NES How to Write an NES Specification December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 1 How to Write an NES Specification BSRIA BG 56 Based Format Introduction NES can now produce specifications following BSRIA’s model specification format (BG 56/2016) which was produced in consultation with BESA and CIBSE to meet the needs of “users” of specifications. This NES specification structure is arranged into five parts following the principles in the BSRIA guide and explained in more detail below. At the end of each section, in each part of the specification, a BS Appendix can be included if required that contains a list of all the British and European Standards referred to in the particular section. The majority of the clauses in the BSRIA BG 56 based master specification are the same clauses as those contained in the CAWS based master specification (with the exception of Part B sections B1-B7 – see notes in Table 1). They retain the same NES Part 1, Part 2, Part 3 or Y reference clause number as used in the CAWS master content and have been rearranged to suit the BG 56 structure. Typically, for each work section: Part 1 clauses in CAWS become B8 clauses in BG 56 Part 2 clauses in CAWS become Part C clauses in BG 56 and the Y references in these clauses in CAWS are changed to Part D references in BG 56 (e.g. Y10.2010A HEAVY BLACK STEEL PIPES TO BS EN 10255 becomes D1.8.10.2010A in the BG 56 specification). Part 3 clauses in CAWS become either Part C or Part D clauses in BG 56 and the Y Ref’ clauses become Part D clauses in BG 56. None of the self-contained specifications in NES are included in the BG 56 master. These are still available to use via the CAWS based master specification. Table 1 indicates how the NES BG 56 master specification differs from the example index in the BSRIA Guide and gives some comparison with the CAWS based master specification for each main section. It also describes the section structure, gives the source of clauses and indicates how to use the section. Appendix 1 gives the complete structure and listing of all sections in the BSRIA BG 56 based master specification. Summary Each part with key points on how to set up, edit and publish a specification using the BSRIA BG 56 based master specification: PART A – PRELIMINARIES / GENERAL CONDITIONS The “Preliminaries” clauses are those that relate to the engineering works in particular and must be read in conjunction with the "Preliminaries" of the "Main Contract". These sections are the equivalent of CAWS sections A10 – A55. The self-contained specification A64 is only available via the CAWS master. PART B - PROJECT PARTICULAR SCOPE OF WORKS This part should include general information about the project to enable the reader to quickly understand the scale and nature of the project and should be completely project specific. It will typically include: project team, programme, energy and other strategies, details of tender drawings, contractor design requirements, surveys and investigations, any strip out works, builders work, design criteria, testing, commissioning, handover and aftercare, detailed services systems descriptions, control strategies and operating regimes.

Upload: others

Post on 29-Mar-2020

6 views

Category:

Documents


1 download

TRANSCRIPT

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 1

How to Write an NES Specification BSRIA BG 56 Based Format

Introduction

NES can now produce specifications following BSRIA’s model specification format (BG 56/2016) which

was produced in consultation with BESA and CIBSE to meet the needs of “users” of specifications. This NES specification structure is arranged into five parts following the principles in the BSRIA guide

and explained in more detail below.

At the end of each section, in each part of the specification, a BS Appendix can be included if required that contains a list of all the British and European Standards referred to in the particular section.

The majority of the clauses in the BSRIA BG 56 based master specification are the same clauses as

those contained in the CAWS based master specification (with the exception of Part B sections B1-B7

– see notes in Table 1). They retain the same NES Part 1, Part 2, Part 3 or Y reference clause number as used in the CAWS master content and have been rearranged to suit the BG 56 structure.

Typically, for each work section:

Part 1 clauses in CAWS become B8 clauses in BG 56 Part 2 clauses in CAWS become Part C clauses in BG 56 and the Y references in these clauses in

CAWS are changed to Part D references in BG 56 (e.g. Y10.2010A HEAVY BLACK STEEL PIPES TO BS EN 10255 becomes D1.8.10.2010A in the BG 56 specification).

Part 3 clauses in CAWS become either Part C or Part D clauses in BG 56 and the Y Ref’ clauses

become Part D clauses in BG 56.

None of the self-contained specifications in NES are included in the BG 56 master. These are still available to use via the CAWS based master specification.

Table 1 indicates how the NES BG 56 master specification differs from the example index in the

BSRIA Guide and gives some comparison with the CAWS based master specification for each main section. It also describes the section structure, gives the source of clauses and indicates how to use

the section.

Appendix 1 gives the complete structure and listing of all sections in the BSRIA BG 56 based master specification.

Summary

Each part with key points on how to set up, edit and publish a specification using the BSRIA BG 56 based master specification:

PART A – PRELIMINARIES / GENERAL CONDITIONS

The “Preliminaries” clauses are those that relate to the engineering works in particular and must be

read in conjunction with the "Preliminaries" of the "Main Contract". These sections are the equivalent

of CAWS sections A10 – A55. The self-contained specification A64 is only available via the CAWS master.

PART B - PROJECT PARTICULAR SCOPE OF WORKS

This part should include general information about the project to enable the reader to quickly understand the scale and nature of the project and should be completely project specific. It will

typically include: project team, programme, energy and other strategies, details of tender drawings,

contractor design requirements, surveys and investigations, any strip out works, builders work, design criteria, testing, commissioning, handover and aftercare, detailed services systems descriptions,

control strategies and operating regimes.

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 2

PART C - PROJECT SPECIFIC (PARTICULAR) MATERIALS / SCHEDULES AND REQUIREMENTS

This is where project specific plant / equipment and their duties together with some processes such

as pipework cleaning and chemical treatment should be specified. It is divided into five main sections: C1 – Mechanical, C2 – Electrical, C3 - Transport Systems, C4 - General (M&E) (such as off-site pre-

fabrication), C5 - Equipment.

At the end of PART C a list of schedules referenced from the clauses can be included. This includes both NES schedules and any other schedules referenced from clauses in Part C.

When setting up a specification or inserting a section into an existing specification, and a Part C

section(s) are included that contain references to Part D clauses, the wizard will automatically load the corresponding Part D section / clauses (these sections relate to the CAWS Y reference

specification sections/clauses). To show this process.

However, if a Part C section is included in the specification that does not have any Part D references,

then the corresponding Part D section will need to be added manually (these sections relate to the CAWS work sections i.e. R – X. See Note 1 at end of Part D description).

When all editing of the Part C clauses is complete the Mark Unreferenced Clauses as Deleted routine

(see below) should be run using the button to the left of the Publish Specification button located in the Specification Operations tab. Running this will ensure that all unwanted clauses in PART D, where

the reference to them in PART C clauses have been set to strike through, are also marked as deleted. Therefore these clauses will not appear in the published specification. A prompt has been built into

the software to remind users to do this before publishing when Publish Specification has been

selected.

SCHEDULES (Referenced from PART C)

When either NES schedules (MS Excel spreadsheet format) or a user’s own schedules are referenced

from PART C of a specification, a listing of all these schedules can be produced in the published document by checking the Include Referenced Equipment Schedules box on the Extra Page Options page in the publication wizard. The listing will be included in the published document at the end of PART C and will incorporate the schedule title, the section where the schedules is located and the

clause reference.

The NES schedules associated with a specification will be stored in the particular specification folder within the Specifications folder in MS Excel spreadsheet format, either on the server or on the Local

Disk (C) and will need to be printed or saved to a .ZIP file separately from the published specification.

A PDF document which gives a listing of all NES schedules and an image of the content of each, is

available from Other Resources under the Guidance tab.

