ptk 018/ptk/v/2005
Embed Size (px)
DESCRIPTION
Pedoman dan Tata Kerja SDM (PTK 018)TRANSCRIPT
-
1GUIDELINES
EXECUTIVE AGENCY FOR UPSTREAM OIL AND GAS BUSINESS ACTIVITIES(BPMIGAS)
WORK PROCEDURE GUIDELINES
No.: 018 / PTK / V / 2005
ON
HUMAN RESOURCE MANAGEMENTOF COOPERATION CONTRACT CONTRACTORS
J A K A R T A
BK 1.indd 1BK 1.indd 1 4/27/2007 9:01:21 AM4/27/2007 9:01:21 AM
-
BK 1.indd 2BK 1.indd 2 4/27/2007 9:01:22 AM4/27/2007 9:01:22 AM
-
3GUIDELINES
WORK PROCEDURE GUIDELINESON
HUMAN RESOURCE MANAGEMENTOF COOPERATION CONTRACT CONTRACTORS
MANPOWER UTILIZATION & INDUSTRIAL RELATIONS DEPARTMENTEXTERNAL DIVISION
DEPUTY OF GENERAL AFFAIRSEXECUTIVE AGENCY FOR UPSTREAM OIL AND GAS BUSINESS ACTIVITIES
(BPMIGAS)J A K A R T A
-
4GUIDELINES
Sura
t Kep
utus
an
Sura
t Kep
utus
an
PEDOMAN PENGELOLAAN SUMBER DAYA MANUSIAKONTRAKTOR KONTRAK KERJA SAMA
KEPALA BADAN PELAKSANAKEGIATAN USAHA HULU MINYAK DAN GAS BUMI
Menimbang: a. Bahwa dalam melaksanakan kegiatannya, Kontraktor Kontrak Kerja Sama turut bertanggung jawab dalam mengembangan dan meningkatkan sumber daya manusia baik yang berkaitan dengan proses rencana penggunaan tenaga kerja, pengembangan tenaga kerja nasional serta hubungan industrial dan kesejahteraan.
b. Bahwa Badan Pelaksana Kegiatan Usaha Hulu Minyak dan Gas Bumi mempunyai fungsi pengawasan dan pengendalian yang obyektif, bertanggung jawab dan transparan terhadap pengelolaan sumber daya manusia Kontraktor Kontrak Kerja Sama (KKKS) dengan mengutamakan penggunaan & pengembangan tenaga kerja nasional serta menjaga hubungan industrial yang kondusif di lingkungan kerja KKS.
c. Bahwa para Pengelola sumber daya manusia Kontraktor Kontrak Kerja Sama diharapkan agar melakukan upaya nyata untuk mengelola sunber daya manusia secara profesional agar dapat mendukung program pengembangan tenaga kerja nasional dan mampu memelihara iklim industrial peace di lingkungan kerja.
d. Bahwa BPMIGAS memberikan kewenangan kepada Kontraktor Kontrak Kerja Sama untuk melaksanakan kebijakan yang bersifat operasional, sedangkan kebijakan yang bersifat strategis serta berdampak besar terhadap kelangsungan operasi produksi, bertentangan dengan prinsip pengutamaan tenaga kerja nasional dan berdampak pada hubungan industrial secara menyeluruh di lingkungan KKS, tetap memerlukan persetujuan BPMIGAS.
Mengingat: (1) Undang-Undang No. 22 Tahun 2001, tentang Minyak dan Gas Bumi; (2) Undang-Undang No. 13/2003 tentang Ketenagakerjaan; (3) Peraturan Pemerintah No. 42 Tahun 2002 tentang Badan Pelaksana
Kegiatan Usaha Hulu Minyak dan Gas Bumi; (4) Peraturan Pemerintah No. 35 Tahun 2004 tentang Kegiatan Usaha
Hulu Minyak dan Gas Bumi; (5) Keppres. No. 49/M Tahun 2005 tanggal 29 Maret 2005 tentang
pengangkatan Kepala BPMIGAS;
BADAN PELAKSANAKEGIATAN USAHA HULU MINYAK DAN GAS BUMI
SURAT KEPUTUSAN
No. Kpts. 15/BP00000/2005-S8TENTANG
-
5GUIDELINES
Sura
t Kep
utus
an
Sura
t Kep
utus
an
MEMUTUSKAN :
Menetapkan :
PERTAMA : Memberlakukan Pedoman Pengelolaan Sumber Daya Manusia Kontraktor Kontrak Kerja Sama yang terlampir dalam Surat Keputusan ini.
KEDUA : Pedoman Pengelolaan Sumber Daya Manusia Kontraktor Kontrak Kerja Sama ini berlaku untuk seluruh Kontraktor Kontrak Kerja Sama di lingkungan kegiatan Usaha Hulu Minyak dan Gas Bumi.
KETIGA : Ketentuan-ketentuan lain yang belum diatur atau belum cukup diatur, akan ditetapkan kemudian yang akan menjadi satu kesatuan dalam pedoman ini.
Dengan diberlakukannya Pedoman ini, maka Pedoman Pengelolaan SDM KKKS yang diberlakukan sebelumnya dinyatakan tidak berlaku lagi untuk Kontraktor Kontrak Kerja Sama di lingkungan kegitan Usaha Hulu Minyak dan Gas Bumi.
Surat Keputusan ini berlaku terhitung mulai tanggal ditetapkan.
Ditetapkan di : JakartaPada Tanggal : 11 Mei 2005
Kepala Badan PelaksanaKegiatan Usaha Hulu Minyak dan Gas Bumi
Kardaya Warnika
BADAN PELAKSANAKEGIATAN USAHA HULU MINYAK DAN GAS BUMI
- 2 -
Surat KeputusanNomor : Kpts. 15/BP00000/2005-S8Tanggal : 11 Mei 2005
-
6GUIDELINES
GUIDELINES FOR HUMAN RESOURCE MANAGEMENT OF COOPERATION CONTRACT CONTRACTORS
THE HEAD OF THE EXECUTIVE AGENCY FOR UPSTREAM OIL AND GAS BUSINESS ACTIVITIES
Considering: a. That in carrying out their activities, Cooperation Contract Contractors share responsibility for developing and upgrading human resources, in connection with the planning process for manpower utilization, the development of national personnel, and industrial relations and welfare;
b. That the Executive Agency for Upstream Oil and Gas Business Activities has the function of objective, responsible and transparent supervision and control over the management of Cooperation Contract Contractors (KKKS) human resources, with an emphasis on the use and development of national personnel and on maintaining conducive industrial relations within the KKKS workplaces;
c. That Cooperation Contract Contractors human resource Managers are expected to make a genuine effort to manage human resources professionally in order to support the program for development of national manpower and to be able to maintain a climate of industrial peace in the workplace;
d. That BPMIGAS grants the authority to Cooperation Contract Contractors to implement operational policies, while any policy of a strategic nature that has a major impact on the continuity of production operations, that con icts with the principle of priority on the use of national personnel, or that has an impact on overall industrial relations in the KKKS workplace continues to require BPMIGAS approval;
Bearing in mind: (1) Law No. 22/2001 on Oil and Gas;(2) Law No. 13/2003 on Manpower;(3) Government Regulation No. 42/2002 on the Executive Agency
for Upstream Oil and Gas Business Activities;(4) Government Regulation No. 35/2004 on Upstream Oil and Gas
Business Activities;
(5) Presidential Decree No. 49/M/2005 dated 29 March 2005 on appointment of the Head of BPMIGAS;
EXECUTIVE AGENCY FOR UPSTREAM OIL AND GAS BUSINESS ACTIVITIES
DECREE
No. Kpts. 15/BP00000/2005-S8ON
Decr
ee
i
BK 1.indd 6BK 1.indd 6 4/27/2007 9:01:26 AM4/27/2007 9:01:26 AM
-
iGUIDELINES
Decr
ee
HAS DECIDED:
To stipulate:
FIRST : To enact the Guidelines for Human Resource Management of Cooperation Contract Contractors that are attached to this Decree.
SECOND : These Guidelines for Human Resource Management of Cooperation Contract Contractors shall apply to all Cooperation Contract Contractors in Upstream Oil and Gas Business activities.
THIRD : Other provisions that are not yet regulated, or inadequately regulated, shall be determined later and shall become a part of these guidelines.
When these Guidelines come into force, the Guidelines for Human Resource Management of Cooperation Contract Contractors that were previously in force are declared no longer applicable to Cooperation Contract Contractors in Upstream Oil and Gas Business activities.
This Decree shall come into force effective as of the date of its promulgation.
Promulgated in Jakarta on 11 May 2005
Head of the Executive Agency for Upstream Oil and Gas Business Activities [signed and sealed] Kardaya Warnika
ii
BK 1.indd iBK 1.indd i 4/27/2007 9:01:27 AM4/27/2007 9:01:27 AM
-
ii
GUIDELINES
Fore
word FOREWORD
This Guidebook on Human Resource (HR) Management for Cooperation Contract Contractors (KKKS) represents a revision of the previous guidebooks and contains the procedures for KKKS HR management, in connection with the manpower utilization planning process, development of the national work force, and industrial relations and welfare. The process of drafting these guidelines involved practitioners in KKKS HR through working groups I, II, III, and IV. It is therefore hoped that it now accommodates most of the interests of the KKKS, without detriment to the oversight function of BPMIGAS.
The revisions that have been made to the guidelines this time are based on changes in certain labor regulations and the spirit to manage KKKS HR by taking the side of the national work force based on competence through objective, transparent, and responsible supervision and control of HR. All KKKS HR managers are therefore expected to undertake genuine efforts to manage HR professionally so that the program for development of national workers can be implemented properly in order to support the companies production operation processes.
From these guidelines, it is clear that BPMIGAS grants the authority to the KKKS to implement policies of an operational nature, while policies of a strategic nature, or that have a signi cant impact on the continuity of production operations or on industrial relations, continue to require BPMIGAS approval.
This guidebook should serve as a collective reference for KKKS HR management. [For any] deviations from the implementation of KKKS HR management that are done without BPMIGAS approval, these guidelines will serve as the basis of BPMIGASs decision making in following up on audit ndings related to HR. This guide book is written in Bahasa and English. If there is any difference between the two books, it should be an honest mistake and the Bahasa version shall prerails.
iii
BK 1.indd iiBK 1.indd ii 4/27/2007 9:01:27 AM4/27/2007 9:01:27 AM
-
iii
GUIDELINES
BPM
IGAS
STR
ATEG
Y IN
KKK
S HR
MAN
AGEM
ENT
IN L
INE
WIT
H BP
MIG
AS B
LUEP
RINT
FO
R 20
05-2
010BPMIGAS STRATEGY IN KKKS HR MANAGEMENTIN LINE WITH BPMIGAS BLUEPRINT FOR 2005-2010
Undertake Continuous Improvement Initiatives in all processes to reduce overall costs.
