Date of previous examination and tests Location Contract No. Policy No. Report No. Name of User 005 Date of commencement of examination and tests Date of Report Engineer Surveyor Competent Person Allianz Engineering +44 (0) 1428 722407 UK Tel: ROI Tel: +00353 (0) 1 613 4081 V810b Local Exhaust Ventilation Plant Report CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE NV09796703 TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK, SHEFFIELD, S20 3FH E35223008923 02-MAY-2017 06-NOV-2017 Andrew Allen Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom. Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom. Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator. www.allianzengineering.co.uk Health & Safety at Work etc. Act 1974 Side 1 of 4 06-NOV-2017 Type of Inspection Thorough Examination and Test Regulations Applicable Regulation 9 of COSHH Identification of LEV Plant and Process Plant Number LEV032 Manufacturer Dust Extraction Ltd Serial Number 59190 Location of Air Mover Tool Room Location of Process Tool Room Process(es) being controlled Jones Shipman Surface Grinder Hazardous substance(s) being controlled Steel, Resin and Grinding Medium Dusts Number of Extraction Points 1 Maximum number that can be used at one time 1 Exhaust air returned to Workplace Primary filter fitted Yes Secondary filter fitted No Visual Assessment of the level of control Satisfactory Air Sampling Results We recommend the return air be monitored to ensure that it is not above the set limits for the contaminants. Tests Undertaken Visual, Light Test, Smoke Test, Static Pressure Test, Velocity Measurements Defects AFFECTING the level of control and particulars of any repairs or modifications required None Defects NOT affecting the level of control and particulars of any repairs or modifications required None Other Observations 1/ Cross-reference with the last Thorough Examination and Test report (E35223008318 - dated 02/05/2017) 2/ Test results recorded indicate no marked system performance deterioration since the last Thorough Examination and Test.

Upload: others

Post on 13-Jan-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK, SHEFFIELD, S20 3FH

E35223008923

02-MAY-2017

06-NOV-2017

Andrew Allen

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 406-NOV-2017

Type of Inspection Thorough Examination and Test

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover Tool RoomLocation of Process Tool RoomProcess(es) being controlled Jones Shipman Surface GrinderHazardous substance(s) being controlled Steel, Resin and Grinding Medium DustsNumber of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Light Test, Smoke Test, Static PressureTest, Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None

Defects NOT affecting the level of control and particulars of any repairs or modifications required

None

Other Observations

1/ Cross-reference with the last Thorough Examination and Test report

(E35223008318 - dated 02/05/2017)

2/ Test results recorded indicate no marked system performance deterioration since the last ThoroughExamination and Test.

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 4 E35223008923

3/ No air flow indicators are present at appropriate points on the system to indicate the system isfunctioning correctly. Reference should be made to HSG 258 regarding the installation of air flowindicators.

4/ Please provide test holes for the measurement of PSI and PSO.

5/ We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted toa safe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

6/ COSHH Management System Documentation

The following supporting documents, held by Martin Carr, have been witnessed and are readily availableon the companies' intranet site;

Risk Assessment / COSHH Assessment

Material Safety Data Sheet(s)

Previous Thorough Examination and Test Report(s)

The following supporting documents have not been witnessed;

Air Monitoring/Sampling Report(s),

Commissioning Report

LEV User Manual/ Logbook

7/ Refer to Report No E35223002138, dated 28/03/2011, for system diagram.

8/ Please provide the fan and motor technical data and filter efficiency data.

Condition at Time of Test Normal. Process stood down

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 4 E35223008923

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Fabric BagsCollector Type Metal TrayEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-2377 -2481 104

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )TP 1 Duct 0.08 -2377

TP 2 Hood Face 0.08 x 0.08 -1462 11.95 0.08

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 4 of 4 E35223008923

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACEEM047Rotating Vane Anemometer Not UsedOther N/A

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK, SHEFFIELD, S20 3FH

E35223008318

20-OCT-2016

02-MAY-2017

Andrew Allen

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 402-MAY-2017

Type of Inspection Thorough Examination and Test

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover Tool RoomLocation of Process Tool RoomProcess(es) being controlled Jones Shipman GrinderHazardous substance(s) being controlled Steel, Resin & Grinding Medium DustsNumber of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Light Test, Smoke Test, Static PressureTest, Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None

Defects NOT affecting the level of control and particulars of any repairs or modifications required

None

Other Observations

1/ Cross-reference with the last Thorough Examination and Test report

(E35223007745 - dated 20/10/2016)

2/ Test results recorded indicate no marked system performance deterioration since the last ThoroughExamination and Test.

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 4 E35223008318

3/ The build up of contaminant dusts on the grinder, capture hood and duct should be cleared. Theextraction should be used during all dry grinding operations.

4/ Please provide test holes for the measurement of PSI and PSO.

5/ We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted toa safe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

6/ COSHH Management System Documentation

The following supporting documents, held by Martin Carr, have been witnessed and are readily availableon the companies' intranet site;

Risk Assessment / COSHH Assessment

Material Safety Data Sheet(s)

Previous Thorough Examination and Test Report(s)

The following supporting documents have not been witnessed;

Air Monitoring/Sampling Report(s),

Commissioning Report

LEV User Manual/ Logbook

7/ Refer to Report No E35223002138, dated 28/03/2011, for system diagram.

