  • Princes Highway upgrade, Dignams CreekReview of Environmental Factors

    June 2013

    RMS/pub. 13.317 ISbN. 978-1-922245-52-6

  • MONTH/YEAR (blank page)

  • Roads and Maritime Services

    Upgrade of the Princes Highway, Dignams Creek Review of Environmental Factors June 2013 Final

    Prepared by Sinclair Knight Merz ABN: 37 001 024 095

    710 Hunter Street Newcastle West NSW 2302 Australia

    PO Box 2147 Dangar NSW 2309 Australia

    Tel: +61 2 4979 2600 Fax: +61 2 4979 2666 www.skmconsulting.com

    http:www.skmconsulting.com

  • Document history and status Revision Date issued Reviewed by Approved by Date approved Revision type

    Revision A 18/02/2013 A.Spinks A.Spinks 18/02/2013 Practice Review

    Revision B 7/05/2013 A.Spinks A.Spinks 7/05/2013 Incorporation of client review

    Revision C 11/06/2013 A.Spinks A.Spinks 12/06/2013 Incorporation of client review

    Revision D 17/06/2013 A.Spinks A.Spinks 17/06/2013 Incorporation of client review

    Final 19/06/2013 A.Spinks A.Spinks 19/06/2013 Incorporation of client review

    Distribution of copies Revision Copy no Quantity Issued to

    Revision A 1 1 RMS – Project manager

    Revision B 1 1 RMS – Project manager

    Revision C 1 1 RMS – Project manager

    Revision D 1 1 RMS – Project manager

    Final 1 1 RMS – Project manager

    Printed: 25 June 2013

    Last saved: 25/06/2013 15:44

    File reference number EN02937_Dignams_Creek_REF_Final_Access_2013_06_25

    Author: Rachel Vazey, Vivira Cadungog, Tina Donovan, Shane Lakmaker (Air)

    Project manager: Rachel Vazey

    Name of organisation: Sinclair Knight Merz

    Name of project: Upgrade of the Princes Highway, Dignams Creek

    Name of document: REF

    Document version: Final

    Project number: EN02937

  • Executive summary The proposal The Roads and Maritime Services (RMS) propose to realign around 3.7 kilometres of the Princes Highway at Dignams Creek on the South Coast of New South Wales (NSW). The proposal is located between Narooma and Cobargo in the Eurobodalla and Bega Valley Local Government Areas (LGAs). The proposal includes the section of the Princes Highway starting about 1.5 kilometres north of the intersection of Dignams Creek Road and extending around 2.2 kilometres to the south of the intersection.

    The proposal has been split into two stages in order to obtain construction funding for the proposal and to provide a plan for future works. Stage 2 is a long term plan and is unlikely to be constructed for some time.

    A description of the proposal is provided below. Key features of Stage 1 include: • Realigning about two kilometres of single carriageway starting about 1.5

    kilometres north of the Dignams Creek Road intersection and extending to about 600 metres south of the Dignams Creek Road and Princes Highway intersection. The section would be constructed as a single carriageway with 3.5 metre wide lanes and three metre shoulders in each direction.

    • Removal of four tight sub-standard curves along the existing Princes Highway. • Construction of a new single carriageway bridge over Dignams Creek about

    91 metres in length. • Relocating the Princes Highway and Dignams Creek intersection about 100

    metres north-west. • Realigning around 200 metres of the most eastern section of Dignams Creek

    Road. • Tie ins to the existing Princes Highway alignment. • Provision of around 1.4 kilometres of road safety treatments along the existing

    Princes Highway alignment at the southern end of the proposal. • Provision of one dedicated fauna underpass and one combined drainage

    culvert/fauna underpass. • Relocating two private property access roads and formalising and consolidating

    one national park access point. • Part of the existing Princes Highway alignment and Dignams Creek Bridge

    would be retained for private use.

    Key features of Stage 2 include:

    • Realigning about 1.5 kilometres of single carriageway commencing about 600 metres south of Dignams Creek Road and extending to the southern end of the proposal. The section would be constructed as a single carriageway with 3.5 metre wide lanes and three metre shoulders in each direction.

    • Removal of six sub-standard curves along the existing Princes Highway. • Tie ins to stage 1 and the existing Princes Highway alignment. • Provision of one dedicated fauna underpass, one combined drainage

    culvert/fauna underpass and one rope canopy bridge. • Relocating access roads for Kooraban National Park and Gulaga National

    Park. • Removal of the existing Princes Highway between Dignams Creek Road and

    the access road to Gulaga National Park.

    Upgrade of the Princes Highway, Dignams Creek Review of Environmental Factors

    i

  • The following general features would be included for both stages of the proposal:

    • Installation of operational water quality controls including: − Five biofiltration basins. − A water quality basin. − Two constructed wetlands. − Biofiltration/vegetated swales.

    • Installation of four retaining walls. • Provision of ancillary facilities such as temporary sedimentation basins,

    compound and stockpile sites, and access tracks. • Removal, rehabilitation and revegetation of 0.6 kilometres of the redundant

    sections of the Princes Highway. • Relocation of overhead utilities to accommodate the proposal.

    Construction of the proposal would proceed following determination of the Review of Environmental Factors (REF), obtaining other approvals as required, completion of the detailed design and the securing of funding from government sources. The construction period for Stage 1, would have duration of between 18 and 24 months. Stage 1 of the proposal has a strategic estimate of about $40 million. Whilst Stage 2 is a long term plan which is unlikely to be built for some time, the strategic cost estimate for this stage is around $20 million (2013 dollars). The construction period for Stage 2 would be defined during detailed design.

    The proposal objectives are as follows:

    • To improve road safety. • To provide a continuous 100 kilometre per hour travel speed environment. • To improve economic efficiency including freight through improved alignment. • To provide a well-engineered, safe and environmentally acceptable road

    transport facility. • To provide a value for money project.

