International Journal of Advance Engineering and Research Development Volume 4, Issue 5, May-2017 @IJAERD-2017, All rights Reserved 161 Scientific Journal of Impact Factor (SJIF): 4.72 e-ISSN (O): 2348-4470 p-ISSN (P): 2348-6406 FINTE ELEMENT ANALYSIS AND DESIGN OF POST-TENSIONED TRANSFER GIRDER Desai Ajaykumar J. 1 , Nihil Sorathia 2 , Hiren G. Desai 3 1 Postgraduate student, Department of civil engineering, Parul University, Vadodara 2 Assitant Professor, Department of civil engineering, Parul University, Vadodara 3 Sai Consultant, Surat Abstract-A Post-Tensioned Transfer Girder is utilized to transfer point load of column from the above stories and transfer them to the supporting column. Transfer girder gives great engineering stylish view to the tall structure. Behavior and design of transfer girder is extremely unusual contrast with ordinary beam, so it is important to concentrate the behavior and design of the transfer girder in detail. To understand the same in the present review, G+10 story building is basically modeled in which the columns are float at various levels. The analysis and design of transfer girder considering dynamic loading i.e. seismic load is done in ADAPT Builder. Five unique cases are considered with the end goal of examining the behavior of transfer girder. The behavior of transfer girder is contemplated by considering the adjustment in the position of transfer girder in working in plan and the different location of shear wall. The five fundamentally unique building is displayed in ETABS and behavior of the transfer girder is examined. The entire behavior of the post-tensioned transfer girder is contemplated by doing construction stage analysis in ETABS. Additionally the construction stage analysis is done for every one of the five cases in ETABS. To the extent analysis is concerned, the column is regularly accepted pinned at the base and is consequently taken as a point load on the transfer girder. Additionally the impact of transfer girder on the above structure is concentrated under gravity and lateral load. The final design of the transfer girder will done in ADAPT Builder. Keywords- Post-tensioned, Floating Column, Seismic, ADAPT Builder. I. INTRODUCTION In tall building column is stopped at ground and first floor level to encourage bigger opening at ground level to make get to agreeable to people in general zone at the base. In 1950's and 1960's, some Europe researchers proposed the soft base level to achieve the substantial openings at the base level. A frame is constructed at base level to support the upper structure in this kind of structure. It is viewed as that this kind of structure has better performance during earthquake, however as indicated by the present encounters, it has been demonstrated that the idea isn't right. In 1978, numerous this kind of building fell during the Romania quake. A column should be a vertical part beginning from foundation level and exchanging the load to the ground. The term floating column is additionally a vertical component which closes at lower level (end level) of the building because of structural prerequisite and its lay on beam. The beams thusly exchange the load to different columns below it. Practically speaking, the genuine columns below the end level [usually the stilt level] are not constructed with care and more at risk to disappointment. These days bigger opening at the ground floor level is accomplished by utilization of transfer girder to collect the vertical and parallel load from the elevated structure part and then distribute them to the broadly separated column. However in the analysis of the transfer girder, thought of the impact of intelligent drive in the general examination is past the scope of the advancement of straightforward and approximate and requires appropriate modeling in mind the end goal to have greater understanding the structural behavior and analysis. II. MODELLING 2.1 Problem definition For the purpose of understanding behaviour and design of Post-tensioned transfer girder ETABS 2016 software is utilized. In order to get correct result from the software the correct modelling of structure must be required. To validate the present work with software, following problem of book is taken in order to compare the analysis result given by software with the analytical result.

Upload: ngodan

Post on 17-Mar-2018

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: International Journal of Advance Engineering and Research ...ijaerd.com/papers/finished_papers/FINTE ELEMENT ANALYSIS AND DE… · For the purpose of understanding behaviour and design

International Journal of Advance Engineering and Research Development

Volume 4, Issue 5, May-2017

@IJAERD-2017, All rights Reserved 161

Scientific Journal of Impact Factor (SJIF): 4.72 e-ISSN (O): 2348-4470 p-ISSN (P): 2348-6406

FINTE ELEMENT ANALYSIS AND DESIGN OF POST-TENSIONED

TRANSFER GIRDER

Desai Ajaykumar J.1, Nihil Sorathia2, Hiren G. Desai3

1Postgraduate student, Department of civil engineering, Parul University, Vadodara

2Assitant Professor, Department of civil engineering, Parul University, Vadodara 3Sai Consultant, Surat

Abstract-A Post-Tensioned Transfer Girder is utilized to transfer point load of column from the above stories and

transfer them to the supporting column. Transfer girder gives great engineering stylish view to the tall structure.