8/ Please provide the fan and motor technical data and filter efficiency data.

Condition at Time of Test Normal. Process stood down

admin
Sticky Note
Previous comments.

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 4 E35223008318

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Fabric BagsCollector Type Metal TrayEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-2073 -2283 210

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )TP 1 Duct 0.08 -2073

TP 2 Hood Face 0.08 x 0.08 -1423 17.32 0.11

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 4 of 4 E35223008318

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACEEM047Rotating Vane Anemometer Not UsedOther N/A

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH

E35223007745

18-APR-2016

20-OCT-2016

Andrew Allen

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 420-OCT-2016

Type of Inspection Thorough Examination and Test

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover Tool RoomLocation of Process Tool RoomProcess(es) being controlled Jones Shipman GrinderHazardous substance(s) being controlled Steel, Resin & Grinding Medium DustsNumber of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Light Test, Smoke Test, Static PressureTest, Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None

Defects NOT affecting the level of control and particulars of any repairs or modifications required

1. The hood face is starting to block with debris and should be cleared.

Other Observations

1/ Cross-reference with the last Thorough Examination and Test report

(E35223007038 - dated 18/04/2016)

2/ Test results recorded indicate no marked system performance deterioration since the last ThoroughExamination and Test.

admin
Sticky Note
Ongoing cleaning

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 4 E35223007745

3/ The build up of contaminant dusts on the grinder, capture hood and duct should be cleared. Theextraction should be used during all dry grinding operations.

4/ Please provide test holes for the measurement of PSI and PSO.

5/ We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted toa safe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

6/ COSHH Management System Documentation

The following supporting documents, held by Martin Carr, have been witnessed and are readily availableon the companies' intranet site;

Risk Assessment / COSHH Assessment

Material Safety Data Sheet(s)

Previous Thorough Examination and Test Report(s)

The following supporting documents have not been witnessed;

Air Monitoring/Sampling Report(s),

Commissioning Report

LEV User Manual/ Logbook

7/ Refer to Report No E35223002138, dated 28/03/2011, for system diagram.

8/ Please provide the fan and motor technical data and filter efficiency data.

Condition at Time of Test Normal. Process stood down

admin
Sticky Note
Feel free to drill
admin
Sticky Note
There are limited options - note few workers around
admin
Sticky Note
Age of equipment means they have been lost.

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 4 E35223007745

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Cloth FabricCollector Type Metal TrayEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-2267 -2400 133

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )TP 1 Duct 0.08 -2267

TP 2 Hood Face 0.08 x 0.08 -1478 13.26 0.09

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 4 of 4 E35223007745

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACEEM047Rotating Vane Anemometer Not UsedOther N/A

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Submission Date 2016-04-19 14:29:46

Item Surface Grinder

HS Reference https://hs.carrs-silver.co.uk/levtool.pdf

Due Date 28-04-2016

Status Completed+

Comments/Notes 19/04/16 Requested tool room operatives deal with items 1 & 3 on pages 1 & 2 of theabove report. 20/04/16 Andre dealing with this. 25/04/16 James/Andre when will thisjob be complete? From: Toolroom [mailto:[email protected]] Sent: 26April 2016 11:51 To: 'Martin Carr' Subject: RE: EDIT: Outstanding+ HS Job 28-04-2016It’s done. Andre From: Martin Carr [mailto:[email protected]] Sent: 26April 2016 10:47 To: 'Toolroom' Subject: RE: EDIT: Outstanding+ HS Job 28-04-2016The extraction hood face is starting to block with dusts and should be cleaned. This isthe only item you need to do, if you can confirm it has been done, then I will close thejob. Martin.

Job Type HS Job

Notifier [email protected]

Carrs HS Jobs

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH

E35223007038

19-OCT-2015

18-APR-2016

Andrew Allen

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 418-APR-2016

Type of Inspection Thorough Examination and Test

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover Tool RoomLocation of Process Tool RoomProcess(es) being controlled Jones Shipman GrinderHazardous substance(s) being controlled Steel, Resin & Grinding Medium DustsNumber of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Light Test, Smoke Test, Static PressureTest, Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None

Defects NOT affecting the level of control and particulars of any repairs or modifications required

1/ The extraction hood face is starting to block with dusts and should be cleaned.

Other Observations

1/ Cross-reference with the last Thorough Examination and Test report

(E35223006403 - dated 19/10/2015)

2/ Test results recorded indicate no marked system performance deterioration since the last ThoroughExamination and Test.

admin
Sticky Note
Added to HS job

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 4 E35223007038

3/ The build up of contaminant dusts on the grinder, capture hood and duct should be cleared. Theextraction should be used during all dry grinding operations.

4/ Please provide test holes for the measurement of PSI and PSO.

5/ We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted toa safe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

6/ COSHH Management System Documentation

The following supporting documents, held by Martin Carr, have been witnessed and are readily availableon the companies' intranet site;

Risk Assessment / COSHH Assessment

Material Safety Data Sheet(s)

Previous Thorough Examination and Test Report(s)

The following supporting documents have not been witnessed;

Air Monitoring/Sampling Report(s),

Commissioning Report

LEV User Manual/ Logbook

7/ Refer to Report No E35223002138, dated 28/03/2011, for system diagram.

8/ Please provide the fan and motor technical data and filter efficiency data.