    Need for the proposal The Princes Highway has a poor crash history in the Dignams Creek region. Between 2005 to 2010, there have been 21 crashes along the Dignams Creek section of the Princes Highway. One crash was fatal, 11 crashes resulted in injury, and nine were non causality crashes. Currently the crash rate on the Princes Highway at Dignams Creek is 214.1 per 100 million vehicle kilometres travelled (MVKT). This is over seven times the typical casualty crash rate for this type of road in NSW of 30.4 crashes per 100 MVKT. The casualty crash rate is 132.6 per 100 MVKT, which is nearly eleven times the casualty crash rate for NSW of 12.2 per 100 MVKT. The predominant crash type is run off road on a curve (hit object), representing 67 per cent of the crashes. Contributing factors include speed (76 per cent) and wet road conditions (62 per cent).

    In 2008 a coronial inquiry was undertaken by the NSW Government in response to 15 fatalities on the Princes Highway. One of the findings included a recommendation that the NSW Government seek Australian Government funding to upgrade the Princes Highway between Victoria Creek and Dignams Creek. The proposal is therefore required to improve the substandard alignment, the poor crash history and safety concerns associated with the Dignams Creek section of the Princes Highway.

    Upgrade of the Princes Highway, Dignams Creek Review of Environmental Factors

    ii

  • The proposal forms part of progressive ongoing upgrades of the Princes Highway. The aim of the upgrades is to improve road safety, road geometry and alignment, creek and river crossings, and travel times on the Princes Highway. The proposal would specifically improve road safety along the Dignams Creek section of Princes Highway through the realignment of tight curves. The proposal would also address objectives outlined in the NSW 2021: A Plan to Make NSW Number One, the NSW State Infrastructure Strategy 2008-09 to 2017-18, the RMS 2012-2016 Corporate Strategy, the South Coast Regional Strategy 2006 – 2031 and the South East NSW Local Action Plan.

    Options considered Fifteen options (including four longer options, nine shorter options, 3 intermediate length options and two community options) were considered by RMS during the preliminary investigations and analysed according to the following five selection criteria: • Road Safety. • Economic Analysis/Cost. • Environmental Constraints. • Urban Design. • Constructability.

    Each option was also assessed against whether or not they meet the previously described proposal objectives. Based on the results of the analysis by RMS, Option 13 was shown to fulfil the proposal objectives and identified as the best performing option according to the selection criteria. Consequently Option 13 was selected as the preferred option and is the subject of this REF.

    Statutory and planning framework The State Environmental Planning Policy (Infrastructure) 2007 (ISEPP) aims to facilitate the effective delivery of infrastructure across New South Wales. Clause 94 of the ISEPP permits development on any land for the purpose of a road or road infrastructure facilities to be carried out by or on behalf of a public authority without consent. The proposal can therefore be assessed under part 5 of the Environmental Planning and Assessment Act 1979 (EP&A Act) by the RMS as both the proponent and the determining authority. Development consent from Council is not required.

    The southern part of the proposal is located through a section previously identified as Kooraban National Park, which is currently vested in the Minister for Environment and under the management of Office of Environment and Heritage (OEH). However, the National Parks and Wildlife Amendment (Adjustment of Areas) Bill 2012 has been passed by the NSW Parliament which included the revocation of about 18.28 hectares of Kooraban National Park. The land would be transferred to RMS for use as road reserve as part of this proposal following agreement on an offset strategy between RMS and OEH for the revocation of former national park land. As such the proposal is permitted to be assessed under part 5 of the EP&A Act.

    Community and stakeholder consultation Consultation has been ongoing since June 2009 and has included consultation with the general public, the Aboriginal community, Bega Valley Shire Council, Eurobodalla Shire Council, the Office of Environment and Heritage (OEH), Batemans Marine Park

    Upgrade of the Princes Highway, Dignams Creek Review of Environmental Factors

    iii

  • Authority, Department of Primary Industries (Fisheries and Aquaculture), the Australian Department of Sustainability, Environment, Water, Population and Communities (DSEWPaC) and the Mine Subsidence Board. The consultation process has assisted the development of the proposal. The main issues raised during consultation undertaken to date include the following:

    • Process, including option selection. • Cost. • Road safety, including crash history. • Design. • Future traffic growth. • Property acquisition / revocation of Kooraban National Park. • Offset requirements. • Construction impacts. • Environmental impacts, including:

    − Ecology. − Heritage (Aboriginal and non-Aboriginal). − Social. − Flooding and hydrology. − Noise and vibration. − Visual and urban design.

    • Impacts to utilities.

    This REF would be placed on public display for community comment. All submissions received will be considered and addressed in a submissions report, which will be made publicly available on the RMS website.

    Environmental impacts A summary of the main environmental impacts are summarised below.

    Flora and fauna The proposal is located within the south eastern corner bioregion of NSW, which is important for biodiversity as it’s the transitional area from the coast to the hinterland. The proposal would result in the loss of about 20.6 hectares of vegetation which includes 0.2 hectares of the Threatened Ecological Community (TEC) recognised as River-flat Eucalypt Forest on Coastal Floodplains and listed as endangered under the Threatened Species Conservation Act 1995 (TSC Act).

    The proposal would directly impact on threatened flora including around 50 individuals of the Square Raspwort (Haloragis exaltata subsp. exaltata) which is listed as vulnerable under the TSC Act and the Environmental Planning and Conservation Biodiversity Act 1999 (EPBC Act). The proposal would also remove potential habitat for: • Twenty-four threatened fauna species including the Koala (Phascolarctos

    cinereus) which has recently been listed as vulnerable under the TSC Act and the EPBC Act.

    • Eleven migratory species confirmed to occur in the study area or considered highly likely to occur based on local records and habitat preferences.