Increase integrated supervision and cost control.
Control the use of KKKS Human Resources in a structured and patterned way so that the costs of Indonesian personnel can reach 75% of the total personnel costs, with due attention to Cost-Bene t standards.
Evaluate the weaknesses in the Regulatory Framework (provisions of labor regulations) in Upstream Oil and Gas Activities and urge the Government to rectify them.
Encourage and accelerate supply of trained National Human Resources to support Upstream Oil and Gas Activities.
iv
BK 1.indd iiiBK 1.indd iii 4/27/2007 9:01:27 AM4/27/2007 9:01:27 AM
-
iv
GUIDELINES
Untitled-4 1 4/30/2007, 9:55:04 AM
-
vGUIDELINES
Tabl
e of
Con
tent
s
TABLE OF CONTENTS
Decree .. i Foreword .. iii
BPMIGAS Strategy in KKKS HR Management in Line with BPMIGAS Blueprint
for 2005-2010 .. iv
Table of Contents . v List of Attachments . vi
1. KKKS Employee Information Management .. 1
2. Manpower Work Plan and Budget (RKA) .. 6
3. Manpower Utilization Plan (RPTK) 17
4. Permit to Employ Expatriate Personnel (IMTA) .. 29
5. Career Development Monitoring 34
6. Mentoring .. 38
7. International Career Development 40
8. Extension of Work Relationship Beyond Retirement Age . 43
9. Recruitment of Indonesian Personnel (TKI) . 45
10. Conduct of Education and Training .. 47
11. Education and Training for BPMIGAS Employees and Employees of
Government Agencies at KKKS Expense 51
12. Practical Work Training for University Students, COOP, Students, and Other Parties. 55
13. Domestic Scholarships 62
14. Overseas Scholarships 63
15. Preparation of Company Regulations and Collective Labor Agreements (PP & CLA) . 64
16. Compensation and Benefits 67
17. Termination of Employment (PHK) and Mutual Agreement Termination (MAT) 69
18. Administrative Provisions for Medical Board 72
19. Administrative Procedure for Approval of Medicine by Pharmacists 74
20. Administrative Procedure for Referring Patients for Treatment Abroad .. 76
21. Administrative Procedure for Employee Health Examinations .. 79
v
v
-
vi
GUIDELINES
ATTACHMENTS
1. KKKS EMPLOYEE INFORMATION MANAGEMENT Attachment 1. Workforce Report (KTK) ............... 4Attachment 2. Personnel Transfer Report (MTK) ....... 5
2. MANPOWER WORK PLAN & BUDGETS (RKA) Attachment 1. Budgeted Total Personnel Expenses ...... 11Attachment 2. Compensation & Benefits Budget Evaluation . 12Attachment 3. Operational Statistics for Manpower (Report Table 11 of WP&B) .. 13Attachment 4. Operational Statistics for Expatriate Personnel Analysis
(Report Table 12 of WP&B) ...... 14Attachment 5. Budget Year Expenditure (Budget Schedule 17 of WP&B) ......... 15Attachment 6. Project Status Report (Report Table 15 of WP&B) ....... 16
3. MANPOWER UTILIZATION PLAN (RPTK)Attachment 1. Explanatory Note . 21Attachment 2. Applicant Identity . 22Attachment 3. MD-1 Organizational Structure . 23Attachment 4. MD-2 TKA Use and Replacement Planning Chart 24Attachment 5. Brief Job Descriptions and Minimum Requirements for TKA Positions . 25Attachment 6. Education and Training Programs for Indonesian Workers
for Replacement of TKA . 26Attachment 7. MD-3 Recapitulation of Numbers of Formation of TKA/TKI Positions
and Indonesianization Plan ... 27Attachment 8. MD-4 International Employee Exchange Programs (Swapping) 28
4. PERMITS TO EMPLOY EXPATRIATE PERSONNEL (IMTA) Attachment 1. Letter of Request for Work Permit New/Extension/
Extension with Change of Position 31Attachment 2. Letter of Request to the Three Directors General .. 32Attachment 3. Request for Temporary Work Permit 33
5. CAREER DEVELOPMENT MONITORING (CDM) Attachment 1. Minutes of CDM Meetings .. 37
6. INTERNATIONAL CAREER DEVELOPMENT Attachment 1. See respective KKKS (Individual Development Plans)
7. CONDUCT OF EDUCATION AND TRAINING Attachment 1. Annual Training Report Budget & Evaluation . 50
8. EDUCATION AND TRAINING FOR BPMIGAS EMPLOYEES AND EMPLOYEES OFGOVERNMENT AGENCIES AT KKKS EXPENSEAttachment 1. Agreement Letter for Obligation Entitlement to Follow Training Program
KKKS Expense . 54
9. PRACTICAL WORK PROGRAMS FOR UNIVERSITY STUDENTS, COOP, STUDENTS,AND OTHERS PARTIESAttachment 1. Technical Education Assistance (TEA) 1 . 58Attachment 2. Technical Education Assistance (TEA) 2 . 60
10. ADMINISTRATIVE PROCEDURE FOR REFERRING PATIENTS FOR TREATMENT ABROADAttachment 1. Assistance Requisition Sheet (ARS) 78
vi
Tabl
e of
Con
tent
sAt
tach
men
ts
vi
-
1GUIDELINES
KKKS
Em
ploy
ee In
form
atio
n M
anag
emen
t
FUNCTION :MANPOWER UTILIZATION &INDUSTRIAL RELATION
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :KKKS EMPLOYEE INFORMATIONMANAGEMENT
I. GENERAL 1.1 KKKS Employee Information Management is management of data on KKKS
(Cooperation Contract Contractor) employees as a basis for the HR management that is needed by the managements of BPMIGAS and the KKKS.
1.2 KKKS Employee Information Management is implemented through various means in order to be fast and accurate by using the KKKS manpower data information system that can be accessed through the site http://www.bpmigas.com.
1.3 The reporting information represents the data on employees that is needed to support management decisions in supervising and controlling KKKS HR.
1.4 To anticipate the rapid and complex changes in HR, fast and accurate employee data/information is needed.
II. AIMS 2.1 To monitor the management of the KKKSs HR within the KKKS.
2.2 To obtain data that can serve as a reference within the KKKS and can be opened at any time by employees (those who have access to the KKKS manpower data information system) within the KKKS.
2.3 To provide information for conducting KKKS HR management.
III. AUTHORITY
3.1 Every KKKS shall designate officers to enter data into the KKKS manpower data information system and to produce manpower reports, which shall be approved by the top HR management.
3.2 The employees who are given this duty shall have access to enter the KKKS manpower data information system in the site http://www.bpmigas.com.
IV. INSTRUCTIONS/IMPLEMENTATION
4.1 To support quick and accurate management decisions, the information that is obtained through this reporting system shall be sent to BPMIGAS using these facilities:
KKKS Internet Site: http://www.bpmigas.com. Letter. Facsimile. E-mail.
BK 1.indd Isi1BK 1.indd Isi1 4/27/2007 9:01:29 AM4/27/2007 9:01:29 AM
-
2GUIDELINES
KKKS
Em
ploy
ee In
form
atio
n M
anag
emen
t
FUNCTION :MANPOWER UTILIZATION &INDUSTRIAL RELATION
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :KKKS EMPLOYEE INFORMATIONMANAGEMENT
4.2 KKKS are required to enter their data into the KKKS manpower data information system created by BPMIGAS, which can be accessed through the site http://www.bpmigas.com at the manpower data information system.
4.3 KKKS are required to keep their data updated at all times in line with the actual conditions in the company.
4.4 Until a KKKS has entered its data into the manpower data information system, the KKKS is required to perform monthly reporting in line with what is currently applicable:
4.4.1 KKKS Workforce Report.
Number of TKI (Indonesian personnel), both full posting (in line with RPTK) and TPC (short term, of a project/temporary nature).
Number of TKI, comprised of: - Employees for definite Period (PWTT) or permanent employees. - Employees for Limited Periods (PWT) or contract employees
(direct hires). - TPC employees, for short term on a project/temporary basis.
4.4.2 Personnel Transfer Report (MTK).
Intake of TKI (B).
Transfers (T): - Ta = Change of Position, Department, Location/Area. - Tb = Promotion (change of grade/category, position). - Tc = Internationalization. - Td = Swapping/Exchange of International Employees. - Te = Job Assignment/Overseas On the Job Training. - Tf = Change of Job Title and Organizational Change. - Tg = Leave without Pay.
Termination of Employment (P): - Pa = Retirement at Retirement Age. - Pb = Early Retirement on Own Request. - Pc = Resignation. - Pd = Mutual Agreement Termination (MAT). - Pe = Passed Away. - Pf = Health Reasons. - Pg = Caused by Serious Violations committed by employee. - Ph = Company Closure.
4.5. KKKS shall prepare Reports other than those mentioned above as specified by BPMIGAS.
BK 1.indd Isi2BK 1.indd Isi2 4/27/2007 9:01:30 AM4/27/2007 9:01:30 AM
-
3GUIDELINES
KKKS
Em
ploy
ee In
form
atio
n M
anag
emen
t
FUNCTION :MANPOWER UTILIZATION &INDUSTRIAL RELATION
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :KKKS EMPLOYEE INFORMATIONMANAGEMENT
V. REFERENCES 5.1 Law No. 22/2001 on Oil and Gas.
5.2 Law No. 13/2003 on Manpower.
5.3 Government Regulation No. 42/2002 on the Executive Agency For Upstream Oil and Gas Business Activities.
5.4 Government Regulation No. 35/2004 on the Upstream Oil and Gas Business Activities.
5.5 Cooperation Contracts (KKS).
VI. ATTACHMENTS 6.1 Workforce Report (KTK). (Attachment 1).
6.2 Personnel Transfer Report (MTK). (Attachment 2).
BK 1.indd Isi3BK 1.indd Isi3 4/27/2007 9:01:31 AM4/27/2007 9:01:31 AM
-
4GUIDELINES
KKKS
Em
ploy
ee In
form
atio
n M
anag
emen
tAt
tach
men
t 1
KK
KS
Sta
teS
ub.