Condition at Time of Test Normal. Process stood down

admin
Sticky Note
Andy, I am just updated the reports that you have sent in and would appreciate some additional words placing on the next report that you send in for this item. The link to the report on our system is as follows; https://hs.carrs-silver.co.uk/levtool.pdf On page 2. Suggest you either drill the holes you require or ask Maint on your next trip to do this when you are here, as they will then be in the position that you require. Point 5. Can you add to the wording of the explosion relief door that we have advised you there is no practical alternative location for the extractor unit. Furthermore while the room is occupied it is sparsely so deflection would have little benefit. Regards. Martin.

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 4 E35223007038

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Fabric BagsCollector Type Metal TrayEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-2312 -2620 308

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )TP 1 Duct 0.08 -2312

TP 2 Hood Face 0.08 x 0.08 -1514 18.98 0.12

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 4 of 4 E35223007038

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACEEM047Rotating Vane Anemometer Not UsedOther N/A

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK, SHEFFIELD, S20 3FH

E35223006403

20-APR-2015

19-OCT-2015

Andrew Allen

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 419-OCT-2015

Type of Inspection Thorough Examination and Test

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover Tool RoomLocation of Process Tool RoomProcess(es) being controlled Jones Shipman GrinderHazardous substance(s) being controlled Steel, Resin & Grinding Medium DustsNumber of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Light Test, Smoke Test, Static PressureTest, Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None

Defects NOT affecting the level of control and particulars of any repairs or modifications required

None

Other Observations

1/ Cross-reference with the last Thorough Examination and Test report

(E35223005699 - dated 20/04/2015)

2/ Test results recorded indicate no marked system performance deterioration since the last ThoroughExamination and Test.

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 4 E35223006403

3/ The build up of contaminant dusts on the grinder, capture hood and duct should be cleared. Theextraction should be used during all dry grinding operations.

4/ Please provide test holes for the measurement of PSI and PSO.

5/ We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted toa safe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

6/ COSHH Management System Documentation

The following supporting documents, held by Martin Carr, have been witnessed and are readily availableon the companies' intranet site;

Risk Assessment / COSHH Assessment

Material Safety Data Sheet(s)

Previous Thorough Examination and Test Report(s)

The following supporting documents have not been witnessed;

Air Monitoring/Sampling Report(s),

Commissioning Report

LEV User Manual/ Logbook

7/ Refer to Report No E35223002138, dated 28/03/2011, for system diagram.

8/ Please provide the fan and motor technical data and filter efficiency data.

Condition at Time of Test Normal. Process stood down

admin
Sticky Note
On going use
admin
Sticky Note
There is no obvious place to duct to. The area in question is not a highly populated area

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 4 E35223006403

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Cloth FabricCollector Type Metal TrayEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-2315 -2400 85

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )TP 1 Duct 0.08 -2315

TP 2 Hood Face 0.08 x 0.08 -1462 14.49 0.09

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 4 of 4 E35223006403

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACEEM047Rotating Vane Anemometer Not UsedOther N/A

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH

E35223005699

16-OCT-2014

20-APR-2015

Andrew Allen

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 420-APR-2015

Type of Inspection Thorough Examination and Test

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover Tool RoomLocation of Process Tool RoomProcess(es) being controlled Jones Shipman GrinderHazardous substance(s) being controlled Steel, Resin & Grinding Medium DustsNumber of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Smoke Test, Static Pressure Test,Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None

Defects NOT affecting the level of control and particulars of any repairs or modifications required

None

Other Observations

1/ Cross-reference with the last Thorough Examination and Test report

(E35223005227 - dated 16/10/2014)

2/ Test results recorded indicate no marked system performance deterioration since the last ThoroughExamination and Test.

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 4 E35223005699

3/ The build up of contaminant dusts on the grinder, capture hood and duct should be cleared. Theextraction should be used during all dry grinding operations.

4/ Please provide test holes for the measurement of PSI and PSO.

5/ We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted toa safe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

6/ COSHH Management System Documentation

The following supporting documents, held by Martin Carr, have been witnessed and are readily availableon the companies' intranet site;

Risk Assessment / COSHH Assessment

Material Safety Data Sheet(s)

Previous Thorough Examination and Test Report(s)

The following supporting documents have not been witnessed;

Air Monitoring/Sampling Report(s),

Commissioning Report

LEV User Manual/ Logbook

7/ Refer to Report No E35223002138, dated 28/03/2011, for system diagram.

8/ Please provide the fan and motor technical data and filter efficiency data.

Condition at Time of Test Normal. Process stood down

admin
Sticky Note
Part of general housekeeping. This is there from current work
admin
Sticky Note
We have no records of these

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 4 E35223005699

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Cloth FabricCollector Type Metal TrayEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-2241 -2377 136

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )TP 1 Duct 0.08 -2241

TP 2 Hood Face 0.08 x 0.08 -1320 18.62 0.12

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 4 of 4 E35223005699

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACE EM 047Rotating Vane Anemometer Not UsedOther N/A

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH

E35223005227

15-APR-2014

16-OCT-2014

Andrew Allen

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 416-OCT-2014

Type of Inspection Thorough Examination and Test

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover Tool RoomLocation of Process Tool RoomProcess(es) being controlled Jones Shipman GrinderHazardous substance(s) being controlled Steel, Resin & Grinding Medium DustsNumber of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Smoke Test, Static Pressure Test,Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None

Defects NOT affecting the level of control and particulars of any repairs or modifications required

1/ The capture hood is starting to block up with contaminant dusts which should be cleared.

