grontmij drawing register

19
Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 1 of 3 Project No: Project Title : Day 4 17 31 3 14 2 4 11 13 29 12 30 30 30 4 28 30 6 21 31 5 10 20 3 Client Name: Month 4 8 8 4 6 9 9 11 11 11 12 1 1 1 4 4 4 5 7 7 9 10 10 11 Client Project No (if known): Year 12 12 12 13 13 13 13 13 13 13 13 14 14 14 14 14 14 14 14 14 14 14 14 14 Doc Type Drawing No. Client Drawing No (if different) Drawing Title Draw 106610/M/1000 Mechanical Services Drawing Symbols and Notations A0 00 00 01 02 03 03 04 04 05 05 05 05 05 05 06 06 06 06 06 Draw 106610/M/1001 Central Thermal Distribution Schematic A0 00 01 02 03 04 WITHDRAWN Draw 106610/M/1002-1 Low Temperature Hot Water Schematic A0 00 01 02 03 04 05 05 06 06 07 07 08 09 10 10 11 11 11 11 11 Draw 106610/M/1002-2 Condenser Water System Schematic A0 00 01 02 03 04 04 05 05 06 06 06 07 07 07 08 09 09 09 09 09 Draw 106610/M/1003-1 Type 1-6 Typical Apartment Ventilation Schematics A0 00 01 02 03 04 04 05 05 06 06 06 07 07 07 08 09 09 10 10 10 Draw 106610/M/1003-2 Type 7 & 8 Typical Apartment Ventilation Schematics A0 00 01 02 03 04 04 05 05 06 06 06 07 07 07 08 08 08 08 08 Draw 106610/M/1004-1 Basement Ventilation Schematic - Sheet 1 of 2 A0 00 01 02 03 03 04 05 06 07 08 09 09 09 10 11 11 11 11 11 Draw 106610/M/1004-2 Basement Ventilation Schematic - Sheet 2 of 2 A0 00 01 02 03 03 04 04 05 06 06 07 08 08 09 10 10 10 10 10 Draw 106610/M/1005 CPH Retail Ventilation Schematic A0 00 01 02 03 04 04 05 05 06 06 06 07 08 08 09 09 09 09 09 Draw 106610/M/1006 Gas Service Schematic A0 00 01 02 03 03 04 04 05 05 05 06 06 06 07 07 07 07 07 Draw 106610/M/1007 Generator Fuel Oil Schematic A0 00 01 02 03 03 04 04 05 05 05 06 06 06 07 07 08 08 08 Draw 106610/M/1008 CPT Reception Mechanical Services Schematic A0 00 01 02 03 04 04 05 05 06 06 07 08 08 08 09 10 10 10 10 10 Draw 106610/M/1009 CPW & CPH Fire Lobby Ventilation Schematic A1 00 00 01 02 03 03 04 05 05 06 06 06 Draw 106610/M/1010 CPW Affordable Housing Ventilation Schematics A0 00 01 01 02 02 03 03 03 04 04 04 04 05 05 05 05 05 Draw 106610/M/1011 CPT First Floor Ventilation Schematic A0 00 01 02 02 03 03 04 04 05 05 05 06 06 06 07 08 08 08 08 08 Draw 106610/M/1012 CPT Second Floor Ventilation Schematic 00 02 03 03 04 04 05 05 06 06 06 07 07 07 08 09 09 09 09 09 Revision Stage C Stage D Draft Stage D (CPH, CPL & CPW) Stage E CPT Updated Stage E Pool Package Tender Updated Stage E - Tender Issue P:\106610\IMS\SQP 08 Drawing Size Reason For Issue (e.g. Preliminary, For Tender, For Construction, As Built, For Comment, For Approval, For Information, In Report) Updated Stage E 106610 Centre Point Date of Issue Employer's Requirements Updated Stage E Building Control Submission Stage D Stage E (CPT) DRAFT Mechanical Services Drawings Employer's Requirements Pool Package Tender Updated ER Issue For Tender For Tender Employer's Requirements (CPW) Updated Stage E Updated Stage E Updated Stage E Almacantar - Employer's Requirements Stage E - Tender Issue Updated Stage E - Tender Issue Doc Type: Draw: Drawing Comments: Number of Copies e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e Main Contractor - Sir Robert McAlpine e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e s s s s s s s s s s s s s s s s s s e e e e e e sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc pl pl pl pl pl pl Approved for issue by: Date: Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -): Transmittal Note No: Residential Agent - Savills Cladding Consultant - Wintech Acoustic Consultant - Sandy Brown Associates Format: e = electronic, p = paper Other location details: e.g. file section Building Control - Philip Wilmann - London Borough of Camden Building Control Officer Transportation Consultant - Steer Davies Gleave Transmittal Note No: Received by (Recipient to acknowledge receipt by signing and returning a copy of this form): Signature: Location where stored: s=server, f = file (for hard copy file) Issued by (Issuer's Initials): Cost Consultant - WT Partnership Planning Consultant - Gerald Eve CDM Coordinator - Lend Lease Consulting Client - Almacantar (Geoff Taylor) (Lead) Architect - Rick Mather Architects (CPH, CPL & Public Realm) Architect - Conran & Partners (CPT) Structural/Civil Engineer - Pell Frischmann Date: Print Name: Distribution

Upload: geraint-bessant

Post on 22-Sep-2015

220 views

Category:

Documents


5 download

DESCRIPTION

Drawing record

TRANSCRIPT

  • Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 1 of 3Project No:Project Title : Day 4 17 31 3 14 2 4 11 13 29 12 30 30 30 4 28 30 6 21 31 5 10 20 3Client Name: Month 4 8 8 4 6 9 9 11 11 11 12 1 1 1 4 4 4 5 7 7 9 10 10 11Client Project No (if known): Year 12 12 12 13 13 13 13 13 13 13 13 14 14 14 14 14 14 14 14 14 14 14 14 14

    Doc

    Type Drawing No. Client Drawing No

    (if different)Drawing Title

    Draw 106610/M/1000 Mechanical Services Drawing Symbols and Notations A0 00 00 01 02 03 03 04 04 05 05 05 05 05 05 06 06 06 06 06

    Draw 106610/M/1001 Central Thermal Distribution Schematic A0 00 01 02 03 04 WITHDRAWNDraw 106610/M/1002-1 Low Temperature Hot Water Schematic A0 00 01 02 03 04 05 05 06 06 07 07 08 09 10 10 11 11 11 11 11Draw 106610/M/1002-2 Condenser Water System Schematic A0 00 01 02 03 04 04 05 05 06 06 06 07 07 07 08 09 09 09 09 09Draw 106610/M/1003-1 Type 1-6 Typical Apartment Ventilation Schematics A0 00 01 02 03 04 04 05 05 06 06 06 07 07 07 08 09 09 10 10 10Draw 106610/M/1003-2 Type 7 & 8 Typical Apartment Ventilation Schematics A0 00 01 02 03 04 04 05 05 06 06 06 07 07 07 08 08 08 08 08Draw 106610/M/1004-1 Basement Ventilation Schematic - Sheet 1 of 2 A0 00 01 02 03 03 04 05 06 07 08 09 09 09 10 11 11 11 11 11Draw 106610/M/1004-2 Basement Ventilation Schematic - Sheet 2 of 2 A0 00 01 02 03 03 04 04 05 06 06 07 08 08 09 10 10 10 10 10Draw 106610/M/1005 CPH Retail Ventilation Schematic A0 00 01 02 03 04 04 05 05 06 06 06 07 08 08 09 09 09 09 09Draw 106610/M/1006 Gas Service Schematic A0 00 01 02 03 03 04 04 05 05 05 06 06 06 07 07 07 07 07Draw 106610/M/1007 Generator Fuel Oil Schematic A0 00 01 02 03 03 04 04 05 05 05 06 06 06 07 07 08 08 08Draw 106610/M/1008 CPT Reception Mechanical Services Schematic A0 00 01 02 03 04 04 05 05 06 06 07 08 08 08 09 10 10 10 10 10Draw 106610/M/1009 CPW & CPH Fire Lobby Ventilation Schematic A1 00 00 01 02 03 03 04 05 05 06 06 06Draw 106610/M/1010 CPW Affordable Housing Ventilation Schematics A0 00 01 01 02 02 03 03 03 04 04 04 04 05 05 05 05 05Draw 106610/M/1011 CPT First Floor Ventilation Schematic A0 00 01 02 02 03 03 04 04 05 05 05 06 06 06 07 08 08 08 08 08Draw 106610/M/1012 CPT Second Floor Ventilation Schematic 00 02 03 03 04 04 05 05 06 06 06 07 07 07 08 09 09 09 09 09

    Revision

    Stag

    eC

    Stag

    eD

    Dra

    ft

    Stag

    eD

    (CPH

    ,CPL

    &C

    PW)

    Stag

    eE

    CPT

    Upd

    ated

    Stag

    eE

    Poo

    lPac

    kage

    Tend

    er

    Upd

    ated

    Stag

    eE

    -Ten

    derI

    ssue

    P:\106610\IMS\SQP 08

    Dra

    win

    gSi

    ze

    Reason For Issue (e.g. Preliminary, For Tender, For Construction, As Built, For Comment, For Approval, For Information, In Report)

    Upd

    ated

    Stag

    eE

    106610Centre Point

    Date of Issue

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Upd

    ated

    Stag

    eE

    Build

    ing

    Con

    trolS

    ubm

    issi

    on

    Stag

    eD

    Stag

    eE

    (CPT

    )DR

    AFT

    Mechanical Services Drawings

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Poo

    lPac

    kage

    Tend

    er

    Upd

    ated

    ER

    Issu

    e

    ForT

    ende

    r

    ForT

    ende

    r

    Empl

    oyer

    'sR

    equi

    rem

    ents

    (CPW

    )

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Almacantar-

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Sta

    geE

    -Ten

    derI

    ssue

    Upd

    ated

    Stag

    eE

    -Ten

    derI

    ssue

    Doc Type: Draw: Drawing

    Comments:

    Number of Copiese e e e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e ee e e ee e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e ee e e ee e e e e e e e e e e e e

    Main Contractor - Sir Robert McAlpine e e e e e e e e e e e e e e e e ee e

    e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e e e

    s s s s s s s s s s s s s s s s s s e e e e e e

    sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc pl pl pl pl pl pl

    Approved for issue by:Date:

    Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -):

    Transmittal Note No:

    Residential Agent - SavillsCladding Consultant - Wintech

    Acoustic Consultant - Sandy Brown AssociatesFormat: e = electronic, p = paper

    Other location details: e.g. file section

    Building Control - Philip Wilmann - London Borough of Camden Building Control Officer

    Transportation Consultant - Steer Davies Gleave

    Transmittal Note No:

    Received by (Recipient to acknowledge receipt by signing and returning a copy of this form):

    Signature:

    Location where stored: s=server, f = file (for hard copy file)

    Issued by (Issuer's Initials):

    Cost Consultant - WT PartnershipPlanning Consultant - Gerald EveCDM Coordinator - Lend Lease Consulting

    Client - Almacantar (Geoff Taylor)(Lead) Architect - Rick Mather Architects (CPH, CPL & Public Realm)Architect - Conran & Partners (CPT)Structural/Civil Engineer - Pell Frischmann

    Date:Print Name:

    Distribution

  • Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 2 of 3Project No:Project Title : Day 4 17 31 15 21 23 25 2 3 17 18 26 31 4 7 14 24 2 4 11 13 29 12 30 30 30 26 4 21 4 28 30 21 31 5 10 20Client Name: Month 4 8 8 10 11 11 1 4 4 4 4 4 5 6 6 6 6 9 9 11 11 11 12 1 1 1 2 3 3 4 4 4 7 7 9 10 10Client Project No (if known): Year 12 12 12 12 12 12 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 14 14 14 14 14 14 14 14 14 14 14 14 14 14

    Doc

    Type Drawing No. Client Drawing No

    (if different)Drawing Title

    Draw 106610/M/1100-1 Scale 1:50 Sub-Basement Level Mechanical Services Layout (Sheet 1 of 2) A0 00 01 02 03 04 04 05 06 07 08 09 10 11 11 12 13 14 14Draw 106610/M/1100-2 Scale 1:50 Sub-Basement Level Mechanical Services Layout (Sheet 2 of 2) A0 00 01 02 03 WITHDRAWNDraw 106610/M/1101-1 Scale 1:50 Basement Level Mechanical Services Layout (Sheet 1 of 4) A0 00 01 02 03 04 04 05 06 07 08 09 10 11 11 12 12 13 13Draw 106610/M/1101-2 Scale 1:50 Basement Level Mechanical Services Layout (Sheet 2 of 4) A0 00 01 02 03 04 04 05 06 07 08 09 10 11 11 12 12 12 12Draw 106610/M/1101-3 Scale 1:50 Basement Level Mechanical Services Layout (Sheet 3 of 4) A0 00 01 02 03 04 04 05 06 07 08 09 10 11 11 12 12 12 12Draw 106610/M/1101-5 Scale 1:50 Basement Boiler Room Layout & Sub Basement Condenser Water Plantroom Layout