    Assessments of significance found that the proposal would not have a significant impact on any threatened species, populations or ecological communities. Impacts to these species would be ameliorated, through the implementation of safeguards and

    Upgrade of the Princes Highway, Dignams Creek Review of Environmental Factors

    iv

  • mitigation measures identified in this REF. However, RMS intends to submit a referral, to the Australian Government DSEWPaC to determine whether or not the proposal constitutes a controlled action due to: • Potential impacts upon an important population of Koala and habitat being

    impacted is considered critical to the survival of Koalas based on Commonwealth guidelines (DSEWPaC 2012), refer to Section 6.1.

    • Potential impacts to Square Raspwort.

    If the proposal is determined to be a controlled action, the approval of the Australian Government Minister for the Environment is required.

    A biodiversity offset strategy has been developed to offset the revocation of 18.28 hectares of former Kooraban National Park lands to be transferred to RMS for use as road reserve, and to compensate for impacts to threatened species and TEC which cannot be adequately addressed though mitigation and management measures. The strategy has been undertaken according to the OEH (2009) Biobanking Assessment Methodology and has indicated that RMS would need to secure about 125 hectares of good to moderate condition vegetation for the offset. RMS has purchased a property which could satisfy the biodiversity offset requirements and is currently finalising the offset package with OEH.

    Noise and vibration In the northern part of the proposal the realignment of the Princes Highway would move between 100 to 275 metres closer to sensitive receivers located to the west of the existing Princes Highway on Dignams Creek Road. Construction noise levels would be exceeded at 10 noise sensitive receivers located along Dignams Creek Road. One location (receiver 7 at Lot 321 DP873421) may experience noise levels close to the highly affected noise level. A feasible and reasonable approach towards noise management measures would be required to reduce noise levels as much as possible during construction.

    While earthworks may produce adverse vibration impacts within 30 metres of construction works, structural damage is considered unlikely as there are no residences with 50 metres of the proposal.

    The operational noise assessment was based on two build scenarios being 2016 (potential year of opening) and 2026 (design year). Both of these scenarios indicated that traffic noise levels at all but one receiver (receiver 7 at Lot 321 DP873421) would generally rise by about 2 dB(A) to 5 dB(A),this is due to low traffic volumes and distance to the proposal. For the noise receiver (7) at Lot 321 DP873421 the predicted increase is about 6 dB(A) during the day and 7 dB(A) at night. All receivers are below the project specific noise criteria as defined in the OEH New South Wales Road Noise Policy (RNP) (DECCW 2011). Feasible and reasonable mitigation measures such as individual building treatment would be considered for this receiver.

    Landscape character and visual impacts The existing landscape character is characterised by forested ridges and cleared valleys and the existing Princes Highway. To the north of the proposal the forested ridges are generally private property while to the south of the proposal the forested ridges are national parks, comprised of Kooraban National Park to the west and Gulaga National Park to the east. The landscape character would change as a result of the proposal by the removal of vegetation during construction, the increase in road pavement area, and the scale of earthworks. The impression of landscape character

    Upgrade of the Princes Highway, Dignams Creek Review of Environmental Factors

    v

  • from the road user’s perspective would be altered in that the new alignment would be less responsive to the physical features of the landscape, and speed limits increased which reduces viewing time of cultural and biophysical features.

    Aboriginal and Non-Aboriginal cultural heritage The proposal would not have any significant impacts on any known items of Aboriginal cultural heritage. An Aboriginal Heritage Impact Permit (AHIP) permit was sought and issued (number 1131201) by OEH for all the survey units located within and adjacent to the proposal construction footprint.

    The proposal would impact on and require partial acquisition of Crown Reserve 91754 which currently has an Aboriginal Land Claim (no 7761) on it. This claim would need to be resolved before construction commences. No known native title claims were found within the footprint of the proposal.

    The proposal would have potential impacts to the old Dignams Creek public school (item DC4) and sections of the old Princes Highway alignment (item DC2). Neither item is a listed heritage item. The Dignams Creek Bridge is listed as a local heritage item in the RMS section 170 heritage register. As a result of the proposal the bridge would no longer be required by RMS for the Princes Highway and would be sold. Consequently the Dignams Creek Bridge would require delisting from the RMS section 170 heritage register. Consultation would be undertaken with the Heritage Branch to delist the bridge from the register.

    Traffic and access The proposal would have long-term benefits including improved road safety through improvements in road geometry and alignment of the Princes Highway at Dignams Creek. Other long term benefits include improvements in traffic and freight efficiency along the Princes Highway.

    Hydrology, flooding and groundwater The proposal is predominantly located within the Dignams Creek and Blind Creek catchments and a small portion to the south of the proposal is within the Narira Creek catchment. All catchments flow into Wallaga Lake which is tidally influenced and is located to the south-east of the proposal. The proposal includes the construction of a new 91 metre bridge with bridge abutments and drainage structures over Dignams Creek. The bridge is designed to provide flood immunity to a 100 year average recurrence interval (ARI) flood level. The bridge piers are located outside of the Dignams Creek low flow level and are designed to minimise potential scouring of the banks of the waterways.

    The proposal would cause a minor increase in flood levels by up to 0.10 metres adjacent to the proposed bridge over Dignams Creek for the 100 year ARI level under unblocked conditions. The modelled increase in flood levels gradually reduces to about zero metres around 250 metres upstream of the proposed bridge. The proposal would not significantly change the patterns of ponding/retention of floodwaters, nor would it change the duration of inundation of the floodplain. As such, no adverse flooding impacts to adjacent properties are anticipated and no mitigation controls would be required.

