    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    Reference: PE/ICM/APP/0255 Version: 01.04/EN Date of issue: 16/06/99

    This confidential document is the property of NORTEL MATRA CELLULAR and may not be copied or circulated without permission

  • 7/27/2019 Low Noise Dacs

    2/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 2

    CONTENTS

    1. INTRODUCTION ......................................................................................................................4

    1.1. OBJECT............................................................................................................................................4

    1.2. SCOPE..............................................................................................................................................4

    2. RELATED DOCUMENTS........................................................................................................4

    2.1. REFERENCE DOCUMENTS..........................................................................................................4

    2.2. APPLICABLE DOCUMENTS ........................................................................................................4

    3. ABBREVIATIONS AND TERMS............................................................................................5

    3.1. ABBREVIATIONS..........................................................................................................................5

    3.2. TERMS.............................................................................................................................................5

    4. PREREQUISITES......................................................................................................................6

    5. RESOURCES..............................................................................................................................6

    5.1. HUMAN RESOURCES ...................................................................................................................6

    5.2. HARDWARE TOOLS .....................................................................................................................6

    5.3. SOFTWARE TOOLS.......................................................................................................................6

    5.4. INSTALLATION SUPPLIES ..........................................................................................................6

    6. SAFETY.......................................................................................................................................7

    6.1. STAFF SAFETY ..............................................................................................................................76.2. EQUIPMENT SAFETY ...................................................................................................................7

    7. STRATEGY OF INSTALLATION..........................................................................................8

    8. IMPACTS ON THE NETWORK .............................................................................................8

    9. QUALITY CONTROL ..............................................................................................................8

    10. SEQUENCE OF OPERATIONS...............................................................................................8

    Z END OF DOCUMENTY ..........................................................................................................33

  • 7/27/2019 Low Noise Dacs

    3/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 3

    SHEETS

    SHEET S1 Hardware checks .........................................................................................9

    SHEET S2 Site status checks ......................................................................................10

    SHEET S3 Site shutdown............................................................................................11

    SHEET S4 Cabinet power off......................................................................................13

    SHEET S5 Equipment removing.................................................................................14

    SHEET S6 Ambient air thermistor installation ...........................................................15

    SHEET S7 New equipments installation.....................................................................16

    SHEET S8 Cabinet power up ......................................................................................18

    SHEET S9 Site return in service .................................................................................19SHEET S10 Final checks...............................................................................................20

    APPENDICES

    Appendix 1 Kit components .....................................................................................................21

    Appendix 2 Font view of the cabinet ........................................................................................22

    Appendix 3 AC box general view.............................................................................................23

    Appendix 4 Battery cabinet.......................................................................................................26

    Appendix 5 Thermistor installation ..........................................................................................27

    Appendix 6 Control board ........................................................................................................29

    Appendix 7 View of the ambient thermistor final installation .................................................30

    Appendix 8 Report sheet...........................................................................................................31

  • 7/27/2019 Low Noise Dacs

    4/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 4

    1. INTRODUCTION

    1.1. OBJECT

    This document describes the acoustic noise reduction kit installation on a S8000

    outdoor BTS.

    1.2. SCOPE

    This operation may be performed only on any S8000 outdoor BTS equipped with the

    climatic system DACS. The BTS is equipped with BCF or CBCF.

    2. RELATED DOCUMENTS

    2.1. REFERENCE DOCUMENTS

    None

    2.2. APPLICABLE DOCUMENTS

    All PE/ICM documents listed below are Core I&C Methods product documents.

    These documents must be available on site at the latest version (refer to the project

    documentation status list). On a given project some of those documents may be replaced by other project

    specific ones (refer to the report sheet that indicates for each document which

    reference is applicable).

    For the document phased with the system release, refer to the report sheet thatindicates for each document which reference is applicable.

    All applicable documents are referenced in the report sheet.

