fort mcclellan, alabama - webs

35
Fort McClellan, Alabama Administrative Record Information Repository Index As of October 2012 To view records online - Go To www.mcclellan.army.mil/AdminRec.asp To view hardcopy visit - Houston Cole Library Jacksonville State University 9 th Floor 700 Pelham Road Jacksonville State University Jacksonville, AL 36265 Point of Contact: Ms. Paula Barnett-Ellis Telephone: 256)782-5249 (JSU shelf number indicated after title.) Contact person at Fort McClellan, Alabama Brenda Cunningham, Telephone: (256) 848-3539 Email: [email protected] * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

Upload: others

Post on 28-Dec-2021

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Fort McClellan, Alabama - Webs

Fort McClellan, Alabama

Administrative Record Information Repository Index As of October 2012

To view records online -

Go To www.mcclellan.army.mil/AdminRec.asp

To view hardcopy visit -

Houston Cole Library Jacksonville State University

9th

Floor

700 Pelham Road

Jacksonville State University

Jacksonville, AL 36265

Point of Contact: Ms. Paula Barnett-Ellis

Telephone: 256)782-5249 (JSU shelf number indicated after title.)

Contact person at Fort McClellan, Alabama

Brenda Cunningham, Telephone: (256) 848-3539

Email: [email protected]

* Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

Page 2: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

2

Table of Contents

NEPA Documents ................................................................................................................................ 3

Preliminary Assessments (PA) ............................................................................................................. 3

Site Investigations (SI) ......................................................................................................................... 4

Remedial Investigations (RI) / Feasibility Studies (FS) / Engineering

Evaluation/Cost Analysis (EE/CA) ....................................................................................................... 15

Remedial Actions (RA) / Removal Responses (RR) ............................................................................. 21

Decision Documents (DD) / Records of Decision (ROD) / Action Memorandums (AM) ...................... 24

Resource Conservation and Recovery Act (RCRA) Documents ............................................................ 29

Site Closeout Documents ...................................................................................................................... 30

Community Relations ........................................................................................................................... 30

Restoration Advisory Board (RAB) ...................................................................................................... 30

Land Use Control Assurance Plan (LUCAP) ........................................................................................ 31

BRAC (Base Realignment and Closure) Cleanup Team (BCT) ............................................................. 31

Findings of Suitability to Transfer (FOST) / Findings of Suitability for Early Transfer (FOSET) / Findings of

Suitability to Lease (FOSL) / Environmental Condition of Property (ECOP) Documents ..................... 31

Miscellaneous ...................................................................................................................................... 33

Installation Wide Work Plans ............................................................................................................... 33

Reference Documents ........................................................................................................................... 34

McClellan Development Authority (MDA)/Matrix Documents ............................................................ 34

Page 3: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

3

NEPA Documents

Final Environmental Impact Statement for the Disposal and Reuse of Fort McClellan, Alabama, Description of Proposed Action and

Alternatives (DOPAA). Prepared by Parsons Engineering Science, Inc., Harland Bartholomew and Associates, Inc., April 25, 1997.

JSU Book V105

Final Environmental Impact Statement, Disposal and Reuse. Prepared by U.S. Army Corps of Engineers Mobile District, VOL I and

VOL II, August 1998, and associated Record of Decision dated June 1999. JSU Books V66 and V67

* Draft Environmental Assessment for the Proposed Decommissioning Plan for the Burial Mound, dated October 4, 1999. Filed in

the sleeve of the Decommissioning Plan for the Burial Mound Volume I. JSU Book V54.

Preliminary Assessments (PA)

U.S. Department of the Army Office of the Project Manager for Chemical Demilitarization and Installation Restoration, Installation

Assessment of Fort McClellan, Alabama Records Evaluation Report No. 110, Volume I, April 1977.

JSU Book V1

U.S. Army Toxic and Hazardous Material Agency, Reassessment of Fort McClellan, Anniston, Alabama, Report No. 110A.

Prepared by Environmental Science and Engineering, Incorporated, 1984. JSU Book V2

U.S. Army Environmental Hygiene Agency, Hazardous Waste Consultation No. 37-26-1649-88, 8-12 December 1986. JSU Book

V3

U.S. Army Toxic and Hazardous Materials Agency, Enhanced Preliminary Assessment Fort McClellan, Alabama, Volumes I and II.

Prepared by Roy F. Weston, Inc., December 1990. JSU Books V429 and V430

U.S. Army Environmental Hygiene Agency, Industrial Radiation Consultation No. 27-43-EU66-93, U.S. Army Chemical School and

Military Police Center and Fort McClellan, Fort McClellan, Alabama, 30 March - 2 April 1993, dated 27 July 1993. JSU Book V39

Final Background Metals Survey Work Plan. Prepared by Science Applications International Corporation, July 1997. JSU Book V4

U.S. Army Environmental Center, Final Environmental Baseline Survey, VOL I & II, Fort McClellan, Alabama. Prepared by

Environmental Science & Engineering, Inc, January 1998 Attachments: Letter, ADEM, dated May 27, l998, RE: Final

Environmental Baseline Survey (January 1998) Base Realignment and Closure Program, Fort McClellan, Alabama, Christopher L.

Johnson, signatory. Letter, USEPA, dated Jun 8, 1998, RE: Environmental Baseline Survey, Bart Reedy, signatory. JSU Books

V61 and V62

Final Background Metals Survey Report. Prepared for U.S. Army Corps of Engineers. Prepared by Science Applications

International Corporation, July 1998. JSU Book V11

Historical Aerial Photography Investigation of the Fort McClellan East By-Pass Study Area. Prepared by Lockheed Martin Energy

Research Corporation, Geographic Information Science and Technology, Oak Ridge National Laboratory, August 1998. JSU Book

V47

Historical Aerial Photograph Investigation of Chemical Training Areas at Fort McClellan, Alabama. Prepared by Geographic

Information Science and Technology Group, Oak Ridge National Laboratory, March 1999. JSU Book V51

Final UST Summary Report, Volume 1 of 3, Text, Tables and Figures; Volume 2 of 3, Appendix A; and Volume 3 of 3, Appendices

B-E. Prepared by International Technology Corporation, April 1999. JSU Books V5, V6, and V7

Human Health and Ecological Screening Values and PAH Background Summary Report. Prepared by International Technology Group, July 2000. JSU Book V135.

Final U.S. Department of Defense Base Realignment and Closure Ordnance, Ammunition and Explosives Chemical Warfare

Materials, Archives Search Report, Findings. Prepared by U.S. Army Corps of Engineers, St. Louis District, Revision 1, September

2001. JSU Book V292

Final U.S. Department of Defense Base Realignment and Closure Ordnance, Ammunition and Explosives Chemical Warfare

Materials, Archives Search Report, Maps. Prepared by U.S. Army Corps of Engineers, St. Louis District, Revision 1, September

2001. JSU Book V300

Page 4: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

4

Final U.S. Department of Defense Base Realignment and Closure Ordnance, Ammunition and Explosives Chemical Warfare

Materials, Archives Search Report, Conclusions and Recommendations. Prepared by U.S. Army Corps of Engineers, St. Louis

District, Revision 1, September 2001. JSU Book V299

Final Report Radiological Historical Assessment Main Post. Prepared by U.S. Army Corps of Engineers, St. Louis District,

December 2001. JSU Book V302

Final Report Radiological Historical Assessment Pelham Range. Prepared by U.S. Army Corps of Engineers, St. Louis District,

December 2001. JSU Book V305

Final Revision 1 Perchlorate Addendum to the Human Health and Ecological Screening Values and PAH Background Summary

Report. Prepared by IT Corporation, September 2004, and located in the sleeve of the Human Health and Ecological Screening

Values and PAH Background Summary Report. Prepared by International Technology Group, July 2000. JSU Book V135

Final CTT Inventory Report, Closed, Transferring and Transferred Range and Site Inventory, Fort McClellan BRAC Property.

Prepared by URS Corporation, 25 June 2003. JSU Book V518

Final Range Crosswalk. Prepared by The Shaw Group, Inc., February 5, 2009. JSU Book V602

Site Investigations (SI)

Final Task Order 1 Sampling and Analysis Plan. Prepared by Science Applications International Corporation, March 20, 1992. JSU

Book V13

Final U.S. Army Environmental Center, Site Investigation Report, Volumes I and II. Prepared by Science Applications International

Corporation, August 31, 1993. JSU Books V14 and V15

Technical Memorandum, Site Inspections (SI), Soil Gas Technical Memorandum and Attachments. Prepared by Environmental

Science & Engineering, Inc., November 25, 1996. JSU Book V441

Final Site Investigation Work Plan. Prepared by QST Environmental Inc, March 1998. JSU Book V19

Final Site Investigation Quality Assurance Project Plan. Prepared by QST Environmental Inc, March 1998. JSU Book V20

Final Site Investigation Health and Safety Plan. Prepared by QST Environmental Inc. March 1998. JSU Book V21

Final Site Investigations, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, GSA Area and

Surrounding Warehouses (Parcels 151, 2, 4, 67, 69, 238, 129, 111, 91, and 128), Waste Chemical Storage Area (Parcels 87, 10, and

135), Former Fire Training Pit (Parcel 77). Also known as Package 2. Prepared by International Technology Corporation, August

1998. JSU Book V22

Final Site Investigations, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, Former

Transformer at Building 3798 (Parcel 57Q). Prepared by International Technology Corporation, September. JSU Book V24

Final Site Investigations, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, Motor Pool Area

3100, 13th Avenue (Parcels 146, 212, 24, 25, and 73), Autocraft Shop/Former DPDO Building 1800 (Parcels 100, 20, and 47),

Former Motor Pool Area 1800/1900 (Parcels 145 and 52). Also known as Package 3. Prepared by International Technology

Corporation, September 1998. JSU Book V23

Final Site Investigations, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, 11th Chemical

Motor Pool Areas: Building 3299 (Parcel 29), Building 3298 (Parcel 30), and building 3262 (Parcel 74); Old Hospital (Parcel 95);

Former Motor Pool Area 2000 (Parcel 144); and Former Gas Station Area (Parcel 137). Also known as Package 1. Prepared by International Technology Corporation, September 1998. JSU Book V25

Final Site Investigations, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, Former

Decontamination Complex Building 1271 (Parcels 93, 46, 140, and 70), Former Motor Pool Area 1300 (Parcels 148 and 16), Former

Motor Pool Area 600 (Parcels 149 and 136), Motor Pool Area 800 (Parcels 164, 11, 68, and 12), Former Gas Mask Test Chambers

(Parcels 195, 196, and 198). Also known as Package 4. Prepared by International Technology Corporation, October 1998. JSU

Book V26

Page 5: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

5

Final Site Investigations Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, Range 24A Fog

Oil Drum Storage (Parcel 88), Range 24A Multi-Purpose Range (Parcel 108), Smoke Area BVZ (Parcel 124), Smoke Area S (Parcel

106), Smoke Area R (Parcel 105), Stump Dump (Parcel 82), Old Incinerator Building 5710 (Parcel 125), Former Smoke Area

Choccolocco Corridor (Parcel 107), Former Smoke Area South Slope Morgan Mountain (Parcel 159). Also known as Package 6.

Prepared by International Technology Corporation, October 1998. JSU Book V27

Final Site Investigations Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, Directorate of

Engineering and Housing (DEH) Compound (Parcels 64 and 1), Motor Pool Area 3100 S of 23rd Street (Parcels 147, 72, 27 and 28),

Post Garbage Dump North of Reilly Airfield (Parcel 126), Training Aids Building 267 (Parcel 166), Former Chemical Laundry and

Motor Pool Area 1500 (Parcels 94, 132, 133, and 134). Also known as Package 5. Prepared by International Technology

Corporation, October 1998. JSU Book V28

Final Site Investigations Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, Former

Quartermasters Gasoline Storage Area (Parcel 130), Former Fuel Yard (Parcel 131). Also known as Package 4b. Prepared by

International Technology Corporation, November 1998. JSU Book V29

Final Site Investigations Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, Motor Pool Area

1300 (Parcel 143), Washrack, Building 1224 (Parcel 168), Small Weapons Cleaning and Storage Compound, Building 1378 (Parcel 174), Former Motor Pool Area 1000 (Parcels 150, 13, and 139). Also known as Package 9. Prepared by International Technology

Corporation, November 1998. JSU Book V30

Final Site Investigations Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments DRMO Area

(Parcel 85), Fill Area North of Landfill No. 2 (Parcel 230) Cleared Area with Mound, Choccolocco Corridor (Parcel 237). Also

known as Package 15. Prepared by International Technology Corporation, December 1998. JSU Book V31

Final Site Investigations Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments Golf Course

(Parcel 178), Former Printing Plant, Building 1060 (Parcel 172), Bulk Storage Area, Building 296 (Parcel 60). Also known as

Package 10. Prepared by International Technology Corporation, December 1998. JSU Book V32

Final Site Investigations Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments Former Printing

Plant, Building 144 (Parcel 171); Former Printing Plant, Building 143 Basement (Parcel 138); Printing Plant, Building 3183 (Parcel

162); Former Personnel Decontamination Station at Building 3185 (Parcel 179); Former Fog Oil Drum Storage Area West of the

Skeet Range (Parcel 122); Trenches West of Remount Creek (Parcel 228). Prepared by International Technology Corporation,

December 1998. JSU Book V33

Final Site Investigations, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, Fill Area East

End Reilly Airfield (Parcel 227), Fill Area Northwest of Reilly Airfield (Parcel 229), Drain Field (Building T-459) (Parcel 236Q),

Fill Area at Range 30 (Parcel 231). Also known as Package 8. Prepared by International Technology Corporation, December 1998.

JSU Book V34

Final Site Investigations, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, Former Ordnance Motor Repair Area (Parcels 75, 41, 42, 5, 6 and 66). Also known as Package 14. Prepared by International Technology

Corporation, December 1998. JSU Book V35

Final Site Investigations, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, Fill Area b

(Parcel 233). Also known as Package 7. Prepared by International Technology Corporation, December 1998. JSU Book V36

Final Site Investigations, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, Trenches Near

Range 20 Firing Line (Parcels 239 and 240), Ground Scar with Trenches at Driving Course (Parcel 200). Also known as Package 11.

Prepared by International Technology Corporation, December 1998. JSU Book V37

Final Site Investigations, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, Former Printing Plant, Building 2051 (Parcel 173), Former Washrack, Building 1740, Soldier’s Chapel (Parcel 127), Range 16 AST (Parcel 177).

Also known as Package 13. Prepared by International Technology Corporation, December 1998. JSU Book V38

Decommissioning Plan for the Radiological Laboratories and Alpha Field at the U.S. Army Chemical School, Fort McClellan,

Alabama. Prepared by Health Physics Office, U.S. Army Chemical School dated March 1999. JSU Book V60

Final Baseline Environmental Investigation, Site-Specific Field Sampling Plan and Site-Specific Safety and Site-Specific Safety and

Health Plan Attachments for the Chemical Defense Training Facility (Parcel 126-CWM). Prepared by IT Corporation, May 1999.

JSU Book V12

Page 6: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

6

Final Site Investigations, Site-Specific Field Sampling Plan Addendums to the QST Environmental, Inc. Final Site Investigation

Work Plan for the Boiler Plant No. 4 (Parcel 101); Former Incinerators (Parcel 96); and Ground Scar South of Building 3134 (Parcel

153) and QST Ground Scar and Boiler Plant Sites, Site-Specific Safety and Health Plan Addendum. Prepared by IT Corporation,

September 1999. JSU Book V93

Final Site Investigations, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments for Underground Storage Tank Closure Assessments. Prepared by IT Corporation, September 1999. JSU Book V100

Final Site Investigations, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, Ammunition

Supply Point and Building 4416 (Parcels 197 and 199), Washrack, Building 351 (Parcel 170). Prepared by IT Corporation,

September 1999. JSU Book V102

Final Site Investigations, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, Area 1600 Motor

Pool (Parcels 163, 17, 18, 19, 71, 503, and 504). Prepared by IT Corporation, September 1999. JSU Book V103

Final Site Investigation, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, Trenches West of

Iron Mountain Road (Parcel 500). Prepared by IT Corporation, October 1999. JSU Book V101

Final Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments Buildings South of Reilly Airfield

(Parcel 501). Prepared by IT Corporation, October 1999. JSU Book V98

Final Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments for the Relative Risk Screening for the

Former Security Operation Test Sites, Parcel 102(7); the Anniston Army Depot, Former Shell Tapping Area, Parcel 208(7); and the

Former Agent Training Area, Range K, Parcel 203(7). Prepared by IT Corporation, November 1999. JSU Book V634

Final Site Investigation, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments, Site Investigation

at Area M2, Subsection of Area 45. Prepared by IT Corporation, March 2000. JSU Book V123

Final Survey Report Radiological Laboratories Building 1081. The Addendums are filed in the sleeve of this document. Prepared by U.S. Army Chemical School Health Physics Office, Fort Leonard Wood, MO March 2000. JSU Book V158

Commodity Site Survey Report, Fort McClellan, Anniston, Alabama. Prepared by Allied Technology Group, March 2000. Filed in

the sleeve of this document is the letter Transmittal and Explanation of Amendment to License No. 01-02861-05 (Reference Control

No 258979, Docket No. 030-17584). JSU Book V125

Final Site Investigation, Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, Site Specific Unexploded Ordnance

Safety Plan Attachments, Hand Grenade Range 32, Parcel 90Q-X. Prepared by IT Corporation, August 2000. JSU Book V143

Final Site Investigation, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan, Site Specific Unexploded

Ordnance Safety Plan Attachments, Impact Area Near Stump Dump, Parcel 135Q-X. Prepared by IT Corporation, August 2000.