    Upgrade of the Princes Highway, Dignams Creek Review of Environmental Factors

    vi

  • Soils, landscape and water quality The proposal would require excavation, removal of vegetation, disturbance of soils and the construction of pavements, a new bridge and culverts which may lead to exposed soils, sediment entering waterways and the degradation of water quality. Dignams Creek flows downstream through the Dignams Creek Sanctuary Zone (Batemans Marine Park) and through five State Environmental Planning Policy No 14 – Coastal Wetlands (SEPP 14). The sanctuary zone is around three kilometres downstream of the proposal and the first SEPP 14 wetland is 5.2 kilometres downstream of the proposal. No impacts to the marine sanctuary or the SEPP 14 wetlands would be anticipated provided mitigation measures outlined in this REF are implemented. Operational water quality measures, including one water quality basin, five biofiltration basins, two constructed wetlands and a series of biofiltration swales are proposed and would be further refined during detailed design.

    Socio-economic, land use and property impacts During construction, the community would be likely to experience noise, air quality and visual amenity impacts. The community would also experience traffic delays including occasional temporary restrictions of property access. Any temporary restrictions to property access would be arranged with the affected property owner prior to restrictions occurring. The proposal would require one partial property acquisition and relocation of two property access roads. During operation, the proposal would improve access and connectivity for local and regional communities by reducing travel times and increasing road safety.

    Justification and conclusion This REF has examined and taken into account to the fullest extent possible all matters affecting or likely to affect the environment by reason of the proposed activity. A number of potential environmental impacts resulting from the proposal have been avoided or reduced during the options assessment and development of the concept design. The proposal as described in this REF best meets the proposal objectives. The proposal would still result in some impacts including impacts to biodiversity, noise and vibration impacts, temporary disruptions to traffic flow and access, a minor increase in flood levels of 0.10 metres immediately adjacent to the proposed bridge and property acquisition impacts. A range of measures have been developed to minimise and mitigate the potential adverse impacts of the proposal, and these are summarised in this REF.

    This REF has concluded that the adverse impacts of the proposal would be outweighed by the long term benefits of providing improved safety for all road users. Safety would be specifically improved through the realignment of tight curves to meet existing road design requirements. On balance the proposal is therefore considered justified. This REF has concluded that the proposal would not have a significant impact on the environment and therefore an environmental impact statement and assessment under part 5.1 of the EP&A Act is not required. This REF has also found there would be no significant impacts to matters of national environmental significance or to the environment of Commonwealth land. However, RMS intends to submit a referral, to the Australian Government DSEWPaC to determine whether or not the proposal constitutes a controlled action due to: • Potential impacts upon an important population of Koala and habitat being

    impacted is considered critical to the survival of Koalas based on Commonwealth guidelines (DSEWPaC 2012), refer to Section 6.1. The Koala

    Upgrade of the Princes Highway, Dignams Creek Review of Environmental Factors

    vii

  • (Phascolarctos cinereus) has recently been listed as vulnerable under the TSC Act and the EPBC Act.

    • Potential impacts to Square Raspwort

    If the proposal is determined to be a controlled action, the approval of the Australian Government Minister for the Environment is required.

    Display of the review of environmental factors This review of environmental factors is on public display for comment until July 29 2013. You can access the documents in the following ways:

    Internet The documents would be available as pdf files on the RMS website: http://www.rta.nsw.gov.au/roadprojects/projects/princes_hway/dignams_creek/index. html

    Display The documents can be viewed between 10:00am to 2:00pm Monday to Friday at the following locations:

    • Central Tilba General Store. • Bega Valley and Eurobodalla Shire Councils. • Bega RMS office.

    Purchase The review documents are available in hard copy or CD upon request by contacting Timothy Webster (RMS Project Manager) on (02) 4221 2430.

    How can I make a submission? To make a submission on the proposal, please send your written comments to:

    Roads and Maritime Services project manager: Timothy Webster PO Box 477 Wollongong NSW 2520 Email: [email protected] Facsimile number: 02 4221 2590

    Submissions must be received by 29 July 2013.

    Privacy information All information included in submissions is collected for the sole purpose of assisting in the assessment of this proposal. The information may be used during the environmental impact assessment process by relevant RMS staff and its contractors.

    Where the respondent indicates at the time of supply of information that their submission should be kept confidential, RMS would attempt to keep it confidential. However there may be legislative or legal justification for the release of the information, for example under the Government Information (Public Access) Act 2009 or under subpoena or statutory instrument.

    Upgrade of the Princes Highway, Dignams Creek Review of Environmental Factors

    viii

    http://www.rta.nsw.gov.au/roadprojects/projects/princes_hway/dignams_creek/index.htmlhttp://www.rta.nsw.gov.au/roadprojects/projects/princes_hway/dignams_creek/index.html

  • The supply of this information is voluntary. Each respondent has free access at all times to the information provided by that respondent but not to any identifying information provided by other respondents if a respondent has indicated that the representation should be kept confidential. Any respondent may make a correction to the information that they have provided by writing to the same address the submission was sent. The information would be held by the RMS Southern Regional Office, Level 6, 90 Crown Street, Wollongong.

    What happens next? Following the public display period, RMS will collate submissions. Acknowledgement letters will be sent to each respondent. The details of submission authors will be retained and authors will subsequently be advised when project information is released.

    After consideration of community comments RMS will determine whether the proposal should proceed as proposed, or whether any changes to the proposal are necessary. The community will be kept informed regarding this RMS determination.

    If the proposal is approved, RMS would proceed with final design and call tenders for construction of the project. If you have any queries, please contact the RMS project manager, Timothy Webster on (02) 4221 2430.