2/ The capture hood should be lowered into the correct position, when the ginder is used for dry grinding,in order to acheive the maximum level of control.

Other Observations

1/ Cross-reference with the last Thorough Examination and Test report

(E35223004702 - dated 15/04/2014)

admin
Sticky Note
See point 2 below

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 4 E35223005227

2/ Test results recorded indicate no marked system performance deterioration since the last ThoroughExamination and Test.

3/ The build up of contaminant dusts on the grinder, capture hood and duct should be cleared. Theextraction should be used during all dry grinding operations.

4/ Please provide test holes for the measurement of PSI and PSO.

5/ We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted toa safe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

6/ COSHH Management System Documentation

The following supporting documents, held by Martin Carr, have been witnessed and are readily availableon the companies' intranet site;

Risk Assessment / COSHH Assessment

Material Safety Data Sheet(s)

Previous Thorough Examination and Test Report(s)

The following supporting documents have not been witnessed;

Air Monitoring/Sampling Report(s),

Commissioning Report

LEV User Manual/ Logbook

7/ Refer to Report No E35223002138, dated 28/03/2011, for system diagram.

8/ Please provide the fan and motor technical data and filter efficiency data.

Condition at Time of Test Normal. Process stood down

admin
Sticky Note
See COSHH
admin
Sticky Note
Not available

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 4 E35223005227

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Cloth FabricCollector Type Metal TrayEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-2143 -2306 163

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )TP 1 Duct 0.08 -2143

TP 2 Hood Face 0.08 x 0.08 -1521 13.41 0.09

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 4 of 4 E35223005227

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACE EM 047Rotating Vane Anemometer Not UsedOther N/A

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH

E35223004702

07-OCT-2013

15-APR-2014

Andrew Allen

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 415-APR-2014

Type of Inspection Thorough Examination and Test

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover IntegralLocation of Process Tool RoomProcess(es) being controlled Jones Shipman GrinderHazardous substance(s) being controlled Steel, Resin & Grinding Medium DustsNumber of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Smoke Test, Static Pressure Test,Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None

Defects NOT affecting the level of control and particulars of any repairs or modifications required

1/ The capture hood is starting to block up with contaminant dusts which should be cleared.

Other Observations

1/ Cross-reference with the last Thorough Examination and Test report

(E35223004249 - dated 07/10/2013)

2/ Test results recorded indicate no marked system performance deterioration since the last ThoroughExamination and Test.

admin
Sticky Note
This is on-going

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 4 E35223004702

3/ Capture effective up to 0.15m from the hood face, which should be positioned accordingly during workactivities.

4/ Please provide test holes for the measurement of PSI and PSO.

5/ We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted toa safe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

6/ COSHH Management System Documentation

The following supporting documents, held by Martin Carr, have been witnessed and are readily availableon the companies' intranet site;

Risk Assessment / COSHH Assessment

Material Safety Data Sheet(s)

Previous Thorough Examination and Test Report(s)

The following supporting documents have not been witnessed;

Air Monitoring/Sampling Report(s),

Commissioning Report

LEV User Manual/ Logbook

7/ Refer to Report No E35223002138, dated 28/03/2011, for system diagram.

8/ Please provide the fan and motor technical data and filter efficiency data.

Condition at Time of Test Normal. Process stood down

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 4 E35223004702

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Cloth FabricCollector Type Metal TrayEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-2163 -2387 224

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )TP 1 Duct 0.08 -2136

TP 2 Hood Face 0.08 x 0.08 -2036 14.54 0.09

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 4 of 4 E35223004702

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACE EM 047Rotating Vane Anemometer Not UsedOther N/A

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH

E35223004249

10-APR-2013

07-OCT-2013

Andrew Allen

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 407-OCT-2013

Type of Inspection Thorough Examination and Test

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover IntegralLocation of Process Tool RoomProcess(es) being controlled Jones Shipman GrinderHazardous substance(s) being controlled Safety Data Sheets Not Presented. Substances

Witnessed - Steel, Resin & Grinding MediumDusts

Number of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Smoke Test, Static Pressure Test,Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None

Defects NOT affecting the level of control and particulars of any repairs or modifications required

None

Other Observations

1/ Cross-reference with the last Thorough Examination and Test report

(E35223003797 - dated 10/04/2013)

2/ Test results recorded indicate no marked system performance deterioration since the last Thorough

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 4 E35223004249

Examination and Test.

3/ Capture effective up to 0.15m from the hood face, which should be positioned accordingly during workactivities.

4/ Please provide test holes for the measurement of PSI and PSO.

5/ We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted toa safe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

6/ COSHH Management System Documentation

The following supporting documents, held by Martin Carr, have been witnessed and are readily availableon the companies' intranet site;

Risk Assessment / COSHH Assessment

Material Safety Data Sheet(s)

Previous Thorough Examination and Test Report(s)

The following supporting documents have not been witnessed;

Air Monitoring/Sampling Report(s),

Commissioning Report

LEV User Manual/ Logbook

7/ Refer to Report No E35223002138, dated 28/03/2011, for system diagram.

