ncsx ncsx preliminary design review ‒ october 7-9, 2003 g. oliaro 1 g. oliaro - wbs 5 central...
TRANSCRIPT
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 1
NCSX
G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls
Princeton Plasma Physics Laboratory
NCSX PDR
Princeton NJ 08543
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 2
NCSX
WBS 5 Project Elements
• WBS 5 will provide a computing and controls infrastructure for integrated NCSX operations.
• Includes distributed data acquisition, central controls, timing & shot cycle control, master control, real-time control systems, and central safety interlocks.
– WBS 51 TCP/IP network Infrastructure
– WBS 52 Central I&C
– WBS 53 Diagnostic Data Acquisition and Facility Computing
– WBS 54 Facility Timing and Synchronization
– WBS 55 Real Time Plasma and Power Supply Control System
– WBS 56 Central Safety and Interlock System
– WBS 57 Control Room Facility
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 3
NCSX
Primary Design Basis of WBS 5
• The NCSX Design Leverages the NSTX Technology and Experience Base and Provides a Low Risk - Cost Effective Implementation which requires essentially no new development.
• Commercial-Off-The-Shelf (COTS)
• Maximize Use of Open Source (Free) Software
• Just-In-Time Design & Purchase
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 4
NCSX
WBS 51TCP/IP network Infrastructure
• Provide the common 100Mbps backbone for all NCSX Data Communications using existing PPLnet and NSTX cable & hub infrastructure as much as possible.
• Provide a new Fiber Optic network infrastructure for machine platform environment
• Provide a total of ~24 new day 1 network drops for NCSX Facility at D-Site and C-Site
• Provide over 200 copper & fiber cables for Plasma Control, Central I&C, Interlocks Systems, Diagnostics and Timing and Synchronization
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 5
NCSX
WBS 51TCP/IP network Infrastructure
Control RoomTest CellNBData Acquisition
C-Site RF
Junction AreaFCPC TF-Wing
MG Control Rm.MG High BayFCPC
FCPC Rm220
NSTX Control RoomPPLCC
DASS1
Disk ArchiverEng Hub
Fiber Optics
Eng Hub12 Strands
12 Strands
Fiber Optics
Fiber OpticsPPLCC
NSTX Cont Rm
FCPC
Fiber Optics
Eng Hub
Physics Hub-module
Eng Hub
MG
DAS
60 Strands
12 Strands
MG
48 Strands
S1
Fiber OpticsTest Cell
Fiber OpticsPPLCC
Fiber Optics
Fiber OpticsFCPC
DASFiber Optics
NSTX Cont RmFiber Optics
48 + 96 Strand plan
Fiber OpticsTest Cell
NCSX
Key
NCSX Network Infrastructureusing existing fiber and hub gear
(60 - 48 mm 12 sm)
(2/2/8)
(2s- PPLNet, 2s-Eng, 8s-avail)
(46 avail)
(2/2/8)
Fiber Optics
PC
T
T
T
T
T
DT
PC
T
Existing
New NCSX
Timing
Diagnostics
Plasma Control
Note: 2 Strands required per Ethernet circuit
PC
T
D
96- Strands for Diagnostics, 48- Strands for Network, (24- TC East, 24- TC West)
10-2-03 kwt
Physics Hub-module
Physics Hub-modulePhysics Hub
Physics Hub
Fiber OpticsD-Site
DASFiber Optics
60 + 60 Strands
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 6
NCSX
WBS 51TCP/IP network Infrastructure
• Includes
– Engineering labor to design, configure, install & test
– Tech time for fiber pulls, optic and Copper terminations, AC Power
• Labor
– Engineering: 600 mhrs
– Tech: 1340 mhrs
– Drafting: 160 mhrs
• M&S
– Network hardware: $63.4K
– Fiber optic cable: $28.9K
• Estimate Basis: NSTX and PPLnet experience, catalog prices
• Start date: 3/06, Completion date: 2/07
• Contingency-low risk: 5%
• Total Estimated Cost: $417K
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 7
NCSX
WBS 52Central I&C
• Provide the infrastructure for remote control, monitoring, testing, trending, alarming, logging and coordination of engineering subsystems, including global-subsystem communications, through a common set of interfaces including web based interfaces.