JSU Book V144

Final Baseline Environmental Investigation Report, Chemical Defense Training Facility Parcels 126Q-CWM, 62(2), 59(7), and

104(7). Prepared by IT Corporation, August 2000. JSU Book V142

Final Site Investigation, Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments Former Mock Village at Yahoo Lake, Parcel 130Q-X. Prepared by IT Corporation, September

2000. JSU Book V146

Final Site Investigation Report, Former Fire Training Pit, Parcels 77(7), 7(7), and 170(7). Prepared by IT Corporation, September

2000. JSU Book V148

Report of Investigation of DEH Work Sites, Fort McClellan. Prepared by Zapata Engineering, September 2000. JSU Book V151

Final Site Investigation, Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments for Chemical Warfare Material Site Training Area T-31, Parcels 184(7) and 185(7). Prepared by

IT Corporation, September 2000. JSU Book V149

Final Site Specific Field Sampling Plan Addendum, Supplemental Site Investigation, Former Motor Pool Area 3100, Parcels (146(7),

212(7), 24(7), and 73(7). Prepared by IT Corporation, September 2000. JSU Book V150

Page 7: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

7

Final Site-Specific Field Sampling Plan Addendum, Supplemental Site Investigation, Former Washrack, Building 1740, Soldier’s

Chapel Parcel 127(7). Prepared by IT, September 2000. JSU Book V410

Final Site Investigation Report, Range 16 AST, Parcel 177(7). Prepared by IT Corporation, October 2000. JSU Book V154

Final Site Investigation, Site-Specific Safety and Health Plan, and Site-Specific Unexploded Ordnance Safety Plan Attachments for Chemical Warfare Material Sites – Agent ID Area (Parcel 509), Training Area T-6 (Naylor Field) (Parcel 183), Blacktop Training

Area (Parcel 511), Fenced Yard in Blacktop Area (Parcel 512), Dog Training Area (Parcel 513), Dog Kennel Area (Parcel 516),

Training Area T-5 (Parcel 182), Former Detection and Identification Area (Parcel 180), Old Burn Pit (Parcel 514), CBR Proficiency

Area (Parcel 517), and Old Toxic Training Area (Parcel 188). Prepared by IT Corporation, October 2000. JSU Book V153

Final Site Investigation Report, Former Printing Plant, Building 143 Basement, Parcel 138(7) and the UST at the Administration

Building, Building 143, Parcel 37(7). Prepared by IT Corporation, October 2000. JSU Book V152

Final Site Investigation Report, Former Transformer Near Building 3798, Parcel 57Q. Prepared by IT Corporation, October 2000.

JSU Book V155

Final Site Investigation Report, Former Printing Plant, Building 144, Parcel 171(7). Prepared by IT Corporation, October 2000. JSU Book V157

Final Radiological Status Report. Prepared by Allied Technology Group Inc., October 2000. JSU Book V160

Final Site Investigation Report, Old Hospital, Parcel 95(7). Prepared by IT Corporation, October 2000. JSU Book V163

Final Site Investigation, Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments. Range 29, Former Weapons Demonstration Range, Parcel 87Q-X, Former Rifle Ranges, Parcels

110Q, and Former Impact Area, Parcel 239 Q-X. Prepared by IT Corporation, November 2000. JSU Book V166

Final Site Investigation, Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments for Site Investigation at Former Trap and Skeet Range Parcel 127Q. Prepared by IT Corporation, November 2000. JSU Book V177

Final Site Investigation Report, Trenches Near Range 20 Firing Line, Parcels 239(7) and 240(7). Prepared by IT Corporation,

November 2000. JSU Book V167

Final Site Investigation Report, Buildings South of Reilly Airfield, Parcel 501(7). Prepared by IT Corporation, November 2000.

JSU Book V165

Final Site Investigation Report, Area M2, Subsection of Area 45. Prepared by IT Corporation, November 2000. JSU Book V164

Final Site Investigation, Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments. Ranges West of Iron Mountain Road, Parcels 181(7), 194(7), 518(7), 73Q-X, 91Q-X, 114Q-X, 115Q, 116Q-X, 117Q-X, 129Q-X, 151Q, 200Q, 201Q, 228Q, 229Q-X, 231Q, 232Q-X, Washington Tank Range, and 1950 Rocket

Launcher Range. Prepared by IT Corporation, December 2000. JSU Book V168

Final Site Investigation Report, Former Smoke Area, Choccolocco Corridor, Parcel 107(7). Prepared by IT Corporation, December

2000. JSU Book V178

Final Site Investigation Report, Former Printing Plant, Building 3183, Parcel 162(7). Prepared by IT Corporation, January 2001.

JSU Book V180

Final Site Investigation, Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments Artillery and Mortar Impact Areas South of Bains Gap Road, Parcels 138Q-X, 139Q-X, 140Q-X, 141Q-X and 142Q-X. Prepared by IT Corporation, January 2001. JSU Book V181

Final Site Investigation Report, Former Printing Plant Building 2051, Parcel 173(7). Prepared by IT Corporation, January 2001. JSU

Book V183

Final Site Investigation Report, Old Incinerator Building 5710, Parcel 125(7) Prepared by IT Corporation, January 2001. JSU Book

V186

Final Site Investigation Report, Former Quartermaster’s Gasoline Storage Area, Parcel 130(7). Prepared by IT Corporation, January

2001. JSU Book V185

Page 8: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

8

Final Site Investigation Report, Former Smoke Area, South Slope of Morgan Mountain, Parcel 159(7) Prepared by IT Corporation,

February 2001. JSU Book V192

Final Site Investigation Report, Directorate of Engineering and Housing (DEH) Compound, Parcels 64(7) and 1(7). Prepared by IT

Corporation, February 2001. JSU Book V191

Final Site Investigation Report, DRMO Area, Parcel 85(7). Prepared by IT Corporation, February 2001. JSU Book V188

Final Site Investigation Report, Former Motor Pool Area 1800/1900 Parcels 145(7) and 52(7) and the UST at the Bowling Alley,

Building 1928, Parcel 48(7) Prepared by IT Corporation, February 2001. JSU Book V189

Final Site Investigation Report, Ammunition Supply Point and Building 4416, Parcels 197(7) and 199(7). Prepared by IT

Corporation, February 2001. JSU Book V444

Final Site Investigation, Site-Specific Field Sampling plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments, Range I, Parcel 201(7). Prepared by IT Corporation, February 2001. JSU Book V194

Final Site Investigation Report, Former Motor Pool Area 600, Parcels 149(7) and 136(7), Prepared by IT Corporation, February 2001. JSU Book V198

Final Underground Storage Tank Closure Assessment Report. Prepared by IT Corporation, February 2001. JSU Book V190

Final Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded Ordnance Safety Plan

Attachments, Former Rifle Grenade Range North of Washington Ranges, Parcel 221Q-X. Prepared by IT Corporation, February

2001. JSU Book V195

Final Site Investigation, Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachment, Forestry Compound – Pelham Range, Parcel 84(7). Prepared by IT Corporation, February 2001.

JSU Book V225

Final Site Investigation Report, Former Gas Mask Test Chambers, Parcels 195(7), 196(7) and 198(7). Prepared by IT Corporation,

February 2001. JSU Book V193

Final Site Investigation Report, Former Personnel Decontamination Station at Building 3185, Parcel 179(7). Prepared by IT

Corporation, February 2001. JSU Book V196

Final Site Investigation Report, Former Smoke Area R, Parcel 105(6). Prepared by IT Corporation, February 2001. JSU Book V197

Final Site Investigation Report, Bulk Storage Area, Building 296, Parcel 60(6). Prepared by IT Corporation, March 2001. JSU Book

V201

Final Site Investigation Report, Former Smoke Area S, Parcel 106(6). Prepared by IT Corporation, March 2001. JSU Book V208

Final Site Investigation Report, Fog Oil Storage Area, West of the Skeet Range, Parcel 122(7). Prepared by IT Corporation, March

2001. JSU Book V199

Final Site Investigation Report, Former Smoke Area BVZ, Parcel 124(7). Prepared by IT Corporation, March 2001. JSU Book

V200

Final Site Investigation Report, Motor Pool Area 1300, Parcel 143(7). Prepared by IT Corporation, March 2001. JSU Book V209

Final Site-Specific Field Sampling Plan Addendum, Site Investigation at Ranges West of Iron Mountain Road, Parcel 181(7), 518(7), 73Q-X, 91Q-X, 114Q-X, 115Q, 116Q-X, 117Q-X, 1290Q-X, 151Q, 200Q, 228Q, 229Q-X, 231Q, 232Q, Washington Tank Range

and 1950 Rocket Launcher Range. Prepared by IT Corporation, March 2001. JSU Book V443

Final Site Investigation Report, Washrack, Building 1224, Parcel 168(7). Prepared by IT Corporation, March 2001. JSU Book V203

Final Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific, Unexploded Ordnance Safety Plan

Attachments, Range 4A Fog Oil Storage Area – Pelham Range, Parcel 123(6). Prepared by IT Corporation, March 2001. JSU Book

V210

Final Site Investigation Report, Drain Field (Building T-459), Parcel 236(Q). Prepared by IT Corporation, March 2001. JSU Book

V207

Page 9: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

9

Final Site Investigation Report, Former Motor Pool Area 2000, Parcels 144(7) and 137(7). Prepared by IT Corporation, March 2001.

JSU Book V211

Final Site Investigation Report Former Motor Pool Area 1300, 4th Avenue, Parcels 148(7) and 16(7). Prepared by IT Corporation,

March 2001. JSU Book V212

Final Site Investigation Report, Former Fuel Yard, Parcel 131(7). Prepared by IT Corporation, March 2001. JSU Book V204

Final Site Investigation Report, Former Motor Pool Area 1000. Parcels 150(7), 13(7), and 139(7). Prepared by IT Corporation,

March 2001. JSU Book V206

Final Site Investigation Report, Former Motor Pool Area 3100, 23rd Street, Parcels 147(7), 28(7) and 72(7). Prepared by IT

Corporation, March 2001. JSU Book V205

Final Site Investigation Report, Small Weapons Storage and Cleaning Compound, Building 1378, Parcel 174(7). Prepared by IT

Corporation, March 2001. JSU Book V216

Final Site Investigation Report, Former Motor Pool Area 800, Parcels 164(7), 11(7), 12(7), and 68(7). Prepared by IT Corporation,

April 2001. JSU Book V220

Final Site Investigation Report, Motor Pool Area 1600, Parcels 163(7), 17(7), 18(7), 19(7), 71(7), 503(7), and 504(7). Prepared by

IT Corporation, April 2001. JSU Book V219

Final Site Investigation Report, Former Printing Plant, Building 1060, Parcel 172(7). Prepared by IT Corporation, April 2001. JSU

Book V237

Final Site-Investigation Report Trenches West of Remount Creek, Parcel 228(7). Prepared by IT Corporation, April 2001. JSU

Book V221

Final Site Investigation Report Cleared Area with Mound, Choccolocco Corridor, Parcel 237(7). Prepared by IT Corporation, April

2001. JSU Book V222

Final Site Investigation Report Ground Scar with Trenches at Driving Course Parcel 200(7). Prepared by IT Corporation April 2001.

JSU Book V217

Final Site Investigation Report Former Waste Chemical Storage Area, Parcels 87(7) and 135(7). Prepared by IT Corporation, May

2001. JSU Book V230

Final Site Investigation, Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments, Range 24 Lower Parcel 81Q. Prepared by IT Corporation, June 2001. JSU Book V236

Final Site Investigation Report, Boiler Plant No. 2, Bldg 2278, Parcels 23(7) and 226(7). Prepared by IT Corporation, June 2001.

JSU Book V251

Final Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded Ordnance Safety Plan

Attachments, Former Pistol Range South of Range 25, Parcel 224Q, Former Machine Gun Range, Parcel 226Q and Former Pistol

Range, Parcel 227Q. Prepared by IT Corporation, June 2001. JSU Book V249

Final Site-Investigation Report Chemical School Laboratory Sump, Bldgs 2281 and 2282, Parcels 90(7) and 225(7). Prepared by IT

Corporation, June 2001. JSU Book V248

Final Site Investigation Report, Boiler Plant No. 1, Building 3176, Parcels 26(7) and 89(7). Prepared by IT Corporation, June 2001.

JSU Book V250

Final Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Safety and Health Plan and Site-

Specific Unexploded Ordnance Safety Plan Attachments, former Personnel and Equipment Decontamination Station-Pelham Range,

Parcel 206(7). Prepared by IT Corporation, June 2001. JSU Book V255

Final Site Investigation Report, Former Incinerators, Bldgs 4428 and 4430, Parcel 96(7). Prepared by IT Corporation, June 2001.

JSU Book V256

Page 10: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

10

Final Site Investigation, Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-specific Unexploded

Ordnance Safety Plan Attachments Range 24 Upper, Parcel 80Q. Prepared by IT Corporation, June 2001. JSU Book V235

Final Site Investigation, Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments Possible Range, Parcel 237Q-X and Impact Area, Parcel 238Q-X, Choccolocco Corridor.

Prepared by IT Corporation, June 2001. JSU Book V234

Final Site Investigation Report, Golf Course, Parcels 178(7), 83(7), and 141(7). Prepared by IT Corporation, June 2001. JSU Book

V233

Final Site Investigation Report, Boiler Plant No. 3, Building 1076, Parcels 14(7) and 235(7). Prepared by IT Corporation, June 2001.

JSU Book V231

Final Site Investigation Report, Boiler Plant No. 4, Building 1876 Parcels 101(7) and 236(7). Prepared by IT Corporation, June

2001. JSU Book V243

Final Site-Investigation Report, Autocraft Shop/Former DPDO and Former Motor Pool Area 2100 North of DPDO Parcels 100(7),

20(7), 47(7), 152(7), and 241(7). Prepared by IT Corporation, June 2001. JSU Book V242

Final Site-Investigation Report, Ground Scar South of Building 3134, Parcel 153(7). Prepared by IT Corporation, June 2001. JSU

Book V244

Final Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan and Site-Specific Unexploded Ordnance Safety Plan

Attachments, Former Probable Range Parcel 247Q-X. Prepared by IT Corporation, June 2001. JSU Book V245

Final Site-Specific Work Plan for the Groundwater Investigation at the Burial Mound at Rideout Field, Parcel 202Q-RD- Pelham

Range. Prepared by IT Corporation, June 2001. JSU Book V421

Final Site Investigation Report, Former Sandel Flamethrower Range Parcel 97(7). Prepared by IT Corporation, July 2001. JSU Book V247

Final Site Investigation Report, Ground Scar at South end of Confidence Course, Parcel 158(7). Prepared by IT Corporation, July

2001. JSU Book V246

Final Site Investigation Report, Ground Scar Near the Ammunition Supply Point, parcel 156(7). Prepared by IT Corporation, July

2001. JSU Book V261

Final Site Investigation Report, 11th Chemical Motor Pool Area, Parcels 29(7), 30(7), and 74(7). Prepared by IT Corporation, July

2001. JSU Book V260

Final Site Investigation Report, Impact Area Near Stump Dump, Parcel 135Q-X. Prepared by IT Corporation, August 2001. JSU Book V273

Final Site Investigation Report, Contractor Laydown Area and Former Tar Plant, Parcels 86(7), 99(7), and 32(7). Prepared by IT

Corporation, August 2001. JSU Book V274

Final Site Investigation Report, Hand Grenade Range, Range 32, parcel 90Q-X. Prepared by IT Corporation, August 2001. JSU

Book V271

Final Site-Specific Sampling Plan, Site Specific Safety and Health Plan, Site-Specific Unexploded Ordnance Safety Plan

Attachments, Site Investigation at Range 25, Known Distance Range, Parcel 83Q and Impact Area, Parcel 118Q-X. Prepared by IT

Corporation, August 2001. JSU Book V272

Revised Quarterly Sampling Plan October 2001 and January 2002, Former Base Service Station, Building 2109, parcels 21(7) and

22(7). Prepared by IT Corporation, September 17, 2001. JSU Book V437

Final Supplemental Site Investigation, Site-Specific Field Sampling Plan Addendum and Site-Specific Safety and Health Plan

Attachment Former Decontamination Complex, Parcels 93(7), 46(7) and 70(7). Prepared by IT Corporation, September 2001. JSU

Book V280

Final Site Investigation Report, Former Ordnance Motor Repair Area, Parcels 75(7), 5(7), 6(7), 41(7) and 42(7). Volume I of II, Text

and Appendices A-E; and Volume II of II, Text and Appendixes F-I. Prepared by IT Corporation, September 2001. JSU Books

V283 and V278

Page 11: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

11

Final Site Investigation Report, Training Aids Building (Building 267), Parcel 166(7). Prepared by IT Corporation, September 2001.

