powergrid corporation of india ltd
DESCRIPTION
POWERGRID CORPORATION OF INDIA LTD. GRID OPERATION IN THE SOUTHERN REGION. YESTERDAY, TODAY ……AND TOMORROW. GRID OPERATION IN THE PAST. LOW FREQUENCY PROBLEMS FREQUENCY REMAINED AT 48 HZ AND BELOW FOR MOST PART LOW VOLTAGE OPERATION VOLTAGE AT BANGALORE DIPPED TO AS LOW AS 300 Kv!!!! - PowerPoint PPT PresentationTRANSCRIPT
POWERGRID CORPORATION OF INDIA LTD
GRID OPERATION IN GRID OPERATION IN THE SOUTHERN THE SOUTHERN
REGIONREGION
YESTERDAY, TODAY ……YESTERDAY, TODAY ……AND TOMORROWAND TOMORROW
GRID OPERATION IN THE GRID OPERATION IN THE PAST PAST
LOW FREQUENCY PROBLEMSLOW FREQUENCY PROBLEMS FREQUENCY REMAINED AT 48 HZ AND BELOW FOR FREQUENCY REMAINED AT 48 HZ AND BELOW FOR
MOST PARTMOST PART LOW VOLTAGE OPERATIONLOW VOLTAGE OPERATION
VOLTAGE AT BANGALORE DIPPED TO AS LOW AS 300 VOLTAGE AT BANGALORE DIPPED TO AS LOW AS 300 Kv!!!!Kv!!!!
FREQUENT GRID DISTURBANCESFREQUENT GRID DISTURBANCES A DISTURBANCE ALMOST EVERY MONTHA DISTURBANCE ALMOST EVERY MONTH IMMENSE FINANCIAL LOSSES FOR INDUSTRYIMMENSE FINANCIAL LOSSES FOR INDUSTRY LOADS FREQUENTLY CUT OFF DUE TO RELAY LOADS FREQUENTLY CUT OFF DUE TO RELAY
OPERATIONOPERATION INCREASED ELECTRICAL LOSSESINCREASED ELECTRICAL LOSSES
INEFFICIENT OPERATION OF ELECTRIC EQUIPMENTSINEFFICIENT OPERATION OF ELECTRIC EQUIPMENTS GRID OPERATION FOCUSSED ON FIRE-GRID OPERATION FOCUSSED ON FIRE-
FIGHTING RATHER THAN OPTIMISATION AND FIGHTING RATHER THAN OPTIMISATION AND ECONOMYECONOMY
LANDMARK EVENTSLANDMARK EVENTS
ADDITION OF GENERATING CAPACITYADDITION OF GENERATING CAPACITY TALCHER-KOLAR AND ASSOCIATED TALCHER-KOLAR AND ASSOCIATED
SYSTEMSYSTEM UNIFIED LOAD DESPATCH SCHEMEUNIFIED LOAD DESPATCH SCHEME TRANSMISSION SYSTEM TRANSMISSION SYSTEM
AUGMENTATIONAUGMENTATION AVAILABILITY BASED TARIFFAVAILABILITY BASED TARIFF
IMPROVEMENTS IN GRID IMPROVEMENTS IN GRID OPERATIONOPERATION
POWER SYSTEM PARAMETERSPOWER SYSTEM PARAMETERS FREQUENCY IMPROVEDFREQUENCY IMPROVED VOLTAGES STABLE ACROSS THE GRIDVOLTAGES STABLE ACROSS THE GRID
OPTIMAL OPERATIONOPTIMAL OPERATION LOSSES REDUCED BY 1-1.5 % THROUGHOUT THE GRIDLOSSES REDUCED BY 1-1.5 % THROUGHOUT THE GRID SAVINGS OF ABOUT Rs 450 CRORES EVERY YEARSAVINGS OF ABOUT Rs 450 CRORES EVERY YEAR!! MERIT ORDER OPERATION :- OPTIMISATIONMERIT ORDER OPERATION :- OPTIMISATION
HYDRO CONSERVATIONHYDRO CONSERVATION HEALTHY RESERVOIR LEVELS HEALTHY RESERVOIR LEVELS USE HYDRO GENERATION FOR PEAKING AND RESERVEUSE HYDRO GENERATION FOR PEAKING AND RESERVE
TALCHER – KOLAR LINK TALCHER – KOLAR LINK INTER REGIONAL POWER :- INTER REGIONAL POWER :- 9770MUs/1600MW MAX9770MUs/1600MW MAX
UTILISATION OF COMMERCIAL MECHANISMUTILISATION OF COMMERCIAL MECHANISM TURNOVER OF 4402 MU ON UI WORTH 800 CRORESTURNOVER OF 4402 MU ON UI WORTH 800 CRORES
COSTLY GENERATION REDUCED.COSTLY GENERATION REDUCED.
