presentation to the select committee on land and environmental affairs 7 may 2013

13
20/06/22 1 PRESENTATION TO THE PRESENTATION TO THE SELECT COMMITTEE ON LAND SELECT COMMITTEE ON LAND AND ENVIRONMENTAL AFFAIRS AND ENVIRONMENTAL AFFAIRS 7 MAY 2013 7 MAY 2013

Upload: lucia

Post on 05-Jan-2016

25 views

Category:

Documents


0 download

DESCRIPTION

PRESENTATION TO THE SELECT COMMITTEE ON LAND AND ENVIRONMENTAL AFFAIRS 7 MAY 2013. MOKOLO & CROCODILE WATER AUGMENTATION PROJECT (MCWAP). OBJECTIVE. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PRESENTATION TO THE SELECT COMMITTEE ON LAND AND ENVIRONMENTAL  AFFAIRS 7  MAY 2013

20/04/23 1

PRESENTATION TO THEPRESENTATION TO THESELECT COMMITTEE ON LAND AND SELECT COMMITTEE ON LAND AND

ENVIRONMENTAL AFFAIRSENVIRONMENTAL AFFAIRS

7 MAY 2013 7 MAY 2013

Page 2: PRESENTATION TO THE SELECT COMMITTEE ON LAND AND ENVIRONMENTAL  AFFAIRS 7  MAY 2013

MOKOLO & CROCODILE WATER AUGMENTATION PROJECT (MCWAP)

20/04/23 2

Page 3: PRESENTATION TO THE SELECT COMMITTEE ON LAND AND ENVIRONMENTAL  AFFAIRS 7  MAY 2013

OBJECTIVE

20/04/23 3

The objective of the MCWAP is to plan and implement feasible options to transfer water from the Mokolo River and Crocodile River (West) to Lephalale and Steenbokpan without impacting on the water entitlements of existing users.

Page 4: PRESENTATION TO THE SELECT COMMITTEE ON LAND AND ENVIRONMENTAL  AFFAIRS 7  MAY 2013

MCWAP: DESCRIPTION & PURPOSE• Augmented water supply in the Lephalale area to meet the water

requirements of the Medupi Power Station and the future water requirements related to the expected growth in the Lephalale Municipality

• Phase 1 under construction includes a new pump station at Mokolo Dam and pipeline to Medupi and Matimba Power Station, Exxaro mine and Lephalale town

• Sub-phase 2A: Vlieëpoort Abstraction Works and bulk transfer system (BTS) to Steenbokpan and Lephalale areas including a river management system by 2019

• Sub-phase 2B: Duplication of BTS, if needed • Sub-phase 3: Abstraction Works at Boschkop and BTS to

Vlieëpoort Abstraction Works• Sub-phase 4: Transfer Works from southern Gauteng to augment

supply• Social/Commercial portion on/off-budget

Page 5: PRESENTATION TO THE SELECT COMMITTEE ON LAND AND ENVIRONMENTAL  AFFAIRS 7  MAY 2013

5

LOCATION OF INDUSTRIAL LOCATION OF INDUSTRIAL DEVELOPMENT DEVELOPMENT

Page 6: PRESENTATION TO THE SELECT COMMITTEE ON LAND AND ENVIRONMENTAL  AFFAIRS 7  MAY 2013

Project description:Construction of a pumping station and 46 km of pipeline, with a diameter of 1 m to deliver bulk raw water from the Mokolo Dam to Medupi and Matimba Power stations, Exxaro and for the expected domestic growth in the Lephalale Municipality. The existing pipeline will be refurbished following commissioning of the new works. Status:Approved as Government Waterwork.Province:LimpopoJobs impact: •Direct project construction jobs: 1 600 at peakProjected cost to completion: R2,138 billion (excluding VAT)Project Scope: •Construction of Mokolo Pumping Station.•Construction of a 46 km, 1m diameter pipeline.•Refurbishment of existing pipeline.•TCTA to obtain off budget funding (75% commercial)•Additional yield 30 million m3/a.Project schedule: •Debottlenecking 6,6 km: First water end April achieved•2013 Debottlenecking 10,4 km: First water June 2013

•Entire pipeline Ready for trial operation: May 2014.•Forecast project close out: December 2015Progress& Challenges:•R715 million (within budget) expended to date.•Contract awarded in June 2011.•Site handed over to contractor on 14 Sept 2011 and physical activities started during November 2011, progress is unfortunately slow, i.e. 6 months behind schedule. New contract staff mobilised, more fronts mobilised, new techniques (robot – 300m/day) introduced, start to see improvements. Talks at CEO level held, mitigation plan tabled and monitored. Penalties levied.•Pumps, valves and HVAC equipment manufactured.•Industrial action experienced during January 2013•6 922m pipe laid•Pipe delivery challenges addressed•MCWAP-1 will not delay Medupi’s proposed commissioning end 2013

Mokolo and Crocodile River (West) Water Augmentation Project Phase 1 (MCWAP-1) (75% off-budget)

Page 7: PRESENTATION TO THE SELECT COMMITTEE ON LAND AND ENVIRONMENTAL  AFFAIRS 7  MAY 2013

20/04/23 7

Olifants River Water Resources Development Project – Phase 2A (De

Hoop Dam)

Page 8: PRESENTATION TO THE SELECT COMMITTEE ON LAND AND ENVIRONMENTAL  AFFAIRS 7  MAY 2013

Project description:Construction of the 80 m high De Hoop Dam and related infrastructure - to supply water to domestic and industrial users in the middle Olifants river catchment area.

