outlines:-

84

Upload: gaille

Post on 23-Feb-2016

30 views

Category:

Documents


0 download

DESCRIPTION

Outlines:-. Architectural Design Modifications. Environmental Design. . Lighting and Mechanical Design. Structural Design. Quantity compare. Objective:. - PowerPoint PPT Presentation

TRANSCRIPT

Slide 1

Outlines:- Environmental Design.

Architectural Design Modifications.Structural DesignQuantity compare

Lighting and Mechanical Design.Objective: The principal objectives of this project are to reduce the construction cost of residential buildings, through proposing material alternative for floor tiles, door, window and walls.Objective:

Site plan :

Wind direction :

Old design :

Old design :

New design :

2nd floor:

Elevation :

Elevation :

Elevation :

Elevation :

Section :

Section :

3d :

Passive solarAt the south we decide to make solar window..Why??

* Because solar chimney is not effected as shown in calculation Passive solarSolar chimney calculated: A = 4 ft2T1-T2 = 30 F in winterH = 18 ft.Q= 540*A*h (T1-T2) = 540*4*18 (30) = 50193.86 ft3/ hr.Volume of space = 9486 ft3

Number of change = Q/ V =50193.86/9486 = 5.2 change/hour and that less than 6 so the chimney not efficacy in the house ,Shading :

Sample calculation:

Design the horizontal lover in the 21/5 at 12 pm

X = h/ (tan (Alt))

X= horizontal length of lover

H = glass height

Alt =Altitude at 21/5 at 12 pm and equal 78

So the first design for h = 40 cm and y = 0

X = 0.4/ (tan (78)) = 9 cm

And anther design for h = 120cm and y = 0

X = 1.2/ (tan (78)) = 25cm

Environmental :

Environmental :

Natural lighting

compute the D.F by ECOTECT programFunction D.F%Standard valueAccept Guest room3.12.5-4Living 1st floor32.5-4Kitchen2.92.5-4Bath 1.51.5-2.5Corridor1.91.5-2.5Master bed room2.62.5-4Room 32.72.5-4Living 2nd floor32.5-4Bed room 12.62.5-4Bed room 22.42.5-4Bed room 32.82.5-4Environmental :

Environmental :

Environmental : DIALUX software was used to design the Artificial lighting system

B-Artificial lighting Environmental : Technical values for designFunctionEavgWork planGust room 250-3000.75mKitchen room350-5001mLiving room300-5000.75mCorridor 1501-1.5mBath1500.75m

Environmental : SAMPLE:.

Guest roomLaminar distributed Illumenance =250 luxWork plane =75cm uniformity= 0.66#of lamps=2 lamps 12Led

Environmental :

Environmental : SAMPLE:.

Bed room Laminar distributed Illumenance =340luxWork plane =75cm uniformity= 0.66#of lamps=7 lamps 18Led

Environmental :

Structural36Construction material properties: Concrete, fc= 24MPa steel, fy= 420MPa

37super impose dead Load=2.5KN/M2 building parameter wall load =21KN/Mloads Live load =4KN/M2 38 COLUMNS

40SOME CHECK On RESULT from SAP DEAD LOAD from = 6446 kN/m2 calculation=6446KN/M2 KNkN/m2

DEAD LOAD from Sap =6234 kN/m2

4041CHECK On deflection Max deflection=7mmmax= 19.7mm19.77 ok

max= 19.7mm19.77 ok

4142Design beam Main beam(60*25) Asmin=440mm2

Secondary beam(40*25) Asmin=295mm2

42

43

44 Design slab45

4546

Design slab

4647Design column

4748Footing Design

4849Design Tie beam

Tie beam(50*30 cm) 49HVAC System The former design did not design for HVAC system.Element of the wall and slab

External Wall

Internal wall Ceiling

Ground

Heating Load

Heat transfer through wall and slab. Infiltration through window and door.Out side temperature = 8CInside temperature =20CTotal heating load = 10 KW

Heating Load

# of zoneQ TotalQ total kwQ TR11227.031.230.3521173.601.170.333310.360.310.094748.740.750.215210.880.210.066638.260.640.1871946.521.950.558917.160.920.269423.550.420.1210444.150.440.1311859.100.860.2412342.840.340.10131109.741.110.32Total10351.9510.352.94Cooling Load

Heat transfer through wall and slab. Infiltration through window and door. due to equipment Outside temperature = 35CTotal cooling load = 9 KWCooling Load

# ZoneQ TotlalQtotal kwQ TR12682.832.680.76242.030.040.01390.210.090.034603.040.600.17553.760.050.026655.740.660.1971406.381.410.408911.510.910.269142.550.140.0410171.060.170.05111097.411.100.3112193.730.190.06131123.311.120.329173.569.172.61Average heating and cooling load in building.

Use split unit totalpriceNumberType27000300099000 Btu2521418Pipe 1.527252totalInstallation of split unit

Electrical design

Circuit breaker board

Earth system

Lighting distribution in ground floor

Lighting distribution in first floor

Socket distribution in ground floor

Socket distribution in first floor

Protection system : Fire extinguisher (two class)1-Class K Fire Extinguisher 2-Class C Fire Extinguisher

Water Systems design ( plumping system) :

Diameter used:Vertical feeder = 1.25 inchHorizontal feeder = 1 inchBranch = inchWater Systems design:

The collector location:

Drainage Systems design:Black water :W.CS & kitchen sink Grey water : Laundries & shower head

Black water:

Grey water :

Quantity and comparison: Divide into two types : 1- cost without using alternative materials with area equal 350 m 2 (former design) 2- cost after revised and using alternative materials with area equal 354 m 2 (revised design)

76

Conclusion: Using the alternative materials, external stone, PVC windows, doors, fiber hollow block in the internal wall and PVC floors tiles, reducing the total cost about 21%, with the same or best efficiency than the local material.

Thanks For Your Attention