Behavior and design of transfer girder is extremely unusual contrast with ordinary beam, so it is important to

concentrate the behavior and design of the transfer girder in detail. To understand the same in the present review, G+10

story building is basically modeled in which the columns are float at various levels. The analysis and design of transfer girder considering dynamic loading i.e. seismic load is done in ADAPT Builder. Five unique cases are considered with

the end goal of examining the behavior of transfer girder. The behavior of transfer girder is contemplated by considering

the adjustment in the position of transfer girder in working in plan and the different location of shear wall. The five

fundamentally unique building is displayed in ETABS and behavior of the transfer girder is examined. The entire

behavior of the post-tensioned transfer girder is contemplated by doing construction stage analysis in ETABS.

Additionally the construction stage analysis is done for every one of the five cases in ETABS. To the extent analysis is

concerned, the column is regularly accepted pinned at the base and is consequently taken as a point load on the transfer

girder. Additionally the impact of transfer girder on the above structure is concentrated under gravity and lateral load.

The final design of the transfer girder will done in ADAPT Builder.

Keywords- Post-tensioned, Floating Column, Seismic, ADAPT Builder.

I. INTRODUCTION

In tall building column is stopped at ground and first floor level to encourage bigger opening at ground level to make get

to agreeable to people in general zone at the base. In 1950's and 1960's, some Europe researchers proposed the soft base

level to achieve the substantial openings at the base level. A frame is constructed at base level to support the upper

structure in this kind of structure. It is viewed as that this kind of structure has better performance during earthquake,

however as indicated by the present encounters, it has been demonstrated that the idea isn't right. In 1978, numerous this

kind of building fell during the Romania quake.

A column should be a vertical part beginning from foundation level and exchanging the load to the ground. The term

floating column is additionally a vertical component which closes at lower level (end level) of the building because of structural prerequisite and its lay on beam. The beams thusly exchange the load to different columns below it. Practically

speaking, the genuine columns below the end level [usually the stilt level] are not constructed with care and more at risk

to disappointment.

These days bigger opening at the ground floor level is accomplished by utilization of transfer girder to collect the vertical

and parallel load from the elevated structure part and then distribute them to the broadly separated column. However in

the analysis of the transfer girder, thought of the impact of intelligent drive in the general examination is past the scope of

the advancement of straightforward and approximate and requires appropriate modeling in mind the end goal to have

greater understanding the structural behavior and analysis.

II. MODELLING

2.1 Problem definition

For the purpose of understanding behaviour and design of Post-tensioned transfer girder ETABS 2016 software is

utilized. In order to get correct result from the software the correct modelling of structure must be required. To validate

the present work with software, following problem of book is taken in order to compare the analysis result given by

software with the analytical result.

Page 2: International Journal of Advance Engineering and Research ...ijaerd.com/papers/finished_papers/FINTE ELEMENT ANALYSIS AND DE… · For the purpose of understanding behaviour and design

International Journal of Advance Engineering and Research Development (IJAERD) Volume 4, Issue 5, May-2017, e-ISSN: 2348 - 4470, print-ISSN: 2348-6406

@IJAERD-2017, All rights Reserved 162

2.2 Different models of transfer plate position

Fig-1. -Configurations for Case-1Fig.-2 -Configurations for Case-2

Fig.-3 - Configurations for Case-3

All beams having size of 230 mm x 375 mm are passed in analysis result of ETABS.

All slabs are having the depth of 150 mm in all cases.

Thickness of Shear wall provided in the case-2, case-4 and case-5 is of 180 mm.

