Page 1: GVJ Revised Company Profile 2019 - Power …Microsoft Word - GVJ Revised Company Profile 2019 - Power Generation Author Joseph.Gruter Created Date 11/13/2019 1:19:39 PM

1

Page 2: GVJ Revised Company Profile 2019 - Power …Microsoft Word - GVJ Revised Company Profile 2019 - Power Generation Author Joseph.Gruter Created Date 11/13/2019 1:19:39 PM

2

COMPANYPORTFOLIO

Introduction

GVJElectricalandInstrumentationContractors(Pty)areelectricalcontractorsandspecializeinelectricalreticulationforindustrialandcommercialprojects.OurfocusisintheMiningIndustryandPowerGeneration,includingWind,Solar,Hydro,GasandCoalgeneration.Thisentailsprocuringandinstalling:

LVandMVcables Wireways Transformers VSDs MCCs(MotorControlCentres) DBs(DistributionBoards) MVswitchgear(Incl.RMUsandMinisubstations) PLCPanels SmallPower(Lightingandsocketoutlets) ContainerizedSolutions(MCCs,PLCs,Generatorsetcbuiltintocontainers) ProcessInstruments InstrumentationCables Motors/Generators.Wealsodotestingandcommissioningoftheabove,aswellasissuingofC.O.Cs(CertificatesofCompliances).OurinstallationscomplywithSANS10142‐1:2012(LVWiringCode),aswellas10142‐2:2012(MVWiringCode).WhatmakesGVJuniqueisthefactthatweprovideacombinedElectrical(LVandMV)andInstrumentationservice,whichveryfewcompaniesareabletooffer.GVJisCIDBregisteredandBBBEEaccredited.

MajorProjectInvolvement:

CapeTownStadium–MV/LVReticulation DeAar50MWPVPlant–MV/LVandInstrumentationreticulation Droogfontein50MWPVPlant–MV/LVandInstrumentationreticulation Nobelsfontein75MWWindFarm–MVReticulation Sere100MWWindFarm–LV/MVandInstrumentationReticulation Exxaro/NamakwaSandsSaldanha:DC‐Furnace1Plant SaldanhaSteel–CorexPlant TronoxNamakwaSands–Variousprojects,CompleteE,C&Ireticulation MSRTorminMine‐Variousprojects,CompleteE,C&Ireticulation

Page 3: GVJ Revised Company Profile 2019 - Power …Microsoft Word - GVJ Revised Company Profile 2019 - Power Generation Author Joseph.Gruter Created Date 11/13/2019 1:19:39 PM

3

OurPersonnel

OurqualifiedManagement,ArtisansandSemiskilledpersonnelconstituteaprofessionalwork

forceandarecommittedtoserviceandproductivity. Weareabletomobiliseandengageour

workforceatshortnoticetoaccommodateanycontract.

MissionStatement

GVJmissionstatementis

“TotalQualityCommitment”

We are committed to providing our clientswith professional expertise in theElectrical and

InstrumentationIndustrycombinedwithourinternationaltrainingandexperience.

Page 4: GVJ Revised Company Profile 2019 - Power …Microsoft Word - GVJ Revised Company Profile 2019 - Power Generation Author Joseph.Gruter Created Date 11/13/2019 1:19:39 PM

4

CompanyAnalysis

ReputationalObjectives

Productqualityandcompetitivepricingareseenaskeyfactors.

Smallerpremiseswithlessstaffandoverheadskepttoaminimum.

Outsourcingtoaffirmativecompanies.

CreateademandforSpecialisation.

Motivation

Tobeabletotendercompetitively.

Vigilantmonitoringofcontractcosts.

Lastingrelationshipwithourcustomersthroughperformanceandapositive

reputationforquality.

Managementandhumanresourceskills.

ComprehensiveandwelldocumentedSafetyprogramenforcedonSites.

QA/QCPoliciesandProceduresconformtoISO9000standards.

Servicesoffered

WeofferthehighestqualityIndustrialandCommercialElectrical&

Instrumentationpackagefromconceptthrough:

Electrical,ControlandInstrumentationdesign

CompetitiveProcurement

HV/LVReticulation–undergroundandoverhead

ElectricalandInstrumentationInstallations

ElectricalInstallation,Buildingcomplexes

ProfessionalTestingandCommissioning

Page 5: GVJ Revised Company Profile 2019 - Power …Microsoft Word - GVJ Revised Company Profile 2019 - Power Generation Author Joseph.Gruter Created Date 11/13/2019 1:19:39 PM

5

LeadershipApproach

Ourleadershipapproachwillbeaimedatcreatingtheclimateandcultureforservice

excellencebecausewevalueourcustomerandemployeesatisfaction.

KeytoserviceExcellence:

Humanresourcepracticestopromoteemployeeupliftment.

Activeretentionofexistingcustomers.

Thereisattentiontodetailsregardingthequalityofstaffandtheresourcesneededto

delivertheabove.

Tosumupourleadershipapproachandthecreatingofasuccessfulenvironmentinthe

organisationwequoteJackWelsch,CEOofGeneralElectric:

“Thethreemostimportantthingsyouneedtomeasureinabusinessarecustomersatisfaction,

employeesatisfactionandcashflow.Ifyouaregrowingcustomersatisfaction,yourmarket

shareissuretogrowtoo.Employeesatisfactiongetsyouproductivity,quality,prideand

creativity.Cashflowisthepulse–thekeyvitalsignofacompany.

Page 6: GVJ Revised Company Profile 2019 - Power …Microsoft Word - GVJ Revised Company Profile 2019 - Power Generation Author Joseph.Gruter Created Date 11/13/2019 1:19:39 PM

6

Conclusion

Customersatisfactionisthekeytohavingthecompetitiveedge

Inanever‐changingindustry,thecompany,asanyotherorganisation,iscompelledtotransform

tosurvive.

Companiesthatwanttowinthegamethroughvalueinnovation,withleaderswhoare

committedtotheinherentcompetitiveadvantageoftheirpeople,fullyacceptthatcustomers

willultimatelyonlybeloyaltothemselves.

Thismeansstrategicallymanagingcustomervaluethroughouttheorganisation.

Superiorvaluedeliverybuildscustomerloyalty,whichinturncontributestomarketshare

growthandimprovedprofitability.

Strategicapproachtomanagingmarketperceivedvalue

Customerandstakeholder’sneedsandcompetitivevalueperceptionsdefinethecriteriafor

organisationalsuccessandhowourorganisationperforms.

Creativestrategicthinkingidentifiesthegoalpostsforthefutureandthechallengestobemet

alongtheway.

Effectivemarketfocusedimprovementclosesthegapsbetweenthefutureandyourcurrent

competitivereality.

Theextent,towhichmeasurement,strategyandperformanceareintegrated,alignedand

implementedbasedonvalueinnovationwillseparatetheleadersoftomorrowfromthosethat

follow.

Page 7: GVJ Revised Company Profile 2019 - Power …Microsoft Word - GVJ Revised Company Profile 2019 - Power Generation Author Joseph.Gruter Created Date 11/13/2019 1:19:39 PM

7

CompanyProjectResourcesStructure

BOARD OF DIRECTORS

PERSONEL & INDUSTRIAAL RELATIONS

TRAINING OFFICERS

SAFETY OFFICERS

OPERATIONS

PROJECT ADMINISTRATION

PROCUREMENT MECHANICAL CONSTRUCTION

ELECTRICAL CONSTRUCTION

INSTRUMEN TATION

CONSTRUCTION

OVERHEAD LINE CONSTRUCTION

QA/QC & TESTING

Time Keeper

PROJECT ADMINISTRATION

PROJECT MANAGER

Surveyor

Site Store

Document Control

QC Inspectors Supervisor lighting & small

Power

Supervisor Mechanical

Supervisor LV Distribution

Supervisor HV Distribution

Technician Instrumentation

Supervisor Overhead Lines

Foreman

Electrical Artisans

General Workers

Foreman

Boilermaker Artisans

General Workers

Foreman

Electrical Artisans

General Workers

HT Cable Jointers

Electrical Artisans

General Workers

Foreman

Instrument Mechanicians

General Workers

Foreman

Line Crew

General Workers

Page 8: GVJ Revised Company Profile 2019 - Power …Microsoft Word - GVJ Revised Company Profile 2019 - Power Generation Author Joseph.Gruter Created Date 11/13/2019 1:19:39 PM

8

PowerGenerationProjectList(MostRecentFirst) Project: SaldanhaOTMSCrudeOilStorageandBlendingFacility

Client: WBHODescription: Electrical(LVandMV)andInstrumentReticulation.Supplyandinstallallcables,instruments,

CCTV,accesscontrol,firedetection,MVswitchgear,Minisubs,MCCs,LightingDBs,PLCpanels,Emergencyshutdownsystems,Fibrenetworkandcontrolsystemsoftwareandengineering.

Value: ZAR160MillionDate: 2017topresentReference: CameronAdamsContact: +27766224454

Project: ROMTipRelocationProjectClient: TronoxDescription: Electrical (LV andMV) and Instrument Reticulation including. Supply and install cabling,

instruments,transformers,33kVoverheadline,Value: ZAR30MillionDate: 2018Reference: CarelMaritzContact: +27845015575

Project: TransnetTippler3ProjectClient: GroupFiveDescription: Supply& InstallationofElectricalWork for theConstructionof theVault,Tunnel,Buildings

andAncillariesfortheTransnetTippler3ProjectValue: ZAR12.7MillionDate: 2017topresentReference: Mr.FrancoisRustContact: +27839751230

Project: MedupiPowerStationClient: SiemensDescription: Installationofinstrumentationcable(approx.2kmperday)Value: ZAR20MillionDate: 2018Reference: JosefWinklerContact: +27116522767

Project: ShopriteParkRooftopSolarProject,CapeTown,(1639kWp)Client: SolaFutureEnergyDescription: InstallationofPVmodulesandinverters,supplyandinstallationofLVcablesandDBsValue: ZAR4MillionDate: 2017Reference: N.PrinslooContact: +27760435818

Project: SecundaMallRooftopSolarProject,CapeTown,(1156kWp)Client: SolaFutureEnergyDescription: InstallationofPVmodulesandinverters,supplyandinstallationofLVcablesandDBsValue: ZAR3MillionDate: 2017Reference: N.Prinsloo

Page 9: GVJ Revised Company Profile 2019 - Power …Microsoft Word - GVJ Revised Company Profile 2019 - Power Generation Author Joseph.Gruter Created Date 11/13/2019 1:19:39 PM

9

Contact: +27760435818

Project: RobbenIslandOff‐gridSolarProject,CapeTown,(666kWp)Client: SolaFutureEnergyDescription: InstallationofPVmodulesandinverters,supplyandinstallationofLVcablesandDBsValue: ZAR3MillionDate: 2016Reference: N.PrinslooContact: +27760435818

Project: OldMutualCarportSolarProject,CapeTown,(1152kWp)Client: SolaFutureEnergyDescription: InstallationofPVmodulesandinverters,supplyandinstallationofLVcablesandDBsValue: ZAR3MillionDate: 2016Reference: N.PrinslooContact: +27760435818

Project: NetcarePinehavenRooftopSolarProject,Krugersdorp,(341kWp)Client: SolaFutureEnergyDescription: InstallationofPVmodulesandinverters,supplyandinstallationofLVcablesandDBsValue: ZAR3MillionDate: 2016Reference: N.PrinslooContact: +27760435818

Project: KusileCoalFirePowerPlantClient: SiemensDescription: Installinginstrumentcables.Value: ZAR27MillionDate: 2015–September2016Reference: J.PerlbergContact: +27720802270

Project: IngulaPumpedStorageProjectClient: SAFiveEngineeringDescription: InstallingLVcablesforHVAC.Value: ZAR2.8MillionDate: 2014–Present(ongoing)Reference: J.O’BrienContact: +27836261112

Project: ConstantiaVillageRooftopSolarProject,CapeTown,(815kWp)

Client: SolaFutureEnergyDescription: InstallationofPVmodulesandinverters,supplyandinstallationofLVcablesValue: ZAR1MillionDate: 2015Reference: N.PrinslooContact: +27760435818

Page 10: GVJ Revised Company Profile 2019 - Power …Microsoft Word - GVJ Revised Company Profile 2019 - Power Generation Author Joseph.Gruter Created Date 11/13/2019 1:19:39 PM