    Upgrade of the Princes Highway, Dignams Creek Review of Environmental Factors

    ix

  • Contents Executive summary.......................................................................................................i

    1 Introduction .......................................................................................................... 1 1.1 Proposal identification ...................................................................................... 1 1.2 Purpose of the report........................................................................................ 3

    2 Need and options considered .............................................................................. 6 2.1 Strategic need for the proposal ........................................................................ 6 2.2 Existing road and infrastructure...................................................................... 10 2.3 Proposal objectives ........................................................................................ 15 2.4 Alternatives and options considered .............................................................. 15 2.5 Preferred option.............................................................................................. 47 2.6 Design refinements ........................................................................................ 47

    3 Description of the proposal ................................................................................ 55 3.1 The proposal .................................................................................................. 55 3.2 Design ............................................................................................................ 56 3.3 Construction activities .................................................................................... 81 3.4 Ancillary facilities ............................................................................................ 92 3.5 Public utility adjustment.................................................................................. 98 3.6 Property acquisition........................................................................................ 99

    4 Statutory and planning framework ................................................................... 103 4.1 State Environmental Planning Policies......................................................... 103 4.2 Local Environmental Plans........................................................................... 105 4.3 Other relevant legislation.............................................................................. 105 4.4 Commonwealth legislation ........................................................................... 109 4.5 Confirmation of statutory position................................................................. 109

    5 Stakeholder and community consultation ........................................................ 111 5.1 Consultation strategy.................................................................................... 111 5.2 Community involvement ............................................................................... 111 5.3 Aboriginal community involvement............................................................... 117 5.4 ISEPP consultation....................................................................................... 121 5.5 Government agency and stakeholder involvement ...................................... 138 5.6 Ongoing or future consultation ..................................................................... 148

    6 Environmental assessment.............................................................................. 149 6.1 Biodiversity ................................................................................................... 149 6.2 Noise and vibration....................................................................................... 198 6.3 Landscape character impact, visual impact and urban design..................... 219 6.4 Aboriginal heritage ....................................................................................... 235 6.5 Non-Aboriginal heritage................................................................................ 242 6.6 Water quality and hydrology......................................................................... 248 6.7 Geology, topography and soils..................................................................... 261 6.8 Air quality and climate change ..................................................................... 266 6.9 Land Use and Property ................................................................................ 274

    Upgrade of the Princes Highway, Dignams Creek Review of Environmental Factors

    x

  • 6.10 Traffic and access ........................................................................................ 278 6.11 Socio-economic............................................................................................ 282 6.12 Waste minimisation and management ......................................................... 288 6.13 Cumulative impacts ...................................................................................... 290 6.14 Summary of beneficial effects ...................................................................... 291 6.15 Summary of adverse effects......................................................................... 291

    7 Environmental management ............................................................................ 293 7.1 Environmental management plans (or system)............................................ 293 7.2 Summary of safeguards and management measures ................................. 293 7.3 Licensing and approvals............................................................................... 321

    8 Conclusion ....................................................................................................... 322 8.1 Justification................................................................................................... 322 8.2 Objects of the EP&A Act .............................................................................. 322 8.3 Ecologically sustainable development.......................................................... 325 8.4 Conclusion.................................................................................................... 327

    9 Certification...................................................................................................... 329

    10 References................................................................................................... 330

    11 Terms and acronyms used in this REF ........................................................ 335

    Appendix A - Concept design drawings

    Appendix B - Consideration of clause 228(2) factors and matters of national environmental significance

    Appendix C - Urban design, landscape character and visual impact assessment

    Appendix D - Hydraulic assessment

    Appendix E - Operational water quality assessment

    Appendix F - Erosion and sedimentation management report

    Appendix G - Noise and vibration assessment

    Appendix H - Historical heritage assessment

    Appendix I - Community consultation

    Appendix J - Aboriginal cultural heritage assessments

    Appendix K - Biodiversity assessment

    Upgrade of the Princes Highway, Dignams Creek Review of Environmental Factors

    xi

  • MONTH/YEAR (blank page)

  • 1 Introduction This chapter provides an overview of the proposal and outlines the purpose of the report.

    1.1 Proposal identification Roads and Maritime Services (RMS) propose to realign around 3.7 kilometres of the Princes Highway at Dignams Creek on the South Coast of New South Wales (NSW) (the proposal). The proposal is located between Narooma and Cobargo in the Eurobodalla and Bega Valley Local Government Areas (LGAs). The Princes Highway is a rural highway on the NSW South Coast that extends from Sydney to the Victorian border. To the north of the proposal, in the Eurobodalla LGA, the existing Princes Highway passes through forested areas before descending into the Dignams Creek valley. The valley is characterised by cleared pastoral lands and is comprised of a number of private farms and rural residences. The highway crosses Dignams Creek and into Bega Valley LGA over Dignams Creek Bridge which is listed as a local heritage bridge on RMS section 170 heritage register. To the south of the Dignams Creek Bridge the existing Princes Highway climbs up a forested ridge to the top of Dignams Hill. The forested areas adjacent to the highway include Kooraban National Park to the north and Gulaga National Park to the south. At the base of Dignams Hill, the surrounding area is characterised again by cleared pastoral and rural properties. An overview of the locality of the proposal is shown in Figure 1-1.

    The proposal includes realignment and upgrade of the Princes Highway from about 1.5 kilometres north of the intersection with Dignams Creek Road to around 2.2 kilometres south of the intersection. This section of Princes Highway is a single carriageway with one northbound and one southbound lane. An overtaking lane is present on the southbound lane around 50 metres from the junction with Dignams Creek Road. The alignment of this section of highway is characterised by steep road inclines and tight radii curves that follow east-west orientated ridgelines and spur, which have resulted in a road that is well below modern, safe road design standards.

    In the Dignams Creek region, the Princes Highway has a poor crash history with a casualty crash rate eleven times higher than for similar types of roads in NSW. The majority of these crashes result from vehicles running off the road on curves, with speed being the major contributing factor. This section of the Princes Highway was highlighted in 2008 by the NSW State Coroner’s Report into recent fatal crashes on the Princes Highway. The proposal is therefore required to improve road safety issues associated with the existing road, including geometry, alignment, intersection arrangement and other safety considerations (eg site distance). The need for the proposal is further detailed in Chapter 2.

    An overview of the proposal is provided in Figure 1-2 and detailed drawings are included in Appendix A. Further detail on each of the components of the proposal is provided in Chapter 3. The proposal has been split into two stages in order to assist in obtaining construction funding for the proposal and to provide a plan for future works. A description of the proposal is provided below.