Table 1: Material Specifications

Grade of Concrete Fck = 25 N/mm²

Grade of Steel Fy =500 N/mm²

Density of Concrete 𝛾c =25 kN/m³

Density of Brick wall 𝛾 = 20 kN/m³

Page 3: International Journal of Advance Engineering and Research ...ijaerd.com/papers/finished_papers/FINTE ELEMENT ANALYSIS AND DE… · For the purpose of understanding behaviour and design

International Journal of Advance Engineering and Research Development (IJAERD) Volume 4, Issue 5, May-2017, e-ISSN: 2348 - 4470, print-ISSN: 2348-6406

@IJAERD-2017, All rights Reserved 163

Table 2: Loading

III. RESULTS & DISCUSSION

3.1 Comparison between Construction Stage & Conventional Analysis

Fig-4Bending Moment in Transfer Girder for case-1 Fig-5Shear force in transfer Girder for case-1

The maximum positive and negative bending moments are linearly increasing as construction stage increases. The

maximum positive bending moment in transfer girder (case-1) is 5% more when construction stage analysis is used compare to conventional analysis. The shear forces at support and at floating column are linearly increasing as

construction stage increases. The maximum shear force in transfer girder (case-1) is 3% more when construction stage

analysis is used compare to conventional analysis. The maximum deflection in transfer girder (case-1) is 5% more when

construction stage analysis is used compare to conventional analysis.

Fig-6Bending Moment in Transfer Girder for case-2 Fig-7Shear force in transfer Girder for case-2

Earthquake zone III

Importance factor 1

Response reduction factor 5

Wall load 13.11kN/m

Parapet wall load 4.7kN/m

Typical floor live load 3 kN/m

Terrace love load 1.5kN/m

Typical floor Super dead 2 kN/m

Floor finish 1.5kN/m

Page 4: International Journal of Advance Engineering and Research ...ijaerd.com/papers/finished_papers/FINTE ELEMENT ANALYSIS AND DE… · For the purpose of understanding behaviour and design

International Journal of Advance Engineering and Research Development (IJAERD) Volume 4, Issue 5, May-2017, e-ISSN: 2348 - 4470, print-ISSN: 2348-6406

@IJAERD-2017, All rights Reserved 164

The maximum positive and negative bending moments are linearly increasing as construction stage increases. The

maximum positive bending moment in transfer girder (case-2) is 5% more when construction stage analysis is used

compare to conventional analysis. The shear forces at support and at floating column are linearly increasing as

construction stage increases. The maximum shear force in transfer girder (case-2) is 3% more when construction stage

analysis is used compare to conventional analysis. The maximum deflection in transfer girder (case-2) is 5% more when

construction stage analysis is used compare to conventional analysis.

Fig-8Bending Moment in Transfer Girder for case-3 Fig-9Shear force in transfer Girder for case-3

The maximum positive and negative bending moments are linearly increasing as construction stage increases. The

maximum positive bending moment in transfer girder (case-3) is 5% more when construction stage analysis is used

compare to conventional analysis. The shear forces at support and at floating column are linearly increasing as

construction stage increases. The maximum shear force in transfer girder (case-3) is 3% more when construction stage analysis is used compare to conventional analysis. The maximum deflection in transfer girder (case-3) is 5% more when

construction stage analysis is used compare to conventional analysis.

Fig-10Bending Moment in Transfer Girder for case-4 Fig-11Shear force in transfer Girder for case-4

The maximum positive and negative bending moments are linearly increasing as construction stage increases. The maximum positive bending moment in transfer girder (case-4) is 5% more when construction stage analysis is used

compare to conventional analysis. The shear forces at support and at floating column are linearly increasing as

construction stage increases. The maximum shear force in transfer girder (case-4) is 3% more when construction stage

Page 5: International Journal of Advance Engineering and Research ...ijaerd.com/papers/finished_papers/FINTE ELEMENT ANALYSIS AND DE… · For the purpose of understanding behaviour and design

International Journal of Advance Engineering and Research Development (IJAERD) Volume 4, Issue 5, May-2017, e-ISSN: 2348 - 4470, print-ISSN: 2348-6406

@IJAERD-2017, All rights Reserved 165

analysis is used compare to conventional analysis. The maximum deflection in transfer girder (case-4) is 5% more when

construction stage analysis is used compare to conventional analysis.

