Date of previous examination and tests
Location
Contract No.Policy No. Report No.
Name of User
005
Date of commencement of examination and tests
Date of Report
Engineer Surveyor
Competent PersonAllianz Engineering
+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081
V810b
Local Exhaust Ventilation Plant Report
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE
NV09796703
TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK, SHEFFIELD, S20 3FH
E35223008885
20-OCT-2016
17-OCT-2017
Andrew Allen
Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.
www.allianzengineering.co.uk
Health & Safety at Work etc. Act 1974
Side 1 of 617-OCT-2017
Type of Inspection Thorough Examination and Test
Regulations Applicable Regulation 9 of COSHH
Identification of LEV Plant and Process
Plant Number LEV 030Manufacturer Not MarkedSerial Number Not MarkedLocation of Air Mover OutsideLocation of Process Joiners ShopsProcess(es) being controlled Various Wood Working Machines and
De-nibbing Section.Hazardous substance(s) being controlled Hard and Soft Wood Dusts, MDF and Plywood
Dusts and Dusts from Primer Paints and VarnishCoatings
Number of Extraction Points 43Maximum number that can be used at one time 25Exhaust air returned to AtmospherePrimary filter fitted YesSecondary filter fitted No
Visual Assessment of the level of control UnsatisfactoryAir Sampling Results We observe that the exhaust air is directed to
atmosphere. Workplace air monitoring isrecommended to ensure the WEL does notexceed the set limits for the contaminants.
Tests Undertaken Visual, Light Test, Smoke Test, Static PressureTest, Velocity Measurements
Defects AFFECTING the level of control and particulars of any repairs or modifications required
1/ Contaminant dusts escape capture and can enter the operators breathing zone and workplace at thefollowing points:
a/ Cabinet Makers Shop - Bench extraction, when longer items are placed on their ends and the topsurface sanded.
Suitable repairs/modifications should be carried out to provide adequate Engineering Control.
Emergency Report and "Do Not Use" label issued to Trevor Hunt, at the time of inspection.
Defects NOT affecting the level of control and particulars of any repairs or modifications required
1/ Wadkin Table Saw 8. The level of control during the last part of cutting sheet materials is weak, with
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 2 of 6 E35223008885
dusts escaping capture to the rear / side of the hood. Suitable modifications to the top capture hoodshould be carried out to improve the level of control.
2/ Diplomat Belt Sander RHS Duct. The duct is split at the machine spigot.
3/ Router 5. Hevier dusts escape capture to the RHS of the capture hood and collect on the Router andfloor. Suitable modifications to the capture hood should be carried out to improve the level of control.
Other Observations
óR1/ Cross-reference with the last Thorough Examination and Test report
(E35223007741 - dated 20/10/2016)
óR2/ Test results recorded indicate no marked system performance deterioration since the last ThoroughExamination and Test.
óR3/ Condition at the Time of Test: Tests carried out with an average of 20 to 25 points open, as pernormal operating procedure. The following machines were witnessed in use: CNC Millenium Machine,Diplomat Belt Sander, Spindle Sander 15, Wadkin Table Saw 8, Spindle Moulder 14, Router 5, HorizontalSanders and Wall Saw.
óR4/ No air flow indicators are present at appropriate points on the system to indicate the system isfunctioning correctly. Reference should be made to HSG 258 regarding the installation of air flowindicators.
óR5/ The Effective Capture Distance of the Horizontal Sander No 7 Extract Hood is 0.75 m from thestopper block.
óR6/ The Effective Capture Distance of the Luna Horizontal Sander Extract Hood is 0.50 m from the face.
óR7/ The following parts of the system were not fully accessible;
a/ Fan and Motor Set due to mounting position within the filter enclosure. As a consequence the fan andmotor technical details could not be fully captured and should be provided along with the filter efficiencies.
b/ No safe accessible test points are available for the measurement of PSI and PSO. Suitable Test Holesshould be provided at the Filter Unit for the measurement of PSI and PSO across the primary filter.
It should be noted that inability to access the item(s) specified above has not affected the ability tocomplete an effective assessment of the Engineering Control provided by the system.
óR8/ COSHH Management System Documentation
The following supporting documents, held by Martin Carr, have been witnessed and are readily availableon the companies' intranet site;
Risk Assessment / COSHH Assessment
Material Safety Data Sheet(s)
Previous Thorough Examination and Test Report(s)
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 3 of 6 E35223008885
The following supporting documents have not been witnessed;
Air Monitoring/Sampling Report(s),
Commissioning Report
LEV User Manual/ Logbook
óR9/ Refer to Report No E35223004219 - dated 24/09/2013, for system diagram.
Condition at Time of Test Normal. See observations section.
Fan Details
Manufacturer Not MarkedSerial NumberType CentrifugalRotation (viewed from drive end)
mØSizeVolume Flow m s3 -1
Speed rpm
Motor Details
Manufacturer Not MarkedSerial no.Speed rpmPower kW
Primary Filter
Medium Fabric BagsCollector Type Hopper / PVC BagEfficiency %
Secondary Filter
MediumCollector TypeEfficiency %
Details of Test Results
Primary filter inlet Pressure(Pa)
Primary filter outlet Pressure(Pa)
Pressure Difference(Pa)
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP1 CNC Millenium Machine
Duct0.15 -2364 4.94 0.09
FV1 CNC Millenium MachineDuct Face
0.05 31.60 0.06
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 4 of 6 E35223008885
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP2 Main Duct 0.56 -2273 15.10 3.72
FV2 CNC 4008 Machine DuctFace
0.05 -2422 31.60 0.06
FV3 Lathe LHS Duct Face 0.10 -489 15.53 0.12
FV4 Lathe RHS Duct Face 0.08 -424 16.43 0.13
FV5 Coaster Sander Face 0.08 22.72 0.11
TP3 Diplomat Belt Sander LHSDuct
0.1 -1248
TP4 Diplomat Belt Sander RHSDuct
0.1 -1725
FV6 Diplomat Belt Sander InputFace
0.90 x 0.01 3.61 0.03
FV7 Diplomat Belt SanderOutput Face
0.90 x 0.02 3.29 0.06
FV8 Spindle Sander 19 Duct /Face
0.15 x 0.20 -51 8.41 0.25
FV9 Spindle Sander 15 Duct 0.08 -504 28.75 0.14
TP5 Planer Bottom Hood DuctRear of Hood
0.15 -1336 34.88 0.62
TP6 Planer Top Hood Duct (notin use)
0.18
TP7 Wadkin Table Saw 8 Duct 0.12 -1238 33.34 0.38
TP 7A Wadkin Table Saw 8 TopHood Face
0.46 x 0.07 6.54 0.21
TP8 Auto Spindle LH Duct 0.10 -1161 31.92 0.25
TP9 Auto Spindle RH Duct 0.10 -726 30.32 0.24
FV9A De-nibbing Section - BufferHood Face
0.23 x 0.17 22.78 0.89
FV9B LHS Bench Hood Face 0.46 x 0.08 12.96 0.48
FV9C RHS Bench Hood Face 0.46 x 0.08 14.19 0.52
TP 9A Buffer Rear Hood Duct (notin use)
0.10
FV9D Buffer Bench Hood Face(not in use)
0.17 x 0.15
FV9E Cabinet Makers BenchExtraction Face
0.65 x 0.40 1.24 0.32
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 5 of 6 E35223008885
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )FV10 Router 4 Hood Face 0.26 x 0.05 -227 15.22 0.20
FV11 Router 5 Hood Face 0.30 x 0.05 -217 22.34 0.34
FV12 Cooksley Cross Cut SawRear Hood Face
0.30 x 0.30 5.10 0.46
FV12A Cooksley Cross Cut SawTop Hood Duct
0.10 -963 19.28 0.15
FV13 Wadkin Spindle Moulder 13Hood Face
0.27 x 0.13 13.62 0.48
TP10 Spindle Moulder 14 Duct 0.10 -316 17.00 0.13
TP11 Horizontal Sander 7 Duct 0.22 -1164 30.33 1.15
FV14 Horizontal Sander 7 RHSHood Face
0.33 x 0.25 7.62 0.62
FV14A Horizontal Sander 7 LHSHood Face (obscured)
5.76
FV15 Vertical Sander 11 HoodFace
0.4 x 0.125 5.03 0.25
TP12 Vertical Sander 11 RearDuct
0.15 -548 8.22 0.15
TP13 Bandsaw Duct 0.10
FV13A Bandsaw Top Hood Face 0.20 x 0.10 6.33 0.13
FV13B Bandsaw Bottom HoodDuct
0.10 -230 19.28 0.15
TP14 Table Saw 9 Bottom Duct 0.12 -1983 21.94 0.25
TP14A Table Saw Hood Duct 0.08 -1628 23.76 0.12
TP15 Horizontal Sander HoodDuct
0.15 -337 22.81 0.40
TP15A Saw 10 Top Hood Duct 0.06 -882 33.75 0.09
FV16 Saw 10 Rear Hood Face 0.10 x 0.10 20.34 0.20
TP16 Belt Sander 20 Duct 0.10 -1466 34.57 0.27
FV17 Belt Sander Input 20 Face 1.40
FV18 Belt Sander Output 20 Face 0.72 x 0.04 1.20 0.03
TP17 Wall Saw - Saw Head Duct 0.08 -334 16.03 0.08
TP18 Wall Saw End Hood TopDuct
0.10 -791 29.27 0.23
TP19 Wall Saw End Hood MiddleDuct
0.10 -677 32.00 0.25
TP20 Wall Saw End Hood BottomDuct
0.15 -814 27.39 0.48
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 6 of 6 E35223008885
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )FV19 Wall Saw RHS End Hood
(ave)1.65 x 0.20 2.03 0.67
Calibrated Test Equipment Details
Thermal Anemometer 120622Electronic Manometer ACEEM047Rotating Vane Anemometer 118670Other Not Applicable
Examination carried out on behalf of:Client NameAddress
This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH
1
Martin Carr
From: Wood LEV [[email protected]]Sent: 18 October 2017 07:58To: [email protected]: EDIT: 352852612377241707 http://hs.carrs-silver.co.uk/woodlev.pdf
Item Wood LEV
HS Reference http://hs.carrs-silver.co.uk/woodlev.pdf
Due Date 05-04-2017
Status Completed+
Comments/Notes 21/10/16 Urgent work required on 4 items. NOTE removed from service until fixed;. a/ CNC 4008 Machine b/ Cabinet Makers Shop - Bench extraction c/ De-nibbing Section LHS and RHS Benches when work pieces coated in white primer are sanded. d/ Wadkin Spindle Moulder 13 e/ Table Saw Refer to report for further details 24/10/16 As well as listed jobs Andy from Allianz said overall there has been a marked drop off in extraction performance. In trying to find reason for this we have checked ducting for blockages, checked all 3 motors are working, checked to see if bag shaker is working, all ok, however although bags are not holding sawdust and are all in place this doses not mean they are not "blinded" which would cause a significant fall in suction. Given that nobody can remember them ever being changed before it would be prudent to have them checked and cleaned if possible and or replaced. 31/10/16 Fumex Ltd. going to come and survey wood shop DCE and advise. 14/11/16 Contacted Fumex said they coming in morning 15/11/16 Fumex engineer called to assess problem, bags are shot. When he has identified make and model of DCE he will send quote and recommendations. 30/11/16 Still waiting for quote. 5/12/16 Contacted Fumex to check on progress, going to chase up and let me know? 21/12/16 No reply to date, will chase up in new year. 03/01/17 Fumex say they have received price for replacement bags and will be sending a quote soon.