JSU Book V282

Final Site Investigation Report, Trenches West of Iron Mountain Road, Parcel 500(7). Prepared by IT Corporation, September 2001.

JSU Book V281

Final Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan and Site-Specific Unexploded Ordnance Safety Plan

Attachments, Range 23A, Multipurpose Range, Parcel 109(7)/152Q-X. Prepared by IT Corporation, October 2001. JSU Book V279

Supplemental Groundwater Sampling for Volatile Organic Compounds Former Washrack, Building 1740, Soldier's Chapel, Parcel

127(7). Prepared by IT Corporation, October 2001. Filed in sleeve of Site-Specific Field Sampling Plan Addendum dated

September 2000. JSU Book V410

Final Site Investigation Report, Ground Scar with Small Pit North of Landfill No. 3, Parcel 155(7). Prepared by IT Corporation,

November 2001. JSU Book V290

Final Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded Ordnance Safety Plan Attachments, Area North of Military Operations in Urban Terrain (MOUT) Site. Prepared by IT Corporation, December 2001. JSU

Book V297

Final Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan and Site-Specific Unexploded Ordnance Safety Plan

Attachments. Former Rifle/Machine Gun Range, Parcel 99Q. Prepared by IT Corporation, December 2001. JSU Book V294

Final Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded Ordnance Safety Plan

Attachments, Station No. 6, Subsection of Former Toxic Gas Area - Pelham Range, Parcel 211(7). Prepared by IT Corporation,

December 2001. JSU Book V293

Final Site-Specific Field Sampling Plan, Site-Specific and Health Plan, and Site Specific, Unexploded Ordnance Safety Plan Attachments. Small Arms Impact Area, South of the Former Prisoner of War Training Facility, Former Rifle/Machine Gun Ranges,

Parcels 100Q and 101Q. Prepared by IT Corporation, January 2002. JSU Book V306

Final Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded Ordnance Safety Plan

Attachments. Former Rifle/Machine Gun Range, Parcel 98Q. Prepared by IT Corporation, January 2002. JSU Book V296

Final Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded Ordnance Safety Plan

Attachments. Impact Area, North-Central Main Post, Parcel 132Q-X. Prepared by IT Corporation, January 2002. JSU Book V295

Final Revision 1 Site Investigation Report Ground Scar South of the Autocraft Shop, Parcel 157(7). Prepared by IT Corporation,

January 2002. JSU Book V311

Final Site Investigation Report Range 29, Former Weapons, Demonstration Range, Parcel 87Q-X, Former Rife Ranges, Parcels 110Q

and111Q, and Former Impact Area, Parcel 239Q-X. Prepared by IT Corporation, January 2002. JSU Book V307

Final Site Investigation Site-Specific Sampling Plan, Site Specific Safety and Health Plan, and Site-Specific Unexploded Ordnance

Safety Plan Attachments, Former Rifle/Machine Gun Ranges, Parcel 100Q, and 101Q. Prepared by IT Corporation, January 2002.

JSU Book V308

Final Site Investigation Site Specific Field Safety and Health Plan and Site-Specific Unexploded Ordnance Safety Plan Attachments,

Former Tank Ranges, Parcel 92Q-X and 93Q-X Former Grenade Range, parcel 107Q-X and Impact Areas, Parcels 133Q-X and 134

Q-X. Prepared by IT Corporation. January 2002. JSU Book V310

Final Site Investigation, Site-Specific Field Sampling Plan, Site –Specific Safety and Health Plan and Site-Specific Unexploded

Ordnance Safety Plan Attachments, Range 30, Confidence Course (Firing Line), Parcel 88Q, former Rifle/Machine Gun Range,

Parcel 102Q, Former Grenade Range/Area, Parcel 106Q-X, Tank sub-Caliber/Carbine Transition/Machine Gun Range (OA-08)

Grenade Court (OA-15) Unnamed Small Arms Range. Prepared by IT Corporation, January 2002. JSU Book V309

Final Revision 1 Site Investigation Report Ground Scar with Trenches at Littlebrant Drive, Parcel 154(7). Prepared by IT

Corporation, January 2002. JSU Book V301

Site Investigation at the Impact Area for Parcels 103Q and 88Q. Prepared by IT Corporation February 26, 2002. JSU Book V317

Page 12: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

12

Final Site Investigation Report Forestry Compound – Pelham Range, Parcel 84(7). Prepared by IT Corporation, March 2002. JSU

Book V331

* Final Site Investigation Report Former Trap and Skeet Range, Parcel 127Q. Prepared by IT Corporation, March 2002. JSU Book

V330

Draft Final Site Investigation and Fill Area Definition Report, Landfills and Fill Areas Parcels 78(6), 79(6), 80(6), 81(5), 175(5),

230(7), 227(7), 126(7), 229(7), 231(7), 233(7), and 82(7), Volume 1 of 4 – Text, Tables, and Figures; Volume 2 of 4 – Appendices A

through B; Volume 3 of 4 – Appendices C through D; and Volume 4 of 4 – Appendices E-L. Prepared by IT Corporation, March

2002. JSU Books V333, V334, V335, and V336.

Final Amendment 01 to Final Work Plan/Site Safety Submission, Fort McClellan, Alabama, for Pelham Range Site Investigation

(Lima Pond, Old Water Hole, and Former Decontamination Area South of Toxic Gas Area). Prepared by Parsons Engineering

Science, Inc., March 2002. JSU Book V325. Also filed in the sleeve of this document is the Preoperational Survey Report for Site

Investigation Operations to Establish and Characterize Presence of Chemical Warfare Materiel and/or Chemical Agent on Pelham

Range, Anniston, Alabama.

Final Site Investigation Report 24 Lower, Parcel 81Q. Prepared by IT Corporation, March 2002. JSU Book V340

Final Site Investigation Report Former Personnel and Equipment Decontamination Station, Parcel 206(7). Prepared by IT

Corporation, March 2002. JSU Book V339

Final Site Investigation Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments Impact Area, Parcel 136Q-X. Prepared by IT Corporation, March 2002. JSU Book V350

Final Site Investigation Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments Former Rifle/Machine Gun Range, Parcel 104Q. Prepared by IT Corporation, March 2002. JSU

Book V348

Final Site Investigation Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments Former 81mm Mortar Range, Parcel 137Q-X. Prepared by IT Corporation, April 2002. JSU

Book V351

Final Site Investigation Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments Range, Choccolocco Corridor, Parcel 143Q. Prepared by IT Corporation, April 2002. JSU Book

V349

Final Site Investigation Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments Former Range 40, Parcel 94Q, and Range, Choccolocco Corridor, Parcel 146Q. Prepared by IT

Corporation, April 2002. JSU Book V347

Final Site Investigation Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments Former Range 43, Parcel 97Q, Range, Choccolocco Corridor, Parcel 144Q-X and Impact Area,

Choccolocco Corridor, Parcel 147Q-X. Prepared by IT Corporation, April 2002. JSU Book V346

* Final Site Investigation Report Possible Range, Parcel 237Q-X and Impact Area Parcel 238Q-X, Choccolocco Corridor. Prepared

by IT Corporation, April 2002. JSU Book V345

* Final Site Investigation Report Range 4A Fog Oil Storage Area, Parcel 123(6). Prepared by IT Corporation, April 2002. JSU

Book V356

* Final Site Investigation Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded Ordnance Safety Plan Attachments Range 31: Weapons Demonstration Range, Parcel 89Q-X, and Former Defendum Field Firing

Range No. 2, Parcel 215Q. Prepared by IT Corporation, April 2002. JSU Book V355

* Final Site Investigation Site-Specific Safety and Health Plan Former Range 42, Parcel 96Q; Range, Choccolocco Corridor, Parcel

145Q-X; and Impact Area, Choccolocco Corridor, Parcel 148Q-X. Prepared by IT Corporation, April 2002. JSU Book V357

* Final Site Investigation Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments Former Range 41, Parcel 95Q and Impact Area, Choccolocco Corridor, Parcel 131Q-X. Prepared

by IT Corporation, April 2002. Also in sleeve of report is a letter from IT Corporation, subject: Additional Soil Samples at Former

Range 41, Parcel 95Q and Impact Area, Choccolocco Corridor, Parcel 131Q-X, dated July 3, 2002. JSU Book V354

Page 13: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

13

* Final Site Investigation Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments Former Mortar Firing Point, Parcel 105Q-X and Former Defendam Range (Eastern), Parcel

225Q. Prepared by IT Corporation, April 2002. JSU Book V352

* Final Site Investigation Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments Former 37mm Antitank Range, Parcel 230Q-X and Former Rifle Range, Parcel 149Q. Prepared by IT Corporation, April 2002. JSU Book V353

* Final Site Investigation Report for Range I, Parcel 201(7). Prepared by IT Corporation, April 2002. JSU Book V360

* Final Site Investigation Report, Former Security Operational Test Site, Parcel 102(7). Prepared by IT Corporation, May 2002.

JSU Book V361

* Final Site Investigation Report, Artillery and Mortar Impact Areas South of Bains Gap Road Parcels 138Q-X, 139Q-X, 140Q-X,

141Q-X, and 142Q-X. Prepared by IT Corporation, May 2002. JSU Book V366

* Final Site Investigation Report Anniston Army Depot, Former Shell Tapping Area Parcel 208(7). Prepared by IT Corporation,

May 2002. JSU Book V369

* Final Site Investigation Report for Former Probable Range, Parcel 247Q-X. Prepared by IT Corporation, June 2002. Filed in the

sleeve of this SI - Results of Soil Samples Collected Near Drums at the Former Probable Range, Parcel 247Q-X, prepared by Shaw

Environmental, Inc., May 15, 2003. JSU Book V372

Final Site Investigation Report for Ranges South of Range 25, Parcels 224Q, 226Q and 227Q. Prepared by IT Corporation, June

2002. JSU Book V375

* Final Site Investigation Report, Agent ID Area, Parcel 509(7). Prepared by IT Corporation, June 2002. JSU Book V373

* Draft Final Site Investigation, Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded Ordnance Safety Plan Attachments Former Decontamination Training Area South of the Toxic Gas Area, Parcel 207(7).

Prepared by IT Corporation, July 2002. JSU Book V484

* Draft-Final Site Investigation Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific

Unexploded Ordnance Safety Plan Attachments Former Toxic Gas Area – Pelham Range, Parcel 211(7). Prepared by IT Corporation

August 2002. JSU Book V426

* Final Site Investigation Report for Pelham Range Sites for Recovered Chemical Warfare Material (RCWM) Lima Pond, Old Water

Hole, and Former Decontamination Area South of Toxic Gas Area. Prepared by Parsons, September 2002. JSU Book V383

* Draft Final Site Investigation Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific

Unexploded Ordnance Safety Plan Attachments Cane Creek Training Area, Parcel 510(7). Prepared by IT Corporation, September 2002. JSU Book V414

Airborne Radiological Survey – Main Post and Pelham Range Walkover Radiological Survey at Rideout Field and Anomaly Surveys

on Main Post and Pelham Range Groundwater Investigation – Burial Mound at Rideout Field. Prepared by IT Corporation, October

2002. JSU Book V492

* Final Sampling Summary Report for the Blue Hole, Training Area 6C, Revision I. Prepared by IT Corporation, December 2002.

JSU Book V394

Final, Revision 3, Site Investigation Report, GSA Warehouse Area, Parcels 151(7), 2(7), 3(7), 4(7), 67(7), 69(7), 91(7), 111(7),

128(7), 129(7) and 238(7), Volume I of II, Text and Appendices A-E, and Volume II of II, text Appendices F-I. Prepared by IT Corporation, December 2002. JSU Books V313 and V314

* Draft Site Investigation Report Area North of MOUT Site. Prepared by IT Corporation, January 2003. JSU Book V575

* Draft Site Investigation Report Impact Area North-Central Main Post, Parcel 132Q-X. Prepared by IT Corporation, February 2003.

JSU Book V541

* Draft Site Investigation Report Former Base Service Station, Building 2109 Parcels 21(7) and 22(7). Prepared Shaw

Environmental, Inc., March 2003. JSU Book V576

Page 14: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

14

* Final Site Investigation Report, Former Rifle/Machine Gun Range, Parcel 99Q. Prepared by IT Corporation, March 2003. JSU

Book V404

* Final Site Investigation Report, Impact Area, Parcel 136Q-X. Prepared by Shaw Environmental, Inc., March 2003. JSU Book

V406

* Final Site Investigation Report, Old Toxic Training Area, Parcel 188(7). Prepared by Shaw Environmental, Inc., March 2003. JSU

Book V405

* Final Water Supply Well Report for Pelham Range, Revision 1. Prepared by Shaw Environmental, Inc., May 21, 2003. JSU Book

V412

* Final Site Investigation Report, CBR Proficiency Area, Parcel 517(7). Prepared by Shaw Environmental, July 2003. JSU Book

V446

* Draft Site Investigation Report Impact Area South of Prisoner-of-War Training Facility Former Rifle/Machine Gun Ranges Parcels

100Q and 101Q. Prepared by Shaw Environmental, Inc., September 2003. JSU Book V542

* Final Site Investigation Report, Former Mock Village at Yahoo Lake, Parcel 130Q-X. Prepared by Shaw Environmental,

November 2003. JSU Book V455

* Final Site Investigation Report, Former Decontamination Complex, Parcels 93(7), 46(7), 70(7), and 140(7), Volume I of II: Text

and Appendices A-B, and Volume II of II: Appendices C-J. Prepared by Shaw Environmental December 2003. JSU Books V463

and V464

* Draft Site Investigation Report Training Area T-31 Parcels 184(7) and 185(7). Prepared by Shaw Environmental, Inc., December

2003. JSU Book V543

* Final Site Investigation Report, Former Range 41, Parcel 95Q and Impact Area, Choccolocco Corridor, Parcel 131Q-X. Prepared by Shaw Engineering, January 2004. JSU Book V465

* Final Site Investigation Report, Range 23A, Multipurpose Range Parcel 109(7)/152Q-X. Prepared by Shaw Environmental,

January 2004. JSU Book V469

* Final Site Investigation Report, Former Range 40, Parcel 94Q and Range, Choccolocco Corridor, Parcel 146Q. Prepared by Shaw

Environmental, February 2004. JSU Book V470

* Final Site Investigation Report, Former Range 42, Parcel 96Q; Range, Choccolocco Corridor, Parcel 145Q-X; and Impact Area,

Choccolocco Corridor, Parcel 148Q-X. Prepared by Shaw Environmental, March 2004. JSU Book V476

* Final Site Investigation Report Former Range 43, Parcel 97Q; Range, Choccolocco Corridor, Parcel 144Q-X; and Impact Area, Choccolocco Corridor, Parcel 147Q-X. Prepared by Shaw Environmental, April 2004. JSU Book V481

* Final Site Investigation Report, Sinkholes at Pelham Range. Prepared by Shaw Environmental, Inc., May 2004. JSU Book V490

* Final Site Investigation Report Range, Choccolocco Corridor, Parcel 143Q. Prepared by Shaw Environmental, Inc., June 2004.