– As on NSTX, use Experimental Physics and Industrial Control System (EPICS)
– Well Established DCS, World Wide User Community– Scales to hundreds of thousands of points
– Multi-Platform & OS Base
– open source
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 8
NCSX
WBS 52Central I&C
• Support for 5 Baseline Engineering Subsystems• WBS 21 Fueling Systems
• WBS 22 Vacuum Pumping Systems
• WBS 43 Magnet Power Systems
• WBS 62 Water Systems
• WBS 63 Cryogenic Systems
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 9
NCSX
WBS 52Central I&C
• Includes
– Engineering labor to design and configure EPICS, implement & test 5 engineering subsystems
• Labor
– Engineering: 2352 mhrs
– Tech: 600 mhrs
• M&S
– PCs, IOCs, EPICS Hosts: $108.0K
• Estimate Basis: NSTX actual experience, catalog prices
• Start date: 2/06, Completion date: 4/07
• Contingency-low risk: 10%
• Total Estimated Cost: $574K
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 10
NCSX
WBS 53Diagnostic Data Acquisition and Facility
Computing
• Provide hardware and software for distributed data acquisition, data analysis, display, and archival of shot based data. This WBS will be responsible for data management of Terabytes of data for the life of NCSX.
– Design Objectives
• All Data Available Online for Life of Machine
• Redundancy– High availability computer architecture
– Archive 3 Copies of Raw & Processed Data (same as NSTX)
• As on NSTX, use MDSplus (MIT) Set of Tools
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 11
NCSX
WBS 53Diagnostic Data Acquisition and Facility
Computing
• Support 2 baseline diagnostics, Magnetics and Field Mapping
• Deploy Primary UNIX Based MDSplus Data Acquisition Server with small data store of under 1TB
• After the first year of operations augment PPPL Facility Tape Backup and Compute Cluster
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 12
NCSX
WBS 53Diagnostic Data Acquisition and Facility
Computing
• Includes
– Engineering labor to design, configure & test the data acquisition system, initial diagnostic acquisition hardware, and master control
• Labor
– Engineering: 2080 mhrs
• M&S
– Data acquisition hardware: $57.7K
• Estimate Basis: NSTX actual experience, catalog prices
• Start date: 2/06, Completion date: 4/07
• Contingency: 16%
• Total Estimated Cost: $405K
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 13
NCSX
WBS 54Facility Timing and Synchronization
• Provide timing information (10MHz clock base) to all facility and diagnostic subsystems and provide the configuration control for the event driven shot cycle.
• A new PCI based Timing And Synchronization System designed for NSTX will be deployed for NCSX.
• Xilinx 200,000 logic gate FPGA
• Each board has 6 multi-function timing channels which mirror NSTX/TFTR functionality
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 14
NCSX
WBS 54Facility Timing and Synchronization
• Includes
– Engineering to design clock encoder and repeaters, deploy master shot cycle timing system
– Tech time for testing and construction
• Labor
– Engineering: 1560 mhrs
– Tech: 700 mhrs
• M&S
– Timing system hardware: $24.8K
• Estimate Basis: NSTX actual experience
• Start date: 1/06, Completion date: 4/07
• Contingency: 14%
• Total Estimated Cost: $344K
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 15
NCSX
WBS 55Real Time Plasma and Power Supply Control
System
• Provide real time power supply and plasma feedback control systems
– Use Existing SKY Computer Hardware and Software System In Use on NSTX
– Clone Software With Parameter Changes for NCSX
– Add 64 Digitizer Channels in NCSX Test Cell in Two Crates for real time data acquisition
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 16
NCSX