2
11/01/17 Don't think this is the case, after speaking to them today, they are now asking for details of the extractor so they can locate replacement bags. Will keep you advised on any progress. 16/01/17 We couldn't find any details on M/C or on paper have advised Fumex, they are going to try and source bags without info. 06/02/17 Contacted Fumex again, going to get engineer who originally surveyed job to get in touch when he gets back in office. 13/02/17 Still waiting for some contact! 15/02/17 Rang today for progress, are going to ring back again! 15/02/17 Fumex rang, upshot can't help. Have sourced another firm, Scottex, seems promising, need to send them some details. 20/02/17 Scottex sent quote which seems quite reasonable, however this was only to supply bags, we need a replacement service as well. Have been in touch and am awaiting a reply. 22/02/17 Scottex came to view job and will send quote for total job, estimated to take a full day. 27/02/17 Quote accepted, Scottex will advise on date when new bags have arrived and arrange a date to fit, SF ok to fit in whenever they can come. 21/03/17 Job arranged for Fri 24/03/17. 03/04/17 Scottex came on Fri to change bags, on removing old bags it was found the shaker mechanism was broken and needed welding, so Trev called Star Weld back to take of it which they did. Scottex fitting bags on Monday now. 05/04/17 Found shaker frames broken in two more places, we removed frames and repaired. Scottex fitted remaining bags on Wednesday. Dust collector working ok and Scottex will come back in a month to check all ok. Biffa skip when returned had the back door broken, needs substantial repair. Mark has contacted Biffa.
Job Type HS Job
Notifier [email protected]
Note you can also reply to this e-mail. 352852612377241707
Date of previous examination and tests
Location
Contract No.Policy No. Report No.
Name of User
005
Date of commencement of examination and tests
Date of Report
Engineer Surveyor
Competent PersonAllianz Engineering
+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081
V810b
Local Exhaust Ventilation Plant Report
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE
NV09796703
TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK, SHEFFIELD, S20 3FH
E35223007741
07-OCT-2015
20-OCT-2016
Andrew Allen
Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.
www.allianzengineering.co.uk
Health & Safety at Work etc. Act 1974
Side 1 of 620-OCT-2016
Type of Inspection Thorough Examination and Test
Regulations Applicable Regulation 9 of COSHH
Identification of LEV Plant and Process
Plant Number LEV 030Manufacturer Not MarkedSerial Number Not MarkedLocation of Air Mover OutsideLocation of Process Joiners ShopsProcess(es) being controlled Various Wood Working Machines and
De-nibbing Section.Hazardous substance(s) being controlled Hard and Soft Wood Dusts, MDF and Plywood
Dusts and Dusts from Primer Paints and VarnishCoatings
Number of Extraction Points 43Maximum number that can be used at one time 25Exhaust air returned to AtmospherePrimary filter fitted YesSecondary filter fitted No
Visual Assessment of the level of control UnsatisfactoryAir Sampling Results We observe that the exhaust air is directed to
atmosphere. Workplace air monitoring isrecommended to ensure the WEL does notexceed the set limits for the contaminants.
Tests Undertaken Visual, Light Test, Smoke Test, Static PressureTest, Velocity Measurements
Defects AFFECTING the level of control and particulars of any repairs or modifications required
1/ Contaminant dusts escape capture and can enter the operators breathing zone and workplace at thefollowing points:
a/ CNC 4008 Machine
b/ Cabinet Makers Shop - Bench extraction
c/ De-nibbing Section LHS and RHS Benches when work pieces coated in white primer are sanded.
d/ Wadkin Spindle Moulder 13
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 2 of 6 E35223007741
Suitable repairs/modifications should be carried out to provide adequate Engineering Control.
Emergency Report and "Do Not Use" label issued to Trevor Hunt, at the time of inspection.
Defects NOT affecting the level of control and particulars of any repairs or modifications required
1/ The test result readings are significantly lower than those obtained at the last examination and the levelof control has reduced throughout the system. Investigation as to the cause should be carried out andimprovements made.
2/ Vertical Sander 11. The level of contol is weak, with some of the dusts escaping capture and collectingon the floor.
Other Observations
1/ Cross-reference with the last Thorough Examination and Test report
(E35223006327 - dated 07/10/2015)
2/ Condition at the Time of Test: Tests carried out with an average of 20 to 25 points open, as per normaloperating procedure. The following machines were witnessed in use: CNC 4008 Machine, Diplomat BeltSander, Planer, Wadkin Table Saw 8, De-nibbing Section LHS and RHS Benches, Spindle Moulder 14,Router 5, Wadkin Spindle Moulder and Table Saw 9.
3/ The Effective Capture Distance of the Horizontal Sander No 7 Extract Hood is 0.75 m from the stopperblock.
4/ The Effective Capture Distance of the Luna Horizontal Sander Extract Hood is 0.50 m from the face.
5/ Machines not in use, should have their Extraction Dampers kept shut, to improve Extraction Rates.
6/ The following parts of the system were not fully accessible;
a/ Fan and Motor Set due to mounting position within the filter enclosure. As a consequence the fan andmotor technical details could not be fully captured and should be provided along with the filter efficiencies.
It should be noted that inability to access the item(s) specified above has not affected the ability tocomplete an effective assessment of the Engineering Control provided by the system.
7/ COSHH Management System Documentation
The following supporting documents, held by Martin Carr, have been witnessed and are readily availableon the companies' intranet site;
Risk Assessment / COSHH Assessment
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 3 of 6 E35223007741
Material Safety Data Sheet(s)
Previous Thorough Examination and Test Report(s)
The following supporting documents have not been witnessed;
Air Monitoring/Sampling Report(s),
Commissioning Report
LEV User Manual/ Logbook
8/ Refer to Report No E35223004219 - dated 24/09/2013, for system diagram.
Condition at Time of Test Normal. See observations section.
Fan Details
Manufacturer Not MarkedSerial NumberType CentrifugalRotation (viewed from drive end)
mØSizeVolume Flow m s3 -1
Speed rpm
Motor Details
Manufacturer Not MarkedSerial no.Speed rpmPower kW
Primary Filter
Medium Fabric BagsCollector Type HopperEfficiency %
Secondary Filter
MediumCollector TypeEfficiency %
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 4 of 6 E35223007741
Details of Test Results
Primary filter inlet Pressure(Pa)
Primary filter outlet Pressure(Pa)
Pressure Difference(Pa)
Details of Test Results
Primary filter inlet Pressure(Pa)
Primary filter outlet Pressure(Pa)
Pressure Difference(Pa)
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP1 CNC Millenium Machine
Duct0.15 -1281 4.42 0.08
FV1 CNC Millenium MachineDuct Face
0.05 29.4 0.06
TP2 Main Duct 0.56 -1297 12.63 3.11
FV2 CNC 4008 Machine DuctFace
0.05 22.30 0.04
FV3 Lathe LHS Duct Face 0.10 10.50 0.08
FV4 Lathe RHS Duct Face 0.08 12.07 0.06
FV5 Coaster Sander Face 0.08 11.83 0.06
TP3 Belt Sander Duct 0.1 -1021
TP4 Belt Sander Duct 0.1 -930
FV6 Belt Sander Input Face 0.90 x 0.01 1.74 0.02
FV7 Belt Sander Output Face 0.90 x 0.02 0.92 0.02
FV8 Spindle Sander 19 Duct /Face
0.15 x 0.20 -314 6.48 0.19
FV9 Spindle Sander 15 Duct 0.08 -408 18.70 0.09
TP5 Planer Bottom Hood DuctRear of Hood
0.15 -619 33.35 0.59
TP6 Planer Top Hood Duct (notin use)
0.18
TP7 Wadkin Table Saw 8 Duct 0.12 -710 21.16 0.23
TP 7A Wadkin Table Saw 8 TopHood Face
0.46 x 0.07 5.78 0.19
TP8 Auto Spindle LH Duct 0.10 -554 21.32 0.17
TP9 Auto Spindle RH Duct 0.10 -512 23.04 0.18
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 5 of 6 E35223007741
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )FV9A De-nibbing Section - Buffer
Hood Face0.23 x 0.17 16.92 0.66
FV9B LHS Bench Hood Face 0.46 x 0.08 12.00 0.44
FV9C RHS Bench Hood Face 0.46 x 0.08 9.78 0.36
TP 9A Buffer Rear Hood Duct 0.10 -204 16.19 0.13
FV9D Buffer Bench Hood Face 0.17 x 0.15 3.89 0.10
FV9E Cabinet Makers BenchExtraction Face
0.65 x 0.40 1.04 0.27
FV10 Router 4 Hood Face 0.26 x 0.05 9.92 0.13
FV11 Router 5 Hood Face 0.30 x 0.05 12.74 0.19
FV12 Cooksley Cross Cut SawRear Hood Face
0.30 x 0.30 3.40 0.31
FV12A Cooksley Cross Cut SawTop Hood Duct
0.10 -723 14.59 0.12
FV13 Wadkin Spindle Moulder 13Hood Face
0.27 x 0.13 11.65 0.41
TP10 Spindle Moulder 14 Duct 0.10 -522 19.97 0.16
TP11 Horizontal Sander 7 Duct 0.22 -853 31.60 1.20
FV14 Horizontal Sander 7 RHSHood Face
0.33 x 0.25 5.66 0.47
FV14A Horizontal Sander 7 LHSHood Face (obscured)
3.45
FV15 Vertical Sander 11 HoodFace
0.4 x 0.125 3.55 0.18
TP12 Vertical Sander 11 RearDuct
0.15 -233 5.55 0.10
TP13 Bandsaw Duct 0.10
FV13A Bandsaw Top Hood Face 0.20 x 0.10 5.00 0.10
FV13B Bandsaw Bottom HoodDuct
0.10 -120 12.33 0.10
TP14 Table Saw 9 Bottom Duct 0.12 -583 10.95 0.12
TP14A Table Saw Hood Duct 0.08 -574 9.90 0.05
TP15 Horizontal Sander Duct 0.15 -460 9.28 0.16
TP15A Saw 10 Top Hood Duct 0.06 -376 18.57 0.06
FV16 Saw 10 Rear Hood Face 0.10 x 0.10 10.90 0.11
TP16 Belt Sander 20 Duct 0.10 -606 19.28 0.15
FV17 Belt Sander Input 20 Face 1.52
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 6 of 6 E35223007741
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )FV18 Belt Sander Output 20 Face 0.72 x 0.04 1.60 0.05
TP17 Wall Saw - Saw Head Duct 0.08 -87 12.80 0.06
FV19 Wall Saw RHS End Hood(ave)
1.65 x 0.20 1.97 0.65
Calibrated Test Equipment Details
Thermal Anemometer 120622Electronic Manometer ACEEM047Rotating Vane Anemometer 118670Other Not Applicable
Examination carried out on behalf of:Client NameAddress
This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH
Submission Date 2014-06-13 18:26:05
Item 473 Woodwork LEV
HS Reference http://hs.carrs-silver.co.uk/woodlev.pdf
Due Date 07-06-2016
Status Completed+
Comments/Notes a,b,e Complete.