Sta
ff
Non
Sta
ffS
ub T
otal
Sta
ff
Non
Sta
ffS
ub T
otal
Em
pl.
Con
t.P
WT
Nas
iona
lTe
naga
Ker
ja A
sing
IKS
Sub
K
ontr
akto
rS
ub
Tota
l
Att
achm
ent 1
Gra
nd
Tota
lK
eter
anga
n
LAP
OR
AN
KE
KU
ATA
N P
EK
ER
JA K
KK
S
Bul
an
Loka
si/W
ilaya
h K
erja
No.
T
otal
IMTA
PW
TT
BK 1.indd Isi4BK 1.indd Isi4 4/27/2007 9:01:31 AM4/27/2007 9:01:31 AM
-
5GUIDELINES
KKKS
Em
ploy
ee In
form
atio
n M
anag
emen
tAt
tach
men
t 2
LAPO
RAN
MUT
ASI T
ENAG
A KE
RJA
INDO
NESI
ABu
lan
Tmt.
Code
Ket.
Loka
siDe
pt.
Jaba
tan
Gol
.Lo
kasi
Dept
.Ja
bata
nG
ol.
Cata
tan
:
B =
Baru
(Pen
erim
aan
Peke
rja B
aru)
P =
PHK
(pem
utus
an h
ubun
gan
kerja
)T
= Tr
ansf
erPa
= P
ensiu
n Pu
rnak
arya
Pb
= P
ensiu
n Di
ni A
tas
Perm
inta
an S
endi
riTa
=
Pind
ah J
abat
an, D
epar
tem
en, L
okas
i/Are
aPc
= M
engu
ndur
kan
Diri
Tb=
Prom
osi (
peru
baha
n gr
ade/
golo
ngan
/jaba
tan)
Pd =
Men
gund
urka
n Di
ri At
as K
esep
akat
an B
ersa
ma
Tc=
Inte
rnas
iona
lisas
i
(
Mut
ual A
gree
men
t Ter
min
atio
n)Td
= Sw
appi
ng/P
ertu
kara
n Pe
kerja
Inte
rnas
iona
lPe
= M
enin
ggal
Dun
ia
Te=
Job
Assig
nmen
t/Ove
rsea
s O
n Th
e Jo
b Tr
aini
ngPf
= A
lasa
n Ke
seha
tan
Tf=
Chan
ge J
ob T
itle d
an p
erub
ahan
org
anisa
siPg
= D
iseba
bkan
Pel
angg
aran
Ber
at Y
ang
Dila
kuka
n Pe
kerja
Tg
= Le
ave
With
out P
aym
ent
Ph =
Pen
utup
an P
erus
ahaa
n
Atta
chm
ent 2
No.
Nam
a KK
KSNa
ma
Nope
gLa
ma
Baru
Jaba
tan
dan
Kedu
duka
nKa
tego
ri
SNS
BK 1.indd Isi5BK 1.indd Isi5 4/27/2007 9:01:32 AM4/27/2007 9:01:32 AM
-
6GUIDELINES
Man
pow
er W
ork
Plan
and
Bud
get (
RKA)
FUNCTION :MANPOWER UTILIZATION &INDUSTRIAL RELATION
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :MANPOWER WORK PLAN AND BUDGET (RKA)
FUNCTION :
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :AN
SUBJECT :
I. GENERAL 1.1. The Manpower Work Plan & Budget (RKA) is a work plan for Personnel
management activities that is put into the form of a plan for the expenditures of each KKKS (Cooperation Contract Contractor), which forms the basis for preparation of the overall Work Program & Budget.
1.2. Total Personnel Expenses is the entire amount of expenditures of personnel costs, which consists of Salary & Wages, Benefits, and other expenditures for personnel (Personnel Expenses).
Total Personnel Expenses are broken down into three types of activities, namely: categories of Exploration/Development, Production, and Administration.
1.2.1. Exploration/Development Category. These Total Personnel Expenses data should be in line with what is set forth in the Budgeted Exploration/Development Expenses section of the Work Program and Budget (Attachment to Schedule-4).
1.2.2. Production Category. These Total Personnel Expenses data should be in line with what is set forth in the Budgeted Production Expenses section of the Work Program and Budget (Attachment to Schedule-8).
1.2.3. Administration Category. These Total Personnel Expenses data should be in line with what is set forth in the Administrative Expenses section of the Work Program and Budget (Attachment to Schedule-11).
1.3. Budgeted Total Personnel Expenses is the breakdown of the budget filled in with data on expenditures for TKI [Indonesian personnel] & TKA [Expatriate personnel] to the end of the year from Total Personnel Expenses, which include Salary, Wages & Benefits, and the Personnel Expenses that are allocated to the functions of Exploration/Development Expenses, Production Expenses, and Administrative Expenses.
1.4. Compensation and Benefits Budget Evaluation is the breakdown of the budget based on the components of Salary/Wages, Other/Employee Benefits, and the labor cost content that is included in Technical Services, Outside Services, Materials, Insurance, Environmental Control, and Sundries.
II. AIMS 2.1. To exercise supervision and control over the HR management of Cooperation
Contract Contractors (KKKS) through Strategic analysis and evaluation, based on the Cooperation Contract relationship.
2.2. To ensure the KKKSs commitment in implementing its manpower management.
BK 1.indd Isi6BK 1.indd Isi6 4/27/2007 9:01:32 AM4/27/2007 9:01:32 AM
-
7GUIDELINES
Man
pow
er W
ork
Plan
and
Bud
get (
RKA)
FUNCTION :MANPOWER UTILIZATION &INDUSTRIAL RELATION
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :MANPOWER WORK PLAN AND BUDGET (RKA)
FUNCTION :
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :SUBJECT :
III. AUTHORITY 3.1. KKKS shall prepare a draft budget based on the work plan for personnel
activities to be carried out in the coming fiscal year in line with the companys business strategy/needs and its financial capability.
3.2. BPMIGAS shall conduct an evaluation of the draft Work Plan & Budget (RKA) in the personnel sector that was prepared by the KKKS in line with the companys WP&B and grant its approval, to serve as guidelines for the KKKS in the implementation of its work plan in the personnel sector for the coming fiscal year. If the KKKS must make personnel policies outside the RKA that has been approved by BPMIGAS, the KKKS must request prior approval from BPMIGAS.
IV. INSTRUCTIONS/IMPLEMENTATION 4.1. KKKS shall prepare a budget based on the work plan of activities in the
Personnel sector that are to be carried out in the coming fiscal year. This shall be entered into the Budgeted Total Personnel Expenses, Annual Compensation & Benefits Budget Evaluation, and Budget & Evaluation Training Report forms (see guidelines for conduct of education and training), accompanied by Budget Schedule No. 17 (Budget Year Expenditure), Report Table 15 of the WP&B (Project Status Report), Report Table 11 of the WP&B (Operational Statistics for Expatriate Personnel Analysis). This shall then be submitted to BPMIGAS, attn. Head of Manpower Utilization & Industrial Relations Service, before the WP&B meeting is held (before 30 September of the current year).
4.2. The Head of the Manpower Utilization & Industrial Relations Service shall conduct an evaluation of the Personnel Work Plan and Budget that has been submitted and discuss it with the KKKS concerned for a recommendation to the WP&B Team.
4.3. The approved Work Plan and Budget for the Personnel sector shall serve as material for the implementation of the KKKSs personnel management in the period of the coming fiscal year (in line with the period of the overall WP&B).
4.4. In the current fiscal year: 4.4.1. If, in the implementation/realization of the work plan, there are cost
overruns that exceed the approved budget limit, the KKKS is required to request prior approval from BPMIGAS before these can be entered as an additional charge to operating costs. However, if these cost increases are solely due to an increase in the number of Indonesian personnel, and the amount is not greater than 10% of the approved personnel budget, the KKKS may carry this out without BPMIGAS approval.
4.4.2. If the KKKS undertakes Compensation & Benefits measures outside the work plan, the KKKS shall request prior approval from BPMIGAS.
BK 1.indd Isi7BK 1.indd Isi7 4/27/2007 9:01:33 AM4/27/2007 9:01:33 AM
-
8GUIDELINES
Man
pow
er W
ork
Plan
and
Bud
get (
RKA)
FUNCTION :MANPOWER UTILIZATION &INDUSTRIAL RELATION
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :MANPOWER WORK PLAN AND BUDGET (RKA)
FUNCTION :
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :SUBJECT :
4.5. If the KKKS plans to revise its approved Personnel Budget, the KKKS shall submit the revision to BPMIGAS, attn. Head of Manpower Utilization & Industrial Relations Service, by submitting the completed Attachment 1.2 form and the revised Report Table 11 of the WP&B (Attachment 3) and Report Table 12 of the WP&B (Attachment 4).
4.6. The Personnel Work Plan and Budget represents the basis for the use of Manpower. Therefore, every submission of RPTK & Permit for Use of Workers, especially for TKA (expatriate personnel), must be based on the Personnel Work Plan & Budget that has been approved.
4.7. Measures taken by the KKKS in the Manpower sector that are not based on the Manpower Work Plan & Budget without going through BPMIGAS approval and/or that are not based on BPMIGAS policies/decisions, cannot be counted as operating costs.
V. REFERENCES 5.1. Law No. 22/2001 on Oil and Gas. 5.2. Law No. 13/2003 on Manpower. 5.3. Government Regulation No. 42/2002 on the Executive Agency For Upstream
Oil and Gas Business Activities. 5.4. Government Regulation No. 35/2004 on Upstream Oil and Gas Business
Activities.5.5. Cooperation Contract (KKS). 5.6. Work Program & Budget (WP&B).
VI. ATTACHMENTS 6.1. Budgeted Total Personnel Expenses (Attachment 1). 6.2. Compensation & Benefits Budget Evaluation (Attachment 2). 6.3. Operational Statistics for Manpower, Report Table 11 of WP&B
(Attachment 3). 6.4. Operational Statistics for Expatriates Personnel Analysis, Report Table 12 of
WP&B (Attachment 4).6.5. Budget Year Expenditure, Budget Schedule 17 of WP&B (Attachment 5). 6.6. Budget Status Report, Report Table 15 of WP&B (Attachment 6).
VII. COMPLETION INSTRUCTIONS Attachment 1: BUDGETED TOTAL PERSONNEL EXPENSES. Line 1: Exploration/Development Expenses.
Data on employees from the Exploration/Development group.