WBS 55Real Time Plasma and Power Supply Control
System
SB
S C
rate
Con
tro
ller
SB
S D
isk
Dri
ve
Clo
ck R
ecei
ver
FP
DP
Bre
ako
ut
Mer
lin
9421
AD
C
Mer
lin
9421
AD
C
Sys
tran
Fib
reX
tree
m
Clo
ck R
ecei
ver
FP
DP
Bre
ako
ut
Mer
lin
9421
AD
C
Sys
tran
Fib
reX
tree
m
Clo
ck R
ecei
ver
FP
DP
Bre
ako
ut
Mer
lin
9421
AD
C
Sys
tran
Fib
reX
tree
m
SB
S C
rate
Con
tro
ller
SB
S D
isk
Dri
ve
Clo
ck R
ecei
ver
FP
DP
Bre
ako
ut
Mer
lin
9421
AD
C
Sys
tran
Fib
reX
tree
m
For
ce C
rate
Co
ntro
ller
PC
Lin
k In
terf
ace
Mo
dule
T &
S M
odu
le
Sys
tran
Fib
reX
tree
m
Sys
tran
Fib
reX
tree
m
Mer
lin
9421
AD
C
Mer
lin
9421
AD
C
FP
DP
Bre
ako
ut
FIM
M
FIM
M
Sk
y II
Sk
y II
NSTX TEST CELL NCSX TEST CELL
JUNCTION AREA
ADC Clock ADC Clock
ADC Clock ADC Clock
Data
Data
Data
Data
FPDP
FPDP
FPDP
FPDP
FPDP
FPDP
FPDP
FPDP FPDP
FPDP
FPDP
Sys
tran
VM
E B
us
Ext
end
er
Sys
tran
VM
E B
us
Ext
end
er
Sys
tran
VM
E B
us
Ext
end
er
Sys
tran
VM
E B
us
Ext
end
erS
ystr
an V
ME
Bu
s E
xten
der
GasInjectionSystem
Class 4
Class 2i/3
Shared Plasma Control SystemNSTX/NCSX
R J Marsala02-26-02
Class 3
Class 2
New Puchaseor Fabrication
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 17
NCSX
WBS 55Real Time Plasma and Power Supply Control
System
• Includes
– Engineering design software & hardware reconfiguration
– Tech time wiring, construction, testing
• Labor
– Engineering: 615 mhrs
– Tech: 1200 mhrs
• M&S
– Real time communications hardware: $53.2K
• Estimate Basis: NSTX actual experience
• Start date: 7/06, Completion date: 4/07
• Contingency: 8%
• Total Estimated Cost: $290K
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 18
NCSX
WBS 56Central Safety and Interlock System
• Includes
– Multi Site Fail Safe Design • Access Control at 2 Doors
• Door Interlocks for 6-8 doors
• E-Stop
• Interfaces to all day 1 subsystems
• Labor
– Engineering: 1102 mhrs
– Tech: 1200 mhrs
• M&S
– PLC, badge readers, Kirk Hardware: $57K
• Estimate Basis: NSTX actual experience
• Start date: 4/06, Completion date: 3/07
• Contingency: 8%
• Total Estimated Cost: $399K
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 19
NCSX
WBS 57Control Room Facility
• Includes– Installation of 4 workstation
tables wired for network and power for day 1 operations
– Installation of 12-15 equipment racks wired for day 1 network and power requirements
– Test Cell PA system
– Wireless Ethernet for the Physics network to support visitors and laptop computers
• Labor– Engineering: 320 mhrs
– Tech: 500 mhrs
• M&S– M&S: $10.5K
• Estimate Basis: NSTX actual experience
• Start date: 6/06, Completion date: 1/07
• Contingency: 3%
• Total Estimated Cost: $117K
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 20
NCSX
WBS 57Control Room Facility
Isle
Ro
utin
g
NCSX Diag. Rack Area
Network Hubs&Fiber OpticPatch Panels
We
b C
as
ting
Eq
uip
/ PA
Sy
ste
m
Display Wall System
Ste
p D
ow
n
Ste
p D
ow
n
Ste
p D
ow
n
Ex
pa
ns
ion
Storage
OfficeM
ee
ting
Are
a
Removable
Note:
Main Platform Entrance NCSX Test Cell
PLC Area
NBIControlRoom
5-15-02 kwt
C-Wing Hallway
NCSX Diag. Rack AreaNCSX Diag. Rack Area
Future seats
Proposed Control Room Layout – Day 1 and future
NCSX Preliminary Design Review‒October 7-9, 2003 G. Oliaro 21
NCSX
WBS 5 Cost & Schedule
Central I&C (WBS 5) cost summary by year of expenditure (WBS Level 2)
WBS Level 2 (k$) FY03 FY04 FY05 FY06 FY07 TOTAL51 - TCP/IP Infrastructure Systems $13 $13 $199 $193 $41752 - Central Instrumentation & Control $221 $353 $57453 - Data Acquisition & Facility Computing $184 $221 $40554 - Facility Timing & Synchronization $186 $158 $34455 - Real Time Plasma & Power $66 $223 $29056 - Central Safety Interlock $46 $353 $39957 - Control Room Facility $46 $71 $1175 - Central Instrumentation and Control $0 $13 $13 $947 $1,573 $2,546