Contaminant escapes capture and can enter the operators breathing zone andworkplace at the following points:
a/ Wadkin Table Saw No 8b/ De-Nibbing Shop - Drill Driven Buffing Wheelc/ Cabinet Makers Shop - Bench extraction d/ Routers 4 and 5e/ Cooksley Cross Cut Saw No 1
08/10/2015 MH added date of 22/04/2016 for the above. New report indicates issuesthat wood dept will fix asap
19/04/16 Dave is to get DSS to install some inspection hatches as we believe the pipesrequire cleaning out20/04/16 DSS would make inspection hatches but not able to fit. Have priced uphatches from usual supplier , had word with CW, will fit ourselves.11/05/16 We are going to check extractor bags and operation of bag shaking mech. onThursday afternoon weather permitting, if not will check internal ducting. 17/05/16 Trev checked extractor, a number of bungee cords that hold extractor bags upto shaker were broken as a result many bags are blinded impairing suction. Jason tosource replacement cord and then will refit. Ducting in shop checked, one outlet torouter partly blocked with blue paper, removed and extraction seemed a lot better, restof ducting clean. 19/05/16 Parts not arrived, will be done next Thursday31/05/16 Update requested from Trev01/06/16 Tomorrow PM07/06/16 Extractor unblocked, issues should now be resolved, await tests from nextassessment.
Job Type HS Job
Notifier [email protected]
Carrs HS Jobs
1
Martin Carr
From: 473 Woodwork LEV [[email protected]]Sent: 05 November 2015 12:10To: [email protected]: EDIT: Outstanding HS Job 13-10-2015
Question Answer
Item 473 Woodwork LEV
HS Reference http://hs.carrs-silver.co.uk/woodlev.pdf
Due Date 13-10-2015
Status Outstanding
Comments/Notes
a,b,e Complete. Contaminant escapes capture and can enter the operators breathing zone and workplace at the following points: a/ Wadkin Table Saw No 8 b/ De-Nibbing Shop - Drill Driven Buffing Wheel c/ Cabinet Makers Shop - Bench extraction d/ Routers 4 and 5 e/ Cooksley Cross Cut Saw No 1 08/10/2015 MH added date of 22/04/2016 for the above. New report indicates issues that wood dept will fix asap 30/10/2015 Marc, what became of this CNC guard with the attachment for the LEV?? 05/11/2015 The attachment to the CNC was changed to one without an LEV attachment, but with a little better guarding of the blade. At the moment we are using the one with the LEV attachment, but with the less good blade coverage. However, for the jobs currently being done this is less of an issue. ALthough the plan is still to upgrade the better blade protection with LEV attachment.
Job Type HS Job
Notifier [email protected]
Note you can also reply to this e-mail. 268489565632137172
Date of previous examination and tests
Location
Contract No.Policy No. Report No.
Name of User
005
Date of commencement of examination and tests
Date of Report
Engineer Surveyor
Competent PersonAllianz Engineering
+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081
V810b
Local Exhaust Ventilation Plant Report
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE
NV09796703
TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH
E35223006327
01-OCT-2014
07-OCT-2015
Andrew Allen
Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.
www.allianzengineering.co.uk
Health & Safety at Work etc. Act 1974
Side 1 of 607-OCT-2015
Type of Inspection Thorough Examination and Test
Regulations Applicable Regulation 9 of COSHH
Identification of LEV Plant and Process
Plant Number LEV 030Manufacturer Not MarkedSerial Number Not MarkedLocation of Air Mover OutsideLocation of Process Joiners ShopsProcess(es) being controlled Various Wood Working Machines and
De-nibbing Section.Hazardous substance(s) being controlled Wood Dusts, including Hardwood & MDFNumber of Extraction Points 43Maximum number that can be used at one time 25Exhaust air returned to AtmospherePrimary filter fitted YesSecondary filter fitted No
Visual Assessment of the level of control UnsatisfactoryAir Sampling Results We observe that the exhaust air is directed to
atmosphere. Workplace air monitoring isrecommended to ensure the WEL does notexceed the set limits for the contaminants.
Tests Undertaken Visual, Light Test, Smoke Test, Static PressureTest, Velocity Measurements
Defects AFFECTING the level of control and particulars of any repairs or modifications required
1/ Contaminant escapes capture and can enter the operators breathing zone and workplace at thefollowing points:
a/ Cabinet Makers Shop - Bench extraction
b/ Router 5
c/ CNC Millenium Machine
Suitable repairs/modifications should be carried out to provide adequate Engineering Control.
Emergency Report and "Do Not Use" label issued to Trevor Hunt, at the time of inspection.
Defects NOT affecting the level of control and particulars of any repairs or modifications required
1/ Vertical Sander 11. The level of contol is weak, with some of the dusts escaping capture and collecting
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 2 of 6 E35223006327
on the floor.
Other Observations
1/ Cross-reference with the last Thorough Examination and Test report
(E35223005183 - dated 01/10/2014)
2/ Test results recorded indicate no marked system performance deterioration since the last ThoroughExamination and Test.
3/ Condition at the Time of Test: Tests carried out with an average of 20 to 25 points open, as per normaloperating procedure. The following machines were witnessed in use: CNC Millenium Machine, CNC 4008Machine, Diplomat Belt Sander, Spindle Sanders 19 and 15, Wadkin Table Saw 8, De-nibbing SectionBuffing Wheels, Horizontal Sander 7, Vertical Sander 11, Table Saw 9 and Wall Saw.
4/ The Effective Capture Distance of the Horizontal Sander No 7 Extract Hood is 0.75 m from the stopperblock.
5/ The Effective Capture Distance of the Luna Horizontal Sander Extract Hood is 0.50 m from the face.
6/ Machines not in use, should have their Extraction Dampers kept shut, to improve Extraction Rates.
7/ The following parts of the system were not fully accessible;
a/ Fan and Motor Set due to mounting position within the filter enclosure. As a consequence the fan andmotor technical details could not be fully captured and should be provided along with the filter efficiencies.
It should be noted that inability to access the item(s) specified above has not affected the ability tocomplete an effective assessment of the Engineering Control provided by the system.
8/ COSHH Management System Documentation
The following supporting documents, held by Martin Carr, have been witnessed and are readily availableon the companies' intranet site;
Risk Assessment / COSHH Assessment
Material Safety Data Sheet(s)
Previous Thorough Examination and Test Report(s)
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 3 of 6 E35223006327
The following supporting documents have not been witnessed;
Air Monitoring/Sampling Report(s),
Commissioning Report
LEV User Manual/ Logbook
9/ Refer to Report No E35223004219 - dated 24/09/2013, for system diagram.
Condition at Time of Test Normal. See observations section.