GRID OPERATION GRID OPERATION TODAYTODAY
EFFICIENT AND OPTIMAL GRID EFFICIENT AND OPTIMAL GRID OPERATION : REDUCED COST OF POWEROPERATION : REDUCED COST OF POWER
NO GRID DISTURBANCE FOR PAST 20 NO GRID DISTURBANCE FOR PAST 20 MONTHSMONTHS
BETTER HYDRO RESERVESBETTER HYDRO RESERVES REDUCED LOSSESREDUCED LOSSES
GRID OPERATION IN THE GRID OPERATION IN THE FUTURE: FUTURE:
A LITTLE ‘CRYSTAL BALL A LITTLE ‘CRYSTAL BALL GAZING’GAZING’
NEW INVESTMENTS WORTH NEW INVESTMENTS WORTH Rs 4665Rs 4665 CRORESCRORES IN THE SOUTHERN REGION IN THE SOUTHERN REGION ROBUST AND CONSTRAINT FREE GRIDROBUST AND CONSTRAINT FREE GRID ACCESS TO AND EVACUATION OF ACCESS TO AND EVACUATION OF
CHEAPER POWERCHEAPER POWER GRID PARAMETERS FURTHER IMPROVEDGRID PARAMETERS FURTHER IMPROVED
REDUCED COST OF POWER :- MERIT REDUCED COST OF POWER :- MERIT ORDER OPERATIONORDER OPERATION
PROJECTS IN THE PROJECTS IN THE PIPELINE IN PIPELINE IN SOUTHERN SOUTHERN
REGIONREGION
PROJECTS IN SOUTHERN PROJECTS IN SOUTHERN REGIONREGION
HIRIYUR STATION COMMISSIONED HIRIYUR STATION COMMISSIONED RECENTLYRECENTLY
400 KV NELAMANGALA-MYSORE LINE 400 KV NELAMANGALA-MYSORE LINE WITH 400 KV SUBSTATION AT MYSOREWITH 400 KV SUBSTATION AT MYSORE
400 KV KAIGA-NARENDRA LINK400 KV KAIGA-NARENDRA LINK 400 KV SUB STATION AT NARENDRA400 KV SUB STATION AT NARENDRA 400 KV 2400 KV 2ndnd GOOTY-BANGALORE LINK GOOTY-BANGALORE LINK 400 KV RAICHUR-GOOTY D/C QUAD LINE400 KV RAICHUR-GOOTY D/C QUAD LINE 400 KV STATION AT HASSAN BY LILO OF 400 KV STATION AT HASSAN BY LILO OF
EXISTING TALAGUPPA-NELAMANGALA EXISTING TALAGUPPA-NELAMANGALA LINE AT HASSANLINE AT HASSAN
400 KV RING MAIN AROUND BANGALORE400 KV RING MAIN AROUND BANGALORE
