rebuild components - hastings deering

6
REBUILD COMPONENTS AS NEW LIFE. MAXIMUM VALUE. NEW EXCHANGE REBUILD REPAIR REPAIR OPTIONS

Upload: others

Post on 25-Oct-2021

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REBUILD COMPONENTS - Hastings Deering

R E B U I L DC O M P O N E N T S

A S N E W L I F E .M A X I M U M V A L U E .

N E W

E X C H A N G E

R E B U I L D

R E P A I R

N E W

E X C H A N G E

R E B U I L D

R E P A I R

N E W

E X C H A N G E

R E B U I L D

R E P A I R

N E W

E X C H A N G E

R E B U I L D

R E P A I R

REPAIR OPTIONS

Page 2: REBUILD COMPONENTS - Hastings Deering

C O M P O N E N T R E B U I L D - A S N E W L I F E . M A X I M U M V A L U E .

Cat® Certified Rebuild programs help you benefit from the multiple lives designed into Cat machines, power trains and major components. They are “built to be rebuilt” for maximum value and longer life. Maximise the investment in your asset with full utilisation of a second life, at a fraction of the cost of buying new.

• Full utilisation of a second life for maximum lifetime value

• Tailor to your needs - rebuild part or all

• Includes latest critical engineering updates

• Best technicians with state-of-art tooling and workshops

• Transferable 24 months / 4000 hours parts and service warranty*

• Access to HDAdvantage™ advanced condition monitoring

• Reduced waste by reusing and recycling quality material

• Finance options available

C H O O S E A C E R T I F I E D R E B U I L D P R O G R A M T H A T ' S R I G H T F O R Y O U .

*Certified Rebuild terms and conditions apply.

Maximum value - rebuild the entire machine and recover all of its performance and productivity. Plus benefit from the latest engineering updates. All at a fraction of the cost of new and with extended parts and service warranty coverage.*

C E R T I F I E D R E B U I L D

A focused rebuild program to renew your excavator’s hydraulic systems performance.

C E R T I F I E D H Y D R A U L I C R E B U I L D

Marine propulsion, generator sets, pumps, and other power applications. Rebuilding your Cat engines maximises your investment in Cat durability, dependability and performance.

C E R T I F I E D E N G I N E R E B U I L D

Everything from the machine’s radiator to the wheels or sprockets. Renew power train performance and productivity. Extend the productive life of your equipment.

C E R T I F I E D P O W E R T R A I N R E B U I L D

C E R T I F I E D M A C H I N E C O M P O N E N T R E B U I L D

Get the most from your machine. Restore your engine, transmission, torque converter, axle assemblies or final drives to like-new performance. Backed with 24 months / 4000 hours parts and service warranty coverage.*

Page 3: REBUILD COMPONENTS - Hastings Deering

T A I L O R T O Y O U R N E E D S

T H E R E B U I L D P R O C E S S , S T E P B Y S T E P

Cat components are “built to be rebuilt”. With access to extensive industry component performance data, your equipment specialist can provide expert advice on the operational performance of your machine better than anyone else, to design the best rebuild for your needs.

Accessing state-of-art tooling, workshops and proprietary know-how ensures your Cat components can be rebuilt again and again. Our expertise regarding critical component wear limits means replacing the right parts, at the right time. Helping you avoid unnecessary and expensive full component replacements at or before the next rebuild.

Benefit from the highest standard of work and quality assurance procedures.

STANDARD REBUILD CAT CERTIFIED REBUILD

Improve reliability and availability of your machine with reduced downtime Restores to like-new performance

Range of parts replacement options: new, exchange, salvage or reuse Like-new rebuild level for components

Mix and match rebuild levels for different components to meet your needs Latest critical engineering updates

12-month parts warranty coverage Transferable 24-month / 4000-hour parts and service warranty coverage*

Access to advanced condition monitoring with HDAdvantage™ program.