PART D – WORKMANSHIP, MATERIALS AND TESTING AND GENERAL REQUIREMENTS (could be applicable to multiple projects)

This is where general standards and materials / workmanship clauses, generally associated with the plant, equipment and processes specified in PART C, are located. The sections are typically not

project specific, but rather represent general industry good practice for generic applications. These

sections may be used on a number of projects, without any editing directly from the “NES master

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 3

specification” or can be freely edited / adapted as part of a “corporate master specification”. Part D is

divided into five main sections generally in line with PART C (with a few exceptions) using the same

numbering e.g. for Natural Gas the section number is C1.3.10 in Part C and the section number is D1.3.10 in Part D.

Part D has been structured / numbered to mirror, as far as possible, PART C and includes both CAWS

Y ref’ clauses and CAWS Part 3 clauses that have been deemed to be workmanship and standards / materials requirements.

The Part D clauses once edited for a “corporate master specification” should need minimal or no

editing for project specific specifications. Some sections could be for plant and equipment that are common to several systems (for example pipework, ductwork and cabling).

Where choices are required (e.g. pipes / cables), they are made with in the PART C clauses or

schedules and only those Part D, clauses relating to the type selected will be included in the

published Part D provided the Mark Unreferenced Clauses as Deleted routine has been run (described below).

When all editing of the Part C clauses is complete the Mark Unreferenced Clauses as Deleted routine

should be run using the button to the left of the Publish Specification button located in the Specification Operations tab. Running this will ensure that all unwanted clauses in PART D, where the

reference to them in PART C clauses have been set to strike through, are also marked as deleted. Therefore these clauses will not appear in the published specification. A prompt has been built into

the software to remind users to do this before publishing.

This part of the specification is where NES differs most from the example contents list given in

Appendix D in the BSRIA Guide. The example in the BSRIA Guide only includes sections that are common to more than one system, such as pipework, pumps, ductwork, cables, etc. (i.e. the CAWS Y

sections) whereas Part D in the NES BG 56 based master specification includes all sections.

Note 1: Part D sections that are not referenced from Part C clauses These sections relate to the CAWS work sections R - X and need to be added manually. For example:

If Section C1.4.10 LOW TEMPERATURE HOT WATER HEATING is added – Section D1.4.10 has to

be manually included. However: If Section C1.8.40 PUMPS is added - Section D1.8.40 will be bought into the specification

automatically.

PART E - TENDER DELIVERABLES

This is where all deliverables required as part of the tender should be defined including: pricing

documents, programme, organisation charts, operating procedures / method statements, details of manufacturers / specialists and BIM.

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 4

Table 1 Main headings in NES BG 56 based master specification (Parts A-E) indicating how it differs from the BSRIA Guide and comparison with the CAWS based

master specification.

NES - BSRIA BG 56 Based Master Specification

Main Structure (Appendix 1 gives details of all sections in each Part)

Key Differences to Example Index in

BG 56/2016 Appendix D

Comparison with CAWS Based Master Specification, Section

Structure / Source of Clauses and How to Use

PART A Preliminaries / General Conditions

A1 The project generally None Based on A10 - 13

A2 The contract None Based on A20

A3 Employer’s requirements None Based on A30 – A37 Some clauses in A30 (Tendering / Sub-letting / Supply) are included in A3 – the remainder are included in PART E – Tender Deliverables

A4 Contractors general cost items None Based on A40 – A44

A5 Works by others, provisional sums and dayworks

None Based on A50 – A57

PART B Project Particular Scope of Works (BG 56 title – Scope of Works and Related Services)

B1 Introduction, project team and programme

Title expanded to include project team & programme

No equivalent section in CAWS Mainly user written clauses covering description of the project, building type and use, building flexibility and future proofing together with details of the site, the project team and project programme.

B2 Services generally, energy and other strategies, drawings and contractor design responsibilities

Title changed to be more explicit No equivalent section in CAWS Mainly user written clauses covering: drawings, tender stage design status to RIBA Plan of work 2013, any services related strategies or references to reports produced during the design phase and design works required by the installation contractor or any specialist sub-contractors or equipment manufacturers.

B3 Surveys and investigations Not included in the BSRIA document Based on existing clauses in CAWS Sections C12 and C14 Covers underground services work and building services survey works

B4 Strip out, removal and demolition Not included in the BSRIA document Based on CAWS clauses in Work Sections C10, C20, C21 and C90. Mainly headings for user written clauses covering removal and disposal of services, strip out works and demolition.

B5 Builders work Not included in the BSRIA document No equivalent in section in CAWS but clauses for detailing trenches, pipe ways and have been taken from clauses in section P30.

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 5

NES - BSRIA BG 56 Based Master Specification

Main Structure (Appendix 1 gives details of all sections in each Part)

Key Differences to Example Index in

BG 56/2016 Appendix D

Comparison with CAWS Based Master Specification, Section

Structure / Source of Clauses and How to Use

Other clauses are for users to complete and cover general scope of builders work and demarcation of responsibilities for numerous tasks where there is often ambiguity when the project is in construction.

B6 Design criteria and standards This section is numbered B3 in the BSRIA document

CAWS equivalent section is A13 Predominantly clauses for the user to expand / edit covering design criteria for external and internal comfort / environmental control / plant operation & selections. Also covers system operating conditions / cleanliness classes, water storage, rainfall, power density for small power design / cooling load calculation, fire detection classification, energy metering requirements for the whole building and an overview of any environmental assessment scheme.

B7 Testing, commissioning, handover and aftercare

This section is numbered B4 in the BSRIA document.

No equivalent in section in CAWS. This section is intended to be an overview of the commissioning requirements of the whole project and cross refers to sections C1.10.20 / D1.10.20 (CAWS Ref’ Y51 - mechanical) and sections

C2.8.10 / D2.8.10 (CAWS Ref’ Y81 - electrical) Clauses are included for specifying:

Commissioning management Commissioning team and demarcation of responsibilities. Environmental assessment scheme details associated with

commissioning Details of any off site factory testing Details of any required mock-up testing Systems performance, capacity and environmental testing Commissioning allowances / margins used in the design and

plant duties Whole building integrated testing and Black Building testing Handover, fine tuning during initial occupation, aftercare,

seasonal commissioning Soft landings (GSL for BIM Level 2 or BSRIA soft landings

framework) Building performance studies against benchmarks

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 6

NES - BSRIA BG 56 Based Master Specification

Main Structure (Appendix 1 gives details of all sections in each Part)

Key Differences to Example Index in

BG 56/2016 Appendix D

Comparison with CAWS Based Master Specification, Section

Structure / Source of Clauses and How to Use

B8 Detailed systems descriptions, control strategies and operating regimes

This section is numbered B5 in the BSRIA document and the title has been amended to be more explicit BSRIA title is System descriptions and requirements

This section is equivalent to Part 1 clauses for each work section in a CAWS specification but all brought together in one place. The sub sections in B8 are where detailed descriptions of all building services systems and how they should work should be written.