Fig-12Bending Moment in Transfer Girder for case-5 Fig-13Shear force in transfer Girder for case-5

The maximum positive and negative bending moments are linearly increasing as construction stage increases. The

maximum positive bending moment in transfer girder (case-5) is 5% more when construction stage analysis is used

compare to conventional analysis. The shear forces at support and at floating column are linearly increasing as

construction stage increases. The maximum shear force in transfer girder (case-5) is 3% more when construction stage

analysis is used compare to conventional analysis. The maximum deflection in transfer girder (case-5) is 5% more when

construction stage analysis is used compare to conventional analysis.

IV. CONCLUSION

[1] Construction stage analysis in structure is important to improve the analysis accuracy in terms of displacement,

axial force, bending moment and shear force in transfer girder and column near of it and also for structure as a whole.

[2] Bending moment and shear force in transfer girder are higher in construction stage analysis which must be

consider in design phase for avoiding cracking of the beam and column due to sequence effect.

[3] In case of displacement, structure analyzed utilizing construction stage analysis indicates considerable larger

displacement which is reality in comparison to conventional analysis in which structure is conceptualized as

entire and loaded at the same time after construction which is not reality.

[4] The provision of shear wall improves the behavior of transfer girder under earthquake load.

[5] The maximum reduction in bending moment is about 85% due to the provision of the shear wall under

earthquake load.

[6] The beam above the transfer girder shows drastic change in flexural behavior as we construct the floor stage

wise, it changes from hogging to ultimately sagging which should be taken care while designing the beams above the transfer girder.

[7] In conventional analysis, this flexural behavior change is not getting reflected and it may result into the flexural

cracking, if beams are designed considering conventional analysis only.

[8] The transfer girder must be design as partially prestressed member to get acceptable depth of girder rather than

fully prestressed member.

REFERENCES

[1] Chris, G. and Constantin, E. (2013) “Design of partially prestressed concrete beam basedon cracking control

provision” Engineering Structures 48, pp. 402–416.

[2] Devashree, U., Salunke, P. and Sayagavi, V. (2014) “Cost optimization of post-tensioned I girder” International Journal of Students Research in Technology & Management, Vol.2 (01), Jan –Feb, ISSN 2321-2543, and pp.

14-18.

[3] Edward, G., Christopher, B. and Yook-Kong, Y (1986) “Anchorage zone stresses ofbeams subjected to shear

force” J. Struct. Eng. no. 113, pp.1789-1805.

Page 6: International Journal of Advance Engineering and Research ...ijaerd.com/papers/finished_papers/FINTE ELEMENT ANALYSIS AND DE… · For the purpose of understanding behaviour and design

International Journal of Advance Engineering and Research Development (IJAERD) Volume 4, Issue 5, May-2017, e-ISSN: 2348 - 4470, print-ISSN: 2348-6406

@IJAERD-2017, All rights Reserved 166

[4] Eric, skibbe (2010) “A Comparison of Design using Strut-And-Tie of Modelling andDeep Beam Method for

Transfer Girders in Building Structures ”B.S, Kansas StateUniversity.

[5] Elif A. (2010) “Transfer and development length of strands in post-tensioned membersafter anchor head failure”

M.sc Thesis, University of Central Florida.

[6] Jacques, E J. (1971) "Study of long-span prestressed concrete bridge girders." J.Prestressed Concrete Inst., pp.

24-42.

[7] Kaung, J. And Puvvala, J. (1996) “The Behaviour and failure of wall beams in tallbuilding” Proc. Of 2nd Int.

Conf. Multi-Purpose High-Rise Towers and Tall buildings,Singapore, pp. 139-143. [8] Michael S., Zenon A., and Abdolrahim N. (1989)” Pre-tensioned and Post-tensionedcomposite girders” Journal

of Structural Engineering, Vol. 115, No. 12, December, pp.3142-3153.