JSU Book V491

* Final Concrete Monument Installation Report, Stump Dump, Parcel 82(7). Prepared by Shaw Environmental, Inc., August 19,

2004. JSU Book V496

* Final Revision 1 Site Investigation Report, Former Toxic Gas Area Pelham Range, Parcel 211(7) and Former Decontamination Training Area South of the Toxic Gas Area, Parcel 207(7). Prepared by Shaw Environmental, September 2004. JSU Book V466

Final Site Investigation Report Former Washrack, Building 1740, Soldier’s Chapel Parcel 127(7). Prepared by Shaw Environmental,

October 2004. JSU Book V500

Final Site Investigation Report, Former Motor Pool Area 3100, Parcels 146(7), 212(7), 24(7), 25(7), and 73(7). Prepared by Shaw

Environmental, February 2005. JSU Book V504

* Monitoring Well Abandonment Report, Army National Guard Sites at Pelham Range. Prepared by Shaw Environmental, Inc.,

March 2005. JSU Book V505

Page 15: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

15

* Letter Work Plan for Investigation of AWWSB Tank Sites Near BBGR Ranges. Prepared by Shaw Environmental, Inc., July 19,

2005. JSU Book V509

* Final Site Investigation Report for the Fill Area West of Range 19 Parcel 233(7). Prepared by Shaw Environmental, Inc., July

2005. JSU Book V508

* Final Site Investigation Report Former Rifle/Machine Gun Range, Parcel 104Q. Prepared by Shaw Environmental, Inc., August

2005. JSU Book V516

Final Site Investigation Report Ranges West of Iron Mountain Road Parcels 73Q-X, 91Q-X, 115Q, 116Q-X, 117Q-X, 129Q-X,

151Q, 181(7), 194(7)/518(7), 200Q, 201Q, 228Q, 229Q-X, 231Q, 232Q-X., Washington Tank Range, and 1950 Rocket Launcher

Range. Volume I of IV: Text Tables, and Figures, Volume II of IV: Appendices A and B; Volume II of IV: Appendices C through

F; Volume IV of IV: Appendices G through J. Prepared by Shaw Environmental, Inc., August 2005. JSU Books V512, V513, V514

and V515

* Final Site Investigation Report Former Rifle/Machine Gun Ranges (Firing Line Areas) Parcels 100Q and 101Q. Prepared by Shaw

Environmental, Inc., September 2005. JSU Book V517

* Final Site Investigation Report Fill Area at Range 30, Parcel 231(7). Prepared by Shaw Environmental, Inc, September 2005. JSU

Book V521

* Supplemental Soil Sampling at Former Tank Ranges, Parcel 92Q-X and 93Q-X, Former Grenade Range, Parcel 107Q-X, and

Impact Areas, Parcels 133Q-X and 134Q-X. Prepared by Shaw Environmental, Inc., March 26, 2006. JSU Book V551

* Final Site Investigation Report for AWWSB Tank Sites Near Baby Bains Gap Road Ranges. Prepared by Shaw Environmental,

Inc., July 17, 2006. JSU Book V528

* Final Site Investigation Report for Range 31: Weapons Demonstration Range, Parcel 89Q-X and Former Defendum Field Firing

Range No. 2, Parcel 215Q. Prepared by Shaw Environmental, Inc., August 2006. JSU Book V533

* Final Site Investigation Report Range 30, Confidence Course (Firing Line), Parcel 88Q; Former Rifle/Machine Gun Range, Parcel

102Q; Former Grenade Range/Area, Parcel 106Q-X; Tank Sub-Caliber/Carbine Transition/Machine Gun Range (OA-08); Grenade

Court (OA-15); Unnamed Small Arms Range. Prepared by Shaw Environmental, Inc., October 2006. JSU Book V547

* Final Site Investigation Report Stump Dump, Parcel 82(7). Prepared by Shaw Environmental, Inc., October 2006. JSU Book

V548

* Final Site Investigation Report Former Rifle/Machine Gun Range, Parcel 98Q. Prepared by Shaw Environmental, Inc., October

2006. JSU Book V581

* Final Site Investigation Report Former Mortar Firing Point, Parcel 105Q-X and Former Defendam Range (Eastern), Parcel 225Q. Prepared by Shaw Environmental, Inc., November 2006. JSU Book V582

* XRF Soil Sampling at OA-03, Former Pistol Range. Prepared by Shaw Environmental, Inc., December 20, 2007. JSU Book V572

* Results of XRF Soil Sampling at OA-03, Former Pistol Range. Prepared by Shaw Environmental, Inc., June 4, 2008. JSU Book

V586

Final Site-Specific Work Plan Site Investigation on Portions of Range 29 Located on U.S. Fish & Wildlife Service Property.

Prepared by Shaw Environmental, Inc., November 2009. JSU V615

Letter Work Plan for XRF Delineation Sampling on Portions of Range 29 Located on U.S. Fish & Wildlife Service Property. Prepared by Shaw Environmental, Inc., August 17, 2010. JSU Book V623

* Final Rev 1 Site Investigation Report Former Tank Ranges, Parcels 92Q-X and 93Q-X, Former Grenade Range, Parcel 107Q-X,

and Impact Areas, Parcels 133Q-X and 134Q-X. Prepared by Shaw Environmental, Inc., March 2012. JSU Book V584

Remedial Investigations (RI) / Feasibility Studies (FS) / Engineering/Evaluation Cost Analysis (EE/CAs)

Final U.S. Army Environmental Center, Remedial Investigation and Feasibility Study Work Plan. Prepared by Science Applications

International Corporation, April 6, 1994. JSU Book V432

Page 16: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

16

Final U.S. Army Environmental Center, Remedial Investigation and Feasibility Study Health and Safety Plan. Prepared by Science

Applications International Corporation, April 6, 1994. JSU Book V431

Final U.S. Army Environmental Center, Remedial Investigation and Feasibility Study Sampling and Analysis Plan, Volumes I, II, III

and IV. Prepared by Science Applications International Corporation, April 6, 1994. JSU Books V433, V434, V435, and V436

Work Plan Radiological Remediation of Fort McClellan Hot Cell and Grounds, Anniston, Alabama. Prepared by Allied Technology

Group, Inc, December 1994. JSU Book V53

Draft Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments Long-Term Monitoring Program at

Landfills No. 1, 2 and 3. Prepared by International Technology Corporation, December 1997. JSU Book V18

Final Supplemental Remedial Investigation Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments

for the Fenced Area at Range J – Pelham Range (Parcel 202). Prepared by International Technology Corporation, November 1998.

JSU Book V42

* Final Work Plans for Eastern Bypass EE/CA. Prepared by Zapata Engineering, PA, December 1998. JSU Book V43

* Final Long-Term Monitoring Program, First Quarterly Report for Landfills No. 1, 2, and 3, April 1999. JSU Book V91

* Decommissioning Plan, Phase II, ‘Burial Mound’, Volumes I and II. Prepared by Allied Technology Group, Inc, September 9,

1999. JSU Books V54 and V55. Also filed in the sleeve of Volume I is the Draft Environmental Assessment for the Proposed

Decommissioning Plan for the Burial Mound, dated October 4, 1999 and the Public Meeting Announcement.

* Final Engineering Evaluation/Cost Analysis, Fill Area Definition Work Plan, Parcels 78(6), 79(6), 80(6), 81(5), 175(5), 230(7),

227(7), 229(7), 126(7), 231(7), 233(7) and 82(7). Prepared by International Technology Corporation, February 2000. JSU Book

V119

* Final Engineering Evaluation/Cost Analysis (EE/CA) Proposed Eastern Bypass . Prepared by Zapata Engineering, April 2000. JSU Book V277. Also filed in the sleeve of this document is the Action Memorandum for the Eastern Bypass.

* Final Engineering Evaluation/Cost Analysis Report, M2 Parcel. Prepared by U.S. Army Engineering and Support Center,

Huntsville, AL, June 2000. JSU Book V422. Also filed in the sleeve of this document are the Action Memorandum and ADEM and

EPA concurrence letters.

* Final Remedial Investigation / Baseline Risk Assessment Report, Volumes I and II. Prepared by Science Applications International

Corporation, July 2000. JSU Books V130 and V131

* Final Supplemental Remedial Investigation, Site-Specific Field Sampling Plan, Site-Specific Unexploded Ordnance Safety Plan

Attachments for Training Area T-38, Former Technical Escort Reaction Area, Parcel 186(6). Prepared by IT Group, August 2000.

JSU Book V140

* Reconnaissance Findings, Conceptual Plan, and Proposed Scope of Work for EE/CA Sampling * M1.13. Prepared by Foster

Wheeler Environmental, August 2000. Also included is Fact Sheet prepared by U.S. Army Engineering and Support Center,

Huntsville by Foster Wheeler Environmental, August 25, 2000. JSU Book V445

* Final Site-Specific Ordnance and Explosives Work Plan Fill Area North of Landfill No. 2, Parcel 230(7); Fill Area at Range 30,

Parcel 231 (7); and Fill Area West of Iron Mountain Road and Range 19, Parcel 233(7) For Support of Construction Activities.

Prepared by IT Corporation, Rev 1, August 2000. JSU Book V565

* Final Work Plan / Site Safety Submission, Volume I – Work Plan; Volume II – Site Safety and Health Plan; and Volume III –

Agency Plans, Chemical Warfare Materiel Site EE/CA. Prepared by Parsons Engineering Science, Inc. September 2000. JSU Books V174, V175, and V176

Final Site-Specific Field Sampling Plan Addendum, Remedial Investigation Former Chemical Laundry and Motor Pool Area 1500,

Parcel 94(7). Prepared by IT Corporation September 2000. JSU Book V145

* Final Supplemental Remedial Investigation, Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-

Specific Unexploded Ordnance Safety Plan Attachments, Ranges Near Training Area T-24A, Parcels 187(7), 112Q, 113 Q-X, 213Q,

and 214Q. Prepared by IT Corporation, September 2000, Revision 1. JSU Book V159

* Final Site-Specific Field Sampling Plan Addendum, Remedial Investigation, Former Base Service Station, Building 2109, Parcels

21(7) and 22(7). Prepared by IT Corporation, September 2000. JSU Book V423

Page 17: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

17

* Final Site-Specific Work Plan Addendum for the Supplemental Remedial; Investigation for the Fenced Area at Range J-Pelham

Range, Parcel 202(7). Prepared by IT Corporation, November 3, 2000. JSU Book V420

* Work Plan for Airborne Gamma Radionuclide Survey of Fort McClellan (Main Post and Pelham Range), Anniston, Alabama.

Prepared by Fugro Airborne Surveys Corporation, November 6, 2000. JSU Book V419

* Final Remedial Investigation, Site-Specific Field Sampling Plan Addendum and Small Weapons Repair Shop, Parcel 66(7).

Prepared by IT Corporation, November 2000. JSU Book V411

* Final Site-Specific Work Plan, Alpha Area, Ordnance and Explosives Response. Prepared by Foster Wheeler Environmental

Corporation, March 2001. JSU Book V266

* Final Remedial Investigation, Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific

Unexploded Ordnance Safety Plan Attachments, Range K, Former Agent Training Area, Parcel 203(7). Prepared by IT Corporation,

March 2001. JSU Book V202

* Final Site-Specific Work Plan Bravo Area, Engineering Evaluation/Cost Analysis Ordnance and Explosive Response. Prepared by Foster Wheeler Corporation, April 2001. JSU Book V227

* Final Site-Specific Groundwater Monitoring Well Installation and Field Sampling Plan Attachment and Site-specific Safety and

Health Plan Attachment, Landfill No. 3, Parcel 80(6). Prepared by IT Corporation, April 2001. JSU Book V218

* Final Explosives Safety Site Plan and Safety Submission for the Interim Holding Facility. Prepared by Parsons Engineering

Science, Inc., May 2001. JSU Book V326

* Site-Specific Field Sampling Plan Addendum for the Supplemental Remedial Investigation for the Fenced Area at Range J-Pelham

Range, Parcel 202(7). Prepared by IT Corporation, June 15, 2001. JSU Book V424

* Final Site Characterization, Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific Unexploded

Ordnance Safety Plan Attachments, Ranges at Iron Mountain Road and Ranges at Bains Gap Road: Skeet Range, Parcel 69, (Q),

Range 19, Parcel 75(Q), Range 13, Parcel (71Q), Range 12, Parcel (70Q), Range 21, Parcel 77(Q), Range 27, Parcel 85 (Q).

Prepared by IT Corporation, August 2001. JSU Book V270

* Revised Site-Specific Field Sampling Plan Addendum for the Supplemental Remedial Investigation at Training Area T-38, Former

Technical Escort Reaction Area, Parcel 186(6). Prepared by IT Corporation, August 14, 2001. JSU Book V460

* Final Engineering Evaluation/Cost Analysis M1.01 Parcel. Prepared by Foster Wheeler Environmental Corporation, 14 December

2001. JSU Book V285

* Site Specific Field Sampling Plan for the Remedial Investigation at Landfill No. 3, Parcel 80(6). Prepared by IT Corporation, January 2002. JSU Book V645

* Final Engineering Evaluation /Cost Analysis, Site-Specific Safety and Health Plan, and Site-Specific Unexploded Ordnance Safety

Plan Attachments at the Baby Bains Gap Road Ranges, Range 18 Down Range Feedback, (Known Distance) Range, Parcel, Range

20, Infiltration Course, Parcel 76Q-X, Range 23, Trainfire (Record) Range, Parcel 79Q, Range 25, Known Distance Range,, Parcel

83Q, Range 26, Life Fire and Maneuver Range, Parcel 84Q-X, Main Post Impact Area, Parcel 118Q-X, and former Range 25 East,

Parcel 223Q. Prepared by IT Corporation, January 2002. JSU Book V304

* Final Site-Specific Work Plan M1.01 Parcel & M3 Miscellaneous Property Ordnance and Explosives Response. Prepared by

Foster Wheeler Environmental Corporation, 19 February 2002. JSU Book V329

* Final Site-Specific Work Plan Charlie Area Engineering Evaluation/Cost Analysis Ordnance and Explosives Response. Prepared

by Foster Wheeler Environmental Corporation, 28 February 2002. JSU V328

* Site-Specific Work Plan for the Supplemental Remedial Investigation of Range L – Lima Pond, Pelham Range, Parcel 204(7).

Prepared by IT Corporation, March 6, 2002. JSU Book V332

* Draft Final Engineering Evaluation/Cost Analysis Landfills and Fill Areas Parcels 78(6), 79(6), 80(6), 81(5), 175(5), 230(7),

227(7), 126(7), 229(7), 231(7), 233(7) and 82(7). Prepared by IT Corporation, March 2002. Filed in the sleeve of this document is a

letter to Lee Coker, US Corps of Engineers, Mobile District, from Jeanne Yacoub, Shaw Environmental regarding Asphalt Removal

at the Fill Area at Range 30, Parcel 231(7), dated August 11, 2003. JSU Book V327

Page 18: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

18

* Final Screening-Level Ecological Risk Assessment for Iron Mountain Road Ranges. Prepared by IT Corporation, May 2002. JSU

Book V370

* Draft Remedial Investigation Report Small Weapons Repair Shop Parcel 66(7). Prepared by IT Corporation, May 2002. JSU

Book V536

* Draft Remedial Investigation Report Former Chemical Laundry and Motor Pool Area 1500 Parcel 94(7) Volume I Text, Tables and

Figures, Volume II Appendices A-M. Prepared by IT Corporation, May 2002. JSU Books V365(I) and V365(II)

* Final Work Plan Site-Specific Drum Removal and Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific

Unexploded Ordnance Safety Plan Attachments to the Remedial Investigation Field Sampling Plan at Range K, Former Agent

Training Area, Parcel 203(7). Prepared by IT Corporation, June 2002. JSU Book V374

Final Chemical Warfare Materiel (CWM) Engineering Evaluation/Cost Analysis (EE/CA). Prepared by Parsons Engineering

Science, Inc., June 2002. JSU Book V371

* Draft Final Supplemental Remedial Investigation Site-Specific Field Sampling Plan Addendum, Site-Specific Safety and Health

Plan, and Site-Specific Unexploded Ordnance Safety Plan Attachments Old Water Hole – Pelham Range, Parcel 205(7). Prepared by IT Corporation, July 2002. JSU Book V397

* Final Data Evaluation Report and Screening Level Ecological Risk Assessment Bains Gap Road Ranges. Range 24 Upper, Parcel

80Q; Range 21, Parcel 77 Q; Range 22, Parcel 78Q; Former Mortar Range (Firing Line), Parcel 109; Range 27, Parcel 85Q. Volume

I of III: Text and Appendices A-E; Volume II of III: Appendix F; and Volume III of III, Appendices G-I. Prepared by IT

Corporation, August 2002. JSU Books V380, V381, and V382

* Draft Site-Specific Field Sampling Plan Addendum II for the Remedial Investigation (Source Area) at Ranges Near Training Area

T-24A, Parcel 187(7), 112Q, 113Q-X, 213Q, and 214Q. Prepared by IT Corporation, August 23, 2002. JSU Book V398

* Draft Site-Specific Field Sampling Plan Addendum II for the Remedial Investigation (Source Area) at Training Area T-38, Former Technical Escort Reaction Area, Parcel 186(6). Prepared by IT Corporation, August 26, 2002. JSU Book V399

* Draft Remedial Investigation Site-Specific Field Sampling Plan Addendum III for the Remedial Investigation (Horizontal Extent-

Surface Soil and Groundwater) at Ranges Near Training Area T-24A Parcels 187(7), 112Q, 113Q-X, 213Q, and 214Q. Prepared by

IT Corporation, October 2002. JSU Book V400

* Draft Remedial Investigation Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific

Unexploded Ordnance Safety Plan Attachments Training Area T-5 Sites, Parcels 180(7), 182(7), 511(7), 512(7), 513(7), 514(7), and

516(7). Prepared by IT Corporation, October 2002. JSU Book V415

* Draft Remedial Investigation Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific

Unexploded Ordnance Safety Plan Attachments Training Area T-6 (Naylor Field), Parcel 183(6). Prepared by IT Corporation, October 2002. JSU Book V416

* Final, Revision 1 Baseline Ecological Risk Assessment Problem Formulation for Small Arms Ranges at Iron Mountain Road.