PART C Project Specific (Particular) Materials / Schedules and Requirements (BG 56 title – Project Particular Materials - Schedules)

C1 Mechanical More sections included – see Appendix 1 This is divided into ten main sections as below (see Appendix 1 for more detail of sub-sections)

Drainage and disposal (CAWS R10 – R30) Water services (CAWS S10 – S22, Y21, Y23) Fuel systems (CAWS S32, S33, S40, S41) Heating, ventilation, cooling and air conditioning (CAWS T, U

and V5 sections plus Y30, Y40, Y41, Y42, Y43, Y44, Y45, Y46) Piped services (gases, steam, compressed air etc. – CAWS

S30, S31, S34) Fire suppression (CAWS S60 – S72) Controls and BMS (CAWS W60)

Pumps, pipework, valves, ancillary equipment & trace heating (CAWS Y10, Y11, Y20, Y22, Y24)

Other mechanical items (thermal insulation, vibration isolation & identification – CAWS Y50, Y52, Y54)

Processes (pipework cleaning, testing and commissioning – CAWS Y25, Y51)

C2 Electrical More sections included – see Appendix 1 This is divided into eight main sections as below (see Appendix 1 for more detail of sub-sections)

Power, earthing & lightning protection (CAWS V10 – V14, V20, V22, V30, V31, V32, W51, W52 W53, Y80)

Lighting (CAWS V21, V40, V41, Y73)

Communications, IT and telecoms (CAWS W10, W30, W70, W11, W12, W14, W15, W20, W21, W22, W23)

Security (CAWS W40. W41, W42) Detection and alarms (W50, W54, W55) Cables, conduits, trunking & general electrical equipment

(CAWS Y60, Y61, Y62, Y63, Y71, Y72, Y74) Other common electrical items (identification CAWS Y82)

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 7

NES - BSRIA BG 56 Based Master Specification

Main Structure (Appendix 1 gives details of all sections in each Part)

Key Differences to Example Index in

BG 56/2016 Appendix D

Comparison with CAWS Based Master Specification, Section

Structure / Source of Clauses and How to Use

Processes (testing and commissioning – CAWS Y81)

C3 Transport systems Not included in the BSRIA document This is subdivided between people and goods/maintenance/documents (CAWS X sections)

C4 General mechanical and electrical

and prefabrication

Not included in the BSRIA document This is divided into four sub-sections as below

Fixing to building fabric (CAWS Y90) Off-site painting and anti-corrosion treatments (CAWS Y91) Packaged plant rooms (CAWS N30) Off-site prefabricated plant and service modules (CAWS N31)

C5 Equipment Not included in the BSRIA document This is divided into four sub-sections as below Portable fire extinguishers / blankets (CAWS N10) Domestic kitchen fittings (CAWS N11) Catering equipment (CAWS N12) Sanitary appliances / fittings (CAWS N13) Special purpose fixture, furnishings and equipment (CAWS

N20)

PART C

SCHEDULES

Listing of project specific

schedules

N/A See notes in introduction for publishing

In a CAWS published specification Schedules can be included as an appendix at the end of the specification

PART D Workmanship, Materials, Testing and General Requirements (Applicable to Multiple Projects) (BG 56 title – Workmanship and Materials)

D1 Mechanical Does not follow the BSRIA document see PART D explanatory notes above

Structured / numbered to mirror, as far as possible, PART C See notes in the Introduction

D2 Electrical Does not follow the BSRIA document see PART D explanatory notes above

Structured / numbered to mirror, as far as possible, PART C See notes in the Introduction

D3 Transport systems Does not follow the BSRIA document see PART D explanatory notes above

Structured / numbered to mirror, as far as possible, PART C See notes in the Introduction

D4 General mechanical and electrical

and prefabrication

Does not follow the BSRIA document see

PART D explanatory notes above

Structured / numbered to mirror, as far as possible, PART C See notes in the Introduction Section D4.30 Electric Motors (CAWS Y92) does not have a corresponding PART C section because references to electric motors are made in the HVAC sections in C1

D5 Equipment Does not follow the BSRIA document see PART D explanatory notes above

Structured / numbered to mirror, as far as possible, PART C

See notes in the Introduction

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 8

NES - BSRIA BG 56 Based Master Specification

Main Structure (Appendix 1 gives details of all sections in each Part)

Key Differences to Example Index in

BG 56/2016 Appendix D

Comparison with CAWS Based Master Specification, Section

Structure / Source of Clauses and How to Use

PART E Tender deliverables

E1 Tender pricing documents None No equivalent section in CAWS - clauses are sourced from A30

E2 Programme None No equivalent section in CAWS - clauses are sourced from A30

E3 Contractors organisation Title changed from “Line Management Diagram”

No equivalent section in CAWS - clauses are sourced from A30

E4 Key personnel Title changed from “Line Management Diagram”

No equivalent section in CAWS - clauses are sourced from A30

E5 Operating procedure statements Minor title change No equivalent section in CAWS - clauses are sourced from A30

E6 Tender stage method statements Title changed from “Quality Control Method Statements” and this is included in E8 below

No equivalent section in CAWS - clauses are sourced from A30

E7 Quality control Title changed from “Health and Safety Statements”

No equivalent section in CAWS - clauses are sourced from A30

E8 Health and safety Title changed from “Health and Safety Plan” items E7 & E8 in the BSRIA document merged into this section

No equivalent section in CAWS - clauses are sourced from A30

E9 Proposed manufacturers, suppliers and specialists

Title changed from “Line Management Diagram”

No equivalent section in CAWS - clauses are sourced from A30

E10 Technical information to support the tender

Not included in the BSRIA document No equivalent section in CAWS - clauses are sourced from A30

E11 Proposals for annual maintenance contract

Not included in the BSRIA document No equivalent section in CAWS - clauses are sourced from A30

E12 Building information model Not included in the BSRIA document No equivalent section in CAWS - clauses are sourced from A30

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 9

Appendix 1 – Listing of Sections in NES (BSRIA BG 56 Based Format Master Specification)

PART A - PRELIMINARIES / GENERAL CONDITIONS

A1 - THE PROJECT GENERALLY

A1.1 - PROJECT PARTICULARS

A1.2 - TENDER AND CONTRACT DOCUMENTS A1.3 - THE SITE / EXISTING BUILDINGS

A1.4 - DESCRIPTION OF THE BUILDING WORKS AND OVERVIEW OF SERVICES SYSTEMS

A2 - THE CONTRACT

A2.1 - THE CONTRACT/SUB-CONTRACT

A3 - EMPLOYER'S REQUIREMENTS A3.1 - TENDERING/SUB-LETTING/SUPPLY

A3.2 - PROVISION, CONTENT AND USE OF DOCUMENTS A3.3 - MANAGEMENT OF THE WORKS

A3.4 - QUALITY STANDARDS/CONTROL A3.5 - SECURITY/SAFETY/PROTECTION

A3.6 - SPECIFIC LIMITATIONS ON METHOD/SEQUENCE/TIMING

A3.7 - FACILITIES/TEMPORARY WORK/SERVICES A3.8 - OPERATION/MAINTENANCE OF THE FINISHED BUILDING

A4 - CONTRACTORS GENERAL COST ITEMS A4.1 - CONTRACTOR / SUB-CONTRACTOR'S COST ITEMS

A5 - WORKS BY OTHERS, PROVISIONAL SUMS AND DAYWORKS

A5.1 - WORKS/PRODUCTS BY/ON BEHALF OF THE EMPLOYER A5.4 - WORK BY STATUTORY AUTHORITIES/UNDERTAKERS

A5.5 - PROVISIONAL WORK/ITEMS A5.6 – DAYWORKS

PART B - PROJECT PARTICULAR SCOPE OF WORKS

B1 - INTRODUCTION, PROJECT TEAM AND PROGRAMME B2 - SERVICES GENERALLY, ENERGY & OTHER STRATEGIES, DRAWINGS AND CONTRACTOR DESIGN RESPONSIBILITIES