8/ Please provide the fan and motor technical data and filter efficiency data.

Condition at Time of Test Normal. Process stood down

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 4 E35223004249

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Cloth FabricCollector Type Metal TrayEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-2117 -2396 279

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )TP 1 Duct 0.08 -2117

TP 2 Hood Face 0.08 x 0.08 -1352 18.92 0.12

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 4 of 4 E35223004249

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACE EM 047Rotating Vane Anemometer Not UsedOther N/A

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH

E35223003797

11-OCT-2012

15-APR-2013

Andrew Allen

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 410-APR-2013

Type of Inspection Thorough Examination and Test

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover IntegralLocation of Process Tool RoomProcess(es) being controlled Jones Shipman GrinderHazardous substance(s) being controlled Safety Data Sheets Not Presented. Substances

Witnessed - Steel, Resin & Grinding MediumDusts

Number of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Smoke Test, Static Pressure Test,Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None

Defects NOT affecting the level of control and particulars of any repairs or modifications required

None

Other Observations

1/ Cross-reference with the last Thorough Examination and Test report

(E35223003335 - dated 11/10/2012)

2/ Test results recorded indicate no marked system performance deterioration since the last Thorough

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 4 E35223003797

Examination and Test.

3/ Capture effective up to 0.15m from the hood face, which should be positioned accordingly during workactivities.

4/ Please provide test holes for the measurement of PSI and PSO.

5/ We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted toa safe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

6/ COSHH Management System Documentation

In accordance with the requirements of HS(G)258 - Controlling Airborne Contaminants at Work, thefollowing supporting documents have not been witnessed and should be made readily available;

Risk Assessment / COSHH Assessment

Safety Data Sheet(s)

Air Monitoring/Sampling Report(s),

Commissioning Report

LEV User Manual/ Logbook

7/ Refer to Report No E35223002138, dated 28/03/2011, for system diagram.

8/ Please provide the fan and motor technical data and filter efficiency data.

Condition at Time of Test Normal. Process stood down

admin
Sticky Note
This is is available if requested. Please refer to the risk assessment

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 4 E35223003797

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Cloth FabricCollector Type Metal TrayEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-2006 -2305 299

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )TP 1 Duct 0.08 2006

TP 2 Hood Face 0.08 x 0.08 -1362 18.37 0.12

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 4 of 4 E35223003797

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACE EM 047Rotating Vane Anemometer Not UsedOther N/A

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH

E35223003335

04-APR-2012

11-OCT-2012

Andrew Allen

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 311-OCT-2012

Type of Inspection Thorough Periodic

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover IntegralLocation of Process Tool RoomProcess(es) being controlled Jones Shipman GrinderHazardous substance(s) being controlled Safety Data Sheets Not Presented. Substances

Witnessed - Steel, Resin & Grinding MediumDusts

Number of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Smoke Test, Static Pressure Test,Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None

Defects NOT affecting the level of control and particulars of any repairs or modifications required

None

Other Observations

Cross-reference with the last Thorough Examination and Test report

(E35223002913 - dated 04/04/2012)

Test results recorded indicate no marked system performance deterioration since the last Thorough

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 3 E35223003335

Examination and Test.

1/ Capture effective up to 0.15m from the hood face, which should be positioned accordingly during workactivities.

2/ Please provide test holes for the measurement of PSI and PSO.

3/ We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted toa safe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

COSHH Management System Documentation

In accordance with the requirements of HS(G)258 - Controlling Airborne Contaminants at Work, thefollowing supporting documents have not been witnessed and should be made readily available;

Risk Assessment / COSHH Assessment

Safety Data Sheet(s)

Air Monitoring/Sampling Report(s),

Commissioning Report

LEV User Manual/ Logbook

Refer to Report No E35223002138, dated 28/03/2011, for system diagram.

Please provide the fan and motor technical data and filter efficiency data.

Condition at Time of Test Normal. Process stood down

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

admin
Sticky Note
This is available should it be requested.

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 3 E35223003335

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Cloth FabricCollector Type Metal TrayEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-2072 -2445 373

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )TP 1 Duct 0.08 -2072

TP 2 Hood Face 0.08 x 0.08 -1109 18.61 0.12

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACE EM 047Rotating Vane Anemometer Not UsedOther N/A

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH

E35223002913

28-SEP-2011

04-APR-2012

Andrew Allen

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 304-APR-2012

Type of Inspection Thorough Periodic

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover IntegralLocation of Process Tool RoomProcess(es) being controlled Jones Shipman GrinderHazardous substance(s) being controlled Safety Data Sheets Not Presented. Substances

Witnessed - Steel, Resin & Grinding MediumDusts

Number of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Smoke Test, Static Pressure Test,Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None

Defects NOT affecting the level of control and particulars of any repairs or modifications required

None

Other Observations

Cross-reference with the last Thorough Examination and Test report

(E35223002488 - dated 28/09/2011)

Test results recorded indicate no marked system performance deterioration since the last Thorough

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 3 E35223002913

Examination and Test.

1/ Capture effective up to 0.15m from the hood face, which should be positioned accordingly during workactivities.

2/ Please provide test holes for the measurement of PSI and PSO.