Fan Details
Manufacturer Not MarkedSerial NumberType CentrifugalRotation (viewed from drive end) Clockwise
mØSize 3x0.6Volume Flow m s3 -1
Speed rpm
Motor Details
Manufacturer Not MarkedSerial no.Speed rpmPower kW
Primary Filter
Medium Fabric BagsCollector Type HopperEfficiency %
Secondary Filter
MediumCollector TypeEfficiency %
Details of Test Results
Primary filter inlet Pressure(Pa)
Primary filter outlet Pressure(Pa)
Pressure Difference(Pa)
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP1 CNC Millenium Machine
Duct0.15 -1842 7.14 0.13
FV1 CNC Millenium MachineDuct Face
0.05 31.60 0.06
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 4 of 6 E35223006327
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP2 Main Duct 0.56 -2030 18.07 4.45
FV2 CNC 4008 Machine DuctFace
0.05 24.16 0.05
FV3 Lathe LHS Duct Face 0.10 16.00 0.13
FV4 Lathe RHS Duct Face 0.08 21.33 0.11
FV5 Coaster Sander Face 0.08 23.45 0.12
TP3 Belt Sander Duct 0.1 -1290
TP4 Belt Sander Duct 0.1 -1597
FV6 Belt Sander Input Face 0.90 x 0.01 4.19 0.04
FV7 Belt Sander Output Face 0.90 x 0.02 4.03 0.07
FV8 Spindle Sander 19 Duct /Face
0.10 -898 20.26 0.16
FV9 Spindle Sander 15 HoodFace
0.15 x 0.20 8.00 0.24
TP5 Planer Bottom Hood Face(not in use)
0.44 x 0.13
TP6 Planer Top Hood Duct 0.18
TP7 Wadkin Table Saw 8 Duct 0.12 -674 18.43 0.21
TP 7A Wadkin Table Saw 8 TopHood Face
0.46 x 0.07 5.87 0.19
TP8 Auto Spindle LH Duct 0.10 -856 23.04 0.26
TP9 Auto Spindle RH Duct 0.10 -836 16.55 0.13
FV9A Buffer Hood Face 0.23 x 0.17 16.17 0.63
FV9B LHS Bench Hood Face 0.46 x 0.08 18.70 0.69
FV9C RHS Bench Hood Face 0.46 x 0.08 17.54 0.65
TP 9A Buffer Rear Hood Duct 0.10 -535 20.06 0.16
FV9D Buffer Bench Hood Face 0.17 x 0.15 6.00 0.15
FV9E Cabinet Makers BenchExtraction Face
0.65 x 0.40 1.00 0.26
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 5 of 6 E35223006327
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )FV10 Router 4 Hood Face 0.26 x 0.05 9.46 0.12
FV11 Router 5 Hood Face 0.30 x 0.05 20.45 0.31
FV12 Cooksley Cross Cut SawRear Hood Face
0.30 x 0.30 3.18 0.29
FV12A Cooksley Cross Cut SawTop Hood Duct
0.10 -638 19.02 0.15
FV13 Wadkin Spindle MoulderHood Face
0.27 x 0.13 11.55 0.41
TP10 Spindle Moulder 14 Duct 0.10 -778 27.58 0.22
TP11 Horizontal Sander 7 Duct 0.22 -1307 28.87 1.10
FV14 Horizontal Sander 7 RHSHood Face
0.33 x 0.25 4.90 0.40
FV14A Horizontal Sander 7 LHSHood Face (obscured)
5.45
FV15 Vertical Sander 11 HoodFace
0.4 x 0.125 3.65 0.18
TP12 Vertical Sander 11 RearDuct
0.15 -327 8.79 0.16
TP13 Bandsaw Duct 0.10 -142
FV13A Bandsaw Top Hood Face 0.20 x 0.10 5.07 0.10
FV13B Bandsaw Hood Face(below table)
0.96
TP14 Table Saw 9 Bottom Duct 0.12 -960 11.18 0.13
TP14A Table Saw Hood Duct 0.08 -849 10.15 0.05
TP15 Horizontal Sander Duct 0.15 -687 14.59 0.26
TP15A Saw 10 Top Hood Duct 0.06 -912 24.67 0.07
FV16 Saw 10 Rear Hood Face 0.10 x 0.10 12.44 0.12
TP16 Belt Sander 20 Duct 0.10 -664 23.4 0.18
FV17 Belt Sander Input 20 Face 0.70 x 0.04 1.84 0.05
FV18 Belt Sander Output 20 Face 0.72 x 0.04 1.71 0.05
TP17 Wall Saw - Saw Head Duct 0.08 -103 12.33 0.06
FV19 Wall Saw RHS End Hood(ave)
1.65 x 0.20 1.80 0.59
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 6 of 6 E35223006327
Calibrated Test Equipment Details
Thermal Anemometer 120622Electronic Manometer ACEEM047Rotating Vane Anemometer 118670Other Not Applicable
Examination carried out on behalf of:Client NameAddress
This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH
Submission Date 2014-06-13 18:26:05
Item 473 Woodwork LEV
HS Reference http://hs.carrs-silver.co.uk/woodlev.pdf
Due Date 30-06-2015
Status Outstanding
Comments/Notes a,b,e Complete.
Contaminant escapes capture and can enter the operators breathing zoneand workplace at the following points:
a/ Wadkin Table Saw No 8b/ De-Nibbing Shop - Drill Driven Buffing Wheelc/ Cabinet Makers Shop - Bench extraction d/ Routers 4 and 5e/ Cooksley Cross Cut Saw No 1
Job Type HS Job
Carrs HS Jobs
1
Submission Date 2014-10-08 16:34:35
Item Woodworking LEV
HS Reference http://hs.carrs-silver.co.uk/woodlev.pdf
Due Date 08-10-2014
Status Completed
Comments/Notes Emergency repairs are required. Noted that one has been done.
Duplicate entry
Job Type HS Job
Carrs HS Jobs
1
Submission Date 2014-12-15 08:46:25
Machine ID LEV20 stopping off area
Person doing work Shaun Whitaker
Fault Fume extraction required to take away paint fumes.
Parts Used spiral ducting, various fittings, hoods, shut off gates.
Work Done Re-connected the ducting to LEV20 as instructed usingducting and fittings, fitted hoods at operators advised height.
Further Work will require testing at next due LEV inspection.
Carrs Machine Record Sheet
1
Submission Date 2014-06-13 17:26:05
Item 473 Woodwork LEV
HS Reference http://hs.carrs-silver.co.uk/woodlev.pdf
Due Date 07-11-2014
Status Outstanding
Comments/Notes Contaminant escapes capture and can enter the operatorsbreathing zone and workplace at the following points:
a/ Wadkin Table Saw No 8b/ De-Nibbing Shop - Drill Driven Buffing Wheelc/ Cabinet Makers Shop - Bench extraction d/ Routers 4 and5e/ Cooksley Cross Cut Saw No 1
Job Type HS Job
Carrs HS Jobs
1
Submission Date 2014-10-27 12:04:10
Item Auto Butterfly Valve
HS Reference LEV on Woodshop
Due Date 31-03-2015
Status Outstanding
Comments/Notes Investigate Autoshutoff for Wood LEV
Job Type HS Job
Carrs HS Jobs
1
Submission Date 2014-10-08 16:34:35
Item Woodworking LEV
HS Reference http://hs.carrs-silver.co.uk/woodlev.pdf
Due Date 08-10-2014
Status Outstanding
Comments/Notes Emergency repairs are required. Noted that one has beendone.
Job Type HS Job
Carrs HS Jobs
1
Submission Date 2014-10-08 13:40:29
Machine ID Spindle sander/brush No19
Person doing work Shaun Whitaker
Fault Allianz emergency report,dust entering operators breathingzone at the extraction point. Alter and improve as peridentical M/C in de-nibbing.
Parts Used alternative extraction hood.
Work Done using the alternative hood re- fitted in new position identicalto de-nibbing and piped up.
Further Work next inspection to reveal if capture of dust is acceptable.
Carrs Machine Record Sheet
1
Date of previous examination and tests
Location
Contract No.Policy No. Report No.
Name of User
005
Date of commencement of examination and tests
Date of Report
Engineer Surveyor
Competent PersonAllianz Engineering
+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081
V810b
Local Exhaust Ventilation Plant Report
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE
NV09796703
TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK, SHEFFIELD, S20 3FH
E35223005183
24-SEP-2013
01-OCT-2014
Andrew Allen
Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.
www.allianzengineering.co.uk
Health & Safety at Work etc. Act 1974
Side 1 of 601-OCT-2014
Type of Inspection Thorough Examination and Test
Regulations Applicable Regulation 9 of COSHH
Identification of LEV Plant and Process
Plant Number LEV 030Manufacturer Not MarkedSerial Number Not MarkedLocation of Air Mover OutsideLocation of Process Joiners ShopsProcess(es) being controlled Various Wood Working Machines and
De-nibbing Section.Hazardous substance(s) being controlled Wood Dusts, including Hardwood & MDFNumber of Extraction Points 41Maximum number that can be used at one time 41Exhaust air returned to AtmospherePrimary filter fitted YesSecondary filter fitted No
Visual Assessment of the level of control UnsatisfactoryAir Sampling Results We observe that the exhaust air is directed to
atmosphere. Workplace air monitoring isrecommended to ensure the WEL does notexceed the set limits for the contaminants.
Tests Undertaken Visual, Light Test, Smoke Test, Static PressureTest, Velocity Measurements
Defects AFFECTING the level of control and particulars of any repairs or modifications required
1/ Contaminant escapes capture and can enter the operators breathing zone and workplace at thefollowing points:
a/ Spinde Sander / Brush 19
b/ Wadkin Table Saw No 8
c/ Cabinet Makers Shop - Bench extraction
d/ Router 5
e/ Wall Saw
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 2 of 6 E35223005183
Suitable repairs/modifications should be carried out to provide adequate Engineering Control.
Emergency Report and "Do Not Use" label issued to Marc Horner, at the time of inspection.
Defects NOT affecting the level of control and particulars of any repairs or modifications required
1/ Several duct dampers throghout the system are missing and should be repaced.
2/ There has been a general reduction in readings on the lower half of the system, from the back to backspindle mouders and beyond.
Investigation as to the cause should be carried out and improvements made.
Other Observations
1/ Cross-reference with the last Thorough Examination and Test report
(E35223004219 - dated 24/09/2013)
2/ No Safe System of Work witnessed. Tests carried out with an average of 20 points open at any onetime.
3/ The Effective Capture Distance of the Horizontal Sander No 7 Extract Hood is 0.50 m from the stopperblock.
4/ The Effective Capture Distance of the Luna Horizontal Sander Extract Hood is 0.50 m from the face.
5/ Please provide the fan and motor technical data and the filter efficiency data.
6/ Machines not in use, should have their Extraction Dampers kept shut, to improve Extraction Rates.
7/ Build up of heavier dusts on machines should be cleared on a regular basis.
8/ COSHH Management System Documentation
The following supporting documents, held by Martin Carr, have been witnessed and are readily availableon the companies' intranet site;
Risk Assessment / COSHH Assessment
Material Safety Data Sheet(s)
Previous Thorough Examination and Test Report(s)
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 3 of 6 E35223005183
The following supporting documents have not been witnessed;
Air Monitoring/Sampling Report(s),
Commissioning Report
LEV User Manual/ Logbook
9/ Refer to Report No E35223004219 - dated 24/09/2013, for system diagram.
Condition at Time of Test Normal.
