©2014 iNEMI

End of Project Webinar

Feb 27, 2014Co-chairs:

Thomas Homorodi (Dell)

Aamir Kazi (Dell)

iNEMI Project on Assembly-Level Reliability

Qualification for Enterprise PCBAs

Page 2: iNEMI Project on Assembly-Level Reliability Qualification for Enterprise …thor.inemi.org/webdownload/2014/EOP_PCBA_Rel_Qual_022714.pdf · 2015-09-10 · Enterprise PCBA Qualification:

1©2014 iNEMI

Agenda

• Industry Participants

• Acknowledgments

• Background and Impetus

• Goals

• Benefits

• Scope: Is/ Is Not

• Schedule

• Document Walk-through & Link

• Wrap up and Next Steps

Page 3: iNEMI Project on Assembly-Level Reliability Qualification for Enterprise …thor.inemi.org/webdownload/2014/EOP_PCBA_Rel_Qual_022714.pdf · 2015-09-10 · Enterprise PCBA Qualification:

2©2014 iNEMI

Industry Participants

Page 4: iNEMI Project on Assembly-Level Reliability Qualification for Enterprise …thor.inemi.org/webdownload/2014/EOP_PCBA_Rel_Qual_022714.pdf · 2015-09-10 · Enterprise PCBA Qualification:

3©2014 iNEMI

Acknowledgments

The chairs profusely thank the project participants:

• Fubin Song, Celestica

• Mitchell Ferrill, IBM

• Jeffrey Lee, iST –Integrated Service Technology, Inc.

• Tomy Dong, Lenovo

• Vico Duan, Lenovo

• Leo Zhao, Lenovo

• John Godfrey, Microsoft

• Ander Hsieh, Wistron

• Jimmy Yang, Wistron

And our Project Manager Mark Schaffer, iNEMI

Page 5: iNEMI Project on Assembly-Level Reliability Qualification for Enterprise …thor.inemi.org/webdownload/2014/EOP_PCBA_Rel_Qual_022714.pdf · 2015-09-10 · Enterprise PCBA Qualification:

4©2014 iNEMI

Background and Impetus

• Proliferation of PCBA assembly sites worldwide

• Concurrent intro of new materials with assembly and

feature complexity

• Opaque, non-standard qualification test suites

• Inconsistent OEM requirements and ODM/EMS/CM

responses for similar assembly complexity

• ODMs receive diverging and conflicting guidance from

the multiple OEMs, leading to…

• Multiple qualification cycles at a single ODM/CM add

time, costs and delays time-to-market

Enterprise PCBA Qualification: Pain Points Addressed

Page 6: iNEMI Project on Assembly-Level Reliability Qualification for Enterprise …thor.inemi.org/webdownload/2014/EOP_PCBA_Rel_Qual_022714.pdf · 2015-09-10 · Enterprise PCBA Qualification:

5©2014 iNEMI

Problem Statement, Opportunity and Goal

• Problem Statement

– Inconsistency in the qualification of new technology, materials, suppliers/factories at EMS and ODM firms by OEMs (Each OEM has their own, and different, qualification process).

• Opportunity

– “Level the playing field” -- Standardize PCBA reliability qualification methods at the ODM/CM/EMS level

– Improve supplier capabilities

• Goal

– Develop an industry-wide set of common qualification elements and processes for consistent ODM/CM/EMS PCBA reliability

Page 7: iNEMI Project on Assembly-Level Reliability Qualification for Enterprise …thor.inemi.org/webdownload/2014/EOP_PCBA_Rel_Qual_022714.pdf · 2015-09-10 · Enterprise PCBA Qualification:

6©2014 iNEMI

Benefits

• Standardize OEM qualification suites

– Analogous to the automotive industry’s QS-9000

• Reduce cost

– by avoiding repeated qualification tests

• Satisfy demand

– for qualifying similar technologies across various OEMs

• Level playing field

– Across OEM supply base and industry as a whole

• Reduce ambiguity

– With qualification suites at ODM/CM/EMS

• Streamline, simplify

– Negotiation of qualification suite requirements

• Instill supplier responsibility

• Establish qualification level

– When OEM’s are all aligned it administers a consistent minimum qualification

requirement across supply base

Page 8: iNEMI Project on Assembly-Level Reliability Qualification for Enterprise …thor.inemi.org/webdownload/2014/EOP_PCBA_Rel_Qual_022714.pdf · 2015-09-10 · Enterprise PCBA Qualification:

7©2014 iNEMI

IS / IS NOT AnalysisThis document IS: This document IS NOT:

Defining an OEM/industry-wide Enterprise (inlc

telecom datacenter) PCBA reliability qualification

methods and processes (toolbox) for developed

products using:

• new suppliers

• new technologies

• new materials

• new processes

Intended for

• Outdoor-telecom

• Military/aerospace

• Medical

For supplier qualifications intended to evaluate

capability and quality. The document is meant to

qualify new technologies where process development

work is complete.

Early R&D for new technology/process or materials’

viability; not for process definition/development or

material evaluation

Identification of Best Known Methods/ Practices in

reliability of electronic OEMs for “new” qualifications.

Developing new reliability test

standards/procedures/test methods

Testing/materials resources commitment

Utilizes existing industry standards/procedures

wherever appropriate.

Regulatory/environmental materials compliance

PCBA-level qualification, with evaluation of risk sites

on PCBs that depend on solder-assembly process

Re-creation of component qualification test methods

and processes

A reliability qualification of newly developed solder

assembly processes, technologies, materials at

manufacturing facilities of new and existing suppliers.

Failure Analysis requirement/procedure development

Raw PCB material/ construction evaluation

Definition of test-level failure criteria. Definition of qualification-suite level failure criteria –

this is the domain of each OEM, and defined by them

Page 9: iNEMI Project on Assembly-Level Reliability Qualification for Enterprise …thor.inemi.org/webdownload/2014/EOP_PCBA_Rel_Qual_022714.pdf · 2015-09-10 · Enterprise PCBA Qualification:

8©2014 iNEMI

Project Schedule & Tasks

• The Timetable for this project was 12 months

TASK LISTQ1-’13 Q2 Q3 Q4 Q1-’14

J F M A M J J A S O N D J F M

Task 1: Disseminate current document

Task 2: Review OEM documents

Task 3: Gap analyses

Task 4: Develop Flow, of qualification

Task 5: Develop agreement/modifications

Task 6: Editing/rewriting

Task 7: Approval by team

Task 8: Invite EM/CM/ODM feedback

Task 9: Release completed document

Page 10: iNEMI Project on Assembly-Level Reliability Qualification for Enterprise …thor.inemi.org/webdownload/2014/EOP_PCBA_Rel_Qual_022714.pdf · 2015-09-10 · Enterprise PCBA Qualification:

9©2014 iNEMI

Document Walk-through

iNEMI Project Link

(and document download):

http://www.inemi.org/node/2325

Page 11: iNEMI Project on Assembly-Level Reliability Qualification for Enterprise …thor.inemi.org/webdownload/2014/EOP_PCBA_Rel_Qual_022714.pdf · 2015-09-10 · Enterprise PCBA Qualification:

10©2014 iNEMI

Wrap up and Next Steps

• Develop database of qualification results

• Classify results by

– Materials: solders, PCBA

– Technology/ complexity: Feature sets affected by processes and factory capabilities

• BGA density and spread on single assembly

• Layer count and PCB thickness

– Assembly Processes

• Reflow, Wave, Selective solder

• Database will help ODM/ CMS business development

– Helps OEMs’ assess EMS/CM by minimizing reliability uncertainty

– Leverage qualification results for new product using previously qualified processes

Page 12: iNEMI Project on Assembly-Level Reliability Qualification for Enterprise …thor.inemi.org/webdownload/2014/EOP_PCBA_Rel_Qual_022714.pdf · 2015-09-10 · Enterprise PCBA Qualification:

11©2014 iNEMI

Thank you for attending!