    (Sheet 4 of 4)A0 00 01 02

    03 04 04 05 06 07 08 09 10 11 11 12 12 12 12

    Draw 106610/M/1102-1 Scale 1:100 CPH Ground Floor Mechanical Services Layout A0 00 01 02 03 04 04 05 05 06 07 08 09 10 10 11 11 12 12Draw 106610/M/1102-2 Scale 1:100 CPH Ground Mezzanine Mechanical Services Layout A0 00 01 01 02 02 03 04 05 06 07 07 08 08 08 08Draw 106610/M/1103-1 Scale 1:100 CPH First Floor Mechanical Services Layout A0 00 01 02 03 04 04 05 05 06 07 08 09 10 10 11 11 12 12Draw 106610/M/1103-2 Scale 1:100 CPH First Mezzanine Mechanical Services Layout 00 01 01 02 02 03 04 05 06 06 06 07 07 07 07Draw 106610/M/1104 Scale 1:100 CPH Second Floor (Podium) Mechanical Services Layout A0 00 01 02 03 04 04 05 05 06 07 08 09 09 09 10 10 10 10

    Draw 106610/M/1200 Scale 1:50 CPT Grd Mechanical Services Layout A0 00 01 02 03 04 04 05 05 06 06 07 08 09 10 11 12 12 13 13 14 15 15 15 15Draw 106610/M/1201 Scale 1:50 CPT Grd Mezzanine Level Mechanical Services Layout A0 00 01 02 03 03 04 04 05 05 06 07 07 08 09 09 09 10 11 11 11 11Draw 106610/M/1202 Scale 1:50 CPT First Floor Ventilation Layout A0 00 01 02 02 03 04 04 05 05 06 06 07 07 08 08 08 09 10 10 11 12 12 13 13Draw 106610/M/1203 Scale 1:50 CPT Second Floor Ventilation Layout A0 00 01 01 02 02 03 03 04 04 05 06 07 08 08 09 10 10 11 11Draw 106610/M/1204 Scale 1:50 CPT Apartment Types 1 & 2 Typical Levels 03-10 Mechanical Services Layout A0 00 01 02 03 03 04 04 05 05 06 06 07 08 09 09 10 11 11 11 11Draw 106610/M/1205 Scale 1:50 CPT Apartment Type 3 & 4 Typical Levels 11-17 Mechanical Services Layout A0 00 01 02 03 03 04 04 05 05 06 06 07 08 09 09 10 11 12 12 12Draw 106610/M/1206 Scale 1:50 CPT Apartment Type 5 Typical Levels 11-17 Mechanical Services Layout A0 00 01 02 03 03 04 04 05 06 07 08 09 10 11 11 12 12 13 13 13

    Upd

    ated

    Stag

    eE

    Doc Type: Draw: Drawing

    Revision

    ForI

    nfor

    mat

    ion

    ForI

    nfor

    mat

    ion

    ForT

    ende

    r

    Upd

    ated

    Stag

    eE

    ForT

    ende

    r

    Poo

    lPac

    kage

    Tend

    er

    ForI

    nfor

    mat

    ion

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Mec

    hC

    PTD

    GN

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Stag

    eE

    -Ten

    derI

    ssue

    Upd

    ated

    ER

    Issu

    e

    Upd

    ated

    Stag

    eE

    -Ten

    derI

    ssue

    Build

    ing

    Con

    trolS

    ubm

    isio

    n

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Upd

    ated

    Stag

    eE

    -Ten

    derI

    ssue

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Pool

    Pack

    age

    Tend

    er

    DR

    AFT

    ForI

    nfor

    mat

    ion

    DR

    AFT

    ForI

    nfor

    mat

    ion

    Stag

    eD

    (CPH

    ,CPL

    ,CPW

    )D

    RAF

    T

    Stag

    eD

    (CPH

    ,CPL

    ,CPW

    )D

    RAF

    T

    Stag

    eD

    (CPH

    ,CPL

    &C

    PW)

    Stag

    eE

    CPT

    Stag

    eD

    (CPH

    ,CPL

    &C

    PW)

    Stag

    eE

    CPT

    Rev

    ised

    Stag

    eD

    Stag

    eD

    Adde

    ndum

    Info

    rmat

    ion

    Stag

    eE

    (CPT

    )DR

    AFT

    Stag

    eE

    (CPT

    )DR

    AFT

    DR

    AFT

    ForI

    nfor

    mat

    ion

    Dra

    ftSt

    age

    DAd

    dend

    um

    Comments: Mechanical Services Drawings

    Dra

    win

    gSi

    ze

    Centre Point

    Reason For Issue (e.g. Preliminary, For Tender, For Construction, As Built, For Comment, For Approval, For Information, In Report)

    Stag

    eC

    Stag

    eD

    Dra

    ft

    Stag

    eD

    Almacantar-

    P:\106610\IMS\SQP 08

    106610 Date of Issue

    Draw 106610/M/1206 Scale 1:50 CPT Apartment Type 5 Typical Levels 11-17 Mechanical Services Layout A0 00 01 02 03 03 04 04 05 06 07 08 09 10 11 11 12 12 13 13 13Draw 106610/M/1207 Scale 1:50 CPT Apartment Type 6 Typical Levels 18-30 Mechanical Services Layout A0 00 01 02 03 03 04 04 05 06 07 07 08 09 10 10 11 12 12 12Draw 106610/M/1208 Scale 1:50 CPT Apartment Type 7 Typical Levels 31-32 Mechanical Services Layout A0 00 01 02 03 03 04 04 05 05 06 06 07 08 09 09 10 11 11 11Draw 106610/M/1209 Scale 1:50 CPT Apartment Type 8(a) Level 33 Lower Duplex Mechanical Services Layout A0 00 01 02 03 03 04 05 05 06 06 07 07 08 08 09 10 11 11 12 13 13 13Draw 106610/M/1210 Scale 1:50 CPT Apartment Type 8(b) Level 34 Upper Duplex Mechanical Services Layout A0 00 01 02 03 03 04 05 05 06 06 07 07 08 08 09 10 11 11 12 13 14 14Draw 106610/M/1211 Scale 1:50 CPT Roof Level Mechanical Services Layout A0 00 01 02 03 03 04 05 05 06 06 08 08 09 09 09 10 10 10 11 11 11 11

    Draw 106610/M/1340 Scale 1:20 CPT Typical Core Services within Ceiling void A0 00 01 WITHDRAWN

    Draw 106610/M/1350-1 Scale 1:50 CPT Typical Cores & Staircase Mechanical Services Layout (Sheet 1 of 2) A0 00 01 03 04 05 06 06 07 07 08 08 08 09 09 09 10 11 11 11Draw 106610/M/1350-2 Scale 1:50 CPT Typical Cores & Staircase Mechanical Services Layout (Sheet 2 of 2) A0 00 00 01 01 02 02 03 03 04 05 06 07 07 07 08 09 09 09

    Draw 106610/M/1351 Scale 1:50 CPH Typical Cores & Staircase Mechanical Services Layout A0 WITHDRAWN

    Draw 106610/M/1400 Scale 1:50 CPL Temporary Marketing Suite Mechanical Services Layout A0 WITHDRAWN

    Number of Copiese e e e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e eee e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e eee e e e e e e e e e e e e e e e e

    Fire Engineering Consultant - Frontline Fire e e e e e e ee e e e e e e e e e e e e e e e

    ee e e e e e e e e e e e e

    e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e es s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s

    sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc pl pl pl pl pl

    Building Control - Philip Wilmann - London Borough of Camden Building Control Officer

    Planning Consultant - Gerald EveCDM Coordinator - Lend Lease ConsultingTransportation Consultant - Steer Davies GleaveResidential Agent - SavillsCladding Consultant - Wintech

    Format: e = electronic, p = paperAcoustic Consultant - Sandy Brown Associates

    Location where stored: s=server, f = file (for hard copy file)Other location details: e.g. file section

    Issued by (Issuer's Initials):Transmittal Note No:

    DistributionClient - Almacantar (Geoff Taylor)(Lead) Architect - Rick Mather Architects (CPH, CPL & Public Realm)Architect - Conran & Partners (CPT)Structural/Civil Engineer - Pell FrischmannCost Consultant - WT Partnership

    Main Contractor - SRM

    Approved for issue by:Date:

    Print Name: Signature:Date:

    Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -): Received by (Recipient to acknowledge receipt by signing and returning a copy of this form):

    Transmittal Note No:

  • Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 2 of 3Project No:Project Title : Day 3Client Name: Month 11Client Project No (if known): Year 14

    Doc

    Type Drawing No. Client Drawing No

    (if different)Drawing Title

    Draw 106610/M/1100-1 Scale 1:50Sub-Basement Level Mechanical Services Layout (Sheet 1 of 2)

    A0 14

    Draw 106610/M/1100-2 Scale 1:50Sub-Basement Level Mechanical Services Layout (Sheet 2 of 2)

    A0 WITHDRAWNDraw 106610/M/1101-1 Scale 1:50

    Basement Level Mechanical Services Layout (Sheet 1 of 4)A0 13

    Draw 106610/M/1101-2 Scale 1:50 Basement Level Mechanical Services Layout (Sheet 2 of 4) A0 12Draw 106610/M/1101-3 Scale 1:50 Basement Level Mechanical Services Layout (Sheet 3 of 4) A0 12

    Draw 106610/M/1101-5 Scale 1:50Basement Boiler Room Layout & Sub Basement Condenser Water Plantroom Layout(Sheet 4 of 4) A0 12

    Draw 106610/M/1102-1 Scale 1:100CPH Ground Floor Mechanical Services Layout

    A012

    Draw 106610/M/1102-2 Scale 1:100 CPH Ground Mezzanine Mechanical Services Layout A0 08Draw 106610/M/1103-1 Scale 1:100 CPH First Floor Mechanical Services Layout A0 12Draw 106610/M/1103-2 Scale 1:100 CPH First Mezzanine Mechanical Services Layout 07Draw 106610/M/1104 Scale 1:100 CPH Second Floor (Podium) Mechanical Services Layout A0 10

    Draw 106610/M/1200 Scale 1:50 CPT Grd Mechanical Services Layout A0 16Draw 106610/M/1201 Scale 1:50 CPT Grd Mezzanine Level Mechanical Services Layout A0 12Draw 106610/M/1202 Scale 1:50 CPT First Floor Ventilation Layout A0 15Draw 106610/M/1203 Scale 1:50 CPT Second Floor Ventilation Layout A0 12

    0

    0 Date of IssueScale 1:50Scale 1:50Scale 1:50

    Comments: Scale 1:50

    Dra

    win

    gSi

    ze

    Reason For Issue (e.g. Preliminary, For Tender, For Construction, As Built, For Comment, For Approval, For Information, In Report)

    Upd

    ated

    Stag

    eE

    Doc Type: Draw: Drawing

    Revision

    Draw 106610/M/1203 Scale 1:50 CPT Second Floor Ventilation Layout A0 12Draw 106610/M/1204 Scale 1:50 CPT Apartment Types 1 & 2 Typical Levels 03-10 Mechanical Services Layout A0 12Draw 106610/M/1205 Scale 1:50 CPT Apartment Type 3 & 4 Typical Levels 11-17 Mechanical Services Layout A0 13Draw 106610/M/1206 Scale 1:50 CPT Apartment Type 5 Typical Levels 11-17 Mechanical Services Layout A0 14Draw 106610/M/1207 Scale 1:50 CPT Apartment Type 6 Typical Levels 18-30 Mechanical Services Layout A0 13Draw 106610/M/1208 Scale 1:50 CPT Apartment Type 7 Typical Levels 31-32 Mechanical Services Layout A0 12Draw 106610/M/1209 Scale 1:50 CPT Apartment Type 8(a) Level 33 Lower Duplex Mechanical Services Layout A0 14Draw 106610/M/1210 Scale 1:50 CPT Apartment Type 8(b) Level 34 Upper Duplex Mechanical Services Layout A0 15Draw 106610/M/1211 Scale 1:50 CPT Roof Level Mechanical Services Layout A0 12

    Draw 106610/M/1340 Scale 1:20 CPT Typical Core Services within Ceiling void A0 WITHDRAWN

    Draw 106610/M/1350-1 Scale 1:50 CPT Typical Cores & Staircase Mechanical Services Layout (Sheet 1 of 2) A0 12Draw 106610/M/1350-2 Scale 1:50 CPT Typical Cores & Staircase Mechanical Services Layout (Sheet 2 of 2) A0 10

    Draw 106610/M/1351 Scale 1:50 CPH Typical Cores & Staircase Mechanical Services Layout A0 WITHDRAWN

    Draw 106610/M/1400 Scale 1:50 CPL Temporary Marketing Suite Mechanical Services Layout A0 WITHDRAWN