Fan Details
Manufacturer Not MarkedSerial NumberType CentrifugalRotation (viewed from drive end) Clockwise
mØSize 3x0.6Volume Flow m s3 -1
Speed rpm
Motor Details
Manufacturer Not MarkedSerial no.Speed rpmPower kW
Primary Filter
Medium Fabric BagsCollector Type HopperEfficiency %
Secondary Filter
MediumCollector TypeEfficiency %
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 4 of 6 E35223005183
Details of Test Results
Primary filter inlet Pressure(Pa)
Primary filter outlet Pressure(Pa)
Pressure Difference(Pa)
Details of Test Results
Primary filter inlet Pressure(Pa)
Primary filter outlet Pressure(Pa)
Pressure Difference(Pa)
No Access
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP1 CNC Millenium Machine
(Duct)0.15 -1501 3.52 0.06
FV1 CNC Millenium Machine(face)
0.05 31.60 0.06
TP2 Main Duct 0.56 -1433 20.46 5.04
FV2 CNC 4008 Machine (face) 0.05 31.60 0.06
FV3 Lathe LHS Duct (face) 0.1 13.34 0.11
FV4 Lathe RHS Duct (face) 0.08 17.88 0.09
FV5 Coaster Sander (Duct) 0.08 20.86 0.10
TP3 Belt Sander (Duct) 0.1 -1063
TP4 Belt Sander (Duct) 0.1 -1021
FV6 Belt Sander Input (Face) 0.90 x 0.01 3.20 0.03
FV7 Belt Sander Output (Face) 0.90 x 0.02 2.69 0.05
FV8 Spindle Sander 19 (Face) 0.1 18.29 0.14
FV9 Spindle Sander 15 (Face) 0.08 14.69 0.07
TP5 Planer Bottom Hood 0.44 x 0.13 10.59 0.61
TP6 Planer Top Hood Duct 0.18 -917 16.55 0.42
TP7 Wadkin Table Saw 8 (Duct) 0.12 -762 22.67 0.26
TP8 Auto Spindle LH (Duct) 0.1 -690 19.97 0.16
TP9 Auto Spindle RH (Duct) 0.1 -619 22.36 0.18
FV9A Buffer Hood Face 0.23 x 0.17 17.64 0.69
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 5 of 6 E35223005183
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )FV9B LHS Bench Hood Face 0.46 x 0.08 16.57 0.61
FV9C RHS Bench Hood Face 0.46 x 0.08 17.02 0.63
TP 9A Buffer Rear Hood Duct 0.10 -265 16.54 0.13
FV9D Buffer Bench Hood Face 0.17 x 0.15 4.33 0.11
FV9E Cabinet Makers BenchExtraction Face
0.65 x 0.40 0.92 0.24
FV10 Router 4 Hood Face (notconnected)
0.26 x 0.05
FV11 Router 5 Hood Face 0.30 x 0.05 21.12 0.32
FV12 Cooksley Cross Cut SawRear Hood Face
0.30 x 0.30 3.41 0.31
FV12A Cooksley Cross Cut SawTop Hood Duct
0.10 -642 14.77 0.12
FV13 Wadkin Spindle MoulderHood Face
0.27 x 0.13 9.88 0.35
TP10 Spindle Moulder 14 (Duct) 0.1 -720 20.26 0.16
TP11 Horizontal Sander 7 (Duct) 0.22 -1316 11.18 0.43
FV14 Horizontal Sander 7 RHSHood Face
0.33 x 0.25 4.88 0.40
FV14A Horizontal Sander 7 LHSHood Face
0.51 x 0.24 2.06 0.25
FV15 Vertical Sander 11 (Face) 0.4 x 0.125 3.41 0.17
TP12 Vertical Sander 11 (Duct) 0.15 -236 6.21 0.11
TP13 Bandsaw (Duct) 0.1 -152 14.42 0.11
FV13A Bandsaw Hood Face(below table)
0.58
TP14 Table Saw 9 (Duct) 0.12 -758 8.42 0.10
TP14A Table Saw Hood Duct 0.08 -726 12.33 0.06
TP15 Horizontal Sander (Duct) 0.15 -538 13.00 0.23
TP15A Saw 10 Hood Duct 0.06 -548 21.16 0.06
FV16 Saw 10 (Face) 0.10 x 0.10 13.54 0.14
TP16 Belt Sander 20 (Duct) 0.1 -350 17.96 0.14
FV17 Belt Sander Input 20 (Face) 0.70 x 0.04 1.33 0.04
FV18 Belt Sander Output 20(Face)
0.72 x 0.04 1.34 0.04
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 6 of 6 E35223005183
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP17 Wall Saw Hood duct 0.08 -298 8.42 0.04
FV19 Wall Saw Hood (duct facetop)
0.15 13.33 0.24
FV20 Wall Saw Hood (duct facebtm)
0.20 x 0.13 23.36 0.61
Calibrated Test Equipment Details
Thermal Anemometer 120622Electronic Manometer ACEEM047Rotating Vane Anemometer 118670Other Not Applicable
Examination carried out on behalf of:Client NameAddress
This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH
Carrs Machine Record Sheet
Submission Date 2014-01-10 08:39:52
Machine ID HS 473 Woodwork LEV UPDATED
Person doing work Shaun Whitaker
Fault 1/ Contaminant escapes capture and can enter theoperators breathing zone and workplace at thefollowing points:
b/ De-Nibbing Shop - Drill Driven Buffing Wheel
Parts Used New Guard & housing –made from parts of LEV 41(Additional extraction point added)
Work Done Fabricate New Guard and Install to operators area
Further Work Review once Insurance inspector revisits
1
Date of previous examination and tests
Location
Contract No.Policy No. Report No.
Name of User
005
Date of commencement of examination and tests
Date of Report
Engineer Surveyor
Competent PersonAllianz Engineering
+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081
V810b
Local Exhaust Ventilation Plant Report
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE
NV09796703
TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH
E35223004219
26-SEP-2012
26-SEP-2013
Andrew Allen
Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.
www.allianzengineering.co.uk
Health & Safety at Work etc. Act 1974
Side 1 of 1124-SEP-2013
Type of Inspection Thorough Examination and Test
Regulations Applicable Regulation 9 of COSHH
Identification of LEV Plant and Process
Plant Number LEV 030Manufacturer Not MarkedSerial Number Not MarkedLocation of Air Mover OutsideLocation of Process Joiners ShopsProcess(es) being controlled Various Wood Working Machines and
De-nibbing Section.Hazardous substance(s) being controlled Wood Dusts, including Hardwood & MDFNumber of Extraction Points 40Maximum number that can be used at one time 40Exhaust air returned to AtmospherePrimary filter fitted YesSecondary filter fitted No
Visual Assessment of the level of control UnsatisfactoryAir Sampling Results We observe that the exhaust air is directed to
atmosphere. Workplace air monitoring isrecommended to ensure the WEL does notexceed the set limits for the contaminants.
Tests Undertaken Visual, Light Test, Smoke Test, Static PressureTest, Velocity Measurements
Defects AFFECTING the level of control and particulars of any repairs or modifications required
1/ Contaminant escapes capture and can enter the operators breathing zone and workplace at thefollowing points:
a/ Wadkin Table Saw No 8
b/ De-Nibbing Shop - Drill Driven Buffing Wheel
c/ Cabinet Makers Shop - Bench extraction d/ Routers 4 and 5
e/ Cooksley Cross Cut Saw No 1
Suitable repairs/modifications should be carried out to provide adequate Engineering Control.
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 2 of 11 E35223004219
Emergency Report and "Do Not Use" label issued to Marc Horner, at the time of inspection.
Defects NOT affecting the level of control and particulars of any repairs or modifications required
1/ Wadkin Table Saw No 8. The duct damper is missing and has been replaced by a temporary woodone. This damper does not fit correctly and is pulled into the duct, when the system is running, closing it.
Other Observations
1/ Cross-reference with the last Thorough Examination and Test report
(E35223003276 - dated 26/09/2012)
2/ Test results recorded indicate no marked system performance deterioration since the last ThoroughExamination and Test.
3/ No Safe System of Work witnessed. Tests carried out with an average of 20 points open at any onetime.
3/ The Effective Capture Distance of the Horizontal Sander No 7 Extract Hood is 0.50 m from the stopperblock.
4/ The Effective Capture Distance of the Luna Horizontal Sander Extract Hood is 0.50 m from the face.
5/ Please provide the fan and motor technical data and the filter efficiency data.
6/ Machines not in use, should have their Extraction Dampers kept shut, to improve Extraction Rates.
7/ COSHH Management System Documentation
The following supporting documents, held by Martin Carr, have been witnessed and are readily availableon the companies' intranet site;
Risk Assessment / COSHH Assessment
Material Safety Data Sheet(s)
Previous Thorough Examination and Test Report(s)
The following supporting documents have not been witnessed;
Air Monitoring/Sampling Report(s),
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 3 of 11 E35223004219
Commissioning Report
LEV User Manual/ Logbook
8/ See additional cover for system diagram.
Condition at Time of Test Normal.