    [A1] Site preparation and installation document : Project document

    [A2] Packing list : Project document

    [A3] V8 OMC-R operations called by I&C procedures : PE/ICM/APP/0071

    Or V9 OMC-R operations called by I&C procedures : PE/ICM/APP/0144

    Or V10 OMC-R operations called by I&C procedures : PE/ICM/APP/0188

    Or V11 OMC-R operations called by I&C procedures : PE/ICM/APP/0218

  • 7/27/2019 Low Noise Dacs

    5/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 5

    3. ABBREVIATIONS AND TERMS

    3.1. ABBREVIATIONS

    BCF : Base Common Function

    BTS : Base Transceiver Station

    CSWM : Control and switching matrix

    DACS : Direct Ambient Climatic System

    DRX : Low RF-power Driver and Receiver

    DSC : Data signaling concentrator

    GND : GrouND

    GTW : Gateway

    LED : Light emitting diode

    OMC : Operation & Maintenance center

    PA : Power Amplifier

    PCMI : Pulse code modulation interface

    PCU : Power Control Unit

    PSCMD : Power supply command

    SYNC : synchronization unit

    TX : Transmitter

    3.2. TERMS

    Installer Person in charge of the installation

    Coordinator Person in charge of coordinating the project installation

    Supervisor Person in charge to supervising a site installation

  • 7/27/2019 Low Noise Dacs

    6/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 6

    4. PREREQUISITES

    The use of this procedure requires the availability on site of :

    - The filled-out report sheet (See Appendix at the end of this document) which

    gives all required input data to apply the procedure.

    - All the applicable documents listed in paragraph 2.2.

    5. RESOURCES

    5.1. HUMAN RESOURCES

    - One OMC Technician on the OMC site.

    - One Installer on the BTS site ( two installers required for safety reasons if this is a

    roof-top or a site remotely located).

    5.2. HARDWARE TOOLS

    Description Comments

    Drilling machine wireless type

    Drills for metal Size : 3.5 mm - 6.5 mm

    Standard centre punch

    Screwdriver for phillips heads extra long blade (N 2, 250 mm)

    Hand riveters for 3 mm

    Five-tread stepladders

    Crimping pliers for insulated

    terminals

    Vacuum cleaner small type with batteries

    5.3. SOFTWARE TOOLSNone.

    5.4. INSTALLATION SUPPLIES

    Acoustic noise reduction kit : NTQA 97 AB.

    Adhesives rules to catch the cutting of metal.

  • 7/27/2019 Low Noise Dacs

    7/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 7

    6. SAFETY

    6.1. STAFF SAFETY

    Any operation on an outside site is forbidden in case of thunder storm, heavyrain or high wind.

    You must switch off the circuit-breaker at the operator AC interface, and disactivate

    the batteries before manipulating the power supply wiring of the AC box and of the

    rectifier shelf.

    The AC switch-off provokes the batteries discharge (the BTS remains powered with

    - 48V DC).

    If the batteries are internal, turn off the battery disconnect switch located above the

    rectifier shelf of the BTS cabinet to disactivate them.

    If there is a separate battery cabinet, turn off the DC circuit-breaker located at the

    bottom-left of the battery cabinet to disactivate them.

    6.2. EQUIPMENT SAFETY

    In case of rainy / snowy weather, do not open a cabinet without a tent set up

    beforehand. A tent specific to the S8000 Outdoor BTS cabinet is available.

    Never leave wet equipment inside the cabinet (tent, etc...).

    Initially powered, the S8000 BTS cabinet is operational during 3 hours door open at a

    temperature of -10C (~ 14F). Once this time is passed the door opening of the

    powered-up BTS cabinet is only possible with the use of an external heated shelter

    (use a tent and heaters).

    Be careful with the cutting of metal. Clean the DACS after the operation of drilling.

    WARNING:

    When the blowers are switched off, it is mandatory to wait a complete stop before

    attempting to restart. In practice this means ensuring a period od least 30 second after

    switch off before switching back on.

  • 7/27/2019 Low Noise Dacs

    8/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 8

    7. STRATEGY OF INSTALLATION

    The installation of the noise reduction kit may be performed on a DACS in a

    warehouse. The working condition is better. In this case only the replacement of the

    DACS is achieved on site.

    8. IMPACTS ON THE NETWORK

    During the installation of the kit on site, the cabinet is not operational.

    These operations must be performed at the appropriate time, to limit call attempt

    failures from the network subscribers.

    Duration of site unavailability is estimated at 1.5 hours in the worst case.

    9. QUALITY CONTROL- All cases of non-compliance must be recorded as they are observed and

    recapitulated clearly on the report sheet.

