quality assurance tqm ss05.06
Embed Size (px)
TRANSCRIPT
-
8/12/2019 Quality Assurance TQM Ss05.06
1/36
TOTAL QUALITY MANAGEMENT:
TQM
Origins, Evolution & key elements
-
8/12/2019 Quality Assurance TQM Ss05.06
2/36
What is Quality?
Quality is fitness for use
(Joseph Juran)
Quality is conformance to requirements
(Philip B. Crosby)
Quality of a product or services is its ability to satisfythe needs and expectations of the customer
-
8/12/2019 Quality Assurance TQM Ss05.06
3/36
Evolution of Quality Management
Inspection
Quality
Control
Quality
Assurance
TQM
Salvage, sorting, grading, blending, corrective
actions, identify sources of non-conformance
Develop quality manual, process performance
data, self-inspection, product testing, basic
quality planning, use of basic statistics,
paperwork control.
Quality systems development, advanced quality
planning, comprehensive quality manuals, use of
quality costs, involvement of non-production
operations, failure mode and effects analysis, SPC.
Policy deployment, involve supplier & customers,
involve all operations, process management,
performance measurement, teamwork, employee
involvement.
-
8/12/2019 Quality Assurance TQM Ss05.06
4/36
Demings view of a production as a system
Consumer
Research
Design &
redesign
Receipt & test of
materials
Suppliers,
materials &
equipment
Production,
assembly,
inspection
Distribution Consumers
Test of processes, machines,
methods, cost
-
8/12/2019 Quality Assurance TQM Ss05.06
5/36
Improve Quality
Productivity improves
Provide jobs and
more jobs
Demings Chain Reaction
Cost decreases because
of less rework, fewer
mistakes, fewer delays,
snags, better use of
machine time and
materialsStay in business
Capture the market with
better quality and lower price
-
8/12/2019 Quality Assurance TQM Ss05.06
6/36
What is TQM?
Constant drive
for continuousimprovement and
learning.
Concern for
employee
involvement anddevelopment
Management
by Fact
Result Focus Passion to delivercustomer value /
excellence
Organisation
responseability
Actions not just
words(implementation)
Process
Management
Partnership
perspective(internal /
external)
-
8/12/2019 Quality Assurance TQM Ss05.06
7/36
BASIC PRINCIPLES OF TQM
Approach Management Led
Scope Company Wide
Scale Everyone is responsible for Quality
Philosophy Prevention not Detection
Standard Right First Time
Control Cost of Quality
Theme On going Improvement
-
8/12/2019 Quality Assurance TQM Ss05.06
8/36
W Edwards Demings 14 PointsCreate constancy of purpose towards improvement
of product and services.
Adopt the new philosophy. We can no longer live
with commonly accepted levels of delays, mistakes,
defective workmanship.
Cease dependence on mass inspection. Require,
instead, statistical evidence that quality is built in.
End the practice of awarding business on the basis of
price tag.
1)
2)
3)
4)
-
8/12/2019 Quality Assurance TQM Ss05.06
9/36
W Edwards Demings 14 PointsFind problems. It is managements job to work
continually on the system.
Institute modern methods of training on the job.
Institute modern methods of supervision of
production workers. The responsibility of foremen
must be changed from numbers to quality.
Drive out fear that everyone may work effectively for
the company.
5)
6)
7)
8)
-
8/12/2019 Quality Assurance TQM Ss05.06
10/36
Break down barriers between departments.
Eliminate numerical goals, posters and slogans for
the workforce asking for new levels of productivity
without providing methods.
Eliminate work standards that prescribe numerical
quotas.
Remove barriers that stand between the hourly
worker and his right to pride of workmanship.
9)
10)
11)
12)
W Edwards Demings 14 Points
-
8/12/2019 Quality Assurance TQM Ss05.06
11/36
Institute a vigorous programme of education and
retraining.
Create a structure in top management that will push
everyday on the above 13 points.
13)
14)
W Edwards Demings 14 Points
-
8/12/2019 Quality Assurance TQM Ss05.06
12/36
PLAN
CHECK
DOACT
The Deming Cycle or PDCA Cycle
Plan a change to the process. Predict the
effect this change will have and plan how
the effects will be measured
Implement the change on
a small scale and measure
the effects
Adopt the change as a
permanent modification
to the process, or
abandon it.