3/ We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted toa safe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

COSHH Management System Documentation

In accordance with the requirements of HS(G)258 - Controlling Airborne Contaminants at Work, thefollowing supporting documents have not been witnessed and should be made readily available;

Risk Assessment / COSHH Assessment

Safety Data Sheet(s)

Air Monitoring/Sampling Report(s),

Commissioning Report

LEV User Manual/ Logbook

Refer to Report No E35223002138, dated 28/03/2011, for system diagram.

Please provide the fan and motor technical data and filter efficiency data.

Condition at Time of Test Normal. Process stood down

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

admin
Sticky Note
They are available if asked for.

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 3 E35223002913

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Cloth FabricCollector Type Metal TrayEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-2124 -2403 279

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )TP 1 Duct 0.08 -2124

TP 2 Hood Face 0.08 x 0.08 -1320 14.60 0.09

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACE EM 047Rotating Vane Anemometer Not UsedOther N/A

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK, SHEFFIELD, S20 3FH

E35223002488

28-MAR-2011

30-SEP-2011

Andrew Allen

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 328-SEP-2011

Type of Inspection Thorough Periodic

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover IntegralLocation of Process Tool RoomProcess(es) being controlled Jones Shipman GrinderHazardous substance(s) being controlled Safety Data Sheets Not Presented. Substances

Witnessed - Steel, Resin & Grinding MediumDusts

Number of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Smoke Test, Static Pressure Test,Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None

Defects NOT affecting the level of control and particulars of any repairs or modifications required

None

Other Observations

Cross-reference with the last Thorough Examination and Test report

(E35223002138 - dated 28/03/2011)

1/ Capture effective up to 0.15m from the hood face, which should be positioned accordingly during work

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 3 E35223002488

activities.

2/ Please provide test holes for the measurement of PSI and PSO.

3/ We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted toa safe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

COSHH Management System Documentation

In accordance with the requirements of HS(G)258 - Controlling Airborne Contaminants at Work, thefollowing supporting documents have not been witnessed and should be made readily available;

Risk Assessment / COSHH Assessment

Safety Data Sheet(s)

Air Monitoring/Sampling Report(s),

Commissioning Report

LEV User Manual/ Logbook

Refer to Report No E35223002138, dated 28/03/2011, for system diagram.

Please provide the fan and motor technical data and filter efficiency data.

Condition at Time of Test Normal. (Process stood down)

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

admin
Sticky Note
It is not located in a vastly populated area. We have never had one go off so far. Relocation outside is not possible due to theft and reduction in suction.
admin
Sticky Note
They are available, should they actually ask for them.

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 3 E35223002488

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Cloth FabricCollector Type Metal TrayEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-2254 -2315 61

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )TP 1 Duct 0.08 -2254

TP 2 Hood Face 0.08 x 0.08 -1425 16.08 0.10

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACE EM 047Rotating Vane Anemometer Not UsedOther N/A

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH

E35223002138

28-SEP-2010

28-MAR-2011

Allen, Andrew

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 528-MAR-2011

Type of Inspection Thorough Periodic

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover IntegralLocation of Process Tool RoomProcess(es) being controlled Jones Shipman GrinderHazardous substance(s) being controlled Steel, Resin & Grinding MediumNumber of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Smoke Test, Static Pressure Test,Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None.

Defects NOT affecting the level of control and particulars of any repairs or modifications required

None.

Other Observations

Please provide test holes for the measurement of PSI and PSO.

We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted to asafe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

Please provide the fan and motor technical data.

admin
Sticky Note
It is not located in a vastly populated area. We have never had one go off so far. Relocation outside is not possible due to theft and reduction in suction.

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 5 E35223002138

Please provide the filter efficiency data.

Capture effective up to 0.15m from the hood, which should be positioned accordingly during workactivities.

The following supporting documents, as indicated in HS(G)258 - Controlling Airborne Contaminants atWork, have not been witnessed and should be made readily available; Risk Assessment, CoSHHAssessment, Safety Data Sheet(s), Air Monitoring/Sampling Report(s), Commissioning Report, UserManual and Logbook.

Condition at Time of Test Normal. (Process stood down)

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Cloth FabricCollector Type Metal TrayEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-2306 -2325 19

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )TP 1 Duct 0.08 -2306

TP 2 Hood Face 0.08 x 0.08 -1517 16.89 0.11

admin
Sticky Note
This is available should they ask

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 5 E35223002138

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )See additional cover forsystem diagram

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACE EM 047Rotating Vane Anemometer Not UsedOther N/A

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 4 of 5 E35223002138

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 5 of 5 E35223002138

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH

E35223001800

30-MAR-2010

30-SEP-2010

Allen, Andrew

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 528-SEP-2010

Type of Inspection Thorough Periodic

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover IntegralLocation of Process Tool RoomProcess(es) being controlled Jones Shipman GrinderHazardous substance(s) being controlled Steel, Resin & Grinding MediumNumber of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Smoke Test, Static Pressure Test,Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None.

Defects NOT affecting the level of control and particulars of any repairs or modifications required

None.

Other Observations

We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted to asafe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

Please provide the fan and motor technical data.

Please provide the filter efficiency data.

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 5 E35223001800

Capture effective up to 0.15m from the hood, which should be positioned accordingly during workactivities.

The following supporting documents, as indicated in HS(G)258 - Controlling Airborne Contaminants atWork, have not been witnessed and should be made readily available; Risk Assessment, CoSHHAssessment, Safety Data Sheet(s), Air Monitoring/Sampling Report(s), Commissioning Report, UserManual and Logbook.