B3 - SURVEYS AND INVESTIGATIONS B4 - STRIP OUT, REMOVAL AND DEMOLITION

B5 - BUILDERS WORK

B6 - DESIGN CRITERIA AND STANDARDS B7 - TESTING, COMMISSIONING, HANDOVER AND AFTERCARE

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 10

B8 - DETAILED SYSTEMS DESCRIPTIONS, CONTROL STRATEGIES AND OPERATING REGIMES

B8.1 - DRAINAGE AND DISPOSAL B8.1.10 - RAINWATER PIPEWORK/GUTTERS

B8.1.20 - FOUL DRAINAGE ABOVE GROUND B8.1.30 - DRAINAGE BELOW GROUND

B8.1.40 - LAND DRAINAGE

B8.1.50 - LABORATORY/INDUSTRIAL WASTE DRAINAGE B8.1.60 - SEWAGE PUMPING PLANT

B8.1.70 - SEWAGE TREATMENT/STERILISATION PLANT B8.1.80 - CENTRALISED VACUUM CLEANING PLANT

B8.1.90 - REFUSE CHUTES B8.1.100 - COMPACTORS/MACERATORS

B8.1.110 - INCINERATION PLANT

B8.2 - WATER SERVICES B8.2.10 - COLD WATER

B8.2.20 - HOT WATER B8.2.21 - SOLAR HOT WATER SYSTEMS

B8.2.30 - PRESSURISED WATER

B8.2.40 - IRRIGATION PLANT B8.2.50 - FOUNTAINS/WATER FEATURES

B8.2.60 - BOREHOLE/WELL WATER B8.2.70 - WATER RECLAMATION SYSTEM

B8.2.80 - TREATED WATER

B8.2.90 - SWIMMING POOL WATER TREATMENT PLANT B8.2.100 - HIGH PURITY WATER PLANT

B8.3 - FUEL SYSTEMS B8.3.10 - NATURAL GAS

B8.3.20 - LIQUEFIED PETROLEUM GAS B8.3.30 - PETROL/DIESEL - STORAGE/DISTRIBUTION

B8.3.40 - FUEL OIL STORAGE/DISTRIBUTION

B8.4 - HEATING, VENTILATION, COOLING AND AIR CONDITIONING B8.4.10 - LOW TEMPERATURE HOT WATER HEATING EMITTERS

B8.4.20 - MEDIUM TEMPERATURE HOT WATER HEATING EMITTERS AND HEAT EXCHANGERS B8.4.30 – GAS/OIL FIRED BOILERS

B8.4.40 - COAL FIRED BOILERS

B8.4.50 - ELECTRODE/DIRECT ELECTRIC BOILERS

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 11

B8.4.60 - PACKAGED STEAM GENERATORS

B8.4.70 - HEAT PUMPS B8.4.90 - BIOMASS BOILERS AND ANCILLARY PLANT

B8.4.100 - COMBINED HEAT AND POWER UNITS AND ANCILLARY PLANT B8.4.110 - PRIMARY HEAT DISTRIBUTION, THERMAL ENERGY STORES AND PRE-INSULATED UNDERGROUND PIPEWORK

B8.4.120 - STEAM HEATING

B8.4.130 - WARM AIR HEATING B8.4.140 - LOCAL HEATING UNITS

B8.4.150 - ELECTRIC TRACE HEATING SYSTEMS (EXCLUDING PIPED SERVICES) B8.4.160 – DIRECT ELECTRICAL ROOM HEATING UNITS AND EMBEDDED HEATING

B8.4.170 - GENERAL VENTILATION AND NATURAL / MIXED MODE VENTILATION B8.4.180 - TOILET VENTILATION

B8.4.190 - KITCHEN VENTILATION

B8.4.200 - CAR PARK VENTILATION B8.4.210 - SMOKE AND HEAT CONTROL

B8.4.220 - FUME CUPBOARD AND SAFETY CABINET SYSTEMS B8.4.230 - FUME EXTRACT

B8.4.240 - ANAESTHETIC GAS EXTRACT

B8.4.245 - DUST COLLECTION B8.4.250 - LOW VELOCITY AIR CONDITIONING

B8.4.260 - VAV AIR CONDITIONING B8.4.270 - DUAL-DUCT AIR CONDITIONING

B8.4.280 - MULTI-ZONE AIR CONDITIONING

B8.4.290 - INDUCTION AIR CONDITIONING B8.4.300 – FAN COIL AIR CONDITIONING

B8.4.310 - TERMINAL REHEAT UNITS B8.4.320 - TERMINAL HEAT PUMP UNITS

B8.4.330 - AIR CONDITIONING UNITS B8.4.350 - CHILLED BEAMS

B8.4.355 - CHILLED CEILINGS AND RAFTS / SAILS

B8.4.360 – CHILLERS AND HEAT REJECTION PLANT B8.4.370 - PRIMARY/SECONDARY COOLING DISTRIBUTION, THERMAL ENERGY STORES AND PRE-INSULATED UNDERGROUND

PIPEWORK B8.4.372 - LOCAL COOLING UNITS

B8.4.374 - VRF SYSTEM

B8.4.376 - COLD ROOM SYSTEMS

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 12

B8.4.378 - ICE PADS

B8.4.380 - AIR CURTAINS B8.4.440 - HEAT RECOVERY

B8.5 - PIPED SERVICES (GASES, VACUUM, STEAM COMPRESSED AIR) B8.5.10 - COMPRESSED AIR

B8.5.30 - MEDICAL / LABORATORY / INDUSTRIAL GAS

B8.5.40 - VACUUM B8.5.50 - STEAM SYSTEM AND ANCILLARY PLANT

B8.6 - FIRE SUPPRESSION / FIRE FIGHTING B8.6.10 - FIRE HOSE REELS

B8.6.20 - DRY RISERS B8.6.30 - WET RISERS

B8.6.40 - SPRINKLERS

B8.6.50 - DELUGE B8.6.60 - FIRE HYDRANTS

B8.6.70 - GAS FIRE FIGHTING B8.6.80 - FOAM FIRE FIGHTING

B8.6.90 - POWDER FIRE FIGHTING

B8.6.100 - WATERMIST FIRE PROTECTION

B8.7 - CONTROLS AND BMS

B8.7.10 - CENTRAL CONTROL/BUILDING MANAGEMENT B8.7.20 – BUILDING SYSTEMS INTEGRATION

B8.8 - POWER, EARTHING, LIGHTNING PROTECTION & EMC

B8.8.10 - EMERGENCY AND STANDBY GENERATORS & EMC B8.8.20 - HV SUPPLY/DISTRIBUTION/PUBLIC UTILITY SUPPLY

B8.8.30 - LV SUPPLY/PUBLIC UTILITY SUPPLY B8.8.40 – SOLAR PHOTOVOLTAIC (PV) SYSTEMS

B8.8.50 - WIND POWER SYSTEMS B8.8.70 - LV DISTRIBUTION

B8.8.80 - GENERAL LV POWER

B8.8.90 - EXTRA-LOW VOLTAGE / REDUCED LOW VOLTAGE AC SUPPLY B8.8.100 - LOW AND EXTRA-LOW VOLTAGE DC SUPPLY

B8.8.110 - UNINTERRUPTIBLE POWER SUPPLY (UPS) B8.8.120 - LV EARTHING AND BONDING

B8.8.130 - HV EARTHING AND BONDING

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 13

B8.8.140 - LIGHTNING AND SURGE PROTECTION SYSTEMS (LSPS)