    Key features of Stage 1 include: • Realigning about two kilometres of single carriageway starting about 1.5

    kilometres north of the Dignams Creek Road intersection and extending to about 600 metres south of the Dignams Creek Road and Princes Highway

    Upgrade of the Princes Highway, Dignams Creek Review of Environmental Factors

    1

  • intersection. The section would be constructed as a single carriageway with 3.5 metre wide lanes and three metre shoulders in each direction.

    • Removal of four tight sub-standard curves along the existing Princes Highway. • Construction of a new single carriageway bridge over Dignams Creek about

    91 metres in length. • Relocating the Princes Highway and Dignams Creek intersection about 100

    metres north-west. • Realigning around 200 metres of the most eastern section of Dignams Creek

    Road. • Tie ins to the existing Princes Highway alignment. • Provision of around 1.4 kilometres of road safety treatments along the existing

    Princes Highway alignment at the southern end of the proposal. • Provision of one dedicated fauna underpass and one combined drainage

    culvert/fauna underpass. • Relocating two private property access roads and formalising and consolidating

    one national park access point. • Part of the existing Princes Highway alignment and Dignams Creek Bridge

    would be retained for private use.

    Key features of Stage 2 include:

    • Realigning about 1.5 kilometres of single carriageway commencing about 600 metres south of Dignams Creek Road and extending to the southern end of the proposal. The section would be constructed as a single carriageway with 3.5 metre wide lanes and three metre shoulders in each direction.

    • Removal of six sub-standard curves along the existing Princes Highway. • Tie ins to stage 1 and the existing Princes Highway alignment. • Provision of one dedicated fauna underpass, one combined drainage

    culvert/fauna underpass and one rope canopy bridge. • Relocating access roads for Kooraban National Park and Gulaga National

    Park. • Removal of the existing Princes Highway between Dignams Creek Road and

    the access road to Gulaga National Park.

    The following general features would be included for both stages of the proposal:

    • Installation of operational water quality controls including: − Five biofiltration basins. − A water quality basin. − Two constructed wetlands. − Biofiltration/vegetated swales.

    • Installation of four retaining walls. • Provision of ancillary facilities such as temporary sedimentation basins,

    compound and stockpile sites, and access tracks. • Removal, rehabilitation and revegetation of 0.6 kilometres of the redundant

    sections of the Princes Highway. • Relocation of overhead utilities to accommodate the proposal.

    Construction of the proposal would proceed following determination of the Review of Environmental Factors (REF), obtaining other approvals as required, completion of the detailed design and the securing of funding from government sources. The construction period for Stage 1, would have duration of between 18 and 24 months. Stage 1 of the proposal has a strategic estimate of about $40 million.

    Upgrade of the Princes Highway, Dignams Creek Review of Environmental Factors

    2

  • Whilst Stage 2 is a long term plan which is unlikely to be built for some time, the strategic cost estimate for Stage 2 is around $20 million (2013 dollars). The construction period for Stage 2 would be defined during detailed design.

    1.2 Purpose of the report This REF has been prepared by Sinclair Knight Merz (SKM) on behalf of RMS Infrastructure Development South Coast Regional Office. The purpose of this REF is to describe the proposal, to document the likely impacts of the proposal on the environment, and to detail protective measures to be implemented. For the purposes of these works, RMS is the proponent and the determining authority under part 5 of the Environmental Planning and Assessment Act 1979 (EP&A Act).

    The description of the proposal and assessment of associated potential environmental impacts have been undertaken in context of clause 228 of the Environmental Planning and Assessment Regulation 2000 (refer to Appendix B), the Threatened Species Conservation Act 1995 (TSC Act), the Fisheries Management Act 1994 (FM Act), and the Commonwealth Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act). In doing so, this REF helps to fulfil the requirements of section 111 of the EP&A Act, that RMS examine and take into account to the fullest extent possible, all matters affecting or likely to affect the environment by reason of the activity.

    The findings of this REF would be considered when assessing:

    • Whether the proposal is likely to have a significant impact on the environment and therefore the necessity for an environmental impact statement to be prepared and approval to be sought from the Minister for Planning and Infrastructure under part 5.1 of the EP&A Act (refer to Appendix B).

    • The significance of any impact on threatened species as defined by the TSC Act and/or FM Act, in section 5A of the EP&A Act and therefore the requirement for a Species Impact Statement.

    • The potential for the proposal to significantly impact a matter of national environmental significance or Commonwealth land and the need to make a referral to the Australian Government Department of Sustainability, Environment, Water, Population and Communities (DSEWPaC) for a decision by the Commonwealth Minister for the Environment on whether assessment and approval is required under the EPBC Act (refer to Appendix B).

    Upgrade of the Princes Highway, Dignams Creek Review of Environmental Factors

    3

  • Upgrade of the Princes Highway, Dignams Creek LEGEND Concept design T URO KIANGA SS VER LAKE Stage 1R I BI LR L Stage 2 E E A D BI L WAGONGA

    Major roadYC B A INLET NAROOMA Local road

    B RE C RE K E L!(

    ITTLE WatercourseRAS

    WAN EK LAKE ake SK LNO DE National Park L

    WADBILLIGA

    C

    NATIONAL

    K L E A NANGUDGA

    R CR L AKEPA R K C ERE E K EK CORUNNALAKE

    KOORABAN GULAGANATIONAL NATIONALPARK ADIGN AM E P RK

    T ILBAS R K C E TIL

    BALAKE

    LITTLE

    DIGNAMS CREEK LAKE DATA SOURCES !( LPMA 2010SKM 2011

    WS H AY HIG WALLAGA PRINC E LAKE

    NAR

    I °COBAR(!

