AXIOM Boardsignal integrity, setup a cluster and power management
18th october 2017
Ing. Alessandro Pali Ing. Davide [email protected] [email protected]
![Page 2: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/2.jpg)
AXIOM Ecosystem
H2020 allowed SECO to invest in the Programmable hybrid
ARM/FPGA SoCs area bringing new solutions to the embedded market
through relationships with both industrial and academic partners
ACADEMIC PARTNERSINDUSTRIAL PARTNERS
![Page 3: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/3.jpg)
Clustering capabilities
OmpSs framework
Software
Open source OSHybrid SoC
Compatibility with Arduino
Cost-effective networing infrastructure
Hardware
ARM based
AXIOM BoardHardware and Software Stack Solution
![Page 4: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/4.jpg)
BOOTMEDIA
AXIOM LINK
Video outputs
Zynq Ultrascale+ ZU9EG MPSoC
Gigabit Ethernet
transceiver
2 x USB 3.0
Type-A connectors
JTAG connector
QSPI Flash
microSD
connector
DDR4 ECC
So-DIMM
RJ-45 Ethernet
connector
2 x USB 2.0 ULPI
Transceivers
mini-DP connector
Camera Connector
LVDS connector
Clock generator
1GB 32-bit
Soldered down
DDR4 memory
8GB eMMC
micro-B USB
Device connector
USB-to-UART
bridge
Arduino UNO
connectors
Trace port
connector
HSDP connector
USB Type-C
connectors #[0..3]
Cable orientation
detection logic
Processing
system
RGMII
ULPI #[0..1]
USB SS #[0..1]
eDP
DDR4
JTAG
QSPI
SDIO #0
SDIO #1
UART #0
Programmable
Logic
LVDS
DDR4
GPIO
TRACE
PORT
HSDP
GTH Transceivers
REFCLK
GTH
#[0..3]Power supply
-
Power monitors
Hardware Prototype
![Page 5: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/5.jpg)
Dedicated On-Board Hardware:
Power measurements on 8 supply
rails (70% of maximum total
estimated power)
Specific Development Tools Cross
Triggering Capabilities During Debug
and Trace:
Dedicated test points for analog
probe connections and ‘Breakpoint’
on given power consumption levels
I2C bus
Zynq
SoC
VCC
ON BOARD POWER MONITOR
ANALOG PROBE
SHUNT
RESISTOR
• APPLICATIONS CAN TRACK POWER CONSUMTPION AGAINST RUNNING TASKS
• USERS MAY TEST CODING STYLES AGAINST POWER CONSUMPTION
AXIOM id. 645496
http://www.axiom-project.eu/deliverable
Power Monitoring and Profiling
![Page 6: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/6.jpg)
SMART SURVEILLANCE
SMART HOME
SMART ENERGY
SMART HEALTH
SMART CARDO- IT-YOURSELF
![Page 7: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/7.jpg)
First Outcome for SECOIndustrial solution SM-B71
Wide scalability from cost effective
Dual-Core to high performance
Quad-Core ARM® Cortex®-A53
MPSoCs with GPU/VCU
Dedicated Real-Time ARM® Cortex®-
R5 processors
Extreme flexibility: up to 256k FPGA
logic cells
LVDS and DP video interfaces up to
4K resolution High-speed interfaces
SMARC Rel. 2.0 with the Xilinx® Zynq® Ultrascale+™ MPSoC
SM-B71
![Page 8: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/8.jpg)
EMC evaluation and Signal Integrity
![Page 9: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/9.jpg)
EMC evaluation & Signal IntegrityProduct Research and Development
What SECO EMC division for measurements
and certifications does:
▪ Design of HS digital lines
▪ Post layout symulations
▪ Signal integrity measurements
▪ Pre-conformity EMI/EMS measurements
![Page 10: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/10.jpg)
Pre Layout Vias tecnology
Pre-layoutTo verify the improvement
![Page 11: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/11.jpg)
At the pre-layout stage we can
define the budget we need to
garant a correct routing of the
board.