    - For any corrective action refer to the coordinator.

    10. SEQUENCE OF OPERATIONS

    The sequence of operations is given by the report sheet.

  • 7/27/2019 Low Noise Dacs

    9/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 9

    SHEET S1 Hardware checks

    INITIAL STATUS:

    The site is operational.

    ACTIONS:

    The installers inspect the premises in order to check that they comply with [A1] Site

    preparation and installation document.

    The following operations have to be performed:

    1. Upon arrival, read the safety guidelines specific to the site.

    2. Check that the number of units for each kind of items corresponds to the operation to beperformed (refer to [A2] Packing listand Appendix 1 for the kit).

    3. Unpack each item.

    4. Fill in the report sheet.

    FINAL STATUS:

    The hardware equipment delivered complies with the operations.

  • 7/27/2019 Low Noise Dacs

    10/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 10

    SHEET S2 Site status checks

    INITIAL STATUS:

    The S8000 outdoor BTS is on line.

    ACTIONS:

    1. Set up a phone link with the OMC technician and inform him that alarms will appearwhen opening the base radio cabinet front doors.

    2. Open the base radio cabinets front doors.

    3. Visually check the operating status of the site (see Appendix 2).

    LEDs on BCF front face:

    active CSWM: "RDY" and "ON" green LEDs on,

    passive CSWM: "RDY" green LED on but "ON" LED off,

    active GTW: "ON" green LED is on,

    active SYNC: "MASTER" green LED is on,

    no alarm on any SYNC or PCMI (if a PCMI card is connected to only one externalPCM, a NOS alarm will illuminate a red LED on its front face).

    LEDs on CBCF front face:

    both CMCF : "+5V", "RDY" and "RUN" green LEDs on,

    active CMCF: "ABIS" and "ON" green LEDs on,

    no alarm on any CPCMI (if a CPCMI card is connected to only one external PCM, aNOS alarm will illuminate a red LED on its front face).

    LEDs on radio module front face:

    each DRX has the "+5V" and "DRX" green LEDs on.

    each PA has the "ALARM" LED green.

    FINAL STATUS:

    The OMC technician and the commissioner have performed the initial checks.

  • 7/27/2019 Low Noise Dacs

    11/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 11

    SHEET S3 Site shutdown

    INITIAL STATUS:

    The site is in service

    ACTIONS:

    There are three possible network configurations. See Figure 1:

    BTS

    DTI0

    TEI 0

    DTI1

    BSC BTS

    DTI0

    TEI 1

    DTI1

    BTS

    DTI0

    TEI 2

    DTI1

    BTS

    DTI0

    TEI 3

    DTI1

    chained BTS

    BTS

    DTI0

    TEI 0

    DTI1

    BSC BTS

    DTI0

    TEI 1

    DTI1

    BTS

    DTI0

    TEI 2

    DTI1

    BTS

    DTI0

    TEI 3

    DTI1

    looped BTS

    BTS

    DTI0

    TEI 0

    DTI1

    BSC star BTS

    Figure 1: Network configurations

    1. Ask the OMC-R technician to interrupt the BTS traffic by performing a soft shutdown,see SheetLO2

    If the BTS is chainedor looped :

    2. Ask the OMC-R technician to interrupt the traffic of each dropped BTS by performing asoft shutdown, see SheetLO2.

    3. Remove the blue straps on the PCMI or CPCMI board and make a short circuit as shownbelow.

  • 7/27/2019 Low Noise Dacs

    12/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 12

    XL

    LP

    RL

    XL

    LP

    RL

    4. Ask the OMC-R technician to make the formerly shutdown BTSs return to service, seeSheetUN2.

    FINAL STATUS:

    The site is interrupted to traffic and the initial cabinets are still powered on.

  • 7/27/2019 Low Noise Dacs

    13/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 13

    SHEET S4 Cabinet power off

    INITIAL STATUS:

    The site is shutdown

    ACTIONS:

    1. If necessary, open the cabinet doors.

    2. Only for the base cabinet, turn off the PSCMD to power off the BCF ( see Appendix 2).

    3. Turn off each power amplifier and each F-type converter, ( see Appendix 2).

    4. With internal batteries : turn off the battery disconnect switch above the rectifiers, ( seeAppendix 2).

    With battery cabinet : open the doors, turn off the DC breaker, Appendix 4.

