Government of the District of Columbia Vincent C. Gray, Mayor MAYOR’S TASK FORCE ON THE PREVENTION OF FLOODING IN THE BLOOMINGDALE /LeDROIT PARK TECHNICAL COMMITTEE Technical Committee Bloomingdale / LeDroit Park Proposed Improvements October 31, 2012 1

Upload: others

Post on 22-Aug-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN … · Government of the District of Columbia Vincent C. Gray, Mayor MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN THE

Government of the District of Columbia Vincent C. Gray, Mayor

MAYOR’S TASK FORCE ON THE PREVENTION OF FLOODING IN THE BLOOMINGDALE /LeDROIT PARK TECHNICAL COMMITTEE

Technical Committee

Bloomingdale / LeDroit Park Proposed Improvements

October 31, 2012

1

Page 2: MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN … · Government of the District of Columbia Vincent C. Gray, Mayor MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN THE

Government of the District of Columbia Vincent C. Gray, Mayor

MAYOR’S TASK FORCE ON THE PREVENTION OF FLOODING IN THE BLOOMINGDALE/LeDROIT PARK TECHNICAL COMMITTEE

Agenda

• Design Team

• Proposed Improvements

• Schedule

• Community Engagement

• Questions

2

Page 3: MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN … · Government of the District of Columbia Vincent C. Gray, Mayor MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN THE

Government of the District of Columbia Vincent C. Gray, Mayor

MAYOR’S TASK FORCE ON THE PREVENTION OF FLOODING IN THE BLOOMINGDALE/LeDROIT PARK TECHNICAL COMMITTEE

Design Team

DDOT

Rajan Mahima Associates

Low Impact Development Center

AB Consultants, Inc.

LimnoTech

Nspiregreen

(via Capitol Engineers)

• Project Manager: Rajan Mahima Associates

• Subs:

• Low Impact Development Center (LIDC)—Conducting the low impact development design

• AB Consultants, Inc.– conducting the survey work

• LimnoTech—conducting the modeling

• Community Outreach: Nspiregreen LLC

Page 4: MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN … · Government of the District of Columbia Vincent C. Gray, Mayor MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN THE

Government of the District of Columbia Vincent C. Gray, Mayor

MAYOR’S TASK FORCE ON THE PREVENTION OF FLOODING IN THE BLOOMINGDALE/LeDROIT PARK TECHNICAL COMMITTEE

Proposed Improvement Options Florida Ave NW—500 Block

4

Page 5: MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN … · Government of the District of Columbia Vincent C. Gray, Mayor MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN THE

Government of the District of Columbia Vincent C. Gray, Mayor

MAYOR’S TASK FORCE ON THE PREVENTION OF FLOODING IN THE BLOOMINGDALE/LeDROIT PARK TECHNICAL COMMITTEE

Proposed Improvement Options • Convert Existing Single Basin to Double Catch Basin

• Install two new Double Catch Basins on the north side of Florida Avenue

• Install a new Single Grate Inlet on the south side of Florida Avenue, NW (500 Block)

Challenges

• Insufficient space to protect against overflows.

5

Page 6: MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN … · Government of the District of Columbia Vincent C. Gray, Mayor MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN THE

Government of the District of Columbia Vincent C. Gray, Mayor

MAYOR’S TASK FORCE ON THE PREVENTION OF FLOODING IN THE BLOOMINGDALE/LeDROIT PARK TECHNICAL COMMITTEE

6

Project Area

Page 7: MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN … · Government of the District of Columbia Vincent C. Gray, Mayor MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN THE

Government of the District of Columbia Vincent C. Gray, Mayor

MAYOR’S TASK FORCE ON THE PREVENTION OF FLOODING IN THE BLOOMINGDALE/LeDROIT PARK TECHNICAL COMMITTEE

7

Project Area – Rhode Island Avenue

Page 8: MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN … · Government of the District of Columbia Vincent C. Gray, Mayor MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN THE

Government of the District of Columbia Vincent C. Gray, Mayor

MAYOR’S TASK FORCE ON THE PREVENTION OF FLOODING IN THE BLOOMINGDALE/LeDROIT PARK TECHNICAL COMMITTEE

Proposed Improvement Options • Install underground detention under the median within the 100 block of Rhode Island Avenue &

1st Street, NW

• Install Bioretention Cells at Rhode Island Avenue & T Street, N.W.

• Expand the Tree Boxes along

– U Street, NW between 1st and 2nd Street, & between North Capitol Street and 1st Street

– T Street, NW between North Capitol Street and 1st Street

Challenges

• Insufficient space to protect against overflows.

• Avoid ponding Sewage in open space during receding period

8

Page 9: MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN … · Government of the District of Columbia Vincent C. Gray, Mayor MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN THE

Government of the District of Columbia Vincent C. Gray, Mayor

MAYOR’S TASK FORCE ON THE PREVENTION OF FLOODING IN THE BLOOMINGDALE/LeDROIT PARK TECHNICAL COMMITTEE

9

Proposed Improvements Options Potential Green/ Gray Infrastructure Solutions

1st Street Section

Page 10: MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN … · Government of the District of Columbia Vincent C. Gray, Mayor MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN THE

Government of the District of Columbia Vincent C. Gray, Mayor

MAYOR’S TASK FORCE ON THE PREVENTION OF FLOODING IN THE BLOOMINGDALE/LeDROIT PARK TECHNICAL COMMITTEE

Permeable paving is an alternative to traditional

pavements. It uses a number of materials that will

allow water to pass through the riding surface and

pass to an underdrain or in to the soil . It can help to

reduce runoff and can help to filter pollutants from

water. Not only will these surfaces allow water to

pass through but they can also be strong enough to

hold the weight of a vehicle.

10

Proposed Improvement Options Proposed Materials

Page 11: MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN … · Government of the District of Columbia Vincent C. Gray, Mayor MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN THE

Government of the District of Columbia Vincent C. Gray, Mayor

MAYOR’S TASK FORCE ON THE PREVENTION OF FLOODING IN THE BLOOMINGDALE/LeDROIT PARK TECHNICAL COMMITTEE

Schedule

11

• Florida Avenue – Survey: Sept. 24 – Oct 5 - Completed – Design: Oct. 8 – Oct. 18 - Completed – Construction: November 1 – 30

• Rhode Island Avenue – Survey: Oct. 4 – 11 – Completed – Geotech Oct. 8 – 12 – New Completion date: Nov. 15 – Design Oct. 15 – Nov 16 - New Completion date: Nov. 30 – Fabrication Nov. 19 – Nov. 23 - New Completion date: Dec. 7 – Construction Nov. 26 – March. 31 - TBA

Note: this requires expedited removal and approval permits from DDOT, DCRA and DDOE.

Construction could possibly begin earlier in areas where are increasing the size of the catch basins

Page 12: MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN … · Government of the District of Columbia Vincent C. Gray, Mayor MAYOR’S TASK FORE ON THE PREVENTION OF FLOODING IN THE

Government of the District of Columbia Vincent C. Gray, Mayor

MAYOR’S TASK FORCE ON THE PREVENTION OF FLOODING IN THE BLOOMINGDALE/LeDROIT PARK TECHNICAL COMMITTEE

Questions