Condition at Time of Test Normal. (Process stood down)

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Cloth FabricCollector Type Metal TrayEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-2260 -2306 46

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )TP 1 Duct 0.08 -2260

TP 2 Hood Face 0.08 x 0.08 -1446 16.58 0.11

See additional cover forsystem diagram

admin
Sticky Note
This is available should he ask for it.

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 5 E35223001800

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACE EM 047Rotating Vane Anemometer Not UsedOther N/A

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 4 of 5 E35223001800

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 5 of 5 E35223001800

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH

E35223001448

21-SEP-2009

01-APR-2010

Allen, Andrew

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 530-MAR-2010

Type of Inspection Thorough Periodic

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover IntegralLocation of Process Tool RoomProcess(es) being controlled Jones Shipman GrinderHazardous substance(s) being controlled Steel, Resin & Grinding MediumNumber of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Smoke Test, Static Pressure Test,Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None.

Defects NOT affecting the level of control and particulars of any repairs or modifications required

None.

Other Observations

We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted to asafe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

Please provide the fan and motor technical data.

Please provide the filter efficiency data.

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 5 E35223001448

Capture effective up to 0.15m from the hood, which should be positioned accordingly during workactivities.

The following supporting documents, as indicated in HS(G)258 - Controlling Airborne Contaminants atWork, have not been witnessed and should be made readily available; Risk Assessment, CoSHHAssessment, Safety Data Sheet(s), Air Monitoring/Sampling Report(s), Commissioning Report, UserManual and Logbook.

Condition at Time of Test Normal. (Process stood down)

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Cloth FabricCollector Type Metal TrayEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-2304 -2341 37

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )TP 1 Duct 0.08 -2304

TP 2 Hood Face 0.08 x 0.08 -1277 16.60 0.11

See additional cover forsystem diagram

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 5 E35223001448

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACE EM 047Rotating Vane Anemometer Not UsedOther N/A

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 4 of 5 E35223001448

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 5 of 5 E35223001448

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Date of previous examination and tests

Location

Contract No.Policy No. Report No.

Name of User

005

Date of commencement of examination and tests

Date of Report

Engineer Surveyor

Competent PersonAllianz Engineering

+44 (0) 1428 722407UK Tel:ROI Tel: +00353 (0) 1 613 4081

V810b

Local Exhaust Ventilation Plant Report

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE

NV09796703

TROY HOUSE, 2 HOLBROOK AVENUE, HOLBROOK,SHEFFIELD, S20 3FH

E35223001087

17-MAR-2009

25-SEP-2009

Allen, Andrew

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom.Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator.

www.allianzengineering.co.uk

Health & Safety at Work etc. Act 1974

Side 1 of 321-SEP-2009

Type of Inspection Thorough Periodic

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032Manufacturer Dust Extraction LtdSerial Number 59190Location of Air Mover IntegralLocation of Process Tool RoomProcess(es) being controlled Jones Shipman GrinderHazardous substance(s) being controlled Steel, Resin & Grinding MediumNumber of Extraction Points 1Maximum number that can be used at one time 1Exhaust air returned to WorkplacePrimary filter fitted YesSecondary filter fitted No

Visual Assessment of the level of control SatisfactoryAir Sampling Results We recommend the return air be monitored to

ensure that it is not above the set limits for thecontaminants.

Tests Undertaken Visual, Smoke Test, Static Pressure Test,Velocity Measurements

Defects AFFECTING the level of control and particulars of any repairs or modifications required

None.

Defects NOT affecting the level of control and particulars of any repairs or modifications required

Contaminant dust is present on the clean side of the filter housing. Investigation as to the cause should becarried out and the dusts cleaned away in order to prevent them being exhausted back to the workplace.

Other Observations

We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted to asafe place in the open air. Where this is not possible then consideration should be given to the fitting ofexplosion deflector plates or the re-siting of the collector unit. In no case should it be discharged intooccupied workrooms or areas containing combustible materials.

Please provide the fan and motor technical data.

Please provide the filter efficiency data.

admin
Sticky Note
27/11/2009 Jim advised job 337 completed 24/02/2010 Jim advised job completed

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 2 of 3 E35223001087

Capture effective up to 0.15m from the hood, which should be positioned accordingly during workactivities.

Condition at Time of Test Normal. (Process stood down)

Fan Details

Manufacturer Dust Extraction LtdSerial NumberType CentrifugalRotation (viewed from drive end) Anti-clockwise

mØSize 0.4Volume Flow m s3 -1

Speed rpm

Motor Details

Manufacturer Not MarkedSerial no.Speed rpmPower kW

Primary Filter

Medium Cloth FabricCollector Type Metal BinEfficiency %

Secondary Filter

MediumCollector TypeEfficiency %

Details of Test Results

Primary filter inlet Pressure(Pa)

Primary filter outlet Pressure(Pa)

Pressure Difference(Pa)

-1284 -2234 950

-13

Test Point and Type Size Results of Inspection

Duct / Face / PointHood / Duct

Size(m)

StaticPressure

(Pa)

Face / DuctVelocity(ms )

Point No.-1

VolumeFlow

(m s )PS1 Duct 0.08 -1284

PS2 Hood Face 0.08 x 0.08 -681 11.91 0.08

Report No.