Full utilization of a second life for max value

S T E P 1 . I N S P E C T I O N / E V A L U A T I O N

Power train rebuilds involve up to 200 tests and inspections. To begin with, fluid analysis, visual inspections, andmaintenance procedure reviews are carried out to determine a customized rebuild plan and an accurate cost estimate.

S T E P 2 . D I S A S S E M B L Y

The power train is disassembled. All Level 1 parts, hoses, belts, seals, gaskets, bearings, knobs, wiring, switchesand gauges are replaced with new parts. Remaining Level 2 and 3 parts are inspected and measured againststrict reusability guidelines. Any parts that don’t meet the guidelines are either replaced with new or Cat Remanparts, or reconditioned to meet specifications.

S T E P 3 . E N G I N E E R I N G U P D A T E S

Improvements introduced after the original date of manufacture are incorporated.

S T E P 4 . P O W E R T R A I N P A R T S I N S P E C T I O N

Engine, fuel system, transmission, torque converter, differential, final drives and radiator are inspected, reconditioned and updated with new or qualified parts. Each component is thoroughly bench-tested before reinstallation.

S T E P 5 . R E A S S E M B L Y

All critical torques, clearances and pressure settings are maintained and recorded. Engine wiring harnesses are always replaced. Other wiring is replaced on full machine rebuilds only.

S T E P 6 . P E R F O R M A N C E T E S T I N G A N D A D J U S T I N G

Rigorous testing ensures quality control. Standard tests include: turbocharger boost, throttle response, stall speedrpm, transmission and steering clutch response, plus hydraulic and pilot relief valve pressures. Contaminationcontrol procedures recommended by Caterpillar are implemented to maximize system cleanliness.

S T E P 7 . C U S T O M E R E V A L U A T I O N

The rebuild process is complete only when the customer is satisfied with the performance of the power train in its working environment.

Page 4: REBUILD COMPONENTS - Hastings Deering

G U A R A N T E E D C O V E R A G E

The process extends beyond just a rebuilt component or piece of equipment. Its value increases with 24 months / 4000 hours parts and service warranty coverage for each rebuild.* Visit hastingsdeering.com.au/rebuild for details, terms and conditions.

M O D E L A V A I L A B I L I T Y

ARTICULATED TRUCKS725,730, 735, 740, 740B

TRACK SKIDDERS527

COMPACTORS836, 815B/F, 816B/F, 825G,826C/G/H, 836G/H/K

TRACK-TYPE TRACTORSD10N/R/T/T2, D11N/R/T, D5B/G/H/K/M/N,D6H/K/M/N/R/T, D7E, D7G/H/R, D8L/N/R/T, D9L/N/R/T

ENGINES3116, 3306, 3406A/B/C, 3408A/B/C/E, 3412A/C, 3456, 3508A/B, 3512A/B/C, 3516A/B, 3606, 3608, 3612, 3616, 3618, 3126B, C7, C9, C10, C11, C12, C13, C15, C18,C27, C32

G3304, G3306, G3406, G3408, G3412, G3508, G3512, G3516A/B/C, G3520C, G3606A/B, G3608, G3612, G3616, PM3516

TRACK-TYPE TRACTOR PIPELAYERS578, 589, 561D, 572R

HYDRAULIC EXCAVATORS320A/B/C/D/N/S, 322A/B, 325, 330A/B/C/D, 350, 375, 5080, 5130A/B, 5230, 245B/D, 312C, 318C, 319C/D, 323D, 324D, 325A/B/C/D, 328D, 329D, 332C, 336D/E, 336E, 345B/C/D, 349D/E, 365B/C, 374D/F, 375,385B/C, 390D, 5110B, 568FM, M315A/C/D, M316C/D, M320, M322C/D, M325C/D