Prepared by IT Corporation, November 2002. JSU Book V389

* Final Baseline Ecological Risk Assessment Study Design for Iron Mountain Road Ranges. Prepared by IT Corporation, November

2002. JSU Book V390

* Draft Focused Feasibility Study Small Weapons Repair Shop Parcel 66(7). Prepared by IT Corporation, November 2002. JSU

Book V537

* Draft Site-Specific Field Sampling Plan Addendum III for the Remedial Investigation at Landfill No. 3, Parcel 80(6). Prepared by

IT Corporation, November 2002. JSU Book V566

* Draft Remedial Investigation Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific

Unexploded Ordnance Safety Plan Attachments Former Large Caliber Weapons Range, Parcel 114Q-X. Prepared by IT Corporation,

January 2003. JSU Book V574

* Draft Remedial Investigation Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific

Unexploded Ordnance Safety Plan Attachments Former 81mm Mortar Range, Parcel 37Q-X. Prepared by IT Corporation, February

2003. JSU Book V485

Page 19: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

19

* Draft Remedial Investigation, Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific

Unexploded Ordnance Safety Plan Attachments Former 37mm Antitank Range, Parcel 230Q-X and Former Rifle Range, Parcel

149Q. Prepared by IT Corporation, February 2003. JSU Book V539

* Draft Remedial Investigation, Site-Specific Field Sampling Plan, Site-Specific Safety and Health Plan, and Site-Specific

Unexploded Ordnance Safety Plan Attachments Impact Area for Range 30, Parcel 88Q and Former Rifle/Machine Gun Range, Parcel 103Q. Prepared by IT Corporation, February 2003. JSU Book V538

* Draft Focused Feasibility Study Former Chemical Laundry and Motor Pool Area 1500, Parcel 94(7). Prepared by IT Corporation,

February 2003. JSU Book V540

* Final – Revision 1 Baseline Ecological Risk Assessment Problem Formulation and Study Design for the Baines Gap Road Ranges.

Prepared by Shaw Environmental, Inc., April 2003. JSU Book V408

* Final Landfill Gas Investigation Field Sampling Plan, Health and Safety Plan, and Unexploded Ordnance Safety Plan, Landfills and

Fill Areas Parcels 78(6), 79(6), 80(6), 227(7), 126(7), 229(7), and 82(7). Prepared by Shaw Environmental, Inc., May 2003. JSU

Book V567

* Draft Remedial Investigation Site-Specific Field Sampling Plan and Site-Specific Safety and Health Plan Attachments Former

Choccolocco Corridor Ranges: Former Range 40, Parcel 94Q, and Range, Choccolocco Corridor, Parcel 146Q; Former Range 41,

Parcel 95Q and Impact Area, Choccolocco Corridor, Parcel 131Q-X; Former Range 42, Parcel 96Q, range, Choccolocco Corridor,

Parcel 145Q-X, and Impact Area, Choccolocco Corridor, Parcel 148Q-X; and Former Range 43, Parcel 97Q, Range, Choccolocco

Corridor, Parcel 144Q-X, and Impact Area, Choccolocco Corridor, Parcel 147Q-X. Prepared by Shaw Environmental, May 2003.

JSU Book V487

* Results of Well and Spring User Survey North of Landfill No.3, Parcel 80(6). Prepared by Shaw Group, June 2, 2003. Included is

Revision Table 1 dated June 13, 2003. JSU Book V417

* Final Engineering Evaluation/Cost Analysis Alpha Area of the Redevelopment Area. Prepared by Foster Wheeler Environmental Corporation, September 2003. JSU Book V449. Also filed in the sleeve of this document is the Notification of Intent.

* Draft Site-Specific Work Plan Remedial Investigation, Addendum IV Ranges Near Training Area T-24 Alpha Parcels 88(7),

108(7), 112Q, 113Q-X, 123Q, 187(7), 213Q, and 214Q. Prepared by Shaw Environmental, Inc., October 2003. JSU V618

* Report of Finding Training Area T-6 (Naylor Field), Parcel 183(6) and Cane Creek Training Area, Parcel 510-(7), Volume I of II:

Text, Tables, and Figures; and Volume II of II: Appendices A-G. Prepared by Shaw Environmental, January 2004. JSU Books

V467 and V468

* Report of Findings, Training Area T-38, Former Technical Escort Reaction Area, Parcel 186(6), Volume I of III: Text, Tables, and

Figures; Volume II of III: Appendices A-C; and Volume III of III: Appendices D-K. Prepared by Shaw Environmental, February

2004. JSU Books V471, V472, and V473

* Draft Site-Specific Work Plan Supplemental Remedial Investigation Training Area T-5 Sites, Parcels 180(7), 182(7), 511(7),

512(7), 513(7), 514(7), and 516(7). Prepared by Shaw Environmental, February 2004. JSU Book V475

* Report of Findings, Landfill No. 3, Parcel 80(6), Volume I of IV: Text, Tables, and Figures; Volume II of IV: Appendix A;

Volume III of IV: Appendices B through F; and Volume IV of IV: Appendices G and H. Prepared by Shaw Environmental, April

2004. JSU Books V477, V478, V479, and V480

* Final Supplemental RI Results, Range L – Lima Pond, Parcel 204(7). Prepared by Shaw Environmental, Inc., April 26, 2004. JSU

Book V486

* Final Supplemental RI Results for the Old Water Hole – Pelham Range, Parcel 205(7). Prepared by Shaw Environmental, May 3,

2004. JSU Book V488

* Final Site-Specific Work Plan Choccolocco Corridor Ranges. Prepared by Shaw Environmental, May 2004. JSU

Book V489

* Final Addendum to the Final Site-Specific Work Plan Bravo Area, Engineering Evaluation/Cost Analysis Ordnance and Explosive

Response. Prepared by Foster Wheeler Corporation, June 2004. Filed in the sleeve of the Final Site-Specific Work Plan Bravo Area,

Engineering Evaluation/Cost Analysis Ordnance and Explosive Response dated April 2001. JSU Book V227

Page 20: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

20

* Final Sign Installation Report, Choccolocco Corridor Ranges, Parcels 94Q, 95Q, 96Q, and 97Q. Prepared by Shaw Environmental,

Inc., August 19, 2004. JSU Book V495

* Final Remedial Investigation Report, Range K, Former Agent Training Area Parcel 203(7). Volume I of II: Test, Tables and

Figures. Volume II of II: Appendices A through I. Prepared by Shaw Environmental, Inc., August 2004. JSU Books V497 and

V498.

* Final Revision 1 Remedial Investigation Report Range J – Pelham Range, Parcel 202(7) Volumes I and II. Prepared by Shaw

Environmental, September 2004. JSU Books V451 and V452

* Final Site-Specific Work Plan OE Site Characterization for M1.01 Parcel and M3 Miscellaneous Properties on Fort McClellan, AL.

Prepared by Tetra Tech FW, Inc, December 2004. JSU Book V501

* Draft Remedial Investigation Report Training Area T-5 Sites, Parcels 180(7), 182(7), 511(7), 512(7), 513(7), 514(7), and 516(7).

Volume I of III: Text, Tables, and Figures; Volume II of III: Appendices A through E; and Volume III of III: Appendices F through

I. Prepared by Shaw Environmental, Inc., January 2005. JSU Books V577, 578 and 579

* Draft Final Engineering Evaluation/Cost Analysis Bravo Area of the Redevelopment Area Fort McClellan, Alabama. Prepared by Tetra Tech, Inc., July 2006. JSU Book V580

* Final Baseline Ecological Risk Assessment Problem Formulation and Study Design for the Baby Bains Gap Road Ranges.

Prepared by Shaw Environmental, Inc. August 2006. JSU Book V532

* Groundwater Sampling at Ranges Near Training Area T-24A. Prepared by Shaw Environmental, Inc., September 6, 2006. JSU

Book V534

Final SLERA for Ranges Near Training Area T-24A, Parcels 187, 88(6), 108(7)/82Q-X, 112Q, 113Q-X, 213Q, and 214Q. Prepared

by Shaw Environmental, Inc., January 3, 2007. JSU Book V598

* Groundwater Sampling Summary Ranges Near Training Area T-24A Parcels 187(7), 88(6), 108(7)/82Q-X, 112Q, 113Q-X, 213Q,

and 214Q. Prepared by Shaw Environmental, Inc., May 2007. JSU Book V555

* Letter Work Plan for Monitoring Well Installation and Groundwater Sampling at the Skeet Range, parcel 69Q and Bains Gap Road

(BGR) Ranges. Prepared by Shaw Environmental, Inc., October 2007. JSU Book V570

* Final Revision 1 Remedial Investigation Former 81mm Mortar Range, Parcel 137Q-X. Prepared by Shaw Environmental, Inc.,

April 2008. JSU Book V556

Final Baseline Ecological Risk Assessment Problem Formulation and Study Design Former Choccolocco Corridor Ranges. Prepared

by Shaw Environmental, Inc. August 2008. JSU Book V599

Final Baseline Ecological Risk Assessment Problem Formulation and Study Design for the Ranges Near Training Area T-24A.

Prepared by Shaw Environmental, Inc., February 2009. JSU Book V600

Final Engineering Evaluation/Cost Analysis (EE/CA) Iron Mountain Road Addition. Prepared by U.S. Army Corps of Engineers,

Engineering and Support Center, Huntsville, Alabama, July 2008. Also filed in the sleeve of this document are the Notification of

Intent and Public Meeting dated Nov 13, 16, 2008, Notice of Public Meeting dated Dec 4, 7, 2008, and the Notification of Signature

dated June 2009. JSU Book V587

Letter Work Plan for Drum Sampling at Range T-24. Prepared by Shaw Environmental, May 18. 2009. JSU Book V592

Final Remedial Investigation Report Iron Mountain Road Ranges. Skeet Range, Parcel 69Q; Range 19, Parcel 75Q; Range 13, Parcel 71Q; Range 12, Parcel 70Q; Former Rifle Grenade Range at Skeet Range, Parcel 222Q-X; and Former Rifle Grenade Range

North or Washington Ranges, Parcel 221Q-X, Volumes I through IV. Prepared by Shaw Environmental, Inc., May 2009. JSU Book

V594, V595, V596, V597

Letter Work Plan for Monitoring Well Installation and Groundwater Sampling at the Ranges Near Training Area T-24A, Parcels

187(7), 88(6), 108(7)/82Q-X, 112Q, 113Q-X, and 214Q. Prepared by Shaw Environmental, Inc., July 13, 2009. JSU Book V605

Letter Work Plan for Oil/Water Separator Sampling at Range T24A. Prepared by Shaw Environmental, Inc., December 9, 2009.

JSU Book V616

Page 21: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

21

Explosive Site Plan Charlie Area Supplemental MEC Sampling, Fort McClellan, AL. Prepared by U.S. Army Engineering Center,

Huntsville, December 2009. JSU Book V617

Final Remedial Investigation Report, Bains Gap Road Ranges; Range 24 Upper, Parcel 80Q, Range 21, Parcel 77Q, Range 22, Parcel

78Q, Former Mortar Range, Parcel 109Q, and Range 27, Parcel 85Q, Volumes I - IV. Prepared by Shaw Environmental, Inc., April

2009. JSU Books V610, 611, 612, and 613

* Final - Revision 2 Identification of Risk-Based Remedial Goals Iron Mountain Road and Bains Gap Road Ranges. Prepared by

Shaw Environmental, Inc., dated April 2010. JSU Book V651

Final Work Plan Addendum for the Engineering Evaluation/Cost Analysis Additional Sampling at Charlie Area. Prepared by EODT,

May 2010. JSU Book V621

Final Remedial Investigation Report Former Choccolocco Corridor Ranges Parcels 94Q, 95Q, 96Q, 97Q, 131Q-X, 144Q-X, 145Q-X,

146Q-x, 147Q-X, and 148Q-X. Volumes I – V. Prepared by Shaw Environmental, Inc., August 2010. JSU Books V624, V625,

V626, V627 and V628.

Final Site-Specific Work Plan Supplemental RI Sampling at the Baby Bains Gap Road Ranges. Prepared by Shaw Environmental, Inc., January 2011. JSU Book V635

* Final Remedial Investigation Report Ranges Near Training Area T-24A Parcels 187(7), 88(6), 108(7)/82Q-X, 112Q, 113Q-X,

213Q, and 214Q. Volumes I-VI. Prepared by Shaw Environmental, Inc., August 2011. JSU Books V639, V640, V641, V642,

V643, V644

* Final Focused Feasibility Study Former 81mm Mortar Range, Parcel 137Q-X. Prepared by Shaw Environmental, Inc., January

2012. JSU Book V654

* Final Revision 1 Remedial Investigation Report for the Baby Bains Gap Road Ranges Range 18, Parcel 74Q, Range 20, Parcel

76Q-X; Range 23, Parcel 79Q; Range26, Parcel 84Q-X; Range 25, Parcels 83Q and 118Q-X; Range 25 East, Parcel 223Q; Range 28, Parcel 86Q; Area of Further Investigation for Ranges South of Range 25, Parcels 224Q and 226Q; and Probable Impact Area for

Parcel 227Q. Volumes I thru V. Volume I – Text, Tables, and Figures. Volume II –Appendix A through F; Volume III – Appendix

G; Volume IV – Appendix H; and Appendix V – Appendices I through K. Prepared by Shaw Environmental, Inc., September 2012.

JSU Books V655, V656, V657, V658 and V659

Remedial Actions (RA) / Removal Responses (RR)

Final Radiological Remediation of Building 3192 Hot Cell and Grounds and Building 31 'Military Police Museum', Fort McClellan,

Anniston, Alabama. Prepared by Allied Technology Group, December 1996. Volume I – Appendix A-I; Volume II – Appendix J-L;

Volume III – Appendix M-Q; Volume IV – Appendix R-W. Filed in the sleeve of the Volume I is a letter from the U.S. Nuclear

Regulatory Commission, Region II, Atlanta Federal Center, Atlanta, GA, Subject: Termination of License No. 01-02861-0401-

02861-04 (Reference: Control No 257737; Docket No. 030-14759030-14759), dated October 19, 1996. JSU Books V56, V57, V58, V58A and V59

* Final Removal Action Work Plan, Indoor Pistol Ranges at Buildings 141 and 143, (Parcels 16Q and 217Q). Prepared by

International Technology Corporation, January 1999. JSU Book V41

* Parade Ground Geophysical Investigation and Removal. Prepared by Zapata Engineering, P.A., June 1999. JSU Book V104

* Work Plan for Surface to One-Foot Subsurface Ordnance and Explosives Construction Support, proposed Eastern Bypass.

Prepared by EODT, dated July 1999. JSU Book V120

* Final Removal Action Completion Report, Indoor Pistol Ranges at Buildings 141 and 143, (Parcels 16Q and 217Q). Prepared by International Technology Corporation, January 2000. JSU Book V118

* Final Work Plan, Underground Storage Tank (UST) Removals and Closure Reports. Prepared by IT Corporation, July 2000. JSU

Book V137

* Final M2 Parcel Ordnance and Explosives Removal Action Work Plan. Prepared by Foster Wheeler Environmental Corporation,

28 July 2000. JSU Book V139

* Final Explosives Safety Submission, M2 Parcel Ordnance and Explosives Removal Action. Prepared by Foster Wheeler

Environmental Corporation, 11 July 2000. JSU Book V438

Page 22: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

22

* Final Ordnance and Explosives Final Removal Action Report, M2 Parcel. Prepared by Foster Wheeler Environmental Corporation,

29 November 2000. JSU Book V252

* Final Site-Specific Work Plan Ordnance and Explosives Disposal Support. Prepared by Foster Wheeler Environmental

Corporation, May 10, 2001. JSU Book V241

* Final Remedial Work Plan for Former Washrack, Building 1740, Soldiers Chapel Parcel 127(7). Prepared by IT Corporation,

October 2001. JSU Book V442

Explosive Siting Plan, Ordnance and Explosives Disposal Support. Prepared by Foster Wheeler Environmental Corporation, October

11, 2001. JSU Book V289

* Final Removal Report Ordnance and Explosives Surface Clearance for Construction Support, Proposed Eastern Bypass. Prepared

by EODT, October 2001. JSU Book V275

* Final Conventional Explosives Safety Submission Ordnance and Explosive (OE) Removal Action Eastern Bypass. Prepared by

Foster Wheeler Environmental Corporation, October 2001. This binder includes all approval letters, corrections to ESS and Amendments 1 through 8. JSU Book V557

* Final Underground Storage Tank Removal Closure Reports. Prepared by IT Corporation, November 2001. JSU Book V287

* Final M1.01 Parcel Explosives Safety Submission, Ordnance and Explosives Response. Prepared by Foster Wheeler

Environmental Corporation, 12 February 2002. JSU Book V315

* Final Addendum to the July 2000 Work Plan, Underground Storage Tank (UST) Removals and Closure Reports for Removal of

Three USTs (Parcels 24(7), 25(7), and 212(7)) at the Motor Pool Area 3100, Parcel 146(7). Prepared by IT Corporation, October 4,

2002. Filed in sleeve of original document dated July 2000. JSU Book 137

* Final Radiological Status Report for Pelham Range “Burial Mound”. Prepared by Allied Technology Group, Inc., October 2002.