PROJECTS IN SOUTHERN PROJECTS IN SOUTHERN REGIONREGION 400 KV MADURAI-TRIVANDRUM LINE400 KV MADURAI-TRIVANDRUM LINE
400 KV RAMAGUNDAM – HYDERABAD-GOOTY-400 KV RAMAGUNDAM – HYDERABAD-GOOTY-NELAMANGALA LINE: RS 390 CRORESNELAMANGALA LINE: RS 390 CRORES
ADDITIONAL 500 MW HVDC POLE AT GAZUWAKA: ADDITIONAL 500 MW HVDC POLE AT GAZUWAKA: WORTH Rs 770 CRORESWORTH Rs 770 CRORES
ENHANCEMENT OF CAPACITY OF TALCHER POLES ENHANCEMENT OF CAPACITY OF TALCHER POLES BY 500MW (FROM 2000 MW TO 2500 MW): Rs 90 BY 500MW (FROM 2000 MW TO 2500 MW): Rs 90 CRORESCRORES
SYSTEM AUGMENTATION SCHEMES : Rs 415 SYSTEM AUGMENTATION SCHEMES : Rs 415 CRORESCRORES
KOODANKULAM NUCLEAR PLANT EVACUATION KOODANKULAM NUCLEAR PLANT EVACUATION SCHEME – 2000 MW CAPACITY- WORTH ABOUT Rs SCHEME – 2000 MW CAPACITY- WORTH ABOUT Rs 1700 CRORES1700 CRORES
WR STRENGTHENING/EVACUATION WILL WR STRENGTHENING/EVACUATION WILL FACILITATE BETTER IMPORTS THROUGH HVDC FACILITATE BETTER IMPORTS THROUGH HVDC CHANDRAPUR- WORTH ABOUT Rs 5000 CRORESCHANDRAPUR- WORTH ABOUT Rs 5000 CRORES
ANOTHER HVDC LINK TO SR FROM ERANOTHER HVDC LINK TO SR FROM ER SYSTEM EXPANSION SCHEMES WORTH Rs 1233 SYSTEM EXPANSION SCHEMES WORTH Rs 1233
CRORESCRORES
TIRUNELVELI
KOODANKULAMTRIVANDRUM
EDAMON
COCHIN
THRISSUR
MADURAI
UDUMALPET
ARASUR NLY-EXP
NEYVELI
BAHOOR
PUGALUR
TRICHY
SALEM
HOSUR
MYSORE
SP-BUDUR
MELKOTTAIYUR
ALMATHI
CHITOOR
KOLAR
S’HALLI
NLMNG
HOODY
KOODANKULAM TRANSMISSION SYSTEM AS APPROVED IN 17TH
STANDING COMMITTEE MEETING HELD AT BANGALORE
IN SEP03
JAYAMKONDAM
KARAIKUDI
TIRUNELVELI-EDAMON AND TIRUNELVELI-COCHIN ON MULTI-CKT TOWERS
ENJOY THE EXISTING
CORRIDOR OF 220 KV
EDAMON-KAYATHAR LINE FOR
PART OF THE DISTANCE.