    Number of Copieseeeee

    ee

    eFire Engineering Consultant - Frontline Fire

    e

    ee

    s

    DistributionClient - Almacantar (Geoff Taylor)(Lead) Architect - Rick Mather Architects (CPH, CPL & Public Realm)Architect - Conran & Partners (CPT)Structural/Civil Engineer - Pell FrischmannCost Consultant - WT PartnershipPlanning Consultant - Gerald EveCDM Coordinator - Lend Lease ConsultingTransportation Consultant - Steer Davies GleaveResidential Agent - SavillsCladding Consultant - Wintech

    Main Contractor - SRM

    Building Control - Philip Wilmann - London Borough of Camden Building Control OfficerAcoustic Consultant - Sandy Brown Associates

    Format: e = electronic, p = paper

    Location where stored: s=server, f = file (for hard copy file)

    pl

    Approved for issue by:Date:

    Other location details: e.g. file sectionIssued by (Issuer's Initials):

    Transmittal Note No:Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -): Received by (Recipient to acknowledge receipt by signing and returning a copy of this form):Transmittal Note No: Print Name: Signature:

    Date:

  • Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 3 of 3

    Project No:Project Title : Day 31 14 2 4 11 13 29 12 30 4 28 30 6 31 5 10 20 3Client Name: Month 5 6 9 9 11 11 11 12 1 4 4 4 5 7 9 10 10 11Client Project No (if known): Year 13 13 13 13 13 13 13 13 14 14 14 14 14 14 14 14 14 14

    Doc

    Type Drawing No. Client Drawing No

    (if different)Drawing Title

    106610/M/1500 CPW Affordable Housing Apartment Types 1, 2 & 4 & Typical Core & Staircase -Mechanical Services Layout

    00 01 02 02 03 03 04 05 06 07 07 07 07 08 08 10 10 10

    106610/M/1501 CPW Affordable Housing Apartment Types 3 & 5 - Mechanical Services Layout 00 01 02 02 03 03 04 04 05 06 06 06 07 08 08 10 10 10106610/M/1502 CPW Affordable Housing Apartment Types 6 & 7 (Option B) - Mechanical Services

    Layout00 01 WITHDRAWN

    Doc Type: Draw: DrawingRevision

    Upd

    ated

    Stag

    eE

    Build

    ing

    Con

    trol

    Subm

    issi

    onEm

    ploy

    er's

    Req

    uire

    men

    ts(C

    PW)

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    -Te

    nder

    Issu

    eU

    pdat

    edSt

    age

    E-

    Tend

    erIs

    sue

    Empl

    oyer

    'sR

    equi

    rem

    ents

    ForT

    ende

    r

    ForT

    ende

    rEm

    ploy

    er's

    Req

    uire

    men

    ts

    Comments: Client Drawing No (if different)

    Dra

    win

    gSi

    ze

    Reason For Issue (e.g. Preliminary, For Tender, For Construction, As Built, For Comment, For Approval, For Information, In Report)

    Stag

    eD

    (CPH

    ,C

    PL,C

    PW)

    DR

    AFT

    Stag

    eD

    (CPH

    ,C

    PL&

    CPW

    )St

    age

    EC

    PT

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Stag

    eE

    -Ten

    der

    Issu

    e

    Upd

    ated

    ER

    Issu

    e

    P:\106610\IMS\SQP 08

    106610 Date of IssueCentre PointAlmacantar-

    Number of Copiese e e e e e e e e e e e e e e e e

    e e e e e e e e e e e e e e e ee e e e e e e e e e e e e

    e e e e e e e e e e e e e e ee e e e e e e e e e e e e e

    e e e e e e e e e e e e ee e e e e e e e e e e e e

    e e e e e e e e e e e e ee e e e e e e e e e e e e e

    ee e e e e e e e e e e e e

    e e e e e e e e e e e e e e e e e es s s s s s s s s s s s s e e e e e

    sc sc sc sc sc sc sc sc sc sc sc sc sc pl pl pl pl pl

    Approved for issue by:Date:

    Building Control - Philip Wilmann - London Borough of Camden Building Control Officer

    Transmittal Note No: Print Name: Signature:

    CDM Coordinator - Lend Lease ConsultingTransportation Consultant - Steer Davies GleaveResidential Agent - SavillsCladding Consultant - Wintech

    Date:

    Location where stored: s=server, f = file (for hard copy file)Other location details: e.g. file section

    Issued by (Issuer's Initials):Transmittal Note No:

    Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -): Received by (Recipient to acknowledge receipt by signing and returning a copy of this form):

    Acoustic Consultant - Sandy Brown AssociatesFormat: e = electronic, p = paper

    Main Contractor - SRM

    Client - Almacantar (Geoff Taylor)(Lead) Architect - Rick Mather Architects (CPH, CPL & Public Realm)Architect - Conran & Partners (CPT)Structural/Civil Engineer - Pell FrischmannCost Consultant - WT PartnershipPlanning Consultant - Gerald Eve

    Distribution

  • Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 1 of 4Project No:Project Title : Day 4 17 31 21 23 4 24 31 14 25 2 4 11 13 29 13 30 4 28 30 31 9 10 20 3Client Name: Month 4 8 8 11 11 4 4 5 6 6 9 9 11 11 11 12 1 4 4 4 7 9 10 10 11Client Project No (if known): Year 12 12 12 12 12 13 13 13 13 13 13 13 13 13 13 13 14 14 14 14 14 14 14 14 14

    Doc

    Type Drawing No. Client Drawing No

    (if different)Drawing Title

    Draw 106610/E/2000 Electrical Services Drawing Symbols and Notations 00 01 02 03 03 04 04 05 05 05 07 08 08 09 09 09 09 09Draw 106610/E/2001 Landlords LV Schematic 01 01 02 03 04 05 06 06 07 07 08 09 10 11 12 12 13 13 13 13Draw 106610/E/2002 Residential LV Schematic 01 01 02 03 04 05 05 06 06 07 07 08 09 09 09 10 10 10 10 10Draw 106610/E/2003 Centre Point House & Affordable Housing LV Schematic 01 01 02 03 04 05 05 06 06 07 07 08 09 10 10 11 11 11 11Draw 106610/E/2004 Main Earthing Schematic 00 01 02 03 03 03 03 04 05 06 07 07 07 08 08 08 08 08

    Draw 106610/E/2006 CPT & CPH Fire Detection and Alarm Schematic 00 01 02 03 04 04 05 05 06 06 07 08 08 08 09 09 09 09 09Draw 106610/E/2008 CPT & CPH Emergency Voice Communication, Disabled Refuge System and

    Disabled Person Call System Schematic00 01 02 03 04 04 05 05 06 06 07 08 08 08 09 09 10 10 10

    Draw 106610/E/2010 CPT & CPH Landlords Lighting Control Schematic 00 01 02 03 04 04 04 05 06 06 07 08 08 08 09 09 09 09 09Draw 106610/E/2012 CPT & CPH Sprinkler Status Panel, Firemans Override Control Panel and Lift

    Status Panel00 01 02 02 02 03 04 04 05 06 06 06 07 07 07 07 07

    Draw 106610/E/2013 Lift Interconnecting schematic 00 01 02 03 04 04 04 04 05 05 05 06 06 06 06 07 07 07 07Draw 106610/E/2014 Landlords Telephone Schematic 00 01 02 03 04 04 04 04 05 06 06 07 07 07 08 09 09 09 09

    P:\106610\IMS\SQP 08

    106610 Date of IssueCentre PointAlmacantar-

    Comments: Electrical Services Drawings

    Dra

    win

    gSi

    ze

    Reason For Issue (e.g. Preliminary, For Tender, For Construction, As Built, For Comment, For Approval, For Information, In Report)

    Stag

    eC

    Stag

    eD

    Dra

    ft

    Stag

    eD

    Dra

    ftSt

    age

    DAd

    dend

    um

    Stag

    eD

    Adde

    ndum

    Stag

    eE

    (CPT

    )DR

    AFT

    Stag

    eE

    (CPT

    )DR

    AFT

    Stag

    eD

    (CPH

    ,CPL

    ,CPW

    )D

    RAF

    T

    Stag

    eD

    (CPH

    ,CPL

    &C

    PW)

    Stag

    eE

    CPT

    Stag

    eE

    CPT

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Upd

    ated

    Stag

    eE

    Stag

    eE

    -Ten

    derI

    ssue

    Upd

    ated

    ER

    Issu

    e

    Upd

    ated

    Stag

    eE

    -Ten

    derI

    ssue

    Upd

    ated

    Stag

    eE

    -Ten

    derI

    ssue

    Empl

    oyer

    'sR

    equi

    rem

    ents

    ForT

    ende

    r

    Upd

    ated

    Stag

    eE

    ForT

    ende

    r

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Build

    ing

    Con

    trolS

    ubm

    issi

    on

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Doc Type: Draw: Drawing

    Revision

    Upd

    ated

    Stag

    eE

    Draw 106610/E/2100 Apartment Type 1 & 2 Floors 3 to 10 Electrical Services Layout 00 01 02 03 03 04 04 05 05 06 06 06 08 09 09 10 11 12 12 13Draw 106610/E/2101 Apartment Type 3 & 4 Floors 11 to 17 Electrical Services Layout 00 01 02 03 03 04 04 05 05 06 06 07 08 09 09 10 11 12 12 13Draw 106610/E/2102 Apartment Type 5 Floors 11 to 17 Electrical Services Layout 00 01 02 03 03 04 04 05 05 06 06 06 08 09 09 10 11 12 12 13Draw 106610/E/2103 Apartment Type 6 Floors 18 to 30 Electrical Services Layout 00 01 02 02 03 03 04 04 05 05 06 06 06 08 09 09 10 11 12 12 13Draw 106610/E/2104 Apartment Type 7 Floors 31 to 32 Electrical Services Layout 00 01 02 03 03 04 04 05 05 06 06 06 08 09 09 10 11 12 12 13Draw 106610/E/2105 Apartment Type 8a Floors 33 Electrical Services Layout 00 01 02 02 03 03 04 04 05 05 06 06 07 07 07 09 10 10 11 12 13 13 14Draw 106610/E/2106 Apartment Type 8b Floors 34 Electrical Services Layout 00 01 02 02 03 04 04 05 05 06 06 07 07 07 09 10 10 11 11 12 12 13

    e e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e ee ee e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e ee ee e e e e e e e e e e e e e e e

    e e e e e e e e e e e e e ee

    e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e e e

    s s s s s s s s s s s s s s s s s s e e e e e

    AH sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc pl ah ah ah ah

    Approved for issue by:

    Building Control - Philip Wilmann - London Borough of Camden Building Control Officer

    Received by (Recipient to acknowledge receipt by signing and returning a copy of this form):

    Transmittal Note No: Print Name:

    Location where stored: s=server, f = file (for hard copy file)Other location details: e.g. file section

    Issued by (Issuer's Initials):Transmittal Note No:

    Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -):

    Client - Almacantar (Geoff Taylor)Distribution Number of Copies

    CDM Coordinator - Lend Lease ConsultingTransportation Consultant - Steer Davies GleaveResidential Agent - SavillsCladding Consultant - Wintech

    (Lead) Architect - Rick Mather Architects (CPH, CPL & Public Realm)Architect - Conran & Partners (CPT)Structural/Civil Engineer - Pell FrischmannCost Consultant - WT PartnershipPlanning Consultant - Gerald Eve

    Format: e = electronic, p = paperAcoustic Consultant - Sandy Brown Associates

    Signature:

    Main Contractor - SRM

    Date:Transmittal Note No:

    Date:

  • Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 2 of 4Project No:Project Title : Day 4 17 31 22 23 4 26 31 14 25 2 4 11 13 29 13 30 30 31 4 28 30 31 9 10 20 3Client Name: Month 4 8 8 11 11 4 4 5 6 6 9 9 11 11 11 12 1 1 1 4 4 4 7 9 10 10 11Client Project No (if known): Year 12 12 12 12 12 13 13 13 13 13 13 13 13 13 13 13 14 14 14 14 14 14 14 14 14 14 14

    Doc

    Type Drawing No. Client Drawing No

    (if different)Drawing Title

    Draw 106610/E/2300 Sub Basement Level Electrical Containment and Small Power Layout A0 00 01 02 03 04 04 05 05 06 07 08 09 10 10 11 11 11 11 11106610/E/2301 Basement Level Electrical Containment and Small Power Layout A0 00 01 02 03 04 04 05 05 06 07 08 09 10 10 11 12 12 12 12106610/E/2302 CPT Ground Level - Electrical Containment and Small Power Layout A0 00 01 02 03 03 04 04 05 05 06 06 07 08 09 09 10 10 11 11 12106610/E/2303 CPT Ground Mezzanine Level - Electrical Containment and Small Power Layout A0 00 01 02 03 03 04 04 05 05 06 06 06 06 07 07 08 08 09 09 10106610/E/2310 CPT First Floor - Electrical Containment and Small Power Layout A0 00 02 02 03 03 04 04 05 05 06 06 06 07 08 08 09 09 10 11 12106610/E/2311 CPT Second Floor - Electrical Containment and Small Power Layout A0 00 00 01 01 02 02 03 03 04 05 06 06 07 07 08 08 09106610/E/2326 CPT Roof Level - Electrical Services Layout A0 00 01 02 02 03 04 04 05 05 06 06 07 07 08 09 09 09 09 09 09 10 11

    106610/E/2330 CPH Ground Level - Electrical Containment and Small Power Layout A0 00 01 02 03 04 04 04 05 06 07 08 09 10 10 11 12 12 12 12106610/E/2331 CPH Ground Mezzanine Level - Electrical Containment and Small Power Layout A0 00 01 02 03 04 04 04 04 05 06 07 08 09 09 10 10 10 10 10106610/E/2332 CPH First Floor - Electrical Containment and Small Power Layout A0 00 01 02 03 04 04 04 05 06 07 07 08 09 09 10 10 10 10 10106610/E/2333 CPH First Floor Mezzanine - Electrical Containment and Small Power Layout A0 00 01 02 03 04 04 04 05 06 07 07 08 09 09 10 10 10 10 10106610/E/2334 CPH Second Floor (Podium) - Electrical Containment and Small Power Layout A0 00 01 02 03 04 04 04 05 06 07 08 09 10 10 10 10 10 10 10106610/E/2335 CPH Typical Floors (3-8) Electrical Services Layout A0 00 01 02 03 03 03 04 05 05 06 06 06 06 06 07 07 07 07

    106610 Date of IssueCentre PointAlmacantar-

    P:\106610\IMS\SQP 08

    Comments: Electrical Services Drawings

    Dra

    win

    gSi

    ze

    Reason For Issue (e.g. Preliminary, For Tender, For Construction, As Built, For Comment, For Approval, For Information, In Report)

    Stag

    eC

    Stag

    eD

    draf

    t

    Upd

    ated

    Stag

    eE

    -Ten

    derI

    ssue

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Pool

    Pack

    age

    Tedn

    er

    Dra

    ftSt

    age

    DAd

    dend

    um

    Stag

    eD

    Adde

    ndum

    Stag

    eE

    (CPT

    )DR

    AFT

    Stag

    eE

    (CPT

    )DR

    AFT

    Stag

    eD

    (CPH

    ,CPL

    ,CPW

    )D

    RAF

    T

    Doc Type: Draw: Drawing

    Revision

    ForT

    ende

    r

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Build

    ing

    Con

    trolS

    ubm

    issi

    on

    Stag

    eD

    (CPH

    ,CPL

    &C

    PW)

    Stag

    eE

    CPT

    Stag

    eE

    CPT

    Upd

    ated

    Stag

    eE

    ForT

    ende

    r

    Pool

    Pack

    age

    Tedn

    er

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Stag

    eE

    -Ten

    derI

    ssue

    Upd

    ated

    ER

    Issu

    e

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    -Ten

    derI

    ssue

    106610/E/2335 CPH Typical Floors (3-8) Electrical Services Layout A0 00 01 02 03 03 03 04 05 05 06 06 06 06 06 07 07 07 07

    Number of Copiese e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e

    ee e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e

    ee e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e

    ee e e e e e e e e e e e e e e e

    e e e e e e e e e e e e e e e e e e e e e e e es s s s s s s s s s s s s s s s s s s s e e e e e

    AH sc sc sc AH sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc pl ah ah ah ah

    Approved for issue by:Date:

    Building Control - Philip Wilmann - London Borough of Camden Building Control Officer

    DistributionClient - Almacantar (Geoff Taylor)(Lead) Architect - Rick Mather Architects (CPH, CPL & Public Realm)Architect - Conran & Partners (CPT)Structural/Civil Engineer - Pell FrischmannCost Consultant - WT PartnershipPlanning Consultant - Gerald EveCDM Coordinator - Lend Lease ConsultingTransportation Consultant - Steer Davies GleaveResidential Agent - Savills

    Main Contractor - SRMFormat: e = electronic, p = paper

    Location where stored: s=server, f = file (for hard copy file)

    Cladding Consultant - WintechAcoustic Consultant - Sandy Brown Associates

    Other location details: e.g. file section

    Issued by (Issuer's Initials):Transmittal Note No:

    Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -): Received by (Recipient to acknowledge receipt by signing and returning a copy of this form):

    Transmittal Note No: Print Name: Signature:Date:

  • Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 3 of 4Project No:Project Title : Day 4 17 31 22 23 4 26 31 14 25 2 4 11 13 29 13 30 30 31 4 28 30 30 9 10 20 3Client Name: Month 4 8 8 11 11 4 4 5 6 6 9 9 11 11 11 12 1 1 1 4 4 4 7 9 10 10 11Client Project No (if known): Year 12 12 12 12 12 13 13 13 13 13 13 13 13 13 13 13 14 14 14 14 14 14 14 14 14 14 14

    Doc

    Type Drawing No. Client Drawing No

    (if different)Drawing Title

    Draw 106610/E/2400 Sub Basement Level - Lighting, Fire detection and Alarm system Layout A0 00 01 02 03 04 04 04 05 06 07 08 09 10 10 11 11 11 11 11106610/E/2401 Basement Level - Lighting, Fire detection and Alarm system Layout A0 00 01 02 03 04 04 04 04 05 06 07 08 09 09 10 10 10 10 10106610/E/2402 CPT Ground Level - Lighting, Fire detection and Alarm system Layout A0 00 01 02 03 03 04 04 05 05 06 06 07 08 09 09 10 10 11 11 12106610/E/2403 CPT Ground Mezzanine Level - Lighting, Fire detection and Alarm system

    LayoutA0 00 01 02 03 03 04 04 05 05 06 06 07 08 09 09 10 10 11 11 12

    106610/E/2410 CPT First Floor -Lighting, Fire detection and Alarm system Layout A0 01 02 02 03 03 04 04 05 05 05 06 07 07 08 08 09 09 10106610/E/2411 CPT Second Floor - Lighting, Fire detection and Alarm system Layout A0 00 01 01 02 02 03 03 04 04 05 06 07 07 08 08 09 09 10106610/E/2412 CPT 33rd & 34th Floors - Landlord Electrical Services Layout A0 00 01 01 02 02 03 03 04 04 05 06 07 07 08 08 08 08 10

    106610/E/2430 CPH Ground Floor - Lighting, Fire detection and Alarm system Layout 00 01 02 03 04 04 04 05 06 07 08 09 10 10 11 12 12 12 12106610/E/2431 CPH Ground Floor Mezzanine-Lighting,Fire detection and Alarm systems Layout 00 01 02 03 04 04 04 05 06 07 08 09 10 10 11 12 12 12 12106610/E/2432 CPH First Floor - Lighting, Fire detection and Alarm systems Layout 00 01 02 03 04 04 04 05 06 07 08 09 10 10 11 12 12 12 12106610/E/2433 CPH First Floor Mezzanine - Lighting, Fire detection and Alarm system Layout 00 01 02 03 04 04 04 05 06 07 08 08 09 09 10 11 11 11 11106610/E/2434 CPH Second (Podium) Level-Lighting, Fire detection and Alarm system Layout 00 01 02 03 04 04 04 05 06 07 08 09 10 10 11 12 12 12 12106610/E/2435 CPH Roof Level-Lighting, Fire detection and Alarm system Layout 00 01 01

    P:\106610\IMS\SQP 08

    106610 Date of IssueCentre PointAlmacantar-

    Comments: Electrical Services Drawings

    Dra

    win

    gSi

    ze

    Stag

    eC

    Stag

    eD

    Dra

    ft

    Stag

    eD

    Upd

    ated

    Stag

    eE

    -Ten

    derI

    ssue

    Upd

    ated

    Stag

    eE

    -Ten

    derI

    ssue

    Dra

    ftSt

    age

    DAd

    dend

    um

    Stag

    eD

    Adde

    ndum

    Stag

    eE

    (CPT

    )DR

    AFT

    Stag

    eE

    (CPT

    )DR

    AFT

    Stag

    eD

    (CPH

    ,CPL

    ,CPW

    )D

    RAF

    T

    Stag

    eD

    (CPH

    ,CPL

    &C

    PW)

    Stag

    eE

    CPTDoc Type: Draw: Drawing

    Revision

    Upd

    ated

    Stag

    eE

    Build

    ing

    Con

    trolS

    ubm

    issi

    on

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Pool

    Pack

    age

    Tend

    er

    ForT

    ende

    r

    Pool

    Pack

    age

    Tend

    er

    ForT

    ende

    r

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Stag

    eE

    CPT

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Stag

    eE

    -Ten

    derI

    ssue

    Upd

    ated

    ER

    Issu

    e

    106610/E/2435 CPH Roof Level-Lighting, Fire detection and Alarm system Layout 00 01 01106610/E/2486 CPT - Lightning Protection Arrangement 00 01 02 02 03 04 04 05 05 05 05 06 06 07 08 08 08 09 09 09 09 09106610/E/2487 Comms Room and Fire Command/Security Room Layout 00 01 02 03 03 03 04 05 05 05 05 05 05 06 06 06 06 06106610/E/2490 North and South Cores (Levels 01-33) Electrical Services Layout 00 01 02 03 03 04 04 04 05 06 06 07 08 09 09 10 10 10 10 12

    Draw 106610/E/2500 Scale 1:50 CPL Temporary Marketing Suite Electrical Services Layout A0106610/E/2820 External Lighting Plan A0106610/E/2821 Public Realm External Lighting Plan A0106610/E/2822 Electrical services typical details Sheet 1 A0 00 01 02 02 02 02 03 03 04 05 05 05 06 06 07 07 07106610/E/2823 Electrical services typical details Sheet 2 A0 00 01 01 01 02 02 03 03 03106610/E/2833 Typical Jamb Detail A0 00 01 01 01 02 02 02 02 02 03 03 03

    Number of Copiese e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e

    ee e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e

    ee e e e e e e e e e e e e e e

    e e e e e e e e e e e e e e ee

    e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e e e e e

    s s s s s s s s s s s s s s s s s s s e e e e e

    AH sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc pl ah ah ah ah

    Building Control - Philip Wilmann - London Borough of Camden Building Control OfficerAcoustic Consultant - Sandy Brown Associates

    Received by (Recipient to acknowledge receipt by signing and returning a copy of this form):

    CDM Coordinator - Lend Lease ConsultingTransportation Consultant - Steer Davies Gleave

    Cladding Consultant - Wintech

    Format: e = electronic, p = paper

    Residential Agent - Savills

    Transmittal Note No:

    Location where stored: s=server, f = file (for hard copy file)Other location details: e.g. file section

    Issued by (Issuer's Initials):

    Client - Almacantar (Geoff Taylor)(Lead) Architect - Rick Mather Architects (CPH, CPL & Public Realm)Architect - Conran & Partners (CPT)Structural/Civil Engineer - Pell FrischmannCost Consultant - WT PartnershipPlanning Consultant - Gerald Eve

    Main Contractor - SRM

    Distribution

    Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -):

    Approved for issue by:Date:

    Received by (Recipient to acknowledge receipt by signing and returning a copy of this form):

    Date:Transmittal Note No: Signature:

    Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -):

    Print Name:

  • Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 4 of 4

    Project No:Project Title : Day 31 14 2 4 11 13 29 13 30 4 28 30 6 31 9 10 20 3Client Name: Month 5 6 9 9 11 11 11 12 1 4 4 4 5 7 9 10 10 11Client Project No (if known): Year 13 13 13 13 13 13 13 13 14 14 14 14 14 14 14 14 14 14

    Doc

    Type Drawing No. Client Drawing No

    (if different)Drawing Title

    Draw106610/E/2900 CPW Affordable Housing Apartment Types 1, 2 & 3 - Electrical & IT Services

    Layout 00 01 02 02 03 03 04 04 05 06 06 06 06 07 07 07 07 07

    106610/E/2901 CPW Affordable Housing Apartment Types 4 & 5 - Electrical & IT ServicesLayout 00 01 02 02 03 03 04 04 05 06 06 06 06 07 07 07 07 07

    106610/E/2902 CPW Affordable Housing Apartment Types 6 & 7 (Option B) - Electrical & ITServices Layout 00 01

    106610/E/2910 CPW Affordable Housing Roof Level - Electrical Services Layout 00 01 02 02 03 03 04 04 05 06 06 06 06 07 08 08 08 08106610/E/2911 CPW Affordable Housing - Core Lighting 00 00 01 01 02 03 04 05 05 05 05 06 07 07 07 07106610/E/2912 CPW Affordable Housing - Services Cupboard 00 00 01 01 02 02 03 04 04 04 04 05 05 05 05 05106610/E/2913 CPW Affordable Housing - Lightning Protection 00 00 00 00 01 01 01 01 01106610/E/2920 CPW Affordable Housing - Electrical Riser Detail 00 00 00 00 01 01 01 02 02 02 02 02 02 03 03 03

    WITHDRAWN

    Doc Type: Draw: Drawing

    Revision

    Upd

    ated

    Stag

    eE

    Build

    ing

    Con

    trolS

    ubm

    issi

    on

    Empl

    oyer

    'sR

    equi

    rem

    ents

    (CPW

    )

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    -Ten

    derI

    ssue

    Upd

    ated

    Stag

    eE

    -Ten

    derI

    ssue

    Empl

    oyer

    'sR

    equi

    rem

    ents

    ForT

    ende

    r

    ForT

    ende

    r

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Comments: Electrical Services Drawings

    Dra

    win

    gSi

    ze

    Stag

    eD

    (CPH

    ,CPL

    ,CPW

    )D

    RAF

    T

    Stag

    eD

    (CPH

    ,CPL

    &C

    PW)

    Stag

    eE

    CPT

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Stag

    eE

    -Ten

    derI

    ssue

    Upd

    ated

    ER

    Issu

    e

    P:\106610\IMS\SQP 08

    106610 Date of IssueCentre PointAlmacantar-

    106610/E/2920 CPW Affordable Housing - Electrical Riser Detail 00 00 00 00 01 01 01 02 02 02 02 02 02 03 03 03

    Number of Copiese e e e e e e e e e e e e e e e e

    e e e e e e e e e e e e e e e ee e e e e e e e e e e e e

    e e e e e e e e e e e e e e ee e e e e e e e e e e e e e

    e e e e e e e e e e e e ee e e e e e e e e e e e e

    e e e e e e e e e e e e ee e e e e e e e e e e e e e

    ee e e e e e e e e e e e e

    e e e e e e e e e e e e e e e e e es s s s s s s s s s s s s e e e e e

    sc sc sc sc sc sc sc sc sc sc sc sc sc pl ah ah ah ah

    Building Control - Philip Wilmann - London Borough of Camden Building Control Officer

    Transmittal Note No:

    Cladding Consultant - Wintech

    Acoustic Consultant - Sandy Brown AssociatesFormat: e = electronic, p = paper

    Location where stored: s=server, f = file (for hard copy file)Other location details: e.g. file section

    Issued by (Issuer's Initials):

    Main Contractor - SRM

    (Lead) Architect - Rick Mather Architects (CPH, CPL & Public Realm)Architect - Conran & Partners (CPT)Structural/Civil Engineer - Pell FrischmannCost Consultant - WT PartnershipPlanning Consultant - Gerald EveCDM Coordinator - Lend Lease ConsultingTransportation Consultant - Steer Davies GleaveResidential Agent - Savills

    DistributionClient - Almacantar (Geoff Taylor)

    Approved for issue by:Date:

    Transmittal Note No:Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -): Received by (Recipient to acknowledge receipt by signing and returning a copy of this form):Transmittal Note No: Print Name: Signature:

    Date:

  • Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 1 of 3Project No:Project Title : Day 4 17 31 3 31 14 2 4 11 13 29 12 30 30 31 4 28 30 21 31 5 10 20 03Client Name: Month 4 8 8 4 5 6 9 9 11 11 11 12 1 1 1 4 4 4 7 7 9 10 10 11Client Project No (if known): Year 12 12 12 13 13 13 13 13 13 13 13 13 14 14 14 14 14 14 14 14 14 14 14 14

    Doc

    Type Drawing No. Client Drawing No

    (if different)Drawing Title

    Draw 106610/P/3001 CPT Rainwater Installation Schematic A0 00 01 02 03 04 05 06 06 07 07 08 08 08 08 08 08 09 09 09 09 09Draw 106610/P/3002 CPT Sanitation Installation Schematic A0 00 01 02 03 04 05 06 06 07 07 08 09 10 10 10 11 11 11 12 13 14 14Draw 106610/P/3003 CPT Grey Water Collection Installation Schematic A0 00 01 02 04 05 06 06 07 07 08 09 10 10 10 10 11 12 13 13Draw 106610/P/3004 CPT Domestic Water Installation Schematic A0 00 01 02 03 04 05 06 06 07 07 08 08 09 09 09 10 10 10 11 11 11 11 11Draw 106610/P/3005 CPT Fluid Category 5 (Non Potable) Water Installation Schematic A0 00 01 02 - WITHDRAWNDraw 106610/P/3006 CPT Grey Water Distribution Schematic A0 00 01 02 03 04 05 05 06 06 07 07 07 08 08 08 09 09 09 09 09Draw 106610/P/3007 CPT Apartments Type 1 to 6 - Water Installation Schematic A0 00 01 02 02 WITHDRAWNDraw 106610/P/3008 CPT Apartments Type 7 and 8 - Water Installation Schematic A0 00 01 02 02 WITHDRAWN

    Draw 106610/P/3011 CPH Rainwater Installation Schematic A0 00 01 02 03 04 04 05 05 06 07 08 08 08 08 09 09 10 10Draw 106610/P/3012 CPH Sanitation Installation Schematic A0 00 01 02 03 04 04 05 05 06 07 08 08 08 08 09 09 09 09 09

    Doc Type: Draw: Drawing

    Revision

    Sta

    geE

    Bac

    kgro

    und

    Upd

    ate

    Bui

    ldin

    gC

    ontro

    lSub

    mis

    sion

    Upd

    ated

    Sta

    geE

    Upd

    ated

    Sta

    geE

    Upd

    ated

    Sta

    geE

    Upd

    ated

    Sta

    geE

    Upd

    ated

    Sta

    geE

    Em

    ploy

    er's

    Req

    uire

    men

    ts

    Poo

    lPac

    kage

    Tend

    er

    ForT

    ende

    r

    Poo

    lPac

    kage

    Tend

    er

    ForT

    ende

    r

    Em

    ploy

    er's

    Req

    uire

    men

    ts

    Sta

    geD

    (CP

    H,C

    PL

    &C

    PW

    )S

    tage

    EC

    PT

    Em

    ploy

    er's

    Req

    uire

    men

    ts

    Sta

    geE

    -Ten

    derI

    ssue

    Upd

    ated

    ER

    Issu

    e

    Upd

    ated

    Sta

    geE

    -Ten

    derI

    ssue

    Upd

    ated

    Sta

    geE

    -Ten

    derI

    ssue

    Comments: Public Health Services Drawings

    Dra

    win

    gSi

    ze

    Reason For Issue (e.g. Preliminary, For Tender, For Construction, As Built, For Comment, For Approval, For Information, In Report)

    Sta

    geC

    Sta

    geD

    Dra

    ft

    Sta

    geD

    Sta

    geE

    (CP

    T)D

    RA

    FT

    Sta

    geD

    (CP

    H,C

    PL,

    CP

    W)

    DR

    AFT

    P:\106610\IMS\SQP 08

    106610 Date of IssueCentre PointAlmacantar-

    Number of Copiese e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e eee e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e eee e e e e e e e e e e e e e e e

    e e e e e e e e e e e e e e ee

    e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e es s s s s s s s s s s s s s s e e e s s

    sc sc sc sc sc sc sc sc sc sc sc sc sc sc pl pl pl pl pl

    Approved for issue by:Date:

    Issued by (Issuer's Initials):Transmittal Note No:

    Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -): Received by (Recipient to acknowledge receipt by signing and returning a copy of this form):

    Transmittal Note No: Print Name: Signature:Date:

    Transportation Consultant - Steer Davies GleaveResidential Agent - SavillsCladding Consultant - Wintech

    Format: e = electronic, p = paperLocation where stored: s=server, f = file (for hard copy file)

    Other location details: e.g. file section

    Acoustic Consultant - Sandy Brown Associates

    Main Contractor - SRM

    (Lead) Architect - Rick Mather Architects (CPH, CPL & Public Realm)Architect - Conran & Partners (CPT)Structural/Civil Engineer - Pell FrischmannCost Consultant - WT PartnershipPlanning Consultant - Gerald EveCDM Coordinator - Lend Lease Consulting

    Building Control - Philip Wilmann - London Borough of Camden Building Control Officer

    DistributionClient - Almacantar (Geoff Taylor)

  • Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 2 of 3

    Project No:Project Title : Day 4 17 31 21 23 3 31 14 25 2 4 16 11 13 29 12 30 30 31 4 28 30 21 31 5 10 20 28 30 03Client Name: Month 4 8 8 11 11 4 5 6 6 9 9 10 11 11 11 12 1 1 1 4 4 4 7 7 9 10 10 10 10 11Client Project No (if known): Year 12 12 12 12 12 13 13 13 13 13 13 13 13 13 13 13 14 14 14 14 14 14 14 14 14 14 14 14 14 14

    Doc

    Type Drawing No. Client Drawing No

    (if different)Drawing Title

    Draw 106610/P/3097 Sub-Basement Level Sanitation, Rainwater and Condensate Layout A0 00 01 02 03 04 04 05 06 07 08 09 09 09 10 11 11 12 13 13 13Draw 106610/P/3098 Basement Level Sanitation, Rainwater and Condensate Layout A0 00 01 02 03 04 04 05 06 07 08 09 09 09 10 11 11 12 13 14 14Draw 106610/P/3099 CPT Ground Floor Sanitation, Rainwater and Condensate Layout A1 00 01 02 03 03 04 04 05 05 06 06 07 07 07 07 08 08 08 09Draw 106610/P/3100 CPT Ground Floor Mezzanine Sanitation, Rainwater and Condensate Layout A1 00 01 02 03 03 04 04 05 05 06 06 07 07 07 07 08 08 08 09Draw 106610/P/3101 CPT First Floor Sanitation, Rainwater and Condensate Layout A1 00 01 02 03 03 04 04 05 05 06 06 07 07 07 08 08 08 09 10 10 10 10Draw 106610/P/3102 CPT Second Floor Sanitation, Rainwater and Condensate Layout A1 00 01 02 03 03 04 04 05 05 06 07 08 09 09 09 10 11 12 13 14Draw 106610/P/3103 CPT Level 3 Sanitation, Rainwater and Condensate Layout A1 00 01 02 03 03 04 04 05 05 06 07 07 07 07 07 08 09 10 10 11Draw 106610/P/3109 CPT Levels 4-9 Typical Floor Sanitation, Rainwater and Condensate Layout A1 00 01 02 03 03 04 04 05 05 06 07 07 07 07 07 08 09 10 10 11Draw 106610/P/3110 CPT Level 10 Sanitation, Rainwater and Condensate Layout A1 00 01 02 03 03 04 04 05 05 06 07 08 08 08 08 09 10 11 11 12Draw 106610/P/3111 CPT Level 11 Sanitation, Rainwater and Condensate Layout A1 00 01 02 03 03 04 04 05 05 06 07 08 08 08 08 09 10 11 11 12Draw 106610/P/3116 CPT Levels 12-16 Typical Floor Sanitation, Rainwater and Condensate Layout A1 00 01 02 03 03 04 04 05 05 06 06 07 07 07 07 08 09 10 10 11Draw 106610/P/3117 CPT Level 17 Sanitation, Rainwater and Condensate Layout A1 00 01 02 03 03 04 04 05 05 06 06 07 07 08 08 09 10 11 11 12Draw 106610/P/3118 CPT Level 18 Sanitation, Rainwater and Condensate Layout A1 00 01 02 03 03 04 04 05 05 06 06 07 07 07 07 08 09 10 10 11Draw 106610/P/3129 CPT Levels 19-29 Typical Floor Sanitation, Rainwater and Condensate Layout A1 00 01 02 03 03 04 04 05 05 06 06 07 07 07 07 08 09 10 10 11Draw 106610/P/3130 CPT Level 30 Sanitation, Rainwater and Condensate Layout A1 00 01 02 03 03 04 04 05 05 06 06 07 07 07 07 08 09 10 10 11Draw 106610/P/3131 CPT Level 31 Sanitation, Rainwater and Condensate Layout A1 00 01 02 03 03 04 04 05 05 06 06 07 07 07 07 08 08 09 09 10Draw 106610/P/3132 CPT Level 32 Sanitation, Rainwater and Condensate Layout A1 00 01 02 03 03 04 04 05 05 06 06 07 07 07 07 08 09 10 10 11Draw 106610/P/3133 CPT Level 33 Sanitation, Rainwater and Condensate Layout A1 00 01 02 02 03 04 04 05 05 06 06 07 07 08 08 08 08 09 10 10 10 11Draw 106610/P/3134 CPT Level 34 Sanitation, Rainwater and Condensate Layout A1 00 01 02 02 03 04 04 05 05 06 06 07 07 08 09 09 09 10 11 11 11 12

    P:\106610\IMS\SQP 08

    106610 Date of IssueCentre PointAlmacantar-

    Comments: Public Health Services Drawings

    Dra

    win

    gSi

    ze

    Reason For Issue (e.g. Preliminary, For Tender, For Construction, As Built, For Comment, For Approval, For Information, In Report)

    Sta

    geC

    Sta

    geD

    Dra

    ft

    Sta

    geD

    Dra

    ftS

    tage

    DA

    dden

    dum

    Sta

    geD

    Add

    endu

    m

    Sta

    geE

    (CP

    T)D

    RA

    FT

    Sta

    geD

    (CP

    H,C

    PL,

    CP

    W)

    DR

    AFT

    Sta

    geD

    (CP

    H,C

    PL

    &C

    PW

    )S

    tage

    EC

    PT

    Sta

    geE

    CP

    T

    Em

    ploy

    er's

    Req

    uire

    men

    ts

    Sta

    geE

    -Ten

    derI

    ssue

    Sta

    geE

    Issu

    e

    Upd

    ated

    ER

    Issu

    e

    Upd

    ated

    Sta

    geE

    -Ten

    der

    Issu

    e

    Upd

    ated

    Sta

    geE

    -Ten

    der

    Issu

    e

    Em

    ploy

    er's

    Req

    uire

    men

    ts

    Poo

    lPac

    kage

    Tend

    er

    ForT

    ende

    r

    Poo

    lPac

    kage

    Tend

    er

    ForT

    ende

    r

    Em

    ploy

    er's

    Req

    uire

    men

    ts

    Bui

    ldin

    gC

    ontro

    lSub

    mis

    sion

    Upd

    ated

    Sta

    geE

    Upd

    ated

    Sta

    geE

    Upd

    ated

    Sta

    geE

    Upd

    ated

    Sta

    geE

    Upd

    ated

    Sta

    geE

    Upd

    ated

    Sta

    geE

    Upd

    ated

    Sta

    geE

    Doc Type: Draw: Drawing

    Revision

    Sta

    geE

    Bac

    kgro

    und

    Upd

    ate

    CPT Level 34 Sanitation, Rainwater and Condensate Layout 04 04Draw 106610/P/3135 CPT Roof level Sanitation and Rainwater Installation Layout A1 00 01 02 03 04 04 05 05 06 06 07 07 08 08 08 08 09 09 09 09 10

    Draw 106610/P/3151 CPT Levels 3-10, Apt Types 1&2 Domestic Water Services Layout A0 00 01 01 02 02 02 02 02 02 03 03 03 03 04 05Draw 106610/P/3152 CPT Levels 11-17, Apt Types 3&4 Domestic Water Services Layout A0 00 01 01 02 02 02 02 02 02 03 03 03 03 04 05Draw 106610/P/3153 CPT Levels 11-17, Apt Type 5 Domestic Water Services Layout A0 00 01 01 02 02 02 02 02 02 03 03 03 03 04 05Draw 106610/P/3154 CPT Levels 18-30, Apt Type 6 Domestic Water Services Layout A0 00 01 01 02 02 02 02 02 02 03 03 03 03 04 05Draw 106610/P/3155 CPT Level 31 & 32, Apt Type 7 Domestic Water Services Layout A0 00 01 01 02 02 02 02 02 02 03 03 03 03 04 05Draw 106610/P/3156 CPT Level 33, Apt Type 8A Domestic Water Services Layout A0 00 01 01 02 02 02 02 02 02 03 03 03 03 04 05Draw 106610/P/3157 CPT Level 34, Apt Type 8B Domestic Water Services Layout A0 00 01 01 02 02 02 02 02 02 03 03 03 03 04 04Draw 106610/P/3161 CPT First Floor Level Domestic Water Services Layout A0 00 00 00 01 01Draw 106610/P/3162 CPT Second Floor Level Domestic Water Services Layout A0 00 00 00 01 02

    Number of Copiese e e e e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e e e eee e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e eee e e e e e e e e e e e e e e e e

    e e e e e e e e e e e e e e e e ee

    e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e e e e e e e es s s s s s s s s s s s s s s s s s s e e e s s s s

    sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc pl pl pl pl rw rw rw

    Approved for issue by:Date:

    DistributionClient - Almacantar (Geoff Taylor)(Lead) Architect - Rick Mather Architects (CPH, CPL & Public Realm)Architect - Conran & Partners (CPT)Structural/Civil Engineer - Pell FrischmannCost Consultant - WT PartnershipPlanning Consultant - Gerald EveCDM Coordinator - Lend Lease Consulting

    Date:

    Transportation Consultant - Steer Davies GleaveResidential Agent - SavillsCladding Consultant - Wintech

    Format: e = electronic, p = paperLocation where stored: s=server, f = file (for hard copy file)

    Other location details: e.g. file section

    Acoustic Consultant - Sandy Brown Associates

    Main Contractor - SRMBuilding Control - Philip Wilmann - London Borough of Camden Building Control Officer

    Issued by (Issuer's Initials):Transmittal Note No:

    Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -): Received by (Recipient to acknowledge receipt by signing and returning a copy of this form):Transmittal Note No: Print Name: Signature:

  • Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 3 of 3

    Project No:Project Title : Day 4 17 31 21 23 3 31 14 2 4 11 13 29 12 30 4 28 30 6 31 21 5 10 20 03Client Name: Month 4 8 8 11 11 4 5 6 9 9 11 11 11 12 1 4 4 4 5 7 7 9 10 10 11Client Project No (if known): Year 12 12 12 12 12 13 13 13 13 13 13 13 13 13 14 14 14 14 14 14 14 14 14 14 14

    Doc

    Type Drawing No. Client Drawing No

    (if different)Drawing Title

    Draw 106610/P/3200 CPH Ground Floor, Sanitation and Rainwater Installation Layout A0 00 01 02 03 04 04 05 05 06 07 08 09 09 09 10 11 12 12Draw 106610/P/3201 CPH Ground Floor Mezzanine, Sanitation and Rainwater Installation Layout A0 00 01 02 03 04 04 05 05 06 07 08 09 09 09 10 11 12 12Draw 106610/P/3202 CPH First Floor, Sanitation and Rainwater Installation Layout A0 00 01 02 03 04 04 05 05 06 07 08 09 09 09 10 11 12 12Draw 106610/P/3203 CPH First Floor Mezzanine, Sanitation and Rainwater Installation Layout A0 00 01 02 03 04 04 05 05 06 07 08 09 09 09 10 11 11 11Draw 106610/P/3204 CPH Podium Level, Sanitation and Rainwater Installation Layout A0 00 01 02 03 04 04 05 05 06 07 08 09 09 09 10 11 12 12Draw 106610/P/3205 CPH Third Floor, Sanitation and Rainwater Installation Layout A0 00 00 01 01 02 03 03 03 03 03 04 05 06 06

    Draw 106610/P/3301 CPW Affordable Apartments - Rainwater Installation Schematic A0 00 01 02 02 03 03 04 04 05 05 05 05 05 06 06 07 07 07Draw 106610/P/3302 CPW Affordable Apartments - Sanitation Installation Schematic A0 00 01 02 02 03 03 04 04 05 06 06 06 06 07 07 08 08 08Draw 106610/P/3303 CPW Affordable Apartments - Domestic Water Installation Schematic A0 00 01 02 02 03 03 04 05 06 07 07 07 07 08 09 10 10

    Draw 106610/P/3310 (Option A) CPW Affordable Apartments Basement Level - Sanitation & RainwaterLayout

    A0 00 WITHDRAWN

    Draw 106610/P/3311 CPW Affordable Apartments Level 00, 0M, 01 & 01M - Sanitation & Rainwater Layout A0 00 01 01 02 02 03 04 05 05 05 05 05 06 06 07 07 07Draw 106610/P/3312 CPW Affordable Apartments Level 02, 03, 04 & 05 - Sanitation & Rainwater Layout A0 00 01 01 02 02 03 03 03 03 03 03 03 04 04 05 05 05Draw 106610/P/3313 CPW Affordable Apartments Level 06, 07, 08 & Roof - Sanitation & Rainwater Layout A0 00 01 01 02 02 03 03 04 04 04 04 04 05 05 06 06 06

    Sta

    geC

    Sta

    geD

    Dra

    ft

    Sta

    geD

    P:\106610\IMS\SQP 08

    106610 Date of IssueCentre PointAlmacantar-

    Comments: Public Health Services Drawings

    Dra

    win

    gSi

    ze

    Reason For Issue (e.g. Preliminary, For Tender, For Construction, As Built, For Comment, For Approval, For Information, In Report)

    Sta

    geD

    (CP

    H,C

    PL,

    CP

    W)D

    RA

    FTS

    tage

    D(C

    PH

    ,CP

    L&

    CP

    W)

    Sta

    geE

    CP

    T

    Em

    ploy

    er's

    Req

    uire

    men

    ts

    Sta

    geE

    -Ten

    derI

    ssue

    Dra

    ftS

    tage

    DA

    dden

    dum

    Em

    ploy

    er's

    Req

    uire

    men

    ts(C

    PW

    )

    Upd

    ated

    Sta

    geE

    Sta

    geD

    Add

    endu

    m

    Sta

    geE

    (CP

    T)D

    RA

    FT

    Upd

    ated

    ER

    Issu

    e

    Upd

    ated

    Sta

    geE

    -Ten

    derI

    ssue

    Upd

    ated

    Sta

    geE

    -Ten

    derI

    ssue

    Em

    ploy

    er's

    Req

    uire

    men

    ts

    Upd

    ated

    Sta

    geE

    Upd

    ated

    Sta

    geE

    Sta

    geE

    Bac

    kgro

    und

    Upd

    ate

    Doc Type: Draw: Drawing

    Revision

    Upd

    ated

    Sta

    geE

    Upd

    ated

    Sta

    geE

    ForT

    ende

    r

    ForT

    ende

    r

    Em

    ploy

    er's

    Req

    uire

    men

    ts

    Bui

    ldin

    gC

    ontro

    lSub

    mis

    sion

    Draw 106610/P/3320 (Option B) CPW Affordable Apartments Basement Level - Sanitation & RainwaterLayout

    A0 00 WITHDRAWNDraw 106610/P/3321 (Option B) CPW Affordable Apartments Level 00, 00M, 01 & 01M - Sanitation &

    Rainwater LayoutA0 00 WITHDRAWN

    Draw 106610/P/3322 (Option B) CPW Affordable Apartments Level 02, 03, 04 & 05- Sanitation & RainwaterLayout

    A0 00 WITHDRAWNDraw 106610/P/3323 (Option B) CPW Affordable Apartments Level 06, 07, 08 & 09 - Sanitation & Rainwater

    LayoutA0 00 WITHDRAWN

    Number of Copiese e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e

    e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e

    e e e e e e e e e e e e e e ee e e e e e e e e e e e e e

    ee e e e e e e e e e e e e e e

    e e e e e e e e e e e e e e e e e es s s s s s s s s s s s s e e e s s

    sc sc sc sc sc sc sc sc sc sc sc sc sc pl pl pl pl pl

    Approved for issue by:Date:

    DistributionClient - Almacantar (Geoff Taylor)(Lead) Architect - Rick Mather Architects (CPH, CPL & Public Realm)Architect - Conran & Partners (CPT)Structural/Civil Engineer - Pell FrischmannCost Consultant - WT PartnershipPlanning Consultant - Gerald EveCDM Coordinator - Lend Lease Consulting

    Cladding Consultant - Wintech

    Acoustic Consultant - Sandy Brown AssociatesFormat: e = electronic, p = paper

    Location where stored: s=server, f = file (for hard copy file)

    Transportation Consultant - Steer Davies GleaveResidential Agent - Savills

    Building Control - Philip Wilmann - London Borough of Camden Building Control Officer

    Other location details: e.g. file sectionIssued by (Issuer's Initials):

    Main Contractor - SRM

    Transmittal Note No:Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -): Received by (Recipient to acknowledge receipt by signing and returning a copy of this form):Transmittal Note No: Print Name: Signature:

    Date:

  • Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 1 of 2Project No:Project Title : Day 4 17 31 31 14 2 4 . 11 13 29 12 24 30 21 24 7 4Client Name: Month 4 8 8 5 6 9 9 . 11 11 11 12 01 1 2 2 3 4Client Project No (if known): Year 12 12 12 13 13 13 13 . 13 13 13 13 14 14 14 14 14 14

    Doc

    Type Drawing No. Client Drawing No

    (if different)Drawing Title

    Draw106610/L/SK03 Layout of Three Machine Roomless Passenger Lifts 1000kgs 13 Persons

    at 2.5m/s00 01 02 03 04 04 04 04 04 04 05 06

    106610/L/SK04 Layout of One Machine Roomless Passenger/Goods Lift 1000kgs 17Persons at 1.0m/s

    00 01 02WITHDRAWN

    106610/L/SK05 Layout of One Machine Roomless Passenger/Goods Lift 1000kgs 13Persons at 1.0m/s

    00 01 02 03 04 04 05 05 05 05 06 06

    106610/L/SK06 Layout of One Machine Roomless Passenger/Goods Lift 2500kgs 33Persons at 1.0m/s

    00 01 02 03 04 04 04 04 04 05 05

    106610/L/SK07 Layout Two Electro Hydraulic Vehicle Lifts 5500kgs at 0.5m/s 00 01 02 03 04 04 04 04 04 05 05106610/L/SK08 Layout of One Electrohydraulic Passenger Lift 1800kgs 24 Persons at

    0.63m/s00 01 02 03 04 04 04 04 04 WITHDRAWN

    106610/L/SK09 Layout of One Machine Roomless Passenger/Goods Lift 1000kgs 13Persons at 1.0m/s

    00 01 02 03 04 04 04 04 04 05 05

    SUPERSEDED

    SUPERSEDED

    SUPERSEDED

    SUPERSEDED

    SUPERSEDED

    Doc Type: Draw: Drawing

    Revision

    ForT

    ende

    r

    Em

    ploy

    er's

    Req

    uire

    men

    ts

    ForT

    ende

    r

    ForT

    ende

    r

    Issu

    edfo

    rre-

    pric

    ing

    Issu

    edfo

    rre-

    pric

    ing

    Upd

    ated

    Sta

    geE

    -Ten

    derI

    ssue

    Em

    poly

    er's

    Req

    uire

    men

    ts

    Sta

    geE

    -Ten

    derI

    ssue

    ForT

    ende

    r

    Upd

    ated

    ERIs

    sue

    Upd

    ated

    Sta

    geE

    -Ten

    derI

    ssue

    Upd

    ated

    Sta

    geE

    -Ten

    derI

    ssue

    Comments: Lift Services Drawings

    Dra

    win

    gSi

    ze

    Reason For Issue (e.g. Preliminary, For Tender, For Construction, As Built, For Comment, For Approval, For Information, In Report)

    Sta

    geC

    Sta

    geD

    Dra

    ft

    Sta

    geD

    Sta

    geD

    (CP

    H,C

    PL,

    CP

    W)

    DR

    AFT

    Sta

    geD

    (CP

    H,C

    PL

    &C

    PW

    )S

    tage

    EC

    PT

    P:\106610\IMS\SQP 08

    106610 Date of IssueCentre PointAlmacantar-

    Persons at 1.0m/s106610/L/SK10

    Layout of One Machine Roomless Passenger/Goods Lift 1000kgs 13Persons at 1.0m/s

    00 01 02WITHDRAWN

    106610/L/SK11Layout of One Machine Roomless Passenger/Goods Lift 1000kgs 13Persons at 1.0m/s

    00 01 02 03 04 05 05 05 05 05 06 06

    106610/L/SK13 Layout of One Machine Roomless Passenger/Goods Lift 1000kgs 13Persons at 1.0m/s

    00 01 02 03 04 04 04 04 04 05 05

    106610/L/SK15 Layout Two Electro Hydraulic Vehicle Lifts 5500kgs at 0.5m/s 00 01 02 03 04 04 04 04 04 05 05106610/L/SK16 Layout of One Platform Lift 400kgs at 0.15m/s 01 02 02 02 02 02 03 03106610/L/SK17 Layout of One Platform Lift 400kgs at 0.15m/s 00 REINSTATED 01106610/L/SK18 Layout of One Platform Lift 400kgs at 0.15m/s 00 01 01 01 01 01 01 01 02106610/L/SK19 Layout of One Machine Roomless Passenger Lift 630kgs 8 Persons at

    1.0m/s00 01 01 01 01 01 02 02

    106610/L/SK20 Layout of one machine roomless passenger Lift - CantileveredArrangement

    01 01 01 02 02 03Number of Copies

    e e e e e e e e e ee e e e e e e e e ee e e e e e e e e ee e e e e e e e e ee e e e e e e e e e e

    e e e e e e e ee e e e e e e e

    e e e e e e e ee e e e e e e e e e

    e e e e e e e ee e e e e e e e e e es s s s s s s s s s s s s

    SUPERSEDEDSUPERSEDED

    SUPERSEDED

    SUPERSEDED

    SUPERSEDEDSUPERSEDEDSUPERSEDEDSUPERSEDED

    Transportation Consultant - Steer Davies GleaveResidential Agent - SavillsCladding Consultant - Wintech

    Format: e = electronic, p = paperLocation where stored: s=server, f = file (for hard copy file)

    Other location details: e.g. file section

    Acoustic Consultant - Sandy Brown AssociatesMain Contractor - SRM

    (Lead) Architect - Rick Mather Architects (CPH, CPL & Public Realm)Architect - Conran & Partners (CPT)Structural/Civil Engineer - Pell FrischmannCost Consultant - WT PartnershipPlanning Consultant - Gerald EveCDM Coordinator - Lend Lease Consulting

    DistributionClient - Almacantar (Geoff Taylor)

    dj dj dj dj sc sc sc dj sc dj dj

    Approved for issue by:Date:

    Issued by (Issuer's Initials):Transmittal Note No:

    Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -): Received by (Recipient to acknowledge receipt by signing and returning a copy of this form):

    Transmittal Note No: Print Name: Signature:Date:

  • Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 2 of 2

    Project No:Project Title : Day 4 17 31 31 14 2 4 . 11 13 29 12 24 30 21 24 7 4 28 30 6 31 9 20 03Client Name: Month 4 8 8 5 6 9 9 . 11 11 11 12 01 1 2 2 3 4 4 4 5 7 9 10 11Client Project No (if known): Year 12 12 12 13 13 13 13 . 13 13 13 13 14 14 14 14 14 14 14 14 14 14 14 14 14

    Doc

    Type Drawing No. Client Drawing No

    (if different)Drawing Title

    Draw106610/L/4003 Layout of Three Machine Roomless Passenger Lifts 1000kgs 13 Persons

    at 2.5m/s00 00 00 01 01 01 01

    106610/L/4005 Layout of One Machine Roomless Passenger/Goods Lift 1000kgs 13Persons at 1.0m/s

    00 00 00 01 01 01 01

    106610/L/4006 Layout of One Machine Roomless Passenger/Goods Lift 2500kgs 33Persons at 1.0m/s

    00 00 00 01 01 01 01

    106610/L/4007 Layout Two Electro Hydraulic Vehicle Lifts 5500kgs at 0.5m/s 00 00 00 01 01 01 01106610/L/4009 Layout of One Machine Roomless Passenger/Goods Lift 1000kgs 13

    Persons at 1.0m/s00 00 00 01 01 01 01

    106610/L/4011 Layout of One Machine Roomless Passenger/Goods Lift 1000kgs 13Persons at 1.0m/s

    00 00 00 01 01 01 01

    106610/L/4013 Layout of One Machine Roomless Passenger/Goods Lift 1000kgs 13 00 00 00 01 01 01 01

    -AlmacantarCentre Point

    Date of Issue106610

    0

    Sta

    geD

    Dra

    ftSta

    geC

    Reason For Issue (e.g. Preliminary, For Tender, For Construction, As Built, For Comment, For Approval, For Information, In Report)

    Dra

    win

    gSi

    ze

    Lift Services DrawingsComments:

    ForT

    ende

    r

    Sta

    geE

    -Ten

    derI

    ssue

    Em

    poly

    er's

    Req

    uire

    men

    ts

    Sta

    geD

    (CP

    H,C

    PL

    &C

    PW

    )S

    tage

    EC

    PT

    Sta

    geD

    (CP

    H,C

    PL,

    CP

    W)

    DR

    AFT

    Sta

    geD

    ForT

    ende

    r

    ForT

    ende

    r

    Em

    ploy

    er's

    Req

    uire

    men

    ts

    Upd

    ated

    Sta

    geE

    -Ten

    derI

    ssue

    Upd

    ated

    Sta

    geE

    -Ten

    derI

    ssue

    Upd

    ated

    ERIs

    sue

    Bui

    ldin

    gC

    ontro

    lSub

    mis

    sion

    Em

    ploy

    er's

    Req

    uire

    men

    ts

    ForT

    ende

    r

    Upd

    ated

    Sta

    geE

    -Ten

    derI

    ssue

    Issu

    edfo

    rre-

    pric

    ing

    Issu

    edfo

    rre-

    pric

    ing

    Upd

    ated

    Sta

    geE

    Upd

    ated

    Sta

    geE

    Upd

    ated

    Sta

    geE

    Upd

    ated

    Sta

    geE

    Em

    ploy

    er's

    Req

    uire

    men

    ts(C

    PW

    )

    Revision

    Doc Type: Draw: Drawing

    106610/L/4013 Layout of One Machine Roomless Passenger/Goods Lift 1000kgs 13Persons at 1.0m/s

    00 00 00 01 01 01 01

    106610/L/4015 Layout Two Electro Hydraulic Vehicle Lifts 5500kgs at 0.5m/s 00 00 00 01 01 01 01106610/L/4016 Layout of One Platform Lift 400kgs at 0.15m/s 00 00 00 01 01 01 01106610/L/4017 Layout of One Platform Lift 400kgs at 0.15m/s 00 00 00 01 01 01 01106610/L/4018 Layout of One Platform Lift 400kgs at 0.15m/s 00 00 00 01 01 01 01106610/L/4019 Layout of One Machine Roomless Passenger Lift 630kgs 8 Persons at

    1.0m/s00 00 00 00 01 01 01 01

    106610/L/4021 Layout of one machine roomless passenger Lift 00 00 00 01 01 01 01Number of Copies

    e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e

    e e e e e e e e e e e e ee e e e e e e e e e

    e e e e e e e e e ee e e e e e e e e e e e e e e e e

    e ee e e e e e e e e e e e e

    e e e e e e e e e e e e e e e e e es s s s s s s s s s s s s s s s s s s s

    dj dj dj dj sc sc sc dj sc dj dj sc sc sc sc ah ah ah

    Approved for issue by:Date:

    (Lead) Architect - Rick Mather Architects (CPH, CPL & Public Realm)Client - Almacantar (Geoff Taylor)Distribution

    Transportation Consultant - Steer Davies GleaveCDM Coordinator - Lend Lease ConsultingPlanning Consultant - Gerald EveCost Consultant - WT PartnershipStructural/Civil Engineer - Pell FrischmannArchitect - Conran & Partners (CPT)

    Location where stored: s=server, f = file (for hard copy file)Format: e = electronic, p = paper

    Acoustic Consultant - Sandy Brown Associates

    Main Contractor - BrookfieldCladding Consultant - WintechResidential Agent - Savills

    Building Control - Philip Wilmann - London Borough of Camden Building Control Officer

    Transmittal Note No:Received by (Recipient to acknowledge receipt by signing and returning a copy of this form):Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -):

    Transmittal Note No:Issued by (Issuer's Initials):

    Other location details: e.g. file section

    Date:Signature:Print Name:

    Date: Date:

  • Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 1 of 2Project No:Project Title : Day 4 17 31 21 23 3 4 14 25 2 4 11 13 29 12 30 30 11 4 28 30 31 10 20 3Client Name: Month 4 8 8 11 11 4 4 6 6 9 9 11 11 11 12 1 1 2 4 4 4 7 10 10 11Client Project No (if known): Year 12 12 12 12 12 13 13 13 13 13 13 13 13 13 13 14 14 14 14 14 14 14 14 14 14

    Doc

    Type Drawing No. Client Drawing No

    (if different)Drawing Title

    Draw 106610/F/5001 Wet & Dry Riser System Schematic A0 00 01 02 03 04 05 05 06 06 07 07 08 08 08 08 08 09 09 09 09Draw 106610/F/5002 Sprinkler System Schematic A0 00 01 02 03 04 05 05 06 06 07 07 08 08 09 09 09 10 11 11 11