Employee Salary Wages/Benefits. Data on Salary Wages/Benefits shall be entered into the appropriate columns, i.e. the Salary Wages/Benefits column, for both national employees and expatriates.
BK 1.indd Isi8BK 1.indd Isi8 4/27/2007 9:01:33 AM4/27/2007 9:01:33 AM
-
9GUIDELINES
Man
pow
er W
ork
Plan
and
Bud
get (
RKA)
FUNCTION :MANPOWER UTILIZATION &INDUSTRIAL RELATION
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :MANPOWER WORK PLAN AND BUDGET (RKA)
FUNCTION :
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :SUBJECT :
Personnel Expenses are costs related to personnel other than Salary Wages/Benefits. These costs are used for Employee Relations, Training, Accommodation, Welfare/Medical, and Other which are budgeted in the Exploration/Development group. These data are to be entered into the appropriate column: Technical Services, Outside Services, Materials, Insurance, Environment Control, and Sundries.
In the Work Program & Budget, these Personnel Expenses are part of the Administration budget (row 21) below the sub-heading Exploration Administration Expenditures (row 20) in the Attachment to Schedule-4.
Manpower Budget is to be completed in line with the planned number of personnel in the Exploration/Development group.
Line 2: Production Expenses. Data on employees from the Production group.
Employee Salary Wages/Benefits. Data on Salary Wages/Benefits shall be entered into the appropriate columns, i.e. the Salary Wages/Benefits column, for both national employees and expatriates.
Personnel Expenses.This budget represents costs related to personnel other than for Salary & Benefits. These costs are in line with the data for Employee Relations in row 40 in the Attachment to Schedule-8 of the WP&B, plus the budget for other personnel. These data are to be entered into the appropriate column: Technical Services, Outside Services, Materials, Insurance, Environment Control, and Sundries.
Manpower Budget. Data on the number of personnel, to be completed in line with the planned number of personnel in the Production group.
Line 3: Administrative Expenses. Data on employees from the Administration group.
Employee Salary Wages/Benefits. Data on Salary Wages/Benefits shall be entered into the appropriate columns, i.e. the Salary Wages/Benefits column, for both national employees and expatriates.
Personnel Expenses.This budget represents costs related to personnel other than for Salary & Benefits. These costs are in line with the data in Personnel Expenses (row 24), Attachment to Schedule-11 of the WP&B, plus the budget for other personnel (Outside Contract, Technical Services, etc.) from the Administration group. These data are to be entered into the appropriate column: Technical Services, Outside Services, Materials, Insurance, Environment Control, and Sundries.
BK 1.indd Isi9BK 1.indd Isi9 4/27/2007 9:01:34 AM4/27/2007 9:01:34 AM
-
10
GUIDELINES
Man
pow
er W
ork
Plan
and
Bud
get (
RKA)
FUNCTION :MANPOWER UTILIZATION &INDUSTRIAL RELATION
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :MANPOWER WORK PLAN AND BUDGET (RKA)
FUNCTION :
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :SUBJECT :
Manpower Budget.Data on the number of personnel, to be completed in line with the planned number of personnel in the Production group.
Attachment 2: COMPENSATION & BENEFITS BUDGET EVALUATION.
The data that are evaluated are the data from each group, i.e. Exploration & Development, Production, and Administration, by filling in the data on realization from the previous year, the budget for the current year, and the planned budget for the coming year.
The data are completed in line with the total Salaries & Benefits in the entire work area; data on Outside Services, Materials, Insurance, and environmental control are filled in it they have an allocation of personnel costs for these types of costs.
Attachments 3 & 4: - OPERATIONAL STATISTICS FOR MANPOWER, REPORT TABLE-11 OF WP&B (Attachment 3).
- OPERATIONAL STATISTICS FOR EXPATRIATES PERSONNEL ANALYSIS, REPORT TABLE-12 OF WP&B (Attachment 4). These are the Proposed Budget in Report Table-11 of the WP&B (Attachment 3) and Report Table-12 of the WP&B (Attachment 4).
Attachment 5: BUDGET YEAR EXPENDITURE, Budget Schedule-17 of WP&B (Attachment 5). This is the proposed budget in Budget Schedule 17 of the WP&B.
Attachment 6: PROJECT STATUS REPORT, REPORT TABLE-15 (Attachment 6). These are data on the Supervision and General & Administration budget in the project in line with the AFE. These data are taken from Report Table-15, Project Status Report in the Procedure Manual of Production Sharing Contract. In each project AFE (for example, Seismic & Other Survey, G&G, Exploration Drilling, Delineation Drilling, Development Drilling, etc.), there is a budget allocation for Supervision, General & Administration, which represents the project personnel budget set forth in the Project Status Report/closed out report for the AFE Project.
BK 1.indd Isi10BK 1.indd Isi10 4/27/2007 9:01:35 AM4/27/2007 9:01:35 AM
-
11
GUIDELINES
Man
pow
er W
ork
Plan
and
Bud
get (
RKA)
Atta
chm
ent 1
Opera
tor:
BUDG
ETED
TOTA
L PER
SONN
EL EX
PENS
ESCo
ntract
Area
:
Propos
edBu
dgetY
ear:
ENVIR
ONM.
LINE
DESC
RIPTIO
NCO
NTRO
LEX
PAT
NATIO
NAL
EXPA
TNA
T.EX
PAT
NAT.
1.Ex
plorat
ion/De
v. Expe
nses
a. Emp
loyee
Salary
& Be
nefits
b. Pers
onnel E
xpense
s (Adm
inistra
tion)*
2.Pro
ductio
n Expe
nses
a. Emp
loyee
Salary
& Be
nefits
b. Pers
onnel E
xpense
s**3.
Admin
istrativ
e Expe
nses
a. Emp
loyee
Salary
& Be
nefits
b.Pers
onnelE
xpense
s**
* : Pe
rsonne
l Expe
nses, p
art of
Admin
istratio
n Expe
nses in
Explo
ration
/Dev.
witho
ut Sala
ry & Be
nefits.
** :
Perso
nnel E
xpense
s Witho
ut Sala
ry & Be
nefit fo
r all e
mploy
ee sta
tus.
Attach
ment
1
MAN P
OWER
BUDG
ETPE
RSON
NEL C
OST
MATE
RIALS
SUND
RIES
T O T
A LOU
TSIDE
SE
RV.
TOTA
L
SAL./W
AGES
BENE
FITS
INSUR
ANCE
TECH
. SE
RV.
IMPOR
TDO
MEST
IC
Atta
chm
ent 1
Opera
tor:
BUDG
ETED
TOTA
L PER
SONN
EL EX
PENS
ESCo
ntract
Area
:
Propos
edBu
dgetY
ear:
ENVIR
ONM.
LINE
DESC
RIPTIO
NCO
NTRO
LEX
PAT
NATIO
NAL
EXPA
TNA
T.EX
PAT
NAT.
1.Ex
plorat
ion/De
v. Expe
nses
a. Emp
loyee
Salary
& Be
nefits
b. Pers
onnel E
xpense
s (Adm
inistra
tion)*
2.Pro
ductio
n Expe
nses
a. Emp
loyee
Salary
& Be
nefits
b. Pers
onnel E
xpense
s**3.
Admin
istrativ
e Expe
nses
a. Emp
loyee
Salary
& Be
nefits
b.Pers
onnelE
xpense
s**
* : Pe
rsonne
l Expe
nses, p
art of
Admin
istratio
n Expe
nses in
Explo
ration
/Dev.
witho
ut Sala
ry & Be
nefits.
** :
Perso
nnel E
xpense
s Witho
ut Sala
ry & Be
nefit fo
r all e
mploy
ee sta
tus.
Attach
ment
1
MAN P
OWER
BUDG
ETPE
RSON
NEL C
OST
MATE
RIALS
SUND
RIES
T O T
A LOU
TSIDE
SE
RV.
TOTA
L
SAL./W
AGES
BENE
FITS
INSUR
ANCE
TECH
. SE
RV.
IMPOR
TDO
MEST
IC
Atta
chm
ent 1
Opera
tor:
BUDG
ETED
TOTA
L PER
SONN
EL EX
PENS
ESCo
ntract
Area
:
Propos
edBu
dgetY
ear:
ENVIR
ONM.
LINE
DESC
RIPTIO
NCO
NTRO
LEX
PAT
NATIO
NAL
EXPA
TNA
T.EX
PAT
NAT.
1.Ex
plorat
ion/De
v. Expe
nses
a. Emp
loyee
Salary
& Be
nefits
b. Pers
onnel E
xpense
s (Adm
inistra
tion)*
2.Pro
ductio
n Expe
nses
a. Emp
loyee
Salary
& Be
nefits
b. Pers
onnel E
xpense
s**3.
Admin
istrativ
e Expe
nses
a. Emp
loyee
Salary
& Be
nefits
b.Pers
onnelE
xpense
s**
* : Pe
rsonne
l Expe
nses, p
art of
Admin
istratio
n Expe
nses in
Explo
ration
/Dev.
witho
ut Sala
ry & Be
nefits.
** :
Perso
nnel E
xpense
s Witho
ut Sala
ry & Be
nefit fo
r all e
mploy
ee sta
tus.
Attach
ment
1
MAN P
OWER
BUDG
ETPE
RSON
NEL C
OST
MATE
RIALS
SUND
RIES
T O T
A LOU
TSIDE
SE
RV.
TOTA
L
SAL./W
AGES
BENE
FITS
INSUR
ANCE
TECH
. SE
RV.
IMPOR
TDO
MEST
IC
Atta
chm
ent 1
Opera
tor:
BUDG
ETED
TOTA
L PER
SONN
EL EX
PENS
ESCo
ntract
Area
:
Propos
edBu
dgetY
ear:
ENVIR
ONM.
LINE
DESC
RIPTIO
NCO
NTRO
LEX
PAT
NATIO
NAL
EXPA
TNA
T.EX
PAT
NAT.
1.Ex
plorat
ion/De
v. Expe
nses
a. Emp
loyee
Salary
& Be
nefits
b. Pers
onnel E
xpense
s (Adm
inistra
tion)*
2.Pro
ductio
n Expe
nses
a. Emp
loyee
Salary
& Be
nefits
b. Pers
onnel E
xpense
s**3.
Admin
istrativ
e Expe
nses
a. Emp
loyee
Salary
& Be
nefits
b.Pers
onnelE
xpense
s**
* : Pe
rsonne
l Expe
nses, p
art of
Admin
istratio
n Expe
nses in
Explo
ration
/Dev.
witho
ut Sala
ry & Be
nefits.