V810b

Local Exhaust Ventilation Plant Report

Health & Safety at Work etc. Act 1974

Side 3 of 3 E35223001087

Calibrated Test Equipment Details

Thermal Anemometer 120622Electronic Manometer ACE EM 047Rotating Vane Anemometer Not UsedOther N/A

Examination carried out on behalf of:Client NameAddress

This report shall not be reproduced without the approval of Allianz Engineering and the client for whom it was produced.

CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARETROY HOUSE2 HOLBROOK AVENUEHOLBROOKSHEFFIELDS20 3FH

Local Exhaust Ventilation Plant Report Health & Safety at Work etc. Act 1974

Allianz

Name of User: CARRS OF SHEFFIELD LTD T/AS CARRS SILVERWARE Policy Number: NV09796703

Contract Number:Location: TROY HOUSE, 2 HOLBROOK

AVENUE, HOLBROOK, SHEFFIELD, S20 3FH

Report Number: E35223000716

Type of Inspection Thorough Periodic

Regulations Applicable Regulation 9 of COSHH

Identification of LEV Plant and Process

Plant Number LEV032

Manufacturer Dust Extraction Ltd

Serial Number 59190

Location of Air Mover Integral

Location of Process Tool Room

Process(es) Being Controlled Jones Shipman Grinder

Hazardous Substance(s) Being Controlled Steel, Resin & Grinding Medium

Number of Extraction Points 1

Maximum Number that can be used at one time 1

Exhaust air Returned to Workplace

Primary Filter Fitted Yes

Secondary Filter Fitted NoVisual Assessment of the level of control

Satisfactory

Air Sampling Results We recommend the return air be monitored to ensure that it is not above the set limits for the contaminants.

Tests Undertaken Visual, Smoke Test, Static Pressure Test, Velocity Measurements

Defects AFFECTING the level of control

None.Defects NOT affecting the level of control

Contaminant dust is present on the clean side of the filter housing. Investigation as to the cause should be carried out and the dusts cleaned away in order to prevent them being exhausted back to the workplace. Other Observations We note that the dust collector unit is fitted with explosion relief facility. This facility should be ducted to a safe place in the open air. Where this is not possible then consideration should be given to the fitting of explosion deflector plates or the re-siting of the collector unit. In no case should it be discharged into occupied workrooms or areas containing combustible materials. Please provide the fan and motor technical data. Please provide the filter efficiency data. Capture effective up to 0.15m from the hood, which should be positioned accordingly during work activities.Condition at Time of Test Normal. (Process stood down) Fan Details

Manufacturer Dust Extraction Ltd

Serial Number

Type Centrifugal

Rotation (Viewed from Drive End) Anti-clockwise

Size Ø 0.4 m

Page 1 of 2Local Exhaust Ventilation Plant Report

16/04/2009https://www.eservices-allianzengineering.co.uk/eServices/interface/Reports/...

Details of Results

Calibrated Test Equipment

Allianz Engineering, Head Office, Haslemere Road, Liphook, Hampshire, GU30 7UN, United Kingdom. Allianz Engineering Inspection Services Ltd. Registered in England Number: 5441840. Registered Office: 57 Ladymead, Guildford, Surrey, GU1 1DB, United Kingdom.

Allianz plc, Allianz House, Elmpark, Merrion Road, Dublin 4, Republic of Ireland. Allianz plc trading as Allianz is regulated by the Irish Financial Regulator. Registered in Ireland number 143108.

www.allianzengineering.co.uk

Volume flow m3s-1

Speed rpm

Motor Details

Manufacturer Not Marked

Serial Number

Speed rpm

Power kW

Primary Filter

Medium Cloth Fabric

Collector Type Metal Bin

Efficiency %

Secondary Filter

Medium

Collector Type

Efficiency %

Primary filter inlet Pressure (Pa)

Primary filter outlet Pressure (Pa)

Pressure Difference (Pa)

-781 -2208 1427

Test Point Type and Size Results of Inspection

Point Number

Duct/Face/Point Hood/Duct Size (m)

Static Pressure

(Pa)

Face/Duct Velocity (ms-1)

Volume Flow

(m3s-1)PS1 Duct 0.08 -781 PS2 Hood Face 0.08 x 0.08 10.12 0.06

Thermal Anemometer Rotating Vane Anemometer 120622 Not UsedElectric Manometer Other ACE EM 047 N/A

Client's Report Notes [These notes DO NOT form part of the Allianz Inspection Report]

Date of previous examination 12/09/2008Competent Person

Date of completion of examination and tests 17-Mar-2009 Allianz Engineering

Date of Report 17-Mar-2009 UK Tel: +44 (0) 1428 722407 ROI Tel: +00353 (0) 1 613 4081

Engineer Surveyor A. Allen

This is an electronically produced copy of an original report held on the AllianzEngineering computer database called FACE

Page 2 of 2Local Exhaust Ventilation Plant Report

16/04/2009https://www.eservices-allianzengineering.co.uk/eServices/interface/Reports/...

admin
Note
Added to HS Job 337. Given to Marc 17/03/2008
admin
Note
20/09/07 Advised Mick Chapman to clean
admin
Note
Added to H & S Job 262 30/11/06 JIm advised job completed