    5. On the AC box turn off the following circuit breaker, see Appendix 3 :

    - Main circuit,

    - Climatic system,

    - Rectifier

    6. Turn off the site breaker dedicated in the AC distribution customer box.

    FINAL STATUS:

    The cabinet is powered off.

  • 7/27/2019 Low Noise Dacs

    14/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 14

    SHEET S5 Equipment removing

    INITIAL STATUS:

    The cabinet is powered off

    ACTIONS:

    1. Unlock the cabinet hood and open the hood to its vertical position.

    2. Remove filter cover plate and lid of the DACS.

    3. Disconnect the yellow/green cable on the lid of the DACS.

    4. Remove the transparent cover over the board.

    5. Remove the lid from the cable way at rear of the blower.

    6. Cut the cable ties.

    7. Unplug the blower cables from the control board ( connectors P4A and P4B)

    8. Undo the four screws around the flange of the blower A and remove the blower.

    9. Undo the four screws around the flange of the blower B and remove the blower.

    10. Disconnect all other plugs to the control board (connectors P1, P2, P3, P5 and P6).

    11. Sequentially release the plastics standoffs supporting the control board ( by depressing thetop end of the standoffs) and remove the board.

    FINAL STATUS:

    The control board and the blowers are removed.

  • 7/27/2019 Low Noise Dacs

    15/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 15

    SHEET S6 Ambient air thermistor installation

    INITIAL STATUS:

    The control board and the blowers are removed.

    ACTIONS:

    See the Appendix 5 and Appendix 7.

    1. Remove the filter DACS.

    2. Place the hole template in position.

    3. Mark the four holes through plate ( 3 on horizontal, 1 on vertical).

    4. Remove the hole template.

    5. Drill holes to diameters shown.

    6. Remove the cutting of metal.

    7. Fit grommets supplied to 6.5 DIA holes ( quantity 2).

    8. Push the thermistor through grommet A.

    9. Push the thermistor through grommet B.

    10. Do not attach plug to connector P7 at this time.

    11. Allow sufficient lead under fin block plate to attach thermistor to bracket.

    12. Push the thermistor probe into grommet on bracket.

    13. Push the wire into the clip on bracket.

    14. Position the bracket under the front top channel and rivet it ( two rivets).

    15. Pull excess thermistor cable back through grommet A and B.

    FINAL STATUS:

    The ambient thermistor is installed in the DACS.

  • 7/27/2019 Low Noise Dacs

    16/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 16

    SHEET S7 New equipments installation

    INITIAL STATUS:

    The ambient thermistor is installed in the DACS.

    ACTIONS:

    1. Screw the replacement blowers into place using the eight screws.

    2. Mount the new board onto the plastic standoffs, ensuring that the LEDs are towards thetop of the DACS.

    3. Check the position of the micro-switch [SW1] on the board is in compliance with thephoto below.

    First board version

    SW1

    Strap

    Second board version

    SW1

    OFF

    ON

    Position of the

    switch top

  • 7/27/2019 Low Noise Dacs

    17/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 17

    4. Insert plugs P1, P2, P3, P5, P6 and P7, see Appendix 6.

    WARNING: take care the correct way of the connecteurs.

    5. Plug blower A (left hand from front of unit) into P4A and blower B into P4B.

    6. Push all wire harnesses into the cable trunking in a tidy fashion.

    7. Clamp the cable in the cable trunking.

    8. Replace trunking cover.

    9. Replace the plastic cover over the board.

    10. Replace the filter.

    11. Replace the DACS lid and filter cover plate.

    12. Connect the yellow/green cable on the lid of the DACS.

    13. Check the DACS is tidy and clean.

    FINAL STATUS:

    The new equipments are installed.

  • 7/27/2019 Low Noise Dacs

    18/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 18

    SHEET S8 Cabinet power up

    INITIAL STATUS:

    The new equipments are installed.

    ACTIONS:

    1. For the cabinet, turn on :

    the site breaker dedicated.

    the climatic system breaker on the AC box.

    the rectifier breaker on the AC box (if necessary, check that the new rectifiers arepowered).