Fan Details
Manufacturer Not MarkedSerial NumberType CentrifugalRotation (viewed from drive end) Clockwise
mØSize 3x0.6Volume Flow m s3 -1
Speed rpm
Motor Details
Manufacturer Not MarkedSerial no.Speed rpmPower kW
Primary Filter
Medium Fabric BagsCollector Type HopperEfficiency %
Secondary Filter
MediumCollector TypeEfficiency %
Details of Test Results
Primary filter inlet Pressure(Pa)
Primary filter outlet Pressure(Pa)
Pressure Difference(Pa)
No Access
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP1 CNC Millenium Machine
(Duct)0.15 -1605 3.82 0.07
FV1 CNC Millenium Machine(face)
0.05 31.60 0.06
TP2 Main Duct 0.56 -1819 17.32 4.27
FV2 CNC 4008 Machine (face) 0.05 31.60 0.06
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 4 of 11 E35223004219
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )FV3 Lathe LHS Duct (face) 0.1 14.12 0.11
FV4 Lathe RHS Duct (face) 0.08 19.16 0.10
FV5 Coaster Sander (Duct) 0.1 19.96 0.16
TP3 Belt Sander (Duct) 0.1 -1320
TP4 Belt Sander (Duct) 0.1 -1700
FV6 Belt Sander Input (Face) 0.90 x 0.01 3.29 0.03
FV7 Belt Sander Output (Face) 0.90 x 0.02 3.16 0.06
FV8 Spindle Sander 19 (Face) 0.1 19.00 0.15
FV9 Spindle Sander 15 (Face) 0.08 14.64 0.07
TP5 Planer Bottom Hood 0.44 x 0.13 11.57 0.66
TP6 Planer Top Hood Duct 0.18 -888 16.03 0.41
TP7 Saw Table (Duct) 0.12 -979 23.29 0.26
TP8 Auto Spindle LH (Duct) 0.1 -895 28.27 0.22
TP9 Auto Spindle RH (Duct) 0.1 -810 26.77 0.21
FV9A Buffer Hood Face 0.23 x 0.17 20.05 0.78
FV9B LHS Bench Hood Face 0.46 x 0.08 15.87 0.58
FV9C RHS Bench Hood Face 0.46 x 0.08 17.93 0.66
FV9D Buffer Hood Duct Face 0.15 x 0.11 -411 9.89 0.16
FV9E Cabinet Makers BenchExtraction Face
0.65 x 0.40 1.32 0.34
FV10 Router 4 Hood Face 0.26 x 0.05 10.04 0.13
FV11 Router 5 Hood Face 0.30 x 0.05 10.10 0.15
FV12 Cooksley Cross Cut SawRear Hood Face
0.30 x 0.30 2.71 0.24
FV12A Cooksley Cross Cut SawTop Hood Duct
0.10 -830 20.26 0.16
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 5 of 11 E35223004219
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )FV13 Spindle Moulder Hood Face 0.27 x 0.13 10.55 0.37
TP10 Spindle Moulder (Duct) 0.1 -677 16.70 0.13
TP11 Horizontal Sander 7 (Duct) 0.22 -1346 11.00 0.42
FV14 Horizontal Sander 7 RHSHood Face
0.33 x 0.25 4.44 0.37
FV14A Horizontal Sander 7 LHSHood Face
0.51 x 0.24 2.59 0.32
FV15 Vertical Sander 11 (Face) 0.4 x 0.125 4.29 0.21
TP12 Vertical Sander 11 (Duct) 0.15 -317 8.57 0.15
TP13 Bandsaw (Duct) 0.1 -136 14.24 0.11
FV13A Bandsaw Hood Face 0.20 x 0.10 5.14 0.10
TP14 Table Saw 9 (Duct) 0.12 -1089 16.18 0.18
TP14A Table Saw Hood Duct 0.08 -875 8.42 0.04
TP15 Horizontal Sander (Duct) 0.15 -411 14.60 0.26
TP15A Saw 10 Hood Duct 0.08 -603 27.08 0.14
FV16 Saw 10 (Face) 0.1 4.63 0.04
TP16 Belt Sander 20 (Duct) 0.1 -1003 23.04 0.18
FV17 Belt Sander Input 20 (Face) 0.70 x 0.01 2.23 0.02
FV18 Belt Sander Output 20(Face)
0.72 x 0.04 2.41 0.07
TP17 Wall Saw Hood duct 0.08 -330 10.15 0.05
FV19 Wall Saw Hood (duct facetop)
0.15 13.52 0.24
FV20 Wall Saw Hood (duct facebtm)
0.20 x 0.13 24.44 0.64
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 6 of 11 E35223004219
Calibrated Test Equipment Details
Thermal Anemometer 120622Electronic Manometer ACEEM047Rotating Vane Anemometer 118670Other Not Applicable
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 7 of 11 E35223004219
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 8 of 11 E35223004219
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 9 of 11 E35223004219
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 10 of 11 E35223004219
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 11 of 11 E35223004219
Examination carried out on behalf of:Client NameAddress
This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH
Date of previous examination and tests
Location
Contract No.Policy No. Report No.
Name of User
005
Date of commencement of examination and tests
Date of Report
Engineer Surveyor
Competent PersonAllianz Engineering
+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081
V810b
Local Exhaust Ventilation Plant Report
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE
NV09796703
TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK, SHEFFIELD, S20 3FH
E35223003276
27-SEP-2011
28-SEP-2012
Andrew Allen
Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.
www.allianzengineering.co.uk
Health & Safety at Work etc. Act 1974
Side 1 of 526-SEP-2012
Type of Inspection Thorough Periodic
Regulations Applicable Regulation 9 of COSHH
Identification of LEV Plant and Process
Plant Number LEV 030Manufacturer Not MarkedSerial Number Not MarkedLocation of Air Mover OutsideLocation of Process Joiners ShopsProcess(es) being controlled Various Wood Working Machines and
De-nibbing Section.Hazardous substance(s) being controlled Safety Data Sheets Not Presented. Substances
Witnessed - Wood Dusts, including Hardwood &MDF
Number of Extraction Points 34Maximum number that can be used at one time 34Exhaust air returned to AtmospherePrimary filter fitted YesSecondary filter fitted No
Visual Assessment of the level of control UnsatisfactoryAir Sampling Results We observe that the exhaust air is directed to
atmosphere. Workplace air monitoring isrecommended to ensure the WEL does notexceed the set limits for the contaminants.
Tests Undertaken Visual, Light Test, Smoke Test, Static PressureTest, Velocity Measurements
Defects AFFECTING the level of control and particulars of any repairs or modifications required
Refer to Report No E35223002478 - dated 27/09/2011, for system diagram.
Defects NOT affecting the level of control and particulars of any repairs or modifications required
1/ The bottom flexible duct to the planer is damaged and currently disconnected from the system. Theduct should be repaired and the capture hood refitted.
2/ Capture hoods are missing at Routers 4 and 5 and should be fitted in order to improve the effectivecapture.
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 2 of 5 E35223003276
3/ The Wadkin Cross Cut Saw, No 10, has no extraction fitted to the saw hood.
Other Observations
Cross-reference with the last Thorough Examination and Test report
(E35223002478 - dated 27/09/2011)
Test results recorded indicate no marked system performance deterioration since the last ThoroughExamination and Test.
No Safe System of Work witnessed. Tests carried out with an average of 20 points open at any one time.
1/ The Effective Capture Distance of the Horizontal Sander No 7 Extract Hood is 0.50 m from the stopperblock.
2/ The Effective Capture Distance of the Luna Horizontal Sander Extract Hood is 0.50 m from the face.
3/ Please provide the fan and motor technical data and the filter efficiency data.
4/ Machines not in use, should have their Extraction Dampers kept shut, to improve Extraction Rates.
COSHH Management System Documentation
In accordance with the requirements of HS(G)258 - Controlling Airborne Contaminants at Work, thefollowing supporting documents have not been witnessed and should be made readily available;
Risk Assessment / COSHH Assessment
Safety Data Sheet(s)
Air Monitoring/Sampling Report(s),
Commissioning Report
LEV User Manual/ Logbook
Condition at Time of Test Normal.
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 3 of 5 E35223003276
Fan Details
Manufacturer Not MarkedSerial NumberType CentrifugalRotation (viewed from drive end) Clockwise
mØSize 3x0.6Volume Flow m s3 -1
Speed rpm
Motor Details
Manufacturer Not MarkedSerial no.Speed rpmPower kW
Primary Filter
Medium Fabric BagsCollector Type HopperEfficiency %
Secondary Filter
MediumCollector TypeEfficiency %
Details of Test Results
Primary filter inlet Pressure(Pa)
Primary filter outlet Pressure(Pa)
Pressure Difference(Pa)
No Access
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP1 CNC Millenium Machine
(Duct)0.15 -1615 2.61 0.05
FV1 CNC Millenium Machine(face)
0.05 31.60 0.06
TP2 Main Duct 0.56 -1631 17.90 4.41
FV2 CNC 4008 Machine (face) 0.05 31.60 0.06
FV3 Lathe LHS Duct (face) 0.1 14.59 0.12
FV4 Lathe RHS Duct (face) 0.08 17.88 0.09
FV5 Coaster Sander (Duct) 0.1 22.02 0.17
TP3 Belt Sander (Duct) 0.1 -1190
TP4 Belt Sander (Duct) 0.1 -1731
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 4 of 5 E35223003276
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )FV6 Belt Sander Input (Face) 0.90 x 0.01 3.40 0.03
FV7 Belt Sander Output (Face) 0.90 x 0.02 3.46 0.06
FV8 Spindle Sander 19 (Face) 0.1 19.30 0.15
FV9 Spindle Sander 15 (Face) 0.08 20.40 0.10
TP5 Planer Bottom Hood 0.44 x 0.13
TP6 Planer Top Hood Duct/Lip -1083 24.44
TP7 Saw Table (Duct) 0.12 -272 16.18 0.18
TP8 Auto Spindle LH (Duct) 0.1 -586 19.72 0.16
TP9 Auto Spindle RH (Duct) 0.1 22.67 0.18
FV9A Buffer Hood Face 0.23 x 0.17 21.82 0.85
FV9B LHS Bench Hood Face 0.46 x 0.08 19.07 0.70
FV9C RHS Bench Hood Face 0.46 x 0.08 22.09 0.81
FV9D Buffer Hood Duct Face 0.15 x 0.11 -308 9.86 0.16
FV10 Router 4 (Face) 0.1 23.15 0.18
FV11 Router 5 (Face) 0.1 25.57 0.20
FV12 X Cut Saw (Face) 0.1 x 0.12 3.38 0.04
FV13 Spindle Moulder Hood Face 0.27 x 0.13 9.36 0.33
TP10 Spindle Moulder (Duct) 0.1 -616 17.34 0.14
TP11 Horizontal Sander 7 (Duct) 0.22 -1864 19.96 0.76
FV14 Horizontal Sander 7 (Face) 0.33 x 0.25 6.27 0.52
FV15 Vertical Sander 11 (Face) 0.4 x 0.125 4.33 0.22
TP12 Vertical Sander 11 (Duct) 0.15 -408 9.10 0.16
TP13 Bandsaw (Duct) 0.1 -204 18.57 0.15
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 5 of 5 E35223003276
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP14 Table Saw 9 (Duct) 0.12 -930 18.25 0.21
TP15 Horizontal Sander (Duct) 0.15 -240 16.34 0.29
FV16 Saw 10 (Face) 0.1 7.53 0.06
TP16 Belt Sander 20 (Duct) 0.1 -583
FV17 Belt Sander Input 20 (Face) 0.70 x 0.01 2.16 0.02
FV18 Belt Sander Output 20(Face)
0.72 x 0.04 2.08 0.06
TP17 Wall Saw Hood duct 0.08 -100 14.00 0.07
FV19 Wall Saw Hood (duct facetop)
0.15 12.38 0.22
FV20 Wall Saw Hood (duct facebtm)
0.20 x 0.13 26.10 0.68
Calibrated Test Equipment Details
Thermal Anemometer 120622Electronic Manometer ACEEM047Rotating Vane Anemometer 118670Other Not Applicable
Examination carried out on behalf of:Client NameAddress
This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH
Date of previous examination and tests
Location
Contract No.Policy No. Report No.