UNDERGROUND MINING TRUCKSAD30, AD45A/B, AD55A/B, AD60, AE40

INTEGRATED TOOLCARRIERSIT28B/F/G/H, IT62G/H

WHEEL EXCAVATORSM316D, M318A/C/D, M322C, M325D

UNDERGROUNDMINING LOADERSR1300G, R1600A/G/H, R1700G, R2900A/G/H, R3000H

WHEEL LOADERS994, 914G, 924G/H, 928F/G/H, 930A/G/H/K, 936F, 938F/G/H/K, 950B/E/F/G/H/K, 960F, 962G/H, 966D/E/F/G/H/K, 970F, 972G/H/K, 980C/F/G/H/K/M, 988B/F/G/H/K, 990A/H/K, 992C/D/G/K, 993K,994D/F/H, 996H

MOTOR GRADERS120G/H/K, 12G/H/M, 130G, 135H, 140G/H/K/M, 143H, 14H/M, 160H/K/M, 163H,16G/H/M, 24H/M

WHEEL TRACTOR SCRAPERS613C, 615C, 621E/F/G, 623E/F/G/H, 627E/F/G,631E/G, 633D/E, 637D/E/G, 651E, 657E, 657G

OFF-HIGHWAY TRUCKS769C/D, 770, 771C/D, 772, 773B/D/E/F/G, 775B/D/E/F,776B/D, 777A/B/C/D/E/F/G, 785A/B/C/D, 789A/B/C/D/D XQ, 793A/B/C/C XQ/D/F, 797A/B/F

WHEEL DOZERS814A/B/F/G, 815, 844, 824C/G/H, 826G,834B/G/H/K, 844H, 854G/K

WELL STIMULATIONPUMP TRAILERSSPF343, SPF343C

WHEEL SKIDDERS515, 525, 545, 518C, 525B/C, 535B/C, 545C/D, 621G, 637G

TRACK-TYPE LOADERS953A/B/C/D, 963, 973, 933C, 939C, 953B, 963B/C/D,973C/D, 977L

Visit hastingsdeering.com.au for a full list of Certified Rebuild model availabilities, terms and conditions.

Page 5: REBUILD COMPONENTS - Hastings Deering

They might be our people, but they really work for you. Hastings Deering understands your industry, we know what keeps it moving and our expert teams know everything about the equipment we sell. Whether you are balancing cost versus downtime, looking to extend component life or wanting to keep your own iron, you can rely on us to go the extra mile to provide uncompromising service.

Available anywhere, anytime for advice or support, our people are just one of the advantages of partnering with Hastings Deering.

OUR TEAM, YOUR ADVANTAGE.

P E O P L E Y O U K N O W Y O U C A N C O U N T O N

U N D E R S T A N D I N G Y O U R R E P A I R O P T I O N S

• Optimum reliability• All new iron• Upgrades• 12 months warranty

• Convenience• Shortest Downtime• Eco-friendly option• 12 months warranty

• Known component history

• Retain own iron• 12 month warranty

• Lowest cost• Extended life• Parts re-use• New parts warranty

ATTRIBUTES

New life "As new" life "As new" life Repair to scheduled lifePEACE OF MIND

100% 65 - 85% of new 50 - 65% of new 25 - 50% of new

Fastest (ex stock) Fastest Fast Flexible

PRICE GUIDE

TURNAROUND

NEW EXCHANGE REBUILD REPAIRREPAIR OPTION

MACHINE DOWNTIME

BUDGET

PEACE OF MINDAssured

Fixed

Minimal

Managed

Variable

Flexible

*Certified Rebuild terms and conditions apply.

Page 6: REBUILD COMPONENTS - Hastings Deering

BRO01 03/17

For more information, speak to one of our Equipment Specialists:

CALL 1300 186 248

*T&C’s apply - visit hastingsdeering.com.au details.

N E W

E X C H A N G E

R E B U I L D

R E P A I R

N E W

E X C H A N G E

R E B U I L D

R E P A I R

N E W

E X C H A N G E

R E B U I L D

R E P A I R

N E W

E X C H A N G E

R E B U I L D

R E P A I R