TIRUNELVELI-EDAMON TO
BE OPERATED AT 220 KV INITIALLY
KOODANKULAM-
TIRUNELVELI LINK IS
THROUGH TWO 400 KV
D/C QUAD LINES ON TWO
SEPARATE CORRIDORS. TENTATIVE
COST 1700CR
POWERGRID’S PROPOSAL FOR POWERGRID’S PROPOSAL FOR DEVELOPMENT OF STATE DEVELOPMENT OF STATE
INFRASTRUCTUREINFRASTRUCTURE READY FOR JOINT VENTURE WITH READY FOR JOINT VENTURE WITH
STATES/PRIVATE FOR TRANSMISSION AND STATES/PRIVATE FOR TRANSMISSION AND DISTRIBUTIONDISTRIBUTION
RURAL ELECTRIFICATION RURAL ELECTRIFICATION UMBRELLA AGREEMENT UNDER THE AEGIS UMBRELLA AGREEMENT UNDER THE AEGIS
OF MOPOF MOP APDRPAPDRP
CONCEPT TO COMMISSIONINGCONCEPT TO COMMISSIONING 10-15% CONSULTANCY CHARGES10-15% CONSULTANCY CHARGES WORK IN PROGRESS AT BIHARWORK IN PROGRESS AT BIHAR
READY FOR JOINT VENTURE WITH STATES READY FOR JOINT VENTURE WITH STATES FOR TELECOM : ANDHRA PRADESH MODELFOR TELECOM : ANDHRA PRADESH MODEL
47.50
48.00
48.50
49.00
49.50
50.00
50.50
51.00
25 26 27 28 29 30 31
DAYS ----->
FR
EQ
UE
NC
Y IN
HZ
---
->FREQUENCY PROFILEFREQUENCY PROFILE
2002, 2003 & 2004
320
330
340
350
360
370
380
390
400
410
42000
:05
01:0
5
02:0
5
03:0
5
04:0
5
05:0
5
06:0
5
07:0
5
08:0
5
09:0
5
10:0
5
11:0
5
12:0
5
13:0
5
14:0
5
15:0
5
16:0
5
17:0
5
18:0
5
19:0
5
20:0
5
21:0
5
22:0
5
23:0
5
TIME IN HRS --->
VO
LT
AG
E IN
KV
---
>
REALITY BITE:
FARMERS IN KARNATAKA ARE HAPPY WITH FEWER HOURS OF QUALITY POWER!!.
EFFICIENCY OF PUMPS AT TG HALLI WATER WORKS IMPROVED!
COMPARISION OF BANGALORE VOLTAGE-TYPICAL DAY
BETTER VOLTAGE PROFILE MEANS LESS ELECTRICAL LOSSES
WATER SUPPLY TO WATER SUPPLY TO BANGALOREBANGALORE
LOW VOLTAGE PROBLEMS AROUND BANGALORE HAMPERED WATER SUPPLY EARLIER
WITH BETTER VOLTAGE NOW, PUMPING EFFICIENCY HAS IMPROVED
400 KV STATION AT MYSORE BEING COMMISSIONED ON WAR FOOTING TO FURTHER FORTIFY THIS PART OF THE GRID
PUMPING LOSSES REDUCED
ENORMOUS SAVINGS TO THE STATE
MOTOR BURNING AND MAINTENANCE COSTS ALSO CAME DOWN DRASTICALLY
600
300
150
MERIT ORDER : UNITS BOXED UPMERIT ORDER : UNITS BOXED UPPOWER STATION STATE CAPACITY(MW) FUEL
VARIABLE COST
TATA DIESELKARNATAK
A 79 DIESEL 308
RAYALSEEMA DGPP
KARNATAKA 27 DIESEL 360
YELEHANKA DIESEL
KARNATAKA 128 DIESEL 314
THANRBHAVIKARNATAK
A 220 NAPTHA 325
SUB-TOTAL 454
BRAHAMPURAM DPP KERALA 107 DIESEL 275
BSES KERALA 157 NAPTHA 308
KASARGODE PCL KERALA 22 NAPTHA 298
KAYAMKULAM KERALA 360 NAPTHA 322
SUB-TOTAL 646
BASIN BRIDGETAMIL NADU 120 NAPTHA 584
P.P.NALLURTAMIL NADU 330 NAPTHA 415
SUB-TOTAL 450
TOTAL 1550
OPTIMAL RESERVOIR OPTIMAL RESERVOIR UTILISATIONUTILISATION