Name of User
005
Date of commencement of examination and tests
Date of Report
Engineer Surveyor
Competent PersonAllianz Engineering
+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081
V810b
Local Exhaust Ventilation Plant Report
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE
NV09796703
TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH
E35223002478
27-SEP-2010
29-SEP-2011
Andrew Allen
Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.
www.allianzengineering.co.uk
Health & Safety at Work etc. Act 1974
Side 1 of 1027-SEP-2011
Type of Inspection Thorough Periodic
Regulations Applicable Regulation 9 of COSHH
Identification of LEV Plant and Process
Plant Number LEV 030Manufacturer Not MarkedSerial Number Not MarkedLocation of Air Mover OutsideLocation of Process Joiners ShopsProcess(es) being controlled Various Wood Working Machines and
De-nibbing Section.Hazardous substance(s) being controlled Safety Data Sheets Not Presented. Substances
Witnessed - Wood Dusts, including Hardwood &MDF
Number of Extraction Points 34Maximum number that can be used at one time 34Exhaust air returned to AtmospherePrimary filter fitted YesSecondary filter fitted No
Visual Assessment of the level of control UnsatisfactoryAir Sampling Results Exhaust air is directed to atmosphere, we
therefore recommend suitable air sampling becarried out.
Tests Undertaken Visual, Light Test, Smoke Test, Static PressureTest, Velocity Measurements
Defects AFFECTING the level of control and particulars of any repairs or modifications required
The level of control at the Cooksley Cross Cut Saw, the Band Saw and Wadkin Table Saws No 8 and No9 is poor. The contaminant escapes capture and enters the operators' breathing zone. Suitablerepairs/modifications should be carried out to provide adequate Engineering Control.
Emergency Report and "Do Not Use" label issued to D. Watson, at the time of inspection.
Defects NOT affecting the level of control and particulars of any repairs or modifications required
1/ Several Duct Dampers are missing throughout the system and should be replaced.
2/ Capture hoods are missing at Routers 4 and 5 and should be fitted in order to improve the effectivecapture.
Other Observations
Cross-reference with the last Thorough Examination and Test report
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 2 of 10 E35223002478
(E35223001780 - dated 27/09/2010)
No Safe System of Work witnessed. Tests carried out with an average of 20 points open at any one time.
1/ The Effective Capture Distance of the Horizontal Sander No 7 Extract Hood is 0.50 m from the stopperblock.
2/ The Effective Capture Distance of the Luna Horizontal Sander Extract Hood is 0.50 m from the face.
3/ Please provide the fan and motor technical data and the filter efficiency data.
4/ Machines not in use, should have their Extraction Dampers kept shut, to improve Extraction Rates.
COSHH Management System Documentation
In accordance with the requirements of HS(G)258 - Controlling Airborne Contaminants at Work, thefollowing supporting documents have not been witnessed and should be made readily available;
Risk Assessment / COSHH Assessment
Safety Data Sheet(s)
Air Monitoring/Sampling Report(s),
Commissioning Report
LEV User Manual/ Logbook
Condition at Time of Test Normal.
Fan Details
Manufacturer Not MarkedSerial NumberType CentrifugalRotation (viewed from drive end) Clockwise
mØSize 3x0.6Volume Flow m s3 -1
Speed rpm
Motor Details
Manufacturer Not MarkedSerial no.Speed rpmPower kW
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 3 of 10 E35223002478
Primary Filter
Medium Fabric BagsCollector Type HopperEfficiency %
Secondary Filter
MediumCollector TypeEfficiency %
Details of Test Results
Primary filter inlet Pressure(Pa)
Primary filter outlet Pressure(Pa)
Pressure Difference(Pa)
No Access
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP1 CNC Millenium Machine
(Duct)0.15 -1991 3.22 0.06
FV1 CNC Millenium Machine(face)
0.05 31.24 0.06
TP2 Main Duct 0.56 -1851 15.94 3.93
FV2 CNC 4008 Machine (face) 0.05 29.15 0.05
FV3 Lathe LHS Duct (face) 0.1 16.84 0.13
FV4 Lathe RHS Duct (face) 0.08 18.14 0.09
FV5 Coaster Sander (Duct) 0.1 18.97 0.15
TP3 Belt Sander (Duct) 0.1 -953
TP4 Belt Sander (Duct) 0.1 -1093
FV6 Belt Sander Input (Face) 0.90 x 0.01 3.06 0.03
FV7 Belt Sander Output (Face) 0.90 x 0.02 3.18 0.06
FV8 Spindle Sander 19 (Face) 0.1 16.64 0.13
FV9 Spindle Sander 15 (Face) 0.08 16.02 0.08
TP5 Planer Bottom Hood 0.44 x 0.13 -103 10.35 0.59
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 4 of 10 E35223002478
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP6 Planer Top Hood Duct/Lip -830 19.09
TP7 Saw Table (Duct) 0.12 -321 10.15 0.11
TP8 Auto Spindle LH (Duct) 0.1 -496 26.77 0.21
TP9 Auto Spindle RH (Duct) 0.1 -655
FV9A Buffer Hood Face 0.23 x 0.17 15.48 0.61
FV9B LHS Bench Hood Face 0.46 x 0.08 17.20 0.63
FV9C RHS Bench Hood Face 0.46 x 0.08 18.16 0.67
FV9D Buffer Hood Duct Face 0.15 x 0.11 8.52 0.14
FV10 Router 4 (Face) 0.1 23.06 0.18
FV11 Router 5 (Face) 0.1 17.77 0.14
FV12 X Cut Saw (Face) 0.1 x 0.12 6.24 0.07
FV13 Spindle Moulder Hood Face 0.27 x 0.13 8.20 0.29
TP10 Spindle Moulder (Duct) 0.1 -577 20.92 0.17
TP11 Horizontal Sander 7 (Duct) 0.22 -1320 31.60 1.20
FV14 Horizontal Sander 7 (Face) 0.33 x 0.25 5.02 0.41
FV15 Vertical Sander 11 (Face) 0.4 x 0.125 4.05 0.20
TP12 Vertical Sander 11 (Duct) 0.15 -437 6.60 0.12
TP13 Bandsaw (Duct) 0.1 -321 24.44 0.19
TP14 Table Saw 9 (Duct) 0.12 -872 16.85 0.19
TP15 Horizontal Sander (Duct) 0.15 -541 17.97 0.32
FV16 Saw 10 (Face) 0.1 6.59 0.05
TP16 Belt Sander 20 (Duct) 0.1 -551
FV17 Belt Sander Input 20 (Face) 0.70 x 0.01 2.03 0.01
FV18 Belt Sander Output 20(Face)
0.72 x 0.04 1.81 0.05
TP17 Wall Saw Hood duct 0.08 -103 10.4 0.05
FV19 Wall Saw Hood (duct facetop)
0.15 12.32 0.22
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 5 of 10 E35223002478
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )FV20 Wall Saw Hood (duct face
btm)0.20 x 0.13 20.90 0.54
See additional cover forsystem diagram
Calibrated Test Equipment Details
Thermal Anemometer 120622Electronic Manometer ACEEM047Rotating Vane Anemometer 118670Other Not Applicable
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 6 of 10 E35223002478
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 7 of 10 E35223002478
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 8 of 10 E35223002478
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 9 of 10 E35223002478
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 10 of 10 E35223002478
Examination carried out on behalf of:Client NameAddress
This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH
Date of previous examination and tests
Location
Contract No.Policy No. Report No.
Name of User
005
Date of commencement of examination and tests
Date of Report
Engineer Surveyor
Competent PersonAllianz Engineering
+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081
V810b
Local Exhaust Ventilation Plant Report
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE
NV09796703
TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH
E35223001780
22-SEP-2009
29-SEP-2010
Allen, Andrew
Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.
www.allianzengineering.co.uk
Health & Safety at Work etc. Act 1974
Side 1 of 927-SEP-2010
Type of Inspection Thorough Periodic
Regulations Applicable Regulation 9 of COSHH
Identification of LEV Plant and Process
Plant Number LEV 030Manufacturer Not MarkedSerial Number Not MarkedLocation of Air Mover OutsideLocation of Process Joiners ShopsProcess(es) being controlled Wood Working MachinesHazardous substance(s) being controlled Wood Dusts, including Hardwood & MDFNumber of Extraction Points 30Maximum number that can be used at one time 30Exhaust air returned to AtmospherePrimary filter fitted YesSecondary filter fitted No
Visual Assessment of the level of control UnsatisfactoryAir Sampling Results Exhaust air is directed to atmosphere, we
therefore recommend suitable air sampling becarried out.
Tests Undertaken Visual, Light Test, Smoke Test, Static PressureTest, Velocity Measurements
Defects AFFECTING the level of control and particulars of any repairs or modifications required
The level of control at the Cooksley Cross Cut Saw, the Band Saw and Wadkin Table Saw No 9 is poor.The contaminant escapes capture and enters the operators' breathing zone. Suitablerepairs/modifications should be carried out to provide adequate Engineering Control.
Defects NOT affecting the level of control and particulars of any repairs or modifications required
Several Duct Dampers are missing throughout the system and should be replaced.
Capture hoods are missing at Routers 4 and 5 and should be fitted in order to improve the effectivecapture.
Other Observations
Dusts are collecting in the ductwork to the Millennium CNC machine and should be cleared.
The Effective Capture Distance of the Horizontal Sander No 7 Extract Hood is 0.50 m from the stopperblock.
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 2 of 9 E35223001780
The Effective Capture Distance of the Luna Horizontal Sander Extract Hood is 0.50 m from the face.
Wall Saw Extraction is effective only up to 1 Metre, from the Main Extract Hood Face.
Please provide the fan and motor technical data.
Please provide the filter efficiency data.
Machines not in use, should have their Extraction Dampers kept shut, to improve Extraction Rates.
The following supporting documents, as indicated in HS(G)258 - Controlling Airborne Contaminants atWork, have not been witnessed and should be made readily available; Risk Assessment, CoSHHAssessment, Safety Data Sheet(s), Air Monitoring/Sampling Report(s), User Manual and Logbook.
Condition at Time of Test Normal.