    2. If battery backup used, turn on :

    the internal battery switch above the rectifiers, if internal batteries used

    the DC breaker (left), if battery cabinet used

    3. Turn on :

    each F-type converter

    the PSCMD to power on the BCF only for the base cabinet.

    FINAL STATUS

    The cabinet is powered up.

  • 7/27/2019 Low Noise Dacs

    19/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 19

    SHEET S9 Site return in service

    INITIAL STATUS:

    The cabinet (s) is powered up.

    ACTIONS:

    1. Ask the OMC-R technician to interrupt the traffic of each dropped BTS by performing asoft shutdown, refer to SheetLO2.

    2. Remove the short circuit on the PCMI or CPCMI board and put the blue straps in theirs

    initial location.3. Ask the OMC technician to set all the site back to service, refer to Sheet UN2.

    4. Ask the OMC technician to unbar the Cells , and to enable the incomingHandover, seeSheet UN7.

    FINAL STATUS:

    The site is in service.

  • 7/27/2019 Low Noise Dacs

    20/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 20

    SHEET S10 Final checks

    INITIAL STATUS:

    The site is unlocked and enabled.

    ACTIONS:

    1. Stick the completed label on the DACS adjacent to the standard DACS identificationlabel.

    2. Close and lock the hood of each cabinet.

    3. Close and lock the doors of each cabinet.

    4. Ask the OMC technician to check no alarms are remaining.

    5. Fill up the Report Sheet (Appendix 8). Let one copy on site and send one copy to theCoordinator.

    6. All non compliance have to be physically spotted on site and recapitulated on the ReportSheet.

    7. For any corrective action refer to the Coordinator.

    8. Release the phone link with the OMC-R technician.

    9. Leave the premises clean and tidy.

    FINAL STATUS:

    The acoustic noise reduction kit is installed.

    The site is fully operational

  • 7/27/2019 Low Noise Dacs

    21/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 21

    Appendix 1 Kit components

    Item Quantity by kit

    Blower DDC 0-10V Input 2

    Thermistor assy 1

    Thermistor bracket 1

    Clamp plastic 1

    Control assy 1

    Grommet PVC 6.4mm 2

    Standoff PCB 4

    Rivet pop steel 4

    Hole template 1

    Support plate 1

    Yellow insulated terminal 3

  • 7/27/2019 Low Noise Dacs

    22/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 22

    Appendix 2 Font view of the cabinet

    User

    PA location DRX location

    Battery box

    GND bar

    Hood

    Gas spring

    1 2 AC Box

    Compartment

    6U

    Open-hood EM sensor

    DACS

    BCF location

    Type F converters

    Battery disconnectionswitch

  • 7/27/2019 Low Noise Dacs

    23/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 23

    Appendix 3 AC box general view

    Climatic system circuit breaker(blue)

    Fuse for indicator light

    Main AC power indicator light

    Main circuit breaker

    Alarm return to ALCO board

    Fuse for mains plugs

    Two mains plugs

    Rectifier circuit breaker

    AC power to rectifiers

    Ground

    Cover

    AC voltage to climatic systemand heaters

    AC lightning protector

    (green)

    (red)

    (blue)

    Figure A : Single-phased AC box

  • 7/27/2019 Low Noise Dacs

    24/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 24

    Two mains plugs

    Fuse for mains plugs

    AC voltage to climatic systemand heaters

    Climatic system circuit breaker(blue)

    Fuse for indicator light

    main AC power indicator light

    Main circuit breaker

    Alarm return to ALCO board

    Rectifier circuit breaker

    AC power to rectifiers

    Ground

    AC lightning protector

    (blue)

    (red)

    (green)

    Figure B : Split single-phased AC box

  • 7/27/2019 Low Noise Dacs

    25/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 25

    Alarm return to ALCO board

    ACU0 circuit breaker

    ACU1 circuit breaker(not used)