JSU Book V393

* Final Site-Specific Work Plan, Ordnance and Explosives (OE) Removal Action Eastern Bypass Revision 3. Prepared by Foster

Wheeler Environmental Corporation, October 2002. Included in original document is Final Amendment 1 to Revision 3. Prepared

by Foster Wheeler, March 26, 2003. JSU Book V388

* Final Site Specific Final Report M1.01 Parcel and M3 Miscellaneous Property. Prepared by Foster Wheeler Environmental

Corporation, March 2003. JSU Book V403

Final Conventional Explosives Safety Submission Ordnance and Explosives (OE) Removal Action for the Choccolocco Area, U.S.

Fish and Wildlife Land Transfer of Fort McClellan, Alabama. Prepared by Foster Wheeler Environmental Corporation, August 2003. JSU Book V447 Also included are Amendment 1, dated January 2004; Amendment 2, dated August 2005, and Correction 1

to Amendment 2, dated November 2005; Amendment 3, dated December 2008; and Amendment 4, dated June 2009.

* Final Site Specific Work Plan Ordnance and Explosives (OE) Removal Action for the U.S. Fish and Wildlife Land Transfer of Fort

McClellan, Alabama. Prepared by Foster Wheeler Environmental Corporation, September 2003. JSU Book V450

* Geophysical Prove-Out (GPO) Report, Eastern Bypass “Y” Junction, Task Order 0019, Ordnance and Explosive Response.

Prepared by Foster Wheeler Environmental, August 13, 2003. Filed in the sleeve of Final Site-Specific Work Plan. OE Removal

Action Eastern Bypass Revision 3 dated October 2002. JSU Book V388.

* Final Site-Specific Work Plan 3X Scrap Removal Training Area T-38, Former Technical Escort Reaction Area, Parcel 186(6) Training Area T-24A, Former Chemical Munitions Disposal Area, Parcel 187(7). Prepared by Shaw Environmental, Inc., October

2003. JSU Book V453

* Final Conventional Explosives Safety Submission Ordnance and Explosives (OE) Removal Action for the Water Tanks

Construction Sites in the Bravo Area. Prepared by Foster Wheeler Environmental Corporations, November 2003. JSU Book V457

* Final Site-Specific Work Plan, Concrete Monument Installation, Stump Dump, Parcel 82(7). Prepared by Shaw Environmental,

April 13, 2004. JSU Book V482

Page 23: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

23

Final Revision 1 of the Final Site-Specific Work Plan Ordnance and Explosives (OE) Removal Action for the Water Tank

Construction Sites in the Bravo Area. Also includes Final Revision 2 to add the Dog Kennels. Prepared by Foster Wheeler

Environmental Corporation, May 2004. JSU BookV462

* Explosives Safety Submission (ESS) Fort McClellan, Bravo Area, Dog Kennel Sites. Prepared by Huntsville Center Corps of

Engineers, May 2004. JSU Book V585.

* Final Letter Report, Time Critical Removal, Bravo Area Dog Kennels, Ordnance and Explosive Response at Fort McClellan,

Alabama. Prepared by Foster Wheeler, June 2004. JSU Book V494

* Final Site-Specific Work Plan Addendum: 3X Scrap Removal, Training Area T-38, Former Technical Escort Reaction Area,

Parcel 186(6) and Training Area T-24A, Former Chemical Munitions Disposal Area, Parcel 187(7). Prepared by Shaw

Environmental, July 20, 2004. Filed in the sleeve of the Work Plan dated October 2003. JSU Book V453

* Draft Soil Remediation Interim Removal Action Work Plan, Safety and Health Plan, Iron Mountain Road Ranges on ALDOT EBC

Property; Skeet Range, Parcel 69Q; Range 12, Parcel 70Q; Range 13, Parcel 71Q. Prepared by Shaw Environmental, Inc., August

2004. JSU Book V544

* Construction Work Plan Soil Removal and Disposal in Fuel Pipe Trench at the Former POL Point near Bldg 265, Parcel 4.

Prepared by Shaw Environmental, Inc., September 2004. JSU Book V499

* Revised Final Site Specific Work Plan Amendment 2, Eastern Bypass OE Removal Area. Prepared by TetraTech FW, Inc., May

2005. JSU Book V506

* Final Closure Report 3X Scrap Removal, Training Area T-38, Former Technical Escort Reaction Area, Parcel 186(6), Training

Area T-24A, Former Chemical Munitions Disposal Area, Parcel 187(7). Prepared by Shaw Environmental, Inc., June 2005. JSU

Book V507

* Sample Results for Former AST at Range 13, Parcel 176(7). Prepared by Shaw Environmental, Inc., August 16, 2005. JSU Book V511 – This document is filed in the sleeve of the Final Removal Action Iron Mountain Road Ranges Soil Remediation on ALDOT

Eastern Bypass Corridor Property dated March 2006. JSU Book V522

* Final Site Specific Work Plan for MEC Removal Action Along Bains Gap Road. Prepared by TetraTech EC., Inc., December

2005. JSU Book V545

* Letter Work Plan – Range 12 Supplemental Soil Removal Erosion Control. Prepared by Shaw Environmental, Inc., January 24,

2006. JSU Book V520

* Final Removal Action Report Iron Mountain Road Ranges Soil Remediation on ALDOT Eastern Bypass Corridor Property.

Prepared by Shaw Environmental, Inc., March 2006. JSU Book V522. Also filed in the sleeve of this document is the Sampling

Results for Former AST at Range 13, dated August 16, 2005.

* Site Specific Final Report Eastern Bypass OE Removal. Prepared by Foster Wheeler, Revised April 2006. JSU Book V493

* Final Site Specific Final Report Water Tank Construction Sites, Bravo Area. Prepared by Tetra Tech EC, Inc., May 2006. JSU

Book V524

* Final Site Specific Final Report Addendum Construction Debris Removal Area of the Eastern Bypass. Prepared by Tetra Tech EC,

Inc., May 2006. JSU Book V525

* Final Site Specific Final Report Bains Gap Road MEC Removal Action. Prepared by Tetra Tech EC, Inc., July 2006. JSU Book

V546

* Final Letter Report Site Characterization M1.01 Parcel and M3 Miscellaneous Properties, Ordnance and Explosive Response,

November 2006. Prepared by Tetra Tech EC, Inc., November 2006. Filed in the sleeve of the Final Site Specific Final Report M1.01

Parcel and M3 Miscellaneous Property. Prepared by Foster Wheeler Environmental Corporation, March 2003. JSU Book V403

* Letter Report TO20 Phase 1, Fort McClellan Alabama (Installation of Gates and Barriers in the Charlie Area). Prepared by Tetra

Tech EC, Inc., April 9, 2007. JSU Book V552

* Final Site Specific Final Report Eastern Bypass “Y” Area Junction. Prepared by Foster Wheeler Environmental Corporation, May

2007. JSU Book V563. Also filed in the sleeve of this document is the removal action notice dated February 3, 2003.

Page 24: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

24

* Final Site Specific Final Report FWC Land Transfer Area (Roads, Firebreaks, and High Use Areas). Prepared by Tetra Tech FW,

Inc., December 2007. JSU Book V573

Final Work Plan Remedial Action in Charlie Area for Four Lead Removal Sites. Prepared by Tetra Tech EC, Inc., February 2009.

JSU Book V591. Filed in the sleeve of this document is the Final Work Plan Amendment dated October 2009.

Final Work Plan Addendum 7. Construct Support for Iron Mountain Road Extension. Prepared by US Army Environmental, Inc., 8

June 2009. JSU Book V603 Also filed in the sleeve of this document on CD (no hardcopy available) is a copy of the Final Work

Plan MEC Support at South Atlantic Division FUDS within South Atlantic Division Geographic Area, dated 11 January 2007.

Final Interim Removal Action Work Plan Range 20 Soil Remediation on USFWS Property. Prepared by Shaw Environmental, July

2009. Filed in the sleeve of this document is the Addendum to the Final Interim Removal Action Work Plan, Range 20 Soil

Remediation on USFWS Property, dated August 19, 2009. JSU 601

Site Specific Final Report Construction Support for Iron Mountain Road Extension, Fort McClellan, AL. Prepared by USA

Environmental, Inc., October 2009. JSU Book V607

Letter Work Plan – Range 12 Supplemental Soil Removal and Erosion Control. Prepared by Shaw Environmental, Inc., May 26, 2009. JSU Book V604

Range 12 Supplemental Soil Removal and Erosion Control Report. Prepared by Shaw Environmental, Inc., August 2009. JSU Book

V614

Stormwater Erosion Control Plan for Range 20. Prepared by Shaw Environmental, Inc., August 26, 2010. JSU Book V632

Site Specific Final Report Remedial Action at Selected Sites within the Charlie Area. Prepared by Tetra Tech EC, Inc., April 2011

Rev 01. JSU Book V636

* Final Interim Removal Action Report Range 20, Infiltration Course, Parcel 76 Q-X Soil Remediation on U.S. Fish and Wildlife Service Property. Prepared by Shaw Environmental, Inc., August 2011. JSU Book V638

* Final Performance-Based Quality Assurance Surveillance Plan (QASP) for Munitions and Explosives of Concern (MEC) Removal

Action Charlie Area. Prepared by UXB-KERMRON Remediation Services, LLC, August 30, 2012. JSU Book V665

Decision Documents (DD) / Records of Decision (ROD) / Action Memorandums (AM) -- NOTE: (DDs are filed within the Site

Investigation Report binder; RODs are filed within the sleeve of the Feasibility Study binder; AMs are filed within the sleeve of

the Engineering Evaluation/Cost Analysis binder.)

Final Record of Decision for the Environmental Statement for the Disposal and Reuse of Fort McClellan, AL, dated June 1999, Filed

with the Environmental Impact Statement, Disposal and Reuse dtd August 1998. JSU Book V66

* Final Action Memorandum for the M-2 Parcel. Prepared by U.S. Engineering and Support Center, Huntsville, AL, August 4, 2000.

JSU Book V422. Filed in the sleeve of this document are the Addenda to the Action Memorandum, Notification of Intent and

ADEM/EPA concurrence letters.

Final Decision Document for the Former Fire Training Pit, Parcels 77(7), 7(7), and 170 (7). Prepared by IT Corporation, September

2000. JSU Book V148

Final Decision Document for Former Printing Plant, Building 144, Parcel 171(7). Prepared by IT Corporation, October 2000. JSU

Book V157

Final Decision Document for the Former Printing Plant, Building 143, Basement, Parcel 138(7) and the UST at the Administration Building, Building 143, Parcel 37(7). Prepared by IT Corporation, October 2000. JSU Book V152

Final Decision Document for the Range 16 AST, Parcel 177(7). Prepared by IT Corporation, October 2000. JSU Book V154

Final Decision Document for the Former Transformer Near Building 3798, Parcel, 57Q. Prepared by IT Corporation, October 2000.

JSU Book V155

Final Decision Document for the Old Hospital, Parcel 95(7). Prepared by IT Corporation, October 2000. JSU Book V163

Final Decision Document for Area M2, Subsection of Area 45. Prepared by IT Corporation, November 2000. JSU Book V164

Page 25: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

25

Final Decision Document for the Building South of Reilly Airfield, Parcel 501(7). Prepared by IT Corporation, November 2000.

JSU Book V165

Final Decision Document for Trenches Near Range 20 Firing Line, Parcels 239(7) and 240(7). Prepared by IT Corporation,

November 2000. JSU Book V167

Final Decision Document for the Former Smoke Area, Choccolocco Corridor, Parcel 107(7). Prepared by IT Corporation, December

2000. JSU Book V178

Final Decision Document for the Former Printing Plant, Bldg 3183, Parcel 162(7), Prepared by IT Corporation, January 2001. JSU

Book V180

Final Decision Document for the Former Quartermaster's Gasoline Storage Area, Parcel 130(7). Prepared by IT Corporation,

January 2001. JSU Book V185

Final Decision Document for the Former Printing Plant, Building 2051, Parcel 173(7). Prepared by IT Corporation, January 2001.

JSU Book V183

Final Decision Document for the Old Incinerator Building 5710, Parcel 125(7). Prepared by IT Corporation, January 2001. JSU

Book V186

Final Decision Document for the Ammunition Supply Point and Building 4416, Parcels 197(7) and 199(7). Prepared by IT

Corporation, February 2001. JSU Book V444

Final Decision Document for the Former Smoke Area R, Parcel 105(6). Prepared by IT Corporation, February 2001. JSU Book

V197

* Final Decision Document for the Former Indoor Pistol Ranges at Building 141, Parcel 16(Q). Prepared by IT Corporation,

February 2001 and Final Decision Document for the Former Indoor Pistol Ranges at Building 143, Parcel 217(Q). Prepared by IT Corporation, February 2001. Both are located in Final Removal Action Completion Report, January 2000. JSU Book V118

Final Decision Document for the Directorate of Engineering and Housing (DEH) Compound Parcels 64(7) and 1(7). Prepared by IT

Corporation, February 2001. JSU Book V191

Final Decision Document for the Former Smoke Area, South Slope of Morgan Mountain, Parcel 159(7). Prepared by IT

Corporation, February 2001. JSU Book V192

Final Decision Document for the Former Motor Pool Area 1800/1900, Parcels 145(7) and 52(7) and the UST at the Bowling Alley,

Building 1928, Parcel 48(7). Prepared by IT Corporation, February 2001. JSU Book V189

Final Decision Document for the DRMO Area, Parcel 85(7). Prepared by IT Corporation, February 2001. JSU Book V188

Final Decision Document for the Motor Pool Area 600 Parcels 149(7) and 136(7). Prepared by IT Corporation, February 2001. JSU

Book V198

Final Decision Document for the Former Personnel Decontamination Station at Building 3185, Parcel 179(7). Prepared by IT

Corporation, February 2001. JSU Book V196

Final Decision Document for the Former Gas Mask Test Chambers, Parcels 195(7), 196(7), and 198(7). Prepared by IT Corporation,

February 2001. JSU Book V193

Final Decision Document for Bulk Storage Area, Building 296, Parcel 60(6). Prepared by IT Corporation, March 200l. JSU Book V201

Final Decision Document for Former Motor Pool Area 2000, Parcels 144(7) and 137(7). Prepared by IT Corporation, March 2001.

JSU Book V211

Final Decision Document for Former Fuel Yard, Parcel 131(7). Prepared by IT Corporation, March 200l. JSU Book V204

Final Decision Document for Former Motor Pool Area 3100, 23rd Street, Parcels 147(7), 27(7), 28(7), and 72(7). Prepared by IT

Corporation, March 2001. JSU Book V205

Page 26: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

26

Final Decision Document for the Small Weapons Storage and Cleaning Compound, Building 1378, Parcel 174(7). Prepared by IT

Corporation, March 2001. JSU Book V216

Final Decision Document for the Former Fog Oil Storage Area West of the Skeet Range, Parcel 122(7). Prepared by IT Corporation,

March 2001. JSU Book V199

Final Decision Document for the Former Smoke Area BVZ, Parcel 124(7). Prepared by IT Corporation, March 2001. JSU Book

V200

Final Decision Document for Former Smoke Area S, Parcel 106(6). Prepared by IT Corporation, March 2001. JSU Book V208

Final Decision Document for Former Motor Pool Area 1000, Parcels 150(7), 13(7), and 139(7). Prepared by IT Corporation, March

2001. JSU Book V206

Final Decision Document for the Drain Field (Building T-459), Parcel 236(Q). Prepared by IT Corporation, March 2001. JSU Book

V207

Final Decision Document for the Underground Storage Tank (UST) Parcels. Prepared by IT Corporation, April 2001. Located in the UST Closure Assessment Report dated February 2001. JSU Book V190

Final Decision Document for the Trenches West of Remount Creek, Parcel 228(7). Prepared by IT Corporation, April 2001. JSU

Book V221

Final Decision Document for the Former Printing Plant, Building 1060 Parcel 172(7). Prepared by IT Corporation, April 2001. JSU

Book V237

Final Decision Document for the Cleared Area with Mound, Choccolocco Corridor, Parcel 237 (7). Prepared by IT Corporation,

April 2001. JSU Book V222

Final Decision Document for the Ground Scar with Trenches at Driving Course, Parcel 200(7). Prepared by IT Corporation, April

2001. JSU Book V217

Final Decision Document for Former Motor Pool Area 800, Parcels 164(7), 11(7), 12(7), and 68(7). Prepared by IT Corporation,

April 2001. JSU Book V220

Final Decision Document for Motor Pool Area 1600, Parcels 163(7), 17(7), 19(7), 71(7), 503(7), and 504(7). Prepared by IT

Corporation, April 2001. JSU Book V219

Final Decision Document for Motor Pool Area 1300, Parcel 143(7). Prepared by IT Corporation, May 2001. JSU Book V209

Final Decision Document for the Washrack, Building 1224, Parcel 168(7). Prepared by IT Corporation, May 2001. JSU Book V203

Final Decision Document for Former Motor Pool Area 1300, 4th Avenue Parcels 148(7) and 16(7). Prepared by IT Corporation, May

2001. JSU Book V212

Final Decision Document for the Former Incinerators, Building 4428 and 4430, Parcel 96(7). Prepared by IT Corporation, June

2001. JSU Book V256

Final Decision Document for Boiler Plant No. 1, Building 3176, Parcels 26(7) and 89(7). Prepared by IT Corporation, June 2001.