At the pre-layout stage we can
evaluate the surface roughness,
xtalk etc. effects yet.
Pre-layoutUSB 3.0
![Page 12: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/12.jpg)
At pre-layout stage we
can also define the
equalization’s parameters
we need to garant that
the involved bus does
work correctly.
Pre-layoutUSB 3.0
![Page 13: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/13.jpg)
VIA simulato con Momentum
It can be useful to define general
rules valid for all the data or
addresses of a DDR, helping the CAD
projectist to route a board that
already has predefined distances
and matchings.
To make the pre-layout stage closer
to a real situation, VIASes can be
extracted with ADS or EMPro.
Pre-Layout AnalysisSimulation Bus DDR4
![Page 14: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/14.jpg)
DDR before and after the optimization with ADS
ADS is a powerful optimization instrument
to improve our transmission line.
We used eye width and skew interchip
as optimization parameters to stay in the
standards managed by the processor
controller to have a fly-by topology.
Those parameters would change for a T
topology where the main problems are
reflections not the xtalk.
Pre-Layout OptimizationSimulation Bus DDR4
![Page 15: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/15.jpg)
PDN extracted with EM simulation
Impedance saw from the CPU with an AC
simulation
Decoupling capacitors and EMI suppressor
include real elements: only with
symulations we can comprehend the real
impedance profile.
Power Integrity Analysis
![Page 16: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/16.jpg)
PCB EMI compliance analysisRFEM 3D EM Simulation in EMPro with EMI Emission Calculation
![Page 17: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/17.jpg)
ESD AnalysisFTDT 3D EM Simulation with EMPro
![Page 18: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/18.jpg)
Antenna matching network
designed extracting S
parameters with EMPro and
optimization of the fine tuning
elements with ADS optimization
WiFi antenna on PCBAnalisi FEM with EMPro
![Page 19: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/19.jpg)
Keysight ADS 2017Signal and Power Integrity Solutions
![Page 20: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/20.jpg)
Keysight ADS 2017Signal and Power Integrity Solutions
![Page 21: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/21.jpg)
![Page 22: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/22.jpg)
![Page 23: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/23.jpg)
AXIOM BoardImported in ADS
![Page 24: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/24.jpg)
AXIOM BoardImported in ADS
![Page 25: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/25.jpg)
AXIOM BoardImported in ADS
![Page 26: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/26.jpg)
S-Parameter MeasurementWith Keysight ENA
![Page 27: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/27.jpg)
S-ParametersSimulated vs Measured
![Page 28: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/28.jpg)
Eye Diagram Test BenchIn ADS
![Page 29: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/29.jpg)
Eye Diagram MeasurementWith Keysight V-Series Scope
![Page 30: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/30.jpg)
Measured Simulated
Eye DiagramSimulated vs Measured
![Page 31: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/31.jpg)
Control of whichbusses need a
prelayout
High speed digital design
USB3.0, DDR,
SATA, DDI ecc.
EMC and SI simulations
Mass production
Pre-SeriesPost Layout Verification
Electric Scheme
3D Solver EMCsimulations
Far field ESDsimulations
Specifications
PCB Design
Proto
Project time
Production Costs
Number of Revisions
Design Flow: Now
Definition of Layout rules, optimized stack up
for HSD
![Page 32: Presentazione standard di PowerPoint - CRIT · 8GB eMMC micro-B USB Device connector USB-to-UART ... ESD Analysis FTDT 3D EM ... Simulated vs Measured. Control of which busses need](https://reader030.vdocuments.net/reader030/viewer/2022032613/5ad9715c7f8b9a86378c0399/html5/thumbnails/32.jpg)
Thank You
Ing. Alessandro Pali Ing. Davide [email protected] [email protected]
www.seco.com
SECO s.r.l.
Via Calamandrei, 91
52100 Arezzo - ITALY
Ph. +39 0575 26 979
Fax +39 0575 350 210