** :
Perso
nnel E
xpense
s Witho
ut Sala
ry & Be
nefit fo
r all e
mploy
ee sta
tus.
Attach
ment
1
MAN P
OWER
BUDG
ETPE
RSON
NEL C
OST
MATE
RIALS
SUND
RIES
T O T
A LOU
TSIDE
SE
RV.
TOTA
L
SAL./W
AGES
BENE
FITS
INSUR
ANCE
TECH
. SE
RV.
IMPOR
TDO
MEST
IC
Atta
chm
ent 1
BK 1.indd Isi11BK 1.indd Isi11 4/27/2007 9:01:35 AM4/27/2007 9:01:35 AM
-
12
GUIDELINES
Man
pow
er W
ork
Plan
and
Bud
get (
RKA)
Atta
chm
ent 2
Operator :Contract Area :
LINE DESCRIPTION
EXPAT NATIONAL EXPAT NATIONAL EXPAT NATIONAL EXPAT NATIONAL
1. SALARIES & WAGES - Base Salary
- Housing Allw - Transport Allw
- Regional Allw - Leave day off ..
Total Salaries & Wages
2. OTHER/EMPL. BENEFIT - Field Allw - Rotational Allw - Shift Premium - Meals & Trpt O/T Allw - Incentives Comp Plan - THRK Allw - Employee Tax Total Other/Empl. Benefit
3. TECHNICAL SERVICES - Salary - other Total Technical Services
4. OUTSIDE SERVICES - Salary - other Total Outside Services
5 MATERIALS*
6 INSURANCE*
7 ENVIRONMENTAL CONTROL*
8 SUNDRIES*(personnel expenses that notcovered by all items above)
* : For Personnel Expenses & Benefits** : Diisi sesuai Budget Schedule 17 WP&B
Attachment 2
COMPENSATION & BENEFITS BUDGET EVALUATION
** TOTAL
(1) (2) (3)
PREVIOUS BUDGET CURRENT BUDGET BUDGET FOR NEXT YEAR
% VARIANCE
(3-2)2
Operator :Contract Area :Proposed Budget Year :
Operator :Contract Area :
LINE DESCRIPTION
EXPAT NATIONAL EXPAT NATIONAL EXPAT NATIONAL EXPAT NATIONAL
1. SALARIES & WAGES - Base Salary
- Housing Allw - Transport Allw
- Regional Allw - Leave day off ..
Total Salaries & Wages
2. OTHER/EMPL. BENEFIT - Field Allw - Rotational Allw - Shift Premium - Meals & Trpt O/T Allw - Incentives Comp Plan - THRK Allw - Employee Tax Total Other/Empl. Benefit
3. TECHNICAL SERVICES - Salary - other Total Technical Services
4. OUTSIDE SERVICES - Salary - other Total Outside Services
5 MATERIALS*
6 INSURANCE*
7 ENVIRONMENTAL CONTROL*
8 SUNDRIES*(personnel expenses that notcovered by all items above)
* : For Personnel Expenses & Benefits** : Diisi sesuai Budget Schedule 17 WP&B
Attachment 2
COMPENSATION & BENEFITS BUDGET EVALUATION
** TOTAL
(1) (2) (3)
PREVIOUS BUDGET CURRENT BUDGET BUDGET FOR NEXT YEAR
% VARIANCE
(3-2)2
Operator :Contract Area :Proposed Budget Year :
BK 1.indd Isi12BK 1.indd Isi12 4/27/2007 9:01:36 AM4/27/2007 9:01:36 AM
-
13
GUIDELINES
Man
pow
er W
ork
Plan
and
Bud
get (
RKA)
Atta
chm
ent 3
OPERATIONAL STATISTIC FOR MANPOWER
Operator :Contract Area :Proposed Budget Year :
DESCRIPTION
1. TOTAL MANPOWER 2. NUMBER OF EXPATRIATE POSISITIONS - Routine - Project 3. NUMBER OF NATIONAL STAFF 4. NUMBER OF NATIONAL NON-STAFF 5. NUMBER OF INDONESIANIZED POSITIONS - Exploration - Other E & P - Finec - Administration & Other 6. TRAINING & COURSES a. Category : - S1 degree - S2 degree - S3 degree - Other (AKAMIGAS) - S2 Overseas
Category : - In House - Domestic - Overseas
Practical Training for Univ. Student
b. Training Expenditures (K US$) :
Attachment 4(Report Table 11 of WP&B)
Proposed Next Year
Budget
Previous Budget
WP&B Year To Date Q3CURRENT YEAR
Original Revision Budget Actual
Attachment 3(Report Table 11 of WP&B)
OPERATIONAL STATISTIC FOR MANPOWEROPERATIONAL STATISTIC FOR MANPOWER
Operator :Contract Area :Proposed Budget Year :
DESCRIPTION
1. TOTAL MANPOWER 2. NUMBER OF EXPATRIATE POSISITIONS - Routine - Project 3. NUMBER OF NATIONAL STAFF 4. NUMBER OF NATIONAL NON-STAFF 5. NUMBER OF INDONESIANIZED POSITIONS - Exploration - Other E & P - Finec - Administration & Other 6. TRAINING & COURSES a. Category : - S1 degree - S2 degree - S3 degree - Other (AKAMIGAS) - S2 Overseas
Category : - In House - Domestic - Overseas
Practical Training for Univ. Student
b. Training Expenditures (K US$) :
Attachment 4(Report Table 11 of WP&B)
Proposed Next Year
Budget
Previous Budget
WP&B Year To Date Q3CURRENT YEAR
Original Revision Budget Actual
Attachment 3(Report Table 11 of WP&B)
OPERATIONAL STATISTIC FOR MANPOWER
BK 1.indd Isi13BK 1.indd Isi13 4/27/2007 9:01:37 AM4/27/2007 9:01:37 AM
-
14
GUIDELINES
Man
pow
er W
ork
Plan
and
Bud
get (
RKA)
Atta
chm
ent 4
Operator :Contract Area :Proposed Budget Year :
Previous ProposedBudget Next Year
Budget
1. OPERATIONAL RESULT a. Discoveries + Reassesment Res. Eq. bbl. b. Production Equivalent bbl.
2. FINANCIAL RESULT a. Exploration Expenditures b. Development Expenditures c. Production + Other Expenditures d. Total Expenditures
3. NUMBER OF EXPATRIATES a. Exploration b. Other E&P c. Finance + Administration d. Total Expatriates
4. UNIT ANALYSIS
a. Expatriates Exploration - Additional Reserve/personnel (1a:3a) - Explo. Expenditures/personnel (2a:3a) b. Other E&P - Production/Personnel (1b:3b) - Dev. Expenditures/personnel (2b:3b) c. Finance + Administration - Production/Personnel (1b:3c) - Expenditures/personnel (2d:3d)
DESCRIPTIONOriginal Revision Budget Actual
Attachment 5(Report Table 12 of WP&B)
OPERATIONAL STATISTIC FOR EXPATRIATE PERSONNEL ANALYSIS
CURRENT YEAR W P & B Year to Date Q3
4. UNIT ANALYSIS
Attachment 4(Report Table 12 of WP&B)
Operator :Contract Area :Proposed Budget Year :
Previous ProposedBudget Next Year
Budget
1. OPERATIONAL RESULT a. Discoveries + Reassesment Res. Eq. bbl. b. Production Equivalent bbl.
2. FINANCIAL RESULT a. Exploration Expenditures b. Development Expenditures c. Production + Other Expenditures d. Total Expenditures
3. NUMBER OF EXPATRIATES a. Exploration b. Other E&P c. Finance + Administration d. Total Expatriates
4. UNIT ANALYSIS
a. Expatriates Exploration - Additional Reserve/personnel (1a:3a) - Explo. Expenditures/personnel (2a:3a) b. Other E&P - Production/Personnel (1b:3b) - Dev. Expenditures/personnel (2b:3b) c. Finance + Administration - Production/Personnel (1b:3c) - Expenditures/personnel (2d:3d)
DESCRIPTIONOriginal Revision Budget Actual
Attachment 5(Report Table 12 of WP&B)
OPERATIONAL STATISTIC FOR EXPATRIATE PERSONNEL ANALYSIS
CURRENT YEAR W P & B Year to Date Q3
4. UNIT ANALYSIS
Attachment 4(Report Table 12 of WP&B)
BK 1.indd Isi14BK 1.indd Isi14 4/27/2007 9:01:38 AM4/27/2007 9:01:38 AM
-
15
GUIDELINES
Man
pow
er W
ork
Plan
and
Bud
get (
RKA)
Atta
chm
ent 5
OPE
RA
TOR
:
CO
NTR
AC
T A
REA
:
PRO
POSE
D B
UD
GET
(NEX
T YE
AR
)
:
Expr
esse
d in
Tho
usan
ds o
f Dol
lars
2)3)
C
ON
TRA
CT/
4)5)
6)7)
8)
LIN
ED
ESC
RIP
TIO
NTE
CH
NIC
AL
OU
TSID
E M
ATE
RIA
LSIN
SUR
AN
CE
ENVI
RO
NM
ENTA
LSU
ND
RIE
STO
TAL
EXPA
TN
ATI
ON
AL
EXPA
TN
ATI
ON
AL
SER
VIC
ESSE
RVI
CES
CO
NTR
OL
1C
API
TAL
EXPA
ND
ITU
RES
2Ex
plor
atio
n an
d D
evel
opm
ent
3Pr
oduc
tion
4Ad
min
istra
tion
5To
tal C
apita
l Exp
andi
ture
s6 7
NO
N-C
API
TAL
EXPA
ND
ITU
RES
8Ex
plor
atio
n an
d D
evel
opm
ent
9Pr
oduc
tion
10Ad
min
istra
tion
11To
tal N
on-C
apita
l Exp
andi
ture
s12 13
TOTA
L EX
PAN
DIT
UR
ES
Atta
chm
ent 6
BUD
GET
SC
HED
ULE
17
of W
P&B
SALA
RIE
S
BU
DG
ET Y
EAR
EXP
END
ITU
RE
1) P
ERSO
NA
L C
OST
Atta
chm
ent 6
BUD
GET
SC
HED
ULE
17
OF
WP
& B
OPE
RA
TOR
:
CO
NTR
AC
T A
REA
:
PRO
POSE
D B
UD
GET
(NEX
T YE
AR
)
:
Expr
esse
d in
Tho
usan
ds o
f Dol
lars
2)3)
C
ON
TRA
CT/
4)5)
6)7)
8)
LIN
ED
ESC
RIP
TIO
NTE
CH
NIC
AL
OU
TSID
E M
ATE
RIA
LSIN
SUR
AN
CE
ENVI
RO
NM
ENTA
LSU
ND
RIE
STO
TAL
EXPA
TN
ATI
ON
AL
EXPA
TN
ATI
ON
AL
SER
VIC
ESSE
RVI
CES
CO
NTR
OL
1C
API
TAL
EXPA
ND
ITU
RES
2Ex
plor
atio
n an
d D
evel
opm
ent
3Pr
oduc
tion
4Ad
min
istra
tion
5To
tal C
apita
l Exp
andi
ture
s6 7
NO
N-C
API
TAL
EXPA
ND
ITU
RES
8Ex
plor
atio
n an
d D
evel
opm
ent
9Pr
oduc
tion
10Ad
min
istra
tion
11To
tal N
on-C
apita
l Exp
andi
ture
s12 13
TOTA
L EX
PAN
DIT
UR
ES
Atta
chm
ent 6
BUD
GET
SC
HED
ULE
17
of W
P&B
SALA
RIE
S
BU
DG
ET Y
EAR
EXP
END
ITU
RE
1) P
ERSO
NA
L C
OST
Atta
chm
ent 6
BUD
GET
SC
HED
ULE
17
OF
WP
& B
EMPL
OY
EMPL
OYE
E B
ENE
EE B
ENEF
IFITSTS
5
BK 1.indd Isi15BK 1.indd Isi15 4/27/2007 9:01:38 AM4/27/2007 9:01:38 AM
-
16
GUIDELINES
Man
pow
er W
ork
Plan
and
Bud
get (
RKA)
Atta
chm
ent 6
OPERATOR CONTRACT AREA QUARTER ENDED
Remaining Estimated Over/(Under)Original Revised Prev. Yr This Qtr Total YTD Budget Actual Amount Budget
4 5 6 7 8 9 10 11 16
- Seismic & Other Survey * Supervisi
* General & Admin. Subtotal
- G & G* Supervisi
* General & Admin. Subtotal
- Exploration Drilling * Supervisi
* General & Admin. Subtotal
- Delineation Drilling* Supervisi
* General & Admin. Subtotal
- Development Drilling* Supervisi
* General & Admin. Subtotal
- Production Facilities * Supervisi
* General & Admin. Subtotal
- Work Over* Supervisi
* General & Admin. Subtotal
- Equipment * Supervisi
* General & Admin. Subtotal
- Other * Supervisi
* General & Admin. Subtotal Grand Total
Note : Data kumulatif diambil dari masing-masing AFE Proyek, hanya baris supervisi dan G&A.