    General stop button

    Mains plugs circuit breaker

    Rectifier circuit breaker

    Ground

    AC lightning protector

    AC voltage to rectifiers

    AC voltage to climatic systemand heaters

    Cover

    Two mains plugs

    Figure C : Tri-phased AC box

  • 7/27/2019 Low Noise Dacs

    26/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 26

    Appendix 4 Battery cabinet

    +

    +

    -- +

    - + -

    +

    +

    -- +

    - + -

    +

    +

    -- +

    - + -

    +

    +

    --

    - + -

    +

    Bleu

    Battery compartment

    Battery compartment

    Battery compartment

    Battery compartment

    DCpanel

    Heating and

    ventilation unit

    ACpanel

    Black

    Groundterminal block

    DCbreaker

    HVUbreaker

    Blue

    -48Vterminal block

    Plinth

    ACbreaker

  • 7/27/2019 Low Noise Dacs

    27/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 27

    Appendix 5 Thermistor installation

    m : location of the hole with the template

    Control board

    Front of the DACS

    3.5 dia

    6.5 dia

    Hole template

    6.5 dia

    6.5 dia

    Top view

    To handrail for

    the hole template

  • 7/27/2019 Low Noise Dacs

    28/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 28

    n Installation of the thermistor in the DACS

    Control board

    Front of the DACS

    Thermistor

    Top view

    Gromet "A" Gromet "B"

    o Lateral view of the installation of the thermistor on its support

    Grommet

    Thermistor

  • 7/27/2019 Low Noise Dacs

    29/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 29

    Appendix 6 Control board

    Control board

    P3

    P2

    P1 P7

    P6

    P5

    P4B

    P4A

    P1 : Cabinet air temperatureP2 : AC supplies

    P3 : DC supplies

    P4A : Blower A

    P4B : Blower BP5 : Damper motor drive

    P6 : Alarms and filter clog switch

    P7 : Ambient air thermistor

  • 7/27/2019 Low Noise Dacs

    30/33

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 30

    Appendix 7 View of the ambient thermistor final installation

    Hole with 6.5 dia.

    Ambient thermistor

    Rivets

  • 7/27/2019 Low Noise Dacs

    31/33

    PROJECT:............................

    SITE NAME:.......................

    FOLIO /.....

    RECORD:...................

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 31

    Appendix 8 Report sheet

    The following parts MUST be filled by the coordinator before the site operation.

    Applicable documents: (new documents may be added) Reference

    Project documentation plan : ..............................

    [A1] Site preparation and installation : Project document

    [A2] Packing list : Project document

    [A3] V_ OMC-R operations called by I&C procedures : PE/ICM/APP/00__

    :

    :

    ....................................................... : ..............................

    Note: Default Core methods reference are given in Applicable Documents paragraph.

    Input parameters: (new parameters may be added)

    Network type: GSM 900 Y GSM 1800 Y

    GSM 1900Y

    System release: ..........................

    BTS type: .............. BTS configuration: ..........................

    Type of connection of the BTS : StarY

    ChainedY

    LoopedY

    ....................................................... .......................................................

    ....................................................... .......................................................

    ....................................................... .......................................................

  • 7/27/2019 Low Noise Dacs

    32/33

    PROJECT:............................

    SITE NAME:.......................

    FOLIO /.....

    RECORD:...................

    This confidential document is the property of NORTEL MATRA CELLULAR and should not be copied or circulated without permission.

    S8000 OUTDOOR : NOISE REDUCTION KIT IN DACS INSTALLATION

    PE/ICM/APP/0255 VERSION 01.04/EN OF 16/06/99Page 32

    In the action following chart, To Use? column MUST be filled by the coordinator before the site

    operation.

    Action Condition To USE? Sheet SITE Sheet OMC OK NOK

    Hardware checks ; . S1

    Site status checks;

    . S2

    Site shutdown ; . S3 LO2, UN2

    Cabinet power off;

    . S4

    Equipment removing;

    . S5

    Ambient air thermistor

    installation

    ;

    . S6

    New equipments

    installation

    ;

    . S7

    Cabinet power up;

    . S8

    Site return in service;

    . S9 LO2, UN2

    UN7,

    Final checks;

    . S10

  • 7/27/2019 Low Noise Dacs

    33/33

    PROJECT:............................

    SITE NAME:.......................

    FOLIO /.....

    RECORD:...................

    The following parts MUST be filled by the commissioner during the site operation.

    Additional results:

    Base cabinet : Serial Number:..............

    Extension 1 cabinet : Serial Number:..............

    Extension 2 cabinet : Serial Number:..............

    Comments:

    Sign off :

    Coordinator Commissioner Customer representative

    Company name

    Functions

    Name

    Signature

    Date