B8.8.150 - ELECTROMAGNETIC COMPATIBILITY (EMC) B8.8.160 - MEDICAL IT POWER SUPPLIES (IPS)

B8.8.170 - ELECTRICAL VEHICLE CHARGING EQUIPMENT INSTALLATIONS

B8.8.180 - ELECTRICAL ENERGY STORAGE SYSTEMS (EESS)

B8.9 – LIGHTING

B8.9.10 - GENERAL LIGHTING B8.9.20 - EMERGENCY LIGHTING

B8.9.30 - STREET/AREA/FLOOD LIGHTING

B8.10 - COMMUNICATIONS, IT AND TELECOMS B8.10.10 - TELECOMMUNICATIONS

B8.10.20 - DATA TRANSMISSION B8.10.30 - STRUCTURED CABLING SYSTEM

B8.10.40 - STAFF PAGING/LOCATION

B8.10.50 - PUBLIC ADDRESS/SOUND AMPLIFICATION B8.10.60 - BEDHEAD SERVICES

B8.10.70 - FACILITIES FOR THE DISABLED B8.10.80 - ENTERTAINMENT SYSTEMS

B8.10.90 - PROJECTION AND CONTROL ROOM DISPLAY B8.10.100 - ADVERTISING DISPLAY

B8.10.110 - CLOCKS

B8.11 – SECURITY B8.11.10 - ACCESS CONTROL

B8.11.20 - SECURITY DETECTION AND ALARM B8.11.30 - CLOSED CIRCUIT TELEVISION

B8.12 - DETECTION AND ALARMS

B8.12.10 - FIRE DETECTION AND ALARM B8.12.20 - LIQUID DETECTION ALARM

B8.12.30 - OXYGEN DEPLETION MONITORING SYSTEM B8.13 - TRANSPORT SYSTEMS

B8.13.10 - LIFTS

B8.13.20 - ESCALATORS B8.13.30 - MOVING PAVEMENTS

B8.13.40 - HOISTS B8.13.50 - CRANES

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 14

B8.13.60 - TRAVELLING CRADLES

B8.13.70 - GOODS DISTRIBUTION/MECHANISED WAREHOUSING B8.13.80 - MECHANICAL DOCUMENT CONVEYING

B8.13.90 - PNEUMATIC DOCUMENT CONVEYING B8.13.100 - AUTOMATIC DOCUMENT FILING AND RETRIEVAL

B8.14 - PACKAGED PLANT ROOMS & OFF-SITE FABRICATION

B8.14.10 - PACKAGED PLANT ROOMS B8.14.20 - OFF-SITE PREFABRICATED PLANT AND SERVICES MODULES

B8.15 - EQUIPMENT

B8.15.10 - PORTABLE FIRE EXTINGUISHERS / BLANKETS B8.15.20 - DOMESTIC KITCHEN FITTINGS

B8.15.30 - CATERING EQUIPMENT B8.15.40 - SANITARY APPLIANCES/FITTINGS

B8.15.50 - SPECIAL PURPOSE FIXTURES, FURNISHINGS AND EQUIPMENT

PART C - PROJECT SPECIFIC (PARTICULAR) MATERIALS / SCHEDULES AND REQUIREMENTS

C1 – MECHANICAL

C1.1 - DRAINAGE AND DISPOSAL C1.1.10 - RAINWATER PIPEWORK/GUTTERS

C1.1.20 - FOUL DRAINAGE ABOVE GROUND

C1.1.30 - DRAINAGE BELOW GROUND C1.1.40 - LAND DRAINAGE

C1.1.50 - LABORATORY/INDUSTRIAL WASTE DRAINAGE C1.1.60 - SEWAGE PUMPING PLANT

C1.1.70 - SEWAGE TREATMENT/STERILISATION PLANT

C1.1.80 - CENTRALISED VACUUM CLEANING PLANT C1.1.90 - REFUSE CHUTES

C1.1.100 - COMPACTORS/MACERATORS C1.1.110 - INCINERATION PLANT

C1.2 - WATER SERVICES C1.2.10 - COLD WATER

C1.2.20 - HOT WATER

C1.2.21 - SOLAR HOT WATER SYSTEMS C1.2.30 - PRESSURISED WATER

C1.2.40 - IRRIGATION PLANT C1.2.50 - FOUNTAINS/WATER FEATURES

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 15

C1.2.60 - BOREHOLE/WELL WATER

C1.2.70 - WATER RECLAMATION SYSTEM C1.2.80 - TREATED WATER SYSTEMS

C1.2.90 - SWIMMING POOL WATER TREATMENT PLANT C1.2.100 - HIGH PURITY WATER PLANT

C1.3 - FUEL SYSYEMS

C1.3.10 - NATURAL GAS C1.3.20 - LIQUIFIED PETROLEUM GAS

C1.3.30 - PETROL/DIESEL - STORAGE/DISTRIBUTION C1.3.40 - FUEL OIL STORAGE/DISTRIBUTION

C1.4 - HEATING, VENTILATION, COOLING AND AIR CONDITIONING C1.4.10 - LOW TEMPERATURE HOT WATER HEATING EMITTERS

C1.4.20 - MEDIUM TEMPERATURE HOT WATER HEATING EMITTERS AND HEAT EXCHANGERS

C1.4.30 - GAS/OIL FIRED BOILERS C1.4.40 - COAL FIRED BOILERS

C1.4.50 - ELECTRODE/DIRECT ELECTRIC BOILERS C1.4.60 - PACKAGED STEAM GENERATORS

C1.4.70 - HEAT PUMPS

C1.4.90 - BIOMASS BOILERS AND ANCILLARY PLANT C1.4.100 - COMBINED HEAT AND POWER UNITS AND ANCILLARY PLANT

C1.4.110 - PRIMARY HEAT DISTRIBUTION, THERMAL ENERGY STORES AND PRE-INSULATED UNDERGROUND PIPEWORK C1.4.120 - WATER TO WATER HEAT EXCHANGERS

C1.4.130 - STEAM HEATING

C1.4.140 - WARM AIR HEATING C1.4.150 - LOCAL HEATING UNITS

C1.4.160 - ELECTRIC TRACE HEATING SYSTEMS (EXCLUDING PIPED SERVICES) C1.4.170 - DIRECT ELECTRICAL ROOM HEATING UNITS AND EMBEDDED HEATING

C1.4.180 - GENERAL VENTILATION AND NATURAL / MIXED MODE VENTILATION C1.4.190 - TOILET VENTILATION

C1.4.200 - KITCHEN VENTILATION

C1.4.210 - CAR PARK VENTILATION C1.4.220 - SMOKE AND HEAT CONTROL

C1.4.230 - FUME CUPBOARD AND SAFETY CABINET SYSTEMS C1.4.240 - FUME EXTRACT

C1.4.250 - ANAESTHETIC GAS EXTRACT

C1.4.260 - DUST EXTRACT

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 16

C1.4.280 - VAV AIR CONDITIONING

C1.4.290 - DUAL-DUCT AIR CONDITIONING C1.4.310 - INDUCTION AIR CONDITIONING

C1.4.320 - FAN COIL UNITS C1.4.330 - TERMINAL REHEAT UNITS

C1.4.340 - TERMINAL HEAT PUMPS UNITS

C1.4.350 - AIR CONDITIONING UNITS C1.4.360 - CHILLED BEAMS

C1.4.370 - CHILLED CEILINGS AND RAFTS / SAILS C1.4.380 - CHILLERS AND HEAT REJECTION PLANT

C1.4.385 - PRIMARY / SECONDARY COOLING DISTRIBUTION, THERMAL STORES AND PRE-INSULATED UNDERGROUND PIPEWORK C1.4.390 - LOCAL COOLING UNITS