Study the results to
learn what effect the
change had, if any.
-
8/12/2019 Quality Assurance TQM Ss05.06
13/36
Demings System of Profound Knowledge
Appreciation for
system
Knowledge
about variation
Theory aboutknowledge
Knowledge ofpsychology
-
8/12/2019 Quality Assurance TQM Ss05.06
14/36
Learning
LEARNING AND TQM
Process Improvement
Quality Improvement
Customer
Satisfaction
Shareholder
Satisfaction
Employee
Satisfaction
-
8/12/2019 Quality Assurance TQM Ss05.06
15/36
Philip Crosbys Four Absolutes
Definition : Conformance to
requirements
System of quality isprevention
Performance Standard :
Zero Defects
Measurement : Price of non-
conformance (PON)
What is Quality?
What system is neededto cause quality?
What performance
standard should be
used?
What measurement
system is required?
-
8/12/2019 Quality Assurance TQM Ss05.06
16/36
Crosbys Successful Company
Characteristics of the Eternally Successful
Organisation
People do things right routinely
Growth is profitable and steady
Customer needs are anticipated
Change is planned and managed
People are proud to work there
-
8/12/2019 Quality Assurance TQM Ss05.06
17/36
Joseph M. Jurans Quality Trilogy
Quality Planning
Establish quality goals
Identify customer needs
Translate needs into our
language
Develop a product forthese needs
Optimise product
features for these needs
Quality Control
Prove the process can
produce underoperating conditions
Transfer process to
operation
Quality
Improvement
Seek to optimise theprocess via tools of
diagnosis
-
8/12/2019 Quality Assurance TQM Ss05.06
18/36
1) Identify who are the customers2) Determine the customers needs
3) Translate the needs into our language
4) Develop a product to meet those needs
5) Optimise a product so as to meets our needs
as well as the customers.
6) Develop a process which is able to produce the
product
7) Optimise the process
8) Prove the process can make the product
under operating conditions
Jurans Quality Planning Road Map
-
8/12/2019 Quality Assurance TQM Ss05.06
19/36
Joseph M.Juran and the Cost Of Quality
2 types of costs:
Unavoidable Costs: preventing defects (inspection,
sampling, sorting, QC)
Avoidable Costs: defects and product failures
(scrapped materials, labour for re-work, complaint
processing, losses from unhappy customers
Gold in the Mine
-
8/12/2019 Quality Assurance TQM Ss05.06
20/36
Joseph M.Juran and the Cost Of Quality
100% defective Point of Enough
quality
Total
CostsUnavoidable
costs
Avoidablecosts
Costs
-
8/12/2019 Quality Assurance TQM Ss05.06
21/36
FOUR KEY PRINCIPLES
Measure quality so you can affect it
Focus on a moving customer
Involve every employee
Think long term - Act short term
-
8/12/2019 Quality Assurance TQM Ss05.06
22/36
THE CASE FOR QUALITY
1 Success of competitors who take quality seriously
2 Rising expectations of customers
3 Quality differentiates companies from thecompetition
4 Narrowing of supplier bases by quality conscious
companies
.
-
8/12/2019 Quality Assurance TQM Ss05.06
23/36
5 Growing evidence that growth in market
share comes from sustained quality.
6 Cost advantages
7 High cost of catastrophic failure
8 Inspection poor substitute for right first time
THE CASE FOR QUALITY
-
8/12/2019 Quality Assurance TQM Ss05.06
24/36
SEVEN DEADLY SINS OF TQM
Flight to nowhere
One size fits all
Substituting TQM for leadership
Inside - Out indicators
Mandatory religion
Quality kept as a separate activity
Teaching to the test
-
8/12/2019 Quality Assurance TQM Ss05.06
25/36
IS QUALITY A SOUND INVESTMENT?