JSU Book V250

Final Decision Document for Boiler Plant No. 3, Building 1076, Parcels 14(7) and 235(7). Prepared by IT Corporation, June 2001. JSU Book V231

Final Decision Document for the Chemical School Laboratory Sump, Bldg 2281 and 2282, Parcels 90(7) and 225(7). Prepared by IT

Corporation, June 2001. JSU Book V248

Final Decision Document for Boiler Plant No. 2, Building 2278, Parcels 23(7) and 226(7). Prepared by IT Corporation, June 2001.

JSU Book V251

Final Decision Document for the Ground Scar South of Building 3134, Parcel 153(7). Prepared by IT Corporation, June 2001. JSU

Book V244

Page 27: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

27

Final Decision Document for the Autocraft Shop/Former DPDO and Former Motor Pool Area 2100 North of DPDO, Parcel 100(7),

20(7), 47(7), 152(7), and 241(7). Prepared by IT Corporation, June 2001. JSU Book V242

Final Decision Document for Boiler Plant No. 4, Building 1876, Parcels 101(7) and 236(7). Prepared by IT Corporation, June 2001.

JSU Book V243

Final Decision Document for the Golf Course, Parcels 178(7), 83(7), and 141(7). Prepared by IT Corporation, June 2001. JSU Book

V233

Final Decision Document for Former Sandel Flamethrower Range, Parcel 97(7). Prepared by IT Corporation, July 2001. JSU Book

V247

Final Decision Document for the Ground Scar at South End of Confidence Course, Parcel 158(7). Prepared by IT Corporation, July

2001. JSU Book V246

Final Decision Document for the Ground Scar Near the Ammunition Supply Point, Parcel 156(7). Prepared by IT Corporation, July

2001. JSU Book V261

Final Decision Document for the 11th Chemical Motor Pool Area, Parcels 29(7), 30(7), and 74(7). Prepared by IT Corporation, July

2001. JSU Book V260

* Final Action Memorandum for Eastern Bypass dated August 2, 2001 with the Explanation of Significant Differences Eastern

Bypass, dated March 11, 2002 and the Explanation of Significant Differences Withdrawal of Requirement to Post Warning Signs

along the Eastern Bypass Ordnance and Explosives Site – 2 dated October 5, 2007. JSU Book V277. Also filed with this document

are the Notification of Intent, and notices for the two Explanations of Significant Difference.

Final Decision Document for the Contractor Laydown Area and Former Tar Plant, Parcels 86(7), 99(7), and 32(7). Prepared by IT

Corporation, August 2001. JSU Book V274

Final Decision Document for the Impact Area Near Stump Dump, Parcel 135Q-X. Prepared by IT Corporation, August 2001. JSU

Book V273

Final Decision Document for the Hand Grenade Range, Range 32, Parcel 90Q-X. Prepared by IT Corporation, August 2001. JSU

Book V271

Final Decision Document for the Former Waste Chemical Storage Area, Parcel 87(7), 10 (7), and 135(7). Prepared by IT

Corporation, September 2001. JSU Book V230

Final Decision Document for the Trenches West of Iron Mountain Road, Parcel 500(7). Prepared by IT Corporation, September

2001. JSU Book V281

Final Decision Document for the Training Aids Building (Building 267), Parcel 166(7). Prepared by IT Corporation, September

2001. JSU Book V282

Final Decision Document for the Former Ordnance Motor Repair Area Parcels 75(7), 5(7), 6(7), 41(7), and 42(7). Prepared by IT

Corporation, September 2001. JSU Book V283

Final Decision Document for the Ground Scar with Small Pit North of Landfill No. 3 Parcel 155(7). Prepared by IT Corporation,

November 2001. JSU Book V290

Final Revision 1 Decision Document for the Ground Scar South of the Autocraft Shop, Parcel 157(7). Prepared by IT Corporation,

January 2002. JSU Book V311

Final Revision 1 Decision Document for the Ground Scar with Trenches at Littlebrant Drive Parcel 154(7). Prepared by IT

Corporation, January 2002. JSU Book V301

* Final Action Memorandum for the M1.01 Parcel dated January 18, 2002. JSU Book V285. Filed in the sleeve of this document is

the Notification of Intent.

Final Decision Document for Range 24 Lower, Parcel 81Q. Prepared by IT Corporation, March 2002. JSU Book V340

Final Decision Document for the Forestry Compound – Pelham Range, Parcel 84(7). Prepared by IT Corporation, March 2002. JSU

Book V331

Page 28: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

28

Final Decision Document for the Former Personnel and Equipment Decontamination Station, Parcel 206(7). Prepared by IT

Corporation, March 2002. JSU Book V339

* Final Decision Document for Possible Range, Parcel 237Q-X and Impact Area, Parcel 238Q-X, Choccolocco Corridor. Prepared

by IT Corporation, April 25, 2002. JSU Book V345

* Final Decision Document for the Range 4A Fog Oil Storage Area, Parcel 123(6). Prepared by IT Corporation, May 2002. JSU

Book V356

* Final Decision Document for the Artillery and Mortar Impact Areas South of Bains Gap Road Parcels 138Q-X, 139Q-X, 140Q-X,

141Q-X, and 142Q-X. Prepared by IT Corporation, May 2002. JSU Book V366

* Final Decision Document for Anniston Army Depot, Former Shell Tapping Area Parcel 208(7). Prepared by IT Corporation, May

2002. JSU Book V369

Final Decision Document for Ranges South of Range 25, Parcel 224Q, 26Q, and 227Q. Prepared by IT Corporation, June 2002. JSU

Book V375

* Final Decision Document for the Agent ID Area, Parcel 509(7), Fort McClellan, Alabama. Prepared by IT Corporation, June 2002.

JSU Book V373

* Final Decision Document for Former Probable Range, Parcel 247Q-X. Prepared by IT Corporation, June 2002. JSU Book V372

Action Memorandum Chemical Warfare Materiel (CWM) Engineering Evaluation and Cost Analysis (EE/CA), October 18, 2002.

JSU Book 371

Final, Revision 3, Decision Document for the GSA Warehouse Area, Parcels 151(7), 2(7), 3(7), 4(7), 67(7), 91(7), 111(7), 128(7),

129(7), and 238(7). Prepared by IT Corporation, December 2002. JSU Book V313

* Final Decision Document for the Former Rifle/Machine Gun Range, Parcel 99Q. Prepared by IT Corporation, March 2003. JSU

Book V404

* Final Decision Document for Old Toxic Training Area Parcel 188(7). Prepared by Shaw Environmental, Inc., March 2003. JSU

Book V405

* Final Decision Document for the Impact Area, Parcel 136Q-X. Prepared by Shaw Environmental, Inc., March 2003. JSU Book

V406

* Final Decision Document, CBR Proficiency Area, Parcel 517(7). Prepared by Shaw Environmental, July 2003. JSU Book V446

* Action Memorandum for the Storage and Destruction of a Glass Ampoule from the K995 Chemical Agent Identification Set

(CAIS), Former Training Area (T38), December 2003. JSU Book V461. Also filed in the sleeve of this document is the Notification

of Action.

* Final Decision Document, Range 23A, Multipurpose Range Parcel 109(7)/152Q-X. Prepared by Shaw Environmental, January

2004. JSU Book V469

* Final Decision Document for the Water Supply Wells at Pelham Range. Prepared by Shaw Environmental, May 2004. JSU Book

V412

* Final Decision Document Old Water Hole – Pelham Range Parcel 205(7). Prepared by Shaw Environmental, May 2004. JSU Book V488

* Final Decision Document Range, Choccolocco Corridor, Parcel 143Q. Prepared by Shaw Environmental, Inc., June 2004. JSU

Book V491

* Final Decision Document Fill Area West of Range 19 Parcel 233(7). Prepared by Shaw Environmental, Inc., July 2005. JSU Book

V508

Final Decision Document Former Washrack, Building 1740, Soldier’s Chapel Parcel 127(7). Prepared by Shaw Environmental, July

2005. JSU Book V500

Page 29: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

29

Final Decision Document Former Motor Pool Area 3100, Parcels 146(7), 212(7), 24(7), 25(7), and 73(7). Prepared by Shaw

Environmental, July 2005. JSU Book V504

Final Decision Document Ranges West of Iron Mountain Road Parcels 73Q-X, 91Q-X, 115Q, 116Q-X, 117Q-X, 129Q-X, 151Q,

181(7), 194(7)/518(7), 200Q, 201Q, 228Q, 229Q-X, 231Q, 232Q-X., Washington Tank Range, and 1950 Rocket Launcher Range.

Prepared by Shaw Environmental, Inc., August 2005. JSU Book V512

* Final Decision Document Former Decontamination Complex Parcels 93(7), 46(7), 70(7), and 140(7). Prepared by Shaw

Environmental, Inc., August 2005. JSU Book V463

* Final Decision Document Former Gas Stations at Motor Pool Area 1500 Parcels 132(7), 133(7), and 134(7). Prepared by Shaw

Environmental, Inc., August 2005. Filed in the sleeve of the Final Underground Storage Tank Removal Closure Reports. Prepared

by IT Corporation, November 2001. JSU Book V287

* Final Decision Document Former Rifle/Machine Gun Range, Parcel 104Q. Prepared by Shaw Environmental, Inc., August 2005.

JSU Book V516

* Final Decision Document Former Rifle/Machine Gun Ranges (Firing Line Areas) Parcels 100Q and 101Q. Prepared by Shaw Environmental, Inc., September 2005. JSU Book V517

* Final Decision Document Portions of Iron Mountain Road Ranges on ALDOT Eastern Bypass Corridor Property. Prepared by

Shaw Environmental, Inc., June 2006. JSU Book V522

* Final Decision Document for AWWSB Tank Sites Near Baby Bains Gap Road Ranges. Prepared by Shaw Environmental, Inc.,

July 17, 2006. JSU Book V528

* Final Decision Document for Range 31: Weapons Demonstration Range, Parcel 89Q-X and Former Defendam Field Firing Range

No. 2, Parcel 215Q. Prepared by Shaw Environmental, Inc., August 2006. JSU Book V533

* Final Decision Document Fill Area at Range 30, Parcel 231(7). Prepared by Shaw Environmental, Inc, October 2006. JSU Book

V521

* Final Decision Document Range 30, Confidence Course (Firing Line), Parcel 88Q; Former Rifle/Machine Gun Range, Parcel

102Q; Former Grenade Range/Area, Parcel 106Q-X; Tank Sub-Caliber/Carbine Transition/Machine Gun Range (OA-08); Grenade

Court (OA-15); Unnamed Small Arms Range. Prepared by Shaw Environmental, Inc., October 2006. JSU Book V547

* Final Decision Document Stump Dump, Parcel 82(7). Prepared by Shaw Environmental, Inc., October 2006. JSU Book V548

* Final Decision Document Former Rifle/Machine Gun Range, Parcel 98Q. Prepared by Shaw Environmental, Inc., October 2006.

JSU Book V581

* Final Decision Document for Former Mortar Firing Point, Parcel 105Q-X and Former Defendam Range (Eastern), Parcel 225Q.

Prepared by Shaw Environmental, Inc., April 2007. JSU Book V582

Action Memorandum for Iron Mountain Road Addition. Prepared by U.S. Army Corps of Engineers Engineering and Support

Center, Huntsville, AL, May 2009. JSU Book V587

* Final Rev 1 Decision Document for the Former Tank Ranges, Parcels 92Q-X and 93Q-X, Former Grenade Range, Parcel 107Q-X,

and Impact Areas, Parcels 133Q-X and 134Q-X. Prepared by Shaw Environmental, Inc., March 2012. JSU Book V584

Resource Conservation and Recovery Act (RCRA) Documents

* Closure Certification for Interim Status Storage Facility. Prepared by Department of Environmental Management, July 16, 1996.

JSU Book V646

* Sampling and Analysis Plan for Open Burn and Open Detonation Unit, Fort McClellan, Pelham Range, Alabama. Prepared by

URS Group, July 2001. JSU Book V258

* Site-Specific Health and Safety Plan for the Open Burn and Open Detonation Units, Fort McClellan, Pelham Range, Alabama.

Prepared by URS Group, July 2001. JSU Book V262

* Quality Assurance Project Plan for the Open Burn Detonation Units, Fort McClellan, Pelham Range, Alabama. Prepared by URS

Group, July 2001. JSU Book V259

Page 30: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

30

* Closure Report for Open Burn and Open Detonation Unit, Fort McClellan, Alabama. Prepared by URS Group, August 2002. JSU

Book V384

Site Closeout Documents

* Letter Work Plan for Monitoring Well Abandonment at Multiple Sites at Fort McClellan. Prepared by Shaw Environmental, Inc.,

July 12, 2006. JSU Book V527

* Monitoring Well Abandonment Report, Multiple Sites. Prepared by Shaw Environmental, Inc., August 2006. JSU Book V530

* Letter Work Plan for Monitoring Well Abandonment at the Stump Dump Parcel 82(7). Prepared by Shaw Environmental, Inc.,

August 31, 2006. JSU Book V531

* Monitoring Well Abandonment Report for Stump Dump, Parcel 82(7). Prepared by Shaw Environmental, Inc., October 2006. JSU

Book V535

* Letter Work Plan for Monitoring Well Abandonment At Multiple Sites at Fort McClellan (Revision 1). Prepared by Shaw Environmental, Inc., October 24, 2006. JSU Book V549

* Monitoring Well Abandonment Report Multiple Sites at Fort McClellan. Prepared by Shaw Environmental, Inc., May 2007. JSU

Book V554

* Statement of Clearance Ordnance and Explosives of the Eastern Bypass “Y” Area Junction. Prepared by Corps of Engineers,

Huntsville Center, September 2007. JSU Book V569

* Final First Five-Year Review Report GSA Warehouse Area, Parcels 151(4), 2(4), 3(4), 4(4), 67(4), 69(4), 91(4), 111(4), 128(4),

129(4), and 238(4). Prepared by Shaw Environmental, Inc., October 2009. Also in the sleeve of this document are Notice of Public

Meeting and a Notice of Public Review. JSU Book V606

Final Five-Year Review Report. Prepared by U.S. Army Corps of Engineers, January 2010. Also in the sleeve of this document is

the Notice of Public Review. JSU Book V620

Letters for Administrative Closure of Mounded Material West of Range 19, Parcel 232(7) and Trenches at Range 19, Parcel 234(7).

Prepared by U.S. Army Garrison, September 17, 2001. JSU Book V633

* Final Rev 2 Five-Year Review Preliminary Site Analysis and Work Plan. Prepared by UXB-KEMRON Remediation Services,

LLC, August 28, 2012. JSU Book V664

Community Relations

* Community Relations Plan, Fort McClellan, Alabama. Prepared by J. McKinney Associates for Reisz Engineers, Anniston,

Alabama. Revised January 2000. JSU Book V392

Restoration Advisory Board

* Minutes

1996 - May, June, July, August, September, October, November.

1997 - January, February, March, April, May, June, July, August, September, October, November.

1998 - January, February, March, April, May, June, July, August, September, October.

1999 - January, February, March, April, May, June, July, August, September, October, November.

2000 - January, February, March, April, May, June, July, August, September, October, November. 2001 - January, February, March, April, May, June, July, August, September, October, November.

2002 - January, February, March, April, May, June, July, August, September, November.

2003 - January, February, March, April, May, June, July, August, September, October, November.

2004 - January, April, July, October.

2005 - January, April, July, October.

2006 – January, April, July, October.

2007 – January, April, July, October.

2008 - January, April, July, October.

2009 – January, April, July, October.

Page 31: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

31

2010 – January, April, July, October.

2011 - January meeting was cancelled due to winter storm, no minutes available; April; July meeting was cancelled, no transcript

available; October

2012 – January, April

* Transcripts 1996 - May, June, July, August, September, October, November.

1997 - January, February, March, April, May, June, July, August, September, October, November.

1998 - January, February, March, April, May, June, July, August, September, October, November.

1999 - January, February, March, April, May, June, July, August, September, October, November.

2000 - February, March, April, May, June, July, August, September, October, November.

2001 - January, February, March, April, May, June, July, August, September, October, November.

2002 - January, February, March, April, May, June, July, August, September, October, November.

2003 - January, February, March, April, May, June, July, August, September, October, November.

2004 - January, April, July, October.

2005 - January, April, July, October.

2006 - January, April, July, October.

2007 – January, April, July, October. 2008 – January, April, July, October.

2009 – January, April, July, October.