C1.4.400 - VRF SYSTEM

C1.4.410 - COLD ROOM SYSTEMS C1.4.420 - ICE PADS

C1.4.430 - AIR CURTAINS C1.4.440 - HEAT RECOVERY PLANT

C1.4.450 - AIR HANDLING UNITS

C1.4.460 - FANS C1.4.470 - AIR FILTRATION

C1.4.480 - COILS, HEAT RECOVERY EQUIPMENT AND GAS / ELECTRIC BATTERIES C1.4.490 - HUMIDIFIERS AND DEHUMIDIFIERS

C1.4.500 - SILENCERS/ACOUSTIC TREATMENT

C1.4.510 - DUCTWORK AND ANCILLARIES C1.4.520 - GRILLES/DIFFUSERS/LOUVRES

C1.5 - PIPED SERVICES (GASES, VACUUM, STEAM COMPRESSED AIR) C1.5.10 - COMPRESSED AIR

C1.5.30 - MEDICAL / LABORATORY / INDUSTRIAL GAS C1.5.40 - VACUUM

C1.5.50 - STEAM SYSTEM AND ANCILLARY PLANT

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 17

C1.6 - FIRE SUPPRESSION

C1.6.10 - FIRE HOSE REELS C1.6.20 - DRY RISERS

C1.6.30 - WET RISERS C1.6.40 - SPRINKLERS

C1.6.50 - DELUGE

C1.6.60 - FIRE HYDRANTS C1.6.70 - GAS FIRE FIGHTING

C1.6.80 - FOAM FIRE FIGHTING C1.6.90 - POWDER FIRE FIGHTING

C1.6.100 - WATERMIST FIRE PROTECTION

C1.7 - CONTROLS AND BMS

C1.7.10 - CENTRAL CONTROL / BUILDING MANAGEMENT

C1.7.20 - BUILDING SYSTEMS INTEGRATION

C1.8 - PUMPS, PIPEWORK, VALVES, ANCILLARY EQUIPMENT TRACE HEATING

C1.8.10 - PIPELINES AND PIPEWORK C1.8.20 - VALVES, PIPELINE ANCILLARIES, DEARATORS / SEPARATORS AND THERMAL EXPANSION FACILITIES

C1.8.40 - PUMPS

C1.8.50 - TRACE HEATING OF PIPED SERVICES AND VESSELS

C1.9 - OTHER COMMON MECHANICAL ITEMS

C1.9.10 - THERMAL INSULATION C1.9.30 - VIBRATION & ISOLATION MOUNTING

C1.9.40 - IDENTIFICATION - MECHANICAL

C1.10 – PROCESSES C1.10.10 - PIPEWORK CLEANING AND CHEMICAL TREATMENT

C1.10.20 - TESTING AND COMMISSIONING OF MECHANICAL SERVICES

C2 - ELECTRICAL

C2.1 - POWER, EARTHING, LIGHTNING PROTECTION C2.1.10 - EMERGENCY AND STANDBY GENERATORS

C2.1.20 - HV SUPPLY/ DISTRIBUTION / PUBLIC UTILITY SUPPLY

C2.1.30 - LV SUPPLY/PUBLIC UTILITY SUPPLY C2.1.40 – SOLAR PHOTOVOLTAIC (PV) SYSTEMS

C2.1.50 - WIND POWER SYSTEMS C2.1.60 - LV DISTRIBUTION

C2.1.65 - GENERAL LV POWER

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 18

C2.1.70 - EXTRA-LOW VOLTAGE / REDUCED LOW VOLTAGE AC SUPPLY

C2.1.80 - LOW AND EXTRA-LOW VOLTAGE DC SUPPLY C2.1.90 - UNINTERRUPTIBLE POWER SUPPLY (UPS)

C2.1.100 - LV EARTHING AND BONDING C2.1.110 - HV EARTHING AND BONDING

C2.1.120 - EARTHING & BONDING COMPONENTS

C2.1.130 - LIGHTNING AND SURGE PROTECTION SYSTEMS (LSPS) C2.1.140 - ELECTROMAGNETIC COMPATIBILITY (EMC)

C2.1.150 - MEDICAL IT POWER SUPPLIES (IPS)

C2.1.160 - ELECTRICAL VEHICLE CHARGING EQUIPMENT INSTALLATIONS

C2.1.170 - ELECTRICAL ENERGY STORAGE SYSTEMS (EESS)