LINGANAMAKKI IN KARNATAKALINGANAMAKKI IN KARNATAKA
ENERGY STORAGE IN MU (THIS YEAR) :- 1480MILLION UNITS
ENERGY STORAGE IN MU (LAST YEAR) :- 834MILLION UNITS
MORE THAN 400 MILLION UNITS OF ENERGY SAVED DUE TO IMPROVED OPERATIONAL EFFICIENCY AND OPTIMISATION
THIS IS WORTH Rs 80 CRORES
BANGALORE 400 KV RING BANGALORE 400 KV RING MAIN(INTERIM)MAIN(INTERIM)
400 KV RING MAIN
SOMANAHALLI
NELAMANGALA
KOLAR
HOODY
FROM GOOTY
BANGALORE 400 KV RING BANGALORE 400 KV RING MAIN(FINAL)MAIN(FINAL)
400 KV RING MAIN
SOMANAHALLI
NELAMANGALA
KOLAR
HOODY
FROM GOOTY
SYSTEM AUGMENTATION SYSTEM AUGMENTATION SCHEMESSCHEMES
LILO OF KOLAR-MADRAS LINE AT MELKOTTAIYURLILO OF KOLAR-MADRAS LINE AT MELKOTTAIYUR LILO OF CUDDAPAH-MADRAS LINE AT CHITTORLILO OF CUDDAPAH-MADRAS LINE AT CHITTOR LILO OF ONE CKT NELLORE-MADRAS LINE AT LILO OF ONE CKT NELLORE-MADRAS LINE AT
ALMATHIALMATHI LILO OF ONE CKT OF TRICHY MADURAI LINE AT LILO OF ONE CKT OF TRICHY MADURAI LINE AT
KARAIKUDIKARAIKUDI 400 KV SS AT ALMATHI400 KV SS AT ALMATHI 400 KV SS AT MELKOTTAYUR400 KV SS AT MELKOTTAYUR 400 KV SS AT CHITOOR400 KV SS AT CHITOOR 400 KV SS AT KARAIKUDI400 KV SS AT KARAIKUDI 400 KV D/C MADURAI-PUGALUR LINE400 KV D/C MADURAI-PUGALUR LINE 400 KV D/C NEYVELI-PUGALUR LINE400 KV D/C NEYVELI-PUGALUR LINE 400 KV SS AT PUGALUR400 KV SS AT PUGALUR 400 KV D/C UDUMALPET- ARASUR LINE400 KV D/C UDUMALPET- ARASUR LINE 400 KV SS AT ARASUR400 KV SS AT ARASUR
KOODANKULAM KOODANKULAM EVACUATIONEVACUATION
400 KV D/C QUAD LINE TO TIRUNELVELI400 KV D/C QUAD LINE TO TIRUNELVELI 22ndnd 400 KV D/C QUAD TO TIRUNELVELI ON SEPARATE 400 KV D/C QUAD TO TIRUNELVELI ON SEPARATE
ROUTEROUTE LILO OF 400 KV D/C MADURAI-TRIVANDRUM @ LILO OF 400 KV D/C MADURAI-TRIVANDRUM @
TIRUNELVELITIRUNELVELI 400 KV D/C TIRUNELVELI-UDUMALPET LINE400 KV D/C TIRUNELVELI-UDUMALPET LINE 400 KV D/C TIRUNELVELI-COCHIN-THRISSUR LINE400 KV D/C TIRUNELVELI-COCHIN-THRISSUR LINE 400 KV D/C TIRUNELVELI-EDAMON LINE 400 KV D/C TIRUNELVELI-EDAMON LINE 400 KV D/C TIRUNELVELI-COCHIN-THRISSUR LINE AND THE 400 400 KV D/C TIRUNELVELI-COCHIN-THRISSUR LINE AND THE 400
KV D/C TIRUNELVELI-EDAMON LINE WOULD BE ON THE SAME KV D/C TIRUNELVELI-EDAMON LINE WOULD BE ON THE SAME MULTI-CIRCUIT TOWER USING ROW OF EXISTING 220 KV MULTI-CIRCUIT TOWER USING ROW OF EXISTING 220 KV EDAMON-KAYATHAR LINE.EDAMON-KAYATHAR LINE.
400 KV D/C TIRUNELVELI-EDAMON LINE TO BE CHARGED AT 220 400 KV D/C TIRUNELVELI-EDAMON LINE TO BE CHARGED AT 220 KV INITIALLY.KV INITIALLY.
