4th Quarters)− Continue to refine and improve the FMD organization − Continue to evaluate and monitor the size and

condition of the city’s fleet

20

Page 21: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Consolidation Estimated Fleet Savings Maintenance

− $6.243M in on-going savings due to the downsizing of the staff and overhead costs for closed facilities

Fuel− $605K in one-time savings due to overhead costs of

operating the closed sites− $1.125M in on-going savings due to better controls

in the distribution of fuel

SVPP− $3.141M in one time revenues due to the buy out of

inventory in SWD, HPD and HFD by the SVPP vendor− $2.634M in on-going savings due to reduction in

staff and reduction in overhead costs

21

Page 22: Fleet Management Consolidation Update Lloyd Waguespack, Deputy Chief of Staff, Mayor’s Office Andy Icken, Chief Development Officer, Mayor’s Office 1

Consolidated Fleet Savings Fleet Usage and Sizing

− $2.804M in one-time revenues due to sale of obsolete and downsizing equipment and vehicles

− $5.277M in on-going savings due to maintenance and operational costs reductions for sold or obsolete fleet and reduction in the take home vehicles

Grand Total Savings/Revenues− FY2011 $ 9,963,000− FY2012 $11,866,000

− Grand Total $21,829,000

− Note: These savings do not include the sale of any property that becomes available as a result of the projected closures of facilities. That evaluation will be made at the time the site is closed and a determination is made as to any remediation that has to occur at the site before we can sell the property.