C2.2 – LIGHTING C2.2.10 - GENERAL LIGHTING

C2.2.20 - EMERGENCY LIGHTING

C2.2.30 - STREET/AREA/FLOOD LIGHTING C2.2.50 - LUMINAIRES & LAMPS

C2.3 - COMMUNICATIONS IT AND TELECOMS C2.3.10 - TELECOMMUNICATIONS

C2.3.20 - DATA TRANSMISSION C2.3.30 - STRUCTURED CABLING SYSTEM

C2.3.40 - STAFF PAGING/LOCATION

C2.3.50 - PUBLIC ADDRESS/SOUND AMPLIFICATION C2.3.60 - BEDHEAD SERVICES

C2.3.70 - FACILITIES FOR THE DISABLED C2.3.80 - ENTERTAINMENT SYSTEMS

C2.3.90 - PROJECTION AND CONTROL ROOM DISPLAYS

C2.3.100 - ADVERTISING DISPLAY C2.3.110 - CLOCKS

C2.4 – SECURITY C2.4.10 - ACCESS CONTROL

C2.4.20 - SECURITY DETECTION AND ALARM

C2.4.30 - CLOSED CIRCUIT TELEVISION

C2.5 - DETECTION AND ALARMS

C2.5.10 - FIRE DETECTION AND ALARM C2.5.20 - LIQUID DETECTION ALARM

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 19

C2.5.30 - OXYGEN DEPLETION MONITORING SYSTEM

C2.6 - CABLES, CONDUITS, TRUNKING AND GENERAL ELECTRICAL EQUIPMENT C2.6.10 - CONDUIT & TRUNKING

C2.6.20 - CABLES AND WIRING C2.6.30 - BUSBAR TRUNKING

C2.6.40 - SUPPORT COMPONENTS - CABLES

C2.6.50 - LV SWITCHGEAR & DISTRIBUTION BOARDS C2.6.60 - CONTACTORS AND STARTERS

C2.6.70 - ACCESSORIES FOR ELECTRICAL SERVICES C2.7 - OTHER COMMON ELECTRICAL ITEMS

C2.7.20 - IDENTIFICATION – ELECTRICAL

C2.8 – PROCESSES

C2.8.10 - TESTING AND COMMISSIONING OF ELECTRICAL SERVICES

C3 - TRANSPORT SYSTEMS C3.1 – PEOPLE

C3.1.10 - LIFTS C3.1.20 - ESCALATORS

C3.1.30 - MOVING PAVEMENTS

C3.2 - GOODS / MAINTENANCE / DOCUMENTS C3.2.10 - HOISTS

C3.2.20 - CRANES C3.2.30 - TRAVELLING CRADLES

C3.2.40 - GOODS DISTRIBUTION/MECHANISED WAREHOUSING

C3.2.50 - MECHANICAL DOCUMENT CONVEYING C3.2.60 - PNEUMATIC DOCUMENT CONVEYING

C3.2.70 - AUTOMATIC DOCUMENT FILING AND RETRIEVAL

C4 - GENERAL - MECHANICAL AND ELECTRICAL AND PREFABRICATION

C4.10 - FIXING TO BUILDING FABRIC C4.20 - OFF-SITE PAINTING AND ANTI-CORROSION TREATMENT

C4.40 - PACKAGED PLANT ROOMS

C4.50 - OFF-SITE PREFABRICATED PLANT AND SERVICES MODULES

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 20

C5 – EQUIPMENT

C5.10 - PORTABLE FIRE EXTINGUISHERS / BLANKETS C5.20 - DOMESTIC KITCHEN FITTINGS

C5.30 - CATERING EQUIPMENT C5.40 - SANITARY APPLIANCES/FITTINGS

C5.50 - SPECIAL PURPOSE FIXTURES, FURNISHINGS AND EQUIPMENT

PART D - WORKMANSHIP, MATERIALS, TESTING AND GENERAL REQUIREMENTS (APPLICABLE TO MULTIPLE PROJECTS)

D1 – MECHANICAL

D1.1 – DRAINAGE AND DISPOSAL D1.1.10 - RAINWATER PIPEWORK/GUTTERS

D1.1.20 - FOUL DRAINAGE ABOVE GROUND

D1.1.30 - DRAINAGE BELOW GROUND D1.1.40 - LAND DRAINAGE

D1.1.50 - LABORATORY/INDUSTRIAL WASTE DRAINAGE D1.1.60 - SEWAGE PUMPING PLANT

D1.1.70 - SEWAGE TREATMENT/STERILISATION PLANT D1.1.80 - CENTRALISED VACUUM CLEANING PLANT

D1.1.90 - REFUSE CHUTES

D1.1.100 - COMPACTORS/MACERATORS D1.1.110 - INCINERATION PLANT

D1.2 - WATER SERVICES D1.2.10 - COLD WATER

D1.2.12 - WATER STORAGE TANKS

D1.2.20 - HOT WATER D1.2.21 - SOLAR HOT WATER SYSTEMS

D1.2.22 - STORAGE CYLINDERS AND CISTERNS D1.2.30 - PRESSURISED WATER

D1.2.40 - IRRIGATION PLANT

D1.2.50 - FOUNTAINS/WATER FEATURES D1.2.60 - BOREHOLE/WELL WATER

D1.2.70 - WATER RECLAMATION SYSTEM D1.2.80 - TREATED WATER SYSTEMS

D1.2.90 - SWIMMING POOL WATER TREATMENT PLANT D1.2.100 - HIGH PURITY WATER PLANT

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 21

D1.3 - FUEL SYSYEMS

D1.3.10 - NATURAL GAS D1.3.20 - LIQUIFIED PETROLEUM GAS

D1.3.30 - PETROL/DIESEL - STORAGE/DISTRIBUTION D1.3.40 - FUEL OIL STORAGE/DISTRIBUTION

D1.4 - HEATING, VENTILATION AND AIR CONDITIONING

D1.4.10 - LOW TEMPERATURE HOT WATER HEATING EMITTERS D1.4.20 - MEDIUM TEMPERATURE HOT WATER HEATING EMITTERS AND HEAT EXCHANGERS

D1.4.30 - GAS/OIL FIRED BOILERS D1.4.40 - COAL FIRED BOILERS

D1.4.50 - ELECTRODE/DIRECT ELECTRIC BOILERS D1.4.60 - PACKAGED STEAM GENERATORS

D1.4.70 - HEAT PUMPS

D1.4.90 - BIOMASS BOILERS AND ANCILLARY PLANT D1.4.100 - COMBINED HEAT AND POWER UNITS AND ANCILLARY PLANT

D1.4.110 - PRIMARY HEAT DISTRIBUTION, THERMAL ENERGY STORES AND PRE-INSULATED UNDERGROUND PIPEWORK D1.4.120 - WATER TO WATER HEAT EXCHANGERS

D1.4.130 - STEAM HEATING

D1.4.140 - WARM AIR HEATING D1.4.150 - LOCAL HEATING UNITS

D1.4.160 - ELECTRIC TRACE HEATING SYSTEMS (EXCLUDING PIPED SERVICES) D1.4.170 - DIRECT ELECTRICAL ROOM HEATING UNITS AND EMBEDDED HEATING

D1.4.180 - GENERAL VENTILATION AND NATURAL / MIXED MODE VENTILATION

D1.4.200 - KITCHEN VENTILATION D1.4.210 - CAR PARK VENTILATION

D1.4.220 - SMOKE AND HEAT CONTROL D1.4.230 - FUME CUPBOARD AND SAFETY CABINET SYSTEMS

D1.4.240 - FUME EXTRACT D1.4.250 - ANAESTHETIC GAS EXTRACT

D1.4.260 - DUST EXTRACT

D1.4.280 - VAV AIR CONDITIONING D1.4.290 - DUAL-DUCT AIR CONDITIONING

D1.4.310 - INDUCTION AIR CONDITIONING D1.4.330 - TERMINAL REHEAT UNITS

D1.4.340 - TERMINAL HEAT PUMP UNITS

D1.4.350 - AIR CONDITIONING UNITS

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 22

D1.4.360 - CHILLED BEAMS

D1.4.370 - CHILLED CEILINGS AND RAFTS / SAILS D1.4.380 - CHILLERS AND HEAT REJECTION PLANT

D1.4.385 - PRIMARY / SECONDARY COOLING DISTRIBUTION, THERMAL ENERGY STORES AND PRE-INSULATED UNDERGROUND PIPEWORK

D1.4.390 - LOCAL COOLING UNITS

D1.4.400 - VRF SYSTEM D1.4.410 - COLD ROOM SYSTEMS

D1.4.420 - ICE PADS D1.4.430 - AIR CURTAINS

D1.4.440 - HEAT RECOVERY PLANT D1.4.450 - AIR HANDLING UNITS

D1.4.460 - FANS

D1.4.470 - AIR FILTRATION D1.4.480 - COILS, HEAT RECOVERY EQUIPMENT AND GAS / ELECTRIC BATTERIES AND HEAT RECOVERY EQUIPMENT

D1.4.490 - HUMIDIFIERS AND DEHUMIDIFIERS D1.4.500 - SILENCERS/ACOUSTIC TREATMENT

D1.4.510 - DUCTWORK AND ANCILLARIES

D1.4.520 - GRILLES/DIFFUSERS/LOUVRES

D1.5 - PIPED SERVICES (GASES, VACUUM, STEAM COMPRESSED AIR)

