oplinkp/2 outcomes - international civil aviation … meetings seminars and... · 2015-06-23 ·...

49
OPLINKP/2 OUTCOMES presented at ICAO EUR/NAT PBCS workshop 17 June 2015 Crystal Kim, Tom Kraft and Shelley Bailey 1

Upload: truonghuong

Post on 14-Aug-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

OPLINKP/2 OUTCOMESpresented at ICAO EUR/NAT PBCS workshop

17 June 2015

Crystal Kim, Tom Kraft and Shelley Bailey

1

Introduction of OPLINKP

2nd meeting of OPLINKP (OPLINKP/2)

PBCS provisions

PBCS Manual (Doc 9869)

SATVOICE provisions 

Satellite Voice Operations Manual (Doc 10038)

Next edition/amendment to Manuals

2

OPLINKP Introduction

3

Terms of Reference(approved on 6 Nov. 2008, AN Min 179‐9)

“To undertake specific studies, as approved by the Air Navigation Commission and reflected in the work programme of the panel, with a view to facilitating worldwide coordination of data link implementation, and advising the ANC on technically practical and operationally feasible ICAO provisions. 

To meet the objectives specified in the work programme. In fulfilling this mandate, the panel will act as the focal point for the consolidation and development of ATM data link operational requirements.”

OPLINKP Introduction

4

Description DocumentRegulatory requirements and operational procedures1 Provisions on ATS data link applications 

including updated CPDLC message setsProposal for amendment to PANS‐ATM

2 Provisions on performance‐based communication and surveillance (PBCS)

Proposal for amendments to Annex 6, Annex 11 and PANS‐ATM

3 Provisions on the use of SATCOM voice Proposal for amendment to Annex 10, Volume IIGuidance material 

1 Guidance on the use of data link applications 

Proposal for 1st Edition of Global Operational Data LinkDocument (GOLD), Doc XXXXProposal for amendment to Manual on ATS Data LinkApplications (Doc 9694)

2 Guidance on the use of RCP and RSP to support PBCS

Proposal for amendment to Manual on RCP (Doc 9869,2nd Edition)

3 Guidance on the use of SATCOM voice Proposal for 1st edition of Manual on SATCOM voice (DocXXXX)

Short‐term Work Programme

OPLINKP Introduction

5

26 members from 20 States and 6 int’l Org

Air‐Ground Data Link(DLIC, ADS‐C and CPDLC)

Membership

Ground‐ground Data Link(AIDC)

PBCS, RCP and RSP Satellite Voice Communication

air traffic controllers, pilots, system engineers, operations regulators, human factor specialists

OPLINKP Introduction

6

2nd meeting of OPLINKP(OPLINKP/2)

7

OPLINKP/2

Overview

• 6‐17 Oct 2014, Montreal• Panel meeting with break‐out sessions• 32 participants from 9 States and 4 Int’l Org. • Officers & Secretariat

– Chair: Leifur Hákonarson (Iceland) – Vice‐Chair: Adam Wakin (Australia)– Secretary: Crystal Kim

8

ATS data link applications

DLIC and ADS‐C in support of 2010 HLSC recommendation• Addressed extensive comments received from a State, referred back 

to the OPLINKP by the ANC• Agreed on the proposals for amendment to Annex 10, Volume II and 

PANS‐ATM with applicability of 2016‐ Reorganising the material to correctly link initiation with DLIC, not CPDLC‐ Refining the requirement to facilitate logons to only apply to aircraft near or 

within the ATS unit in question‐ Improving the procedures for the handling of event contracts

Recommendation 1/1 — Amendment to Annex 10 (Volume II) andPANS‐ATM concerning DLIC and ADS‐C

OPLINKP/2

9

ATS data link applications ATS data link services convergence (CPDLC and ADS‐C)

• Agreed on the proposals for amendment to Annex 10, Volume II and PANS‐ATM : ‐ Describing CPDLC & ADS‐C in technology independent and abstract functional 

terms, addressing both current/future services

‐ Updating CPDLC Message Set, organized by functional categories and analogous with voice phraseology, addressing current/future services

• Agreed to repackage the proposals for amendment with applicability of 2016 and 2018+ 

Recommendation 1/2 — Amendment to Annex 10 (Volume II) andPANS‐ATM concerning CPDLC and ADS‐C

OPLINKP/2

10

ATS data link applications

Guidance material on data link operations• Developed based on the regional document • Agreed to the draft manual pending the completion of remaining 

tasks by the drafting group as identified by the meeting.• Final draft for 1st Edition, addressing current implementation 

(FANS‐/1 and ATN B1) to be finalized by 31 Oct. 2014• The work for 2nd Edition, addressing current and future services 

(FANS‐1/A, ATNB1 & B2) will commence once approved by the ANC

Recommendation 1/3 — Publication of Global Data Link (GOLD)Manual (First Edition, Doc xxxx)

OPLINKP/2

11

PBCS, RCP and RSP Annex and PANS provisions for implementation of PBCS 

framework ‐ Extends performance‐based operations concept to COM (PBC) and 

SUR (PBS) to complement NAV (PBN)‐ Agree on the main components of PBCS framework‐ Agreed on the proposals for amendment to Annexes 6, 11, 15, PANS‐

ATM and PANS‐ABC with applicability of 2016, pending further refinement to align with proposals for PBN being developed by FLTOPSP.

Recommendation 2/1 — Amendment to Annexes 6 (Parts I, II and III), 11,15, PANS‐ATM and PANS‐ABC concerning PBCS

OPLINKP/2

12

PBCS, RCP and RSP

Recommendation 2/2 — Amendment to Manual of Required Communication Performance (RCP) (Doc 9869)

Guidance material on PBCS, RCP and RSP• Expand the scope of RCP manual by adding RSP and PBCS concept• Agreed to the draft manual pending the completion of remaining 

tasks by the drafting group as identified by the meeting.• Final draft to be finalized by 30 Nov. 2014• Further work to support longer term implementation initiatives as 

well as to align the PBN and PBCS manuals will commence once approved by the ANC

OPLINKP/2

13

SATVOICE Annex, PANS provisions and guidance material for sateliite

voice communciations• Promote the use of the technology and global harmonization.• Agreed on the proposals for amendment to Annexes 4, 10, 15, PANS‐

ATM and PANS‐ABC with applicability of 2016• Agreed to the draft manual pending the completion of remaining 

tasks by the drafting group as identified by the meeting.

Recommendation 3/1 — Amendment to Annex 4, Annex 10 (Volumes IIand III), Annex 15, PANS‐ATM and PANS‐ABC concerning satellite voicecommunications

Recommendation 3/2 — Publication of Satellite Voice OperationsManual (First Edition, Doc XXXX)

OPLINKP/2

14

AIDC• Reviewed the progress made by inter‐regional task force on the 

development of the status of the Pan Regional (NAT and APAC) Interface Control Document for AIDC (PAN AIDC ICD)

• Considered the development of amendment proposals to Annexes and PANS premature at the moment

• Agreed to establish a drafting group that will commence the following tasks once approved by the ANC

‐ Identify the outdated material that need to be removed from Annex 10, PANS‐ATM, Doc 9694, 9896 and 9880

‐ develop global guidance material, which would update Doc 9694 ATS Data Link Applications

OPLINKP/2

15

Deliverables

OPLINKP/2

16

Doc RefAnnexes and PANS (Nov 2016)

Title of Document

Subject

GOLD

SVGM

PBCS

HLSC

Converge

Annex 4 Aeronautical Charts X

Annex 6 Operation of Aircraft X

Annex 10, Vol. II Aeronautical Telecommunications – Volume II — Communication Procedures including those with PANS status X X X

Annex 10, Vol. III Aeronautical Telecommunications – Volume III — Communication Systems X

Annex 11 Air Traffic Services X

Annex 15 Aeronautical Information Services X X

Doc 4444 Procedures for Air Navigation Services — Air Traffic Management (PANS‐ATM) X X X X

Doc 8400 Procedures for Air Navigation Services — ICAO Abbreviations and Codes (PANS‐ABC) X X

Manuals (2015‐2016)Doc 10037 Global Operational Data Link Manual X X X

Doc 10038 Satellite Voice Operations Manual X

Doc 9869 Performance‐Based Communication and Surveillance (PBCS) Manual X

2016 PfA Package

OPLINKP/2

2010‐2013 2014 2015 2016Oct  2010Brainstorming

Early 2015Prelim. Review

Mid 2015State Letter

Oct 2015Final Review

Mar 2016Consolidated Amendment

PANEL COORDINATIONPANEL COORDINATION

Mar 2014Mature Product Meeting

Coordination by Secretariat

Oct 2013Initial Proposal

Major Internal Coordination

• LEB• Sections• Panel Secretaries

1

2

Oct 2014OPLINKP/23

17

2016 PfA Package

OPLINKP/2

• ANC preliminary review ‐ conducted on 14 May 015‐ Ref. : AN‐WP/8928

• State letter for comments  ‐ issued on 12 June 2015 ‐ Ref. : SP 52/4 – 15/44‐ due date for reply : 12 Sep. 2015‐ PBCS Manual was provided to 

assist evaluation of proposals

18

GOLD Manual (Doc 10037, Edition 1)

OPLINKP/2

• Supersedes regional GOLD V.2 dated 26 April 2013

• RCP/RSP specifications and post‐implementation monitoring removed from regional GOLD and moved to PBCS Manual

• Additional changes made to ensure:‐ No conflicts with provisions in Annex and 

PANS including and up to 2014 amendment ‐ Better flow and readability

• To be published in July/August 2015

19

GOLD Manual (Doc 10037, Edition 1)

OPLINKP/2

Chapter 1. Overview of data link operationsChapter 2. Administrative provisions related to data link operationsChapter 3. Controller and radio operator proceduresChapter 4. Flight crew proceduresChapter 5. Advanced ATS supported by data linkChapter 6. State aircraft data link operations

Appendix A CPDLC message elements and standardized free text message elementsAppendix B Regional/State specific informationAppendix C Operator/aircraft specific information

20

PBCS provisions

21

PBCS framework

• Provision of air traffic services and prescription of RCP and RSP for relevant communication and surveillance capabilities (Annexes 11 and 15)‐ Annex 11 provisions also include a requirement that the ATS equipment must 

meet RCP/RSP criteria

• Approval of air operators for a communication and/or surveillance capability including aircraft equipage for operations where RCP and/or RSP specifications have been prescribed (Annex 6)

• Indication of an aircraft’s communication and surveillance capability in the form of RCP/RSP specifications in the flight plan (PANS‐ATM) 

• Monitoring programmes to assess actual communication and surveillance performance against RCP and RSP specifications and to determine corrective action, as applicable, for the appropriate entity (Annexes 6 and 11)

22

PfA to Annex 11

23

PfA to Annex 11

24

PfA to Annex 11

25

PfA to Annex 11

26

PfA to Annex 11

27

PfA to Annex 6

28

PfA to Annex 6

29

PfA to Annex 6

30

PfA to Annex 6

31

PfA to Annex 6

32

PfA to PANS‐ATM

33

PfA to PANS‐ATM

34

Consequential amendment

PfA to Annex 15• Require RCP and RSP specifications in AIP

PfA to PANS‐ABC (Doc 8400)• Add terms PBC, PBS and RSP 

35

PBCS Manual (Doc 9869)

36

Overview

• Developed based on the RCP Manual (Doc 9869), GOLD, SVGM and other regional material

• Expanded the scope to include: – PBCS concept and surveillance capability– RCP and RSP specifications;– information and guidance provided from several workshops held in 

the regions; and – material from PIRG meetings and their contributory groups

• Mature draft is available, but will need to be aligned to the final outcomes of PfA– Incorporate any changes necessary to support the final provisions as 

approved by the Council 

37

Table of Contents

Chapter 1. Definitions

Chapter 2. PBCS concept

Chapter 3. Developing RCP/RSP specification

Chapter 4. Applying RCP/RSP specification

Chapter 5. Complying with RCP/RSP specification

Appendix A. PBCS implementation plan‐ checklistAppendix B. RCP specificationsAppendix C. RSP specificationsAppendix D. Post‐implementation monitoring and corrective action (CPDLC and ADS‐C)Appendix E. Post‐implementation monitoring and corrective action (SATVOICE)

38

SATVOICE Provisions

39

PfA to Annex 10 Vol II

40

PfA to Annex 10 Vol. III

41

PfA to Annex 10 Vol. III

42

Consequential amendment

PfA to Annexes 4 and 15• Require SATVOICE numbers on aeronautical charts and AIP

PfA to PANS‐ABC (Doc 8400)• Revise term “SATCOM” to apply  generally to both voice and data 

satellite communication or only data satellite communication• Add term “SATVOICE” to allow use in phraseology

PfA to PANS‐ATM (Doc 4444)• Revise terms in Appendix 2 (FPL) and Appendix 3 (ATS messages) 

from “RTF SATCOM” and “RTF” to “SATVOICE

43

Satellite Voice Operations Manual (Doc 10038)

44

Overview

• Developed based on SATCOM Voice Guidance Material (SVGM) developed by inter‐regional SATCOM voice task force (IRSVTF)

• Content related to PBCS has been taken out and moved to PBCS manual

• Mature draft is available, but will need to be aligned to the final outcomes of PfA

45

Table of Contents

Chapter 1. Overview of aeronautical SATVOICE system

Chapter 2. Administrative provisions related to 

SATVOICE  operations

Chapter 3. Controller and radio operator procedures

Chapter 4. Flight crew procedures

Appendix A Future of SATVOICE concept of operation and considerations

46

Next edition/amendment to Operational Data Link

Manuals

47

2016 + Updates 

48

GOLD Manual (Doc 10037) • Update to align the 2016 amendment to Annexes and PANS• Incorporate Baseline 2 services and CPDLC message set

PBCS Manual (Doc 9869)• Guidance on issues/resolution database• RCP/RSP specifications and guidance material to support regional 

implementation and SASP work programme, as necessary SVOM (Doc 10038)

• Guidance on assigning and managing SATVOICE numbers for aeronautical stations 

Manual ATS data link applications (Doc 9694)• Update AIDC section to reflect current implementation of character‐

based messaging for electronic coordination • Delete air‐ground applications section superseded by GOLD manual