400 KV D/C TIRUNELVELI-EDAMON LINE WOULD LATER 400 KV D/C TIRUNELVELI-EDAMON LINE WOULD LATER BE EXTENDED TO TRIVANDRUMBE EXTENDED TO TRIVANDRUM
UI DETAILSUI DETAILS
APAP KARKAR KERKER TNTN PONDPONDYY
Total UI Total UI exported(-) / exported(-) / Imported(+) Imported(+)
in MUsin MUs
--24824833
20612061 10401040 648648 -48-48
Total amount Total amount paid in paid in
Crores Rs.Crores Rs.-469-469 354354 181181 161161 -7-7
Average rate Average rate of UI in of UI in
paise/unitpaise/unit
181899
171722
174174 242488
142142
SUMMARY OF UI – 78 WKSSUMMARY OF UI – 78 WKS(FROM 01/JAN/03 TO 27/JUN/04)(FROM 01/JAN/03 TO 27/JUN/04)
UI IN SR (FROM 01/01/03 TO UI IN SR (FROM 01/01/03 TO 27/06/04)27/06/04)
TOTAL UI TURNOVER :- TOTAL UI TURNOVER :- 4402 MU4402 MU
TOTAL CONSUMPTION OF SR :- TOTAL CONSUMPTION OF SR :-
207136 MU207136 MU
UI MARKET IS 2 % OF THE TOTAL ENERGY UI MARKET IS 2 % OF THE TOTAL ENERGY
MARKETMARKET
TOTAL CGS GENERATION:-TOTAL CGS GENERATION:-
54458 MU54458 MU
UI MARKET IS 8% OF THE TOTAL ISGS UI MARKET IS 8% OF THE TOTAL ISGS
ENERGY MARKETENERGY MARKET…..CONTD
UI IN SR (FROM 01/01/03 TO UI IN SR (FROM 01/01/03 TO 27/06/04)27/06/04)
TOTAL UI AMOUNT DISBURSED:- TOTAL UI AMOUNT DISBURSED:- 823 823 CRCR
INTER REGIONAL UI:-INTER REGIONAL UI:- +876 MU -+876 MU -151 MU151 MU
AVG WEEKLY TRANSACTION:-AVG WEEKLY TRANSACTION:- 57 57 MUMU
AVG WEEKLY UI AMT DISBURSED:- AVG WEEKLY UI AMT DISBURSED:- 10.5 CR10.5 CR
AVG RATE OF EXPORT TO WR IN PAISE/UAVG RATE OF EXPORT TO WR IN PAISE/U 144 PS/U @SR144 PS/U @SR 266 PS/U @WR266 PS/U @WR
AVG RATE OF IMPORT FROM ER IN AVG RATE OF IMPORT FROM ER IN PAISE/UPAISE/U 144 PS/U @ ER144 PS/U @ ER
HVDC BHADRAWATI (WR-SR HVDC BHADRAWATI (WR-SR LINK)LINK)
TOTAL WR-SR IR LINK TOTAL WR-SR IR LINK TRANSMISSION CHARGES (01/01/03 TRANSMISSION CHARGES (01/01/03 TO 30/06/04) :- TO 30/06/04) :- 102.33CRORES102.33CRORES
TOTAL AMOUNT IN IRE A/C TOTAL AMOUNT IN IRE A/C TOWARDS SR BENEFICIARIES TOWARDS SR BENEFICIARIES (01/01/03 TO 30/06/04) :- (01/01/03 TO 30/06/04) :- 23.05CRORES23.05CRORES
23 % OF ANNUAL TRANSMISSION 23 % OF ANNUAL TRANSMISSION CHARGECHARGE
AVAILABILITY BASED AVAILABILITY BASED TARIFFTARIFF
A RATIONAL TARIFF A RATIONAL TARIFF STRUCTURESTRUCTURE
SCIENTIFIC SETTLEMENT SCIENTIFIC SETTLEMENT SYSTEMSYSTEM
……....COMPLEMENTS COMPLEMENTS GRID GRID SECURITY……RATHER THAN SECURITY……RATHER THAN
COMPROMISINGCOMPROMISING IT !!! IT !!!