    GO R A C REEK 0 5Kilometres

    LIT LA GO EO CRE !BATEMANS BAY M OU C E B R K ERMAGU R I VA R I ER BERMR BI N ( !AGUI

    AMA GA NSWH AROOMAV !NI E NATIONAL DIGNAMS CREEKR PARK BEGABARAGOOT LAKE

    !

    Figure 1-1 | Locality 18/06/2013 | I:\ENVR\Projects\EN02937\Technical\GIS\Spatial_Directory\ArcGIS\REF\_Ver3\EN02937_GIS_REF2_F001_r2v1_Locality.mxdNewcastle Spatial Team - Prepared by : KMChecked by : JC

  • Upgrade of the Princes Highway, Dignams Creek DI LEGENDGNA EUROBODALLA SHIRE COUNCIL Concept designStage 1MS A Kooraban Stage 2 National C Potential construction access trackPark R EE Private access track K R Temporary topsoil stockpile site OA

    B Retaining wall (1-4)1

    D Compound siteFauna wildlife crossing structure (A-F)

    Operational water quality control Temporary sediment basin

    Construction footprint

    Dignams Creek and

    LGA boundary

    Major road

    K Local road

    DIGNAMS CREEC Track

    National Pa

    rksBEGA VALLEY SHIRE COUNCIL Gulaga National Park

    Kooraban National Park 2 D DATA SOURCESLPMA 2010SKM 2011, 2013RMS 2013

    3 ° E 4

    0 400

    HW AY Gulaga Metres

    G National F S H

    I ParkPR NCE

    !BATEMANS BAY

    INSW

    !NAROOMADIGNAMS CREEK

    !BEGA

    Figure 1-2 | The proposal 18/06/2013 | I:\ENVR\Projects\EN02937\Technical\GIS\Spatial_Directory\ArcGIS\REF\_Ver3\EN02937_GIS_REF2_F002_r2v3_Proposal_Incl_elements_20130618.mxdNewcastle Spatial Team - Prepared by : ALChecked by : JC

    Title pageUpgrade of the Princes Highway, Dignams CreekDocument history and statusExecutive summaryFlora and faunaNoise and vibrationLandscape character and visual impactsAboriginal and Non-Aboriginal cultural heritageTraffic and accessHydrology, flooding and groundwaterSoils, landscape and water qualitySocio-economic, land use and property impactsInternetDisplayPurchaseHow can I make a submission?Privacy informationWhat happens next?

    Contents1 Introduction1.1 Proposal identification1.2 Purpose of the report

    2 Need and options considered2.1 Strategic need for the proposal2.1.1 Relevant strategies and plansNSW 2021: A Plan to Make NSW Number One State Infrastructure Strategy 2012-2032NSW Long Term Transport Masterplan RMS 2012-2016 Corporate StrategySouth Coast Regional Strategy 2006 – 2031South East NSW Regional Action Plan

    2.2 Existing road and infrastructureThe Princes HighwayThe Dignams Creek BridgeDignams Creek RoadPublic and private access roads

    2.3 Proposal objectives2.4 Alternatives and options considered2.4.1 Methodology for selection of preferred optionPreliminary assessment – corridor studyPhase 1 – Investigation of full length options including Options 1-3 and the do nothing optionPhase 4 - Investigation of intermediate length options to include staging (options 11-13)

    2.4.2 Identified optionsCommunity options (Options 14 and 15)

    2.4.3 Analysis of optionsDo nothing optionOption 1Option 2Option 3Option 10Option 4Option 5Option 6Option 7Option 8Option 9Option 11Option 12Option 13Option 14 – DCCG optionOption 15 – Alternate community option

    2.5 Preferred option2.6 Design refinements2.6.1 Main alignment 2.6.2 Inclusion of stage 2 alignment2.6.3 Inclusion of a construction access track 2.6.4 Private access tracks2.6.5 Steepening of road batter along Dignams Creek Road and extending down to Blind Creek

    3 Description of the proposal3.1 The proposal3.2 Design3.2.1 Design Parameters3.2.2 Design criteriaGeneral

    3.2.3 Major design features Stage 1 Stage 2 Dignams Creek BridgePrinces Highway and Dignams Creek Road intersectionRetaining wallsMajor cut and fill areasOperational water quality controls and spill containmentTie in to existing roadsWildlife crossing structuresUrban and landscape design Private access tracks

    3.2.4 Engineering and environmental constraints

    3.3 Construction activities3.3.1 Work methodologyConstruction sedimentation basins Embankments/cuttingsRetaining wallsBridge works / works within waterways Construction access tracks

    3.3.2 Staging3.3.3 Construction hours and durationConstruction outside of standard construction hours

    3.3.4 Plant and equipment3.3.5 Earthworks3.3.6 Source and quantity of materialsWater use

    3.3.7 Traffic management and access

    3.4 Ancillary facilities3.5 Public utility adjustmentTelecommunicationsElectrical transmission lines

    3.6 Property acquisitionPrivatePublicAncillary facilities

    4 Statutory and planning framework4.1 State Environmental Planning Policies4.1.1 State Environmental Planning Policy (Infrastructure) 20074.1.2 State Environmental Planning Policy (No 44) Koala Habitat protection

    4.2 Local Environmental Plans4.3 Other relevant legislation4.3.1 National Parks and Wildlife Act 19744.3.2 Heritage Act 19774.3.3 Water Management Act 20004.3.4 Fisheries Management Act 19944.3.5 Aboriginal Land Rights Act 1983

    4.4 Commonwealth legislation4.4.1 Environment Protection and Biodiversity Conservation Act 1999

    4.5 Confirmation of statutory position

    5 Stakeholder and community consultation5.1 Consultation strategy5.2 Community involvement5.3 Aboriginal community involvement5.4 ISEPP consultation5.5 Government agency and stakeholder involvement5.6 Ongoing or future consultation5.6.1 Community5.6.2 Government agency and service providers