10

Project: TouwsriverConcentratedPVPlant–TransformerreplacementClient: GroupFiveDescription: Replacing30transformersincludingallLVandMVwork.Value: ZAR4MillionDate: 2015Reference: R.SeemaContact: +27100601555

Project: SereWindFarm(100MW)Client: SiemensDescription: InstallationofMVandDCCables,RMUS,constructionof46substationsValue: ZAR10MillionDate: 2014Reference: R.SumbanaContact: +27716079474

Project: TorminMineralSandsProjectClient: MineralSandsResourcesDescription: NewMineralsSeparationPlantatKoekenaapValue: ZAR13MillionDate: 2014Reference: CobusRobertsonContact: +27798852513

Project: Nobelsfontein75MWWindFarmClient: GroupFive/IberdrolaJVDescription: AssemblyandCommissioningoftheMediumVoltageinfrastructureofValue: ZAR10MillionDate: 2014Reference: AntonioPerezIglesiasContact: +27713836535

Project: DeAar50MWSolarPlantClient: SiemensDescription: InstallMVandDCCables;19xInverterSubstations(4xinvertersineach)with76x630kVA

Transformersand19xRMUsValue: ZAR24MillionDate: 2013/14Reference: H.MummContact: +27827183322

Project: Kimberley50MWSolarPlantClient: SiemensDescription: InstallMVandDCCables;19xInverterSubstations(4xinvertersineach)with76x630kVA

Transformersand19xRMUsValue: ZAR25MillionDate: 2013/14Reference: H.MummContact: +27827183322

Page 11: GVJ Revised Company Profile 2019 - Power …Microsoft Word - GVJ Revised Company Profile 2019 - Power Generation Author Joseph.Gruter Created Date 11/13/2019 1:19:39 PM

11

Project: TronoxNamakwaSandsCO‐GenerationPlantClient: GroupFiveStructuredIngenuityDescription: MV, LV, Control, Instrumentation Installation,MCC’s and PLC Supply and Installations. All

C.O.C’sissuedbyourMIE‐QA/QCManager:ArrieFerreiraValue: ZAR10MillionDate: 2013Reference: P.Kantor–SeniorElectricalIntegrationEngineerContact: +27115137559

Project: MosselbayOpenCycleGasTurbinesClient: SiemensDescription: MV,LV,ControlandInstrumentationInstallationfortwoadditionalOCGTsValue: ZAR8.5MillionDate: 2009Reference: P.RabieContact: +27116522680

Project: AtlantisOpenCycleGasTurbines(Phase2)

Client: SiemensDescription: MV,LV,ControlandInstrumentationInstallationforfiveadditionalOCGTsValue: ZAR19MillionDate: 2009Reference: P.RabieContact: +27116522680

Project: AtlantisOpenCycleGasTurbinesClient: SiemensDescription: MV,LV,ControlandInstrumentationInstallationforfirstfourOCGTsValue: ZAR7.5MillionDate: 2007Reference: P.RabieContact: +27116522680

Page 12: GVJ Revised Company Profile 2019 - Power …Microsoft Word - GVJ Revised Company Profile 2019 - Power Generation Author Joseph.Gruter Created Date 11/13/2019 1:19:39 PM

12

ContactDetails:

GVJElectricalandInstrumentation

Contractors(Pty)Ltd

Website:www.gvj.co.za

HEADOFFICE(CapeTown)ContactPerson:RussellSabor

CellNo.:08241584438NatalStreetPaardenEiland,CapeTown7405P.O.Box1152Milnerton7435SouthAfrica

Tel:(+2721)5113171Fax:(+2721)5113174email:[email protected]

BRANCHES(Vredenburg)ContactPerson:MickVermooten

CellNo.:082415314230ProsesStreet,Vredenburg7380P.O.Box844Vredenburg7380

Tel:(+2722)7131997Fax:(+2722)7131999email:[email protected]

BRANCHES(Vredendal)ContactPerson:HenkSmitCellNo.:0832303415

18GrensStreetVredendal8160P.O.Box68Vredendal8160

Te:(+2727)2133731Fax:(+2727)2133731email:[email protected]