Attachment 7Report Table 15 of WP&B
B P M I G A SPRODUCTION SHARING CONTRACT
PROJECT STATUS REPORT
AFE by Catagories Total Budget Actual Expenditures Remarks
Attachment 6 (Report Table 15 of WP&B)
:::
BK 1.indd Isi16BK 1.indd Isi16 4/27/2007 9:01:39 AM4/27/2007 9:01:39 AM
-
17
GUIDELINES
Man
pow
er U
tiliz
atio
n Pl
an (R
PTK)
FUNCTION :MANPOWER UTILIZATION &INDUSTRIAL RELATION
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :MANPOWER UTILIZATION PLAN(RPTK)
I. GENERAL
1.1 BPMIGAS plays a role as supervisor and controller of the work plans and budgets (WP&B) of KKKS.
1.2 The KKKS Manpower Utilization Plan (RPTK) is prepared on the basis of the WP&B, with consideration to the operational interests of the KKKS, fostering and development of TKI (Indonesian personnel), and transfer of technology.
1.3 Evaluation and monitoring of the use of TKA (expatriate personnel) will be evaluated on the basis of competency in the implementation of point 1.2 above.
1.4 Basically, in filling in the RPTK, priority is on Indonesian personnel. 1.5 Utilization of Expatriate Personnel (TKA) is a part of transfer of technology and
knowledge, and placement of company representatives.
II. AIMS Basically, the RPTK is needed for these aims: 2.1 To support the KKKSs oil and gas operations in line with the WP&B. 2.2 As part of the companys business strategy plan in connection with HR. 2.3 As an instrument for supervising the use of manpower to ensure it is effective
and efficient. 2.4 Optimization of the use of expatriate personnel in the framework of creating job
opportunities for, fostering, and developing Indonesian personnel. 2.5 As a basis for submitting IMTA (Permit to Employ Expatriate Personnel)
requests.
III. AUTHORITY 3.1 KKKS shall submit RPTK applications to BPMIGAS for evaluation. 3.2 BPMIGAS shall evaluate and approve the KKKSs RPTK and forward it to the
relevant agency if necessary.
IV. REGULATION/LIMITS
4.1 The RPTK may be made for a maximum period of 5 years, in accordance with Decree of the Minister of Manpower No. KEP-173/MEN/2000 on Term of RPTK, article 3 clause 2, provided that the KKKS has a WP&B in line with the period of the year of submission of the RPTK.
4.2 Changes shall be made to the RPTK if:
4.2.1 There are changes to the structure, name, or period, or additions to expatriate positions.
4.2.2 There is a significant reorganization/restructuring (3 layers from the top) in the KKKS.
4.2.3 There is a change in Work Plan or Operation Commitment.
BK 1.indd Isi17BK 1.indd Isi17 4/27/2007 9:01:40 AM4/27/2007 9:01:40 AM
-
18
GUIDELINES
Man
pow
er U
tiliz
atio
n Pl
an (R
PTK)
FUNCTION :MANPOWER UTILIZATION &INDUSTRIAL RELATION
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :MANPOWER UTILIZATION PLAN (RPTK)
4.3 Aside from point 4.2 above, the KKKS may make changes to its organizational structure (below [the top] 3 layers), and report them to BPMIGAS.
4.4 Times for submission of KKKS RPTK: For KKKS that employ expatriate personnel: No later than four (4) months before the current RPTK is due to expire.
For KKKS that do not employ expatriate personnel: Approval is granted only by BPMIGAS and it shall be submitted no later than one (1) month before the current RPTK is due to expire.
4.5 Plans for use of foreign workers shall be evaluated based on the WP&B and other special justifications.
4.6 Charges of costs for foreign workers who are used for more than one (1) mining work area (WKP) shall be calculated pro rata.
4.7 Project RPTK are part of the regular RPTK.
4.8 Swapping Program RPTK may be prepared separately from the regular RPTK.
4.9 Every planned use of foreign personnel must be accompanied by a Indonesian personnel development plan, which shall be periodically discussed in the Career Development Monitoring meeting.
V. INSTRUCTIONS/IMPLEMENTATION
5.1 KKKS shall submit the RPTK document in the form of a book and of soft copy (see Attachment) to BPMIGAS to be discussed in the consultation meeting.
5.2 BPMIGAS shall coordinate with the relevant agencies for RPTK approval.
VI. REFERENCES
6.1 Law No. 22/2001 on Oil and Gas. 6.2 Law No. 13/2003 on Manpower. 6.3 Government Regulation No. 42/2002 on the Executive Agency For Upstream
Oil and Gas Business Activities. 6.4 Government Regulation No. 35/2004 on the Upstream Oil and Gas Business
Activities.6.5 Cooperation Contract (KKS). 6.6 Work Program & Budget (WP&B). 6.7 Decree of the Minister of Manpower and Transmigration (KepMen)
No. Kep-228/Men/2003 on Procedure for Ratification of Foreign Manpower Utilization Plans.
6.8 Decree of the Minister of Manpower and Transmigration (KepMen) No. Kep-20/Men/III/2003 on Procedure for Obtaining Permits to Employ Foreign Manpower.
Plans for use of expatriate personnel shall be evaluated based on the WP&B and other special justi cations.Charges of costs for expatriate personnel who are used for more than one (1) mining work area (WKP) shall be calculated pro rata.
Every planned use of expatriate personnel must be accompanied by a Indonesian personnel development plan, which shall be periodically discussed in the Career Development Monitoring meeting.
BK 1.indd Isi18BK 1.indd Isi18 4/27/2007 9:01:40 AM4/27/2007 9:01:40 AM
-
19
GUIDELINES
Man
pow
er U
tiliz
atio
n Pl
an (R
PTK)
FUNCTION :MANPOWER UTILIZATION &INDUSTRIAL RELATION
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :MANPOWER UTILIZATION PLAN(RPTK)
VII. ATTACHMENTS The RPTK contains the planned need for expatriate and Indonesian personnel, put into the form of:
7.1 Explanatory Note Attachment 1. The Explanatory Note is submitted in the form of a cover letter for the
operational overview of the KKKS work plan, which contains: a. Operating area and extent of work area. Exploration activities, specifically
stating how many kilometers of seismic data have been done. b. Level of oil and gas production to be undertaken (for Production KKKS). c. Drilling program/number of wells to be drilled. d. Technology to be used. e. Operation and capital budgets. f. Plans for filling Indonesian personnel positions that are vacant,
Indonesianization, swapping, and internationalization (for Production KKKS).
g. Community Development. h. Environmental Issues. i. Training Program.
For the purposes of evaluating the operational activities, the KKKS must attach a form containing data on the Companys activities for the previous 5 years (explanatory note form).
7.2 Identity of Applicant (Attachment 1, page 1 of KepMen 228/Men/2003) Attachment 2.
Fill in the company identity form by clearly stating the name, address, location of activities/production, type of business, business proceeds, Business Entity Status, and Agency Issuing Business Permits.
7.3 MD-1: Organizational Structure, including within it the use of job titles and placement of both expatriate and Indonesian personnel, whose maximum numbers are based on the manpower forecast/budget in the WP&B Attachment 3.
The MD-1 is prepared based on an organizational analysis and position analysis in accordance with the operational needs projected in the work program. In preparing the organizational structure and placement of expatriate personnel, attention must be given to: a. Availability of the number of personnel, based on knowledge, expertise and
capability in the right time and place.
b. Job titles used for expatriate personnel are to be adapted to the job titles found in the applicable provisions, and their use adapted to the lengths of time specified in the applicable provisions.
BK 1.indd Isi19BK 1.indd Isi19 4/27/2007 9:01:41 AM4/27/2007 9:01:41 AM
-
20
GUIDELINES
Man
pow
er U
tiliz
atio
n Pl
an (R
PTK)
FUNCTION :MANPOWER UTILIZATION &INDUSTRIAL RELATION
Promulgated on : 11-05-2005 Effective : 11-05-2005
SUBJECT :MANPOWER UTILIZATION PLAN (RPTK)
c. Expatriates are to be placed only in positions whose job specifications cannot be filled with the quality of the existing Indonesian personnel, and the user of the expatriate personnel can prove this if necessary.
