  • PROJECT MANUAL TOWN OF GUILFORD CONNECTICUT HVAC Upgrades – Phase 2 Bid #8-1920 Abraham Baldwin Middle School 68 Bullard Drive Guilford, Connecticut 06437 S/P+A Project No. 18.278

    VOLUME 1 OF 1

    Issued for Bid: March 19, 2020

    Architect/Engineers/Interior Designers Silver/Petrucelli + Associates, Inc. 3190 Whitney Avenue, Hamden, Connecticut 06518 One Post Hill Place, New London, Connecticut 06320

  • TABLE OF CONTENTS

    Abraham Baldwin Middle School HVAC Upgrades – Guilford TOC-1

    HVAC UPGRADES – PHASE 2

    ABRAHAM BALDWIN MIDDLE SCHOOL 68 BULLARD DRIVE GUILFORD, CT 06437 BID #8-1920

    S/P+A PROJECT NO. 18.278

    DIVISION 00 – PROCUREMENT AND CONTRACT REQUIREMENTS PAGES

    Invitation to Bid 49 Legal Notice General Conditions and Instructions to Bidders Form Contract Non-Collusive/Non-Conflict Affidavit of Bidders Affirmative Action/EEO Affidavit Bid Proposal Form Non-Disclosure Agreement and Acknowledgement of Receipt of

    Plans Prevailing Wage Rate Information Project Application and Project Certificate for Payment (AIA G702) 1 Project Application Continuation Sheet (AIA G703) 1 2019-20 and 2020-21 School Calendars 2 Drawing List 1

    DIVISION 01 – GENERAL REQUIREMENTS

    Section 011000 Summary of Work 4 Section 012500 Substitution Procedures 4 Section 012600 Contract Modification Procedures 3 Section 012900 Payment Procedures 5 Section 013100 Project Management and Coordination 9 Section 013200 Construction Progress Documentation 6 Section 013233 Photographic Documentation 2 Section 013300 Submittal Procedures 9 Section 014000 Quality Requirements 9 Section 014200 References 10 Section 015000 Temporary Facilities and Controls 4 Section 016000 Product Requirements 5 Section 017300 Execution 7 Section 017700 Closeout Procedures 4 Section 017823 Operation and Maintenance Data 8 Section 017839 Project Record Documents 4 Section 017900 Demonstration and Training 4

    DIVISION 02 – EXISTING CONDITIONS

    Section 024119 Selective Demolition 7

  • TABLE OF CONTENTS

    Abraham Baldwin Middle School HVAC Upgrades – Guilford TOC-2

    DIVISION 04 – MASONRY

    Section 042000 Unit Masonry 16

    DIVISION 05 – METALS

    Section 055000 Metal Fabrications 5

    DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

    Section 061000 Rough Carpentry 5

    DIVISION 07 – THERMAL AND MOISTURE PROTECTION

    Section 076200 Sheet Metal Flashing and Trim 8 Section 077200 Roof Accessories 5 Section 078413 Penetration Firestopping 4 Section 079200 Joint Sealants 6

    DIVISION 08 – OPENINGS

    Section 084213 Aluminum-Framed Entrances 7 Section 087100 Door Hardware 10

    DIVISION 09 – FINISHES

    Section 099113 Exterior Painting 5

    DIVISION 10 – SPECIALTIES

    Section 101400 Signage 5

    DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING

    Section 230000 Basic Mechanical Requirements 4 Section 230130.52 Existing HVAC Air Distribution System Cleaning 7 Section 230513 Common Motor Requirements for HVAC Equipment 3 Section 230517 Sleeves and Sleeve Seals for HVAC Piping 4 Section 230519 Meters and Gages for HVAC Piping and Equipment 12 Section 230529 Hangers and Supports for HVAC Piping and Equipment 11 Section 230548 Vibration and Seismic Controls for HVAC Piping and Equipment 13 Section 230553 Identification for HVAC Piping and Equipment 7 Section 230593 Testing, Adjusting, and Balancing for HVAC 17 Section 230713 Duct Insulation 18 Section 230716 HVAC Equipment Insulation 17 Section 230719 HVAC Piping Insulation 21 Section 230900 Instrumentation and Control for HVAC 24 Section 230993 Sequence of Operations for HVAC Controls 6 Section 232113 Hydronic Piping 16 Section 232123 Hydronic Pumps 9 Section 233113 Metal Ducts 14

  • TABLE OF CONTENTS

    Abraham Baldwin Middle School HVAC Upgrades – Guilford TOC-3

    Section 233300 Air Duct Accessories 7 Section 233423 HVAC Power Ventilators 9 Section 233600 Air Terminal Units 7 Section 233713 Diffusers, Registers, and Grilles 5 Section 233723 HVAC Gravity Ventilators 5 Section 237313 Modular Indoor Central-Station Air-Handling Units 14