Fan Details
Manufacturer Not MarkedSerial NumberType CentrifugalRotation (viewed from drive end) Clockwise
mØSize 3x0.6Volume Flow m s3 -1
Speed rpm
Motor Details
Manufacturer Not MarkedSerial no.Speed rpmPower kW
Primary Filter
Medium Fabric BagsCollector Type HopperEfficiency %
Secondary Filter
MediumCollector TypeEfficiency %
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 3 of 9 E35223001780
Details of Test Results
Primary filter inlet Pressure(Pa)
Primary filter outlet Pressure(Pa)
Pressure Difference(Pa)
Details of Test Results
Primary filter inlet Pressure(Pa)
Primary filter outlet Pressure(Pa)
Pressure Difference(Pa)
No Access
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP1 CNC Millenium Machine
(Duct)0.15 -1517 5.21 0.09
FV1 CNC Millenium Machine(face)
0.05 31.60 0.06
TP2 Main Duct 0.56 -1861 19.21 4.73
FV2 CNC 4008 Machine (face) 0.05 31.60 0.06
FV3 Lathe LHS Duct (face) 0.1 16.87 0.13
FV4 Lathe RHS Duct (face) 0.08 -525 18.19 0.09
FV5 Coaster Sander (Duct) 0.1 21.80 0.17
TP3 Belt Sander (Duct) 0.1 -950
TP4 Belt Sander (Duct) 0.1 -1770
FV6 Belt Sander Input (Face) 0.90 x 0.01 2.63 0.02
FV7 Belt Sander Output (Face) 0.90 x 0.02 2.12 0.02
FV8 Spindle Sander 19 (Face) 0.1 23.46 0.18
FV9 Spindle Sander 15 (Face) 0.08 20.08 0.10
TP5 Planer Bottom Hood 0.44 x 0.13 -110 12.60 0.72
TP6 Planer Top Hood Duct/Lip -1128 23.62
TP7 Saw Table (Duct) 0.12 -1680 29.87 0.34
TP8 Auto Spindle LH (Duct) 0.1 -739
TP9 Auto Spindle RH (Duct) 0.1 -745
FV10 Router 4 (Face) 0.1 17.95 0.14
FV11 Router 5 (Face) 0.1 31.60 0.25
FV12 X Cut Saw (Face) 0.1 x 0.12 11.04 0.13
TP10 Spindle Moulder (face) 0.15 9.78 0.17
FV13 Spindle Moulder (face) 0.1 10.04 0.08
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 4 of 9 E35223001780
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP11 Horizontal Sander 7 (Duct) 0.22 -1290 31.60 1.20
FV14 Horizontal Sander 7 (Face) 0.33 x 0.25 6.43 0.53
FV15 Vertical Sander 11 (Face) 0.4 x 0.125 4.30 0.22
TP12 Vertical Sander 11 (Duct) 0.15 -561 9.61 0.17
TP13 Bandsaw (Duct) 0.1 -463 19.97 0.16
TP14 Table Saw 9 (Duct) 0.12 -1164 23.14 0.26
TP15 Horizontal Sander (face) 0.36 x 0.39 -512 5.01 0.70
FV16 Saw 10 (Face) 0.1 10.56 0.08
TP16 Belt Sander 20 (Duct) 0.1 -609
FV17 Belt Sander Input 20 (Face) 0.70 x 0.01 1.03 0.01
FV18 Belt Sander Output 20(Face)
0.72 x 0.04 1.04 0.03
TP17 Wall Saw Hood duct 0.08 -100 9.60 0.05
FV19 Wall Saw Hood (duct facetop)
0.15 9.92 0.18
FV20 Wall Saw Hood (duct facebtm)
0.20 x 0.13 12.54 0.33
See additional cover forsystem diagram
Calibrated Test Equipment Details
Thermal Anemometer 120622Electronic Manometer ACEEM047Rotating Vane Anemometer 118670Other Not Applicable
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 5 of 9 E35223001780
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 6 of 9 E35223001780
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 7 of 9 E35223001780
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 8 of 9 E35223001780
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 9 of 9 E35223001780
Examination carried out on behalf of:Client NameAddress
This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH
Date of previous examination and tests
Location
Contract No.Policy No. Report No.
Name of User
005
Date of commencement of examination and tests
Date of Report
Engineer Surveyor
Competent PersonAllianz Engineering
+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081
V810b
Local Exhaust Ventilation Plant Report
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE
NV09796703
TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH
E35223001097
15-SEP-2008
25-SEP-2009
Allen, Andrew
Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.
www.allianzengineering.co.uk
Health & Safety at Work etc. Act 1974
Side 1 of 422-SEP-2009
Type of Inspection Thorough Periodic
Regulations Applicable Regulation 9 of COSHH
Identification of LEV Plant and Process
Plant Number LEV 030Manufacturer Not MarkedSerial Number Not MarkedLocation of Air Mover OutsideLocation of Process Joiners ShopsProcess(es) being controlled Wood Working MachinesHazardous substance(s) being controlled Wood Dusts, including Hardwood & MDFNumber of Extraction Points 30Maximum number that can be used at one time 30Exhaust air returned to AtmospherePrimary filter fitted YesSecondary filter fitted No
Visual Assessment of the level of control SatisfactoryAir Sampling Results Exhaust air is directed to atmosphere, we
therefore recommend suitable air sampling becarried out.
Tests Undertaken Visual, Light Test, Smoke Test, Static PressureTest, Velocity Measurements
Defects AFFECTING the level of control and particulars of any repairs or modifications required
None
Defects NOT affecting the level of control and particulars of any repairs or modifications required
The level of control at the Cooksley Cross Cut Saw (TP12), the Band Saw and Wadkin Table Saw No 9 ispoor and should be improved.
Dusts are collecting in the ductwork to the Millennium CNC machine and should be cleared.
Several Duct Dampers are missing throughout the system and should be replaced.
The Band Saw duct is loose and should be made secure.
Capture hoods are missing at Routers 4 and 5 and should be fitted in order to improve the effectivecapture.
Other Observations
The Effective Capture Distance of the Horizontal Sander No 7 Extract Hood is 0.50 m from the stopper
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 2 of 4 E35223001097
block.
The Effective Capture Distance of the Luna Horizontal Sander Extract Hood is 0.50 m from the face.
Wall Saw Extraction is effective only up to 1 Metre, from the Main Extract Hood Face.
Please provide the fan and motor technical data.
Please provide the filter efficiency data.
Machines not in use, should have their Extraction Dampers kept shut, to improve Extraction Rates.
Condition at Time of Test Normal - All Points Open.
Fan Details
Manufacturer Not MarkedSerial NumberType CentrifugalRotation (viewed from drive end) Clockwise
mØSize 3x0.6Volume Flow m s3 -1
Speed rpm
Motor Details
Manufacturer Not MarkedSerial no.Speed rpmPower kW
Primary Filter
Medium Fabric BagsCollector Type HopperEfficiency %
Secondary Filter
MediumCollector TypeEfficiency %
Details of Test Results
Primary filter inlet Pressure(Pa)
Primary filter outlet Pressure(Pa)
Pressure Difference(Pa)
No Access
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP1 CNC Millenium Machine
(Duct)0.15 -1553 6.21 0.11
FV1 CNC Millenium Machine(face)
0.05 31 0.06
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 3 of 4 E35223001097
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP2 Main Duct 0.56 -1871 17.90 4.41
FV2 CNC 4008 Machine (face) 0.05 31 0.06
FV3 Lathe LHS Duct (face) 0.1 11.20 0.09
FV4 Lathe RHS Duct (face) 0.08 -360 18.51 0.09
FV5 Coaster Sander (Duct) 0.1 20.71 0.16
TP3 Belt Sander (Duct) 0.1
TP4 Belt Sander (Duct) 0.1
FV6 Belt Sander Input (Face) 0.90 x 0.01 3.95 0.04
FV7 Belt Sander Output (Face) 0.90 x 0.02 2.74 0.05
FV8 Spindle Sander 19 (Face) 0.1 16.28 0.13
FV9 Spindle Sander 15 (Face) 0.08 13.58 0.07
TP5 Planer Bottom Hood 0.44 x 0.13 -103 8.80 0.50
TP6 Planer Top Hood 0.46 x 0.23 -846 5.43 0.27
TP7 Saw Table (Duct) 0.12 -353 15.16 0.17
TP8 Auto Spindle LH (Duct) 0.1 -421
TP9 Auto Spindle RH (Duct) 0.1 -435
FV10 Router 4 (Face) 0.1 10.45 0.08
FV11 Router 5 (Face) 0.1 19.32 0.15
FV12 X Cut Saw (Face) 0.1 x 0.12 6.63 0.08
TP10 Spindle Moulder (face) 0.15 -282 7.90 0.14
FV13 Spindle Moulder (face) 0.1 10.12 0.08
TP11 Horizontal Sander 7 (Duct) 0.22 -1342 30.40 1.15
FV14 Horizontal Sander 7 (Face) 0.33 x 0.25 4.65 0.48
FV15 Vertical Sander 11 (Face) 0.4 x 0.125 4.74 0.24
TP12 Vertical Sander 11 (Duct) 0.15 -340 8.28 0.15
TP13 Bandsaw (Duct) 0.1 -265 21.8 0.17
TP14 Table Saw 9 (Duct) 0.12 -574 18.75 0.21
Report No.
V810b
Local Exhaust Ventilation Plant Report
Health & Safety at Work etc. Act 1974
Side 4 of 4 E35223001097
-13
Test Point and Type Size Results of Inspection
Duct / Face / PointHood / Duct
Size(m)
StaticPressure
(Pa)
Face / DuctVelocity(ms )
Point No.-1
VolumeFlow
(m s )TP15 Horizontal Sander (face) 0.36 x 0.39 -337 4.61 0.65
FV16 Saw 10 (Face) 0.1 11.94 0.09
TP16 Belt Sander 20 (Duct) 0.1 -444
FV17 Belt Sander Input 20 (Face) 0.70 x 0.01 1.60 0.01
FV18 Belt Sander Output 20(Face)
0.72 x 0.04 1.48 0.04
TP17 Wall Saw Hood duct 0.08 -94 9.64 0.05
FV19 Wall Saw Hood (face top) 2.08 x 0.21 3.12
FV20 Wall Saw Hood (face btm) 2.08 x 0.21 5.79
Calibrated Test Equipment Details
Thermal Anemometer 120622Electronic Manometer ACEEM047Rotating Vane Anemometer 118670Other Not Applicable
Examination carried out on behalf of:Client NameAddress
This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.
CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH