PLANPLANPLAN
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
RALEIGH
REVISIONS
NO. NO.BY BYDATE DATE
1 3
2 4
SHEET NO.
TOTAL SHEETS
COUNTY:
PROJECT NO.
DECK REPAIR BRIDGE NO.
MECKLENBURG
$$$$$$SYSTIME$$$$$
DATE:
DATE:
DRAWN BY:
CHECKED BY:
$$$$USERNAME$$$$
CLB
SQ. YARD OF HYDRO-DEMOLITION.
COST FOR INSTALLING AND REMOVING FORM WORK SHALL BE INCIDENTAL TO THE PRICE PER
SUBMIT DETAILS OF PROPOSED FORM WORK FOR APPROVAL PRIOR TO BEGINNING WORK.
SHALL BE INSTALLED IN AREAS INDICATED AS CLASS III SURFACE PREPARATION.
A METHOD TO CAPTURE WATER AND DEBRIS FROM BLOW THRU DURING HYDRO-DEMOLITION
TYP. "BLOW THRU" CONTAINMENT AND FORMWORK
BRACING
DECKPREP. OR "BLOW THRU" AREA
ANTICIPATED CLASS III SURFACE
SEAL EDGES
NOTES
APPROX. AREA: CLASS II REPAIR
FOR ELASTOMERIC CONCRETE, SEE SPECIAL PROVISIONS.
FORM
MODIFIED CONCRETE OVERLAY
DETAIL FOR LATEX
OVERLAY IS PLACED.
DECK SURFACE BEFORE
BEFORE WORK BEGINS.
SURFACE OF ORIGINAL DECK
MODIFIED OVERLAY AND
FINISHED SURFACE OF LATEX
SQ.YDS.
TOTAL BILL OF MATERIAL
SQ.YDS. SQ.YDS. SQ. FT.SQ.YDS. C.Y.
FLOOR
BRIDGE
GROOVING
LUMP SUM
SQ.YDS.
STRENGTH
VERY EARLY
CONCRETE
MODIFIED
LATEX
STRENGTH
VERY EARLY
CONCRETE
LATEX MODIFIED
PLACING & FINISHING
LUMP SUMSQ.YDS.
SURFACE PREPARATION ARE APPOXIMATE.
THE BOUNDARIES OF AREAS IDENTIFIED FOR CLASS III
APPROX. AREA: CLASS III REPAIR
S-1
309
US 74 WBL OVER NC 27
BRIDGE #309 RAMP ON
PLAN VIEW OF
11/11
12/11DCM
3322 3322 27168
OVERLAY
1�" MIN.
0 03322 162
FOR FOAM JOINT SEALS, SEE SPECIAL PROVISIONS.
BP-5300M
SEALS
JOINT
FOAM
TO 5TH ST.
3
0
{ BENT #3
{ BENT #4
{ BENT #2
{ BENT #1
{ BENT #5
1 NAPS
)ECAF LLIF OT ECAF LLIF( "6-’617 *
FILL FACE
"6-’09 *2 NAPS
FIX
EXPEXP
FIX EXP
EXPFIX
{ RAMP 1
EXPFIXFIX
** QUANTITY SHOWN IS FOR INFORMATION ONLY.
"0-’05 *3 NAPS
"0-’68 *
4 NAPS
"6-’95 *
5 NAPS
"0-’24 *
PREPARATION
SURFACE
** CLASS I
PREPARATION
SURFACE
** CLASS II
PREPARATION
SURFACE
** CLASS III
* RADIAL
VERY EARLY STRENGTH, SEE SPECIAL PROVISIONS.
FOR OVERLAY OF BRIDGE WITH LATEX MODIFIED CONCRETE-
SEE SPECIAL PROVISIONS.
RUN -OFF WATER FROM THE HYDRO- DEMOLITION PROCESS,
THE CONTRACTOR MUST COLLECT, TREAT AND DISPOSE OF
PROVISIONS .
FOR HYDRO-DEMOLITION AND DECK SCARIFICATION, SEE SPECIAL
IN THE FIELD.
ENGINEER IF PLAN DIMENSIONS DIFFER FROM ACTUAL CONDITIONS
VERIFY THE INFORMATION IN THE PLANS AND NOTIFY THE
BEST INFORMATION AVAILABLE. THE CONTRACTOR SHALL FIELD
EXISTING DIMENSIONS AND BRIDGE CONDITIONS ARE FROM THE
CONCRETE, SEE SPECIAL PROVISIONS.
TO BEGINNING REPAIR OF BRIDGE DECK WITH LATEX MODIFIED
EXISTING JOINTS AND DECK DRAINS SHALL BE SEALED PRIOR
DECK
OF BRIDGE
DEMOLITION
HYDRO-
BRIDGE DECK
SCARIFYING
PLANPLANPLAN1" EXP. JT.
1�" @ 90° F
1�" @ 60° F;
2" @ 45° F;
SHALL BE REMOVED.
IS EXPOSED DURING REMOVAL, THE ENTIRE WATERSTOP
IF THE EMBEDDED PORTION OF THE EXISTING WATERSTOP
* ALL LOOSE AND UNSOUND CONCRETE SHALL BE REMOVED.
TO CENTRAL AVE.
CONCRETE
ELASTOMERIC
FIX
EXP
FIX
EXPFIX
)ECAF LLIF OT ECAF LLIF( "6-’617 *
EXPEXPFIX
EXPFIX
{ BENT #5 { BENT #6
{ BENT #7
{ BENT #8
{ BENT #9 FILL FACE
{ RAMP 1
* RADIAL
"6-’89 *
SPAN 6 "0-’95 *
7 NAPS
"0-’201 *
8 NAPS
"0-’59 *
9 NAPS
* 34’-0"SPAN 10
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
RALEIGH
REVISIONS
NO. NO.BY BYDATE DATE
1 3
2 4
SHEET NO.
TOTAL SHEETS
COUNTY:
PROJECT NO.
DECK REPAIR BRIDGE NO.
MECKLENBURG
309
BP-5300M
3
$$$$$$SYSTIME$$$$$
DATE:
DATE:
DRAWN BY:
CHECKED BY:
$$$$USERNAME$$$$
CLB 11/11
12/11DCM
D
* TOTAL
* BASED ON THE MINIMUM BLOCKOUT SHOWN.
ELASTOMERIC CONCRETE(CU. FT.)
(CU. FT.)
NOTES
165.4
CONCRETE OVERLAY
LATEX MODIFIED
CONCRETE
ELASTOMERIC �" JT. SEALER
WATERSTOP
6" PLASTIC
MAT’L
EXP. JT.
CONCRETE OVERLAY
LATEX MODIFIED
BEVEL AS SHOWN
SAWED OPENING FOR
�"
SECTION A-A(MINIMUM EXISTING
JOINT DEMOLITION)
SECTION A-A SECTION A-A(EXISTING JOINT)
SECTION A-A
DIAPHRAGM EXISTING JT.
1"
(TYP.)
(TYP.)
GIRDER
TOP OF
(TYP.)
GIRDER
TOP OF
(TYP.)
GIRDER
TOP OF
(TYP.)
GIRDER
TOP OF
1�" EXP. JT.
@ BENT #9
WITH JOINT
BE CUT FLUSH
* WATERSTOP TO
RETAIN ALL EXISTING REINFORCING
STEEL. CLEAN AND REPAIR AS REQ’D.
NOTE:
(TYP.)
(TY
P.)
DE
MO
45°45°
CONCRETE DIMENSIONS)
(PRE-SAWED ELASTOMERIC
FOAM JOINT SEALEXPANSION)
(FOAM JOINT SEAL
FOAM JOINT SEAL
1�
" N
OM.
1�
" N
OM.
2�
"
5�" 5�"
IN LIEU OF SAWING THE JOINT.
FORM THE JOINT FOR THE FOAM JOINT SEAL
THE CONTRACTOR WILL NOT BE PERMITTED TO
JOINT SEAL SHALL BE 2�".
NOMINAL UNCOMPRESSED SEAL WIDTH OF FOAM
WATERTIGHT.
THE INSTALLED FOAM JOINT SEALS SHALL BE
FOR FOAM JOINT SEAL, SEE SPECIAL PROVISIONS.
BENTS 165.4
EXISTING OPENING (DECK)
DIMENSIONS)
(SEE SECTION D-D FOR
SAWED OPENING (DECK)
A
D
A
{ JOINT @ BENT
SEE SECTION A-A
OPENING IN DECK
SAWED TO MATCH
JOINT OPENING IN CURB
SA
WE
D
SECTION C-CSECTION C-CSECTION D-D
4"
�"
�"
MI
N.
5"
BOTTOM OF SEAL
SAW BLADE
RADIUS OF
RAIL
BARRIER
MANUFACTURER
AS RECOMMENDED BY
FOAM JOINT SEAL
SEAL AT END OF
PROVIDE WATERTIGHT
CONCRETE OVERLAY
LATEX MODIFIED
1�
" N
OM.
SECTION B-B
FLOOR
BRIDGE
DIAPHRAGM
(TYP.) (PROPOSED JOINT)
SECTION B-B
MATERIAL
JT. SEALER
EXISTING JT.
(PROPOSED JOINT)
** BACKER ROD DIA. TO BE DETERMINED BY THE ENGINEER.
BACKER ROD
**
(EXISTING JOINT)
SECTION B-B
EXISTING JT.
APPROACH
CONCRETE
EXISTING
PLAN
S-2
JOINT DETAILS
&
TYPICAL SECTIONS
4�
" +/-
EXI
STI
NG
SPAN 7
TYPICAL SECTION
TYPICAL SECTION
{ RAMP 1
(TYP.)
1’-11�"14’-9"22’-0"
{ RAMP 1
(TYP.)
1’-11�"14’-9"
(TYP.)
1’-11�"14’-9"
(TYP.)
1’-11�"14’-9"
{ RAMP 1
(TYP.)
1’-11�"14’-9"
(TYP.)
1’-11�"14’-9"
(TYP.)
1’-11�"14’-9"
VARIES (22’-4" TO 23’-1�")
TYPICAL SECTION
SPAN 8
TYPICAL SECTION
SPANS 4,5&6
VARIES (22’-0" TO 22’-4�")
12’-0"
POINT OF ROLLOVER
GRADE POINT OF CONCRETE SLAB
@ { BRG. TO TOP
8�" TOP OF GDR.
GRADE POINT
12’-0"
{ RAMP 1
POINT OF ROLLOVER
GRADE POINT
{ RAMP 1
POINT OF ROLLOVER
GRADE POINT
12’-0"
{ RAMP 1
POINT OF ROLLOVERGRADE POINT
{ RAMP 1
POINT OF ROLLOVER
GRADE POINT
POINT OF ROLLOVER
12’-0"
SPAN 3
TYPICAL SECTIONTYPICAL SECTION
SPAN 2
SPAN 1
TYPICAL SECTION
VARIES DUE TO SPIRALVARIES DUE TO SPIRAL
VARIES DUE TO SPIRAL
VARIES
VARIES
POINT OF ROLLOVER
VARIES
GRADE POINT OF CONCRETE SLAB
@ { BRG. TO TOP
8�" TOP OF GDR.
$$$$$$SYSTIME$$$$$
DRAWN BY:
CHECKED BY:
$$$$USERNAME$$$$
CLB DATE:
DATE:
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
RALEIGH
REVISIONS
NO. NO.BY BYDATE DATE
1 3
2 4
SHEET NO.
TOTAL SHEETS
COUNTY:
PROJECT NO.
MECKLENBURG
DECK REPAIR BRIDGE No. 309
TYPICAL SECTIONS
OF CONCRETE SLAB
@ { BRG. TO TOP
8�" TOP OF GDR.
OF CONCRETE SLAB
@ { BRG. TO TOP
8�" TOP OF GDR.
SLAB
OF CONCRETE
@ { BRG. TO TOP
8�" TOP OF GDR.
SLAB
OF CONCRETE
@ { BRG. TO TOP
8�" TOP OF GDR.
SLAB
OF CONCRETE
@ { BRG. TO TOP
8�" TOP OF GDR.
SPANS 9 & 10
11/11
11/11
BP-5300M
DCM
S-3
3
CONCRETE OVERLAY
1�" LATEX MODIFIED
CONCRETE OVERLAY
1�" LATEX MODIFIED
CONCRETE OVERLAY
1�" LATEX MODIFIED
CONCRETE OVERLAY
1�" LATEX MODIFIED
CONCRETE OVERLAY
1�" LATEX MODIFIED
CONCRETE OVERLAY
1�" LATEX MODIFIED
CONCRETE OVERLAY
1�" LATEX MODIFIED
VARIES (23’-1�" TO 24’-5�") (SPAN 6)
VARIES DUE TO SPIRAL (SPANS 4 & 5)
TO MATCH EXISTING.
NOTE: PROPOSED SUPER ELEVATIONS