    DIVISION 26 – ELECTRICAL

    Section 260500 Common Work Results for Electrical 4 Section 260519 Low-Voltage Electrical Power Conductors and Cables 6 Section 260526 Grounding and Bonding for Electrical Systems 2 Section 260529 Hangers and Supports for Electrical Systems 5 Section 260533 Raceway and Boxes for Electrical Systems 5 Section 260553 Identification for Electrical Systems 7 Section 262816 Enclosed Switches and Circuit Breakers 7

    END OF TABLE OF CONTENTS

  • TOWN OF GUILFORD INVITATION TO BID

    BID #8-1920 Abraham Baldwin Middle School HVAC Upgrades – Phase 2

    I. Invitation to Bid (Legal Notice) II. General Conditions & Instructions to Bidder III. Form Contract IV. Non-Collusion/Non-Conflict Affidavit (submit with bid) V. Affirmative Action Affidavit (submit with bid) VI. Bid Proposal Form (submit with bid) VII. Non-Disclosure Agreement and Acknowledgement of Receipt of Plans VIII. Prevailing Wage is applicable IX. Prequalification Certificate and Update (Bid) Statement, if applicable

    REQUIREMENTS

    1) Certificate of Insurance _X_ Yes, upon bid award 2) Bid Bond/Cashier’s Check _X_ (10% of Base Bid) Yes (submit w/bid) 3) 100% Performance Bond _X_ Yes, upon bid award 4) Labor & Materials Bond _X_ (a/k/a Payment Bond) Yes, upon bid award 5) Vendor References _X_ Yes (submit w/bid) 6) Prequalification Certificate/ N/A Update (Bid) Statement Yes (submit w/bid) 7) Required Statements Above _X_ Yes (submit w/bid)

  • I. LEGAL NOTICE TOWN OF GUILFORD

    INVITATION TO BID #8-1920

    Abraham Baldwin Middle School HVAC Upgrades – Phase 2

    The Town of Guilford is seeking competitive bids for the Abraham Baldwin Middle School HVAC Upgrades – Phase 2. Bid specifications can be obtained from the Town of Guilford’s website at www.ci.guilford.ct.us or the Department of Administrative Services procurement website at https://biznet.ct.gov/SCP_Search/. Sealed Bids are due on Monday, April 13, 2020 at 2:00 p.m. at the office of the First Selectman, on the second floor of Town Hall, 31 Park Street, Guilford, CT 06437. Bids received after this date and time will be rejected. Sealed Bid proposals should be labeled with bid number and bid title. The Bid Opening will be held in the Guilford Room at the Nathanael B. Greene Community Center, 312 Church Street, Guilford, CT 06437 at 2:30 p.m., at which time they will be opened publicly.

    Any questions regarding the specifications may be directed, in writing only, to Cliff Gurnham, at gurnhamc@guilfordschools.org with a copy to the Purchasing Department at ahernv@ci.guilford.ct.us. Questions are due by 4:00 p.m. on Wednesday, April 8, 2020.

    A mandatory pre-bid walk-through is scheduled for Wednesday, March 25, 2020. To register for the mandatory pre- bid walk-through, each respondent must contact Cliff Gurnham at gurnhamc@guilfordschools.org with a copy to Vicky Ahern at ahernv@ci.guilford.ct.us. There will be two (2) time slots available, one (1) at 1:00 p.m. and 3:00 p.m. Each respondent will be required to complete a sign-in sheet, bring your own pen, and must use the hand sanitizer provided at the site prior to signing in. Respondents will meet outside by the main entrance of Abraham Baldwin Middle School located at 68 Bullard Drive in Guilford.

    To access the plans for this project, respondents must e-mail Cliff Gurnham at gurnham@guilfordschools.org and attach a completed Receipt of Plans and Non-Disclosure Agreement form that is part of the Invitation to Bid packet. Upon receipt, respondent will receive an e-mail from Skysite.com with an invitation to join the site to access the plans.

    Each bidder will be required to submit to the Office of the First Selectman, their original proposal with one (1) copy, one (1) electronic copy, and a bid bond or cashier’s check in the amount of ten percent (10%) of the base bid. Each bidder shall honor the bid price for ninety (90) business days from the date of the bid opening, without modification. Upon award of the bid, the winning bidder shall be bound by the bid proposal price throughout the contract period. The minimum rates to be paid labor of the various classifications on this project shall be in accordance with current schedule of Prevailing Wages as established by the State of Connecticut, Department of Labor, Wage and Workplace Standards Division. The Town of Guilford reserves the right to reject any or all bids; or to waive defects in same, if it deems such to be in the best interest of the Town. The Town of Guilford is an affirmative action, equal opportunity employer. __________________________ Matthew T. Hoey III First Selectman --------------------------------------------------------------------------------------------------------------------------------------------

    Publish one time only in the New Haven Register under LEGAL NOTICES on Friday, March 20, 2020.