Status: Approved as Government Water Work.Province: LimpopoJobs impact: • Direct project construction jobs (peak):

• 1150 : De Hoop Dam• 528 : Road re-alignment• 250 : Housing infrastructure

• Jobs due to new industrialisation and growth: ±5000Projected cost to completion: • Phase 2A (Dam): R3.1bnProject Scope: • Construction of the De Hoop Dam.• Re-alignment of 20 km portion of P169-1.• Housing infrastructureProject schedule: • Construction started: June 2007• Construction Completion: Sept 2013 (Project Completion

at 95%)

Progress/Challenges• 3rd & 4th stage river diversion completed October

2012.• High risk of missing 2012/13 wet season storage if

impoundment not commenced – relocation of basin families still a concern.

• Construction completion date now Sept 2013.Connected issues: • Sediment from upstream open cast mining

polluting and decreasing dam storage capacity• Community distress if primary water is not supplied

Olifants River Water Resources Development Project – Phase 2A (De Hoop Dam)

8

30 April 2013

Page 9: PRESENTATION TO THE SELECT COMMITTEE ON LAND AND ENVIRONMENTAL  AFFAIRS 7  MAY 2013

20/04/23 9

Olifants River Water Resources Development Project -Phase 2 Bulk Distribution System

Page 10: PRESENTATION TO THE SELECT COMMITTEE ON LAND AND ENVIRONMENTAL  AFFAIRS 7  MAY 2013

Project description:The construction of the bulk distribution system which

will transfer water from the De Hoop and Flag Boshielo Dams to domestic and industrial users in the middle Olifants River catchment area.

Status: Approved as Government Waterwork.Province: LimpopoJobs impact: • Direct project construction jobs: 2 000 jobs for the

BDS• Jobs due to new irrigation and industrialisation and

growth: 5 000Projected cost to completion: • Phase 2 (Bulk Distribution System): R4.4bnProject Scope: • Construction of the Bulk Distribution system that will

convey bulk raw water from the De Hoop and Flag Boshielo Dams to domestic and industrial users, according to the recommendations of the Panel of Experts.

Project schedule: • Construction of 2C commenced in March 2012,

completion expected by March 2014.• Design and Planning activities of 2B as per the PoE’s

recommendations to commence June 2013

Progress:• GAP analysis of the design and planning done is

currently in process.

Challenges:• The project to implement the recommendations by

the POE.• All the work that is to be done on 2B must be done

to realise the start of construction by year end.• Funding model is still under discussion.

Olifants River Water Resources Development Project – Phase 2 Bulk Distribution System

2B – Pipeline from Flag Boshielo to Sekuruwe and its accompanying equipment2C – Pipeline from De Hoop Dam to Steelpoort and its accompanying equipment2D – Upgrading of the pipeline from Steelpoort to Mooihoek (Required by 2021)

Page 11: PRESENTATION TO THE SELECT COMMITTEE ON LAND AND ENVIRONMENTAL  AFFAIRS 7  MAY 2013

20/04/23 11

Luvuvhu River Government Water Scheme: Nandoni Pipelines

Page 12: PRESENTATION TO THE SELECT COMMITTEE ON LAND AND ENVIRONMENTAL  AFFAIRS 7  MAY 2013

Project description:Construction of five new pipelines to replace problematic GRP pipelines

Status:

All the contractors have been appointed and are on site.

Province: Limpopo

Jobs impact: 881 local laboures are employed

Projected cost to completion: R750 million

Project Scope: This project includes five new steel pipelines forXikundu Distribution Scheme and NandoniDistribution Scheme

Project schedule:

Bulk pipelines to the north of Nandoni Dam and Xikundu Weir commissioning dates are as follows:

NN20B Rising Main was commissioned during April 2013 and the Lukalo-Lambani and NR6 Pipelines will respectively be commissioned during May and June 2013.

Secondly the Vuwani Pipeline is being constructed by three Contractors and it is foreseen to be commissioned during July 2013.

Lastly the Valdezia bulk pipeline is being constructed by the DWA Construction North and will be

commissioned during November 2013.

Challenges:

The Nandoni pipeline was planned to be finalized in June 2013, extensive progress has been made, however due to challenges experienced as a result of unsatisfactory performance by the contractor, the project will be delayed by 3 months. The floods that were experienced during the rainy season in the area also contributed to the delays. An accelerated works programme is being implemented by the contractor to make up for the time lost.

Connected issues:

Local Water distribution Infrastructure to be implemented by the Vhembe District Municipality.

Luvuvhu River Government Water Scheme: Nandoni Pipelines

Page 13: PRESENTATION TO THE SELECT COMMITTEE ON LAND AND ENVIRONMENTAL  AFFAIRS 7  MAY 2013

20/04/23 13