    Draw 106610/F/5008 Sub Basement Level Sprinkler System Pump and Tank Layout (CPT & CPH) A0 00 01 02 03 04 05 05 06 06 07 07 08 08 08 08 09 09 09 09Draw 106610/F/5009 Sub Basement Level Sprinkler System Pipework Layout (CPT & CPH) A0 00 01 02 03 04 04 05 06 07 07 08 08 08 08 08 09 10 10 10Draw 106610/F/5010 Basement Level Sprinkler System Pipework Layout (CPT & CPH) A0 00 01 02 03 04 04 05 05 06 06 07 07 08 08 08 09 10 10 10Draw 106610/F/5011 Ground Floor Sprinkler System Pipework Layout (CPT & CPH) A0 00 01 02 03 04 04 05 05 06 06 07 07 08 09 09 10 11 11 11Draw 106610/F/5012 Ground Floor Mezzanine Sprinkler Pipework Zone Layout (CPT & CPH) A0 00 01 02 03 04 04 05 05 06 06 07 07 08 09 09 10 11 11 11Draw 106610/F/5013 First Floor Sprinkler System Pipework Layout (CPT & CPH) A0 00 01 02 03 04 04 05 05 06 06 07 07 07 08 09 09 10 11 11 11Draw 106610/F/5014 First Mezzanine Floor Sprinkler System Pipework Layout (CPT & CPH) 00 01 02 02 03 03 04 04 05 05 06 06 06 07 08 08 08Draw 106610/F/5015 Second Floor Sprinkler System Pipework Layout (CPT & CPH) A0 00 01 02 02 03 03 04 04 05 05 06 06 06 07 08 08 08Draw 106610/F/5016 Levels 03 to 10 Sprinkler System Zone Layout (CPT) A0 00 01 02 03 04 04 05 05 06 06 07 07 07 07 08 09 10 11Draw 106610/F/5017 Levels 11 to 17 Sprinkler System Zone Layout (CPT) A0 00 01 02 03 04 04 05 05 06 06 07 07 07 07 08 09 10 11Draw 106610/F/5018 Levels 18 to 30 Sprinkler System Zone Layout (CPT) A0 00 01 02 03 04 04 05 05 06 06 07 07 07 07 08 09 10 11Draw 106610/F/5019 Levels 31 to 32 Sprinkler System Zone Layout (CPT) A0 00 01 02 03 04 04 05 05 06 06 07 07 07 07 08 09 10 11Draw 106610/F/5020 Level 33 Lower Duplex Sprinkler System Zone Layout (CPT) A0 00 01 02 03 04 04 05 05 06 06 07 07 07 07 08 09 09 10Draw 106610/F/5021 Level 34 Upper Duplex Sprinkler System Zone Layout (CPT) A0 00 01 02 03 04 04 05 05 06 06 07 07 07 07 08 09 10 11Draw 106610/F/5026 Level 00 Ground Floor Sprinkler Head Layout (CPT) A0 00 01 01 02 02 03 03 04 04 05 05 05 05 06 07 08 09

    Doc Type: Draw: Drawing

    Revision

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    ForT

    ende

    r

    ForT

    ende

    r

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Build

    ing

    Con

    trolS

    ubm

    issi

    on

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Upd

    ated

    ER

    Issu

    e

    Upd

    ated

    Stag

    eE

    -Ten

    derI

    ssue

    Upd

    ated

    Stag

    eE

    -Ten

    derI

    ssue

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Pool

    Pack

    age

    Tend

    er

    ForT

    ende

    r

    Stag

    eE

    (CPT

    )DR

    AFT

    Stag

    eE

    (CPT

    )DR

    AFT

    Stag

    eD

    (CPH

    ,CPL

    &C

    PW)

    Stag

    eE

    CPT

    Stag

    eE

    CPT

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Stag

    eE

    -Ten

    derI

    ssue

    Comments: Fire Services Drawings

    Dra

    win

    gSi

    ze

    Reason For Issue (e.g. Preliminary, For Tender, For Construction, As Built, For Comment, For Approval, For Information, In Report)

    Stag

    eC

    Stag

    eD

    Dra

    ft

    Stag

    eD

    Dra

    ftSt

    age

    DAd

    dend

    um

    Stag

    eD

    Adde

    ndum

    P:\106610\IMS\SQP 08

    106610 Date of IssueCentre PointAlmacantar-

    Draw 106610/F/5026 Level 00 Ground Floor Sprinkler Head Layout (CPT) A0 00 01 01 02 02 03 03 04 04 05 05 05 05 06 07 08 09Draw 106610/F/5027 Level 00M Ground Mezz. Sprinkler Head Layout (CPT) A0 00 01 01 02 02 03 03 04 04 05 05 05 05 06 07 08 09

    106610/F/5028 Level 01 Sprinkler Head Layout (CPT) A0 00 00 00 00 01 02 03 04106610/F/5029 Level 02 Sprinkler Head Layout (CPT) A0 00 00 00 00 01 02 03 04

    Draw 106610/F/5030 Levels 03 to 10 Apartment Sprinkler Head Layout A0 00 01 02 03 03 04 04 05 05 06 06 07 07 07 07 08 09 10 11Draw 106610/F/5031 Levels 11 to 17 Apartment Sprinkler Head Layout A0 00 01 02 03 03 04 04 05 05 06 06 07 07 07 07 08 09 10 11Draw 106610/F/5032 Levels 18 to 30 Apartment Sprinkler Head Layout A0 00 01 02 03 03 04 04 05 05 06 06 07 07 07 07 08 09 09 10Draw 106610/F/5033 Levels 31 to 32 Apartment Sprinkler Head Layout A0 00 01 02 03 03 04 04 05 05 06 06 07 07 07 07 08 09 09 10Draw 106610/F/5034 Level 33 Lower Duplex Sprinkler Head Layout A0 00 01 02 02 03 04 04 05 05 06 06 07 07 08 08 08 08 09 10 11 12Draw 106610/F/5035 Level 34 Upper Duplex Sprinkler Head Layout A0 00 01 02 02 03 04 04 05 05 06 06 07 07 08 08 08 08 09 10 10 12

    Number of Copiese e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e eee e e e e e e e e e e e e e e e ee e e e e e e e e e e e e e eee e e e e e e e e e e

    e e e e e e e e e e e e e e ee

    e e e e e e e e e e e e e ee e e e e e e e e e e e e e e e e e e e e es s s s s s s s s s s s s s s s s s s s s s

    sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc sc

    Approved for issue by:Date:

    Issued by (Issuer's Initials):Transmittal Note No:

    Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -): Received by (Recipient to acknowledge receipt by signing and returning a copy of this form):

    Transmittal Note No: Print Name: Signature:Date:

    Transportation Consultant - Steer Davies GleaveResidential Agent - SavillsCladding Consultant - Wintech

    Format: e = electronic, p = paperLocation where stored: s=server, f = file (for hard copy file)

    Other location details: e.g. file section

    Acoustic Consultant - Sandy Brown Associates

    Main Contractor - SRMBuilding Control - Philip Wilmann - London Borough of Camden Building Control Officer

    (Lead) Architect - Rick Mather Architects (CPH, CPL & Public Realm)Architect - Conran & Partners (CPT)Structural/Civil Engineer - Pell FrischmannCost Consultant - WT PartnershipPlanning Consultant - Gerald EveCDM Coordinator - Lend Lease Consulting

    DistributionClient - Almacantar (Geoff Taylor)

  • Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 2 of 2

    Project No:Project Title : Day 31 14 2 4 11 13 29 12 30 11 4 28 30 6 31 10 20 3Client Name: Month 5 6 9 9 11 11 11 12 1 2 4 4 4 5 7 10 10 11Client Project No (if known): Year 13 13 13 13 13 13 13 13 14 14 14 14 14 14 14 14 14 14

    Doc

    Type

    Drawing No. Client Drawing No(if different)

    Drawing Title

    106610/F/5100 CPW Affordable Housing Apartment Types 1, 2 & 3 - Sprinkler SystemZone Layout

    A0 00 01 02 02 03 03 04 04 05 05 06 06 06 06 07 07 07

    106610/F/5101 CPW Affordable Housing Apartment Types 4 & 5 - Sprinkler System ZoneLayout

    A0 00 01 02 02 03 03 04 04 05 05 05 05 05 05 06 06 06

    106610/F/5102 CPW Affordable Housing Apartment Types 6 & 7 (Option B) - SprinklerSystem Zone Layout

    A0 00 01 WITHDRAWN

    106610/F/5110CPW Affordable Housing Apartment Types 1, 2 & 3 - Sprinkler HeadLayout

    A0 00 01 02 02 03 03 04 04 05 05 06 06 06 06 07 07 07

    106610/F/5111 CPW Affordable Housing Apartment Types 4 & 5 - Sprinkler Head LayoutA0 00 01 02 02 03 03 04 04 05 05 05 05 05 05 06 06 06

    106610/F/5112CPW Affordable Housing Apartment Types 6 & 7 (Option B) - SprinklerHead Layout

    A0 00 01 WITHDRAWN

    106610/F/5201 CPW Affordable Housing Dry Riser System Schematic 01 01 02 02 03 03 03 03 03 03 03 03 03 03 03106610/F/5202 CPW Affordable Housing Sprinkler System Schematic 01 01 02 02 03 03 04 04 04 04 04 04 04 04 04

    P:\106610\IMS\SQP 08

    106610 Date of IssueCentre PointAlmacantar-

    Comments: Fire Services Drawings

    Dra

    win

    gSi

    ze

    Reason For Issue (e.g. Preliminary, For Tender, For Construction, As Built, For Comment, For Approval, For Information, In Report)

    Stag

    eD

    (CPH

    ,CPL

    ,CPW

    )D

    RAF

    T

    Stag

    eD

    (CPH

    ,CPL

    &C

    PW)

    Stag

    eE

    CPT

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Stag

    eE

    -Ten

    derI

    ssue

    Upd

    ated

    ER

    Issu

    e

    Upd

    ated

    Stag

    eE

    -Ten

    derI

    ssue

    Upd

    ated

    Stag

    eE

    -Ten

    derI

    ssue

    Empl

    oyer

    'sR

    equi

    rem

    ents

    ForT

    ende

    r

    ForT

    ende

    r

    ForT

    ende

    r

    Empl

    oyer

    'sR

    equi

    rem

    ents

    Build

    ing

    Con

    trolS

    ubm

    issi

    onEm

    ploy

    er's

    Req

    uire

    men

    ts(C

    PW)

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Upd

    ated

    Stag

    eE

    Doc Type: Draw: DrawingRevision

    106610/F/5309 CPH Sub Basement Sprinkler Head Layout 00 01 01 01 02 02 02 02106610/F/5310 CPH Basement Sprinkler Head Layout 00 01 01 01 02 02 02 02106610/F/5311 CPH Ground Floor Sprinkler Head Layout 00 01 01 01 02 02 02 02106610/F/5312 CPH Ground Mezzanine Sprinkler Head Layout 00 01 01 01 02 02 02 02106610/F/5313 CPH First Floor Sprinkler Head Layout 00 01 01 01 02 02 02 02106610/F/5314 CPH First Mezzanine Sprinkler Head Layout 00 01 01 01 02 02 02 02106610/F/5315 CPH Second Floor Sprinkler Head Layout 00 01 01 01 02 02 02 02

    106610/F/5809 Sub Basement Level Sprinkler System Zone Layout (CPT & CPH) 00 00 00 00106610/F/5810 Basement Level Sprinkler System Zone Layout (CPT & CPH) 00 00 00 00106610/F/5811 Ground Floor Sprinkler System Zone Layout (CPT & CPH) 00 00 00 00106610/F/5812 Ground Floor Mezzanine Sprinkler System Zone Layout (CPT & CPH) 00 00 00 00106610/F/5813 First Floor Sprinkler System Zone Layout (CPT & CPH) 00 00 00 00106610/F/5814 First Mezzanine Floor Sprinkler System Zone Layout (CPT & CPH) 00 00 00 00106610/F/5815 Podium Floor Sprinkler System Zone Layout (CPT & CPH) 00 00 00 00

    Number of Copiese e e e e e e e e e e e e e e e

    e e e e e e e e e e e e e e ee e e e e e e e e e e e e

    e e e e e e e e e e e e e e ee e e e e e e e e e e e e e

    e e e e e e e e e e e ee e e e e e e e e e e

    e e e e e e ee e e e e e e e e e e e e e

    e ee e e e e e e e e e e

    e e e e e e e e e e e e e e e e es s s s s s s s s s s s s e e e e

    sc sc sc sc sc sc sc sc sc sc sc sc sc pl pl pl pl

    Transportation Consultant - Steer Davies GleaveResidential Agent - Savills

    DistributionClient - Almacantar (Geoff Taylor)(Lead) Architect - Rick Mather Architects (CPH, CPL & Public Realm)Architect - Conran & Partners (CPT)Structural/Civil Engineer - Pell FrischmannCost Consultant - WT PartnershipPlanning Consultant - Gerald EveCDM Coordinator - Lend Lease Consulting

    Cladding Consultant - Wintech

    Acoustic Consultant - Sandy Brown AssociatesFormat: e = electronic, p = paper

    Location where stored: s=server, f = file (for hard copy file)Other location details: e.g. file section

    Issued by (Issuer's Initials):

    Main Contractor - SRMBuilding Control - Philip Wilmann - London Borough of Camden Building Control Officer

    Transmittal Note No:

    Approved for issue by:Date:

    Transmittal Note Details (Section to be completed by the issuer when using this register as a Transmittal Note - negating the need of issuing IP04-02-F01 -): Received by (Recipient to acknowledge receipt by signing and returning a copy of this form):Transmittal Note No: Print Name: Signature:

    Date:

  • Drawing Register & Issue Sheet File Section (where this register is held): Sheet No. : 1 of 2Project No:Project Title : Day 4 17 31 21 23 3 31 4 14 2 4 . 11 13 29 12 30 30 31 4 28 30 6 31 5 10 20 3Client Name: Month 4 8 8 11 11 4 5 6 6 9 9 . 11 11 11 12 1 1 1 4 4 4 5 7 9 10 10 11Client Project No (if known): Year 12 12 12 12 12 13 13 13 13 13 13 . 13 13 13 13 14 14 14 14 14 1