ULDC-THE ULDC-THE EYES AND EARSEYES AND EARS OF THE SYSTEM OF THE SYSTEM OPERATOROPERATOR
ALL CONSTITUENTS GET THE SAME DATA IN REAL ALL CONSTITUENTS GET THE SAME DATA IN REAL TIMETIME.. TRANSPARENCY.TRANSPARENCY. SYNERGY IN OPERATION.SYNERGY IN OPERATION.
QUANTUM LEAP IN VISIBILITY TO OPERATORQUANTUM LEAP IN VISIBILITY TO OPERATOR.. INCREASED CONFIDENCE.INCREASED CONFIDENCE. FOCUS ON SECURITY AND ECONOMY.FOCUS ON SECURITY AND ECONOMY. INCREASED SCOPE FOR TRANSACTIONS WITH OTHER INCREASED SCOPE FOR TRANSACTIONS WITH OTHER
REGIONSREGIONS
PREMPTIVE, DYNAMIC “EARLY WARNING” PREMPTIVE, DYNAMIC “EARLY WARNING” SYSTEMS.SYSTEMS.
GRID LESS VULNERABLE TO DISTURBANCES.GRID LESS VULNERABLE TO DISTURBANCES. ACCURATE AND EASY ANALYSIS OF GRID ACCURATE AND EASY ANALYSIS OF GRID
INCIDENTS INCIDENTS FASTER RESTORATION AFTER PERTURBATIONFASTER RESTORATION AFTER PERTURBATION COMPREHENSIVE ENERGY MANAGEMENT COMPREHENSIVE ENERGY MANAGEMENT
SYSTEM FUNCTIONS.SYSTEM FUNCTIONS.
PROJECT COST:Rs 6840 MILLION ----COMPLETED SIX MONTHS AHEAD
DEVELOPMENT OF NATIONAL GRID
NER
ER
NR
WR
SR
EXISTING
500MW
MW1000
MW500
GAZUWAKA
CHANDRAPUR
VINDHYACHAL
SASARAM
UNDERCONST.
EXISTING
400 kV
220 kV
BONGAIGAONBIRPARA
MALDA
KORBA BUDHIPADAR
KOLHAPUR
BELGAUM
U.SILERU
BALIMELA
DEHRISAHUPURI
MALANPUR
AURAIYA
PHASE-I(By 2002)
HVDC STATION
KOLAR
(KARNATAKA)
TALCHER
ORISSA)
TALCHER KOLAR HVDC LINE
LENGTH:1400 KMS
TALCHER KOLAR LINKTALCHER KOLAR LINK ONE OF THE LONGEST HVDC LINES IN THE ONE OF THE LONGEST HVDC LINES IN THE
WORLDWORLD DESIGNED TO EVACUATE DESIGNED TO EVACUATE 2000 MW2000 MW COMMISSIONED IN ADVANCE TO UTILISE NON-COMMISSIONED IN ADVANCE TO UTILISE NON-
PEAK SURPLUS POWER OF EASTERN REGIONPEAK SURPLUS POWER OF EASTERN REGION COMMISSIONED 9 MONTHS AHEAD OF COMMISSIONED 9 MONTHS AHEAD OF
SCHEDULESCHEDULE COST INCURRED COST INCURRED Rs 3,100 CRORES Rs 3,100 CRORES AGAINST AGAINST
APPROVED COST OF APPROVED COST OF Rs 3,866 CRORESRs 3,866 CRORES:- SAVING OF :- SAVING OF NEARLY NEARLY 800 CRORE RUPEES800 CRORE RUPEES
THE PROJECT HAS USED THE PROJECT HAS USED APPROXIMATELY 90,000 TONNES OF APPROXIMATELY 90,000 TONNES OF STEEL AND 16,000 KM OF CABLES STEEL AND 16,000 KM OF CABLES
Thank youThank you