D1.5.10 - COMPRESSED AIR D1.5.30 - MEDICAL / LABORATORY / INDUSTRIAL GAS

D1.5.40 - VACUUM

D1.5.50 - STEAM SYSTEM AND ANCILLARY PLANT

D1.6 - FIRE SUPPRESSION

D1.6.10 - FIRE HOSE REELS D1.6.20 - DRY RISERS

D1.6.30 - WET RISERS D1.6.40 - SPRINKLERS

D1.6.50 - DELUGE

D1.6.60 - FIRE HYDRANTS D1.6.70 - GAS FIRE FIGHTING

D1.6.80 - FOAM FIRE FIGHTING D1.6.90 - POWDER FIRE FIGHTING

D1.6.100 - WATERMIST FIRE PROTECTION

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 23

D1.7 - CONTROLS AND BMS

D1.7.10 - CENTRAL CONTROL / BUILDING MANAGEMENT D1.7.20 - BUILDING SYSTEMS INTEGRATION

D1.8 - PUMPS, PIPEWORK, VALVES, ANCILLARY EQUIPMENT TRACE HEATING D1.8.10 - PIPELINES AND PIPEWORK

D1.8.20 - VALVES, PIPELINE ANCILLARIES, DEARATORS/DEPARATORS AND THERMAL EXPANSION FACILITIES

D1.8.40 - PUMPS D1.8.50 - TRACE HEATING OF PIPED SERVICES AND VESSELS

D1.9 - OTHER COMMON MECHANICAL ITEMS D1.9.10 - THERMAL INSULATION

D1.9.30 - VIBRATION & ISOLATION MOUNTING D1.9.40 - IDENTIFICATION – MECHANICAL

D1.10 – PROCESSES

D1.10.10 - PIPEWORK CLEANING AND CHEMICAL TREATMENT D1.10.20 - TESTING AND COMMISSIONING OF MECHANICAL SERVICES

D2 – ELECTRICAL

D2.1 - POWER, EARTHING, LIGHTNING PROTECTION

D2.1.10 - EMERGENCY AND STANDBY GENERATORS

D2.1.20 - HV SUPPLY / DISTRIBUTION / PUBLIC UTILITY D2.1.30 - LV SUPPLY / PUBLIC UTILITY SUPPLY

D2.1.40 - SOLAR PHOTOVOLTAIC (PV) SYSTEMS D2.1.50 - WIND POWER SYSTEMS

D2.1.60 - LV DISTRIBUTION

D2.1.70 - EXTRA-LOW VOLTAGE / REDUCED LOW VOLTAGE AC SUPPLY D2.1.80 - LOW AND EXTRA-LOW VOLTAGE DC SUPPLY

D2.1.90 - UNINTERRUPTIBLE POWER SUPPLY (UPS) D2.1.100 - LV EARTHING AND BONDING

D2.1.110 - HV EARTHING AND BONDING D2.1.120 - EARTHING & BONDING COMPONENTS

D2.1.130 - LIGHTNING AND SURGE PROTECTION SYSTEMS (LSPS)

D2.1.140 - ELECTROMAGNETIC COMPATIBILITY (EMC) D2.1.150 - MEDICAL IT POWER SUPPLIES (IPS)

D2.1.150 - ELECTRICAL VEHICLE CHARGING EQUIPMENT INSTALLATIONS

D2.1.170 - ELECTRICAL ENERGY STORAGE SYSTEMS (EESS)

D2.2 – LIGHTING

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 24

D2.2.10 - GENERAL LIGHTING

D2.2.20 - EMERGENCY LIGHTING D2.2.30 - STREET/AREA/FLOOD LIGHTING

D2.2.50 - LUMINAIRES & LAMPS

D2.3 - COMMUNICATIONS IT AND TELECOMS

D2.3.10 - TELECOMMUNICATIONS

D2.3.20 - DATA TRANSMISSION D2.3.30 - STRUCTURED CABLING SYSTEM

D2.3.40 - STAFF PAGING/LOCATION D2.3.50 - PUBLIC ADDRESS/SOUND AMPLIFICATION

D2.3.60 - BEDHEAD SERVICES D2.3.70 - FACILITIES FOR THE DISABLED

D2.3.80 - ENTERTAINMENT SYSTEMS

D2.3.90 - PROJECTION AND CONTROL ROOM DISPLAYS D2.3.100 - ADVERTISING DISPLAY

D2.3.110 - CLOCKS

D2.4 – SECURITY

D2.4.10 - ACCESS CONTROL

D2.4.20 - SECURITY DETECTION AND ALARM D2.4.30 - CLOSED CIRCUIT TELEVISION

D2.5 - DETECTION AND ALARMS D2.5.10 - FIRE DETECTION AND ALARM

D2.5.20 - LIQUID DETECTION ALARM

D2.5.30 - OXYGEN DEPLETION MONITORING SYSTEM

D2.6 - CABLES, CONDUITS, TRUNKING AND GENERAL ELECTRICAL EQUIPMENT

D2.6.10 - CONDUIT & TRUNKING D2.6.20 - CABLES AND WIRING

D2.6.30 - BUSBAR TRUNKING D2.6.40 - SUPPORT COMPONENTS - CABLES

D2.6.50 - LV SWITCHGEAR & DISTRIBUTION BOARDS

D2.6.60 - CONTACTORS AND STARTERS D2.6.70 - ACCESSORIES FOR ELECTRICAL SERVICES

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 25

D2.7 - OTHER COMMON ELECTRICAL ITEMS

D2.7.20 - IDENTIFICATION – ELECTRICAL

D2.8 – PROCESSES

D2.8.10 - TESTING AND COMMISSIONING OF ELECTRICAL SERVICES

D3 - TRANSPORT SYSTEMS

D3.1 – PEOPLE

D3.1.10 - LIFTS D3.1.20 - ESCALATORS

D3.1.30 - MOVING PAVEMENTS

D3.2 - GOODS / MAINTENANCE / DOCUMENTS

D3.2.10 - HOISTS D3.2.20 - CRANES

D3.2.30 - TRAVELLING CRADLES

D3.2.40 - GOODS DISTRIBUTION/MECHANISED WAREHOUSING D3.2.50 - MECHANICAL DOCUMENT CONVEYING

D3.2.60 - PNEUMATIC DOCUMENT CONVEYING D3.2.70 - AUTOMATIC DOCUMENT FILING AND RETRIEVAL

D4 - GENERAL - MECHANICAL AND ELECTRICAL AND PREFABRICATION

D4.10 - FIXING TO BUILDING FABRIC D4.20 - OFF-SITE PAINTING AND ANTI-CORROSION TREATMENT

D4.30 - ELECTRIC MOTORS D4.40 - PACKAGED PLANT ROOMS

D4.50 - OFF-SITE PREFABRICATED PLANT AND SERVICES MODULES

D5 – EQUIPMENT D5.10 - PORTABLE FIRE EXTINGUISHERS / BLANKETS

D5.20 - DOMESTIC KITCHEN FITTINGS D5.30 - CATERING EQUIPMENT

D5.40 - SANITARY APPLIANCES/FITTINGS D5.50 - SPECIAL PURPOSE FIXTURES, FURNISHINGS AND EQUIPMENT

PART E - TENDER DELIVERABLES

E1 - TENDER PRICING DOCUMENTS E2 - PROGRAMME

E3 - CONTRACTOR'S ORGANISATION E4 - KEY PERSONNEL

E5 - OPERATING PROCEDURE STATEMENTS

NES How to Write an NES Specification

December 2019 How to Write an NES Specification, BSRIA BG 56 Based Format Page | 26

E6 - TENDER STAGE METHOD STATEMENTS

E7 - QUALITY CONTROL E8 - HEALTH AND SAFETY

E9 - PROPOSED MANUFACTURERS, SUPPLIERS AND SPECIALISTS E10 - TECHNICAL INFORMATION TO SUPPORT THE TENDER

E11 - PROPOSALS FOR ANNUAL MAINTENANCE CONTRACT

E12 - BUILDING INFORMATION MODEL

Z1 – BRITISH STANDARDS