7.4 MD-2: Expatriate Worker Utilization and Replacement Plan Chart (attachment in line with KepMen 228/Men/2003) Attachment 4.
The MD-2 is prepared by determining the names of the expatriate personnel and the replacement/understudy Indonesian personnel listed in the MD-1, stating education, work experience, when position starts to be used, and time limit for its use in line with the applicable provisions.
The MD-2 contains the data needed in Attachment 1, pages 2 and 3 of KepMen 228/Men/2003. The attachments to MD-2 consist of:
a. Attachment 1:
Position description and minimum requirements for expatriate positions (attachment 1, page 4 of KepMen 228/Men/2003, which contains brief description of titles and minimum requirements for expatriate positions, which states names of positions, brief description of job/position, and minimum requirements for position as the basis for placement of personnel Attachment 5.
b. Attachment 2:
Education and Training Program for Indonesian Personnel for the purpose of replacing expatriate personnel (attachment 1, page 5 of KepMen 228/Men/2003) Attachment 6.
Contains Education and Training Program for the Indonesian personnel being prepared to replace the expatriates.
All understudy Indonesian personnel planned to replace expatriate personnel must be programmed for Implementation of Education and Training in accordance with the required qualifications.
7.5 MD-3: Recapitulation of Total Position Formations, Expatriate Personnel/ Indonesian Personnel, and Indonesianization Plan Attachment 7.
Contains recapitulation of number of position formations, numbers of expatriate/Indonesian personnel, and Indonesianization and Internationalization/Swapping Plans, detailed by position group in the Department concerned.
7.6 MD-4: Swapping Program Attachment 8. (only needed in International Employee Exchange/Swapping RPTK).
Contains Swapping Program, which provides names of positions in Indonesia and in foreign country planned for swapping. and overseas that planned for swapping.
BK 1.indd Isi20BK 1.indd Isi20 4/27/2007 9:01:41 AM4/27/2007 9:01:41 AM
-
21
GUIDELINES
Man
pow
er U
tiliz
atio
n Pl
an (R
PTK)
Atta
chm
ent 1
1.JE
NIS
PE
RU
SA
HA
AN
:K
KK
S /
JOB
2.L
O K
A S
I:
Off
shor
e / O
nsho
re3.
KA
TEG
OR
I:
Eks
plor
asi &
pro
duks
i / P
rodu
ksi /
Eks
plor
asi
4.M
ULA
I BE
RO
PE
RA
SI
:Ta
hun
(xxx
x) E
kspl
oras
iTa
hun
(xxx
x) P
rodu
ksi
NO
ITE
M(N
-3)
(N-2
)(N
-1)
Tahu
n sa
at in
i (N
)(N
+1)
(N+2
)(N
+3)
(N+4
)
1.E
KS
PLO
RA
SI /
EX
PLO
RA
TIO
NLu
as W
ilaya
h (K
m2)
Are
a (s
q.km
)Ju
mla
h S
umur
Pen
gebo
ran
Num
ber o
f exp
lora
tion
wel
lsJu
mla
h K
KK
S/B
lok
Num
ber o
f PS
C/B
lock
s
2.P
RO
DU
KS
I / P
RO
DU
CTI
ON
Min
yak
& K
onde
nsat
(BO
PD
)O
il &
Con
dens
ate
(BO
PD
)G
as (K
BO
EP
D)
Gas
(KB
OE
PD
)Ju
mla
h S
umur
Pro
duks
iN
umbe
r of p
rodu
ctio
n w
ells
3.P
EN
AM
BA
HA
N C
AD
AN
GA
N /
AD
DIT
ION
AL
RE
SE
RV
ES
(MM
STB
OE
)Ju
mla
h P
enam
baha
n C
adan
gan
Add
ition
al re
serv
es
4.TE
KN
OLO
GI /
TE
CH
NO
LOG
YT
ekno
logi
Rec
over
yR
ecov
ery
Tech
nolo
gy
Tek
nolo
gi D
rillin
gD
rillin
g Te
chno
logy
Tek
nolo
gi B
aru
New
Tec
hnol
ogy
5.A
NG
GA
RA
N (J
uta)
/ B
UD
GE
T (M
illio
n U
S$)
Ope
rasi
Ope
ratio
nK
apita
lC
apita
lA
ngga
ran
Pen
gem
bang
anD
evel
opm
ent/T
rain
ing
6.S
UM
BE
R D
AY
A M
AN
US
IA (o
rang
) / M
AN
PO
WE
R (p
erso
ns)
TK
IN
atio
nal E
mpl
oyee
sT
KA
Exp
atria
tes
% T
KA
terh
adap
TK
I%
of E
xpat
to N
at.
Att
achm
ent 1
BA
DA
N P
ELA
KS
AN
A K
EG
IATA
N U
SA
HA
HU
LU M
INY
AK
DA
N G
AS
BU
MI
DA
TA K
EG
IATA
N P
ER
US
AH
AA
NU
NTU
K P
EN
GA
JUA
N R
PTK
1.JE
NIS
PE
RU
SA
HA
AN
:K
KK
S /
JOB
2.L
O K
A S
I:
Off
shor
e / O
nsho
re3.
KA
TEG
OR
I:
Eks
plor
asi &
pro
duks
i / P
rodu
ksi /
Eks
plor
asi
4.M
ULA
I BE
RO
PE
RA
SI
:Ta
hun
(xxx
x) E
kspl
oras
iTa
hun
(xxx
x) P
rodu
ksi
NO
ITE
M(N
-3)
(N-2
)(N
-1)
Tahu
n sa
at in
i (N
)(N
+1)
(N+2
)(N
+3)
(N+4
)
1.E
KS
PLO
RA
SI /
EX
PLO
RA
TIO
NLu
as W
ilaya
h (K
m2)
Are
a (s
q.km
)Ju
mla
h S
umur
Pen
gebo
ran
Num
ber o
f exp
lora
tion
wel
lsJu
mla
h K
KK
S/B
lok
Num
ber o
f PS
C/B
lock
s
2.P
RO
DU
KS
I / P
RO
DU
CTI
ON
Min
yak
& K
onde
nsat
(BO
PD
)O
il &
Con
dens
ate
(BO
PD
)G
as (K
BO
EP
D)
Gas
(KB
OE
PD
)Ju
mla
h S
umur
Pro
duks
iN
umbe
r of p
rodu
ctio
n w
ells
3.P
EN
AM
BA
HA
N C
AD
AN
GA
N /
AD
DIT
ION
AL
RE
SE
RV
ES
(MM
STB
OE
)Ju
mla
h P
enam
baha
n C
adan
gan
Add
ition
al re
serv
es
4.TE
KN
OLO
GI /
TE
CH
NO
LOG
YT
ekno
logi
Rec
over
yR
ecov
ery
Tech
nolo
gy
Tek
nolo
gi D
rillin
gD
rillin
g Te
chno
logy
Tek
nolo
gi B
aru
New
Tec
hnol
ogy
5.A
NG
GA
RA
N (J
uta)
/ B
UD
GE
T (M
illio
n U
S$)
Ope
rasi
Ope
ratio
nK
apita
lC
apita
lA
ngga
ran
Pen
gem
bang
anD
evel
opm
ent/T
rain
ing
6.S
UM
BE
R D
AY
A M
AN
US
IA (o
rang
) / M
AN
PO
WE
R (p
erso
ns)
TK
IN
atio
nal E
mpl
oyee
sT
KA
Exp
atria
tes
% T
KA
terh
adap
TK
I%
of E
xpat
to N
at.
Att
achm
ent 1
BA
DA
N P
ELA
KS
AN
A K
EG
IATA
N U
SA
HA
HU
LU M
INY
AK
DA
N G
AS
BU
MI
DA
TA K
EG
IATA
N P
ER
US
AH
AA
NU
NTU
K P
EN
GA
JUA
N R
PTK
BK 1.indd Isi21BK 1.indd Isi21 4/27/2007 9:01:42 AM4/27/2007 9:01:42 AM
-
22
GUIDELINES
Man
pow
er U
tiliz
atio
n Pl
an (R
PTK)
Atta
chm
ent 2
Attachment 2(Lampiran I hal. 1 Kepmen 228/2003)
R.P.T.K.A.
1. Nama Perusahaan/Proyek :
2. Alamat di Indonesia :a. Kantor Pusat :b. Kantor Cabang :c. Nomor Telepon : Fax : d. E-Mail (harus diisi) :
3. Nama Pimpinan :
4. Lokasi Kegiatan/Produksi *) :
5. Jenis Usaha/Hasil Usaha :
6. Nomor SIUP : Tanggal :
7. Status Badan Usaha : PMA/PMDN/PROYEK/LEMBAGA/YAYASAN/PERUSAHAAN SWASTA NASIONAL/ASING**)
8. Instansi Pemberi Ijin Usaha :
*) Lokasi sampai Daerah Tingkat II (Kabupaten/Kota)**) Coret yang tidak perlu
DAFTAR ISIANRENCANA PENGGUNAAN TENAGA KERJA DALAM RANGKA PENGGUNAAN
TENAGA KERJA ASING
BADAN PELAKSANA KEGIATAN USAHA HULU MINYAK DAN GAS BUMI
BK 1.indd Isi22BK 1.indd Isi22 4/27/2007 9:01:43 AM4/27/2007 9:01:43 AM
-
23
GUIDELINES
Man
pow
er U
tiliz
atio
n Pl
an (R
PTK)
Atta
chm
ent 3
Atta
chm
ent 3
BAD
AN P
ELAK
SAN
A K
EGIA
TAN
USA
HA
HU
LU M
INYA
K D
AN G
AS B
UM
I
Nam
a B
agia
n/Se
ksi 5
67
23
4JO
B1
EEDA CB
C D
Ket
.K
et.