2010 – January, April, July, October

2011 – January meeting was cancelled due to winter storm, no transcript available; April; July meeting was cancelled, no transcript

available; no transcript for October (did not have court reporter)

2012 – January, April

Land Use Control Assurance Plan (LUCAP)

* Memorandum of Agreement (MOA), Land Use Control Assurance Plan (LUCAP). Prepared by U.S. Army, December 12, 2000.

JSU Book V276

* BRAC Cleanup Team (BCT) Meeting Minutes -

1997 - September 23-24, October 29-30, November 19-20, December 18-19

1998 - January 22-23, February 18-19, March 26-27, June 2-5, August 5-6, September 16-17, October 21-23, December 16-17

1999 - January 20-21, February 23-24, March 18-19, April 14-15, May 18-19, June 22-23, September 14-15, November 16

2000 - March 21-22, April 25-26, May 17-18, June 28-29, August 1-2, September 6-7, October 24-25, November 14 15, December

5-6

2001 - January 10-11, February 5–6, February 13-14, March 27, May 24, June 27-28, July 17-18, August 21-23, September 19-20,

October 22-24, December 5-6

2002 - February 20-21, April 16-18, May 21-22, June 5-6, July 17-18, August 20-21, September 18-19, October 16-17, November

19-20 2003 - January 15-16, February 11-12, March 24-26, April 22-23, June 12, July 23, September 3

2004 – January 7-8, 2004, February 17-18, March 3 and 8, April 27, May 25, August 11-12, September 28, October 28

2005 – January 25

2006 – February 14-16, September 14

2007 – February 8, May 9-10, November 7, 2007

2008 – May 13-14, August 12-14, October 28-29, December 11-12

2009 – October 8

Finding of Suitability to Transfer (FOST) / Findings of Suitability for Early Transfer (FOSET) / Finding of Suitability to

Lease (FOSL) / Environmental Condition of Property (ECOP) Documents

Final Finding of Suitability to Transfer (FOST), Building 69, Fire Station, July 29, 1999. JSU Book V110. Also filed in the sleeve

of this document is the Notification of Intent.

Final Finding of Suitability to Lease (FOSL), Parks and Recreation, August 1999. JSU Book V106. Also filed in the sleeve of this

document is ADEM’s concurrence letter.

Final Finding of Suitability to Transfer (FOST), Waste Water Treatment Plant Parcel 217(1) dated November 30, 1999. JSU Book

V121. Also filed in the sleeve of this document are the Notifications of Intent and Signature.

* Final Finding of Suitability to Lease (FOSL), JPA Master Lease, Volumes I and II, dated January 6, 2000. JSU Books V114 and

V115. Also filed in the sleeve of this document is the Notification of Signature and ADEM’s concurrence letter.

Page 32: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

32

Final Finding of Suitability to Transfer (FOST), Credit Union Building 1122 and ATM, dated April 2000. JSU Book V127. Also

filed in the sleeve of this document are Notifications of Intent/Signature and ADEM/EPA concurrence letters.

Final Findings of Suitability to Lease (FOSL), Veterinary Facility, Building 250 and 254. Addition to Master lease April 2000. JSU

Book V126. Also filed in the sleeve of this document is the Notification of Signature and ADEM/EPA concurrence letters.

Final Finding of Suitability to Transfer (FOST), JPA E1 Transfer, Volumes I and II, June 2000. JSU Books V128 and 129. Also

filed in the sleeve of Volume I of this report are Notifications of Intent/Signature and ADEM and EPA concurrence letters.

Final Environmental Condition of Property (ECOP), Former Noble Army Community Hospital Complex, November 2000. JSU

Book V239

Final Findings of Suitability to Transfer (FOST), JPA E1.13.501(3) Transfer, December 2000. JSU Book V170. Also filed in the

sleeve of this document are Notifications of Intent/Signature and ADEM/EPA concurrence letters.

Final Findings of Suitability to Transfer (FOST), JPA E2 Transfer, December 2000. JSU Book V182. Also filed in the sleeve of this

document are Notifications of Intent/Signature.

Final Findings of Suitability to Transfer (FOST), JPA E7 Transfer, December 2000. JSU Book V171. Also filed in the sleeve of

this document are Notifications of Intent/Signature and ADEM/EPA concurrence letters.

Final Environmental Condition of Property (ECOP), Department of Justice Center for Domestic Preparedness, January 2001. JSU

Book V253

Final Findings of Suitability to Transfer (FOST), Eastern Bypass Tract No. 1, March 2001. JSU Book V226. Also filed in the sleeve

of this document are Notifications of Intent/Signature and ADEM and EPA concurrence letters.

Final Findings of Suitability to Transfer (FOST), SUPERFOST 1, January 2002. JSU Book V288. Also filed in the sleeve of this document are Notifications of Intent/Signature.

Final Findings of Suitability to Transfer (FOST), Parks and Recreation, January 2002. JSU Book V291. Also filed in the sleeve of

this document are Notifications of Intent/Signature.

Final Findings of Suitability to Transfer (FOST), SUPERFOST II, October 2002. JSU Book V379. Also filed in the sleeve of this

document are Notifications of Intent/Signature.

Final Environmental Condition of Property (ECOP), U.S. Fish and Wildlife Service, Mountain Long Leaf National Wildlife Refuge,

April 2003. JSU Book V407. Also filed in the sleeve of this document are Notifications of Intent/Signature.

Final Findings of Suitability to Transfer (FOST), Eastern Bypass Tract No. 2 and the Western Port of Eastern Bypass Tract No. 3, July 2003. JSU Book V401. Also filed in the sleeve of this document are Notifications of Intent/Signature.

Final Findings of Suitability to Transfer (FOST), SUPERFOST No. 3, July 2003. JSU Book V428. Also filed in the sleeve of this

document are the Notifications of Intent/Signature.

Final Findings of Suitability to Transfer (FOST), GSA Warehouse and Reilly Lake Areas, August 2003. JSU Book V427. Also filed

in the sleeve of this document are Notifications of Intent/Signature.

Final Findings of Suitability for Early Transfer (FOSET), September 2003. JSU Book V448. Also in the sleeve of this document are

Notifications of Intent/Signature.

Final Findings of Suitability to Transfer (FOST), Highway 21, April 2004. JSU Book V474. Also filed in the sleeve of this

document is the Notification of Intent.

Final Finding of Suitability to Transfer (FOST), Water Tank Sites, November 2007. JSU Book V553. Also filed in the sleeve of this

document are Notifications of Intent/Signature and Amendment 1.

Final Finding of Suitability to Transfer (FOST), Eastern Bypass-Eastern Portion of Tract No. 3, October 2008. JSU Book V588.

Also filed in the sleeve of this document are Notifications of Intent/Signature and Amendment 1 to the FOST dated December 2009.

Final Finding of Suitability to Transfer (FOST) Eastern Bypass-Iron Mountain Road Addition, January 2011. Also filed in the

sleeve of this document are Notification of Intent/Signature. JSU Book V608

Page 33: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

33

Miscellaneous

U.S. Army Environmental Center, Final Report, Hazard Ranking System Scoring Results. Prepared by ERMPMC, December 1995.

JSU Book V40

Draft Report, Endangered Species Management Plan for Fort McClellan, AL. Prepared by B. William Garland, Directorate of

Environment, January 22, 1996. JSU Book V89

* Federal Facility Notification and Coordination Letters with Natural Resource Trustees Fort McClellan, AL, dated April 1998. JSU

Book V647

Programmatic Agreement among the U.S. Army and the Alabama State Historic Preservation Officer, and Advisory Council on

Historic Preservation for the Closure and Disposal of Fort McClellan, Alabama, 1998. Included are the annual reports for calendar

year 1999, 2000, 2001, 2002, and 2003. JSU Book V323

Biological Assessment: Disposal and Reuse of Fort McClellan, Alabama. Prepared by 3D/International, Inc, April 1998. JSU Book

V87

Integrated Natural Resource Management Plan, 1998-2002. Prepared by Reisz Engineering & Gene Stout and Associates, October 1,

1998. JSU Book V90

Restoration of POW Murals, Remington Hall, Building 51. Prepared by Reisz Engineers, Huntsville, AL, Contract No. DABT02-96-

D-0005, Delivery Order 0038, March 1999. JSU Book V112

Final Site-Specific Work Plan for the Lead-Based Paint Risk Assessment. Prepared by IT Corporation, March 2000. JSU Book

V122

Historic Context Study: World War II and Cold War Era Buildings and Structures. Prepared by New South Associates, Inc., May 5, 2000. JSU Book V418

Final Lead-Based Paint Surveys and Risk Assessments (Phase I). Prepared by IT Corporation, January 2001. JSU Book V187

Final Lead-Based Paint Risk Assessment (Phase II). Prepared by IT Corporation, February 2001. JSU Book V184

* Correspondence Regarding Analytical Results from Groundwater Supply Wells Located in the Surrounding Community Fort

McClellan, AL, dated May 2001. JSU Book V648

Final Base Realignment and Closure Act Cleanup Plan for Fort McClellan, Alabama. Prepared by IT Corporation, December 2001.

JSU Book V298

* Regulatory Oversight Correspondence Fort McClellan, AL, dated February 2002. JSU Book V649

* Rights-of-Entry Correspondence Fort McClellan, AL, dated March 2002. JSU Book V650

Final Wetland Determination, Landfills and Fill Areas. Prepared by Shaw Environmental, April 2003. JSU Book V456

Landfill Gas Investigation Report, Landfills and Fill Areas Parcels 78(6), 79(6), 80(6), 227(7), 126(7), 229(7), and 82(7). Prepared by

Shaw Environmental, November 2003. JSU Book V455

Fort McClellan A Popular History by Mary Beth Reed, Charles E. Cantley and J.W. Joseph. Undated, filed in December 2003 area.

JSU Book V458

Emergency Administrative Order #04-086-EHW, Consent Order #05-009-CHW and supporting documentation, July 2004. JSU

Book V630

Installation Wide Work Plans

Final General Site-Wide Work Plan Ordnance and Explosives Response, Fort McClellan, Alabama. Prepared by Foster Wheeler

Environmental Corporation, Huntsville, Alabama, September 14, 2000. JSU Book V147

Page 34: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

34

* Revision 3 Draft Installation-Wide Sampling and Analysis Plan Volume I of IV Text; Volume II of IV Appendix A, Installation-

Wide Safety and Health Plan; Volume III of IV Appendix B-D, Installation-Wide Quality Assurance Plan Monitoring Well

Installation and Maintenance Plan Installation-Wide Management Plan; and Volume IV of IV Appendixes E, Installation-Wide

Ordnance and Explosives Management Plan for Support Hazardous, Toxic Radiological Waste Activities and Construction

Activities. Prepared by IT Corporation, February 2002. JSU Books V341, V342, V343, and V344

* Revision 2 Draft Installation-Wide Work Plan. Prepared by IT Corporation, February 2002. JSU Book V483. Also filed in the

sleeve of this document is a Memo from Shaw Environmental, dated March 14, 2005, Subject: Selecting Site-Related Chemical for

Human Health and Ecological Risk Assessments for FTMC: Revision 3 with ADEM and EPA’s concurrence letters.

*Final Work Plan MEC Safety Support. Prepared by UXB-KEMRON Remediation Services, LLC, August 15, 2012. JSU Book

V663

Reference Documents

* U.S. Environmental Protection Agency, Superfund Information Repository Administrative Records: Introduction for Librarians.

EPA/520/F-92/001, August 1992. JSU Book V86

U..S. Environmental Protection Agency, Superfund Information Repositories and Administrative Records, EPA/520/F-92/002,

August 1992. JSU Book V86

A Fort McClellan National Wildlife Refuge Feasibility Study for the Fort McClellan Local Reuse and Redevelopment Authority.

Prepared by W. Peter Conroy, Jacksonville State University, undated. Filed in December 1996 area. JSU Book V86

MDA/Matrix Documents

* Fort McClellan Comprehensive Reuse Plan, Fort McClellan Reuse and Redevelopment Authority of Alabama Implementation

Strategy. Prepared by EDAW, Inc., November 1997. JSU Book V652

* Economic Development Conveyance Application. Prepared by Joint Powers Authority, March 2, 2000. JSU Book V653

Final Engineering and Cost Analysis (EE/CA) Action Memorandum Alpha Area Munitions and Explosives of Concern. Prepared by

Matrix Environmental Services, L.L.C., August 2005. JSU Book V510

Final Land Use Control Effectiveness Report. Prepared by Matrix Environmental Services, L.L.C., January 2006. JSU Book V519

McClellan Industrial Landfill Semi-Annual Groundwater Sampling Results. Prepared by Matrix Environmental Services, L.L.C.,

January 2006. JSU Book V568

Final Explosives Safety Submission Munitions and Explosives of Concern Remediation ALPHA and BRAVO Munitions Response

Areas of McClellan. Prepared by ECC Huntsville Office, March 2006. JSU Book V526

Final Revision 1 Engineering Evaluation/Cost Analysis Landfills and Fill Areas, Landfills 1, 2, 4 and Industrial Landfill, Parcels

78(6), 79(6), 81(5), 175(5), Fill Area North of Landfill 2, Parcel 230(7). Prepared by Matrix Environmental Services, LLC,

November 2004, Revised May 2006. JSU Book V559

Final Supplemental Engineering Evaluation/Cost Analysis (EE/CA) Report Alpha Area McClellan, Alabama. Prepared by URS

Group, Inc., January 2006. JSU Book V619

Final Resource Conservation Recovery Act Facility Investigation Fill Area East of Reilly Airfield, Parcel 227(7) and Former Post

Garbage Dump, Parcel 126(7). Prepared by Matrix Environmental Services, LLC, May 2006. JSU Book V558

Final Engineering Evaluation and Cost Analysis (EE/CA) Action Memorandum Bravo Munitions Response Site-1 and Industrial

Access Road. Prepared by Matrix Environmental Services, LLC, August 2006. JSU Book V529

Final Resource Conservation Recovery Act Facility Investigation Training Area T-38, Former Technical Escort Reaction Area,

Parcel 186(6). Prepared by Matrix Environmental Services, LLC, January 2007. JSU Book V560

Final Land Use Control Effectiveness Report. Prepared by Matrix Environmental Services, LLC, Revision 1 April 2007. JSU Book

V562

Final Resource Conservation Recovery Act Facility Investigation Training Area T-6 (Naylor Field), Parcel 183(6) and Cane Creek

Training Area, Parcel 510(7). Prepared by Matrix Environmental Services, LLC, June 2007. JSU Book V564

Page 35: Fort McClellan, Alabama - Webs

____________________

NOTE: * Indicates document is awaiting upload to the U.S. Army Environmental READ/REDI Site.

35

Revision 1 to Final Program-Level Work Plan Munitions and Explosives of Concern Remediation Alpha and Bravo Munitions

Response Areas of McClellan, Anniston, Alabama. Prepared by Matrix Environmental Services, April 2006, Revised September

2007. JSU Book V571

Final Corrective Measures Effectiveness Report December 2006 Sampling Event Former Chemical Laundry and Motor Pool Area 1500, Parcel 94(7). Prepared by Matrix Environmental Services, L.L.C., January 2008. JSU Book V622

* Final Groundwater Sampling Report, June 2006 Former Washrack, Building 1740 Soldier’s Chapel, Parcel 127(7). Prepared by

Matrix Environmental Services, L.L.C., January 2008. JSU Book V661

*Final Resource Conservation Recovery Act Facility Investigation Landfill3, Parcel 80(6) and Fill Area Northwest of Reilly Airfield,

Parcel 229(7). Prepared by Matrix Environmental Services, L.L.C., June 2008. JSU Book V660

Final Document Munitions Response Site 6 Site-Specific Work Plan Addendum to the Program Level Work Plan for Munitions and

Explosives of Concern Remediation of Alpha and Bravo Munitions Response Areas of McClellan, Anniston, Alabama. Prepared by

Matrix Environmental Services, LLC, December 2008. JSU Book V589

Final Document Munitions Response Site 8 Site-Specific Work Plan Addendum to the Program Level Work Plan for Munitions and

Explosives of Concern Remediation of Alpha and Bravo Munitions Response Areas of McClellan. Prepared by Matrix

Environmental Services, LLC, November 2009. JSU Book V609

Final Document Munitions Response Site 4 Site-Specific Work Plan Addendum to the Program Level Work Plan for Munitions and

Explosives of Concern Remediation of Alpha and Bravo Munitions Response Areas of McClellan, Anniston, Alabama. Prepared by

Matrix Environmental Services, LLC, August 2010. JSU Book V631

Final Groundwater Sampling Report, June 2006; Former Motor Pool Area 3100, Parcels 24(7), 73(7), 212(7), and 146(7). Prepared

by Matrix Environmental Services, L.L.C, April 2011. JSU Book V637

*Environmental Covenants Binder, JSU V662

- Environmental Covenant Number FY-11-01.00 recorded on September 23, 2011.

Fill Area Northwest of Reilly – CERFA Parcel No. 229(7)

Former Post Garbage Dump (North of Reilly Field) – CERFA Parcel No. 126(7)

Fill Area East of Reilly Airfield – CERFA Parcel No. 227(7)