Year Company Stock Growth (Oct 94)
1988 Motorola 373.0%
1988 Westinghouse (CNFD) - 49.6%1989 Xerox (BPS) 75.9%
1990 General Motors 1.6%
1990 Federal Express 10.6%
1990 IBM (IBM Rochester) - 34.9%
1991 Selectron 526.9%
1992 AT&T (UCS) 32.2%
1992 AT&T (TSBU) 32.2%
1992 Texas Instruments (DS&E) 106.8%
1993 Zyta 8.4%1994 Eastman Chemical 18.5%
Total Stock Value 23016 (91.8% growth)
Standard & Poor 500 Stock value 15911 (32.6% growth)Source: US Dept. of Commerce Study 1995
-
8/12/2019 Quality Assurance TQM Ss05.06
26/36
Quality is a Journey,
not a Destination
-
8/12/2019 Quality Assurance TQM Ss05.06
27/36
RecordsControl
Audit
Management
Responsibilities
SystemStructure
Resources PersonnelMaterial
Responsibilities
Management review
Objectives
Policy
Interface with
customer
Elements of the ISO 9000 Standards
-
8/12/2019 Quality Assurance TQM Ss05.06
28/36
Contents of The DEP
The Role of Quality assurance.
Q/A in project management.
Contract & Procurement Q/A.Design Q/A.
Procurement Q/A.
Construction & Commissioning Q/A.
Typical contents of different type of PQP.
-
8/12/2019 Quality Assurance TQM Ss05.06
29/36
Project Quality Plan
Definition
The project quality plan is a documented description
of the project management system and must be
approved by the AEM, in part to demonstrate hiscommitment to quality but primarily it is the means by
which technical and administrative authorities are
delegated through out the project.
All projects shall have quality plan.
Project engineer shall develop and update the PQP..
-
8/12/2019 Quality Assurance TQM Ss05.06
30/36
Relationships between project quality plans
PQP
ADCO
PQPDesigner
PQP
construction
contractor
Suppliersquality plans
-
8/12/2019 Quality Assurance TQM Ss05.06
31/36
CONTENTS OF TYPICAL PROJECT QUALITY PLAN
-
8/12/2019 Quality Assurance TQM Ss05.06
32/36
CONTENTS OF TYPICAL PROJECT QUALITY PLAN
1. COVER SHEET + REVISION CONTROL
1.1 Document purpose
1.2 Policy statement
2.INTRODUCTION
2.1 Background
2.2 Project Scope
2.3 Project Objectives & Constraints
2.4 QA Standards (Consider putting in Document purpose)
-
8/12/2019 Quality Assurance TQM Ss05.06
33/36
CONTENTS OF TYPICAL PROJECT QUALITY PLAN
3. EXECUTION STRATEGY
3.1 Project Management risks.
3.2 Critical Activities.
3.3 Control Strategy.
3.4 Cost & Schedule.
3.5 HSE Plan.
3.6 Commissioning & Hand-over.
CONTENTS OF TYPICAL PROJECT QUALITY PLAN
-
8/12/2019 Quality Assurance TQM Ss05.06
34/36
CONTENTS OF TYPICAL PROJECT QUALITY PLAN
4.ORGANISATION, RESPONSIBILITES & INTERFACES4.1 Table with names
4.2 External interfaces
4.3 Definition of specific roles and responsibilities.
5. QUALITY REFERENCE SYSTEM
5.1 Controlling Documents
5.2 Applicable Procedures (Check list based)
6. INTEGRATION OF CONTRACTORS & SUPPLIERS
6.1 Define Contractor interfaces.
6.2 Contractor + Supplier Quality System.
-
8/12/2019 Quality Assurance TQM Ss05.06
35/36
CONTENTS OF TYPICAL PROJECT QUALITY PLAN
7.AUDITS & REVIEWS
This section should include schedule for all audits and reviews
planned during the project execution period
8. QUALITY IMPROVEMENT
8.1 LESSONS LEARNT
8.2 CLOSE-OUT REPORT
-
8/12/2019 Quality Assurance TQM Ss05.06
36/36
CONTENTS OF TYPICAL PROJECT QUALITY PLAN
PREPARATION & APPROVALS:
PREPARE: Student
APPROVE: Supervisor
Timing
The Student shall develop the PQP immediately after receiving the
Assignment and agree the project.