ibs building geotechnical investigation considerations

24
IBS Building IBS Building Geotechnical Investigation Considerations Geotechnical Investigation Considerations Bob Scavuzzo, P.E. [email protected]

Upload: others

Post on 01-Feb-2022

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IBS Building Geotechnical Investigation Considerations

IBS BuildingIBS BuildingGeotechnical Investigation ConsiderationsGeotechnical Investigation Considerations

Bob Scavuzzo, [email protected]

Page 2: IBS Building Geotechnical Investigation Considerations

Geotechnical ConsultantGeotechnical Consultant

Audience/Role:

•Owner/Developer•Structural Engineer•Civil Engineer•Architect•Contractor•Peers•Lawyers

Page 3: IBS Building Geotechnical Investigation Considerations

ConsiderationsConsiderations

•How Many Holes to Drill?•Building Size•Location

•Rule of Thumb/Standard of Care:•100 foot spacing of borings

Page 4: IBS Building Geotechnical Investigation Considerations

IBS Building Site PlanIBS Building Site Plan

• 4 Story Building

• Partial Basement

• Footprint: 160 ft x 65 ft

Page 5: IBS Building Geotechnical Investigation Considerations

How Deep?How Deep?

•Anticipated Foundation System•Piers, Footings, P-T Slab

•Depth to Bedrock

•Column Loads: •DL: 450 kips Max: 900 kips

Page 6: IBS Building Geotechnical Investigation Considerations

Previous CU Campus InvestigationsPrevious CU Campus Investigations

Future IBS Building

Earth Sciences Building

Bdrx @ 17-34 ft

Overburden: sand, clay, silt

GW @ 12 ft

Folsom Field Expansion

Bdrx @ 8-24 ft

Overburden: sand, clay, silt

GW @ 9-19 ft

CU Buffs Practice Bubble

Bdrx @ 20 ft

Overburden: sands & gravel

GW @ 10 ft

Page 7: IBS Building Geotechnical Investigation Considerations

Drilling and SamplingDrilling and Sampling

Page 8: IBS Building Geotechnical Investigation Considerations

Drilling and Sampling Drilling and Sampling

•Sampling Frequency:–2, 4, 9, (3 samples in top 10 feet)–5 feet intervals thereafter

•140 lb hammer falling 30 inches (ASTM D1586)

•Number of hammer blows to drive sampler 1 foot or fraction

Page 9: IBS Building Geotechnical Investigation Considerations

Boring LogsBoring Logs

Page 10: IBS Building Geotechnical Investigation Considerations

Laboratory TestingLaboratory Testing

Page 11: IBS Building Geotechnical Investigation Considerations

Laboratory TestingLaboratory Testing

Swell/Consolidation Swell/Consolidation ResultsResults

Page 12: IBS Building Geotechnical Investigation Considerations

Laboratory Testing Laboratory Testing

Water Soluble SulfatesWater Soluble SulfatesACI SpecificationsACI Specifications

Page 13: IBS Building Geotechnical Investigation Considerations

Foundation RecommendationsFoundation Recommendations

•Drilled Piers–18 foot minimum length–6 foot minimum bedrock penetration

•Ensure pier bottom is in zone of stable moisture content

Page 14: IBS Building Geotechnical Investigation Considerations

Pier Design ValuesPier Design Values

Page 15: IBS Building Geotechnical Investigation Considerations

Pier Design ValuesPier Design Values

•Minimum Pier Diameter

•L/D Ratio

•Design Pressure Reductions (Group Action)

Page 16: IBS Building Geotechnical Investigation Considerations

LL--Pile ParametersPile Parameters

Page 17: IBS Building Geotechnical Investigation Considerations

Seismic SurveySeismic Survey2006 IBC2006 IBC

(2004 Denver Amendment)(2004 Denver Amendment)

Page 18: IBS Building Geotechnical Investigation Considerations

Seismic SurveySeismic SurveyTest Schematic

Page 19: IBS Building Geotechnical Investigation Considerations

Seismic SurveySeismic Survey100 foot long lines, 100 foot deep analysis

Page 20: IBS Building Geotechnical Investigation Considerations

Seismic SurveySeismic Survey

Field Investigation

Page 21: IBS Building Geotechnical Investigation Considerations

Seismic SurveySeismic Survey

•Survey DATA

Page 22: IBS Building Geotechnical Investigation Considerations

Lateral Earth PressureLateral Earth Pressure

•Foundation Walls

•Retaining Walls

Page 23: IBS Building Geotechnical Investigation Considerations

Structural Plan SpecificationsStructural Plan Specifications

Page 24: IBS Building Geotechnical Investigation Considerations

Concluding RemarksConcluding Remarks

QUESTIONS?QUESTIONS?