    6 Environmental assessment6.1 Biodiversity6.1.1 Methodology Study area Database search and literature reviewPrevious ecological assessment and gap analysisField investigations

    6.1.2 Existing environmentGeneral flora and faunaVegetation communities and habitatThreatened ecological communitiesThreatened flora speciesThreatened fauna speciesSurvey Results – species confirmedSpecies tentatively identifiedResults of the targeted Koala survey

    Migratory speciesNoxious weeds, pests and pathogensAquatic habitatsSEPP 44 Koala Habitat ProtectionCritical habitatGroundwater dependant ecosystemsWildlife connectivity corridors

    6.1.3 Potential impactsConstructionLoss of vegetation and habitat removalWildlife connectivity and habitat fragmentationInjury and mortalityIntroduction of weeds, pests and pathogensGroundwater dependent ecosystemsAquatic impactsNoise, vibration and light

    OperationWildlife connectivity and habitat fragmentationInjury or mortalityWater QualityNoise, vibration and lightGroundwater dependant ecosystemsBiodiversity Offset

    6.1.4 Safeguards and management measures

    6.2 Noise and vibration6.2.1 Existing environment6.2.2 CriteriaConstruction noise criteriaVibration assessment (human comfort) criteriaVibration assessment (structural damage) criteriaOperational noise criteria

    6.2.3 Potential impactsConstructionOut of hours construction workVibrationOperation

    6.2.4 Safeguards and management measures

    6.3 Landscape character impact, visual impact and urban design6.3.1 Existing environmentLandform and topographyVegetationLand useTransport network

    6.3.2 MethodologyMethodology for the landscape character assessmentLandscape character zonesMethodology for the visual impact assessmentMethodology for the Urban Design Assessment

    6.3.3 Potential ImpactsConstructionOperationLandscape characterVisual impact Urban Design

    6.3.4 Safeguards and management measuresUrban design objectives and principles

    6.4 Aboriginal heritage6.4.1 Historical background6.4.2 Methodology6.4.3 Existing environmentDatabase searchesNative title claims and Aboriginal land claimsSite investigations

    6.4.4 Potential impactsConstructionOperation

    6.4.5 Safeguards and management measures

    6.5 Non-Aboriginal heritage6.5.1 Existing environmentHistorical backgroundDatabase and background searchesSite inspection

    6.5.2 Potential impactsConstructionOperation

    6.5.3 Safeguards and management measures

    6.6 Water quality and hydrology6.6.1 Existing environmentCatchment descriptionWater qualityConstruction water quality criteriaOperational water quality criteriaDignams Creek hydrology and floodingWater use values

    6.6.2 Potential impactsConstructionWater qualityFlooding and hydrology

    OperationWater qualityFlooding

    6.6.3 Safeguards and management measures

    6.7 Geology, topography and soils6.7.1 Existing environmentTopographyGeologySoilsAcid sulfate soilsContamination

    6.7.2 Potential impactsConstructionTopographySoils and geologyContamination

    Operation

    6.7.3 Safeguards and management measures

    6.8 Air quality and climate change6.8.1 Existing environmentClimateAir QualityClimate change

    6.8.2 Air quality criteria6.8.3 Potential impactsConstructionAir QualityClimate changeOperationAir QualityClimate change

    6.8.4 Safeguards and management measures

    6.9 Land Use and Property6.9.1 Existing environment6.9.2 Potential impactsConstructionOperation

    6.9.3 Safeguards and management measures

    6.10 Traffic and access6.10.1 Existing environment6.10.2 Potential impactsPartial road closures, construction speed limitsHeavy vehiclesOperation

    6.10.3 Safeguards and management measures

    6.11 Socio-economic6.11.1 Existing environmentLand use/businessesSocial infrastructure

    6.11.2 Potential impactsConstructionVisual Amenity Noise and vibration and air qualityTraffic, parking, access and connectivityProperty acquisitionSocial infrastructure

    OperationProperty acquisition

    6.11.3 Safeguards and management measures

    6.12 Waste minimisation and management6.12.1 Policy setting6.12.2 Existing environment6.12.3 Potential impactsConstruction ImpactsOperational Impacts

    6.12.4 Safeguards and management measures

    6.13 Cumulative impacts6.13.1 Existing environmentPrinces Highway worksLocal development

    6.13.2 Potential impacts6.13.3 Safeguards and management measures

    6.14 Summary of beneficial effects6.15 Summary of adverse effects

    7 Environmental management7.1 Environmental management plans (or system)7.2 Summary of safeguards and management measures7.3 Licensing and approvals

    8 Conclusion8.1 Justification8.2 Objects of the EP&A Act8.3 Ecologically sustainable development8.3.1 The precautionary principle8.3.2 Intergenerational equity8.3.3 Conservation of biological diversity and ecological integrity8.3.4 Improved valuation, pricing and incentive mechanisms

    8.4 Conclusion

    9 Certification10 References11 Terms and acronyms used in this REFAppendix ARMS (2013) Drainage/concept design drawings

    Appendix BConsideration of clause 228(2) factors and matters of national environmental significance

    Clause 228(2) ChecklistMatters of National Environmental SignificanceAppendix CSMM (2013) Urban Design, Landscape Character and Visual Impact Assessment

    Appendix DKhamphounvong P. (2013) Princes Highway Upgrade at Dignams Creek – Hydraulic Impact Assessment

    Appendix ESKM (2013) Operational Water Quality Basins Assessment

    Appendix FSoil Conservation Service (2013) Erosion and Sedimentation Management Report Realignment of Princes Highway at Dignams Creek, 20 km south of Narooma, NSW.

    Appendix GSKM (2013) Noise and Vibration Assessment

    Appendix HNew South Wales Archaeology (2010) Historical Heritage Assessment

    Appendix ICommunity Consultation

    Appendix JAboriginal Heritage Assessment

    Appendix KSKM (2013) Biodiversity Assessment