KK
KS
Indo
nesi
aR
PTK
200
3 - 2
007
MD
1 - H
alam
an :
BAG
AN O
RG
ANIS
ASI
8JO
B A B
BK 1.indd Isi23BK 1.indd Isi23 4/27/2007 9:01:43 AM4/27/2007 9:01:43 AM
-
24
GUIDELINES
Man
pow
er U
tiliz
atio
n Pl
an (R
PTK)
Atta
chm
ent 4
MD
- 2
(Lam
p. I
hal 2
&3
Kep
men
228
/200
3)
KKKS
:PE
RIO
DE
:
12
34
12
34
12
34
PEN
DID
IKAN
PEN
GAL
AMAN
*) B
atas
an J
abat
an K
eten
tuan
Pem
erin
tah
Tang
gal
:
Atta
chm
ent 4
Dis
etuj
ui P
impi
nan
Terti
nggi
KKK
S
BATA
SAN
*)
WAK
TUH
AL.
KOO
RD
.Th
n
..Th
n
..Th
n
..
BA
DA
N P
ELAK
SAN
A K
EGIA
TAN
USA
HA
HU
LU M
INYA
K D
AN
GAS
BU
MI
BAG
AN P
EREN
CAN
AAN
PEN
GG
UN
AAN
& P
ENG
GAN
TIAN
TK
A
MD
- 1
NAM
A JA
BATA
NN
AMA
TKA
NAM
A TK
I PE
ND
AMPI
NG
/ PE
NG
GAN
TI
WAK
TU P
ENG
GU
NAA
N &
PEN
GG
ANTI
AN T
KAPE
ND
IDIK
AN &
PEN
GAL
AMAN
KER
JA T
KIJA
BATA
N
MU
LAI
DIG
UN
AKAN
BK 1.indd Isi24BK 1.indd Isi24 4/27/2007 9:01:44 AM4/27/2007 9:01:44 AM
-
25
GUIDELINES
Man
pow
er U
tiliz
atio
n Pl
an (R
PTK)
Atta
chm
ent 5
Attachment 5(Lampiran I hal. 4 Kepmen 228/2003)
PENDIDIKAN PENGALAMAN KERJA1 2 3 4 5
BADAN PELAKSANA KEGIATAN USAHA HULU MINYAK DAN GAS BUMI
URAIAN SINGKAT PEKERJAAN DAN PERSYARATAN MINIMUMJABATAN TENAGA KERJA ASING
PERSYARATAN MINIMUMNO NAMA JABATAN URAIAN SINGKAT PEKERJAAN/JABATAN
BK 1.indd Isi25BK 1.indd Isi25 4/27/2007 9:01:45 AM4/27/2007 9:01:45 AM
-
26
GUIDELINES
Man
pow
er U
tiliz
atio
n Pl
an (R
PTK)
Atta
chm
ent 6
NAM
A RE
NCAN
AJA
BATA
NPE
NEM
PATA
NYA
NG D
IDUD
UKI
JABA
TAN
DALA
M
LUAR
TKA
SEKA
RANG
PERU
SAHA
ANPE
RUSA
HAAN
*)1
23
45
67
89
10
*) Ka
lau D
iklat
dila
ksan
akan
dil
uar P
erus
ahaa
n ha
rap
dis
ebut
kan
Lem
baga
Dikl
at
da
n ala
mat
nya.
Jaka
rta,
.
Pim
pina
n,
SEBA
GAI P
ENGG
ANTI
TKA
DAN
PELA
TIHA
N
JENI
S
Atta
chm
ent 6
(Lam
piran
I ha
l. 5 K
epM
en 2
28/2
003)
BADA
N PE
LAKS
ANA
KEGI
ATAN
USA
HA H
ULU
MIN
YAK
DAN
GAS
BUM
I
PROG
RAM
PEN
DIDI
KAN
DAN
PELA
TIHA
N TE
NAGA
KER
JA IN
DONE
SIA
LAM
ANYA
NAM
A(M
ULAI
PEN
GGAN
TIAN
)
YANG
DIP
ERSI
APKA
N UN
TUK
MEN
GGAN
TIKA
N TE
NAGA
KER
JA A
SING
No.
PEND
IDIK
AN &
PEL
ATIH
ANTK
I YAN
G DI
LATI
HPE
LAKS
ANAA
N PE
NDID
IKAN
KETE
RANG
ANYA
NG D
ILAK
SANA
KAN
Att
achm
ent 6
(Lam
pira
nI h
al. 5
Kep
Men
228/
2003
)
NAM
A RE
NCAN
AJA
BATA
NPE
NEM
PATA
NYA
NG D
IDUD
UKI
JABA
TAN
DALA
M
LUAR
TKA
SEKA
RANG
PERU
SAHA
ANPE
RUSA
HAAN
*)1
23
45
67
89
10
*) Ka
lau D
iklat
dila
ksan
akan
dil
uar P
erus
ahaa
n ha
rap
dis
ebut
kan
Lem
baga
Dikl
at
da
n ala
mat
nya.
Jaka
rta,
.
Pim
pina
n,
SEBA
GAI P
ENGG
ANTI
TKA
DAN
PELA
TIHA
N
JENI
S
Atta
chm
ent 6
(Lam
piran
I ha
l. 5 K
epM
en 2
28/2
003)
BADA
N PE
LAKS
ANA
KEGI
ATAN
USA
HA H
ULU
MIN
YAK
DAN
GAS
BUM
I
PROG
RAM
PEN
DIDI
KAN
DAN
PELA
TIHA
N TE
NAGA
KER
JA IN
DONE
SIA
LAM
ANYA
NAM
A(M
ULAI
PEN
GGAN
TIAN
)
YANG
DIP
ERSI
APKA
N UN
TUK
MEN
GGAN
TIKA
N TE
NAGA
KER
JA A
SING
No.
PEND
IDIK
AN &
PEL
ATIH
ANTK
I YAN
G DI
LATI
HPE
LAKS
ANAA
N PE
NDID
IKAN
KETE
RANG
ANYA
NG D
ILAK
SANA
KAN
Att
achm
ent 6
(Lam
pira
nI h
al. 5
Kep
Men
228/
2003
)
YANG
DIP
ERSI
APKA
N UN
TUK
PENG
GAN
TI T
ENAG
A KE
RJA
ASIN
G
BK 1.indd Isi26BK 1.indd Isi26 4/27/2007 9:01:45 AM4/27/2007 9:01:45 AM
-
27
GUIDELINES
Man
pow
er U
tiliz
atio
n Pl
an (R
PTK)
Atta
chm
ent 7
K.K
.K.S
.
:
..P
ER
IOD
E
:
..
NO
.K
elo
mp
ok
Jab
atan
Fo
rmas
iM
anp
ow
erF
orm
asi
Man
po
wer
Fo
rmas
iF
orm
asi
Fo
rmas
iF
orm
asi
Ke
1K
e 2
Ke
3
1. P
rod
uct
ion
- A
PO
Pro
duct
Ope
ratio
ns -
Com
./Pla
nnin
g/JI
- D
rillin
g -
Lea
d T
eam
- O
pera
tiona
l Tec
hnic
al -
SH
E S
ub T
otal
2. E
xplo
rati
on
3. G
as M
arke
tin
g
4. U
pst
ream
Bu
ssin
ess
Ser
vice
s -
Aud
it -
Con
trol
lers
- F
asili
ties
- G
loba
l Inf
orm
atio
n S
yste
m -
Pro
cure
men
t S
ervi
ces
- J
akar
ta S
ecur
ity
- T
ax -
Tre
asur
y S
ub T
otal
5. L
aw
6. M
edic
ine
& O
ccu
pat
ion
al H
ealt
h
7. P
ub
lic A
fair
s
8. H
um
an R
eso
urc
es
Ju
mla
h
No
n S
taf
Att
ach
men
t 7
For
mul
ir :
MD
3H
alam
an 1
Ten
aga
Ker
jaT
iap
Tah
un
BA
DA
N P
EL
AK
SA
NA
KE
GIA
TA
N U
SA
HA
HU
LU
MIN
YA
K D
AN
GA
S B
UM
IR
EK
AP
ITU
LA
SI J
UM
LA
H F
OR
MA
SI J
AB
AT
AN
, TE
NA
GA
KE
RJA
AS
ING
/TE
NA
GA
KE
RJA
IND
ON
ES
IAD
AN
RE
NC
AN
A P
EN
G-I
ND
ON
ES
IAA
N
TK
WN
AP
TK
IJu
mla
hR
enca
na
Pen
g-I
nd
on
esia
anS
taff
BK 1.indd Isi27BK 1.indd Isi27 4/27/2007 9:01:46 AM4/27/2007 9:01:46 AM
-
28
GUIDELINES
Man
pow
er U
tiliz
atio
n Pl
an (R
PTK)
Atta
chm
ent 8
Dep
t:
KK
KS
:Ar
ea:
PER
IOD
E:
Hal
aman
:
12
34
12
34
12
34
12
34
NAM
A JA
BAT
AN *)
UR
AIAN
JAB
ATAN
THN
THN
THN
NAM
A PE
RU
SAH
AAN
DAN
N
EGAR
A TU
JUAN
SW
APPI
NG
THN
HAL
KO
OR
D.
NAM
A JA
BAT
AN *)
UR
AIAN
JAB
ATAN
MD
- 1
BAD
AN P
ELAK
SAN
A K
EGIA
TAN
USA
HA
HU
LU M
INYA
K D
AN G
AS B
UM
IPR
OG
RAM
PER
TUK
ARAN
PEK
ERJA
INTE
RN
ASIO
NAL
WAK
TU P
ELAK
SAN
AAN
N
AMA
JAB
ATAN
DI I
ND
ON
ESIA
NAM
A JA
BAT
AN D
I LU
AR N
EGER
I
Atta
chm
ent 8
MD
4
Dep
t:
KK
KS
:Ar
ea:
PER
IOD
E:
Hal
aman
:
12
34
12
34
12
34
12
34
NAM
A JA
BAT
AN *)
UR
AIAN
JAB
ATAN
THN
THN
THN
NAM
A PE
RU
SAH
AAN
DAN
N
EGAR
A TU
JUAN
SW
APPI
NG
THN
HAL
KO
OR
D.
NAM
A JA
BAT
AN *)
UR
AIAN
JAB
ATAN
MD
- 1
BAD
AN P
ELAK
SAN
A K
EGIA
TAN
USA
HA
HU
LU M
INYA
K D
AN G
AS B
UM
IPR
OG
RAM
PER
TUK
ARAN
PEK
ERJA
INTE
RN
ASIO
NAL
WAK
TU P
ELAK
SAN
AAN
N
AMA
JAB
ATAN
DI I
ND
ON
ESIA
NAM
A JA
BAT
AN D
I LU
AR N
EGER
I
Atta
chm
ent 8
MD
4
BK 1.indd Isi28BK 1.indd Isi28 4/27/2007 9:01:47 AM4/27/2007 9